KR100924770B1 - 금속파이프의 엠보싱돌기 성형장치 - Google Patents
금속파이프의 엠보싱돌기 성형장치 Download PDFInfo
- Publication number
- KR100924770B1 KR100924770B1 KR1020080137761A KR20080137761A KR100924770B1 KR 100924770 B1 KR100924770 B1 KR 100924770B1 KR 1020080137761 A KR1020080137761 A KR 1020080137761A KR 20080137761 A KR20080137761 A KR 20080137761A KR 100924770 B1 KR100924770 B1 KR 100924770B1
- Authority
- KR
- South Korea
- Prior art keywords
- housing
- metal pipe
- plunger
- punch
- base frame
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D31/00—Other methods for working sheet metal, metal tubes, metal profiles
- B21D31/005—Incremental shaping or bending, e.g. stepwise moving a shaping tool along the surface of the workpiece
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D17/00—Forming single grooves in sheet metal or tubular or hollow articles
- B21D17/02—Forming single grooves in sheet metal or tubular or hollow articles by pressing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D35/00—Combined processes according to or processes combined with methods covered by groups B21D1/00 - B21D31/00
- B21D35/001—Shaping combined with punching, e.g. stamping and perforating
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D43/00—Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
- B21D43/006—Feeding elongated articles, such as tubes, bars, or profiles
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Shaping Metal By Deep-Drawing, Or The Like (AREA)
Abstract
Description
Claims (8)
- 지면에 지지되는 베이스프레임(110)상기 베이스프레임(110)의 전단에 설치된 메인실린더(120);상기 메인실린더(120)의 로드(121)가 내측을 관통하도록 베이스프레임(110)상에 수평상태로 지지되는 수평관(130);상기 베이스프레임(110)의 후단에 설치되어 성형될 금속파이프(P)를 전방으로 수평이동시키는 파이프공급부(140);상기 수평관(130)의 후단에 전후로 슬라이딩 이동가능하게 설치되며, 전방으로 이동된 금속파이프(P)의 내측으로 삽입되는 이동하우징(150);상기 메인실린더(120)의 로드(121) 단부에 체결되어 메인실린더(120)의 동작에 따라 이동하우징(150)의 내측을 전,후방향으로 수평이동하면서 이동하우징(150)측에 이동력을 부여하는 플런저(160);상기 이동하우징(150)내부에 설치되며, 상기 플런저(160)가 후진할 때 플런저(160)에 밀려 이동하우징(150)의 외부로 돌출되고 플런저(160)가 이동하우징(150)을 후방으로 이동시킬 때 금속파이프(P)의 표면에 전후로 일정길이를 갖는 엠보싱 돌기를 형성시키는 펀치(170);이동하우징(150)과 파이프공급부(140) 사이에 위치되어 금속파이프(P)가 성형될 때 금속파이프(P)의 성형부 외주면을 잡아주는 클램퍼(180)를 구비한 금속파이프의 엠보싱 돌기 성형장치.
- 제 1항에 있어서,상기 이동하우징(150)은 전단이 상기 수평관(130)의 후단 외측으로 슬라이딩 가능하게 끼워진 제1하우징(151)과, 상기 제1하우징(151)의 후단에 전단이 체결되며 후단의 외주면에는 수평관(130)의 중심방향으로 복수의 펀치홀(153)이 형성된 제2하우징(152)으로 분할구성된 것을 특징으로 하는 금속파이프의 엠보싱 돌기 성형장치.
- 제 2항에 있어서상기 플런저(160)는 후진시 제2하우징(152)의 펀치(170)를 밀어서 이동시킬 수 있도록 전방으로 상향 경사지게 형성된 경사부(161a)와 밀려 이동된 펀치(170)를 원위치시키도록 경사구간의 후방에 형성된 직선부(161b)로 이루어진 몸체(161)와, 상기 제2하우징(152)의 외경보다는 작고 최소내경보다는 크게 형성되어 상기 몸체(161)의 전단에 체결되는 제1플랜지(162)와, 제2하우징(152)의 외경보다는 작고 최소내경보다는 크게 형성되어 제2하우징(152)의 후방에 위치된 상태로 상기 몸체(161)의 후단에 체결되는 제2플랜지(163)를 가지며,상기 제2하우징(152)의 내부에는 펀치홀(153)의 외부로 펀치(170)가 완전히 돌출된 경우 플런저(160)의 제1플랜지(162)와 간섭됨으로써 플런저(160)가 더 이상 후방으로 이동하지 못하도록 제한하는 걸림턱(154)이 형성된 것을 특징으로 하는 금속파이프의 엠보싱 돌기 성형장치.
- 제 3항에 있어서,플런저(160)가 펀치홀(153)의 외부로 펀치(170)를 돌출시키는 과정에서 이동하우징(150)이 후방으로 밀려 이동되지 않도록, 수평관(130)과 제1하우징(151)을 결합시키는 홀딩수단을 더 구비한 것을 특징으로 하는 금속파이프의 엠보싱 돌기 성형장치.
- 제 4항에 있어서,상기 홀딩수단은상기 제1하우징(151)의 전단에 형성된 복수의 관통공(155);상기 관통공(155)에 대응되도록 상기 수평관(130)의 외주면에 형성된 고정홈(132);외부로 일단이 돌출되도록 상기 관통공(155)에 탄력설치된 걸림돌기(156);후단이 확관된 파이프로서, 수평관(130)의 외주면에 전후로 이동가능하게 끼워지며, 후방으로 이동될 경우 확관된 후단이 상기 제1하우징(151)의 전단에 외측으로 밀착되게 끼워지면서 상기 관통공(155) 외부로 돌출된 걸림돌기(156)의 일단을 가압하여 상기 걸림돌기(156)의 타단을 고정홈(132)에 삽입시키는 홀더(157)로 구성된 것을 특징으로 하는 금속파이프(P)의 엠보싱돌기 성형장치.
- 제 1항에 있어서,상기 클램퍼(180)는 금속파이프(P)에 성형되는 엠보싱 돌기가 수용되는 복수의 이격홈부(183)를 가진 것을 특징으로 하는 금속파이프의 엠보싱 돌기 성형장치.
- 제 1항에 있어서,상기 베이스프레임(110)의 후단에는 일정구간으로 컨베어(111)가 설치되고,상기 파이프공급부(140)는 상기 컨베어(111)상에 고정된 몸체부(141)와, 성형될 금속파이프(P)의 후단을 고정할 수 있도록 상기 몸체부(141) 중앙에 구비된 클램퍼(142)와, 성형시 후방으로 가해지는 외력에 의해 유동되지 않도록 몸체부(141)를 지지하는 지지수단(143)으로 구성된 것을 특징으로 하는 금속파이프의 엠보싱 돌기 성형장치.
- 제 7항에 있어서,상기 지지수단(143)은 베이스프레임(110)의 컨베어(111)와 나란하게 설치되며 경사면이 후방을 향하는 직각삼각형상의 톱니들이 일정간격으로 형성된 한 쌍의 레일(143a)과, 하단이 레일(143a)의 톱니에 지지되도록 상단이 상기 몸체부(141)의 후면에 설치된 한 쌍의 지지바(143b)로 구성된 것을 특징으로 하는 금속파이프의 엠보싱 돌기 성형장치.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080137761A KR100924770B1 (ko) | 2008-12-31 | 2008-12-31 | 금속파이프의 엠보싱돌기 성형장치 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080137761A KR100924770B1 (ko) | 2008-12-31 | 2008-12-31 | 금속파이프의 엠보싱돌기 성형장치 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100924770B1 true KR100924770B1 (ko) | 2009-11-05 |
Family
ID=41561119
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080137761A KR100924770B1 (ko) | 2008-12-31 | 2008-12-31 | 금속파이프의 엠보싱돌기 성형장치 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100924770B1 (ko) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101324751B1 (ko) * | 2013-07-17 | 2013-11-05 | 협신정공 주식회사 | 파이프 진원진직 및 확관장치 |
KR101324753B1 (ko) * | 2013-07-17 | 2013-11-05 | 협신정공 주식회사 | 파이프의 확관 및 진원진직 방법 |
KR101410889B1 (ko) * | 2011-08-03 | 2014-06-23 | 황용기 | 파이프 가공 장치 |
KR101414919B1 (ko) * | 2013-06-26 | 2014-07-04 | 이종기 | 강관 확관 장치 및 이를 이용한 확관 강관의 제조 방법 |
KR101611572B1 (ko) * | 2015-12-28 | 2016-04-11 | 주식회사 성은이엠 | 금속파이프의 문양 성형기 |
KR101857433B1 (ko) * | 2017-09-18 | 2018-05-15 | 주식회사 가나스틸 | 파이프 확관 장치 |
KR20190094959A (ko) * | 2018-02-06 | 2019-08-14 | 동원금속 (주) | 자동차 카울파이프용 홀가공장치 |
CN112935115A (zh) * | 2019-12-27 | 2021-06-11 | 新昌县磊石机械有限公司 | 一种模具加工用冲压控制方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10109128A (ja) | 1996-10-04 | 1998-04-28 | Kihachiro Segawa | 管状加工物の塑性加工機 |
KR100404895B1 (ko) * | 2000-03-29 | 2003-11-10 | 주식회사 세너그린 | 금속파이프의 엠보싱돌기 성형장치 |
KR100414659B1 (ko) | 2001-04-12 | 2004-01-13 | 박금석 | 파이프의 외주연 엠보싱장치 |
KR100815600B1 (ko) * | 2006-08-01 | 2008-03-20 | 안판상 | 파이프의 엠보싱 성형장치 |
-
2008
- 2008-12-31 KR KR1020080137761A patent/KR100924770B1/ko active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10109128A (ja) | 1996-10-04 | 1998-04-28 | Kihachiro Segawa | 管状加工物の塑性加工機 |
KR100404895B1 (ko) * | 2000-03-29 | 2003-11-10 | 주식회사 세너그린 | 금속파이프의 엠보싱돌기 성형장치 |
KR100414659B1 (ko) | 2001-04-12 | 2004-01-13 | 박금석 | 파이프의 외주연 엠보싱장치 |
KR100815600B1 (ko) * | 2006-08-01 | 2008-03-20 | 안판상 | 파이프의 엠보싱 성형장치 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101410889B1 (ko) * | 2011-08-03 | 2014-06-23 | 황용기 | 파이프 가공 장치 |
KR101414919B1 (ko) * | 2013-06-26 | 2014-07-04 | 이종기 | 강관 확관 장치 및 이를 이용한 확관 강관의 제조 방법 |
KR101324751B1 (ko) * | 2013-07-17 | 2013-11-05 | 협신정공 주식회사 | 파이프 진원진직 및 확관장치 |
KR101324753B1 (ko) * | 2013-07-17 | 2013-11-05 | 협신정공 주식회사 | 파이프의 확관 및 진원진직 방법 |
KR101611572B1 (ko) * | 2015-12-28 | 2016-04-11 | 주식회사 성은이엠 | 금속파이프의 문양 성형기 |
KR101857433B1 (ko) * | 2017-09-18 | 2018-05-15 | 주식회사 가나스틸 | 파이프 확관 장치 |
KR20190094959A (ko) * | 2018-02-06 | 2019-08-14 | 동원금속 (주) | 자동차 카울파이프용 홀가공장치 |
KR102049788B1 (ko) | 2018-02-06 | 2019-11-28 | 동원금속 (주) | 자동차 카울파이프용 홀가공장치 |
CN112935115A (zh) * | 2019-12-27 | 2021-06-11 | 新昌县磊石机械有限公司 | 一种模具加工用冲压控制方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100924770B1 (ko) | 금속파이프의 엠보싱돌기 성형장치 | |
KR101390660B1 (ko) | 파이프 확관 및 축관장치 | |
CN103231321A (zh) | 便携式工件夹持装置及组件 | |
JP2010115766A (ja) | 孔の打抜き装置及び打抜き方法 | |
CN216658170U (zh) | 塑料管材生产线中的打孔装置 | |
KR101611572B1 (ko) | 금속파이프의 문양 성형기 | |
KR100404895B1 (ko) | 금속파이프의 엠보싱돌기 성형장치 | |
DE102004038707A1 (de) | Fahrzeugsitz mit einer Kopfstütze | |
CN211437815U (zh) | 自动管端机翻边冲头 | |
KR101642245B1 (ko) | 파이프 플레어 성형장치 | |
KR100927577B1 (ko) | 금속파이프 엠보싱 성형장치 | |
CN109500086B (zh) | 穿孔机顶头更换装置及方法 | |
CN210023375U (zh) | 装饰管成型模具 | |
US20100275453A1 (en) | Wire saw with sawteeth strip updating structure | |
CN208035352U (zh) | 一种可更换模具的扩口机扩充平台 | |
HUE035796T2 (en) | Tool for electromagnetic forming of containers with embossed protrusions | |
CN214683883U (zh) | 一种车厢生产加工用配件模具 | |
KR101917499B1 (ko) | 차량용 배터리의 손잡이끈 커팅장치 | |
EP4112386A1 (en) | Bicycle cross bar adaptor | |
KR20180099112A (ko) | 차량용 배터리의 손잡이끈 제조방법 및 장치 | |
CN211407832U (zh) | 一种救生衣上的安全扣 | |
KR101587406B1 (ko) | 강선 절단 가이드장치 | |
CN218132043U (zh) | 试管架蝴蝶夹结构 | |
KR102051781B1 (ko) | 메인 열쇠 걸이장치 및 사용방법 | |
CN218366021U (zh) | 一种快拆浇注模具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20121030 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20140428 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20141024 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20151027 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20161021 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20171030 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20181030 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20191028 Year of fee payment: 11 |