KR20040027773A - The processing facilities of sepatie - Google Patents
The processing facilities of sepatie Download PDFInfo
- Publication number
- KR20040027773A KR20040027773A KR1020040014454A KR20040014454A KR20040027773A KR 20040027773 A KR20040027773 A KR 20040027773A KR 1020040014454 A KR1020040014454 A KR 1020040014454A KR 20040014454 A KR20040014454 A KR 20040014454A KR 20040027773 A KR20040027773 A KR 20040027773A
- Authority
- KR
- South Korea
- Prior art keywords
- workpiece
- forging process
- processed
- process part
- semi
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21K—MAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
- B21K27/00—Handling devices, e.g. for feeding, aligning, discharging, Cutting-off means; Arrangement thereof
- B21K27/02—Feeding devices for rods, wire, or strips
- B21K27/04—Feeding devices for rods, wire, or strips allowing successive working steps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J5/00—Methods for forging, hammering, or pressing; Special equipment or accessories therefor
- B21J5/02—Die forging; Trimming by making use of special dies ; Punching during forging
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B30—PRESSES
- B30B—PRESSES IN GENERAL
- B30B15/00—Details of, or accessories for, presses; Auxiliary measures in connection with pressing
- B30B15/30—Feeding material to presses
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forging (AREA)
Abstract
Description
본 발명은 콘크리트를 타설하기 위한 거푸집을 설치할 때 사용되는 세파타이의 가공장치에 관한 것으로서, 좀더 구체적으로는 환봉상의 소재를 순차적으로 투입하기 위한 공지의 소재투입장치와 연계되는 상태로 투입된 양단에 나사부가 가공된 반 가공소재를 단조공정으로 이송시킴과 동시에 단조공정에서 가공된 소재를 차기의 형상 및 절단 공정으로 이송시키기 위한 소재이송구조를 둠과 동시에 이 소재 이송구조와 연계되는 상태로 이송되어온 소재의 일부분을 평판상으로 가공하는 단조공정부와, 단조공정이 완료된 소재를 형상가공과 두개로 양분되게 절단하는 형상 및 절단 공정부를 구비토록 함으로써 세파타이의 가공 시 요구되는 프레싱 공정과 펀칭공정을 단일 라인에서 일련된 연속 공정을 통해 처리될 수 있도록 함으로써 제조공정의 단축을 통해 시간과 인력의 낭비를 억제하여 작업능률의 향상과 제조원가의 절감을 기할 수 있도록 한 것이다.The present invention relates to a processing device of the Sepha Tie used when installing the formwork for placing concrete, more specifically, the threaded portion at both ends introduced in a state associated with a known material input device for sequentially inserting the material of the round bar In addition to transferring the processed semi-processed material to the forging process, it also has a material transfer structure for transferring the material processed in the forging process to the next shape and cutting process, and at the same time, the material has been transferred in a state connected with the material transfer structure. Single line for the pressing process and punching process required for the processing of Sepha Tie by providing forging process part for processing a part of the plate into flat shape, shape processing and cutting process part for dividing the material forging process into two parts. Can be processed through a series of continuous processes Suppressing a waste of time and resources through a shaft to be possible to encourage the reduction of production costs and improve the work efficiency.
일반적으로 거푸집은 콘크리트 구조물을 소정의 형태 및 치수로 만들기 위하여 일시 설치하는 구조물로서, 공사 특성에 따라 합판 또는 철판등을 선택 사용하여 거푸집을 구성하게 되며, 그 조립형태로는 세파타이형, 폼 타이형, 프레타이형 등이 사용되고 있다.In general, the formwork is a temporary installation in order to make the concrete structure into a predetermined shape and dimensions, and form the formwork by selecting plywood or steel plate according to the construction characteristics, the form of sepatai, form tie Types, pretai types and the like are used.
상기, 거푸집 조립형태 중 세파타이형 거푸집은 내부에 세파타이를 설치하여 거푸집의 간격을 유지하게 되는데, 이는 거푸집 조립 시 고정핀의 결합을 통한 거푸집의 간격수축을 방지함은 물론 콘크리트 타설시 거푸집의 간격 확장을 방지하는 역할을 하게 되며, 본체볼트 등의 부속품과 함께 벽체 두께를 형성하는데 사용되고 콘크리트 타설 후 거푸집 내부에 매립된다.In the form assembly form, the sephaty type formwork maintains the spacing of the formwork by installing the sephaty inside, which prevents the shrinkage of the formwork through the coupling of the fixing pins during assembling the formwork. It serves to prevent the expansion of the gap, and is used to form the wall thickness together with accessories such as body bolts and embedded in the formwork after the concrete is poured.
이러한 목적으로 사용되는 세파타이는 환봉을 이용하여 가공하게 되는 바 기존의 가공방식은 양단에 이미 수나사부를 가공시킨 환봉을 일차적으로 다이 상에 고정시킨 상태에서 프레스를 통해 환봉의 일부를 납작하게 눌러 일정의 폭과 두께를 형성하여 주는 1차적인 단조 가공을 완료한 다음 이를 2차 공정으로 옮겨 이곳에서 장방형의 핀 홀과 양측에 절단 홈을 가공하는 것이나 이와 같은 기존의 가공방식은 상기한 세파타이의 1차 공정과 2차 공정이 하나의 가공라인에서 일련적으로 이루어지지 못하고 각기 별도의 장소에서 개별적인 공정을 통해 가공되는 것이어서 제조 공정이 많아지고 시간과 인력의 낭비가 초래되어 작업능률과 생산성이 저하되는 것이며,Sepha Thai used for this purpose is processed by using a round bar. The conventional processing method is to press a part of the round bar flat through the press while the round bar is already fixed on the die with the male thread already processed at both ends. After completion of the primary forging process that forms the width and thickness of the metal, it is transferred to the secondary process where the rectangular pinholes and the cutting grooves are machined on both sides. Since the first and second processes cannot be processed in a single processing line in series, but are processed through separate processes in separate locations, the manufacturing process increases and wastes time and manpower, resulting in reduced work efficiency and productivity. Will be
또한 이로 인해 제조원가의 상승과 제품의 경쟁력 저하를 유발하는 폐단이 있었던 것이다.In addition, this led to an increase in manufacturing costs and a reduction in competitiveness of products.
본 발명은 상기와 같은 기존의 구조에서 기인되는 제반 문제점을 해결 보완하기 위하여 안출된 것으로, 본 발명의 목적은 세파타이의 가공 시 요구되는 단조공정과 형상 가공을 위한 형상 및 절단 공정을 단일 라인에서 일련된 연속 공정을 통해 처리될 수 있도록 함으로써 제조공정의 단축을 통해 시간과 인력의 낭비를 억제하여 작업능률의 향상과 제조원가의 절감을 기할 수 있는 거푸집용 세파타이 가공장치를 제공함에 있는 것이며,The present invention has been made to solve the problems caused by the existing structure as described above, the object of the present invention is a forging process and the shape and cutting process for the shape processing required in the processing of the Sepha Tie in a single line It is to provide a form Sepetizer processing device for formwork that can improve the work efficiency and reduce manufacturing cost by reducing the waste of time and manpower by shortening the manufacturing process by allowing it to be processed through a series of continuous processes,
이하, 첨부되는 도면에 의거 본 발명의 구성을 상세하게 설명하면 다음과 같다.Hereinafter, the configuration of the present invention in detail based on the accompanying drawings.
도 1은 세파타이의 일 구성 예를 보이는 사시도.1 is a perspective view showing an example of the configuration of the Sepha Thai.
도 2는 세파타이의 일적용 예를 보이는 단면 예시도.Figure 2 is an exemplary cross-sectional view showing an example of application of Sepha Thai.
도 3은 본 발명의 일적용 예를 보이는 도면.3 is a view showing an application example of the present invention.
도 4는 본 발명의 일 구성 예를 보이는 요부 분리 사시도.Figure 4 is an exploded perspective view of the main portion showing an example of the configuration of the present invention.
도 5(a)내지 도 5(f)는 본 발명의 작동상태를 보이는 도면.5 (a) to 5 (f) is a view showing the operating state of the present invention.
도 6은 본 발명의 단조 공정부에서 가공된 반가공 소재를 보이는 평면 예시도.Figure 6 is a plan view showing a semi-finished material processed in the forging step of the present invention.
도 7은 본 발명의 형상 및 절단 공정부에서 가공된 두개의 완성된 세파타이를 보이는 평면 예시도.Figure 7 is a planar view showing two completed sephaties processed in the shape and cutting process of the present invention.
※ 도면의 주요부분에 대한 부호의 설명 ※※ Explanation of code about main part of drawing ※
10 : 소재투입장치 11 : 소재 정렬판10 material input device 11 material alignment plate
12 : 투입가이드 13 : 밀대12: input guide 13: push rod
14 : 밀대구동장치 20 : 소재이송구조14: rod drive device 20: material transfer structure
21 : 소재 이동대 22 : 소재안착요홈21: material moving table 22: material seating groove
23 : 이송블록 23' : 이송레일23: transfer block 23 ': transfer rail
24 : 수평이동구조 25 : 실린더부24: horizontal movement structure 25: cylinder
26 : 피스톤부 27 : 브라켓26: piston 27: bracket
28 : 이동대 승강구조 29 : 실린더부28: movable platform elevating structure 29: cylinder portion
29' : 피스톤부 30 : 소재거치대29 ': piston part 30: material holder
31 : 소재 지지홈 40 : 단조 공정부31: material support groove 40: forging process
41 : 다이본체 42 : 소재 지지홈41: die body 42: material support groove
50 : 형상 및 절단 공정부 51 : 다이본체50: shape and cutting process section 51: die body
52 : 소재 지지홈 P : 소재52: material support groove P: material
P' : 반가공 소재 P" : 평판부P ': semi-finished material P ": flat plate
도 3은 본 발명의 일적용 예를 보이는 도면이고, 도 4는 본 발명의 일 구성 예를 보이는 요부 분리 사시도이며, 도 5(a)내지 도 5(f)는 본 발명의 작동상태를 보이는 도면으로서,3 is a view showing an example of the application of the present invention, Figure 4 is an exploded perspective view of the main portion showing an example of the configuration of the present invention, Figure 5 (a) to Figure 5 (f) is a view showing an operating state of the present invention. As
일측을 향해 하향되게 경사지는 소재 정렬판(11)상에 위치되는 환봉상의 소재(P)를 상승시켜 경사진 투입가이드(12)로 위치 이동시키도록 승강 가능하게 설치되는 밀대(13)와, 이 밀대(13)에 구동력을 부여하기 위한 밀대구동장치(14)를 포함하는 공지의 소재투입장치(10)에 있어서;And the push rod 13 which is installed to be elevated to move the position of the rod-shaped material (P) located on the material alignment plate 11 which is inclined downward toward one side to the inclined input guide 12, and In the known material input device 10 including a push rod driving device 14 for imparting a driving force to the push rod 13;
상기 소재(P)를 일정 간격으로 안치할 수 있도록 상면에 다수의 소재안착요홈(22)을 구비하는 소재 이동대(21)와; 직선의 왕복운동이 가능하게 복수개의 이송레일(23')에 결합되는 이송블록(23)과: 브라켓(27)을 통해 고정된 위치를 갖도록 설치되는 실린더부(25)와, 상기 실린더부(25)에 에어압을 이용하여 출몰 가능하게 결합 구성되며 일단이 이송블록(23)에 고정되는 피스톤부(26)로 구성되는 수평이동구조(24)와; 상기 이송블록(23)과 소재 이동대(21)의 사이에 설치되며 이송블록(23)상에 고정되는 실린더부(29)와, 상기 실린더부(51)에 에어압을 이용하여 출몰 가능하게 결합 구성되며 일단이 소재이동대(21)의 저면에 고정되는 피스톤부(29')로 구성되는 이동대승강구조(28)를 포함하는 소재이송구조(20)와;A material moving table 21 having a plurality of material mounting recesses 22 formed on an upper surface thereof so as to set the material P at regular intervals; A transfer block 23 coupled to the plurality of transfer rails 23 'to enable a linear reciprocating motion; a cylinder portion 25 installed to have a fixed position through the bracket 27, and the cylinder portion 25 A horizontal movement structure (24) consisting of a piston unit (26) having one end fixed to the transfer block (23) and configured to be projected using air pressure; The cylinder unit 29 is installed between the transfer block 23 and the material moving table 21 and fixed to the transfer block 23, and is coupled to the cylinder unit 51 so that the cylinder can be protruded using air pressure. A material conveying structure 20 including a moving table lifting structure 28 having one end configured with a piston part 29 'fixed to a bottom of the material moving table 21;
상기 투입가이드(12)의 하방에 위치되며 상기 소재안착요홈(22)과 동일한 이격간격으로 소재안착요홈(22) 중 일부와 종방향으로 일치하는 다수의 소재 지지홈(31)을 구비하는 소재거치대(30)와;Located on the lower side of the input guide 12 and the material holder having a plurality of material support grooves 31 longitudinally coincident with some of the material seating recesses 22 at the same spacing interval as the material seating recesses 22. 30;
상기 소재 이동대(21)의 하방에 위치되며 상면이 평면으로 구성되는 다이본체(41)와, 상기 다이본체(41)의 양 단에 구성되며 상기 소재안착요홈(22)중 우측단의 소재안착요홈과 종(縱)으로 일치하도록 위치되는 소재 지지홈(42)과, 다이본체(41)의 상부에 승강 가능하게 구성되는 단조용 해머(43)를 포함하여 구성되며 상기 소재이송구조(20)를 통해 이송되어온 소재(P)의 일부분에 평판부(P")가 형성되는 반가공 소재(P')를 가공하기 위한 단조공정부(40)와;Located on the lower side of the material moving table 21, the upper surface is composed of a die body 41 and the die body 41 is formed at both ends of the material seating recesses 22 of the right end of the material seating The material conveying structure 20 and the material support groove 42 is positioned so as to coincide with the groove and the forging hammer 43 is configured to be elevated on the upper portion of the die main body 41 Forging process portion 40 for processing the semi-finished material (P ') is formed in the plate portion (P ") is formed in a portion of the material (P) has been transferred through;
상기 소재 이동대(21)의 하방에 위치되는 상태에서 상기 단조공정부(40)의 일측에 설치되며 상면이 평면으로 구성되는 다이본체(51)와, 상기 다이본체(51)의 양 단에 구성되며 상기 소재안착요홈(22)과 동일한 이격간격으로 상기 소재지지홈(42)에서 이격되게 구성되는 소재 지지홈(52)과 다이 본체(51)의 상부에 승강 가능하게 구성되는 펀치(53)를 포함하여 구성되며 상기 단조공정부(40)에서 이송된 반가공 소재(P')의 평판부(P")에 핀흘(PH)과 절단홈(CG)을 상호 대향되게 형성함과 동시에 중간부를 절단하여 두개의 완성된 세파타이(S)로 양분시키기 위한 형상 및 절단 공정부(50)를 각각 포함하여서 된 것이다.It is installed on one side of the forging process unit 40 in a state located below the material moving table 21 and is configured on both ends of the die body 51 and the die body 51 having an upper surface in a plane The material supporting groove 52 and the punch 53 is configured to be elevated in the upper portion of the die body 51 and spaced apart from the material support groove 42 at the same spacing interval as the material mounting recess 22. It is configured to form a pinch (PH) and the cutting groove (CG) in the plate portion (P ") of the semi-processed material (P ') transferred from the forging process portion 40 and at the same time cut the middle portion two It is to include a shape and a cutting process unit 50 for dividing into a completed Sepha Tie (S).
이와 같이 구성되는 본 발명은 도 5(a)내지 도 5(f)에서와 같이 작동되는 것으로 이를 좀더 구체적으로 설명하면 다음과 같다.The present invention configured as described above operates as shown in FIGS. 5 (a) to 5 (f).
본 발명에 적용되는 공지의 소재투입장치(10)에 투입되는 소재(P)의 양단에는 미리 수나사부를 가공시키는 것이 적당하며 단조 공정부(40)와 형상 및 절단 공정부(50)의 상부에는 각각 단조용 해머(43)와 해당 형상을 따내고 절단하기 위한 펀치(53)가 공지의 동작 구조를 통해 승강 가능하도록 설치되어 있음은 물론이다.It is suitable to process the male screw portion in advance at both ends of the material (P) to be put into the known material input device 10 to be applied to the present invention, respectively, the upper part of the forging process part 40 and the shape and cutting process part 50 The forging hammer 43 and the punch 53 for removing and cutting the shape are installed to be able to lift and lower through a known operation structure.
도 5(a)는 1회의 작동 사이클을 마치고 소재이송구조(20)가 소재(P)를 이송하기 위하여 초기 위치에 도달된 상태로서,5 (a) is a state in which the material transfer structure 20 has reached the initial position to transfer the material (P) after one operation cycle,
도면에서 보아 소재 거치대(30)의 좌측단의 소재 지지홈(31)에는 소재투입장치(10)의 밀대(13)를 통해 경사진 투입 가이드(12)로 이송된 소재(P)가 안착되게 되며 나머지 2개의 소재 지지홈(31)에는 이미 전 단계에서 공급받은 소재(P)가 재치되어 있으며 단조 공정부(40)의 소재 지지홈(42)은 평판부(P")가 가공된 반 가공소재(P')가 얹혀져 있다.As seen in the drawing, the material support groove 31 of the left end of the material holder 30 is placed on the material P transferred to the inclined feeding guide 12 through the pusher 13 of the material feeding device 10. In the remaining two material support grooves 31, the material P already supplied in the previous step is placed, and the material support grooves 42 of the forging process part 40 are semi-processed materials in which the flat plate part P ″ is processed. (P ') is on.
이와 같이 좌측단의 소재 지지홈(31)에 새로이 소재(P)가 투입됨과 동시에 이동대승강구조(28)의 피스톤부(29')가 상향으로 돌출되어 소재 이동대(21)를 들어올리게 되면 상승되는 소재 이동대(21)가 소재거치대(30)와 단조공정부(40)상에 얹혀진 미가공의 소재(P)와 반가공 소재(P')를 소재 안착요홈(22)에 안착시킨 상태로 걷어 올리면서 도 5(b)에서와 같이 상승되며 이 상태에서 수평이동구조(24)의 실린더부(25)가 작동되어 피스톤부(26)를 전진시켜 이송블록(23)과 소재 이동대(21)를 소재 안착요홈(22)간의 이격 폭만큼 이동시켜 줌으로써 도 5(c)에서와 같이 대기중인 3개의 소재(P)를 차례대로 소재거치대(30)의 소재 지지홈(31)과 단조공정부(40)상에 일치시킴과 동시에 우측단의 소재안착요홈(22)에 안착된 이전단계의 수행과정 중 단조 공정부(40)에서 들어올린 평판부(P")가 가공된 반가공(P')소재를 형상 및 절단 공정부(50)상에 정확하게 위치시킨다.As such, the new material P is introduced into the material support groove 31 at the left end and at the same time, when the piston part 29 'of the moving base lifting structure 28 protrudes upward, the material moving base 21 is lifted up. The material moving table 21 is rolled up with the raw material (P) and the semi-finished material (P ') mounted on the material holder 30 and the forging process part 40 seated in the material mounting recess 22. While rising as shown in FIG. 5 (b), the cylinder part 25 of the horizontal moving structure 24 is operated in this state to advance the piston part 26 to move the feed block 23 and the material moving table 21. By moving by the separation width between the material mounting recesses 22, as shown in Fig. 5 (c), the material support grooves 31 and the forging process part 40 of the material support base 30 in sequence The plate lifted from the forging process part 40 during the execution of the previous step that matches the phase and is seated in the material seating recess 22 at the right end. (P ") is thus accurately position the processed semifinished (P ') on the material shape and the ball cutting section 50.
소재 이동대(21)의 위치이동이 종료됨과 동시에 이동대승강구조(28)의 피스톤부(29')가 적정 범위만큼 하강되어 도 5(d)에서와 같이 소재거치대(30)의 소재지지홈(31)과 단조 공정부(40)의 소재지지홈(42)에 미가공된 소재(P)를 안착시킴과 동시에 평판부(P")가 가공된 반가공 소재(P')는 형상 및 절단 공정부(50)의 소재 지지홈(52)에 안착시킨다.At the same time as the position movement of the material moving stand 21 is finished, the piston portion 29 'of the moving base lifting structure 28 is lowered by an appropriate range, so that the material supporting groove of the material mounting base 30 is as shown in FIG. 31) and the semi-finished material P 'processed with the flat plate portion P ″ while seating the unprocessed material P in the material support groove 42 of the forging process portion 40 has a shape and a cutting process portion. It is seated in the material support groove (52) of (50).
이와 같이 하강되면서 소재(P)와 반가공 소재(P')를 모두 내려놓은 소재 이동대(21)에는 도 5(d)에서와 같이 모든 소재안착요홈(22)이 비어있게 되는 상태이다.As described above, all the material seating recesses 22 are empty in the material moving table 21 in which both the material P and the semi-finished material P 'are laid down, as shown in FIG.
한편 소재 이동대(21)가 하강되면 도 5(e)에서와 같이 단조 공정부(40)와 형상 및 절단 공정부(50)에서는 각각 해머(43)와 펀치(53)가 하강되어 단조 공정부(40)에서는 도 6에서와 같은 형태로 평판부(P")의 가공을 하고, 형상 및 절단 공정부(50)에서는 평판부(P")에 핀홀(PH)과 절단홈(CG)을 상호 대향되게 가공함과 동시에 중간부를 절단하여 도 7에서와 같은 두개의 완성된 세파타이(S)를 제조한다.On the other hand, when the material moving table 21 is lowered, the hammer 43 and the punch 53 are lowered in the forging process part 40 and the shape and cutting process part 50, respectively, as shown in FIG. In FIG. 40, the flat plate portion P ″ is processed in the same manner as in FIG. 6, and in the shape and cutting process unit 50, the pinhole PH and the cutting groove CG are mutually formed in the flat plate portion P ″. At the same time as opposed to the process of cutting the middle part to produce two completed Sepha Tie (S) as shown in FIG.
완성된 세파타이(S)는 도 5(e)에서와 같이 즉시 별도의 라인으로 이동 수거되며 상기의 해머(43)와 펀치(53)의 작동과 동시에 상기 하강된 소재 이동대(21)는 도 5(f)에서와 같이 수평이동구조(24)의 실린더부(25)가 작동되어 피스톤부(26)를 몰입시켜 이송블록(23)과 소재 이동대(21)를 정확하게 소재 안착요홈(22)간의 이격폭만큼 좌측으로 이동시켜 우측단의 소재 안착요홈(22)이 단조 공정부(40)의 소재 지지홈(42)의 하방에서 종방향으로 일치되도록 하여 초기의 도 5(a)의 위치로 복귀되는 것이다.The finished Sepha Tie (S) is immediately collected and moved to a separate line as in FIG. 5 (e), and the lowered material moving table 21 simultaneously with the operation of the hammer 43 and the punch 53 is shown in FIG. As in 5 (f), the cylinder part 25 of the horizontal moving structure 24 is operated to immerse the piston part 26 so that the transfer block 23 and the material moving table 21 can be accurately positioned. Move to the left by the separation width of the left side so that the material seating groove 22 of the right end is aligned in the longitudinal direction from below the material support groove 42 of the forging process portion 40 to the initial position of Figure 5 (a) To return.
상기 소재 지지대(21)의 소재 안착요홈(22)은 비어 있게 되고 소재거치대(30)의 소재 지지홈(31) 중 비어있는 첫번째 소재 지지홈(31)에 도 5(a)에서와 같이 새로운 소재(P)가 투입되면서 상기의 과정을 반복 수행하게 되는 것이다.The material mounting recess 22 of the material support 21 becomes empty and the new material as shown in FIG. 5 (a) in the first material support groove 31 which is empty among the material support grooves 31 of the material holder 30. As (P) is input, the above process is repeated.
이상과 같은 본 발명은 세파타이의 가공 시 요구되는 단조공정과 형상 가공을 위한 형상 및 절단 공정을 단일 라인에서 일련된 연속 공정을 통해 처리될 수 있도록 함으로써 제조공정의 단축을 통해 시간과 인력의 낭비를 억제하여 작업능률의 향상과 제조원가의 절감을 기할 수 있는 효과를 갖는 매우 유용한 발명이다.The present invention as described above wastes time and manpower through the shortening of the manufacturing process by allowing the forging process and the shape and cutting process for the shape processing required in the process of Sepha Thai to be processed through a series of continuous processes in a single line. It is a very useful invention having the effect of restraining the improvement of work efficiency and reduction of manufacturing cost.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040014454A KR100594727B1 (en) | 2004-02-26 | 2004-02-26 | The processing facilities of sepatie |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040014454A KR100594727B1 (en) | 2004-02-26 | 2004-02-26 | The processing facilities of sepatie |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2003-0034427U Division KR200340776Y1 (en) | 2003-10-29 | 2003-10-29 | The processing facilities of sepatie |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20040027773A true KR20040027773A (en) | 2004-04-01 |
KR100594727B1 KR100594727B1 (en) | 2006-07-04 |
Family
ID=37330138
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040014454A KR100594727B1 (en) | 2004-02-26 | 2004-02-26 | The processing facilities of sepatie |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100594727B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100830411B1 (en) * | 2006-12-22 | 2008-05-21 | 정도연 | Device for manufacturing form sepatie |
KR100908631B1 (en) * | 2008-10-10 | 2009-07-21 | 미래테크(주) | Apparatus for manufacturing space sustenance for concrete mold |
KR102584969B1 (en) * | 2023-03-16 | 2023-10-04 | 노윤석 | Metal processing method |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101287248B1 (en) | 2011-11-18 | 2013-07-23 | 정도연 | Removal device of sepatie processing material |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100195830B1 (en) * | 1993-03-16 | 1999-06-15 | 안자키 사토루 | Transfeeder |
KR960000400B1 (en) * | 1993-09-13 | 1996-01-06 | 김충열 | Working apparatus for pipe and bar material |
KR970000680Y1 (en) * | 1994-06-01 | 1997-02-05 | 삼성정밀화학 주식회사 | Conveying apparatus of tube of a heat-exchanger |
KR200241321Y1 (en) * | 2001-03-24 | 2001-10-10 | 고태득 | manufacturing device of separate tie for construction |
KR100525264B1 (en) * | 2003-01-27 | 2005-11-02 | 허인재 | Method for manufacturing separtie for concrete mold |
-
2004
- 2004-02-26 KR KR1020040014454A patent/KR100594727B1/en active IP Right Grant
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100830411B1 (en) * | 2006-12-22 | 2008-05-21 | 정도연 | Device for manufacturing form sepatie |
KR100908631B1 (en) * | 2008-10-10 | 2009-07-21 | 미래테크(주) | Apparatus for manufacturing space sustenance for concrete mold |
KR102584969B1 (en) * | 2023-03-16 | 2023-10-04 | 노윤석 | Metal processing method |
Also Published As
Publication number | Publication date |
---|---|
KR100594727B1 (en) | 2006-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205397379U (en) | Automatic plate feeder | |
KR100683243B1 (en) | The machining equipment for al-form material | |
KR101621065B1 (en) | Automatic punching and noching apparatus of Profile | |
KR100830411B1 (en) | Device for manufacturing form sepatie | |
KR101287248B1 (en) | Removal device of sepatie processing material | |
KR100594727B1 (en) | The processing facilities of sepatie | |
KR20160110009A (en) | Processing station for processing of endless metal profiles | |
KR20100069852A (en) | Apparatus for die-bending wires | |
KR101774337B1 (en) | A Manufacturing Apparatus of a Metal Roofing Tile | |
KR200340776Y1 (en) | The processing facilities of sepatie | |
KR20110108582A (en) | Method and machines for bending a shear steel reinforcing bar | |
CN102133763B (en) | Lower mold positioning and locking device for fire-resistant brick forming hydraulic machine mold | |
CN210100272U (en) | Mould and mould set comprising same | |
KR100801113B1 (en) | Simultaneous manufacturing machine for punching and bending of weather strip coupling bar | |
CN218639868U (en) | Equipment for disassembling waste wood tray by means of hydraulic clamp mechanism | |
KR200480449Y1 (en) | Manufacturing equipment of construction separtie | |
KR200412415Y1 (en) | The punching machine for Al-form panel | |
CN209830045U (en) | Stamping equipment of easy dismouting mould | |
JPH0985346A (en) | Press forming die device | |
KR100995762B1 (en) | Reinforcing rod working device | |
CN213225025U (en) | Automatic grid screw installation equipment | |
KR100792784B1 (en) | Bending method using mould | |
JPH0515381Y2 (en) | ||
CN220052221U (en) | Assembling equipment for disassembly-free heat preservation template | |
KR100977029B1 (en) | Apparatus for automatically manufacturing mould in-corner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A108 | Dual application of patent | ||
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130614 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20140117 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20160524 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20170309 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20190102 Year of fee payment: 14 |
|
FPAY | Annual fee payment |
Payment date: 20200107 Year of fee payment: 15 |