KR100618597B1 - Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this - Google Patents

Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this Download PDF

Info

Publication number
KR100618597B1
KR100618597B1 KR1020040093366A KR20040093366A KR100618597B1 KR 100618597 B1 KR100618597 B1 KR 100618597B1 KR 1020040093366 A KR1020040093366 A KR 1020040093366A KR 20040093366 A KR20040093366 A KR 20040093366A KR 100618597 B1 KR100618597 B1 KR 100618597B1
Authority
KR
South Korea
Prior art keywords
concrete
inner tube
prevention device
steel pipe
rise prevention
Prior art date
Application number
KR1020040093366A
Other languages
Korean (ko)
Other versions
KR20060054711A (en
Inventor
장유식
Original Assignee
민경건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 민경건설 주식회사 filed Critical 민경건설 주식회사
Priority to KR1020040093366A priority Critical patent/KR100618597B1/en
Publication of KR20060054711A publication Critical patent/KR20060054711A/en
Application granted granted Critical
Publication of KR100618597B1 publication Critical patent/KR100618597B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/13Geometrical or physical properties having at least a mesh portion
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

본 발명은 토목 구조물이 설치되는 지반의 지지력을 강화하기 위하여 설치하는 현장타설 콘크리트말뚝 시공을 위한 강관케이싱과 인너튜브 및 콘크리트 오름방지장치를 유기적으로 결합시켜 콘크리트 타설 및 토목 구조물의 시공을 용이하도록 한 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 및 이의 시공방법을 제공하는데 그 목적이 있다.The present invention organically combines the steel pipe casing and the inner tube and the concrete rise prevention device for the construction of the site-placed concrete pile installed to strengthen the bearing capacity of the ground on which the civil structure is installed to facilitate the construction of concrete placing and civil structures The purpose is to provide a cast-in-place concrete pile using inner tube and concrete rise prevention device and its construction method.

상기한 목적을 달성하기 위한 본 발명에 따른 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝은 지반에 소정의 깊이로 근입되며, 소정의 직경 및 길이를 갖는 강관케이싱과; 상기 강관케이싱내에 길이방향으로 소정의 깊이로 근입되며, 소정의 직경 및 길이를 갖는 인너튜브와; 상기 인너튜브내에 길이방향으로 소정의 깊이로 근입되며, 소정의 크기로 이루어진 철근망과; 상기 철근망내에 타설됨과 동시에 경화되는 콘크리트로 구성됨을 특징으로 한다.The cast-in-place concrete pile using the inner tube and the concrete rise prevention device according to the present invention for achieving the above object is a steel pipe casing having a predetermined diameter and length in the ground; An inner tube which is inserted into the steel pipe casing at a predetermined depth in a longitudinal direction and has a predetermined diameter and length; A reinforcing bar network embedded in the inner tube at a predetermined depth in a longitudinal direction and made of a predetermined size; It is characterized in that it is made of concrete which is poured in the reinforcing bar and hardened at the same time.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 시공방법은 지반에 소정의 직경 및 길이를 갖는 강관케이싱을 바이브로 햄머를 이용하여 소정의 깊이로 근입하는 단계(Ⅰ); 상기 강관케이싱내의 지반을 햄머그래브와 역환드릴(RCD)을 이용하여 소정의 깊이로 굴착하는 단계(Ⅱ); 상기 강관케이싱내에 길이방향으로 소정의 직경 및 길이를 갖는 인너튜브를 소정의 깊이로 근입하는 단계(Ⅲ); 상기 인너튜브내에 길이방향으로 소정의 크기로 이루어진 철근망을 소정의 깊이로 근입하는 단계(Ⅳ); 상 기 철근망내 가운데에 트레미관을 설치하고, 상기 트레미관에 콘크리트를 타설함과 동시에 강관케이싱을 인발하는 단계(Ⅴ)로 이루어짐을 특징으로 한다.In addition, in-site casting concrete pile construction method using the inner tube and the concrete rise prevention device according to the present invention for achieving the above object by using a steel pipe casing having a predetermined diameter and length on the ground using a vibro hammer hammer Entering into (I); Digging the ground in the steel pipe casing to a predetermined depth by using a hammer grab and a reverse drill (RCD) (II); Injecting an inner tube having a predetermined diameter and length in a longitudinal direction into the steel pipe casing at a predetermined depth; (IV) incorporating a reinforcing bar network having a predetermined size in a longitudinal direction in the inner tube to a predetermined depth; The tremi tube is installed in the center of the reinforcing bar network, and the concrete is placed in the tremi tube and at the same time the steel pipe casing is drawn out.

바이브로 햄머, 강관케이싱, 인너튜브, 철근망, 트레미관, 현장타설 콘크리트말뚝Vibro Hammer, Steel Pipe Casing, Inner Tube, Reinforcing Bar, Tremi Pipe, Cast In Place

Description

인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 및 이의 시공방법{Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this} Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this}             

도 1 내지 도 6은 본 발명에 따른 현장타설 콘크리트말뚝의 시공 과정을 도시한 공정도로서,1 to 6 is a process chart showing the construction process of the cast-in-place concrete piles according to the present invention,

도 1은 바이브로 햄머를 이용하여 지반에 강관케이싱을 근입하는 상태를 도시한 예시도,1 is an exemplary view showing a state in which the steel pipe casing in the ground using a vibro hammer.

도 2는 강관케이싱내의 토사층으로 이루어진 지반을 햄머그래브로 1차로 굴착하는 상태를 도시한 예시도,2 is an exemplary view showing a state in which the ground consisting of the soil layer in the steel pipe casing is excavated primarily with a hammer grab;

도 3은 암반으로 이루어진 지반을 역환드릴(RCD)로 2차로 굴착하는 상태를 도시한 예시도,Figure 3 is an exemplary view showing a second excavation of the ground consisting of rock with a reverse drill (RCD),

도 4는 강관케이싱내에 인너튜브를 풍화암 상단까지 근입하는 상태를 도시한 예시도,Figure 4 is an exemplary view showing a state in which the inner tube to the upper end of the weathered rock in the steel pipe casing,

도 5는 도 4의 A부분을 확대 도시한 단면도,5 is an enlarged cross-sectional view of portion A of FIG. 4;

도 6은 인너튜브내에 철근망을 근입하는 상태를 도시한 예시도,6 is an exemplary view showing a state in which the reinforcing bar network is embedded in the inner tube;

도 7은 철근망내에 트레미관을 설치하고 콘크리트를 타설하면서 강관케이싱 을 인발하는 상태를 도시한 예시도,7 is an exemplary diagram showing a state in which a steel pipe casing is drawn while installing a tremit tube in a reinforcing steel network and placing concrete;

도 8a 내지 8d는 본 발명에 따른 현장타설 콘크리트말뚝에 사용되는 다양한 형상의 인너튜브를 도시한 단면도,8a to 8d is a cross-sectional view showing the inner tube of various shapes used in the cast-in-place concrete pile according to the present invention,

도 9a 내지 9d는 본 발명에 따른 현장타설 콘크리트말뚝에 사용되는 다양한 링형상의 콘크리트 오름방지장치를 도시한 단면도,9a to 9d is a cross-sectional view showing a variety of ring-shaped concrete rise prevention device used in the cast-in-place concrete pile according to the present invention,

도 9e는 본 발명에 따른 현장타설 콘크리트말뚝에 사용되는 공기 주입식 콘크리트 오름방지장치를 도시한 예시도.Figure 9e is an exemplary view showing an air injection-type concrete rise prevention device used in the cast-in-place concrete piles according to the present invention.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

10 : 지반 12 : 토사층10: ground 12: soil layer

14 : 자갈층 16 : 풍화암14: gravel layer 16: weathered rock

18 : 연암 20 : 강관케이싱18: soft rock 20: steel pipe casing

30 : 바이브로 햄머 40 : 햄머그래브30: vibro hammer 40: hammer grab

50 : 역환드릴(RCD) 60 : 인너튜브50: reverse drill (RCD) 60: inner tube

70 : 철근망 80 : 트레미관70: rebar network 80: tremi tube

90 : 콘크리트 100 : 스페이서90: concrete 100: spacer

110 : 링형 콘크리트 오름방지장치 112 : 중공110: ring-shaped concrete rise prevention device 112: hollow

114 : 날개부 114 wings

120 : 공기주입식 콘크리트 오름방지장치120: air injection concrete rise prevention device

122 : 철판 124 : 에어튜브122: iron plate 124: air tube

126 : 에어밸브 128 : 파이프126: air valve 128: pipe

본 발명은 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 및 이의 시공방법에 관한 것으로, 특히 토목 구조물이 설치되는 지반의 지지력을 강화하기 위하여 설치하는 현장타설 콘크리트말뚝 시공을 위한 강관케이싱과 인너튜브 및 콘크리트 오름방지장치를 유기적으로 결합시켜 콘크리트 타설 및 토목 구조물의 시공을 용이하도록 한 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 및 이의 시공방법에 관한 것이다.The present invention relates to a cast-in-place concrete pile using an inner tube and a concrete rise prevention device and a construction method thereof, in particular, a steel pipe casing and inner for the construction of a cast-in-place concrete pile installed to enhance the bearing capacity of the ground on which the civil engineering structure is installed. The present invention relates to an in situ concrete pile and an installation method thereof using an inner tube and a concrete rise prevention device which organically combine a tube and a concrete rise prevention device to facilitate the construction of concrete placing and civil structures.

일반적으로 현장타설 콘크리트말뚝 공법은 지반의 계획심도까지 케이싱을 항타하여 근입시킨 후, 상기 케이싱내를 굴착한 후, 철근망을 근입하고 트레미관을 이용하여 콘크리트를 타설하여 현장에서 말뚝을 조성하는 공법으로, 크게 지반내 케이싱의 매입 및 인발에 따라 매입형 공법과 인발형 공법으로 나누어진다.In general, the cast-in-place concrete pile method is a method of forming a pile at the site by driving the casing up to the planned depth of the ground, excavating the inside of the casing, and then entering the reinforcing steel network and pouring concrete using a tremi pipe. As a result, it is divided into a buried method and a drawn method according to the purchase and withdrawal of the ground casing.

여기서, 전자인 종래의 매입형 현장타설 콘크리트말뚝 공법은 강관케이싱이 현장타설 콘크리트말뚝 거푸집 역할만을 충족시킨 후, 지반내에 매입되어 사장되는 공법으로 시공상 비경제적인 문제가 있다. Here, the former conventional embedded cast-in-place concrete pile method is a method in which the steel pipe casing satisfies only the role of the cast-in-place concrete pile form, and is buried and buried in the ground.

또한, 후자인 종래의 인발형 현장타설 콘크리트말뚝 공법은 강관케이싱을 소정의 지지층 깊이까지 근입시킨 후, 콘크리트를 타설하면서 케이싱을 인발하는 공 법으로 콘크리트가 경화되기 전에 케이싱을 인발함으로써, 지하수와 직접적으로 접하는 부분인 경우에는 지하수의 흐름으로 콘크리트가 경화되기 전에 유실되는 일차적인 문제가 있고, 철근망을 삽입시 공벽의 긁힘으로 인한 슬라임의 과대발생 등 품질확보의 문제가 있다.In addition, the latter conventional draw-type cast-in-place concrete pile method is a method of injecting a steel pipe casing to a predetermined support layer depth, and then drawing a casing while casting concrete while casting concrete, thereby directly connecting with groundwater. In case of contacting part, there is a primary problem that the concrete is lost before the concrete is hardened by the flow of groundwater, and there is a problem of securing quality such as excessive slime caused by scratching of the wall when inserting the reinforcing bar.

이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로써, 토목 구조물이 설치되는 지반의 지지력을 강화하기 위하여 설치하는 현장타설 콘크리트말뚝 시공을 위한 강관케이싱과 인너튜브 및 콘크리트 오름방지장치를 유기적으로 결합시켜 콘크리트 타설 및 토목 구조물의 시공을 용이하도록 한 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 및 이의 시공방법을 제공하는데 제1 목적이 있다.Therefore, the present invention has been devised to solve the problems described above, steel pipe casing and inner tube and concrete rise prevention for the construction of cast-in-place concrete pile installed to strengthen the bearing capacity of the ground on which the civil structure is installed It is a first object to provide a cast-in-place concrete pile and an installation method thereof using an inner tube and a concrete rise prevention device that facilitate the construction of concrete and civil structures by organically combining the devices.

또한, 강관케이싱의 지중 관입시 변형 또는 파손을 방지하면서 이 강관케이싱이 순차적으로 관입됨과 동시에 관입 과정중 지중의 장애물을 절단하면서 관입할 수 있으며, 격한 마찰환경에서도 반복 사용이 가능하며, 관입효율이 향상되고, 말뚝 시공기간을 단축시킬 수 있도록 한 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 및 이의 시공방법을 제공하는데 제2 목적이 있다.In addition, this steel pipe casing can be intruded in sequence while preventing the deformation or breakage of the steel pipe casing, while cutting the obstacles in the ground during the penetration process, and can be repeatedly used even in a severe friction environment. It is a second object to provide an on-site cast concrete pile using an inner tube and a concrete rise prevention device that can improve and shorten the pile construction period, and a construction method thereof.

그리고, 강관케이싱내에 완벽한 철재 거푸집 형식을 갖는 인너튜브를 사용함으로써, 미경화콘크리트의 유실을 방지할 뿐만 아니라 슬라임의 과대발생을 막을 수 있는 현장타설 콘크리트말뚝 및 이의 시공방법을 제공하는데 제3 목적이 있다. In addition, by using an inner tube having a perfect formwork of steel in the steel pipe casing, a third object is to provide a cast-in-place concrete pile and a construction method thereof that can prevent the loss of uncured concrete and prevent excessive slime. have.                         

상기한 목적을 달성하기 위한 본 발명에 따른 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝은 지반에 소정의 깊이로 근입되며, 소정의 직경 및 길이를 갖는 강관케이싱과; 상기 강관케이싱내에 길이방향으로 소정의 깊이로 근입되며, 소정의 직경 및 길이를 갖는 인너튜브와; 상기 인너튜브내에 길이방향으로 소정의 깊이로 근입되며, 소정의 크기로 이루어진 철근망과; 상기 철근망내에 타설됨과 동시에 경화되는 콘크리트로 구성됨을 특징으로 한다.The cast-in-place concrete pile using the inner tube and the concrete rise prevention device according to the present invention for achieving the above object is a steel pipe casing having a predetermined diameter and length in the ground; An inner tube which is inserted into the steel pipe casing at a predetermined depth in a longitudinal direction and has a predetermined diameter and length; A reinforcing bar network embedded in the inner tube at a predetermined depth in a longitudinal direction and made of a predetermined size; It is characterized in that it is made of concrete which is poured in the reinforcing bar and hardened at the same time.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 시공방법은 지반에 소정의 직경 및 길이를 갖는 강관케이싱을 바이브로 햄머를 이용하여 소정의 깊이로 근입하는 단계(Ⅰ); 상기 강관케이싱내의 지반을 햄머그래브와 역환드릴(RCD)을 이용하여 소정의 깊이로 굴착하는 단계(Ⅱ); 상기 강관케이싱내에 길이방향으로 소정의 직경 및 길이를 갖는 인너튜브를 소정의 깊이로 근입하는 단계(Ⅲ); 상기 인너튜브내에 길이방향으로 소정의 크기로 이루어진 철근망을 소정의 깊이로 근입하는 단계(Ⅳ); 상기 철근망내 가운데에 트레미관을 설치하고, 상기 트레미관에 콘크리트를 타설함과 동시에 강관케이싱을 인발하는 단계(Ⅴ)로 이루어짐을 특징으로 한다.
In addition, in-site casting concrete pile construction method using the inner tube and the concrete rise prevention device according to the present invention for achieving the above object by using a steel pipe casing having a predetermined diameter and length on the ground using a vibro hammer hammer Entering into (I); Digging the ground in the steel pipe casing to a predetermined depth by using a hammer grab and a reverse drill (RCD) (II); Injecting an inner tube having a predetermined diameter and length in a longitudinal direction into the steel pipe casing at a predetermined depth; (IV) incorporating a reinforcing bar network having a predetermined size in a longitudinal direction in the inner tube to a predetermined depth; Step (V) is installed in the center of the reinforcing wire network, the concrete is poured into the tremy pipe and drawing steel pipe casing at the same time.

이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.

도 1 내지 도 6은 본 발명에 따른 현장타설 콘크리트말뚝의 시공 과정을 도시한 공정도로서, 도 1은 바이브로 햄머를 이용하여 지반에 강관케이싱을 근입하는 상태를 도시한 예시도이며, 도 2는 강관케이싱내의 토사층으로 이루어진 지반을 햄머그래브로 1차로 굴착하는 상태를 도시한 예시도이며, 도 3은 암반으로 이루어진 지반을 역환드릴(RCD)로 2차로 굴착하는 상태를 도시한 예시도이며, 도 4는 강관케이싱내에 인너튜브를 풍화암 상단까지 근입하는 상태를 도시한 예시도이며, 도 5는 도 4의 A부분을 확대 도시한 단면도이며, 도 6은 인너튜브내에 철근망을 근입하는 상태를 도시한 예시도이며, 도 7은 철근망내에 트레미관을 설치하고 콘크리트를 타설하면서 강관케이싱을 인발하는 상태를 도시한 예시도이며, 도 8a 내지 8d는 본 발명에 따른 현장타설 콘크리트말뚝에 사용되는 다양한 형상의 인너튜브를 도시한 단면도이며, 도 9a 내지 9d는 본 발명에 따른 현장타설 콘크리트말뚝에 사용되는 다양한 링형상의 콘크리트 오름방지장치를 도시한 단면도이며, 도 9e는 본 발명에 따른 현장타설 콘크리트말뚝에 사용되는 공기 주입식 콘크리트 오름방지장치를 도시한 예시도이다.1 to 6 is a process diagram showing the construction process of the cast-in-place concrete piles according to the present invention, Figure 1 is an exemplary view showing a state in which the steel pipe casing in the ground using a Vibro hammer, Figure 2 Figure 2 is an exemplary view showing a state of excavating the ground consisting of the soil layer in the steel pipe casing first with a hammer grab, Figure 3 is an exemplary view showing a state of excavating the ground made of rock secondary with a reverse drill (RCD), 4 is an exemplary view showing a state in which the inner tube is infiltrated to the upper end of the weathered rock in the steel pipe casing, FIG. 5 is an enlarged cross-sectional view of part A of FIG. 4, and FIG. Figure 7 is an exemplary view showing a state, Figure 7 is an exemplary view showing a state of drawing a steel pipe casing while installing a tremi tube in the reinforcing steel network and placing concrete, Figure 8a to 8d is a site casting according to the present invention Figure 9 is a cross-sectional view showing the inner tube of various shapes used in the concrete pile, Figures 9a to 9d is a cross-sectional view showing a variety of ring-shaped concrete rise prevention device used in the cast-in-place concrete pile according to the present invention, Figure 9e Exemplary diagram showing the air injection type concrete rise prevention device used in the cast-in-place concrete pile according to the invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝은 지반(10)에 소정의 깊이로 근입되며, 소정의 직경 및 길이를 갖는 강관케이싱(20)과; 상기 강관케이싱(20)내에 길이방향으로 소정의 깊이로 근입되며, 소정의 직경 및 길이를 갖는 인너튜브(60)와; 상기 인너튜브(60)내에 길이방향으로 소정의 깊이로 근입되며, 소정의 크기로 이루어진 철근망(70)과; 상기 철근망(70)내에 타설됨과 동시에 경화되는 콘크리트(90)로 구성된다.As shown in these drawings, the cast-in-place concrete piles using the inner tube and the concrete rise prevention device according to the present invention is entered into the ground 10 to a predetermined depth, the steel pipe casing 20 having a predetermined diameter and length and; An inner tube 60 inserted into the steel pipe casing 20 at a predetermined depth in a longitudinal direction and having a predetermined diameter and length; A reinforcing bar network 70 formed in the inner tube 60 at a predetermined depth in a longitudinal direction and made of a predetermined size; It is composed of concrete 90 which is poured into the reinforcing bar 70 and simultaneously hardened.

즉, 본 발명에 따른 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝은 강관케이싱(20), 인너튜브(60) 및 철근망(70)으로 구성된다.That is, the cast-in-place concrete pile using the inner tube and the concrete rise prevention device according to the present invention is composed of a steel pipe casing 20, the inner tube 60 and the reinforcing bar network 70.

여기서, 상기 강관케이싱(20)은 선단부와 연결부로 구성되는 바, 본 발명의 출원인이 기출원한 실용신안등록출원 20-2003-0004397(강관파일 연결구), 20-2003-0012498(현장 타설 콘크리트 말뚝용 케이싱 연결장치)에서 강관케이싱(20)에 대해 강관케이싱(20)의 선단부 및 연결부가 자세히 언급되어 있으므로 본 발명에서는 더 이상의 강관케이싱(20)에 대한 설명은 생략하기로 한다.Here, the steel pipe casing 20 is composed of a tip and a connecting portion, the utility model registration application 20-2003-0004397 (steel pipe pile connector), 20-2003-0012498 (in-site cast concrete piles filed by the applicant of the present invention) Casing connection device for the steel pipe casing 20 with respect to the tip and the connecting portion of the steel pipe casing 20 is mentioned in detail in the present invention, further description of the steel pipe casing 20 will be omitted.

또한, 상기 인너튜브(60)는 근입된 강관케이싱(20)이 콘크리트(90)의 경화시까지 근입되어 있다가 빼내야 함으로, 강관케이싱(20)과 공벽간에 콘크리트(90)가 유입되면 콘크리트(90)의 경화로 인하여 강관케이싱(20)이 빠지지 않으므로 이를 방지할 뿐만 아니라 공벽내의 강도를 보강하기 위해 강관케이싱(20) 내주면으로 인너튜브(60)를 설치한다.In addition, the inner tube 60 is a steel pipe casing 20 is inserted into the inlet until the hardening of the concrete 90, and then pulled out, the concrete 90 when the concrete 90 is introduced between the steel pipe casing 20 and the hollow wall ( Since the steel pipe casing 20 does not fall out due to the hardening of 90, the inner tube 60 is installed on the inner circumferential surface of the steel pipe casing 20 to not only prevent this but also reinforce the strength in the hollow wall.

여기서, 상기 인너튜브(60)는 그 단면형상이 원형관, 파형관, 나선관, 평활관, 주름관 중 어느 하나로 구성되고, 그 재질은 강판, 플라스틱, 섬유강화플라스틱(FRP) 등으로 구성된다.Here, the inner tube 60 has a cross-sectional shape formed of any one of a circular tube, a corrugated tube, a spiral tube, a smooth tube, and a corrugated tube, and the material is composed of steel sheet, plastic, fiber reinforced plastic (FRP), and the like.

또한, 상기 인너튜브(60)의 길이방향을 따라 외주면에 소정의 간격마다 스페이서(100)가 고정 설치된 구조이다.In addition, the spacer 100 is fixed to the outer circumferential surface at predetermined intervals along the longitudinal direction of the inner tube 60.

특히, 상기 스페이서(100)은 강관케이싱(20)에 인너튜브(60) 삽입시 인너튜브(60)의 위치를 정확하게 잡아주기 위해 설치되는 바, 즉 인너튜브(60)가 강관케이싱(20)내의 어느 한쪽에 치우지지 않도록 인너튜브(60)의 좌우측에 교호적으로 스페이서(100)를 설치하여 강관케이싱(20)내의 정확한 설치를 도모하기 위함이다.In particular, the spacer 100 is installed to accurately hold the position of the inner tube 60 when the inner tube 60 is inserted into the steel pipe casing 20, that is, the inner tube 60 is located within the steel pipe casing 20. In order to achieve accurate installation in the steel pipe casing 20 by alternately installing the spacer 100 on the left and right sides of the inner tube 60 so as not to be biased to either side.

또한, 상기 인너튜브(60)에는 그 하단부 외주면에 별도의 링형상 또는 공기주입식 콘크리트 오름방지장치(110, 120)가 설치되되, In addition, the inner tube 60 is provided with a separate ring-shaped or air-injected concrete rise prevention device (110, 120) on the outer peripheral surface of the lower end,

상기 링형상 콘크리트 오름방지장치(110)는 가운데가 중공(112)으로 이루어지며, 외주면에 날개부(114)가 형성되며, 그 단면형상이 원형, 콘형, 보스형 중 어느 하나의 형상으로 형성된 링형 콘크리트 오름방지장치(110)이다.The ring-shaped concrete rise prevention device 110 is formed in the center of the hollow 112, the wing portion 114 is formed on the outer circumferential surface, the cross-sectional shape is a ring-shaped formed in any one of the shape of a circle, cone, boss It is a concrete rise prevention device (110).

이는 강관케이싱(20)내에 인너튜브(60)가 위치된 상태에서 콘크리트(90)를 타설할 경우 타설된 콘크리트(90)가 하단부에서 차올라오면서 인너튜브(60)의 외주면과 강관케이싱(20)의 내주면 사이로 삐져 올라오는 것을 원천적으로 차단시키기 위함이다.When the concrete 90 is poured while the inner tube 60 is positioned in the steel pipe casing 20, the poured concrete 90 rises from the lower end of the inner tube 60 and the steel pipe casing 20. This is to block the sprinkling between the inner circumference.

또한, 상기한 공기주입식 콘크리트 오름방지장치(120)는 에어밸브(126)가 설치된 에어튜브(124)와; 상기 에어밸브(126)를 통해 에어튜브(124)에 공기를 주입하기 위한 파이프(128)로 구성되어, 상기 인너튜브(60)의 하단부에 철판(122)을 매개로 하여 고정 설치된다.In addition, the air injection concrete rise prevention device 120 includes an air tube 124, the air valve 126 is installed; Consists of a pipe 128 for injecting air into the air tube 124 through the air valve 126, it is fixed to the lower end of the inner tube 60 via the iron plate 122.

즉, 상기한 바와 같은 구성으로 이루어진 공기 주입식 콘크리트 오름방지장치(120)를 인너튜브(60)의 외측에 철판(122)을 매개로 하여 부착시켜 강관케이싱(20)내에 삽입하면, 강관케이싱(20)내에 인너튜브(60) 삽입시 인너튜브(60)의 외주면이 파손되는 것을 방지할 수 있고, 강관케이싱(20)내에 인너튜브(60) 삽입 후, 공기주입식 콘크리트 오름장치(120)의 파이프(128)를 통해 공기를 주입하면, 에어밸브(126)를 통해 에어튜브(124)내에 공기가 서서히 팽창되어져, 궁극적으로 강관케이싱(20)의 내주면과 인너튜브(60)의 외주면 사이의 공간을 에어튜브(124)가 막 아주게 된다. That is, when the air-injected concrete rise prevention device 120 having the configuration as described above is attached to the outside of the inner tube 60 through the iron plate 122 and inserted into the steel pipe casing 20, the steel pipe casing 20 When the inner tube 60 is inserted into the inner tube 60, the outer circumferential surface of the inner tube 60 can be prevented from being damaged, and after the inner tube 60 is inserted into the steel pipe casing 20, the pipe of the air-filled concrete climbing device 120 When the air is injected through the air 128, the air is gradually expanded in the air tube 124 through the air valve 126, and ultimately, the space between the inner circumferential surface of the steel pipe casing 20 and the outer circumferential surface of the inner tube 60 is air. Tube 124 is just about to come out.

따라서, 상기한 강관케이싱(20)의 내주면과 인너튜브(60)의 외주면 사이의 공간을 에어튜브(124)가 막아줌으로써, 콘크리트 타설로 인하여 콘크리트가 강관케이싱(20)의 내주면과 인너튜브(60)의 외주면 사이로 타설된 콘크리트가 차오르는 것을 방지할 수 있다.Therefore, the air tube 124 blocks the space between the inner circumferential surface of the steel pipe casing 20 and the outer circumferential surface of the inner tube 60, so that the concrete may be cast by the inner circumferential surface of the steel pipe casing 20 and the inner tube 60. It can prevent the concrete poured between the outer circumferential surface of the).

특히, 상기 공기 주입식 콘크리트 오름방지장치(120)는 철근망(70)을 이용하여 콘크리트를 타설할 경우, 타설된 콘크리트가 해류의 영향이나 또는 지하수의 영향 및 강관케이싱(20)의 인발로 인한 미경화콘크리트의 유실을 방지할 수 있다. In particular, the air-injected concrete rise prevention device 120 is when the concrete is poured using the reinforcing bar 70, the cast concrete is not due to the influence of the current or groundwater and the drawing of the steel pipe casing 20 Loss of hardened concrete can be prevented.

한편, 상기 철근망(70)은 종횡으로 철근이 결합되어 이루어진 원통형 구조체이다.On the other hand, the reinforcing bar 70 is a cylindrical structure consisting of reinforcing bars in the vertical and horizontal.

이와 같은 철근망(70)은 현장타설 콘크리트 말뚝의 주변부의 마찰력과 선단부의 지지력을 증대시키기 위함이다. Such a reinforcing bar 70 is to increase the frictional force of the periphery of the site-cast concrete piles and the bearing capacity of the tip.

상기한 바와 같은 구성으로 이루어진 본 발명에 따른 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝의 시공에 대해 설명한다. It describes the construction of the cast-in-place concrete pile using the inner tube and the concrete rise prevention device according to the present invention made of the configuration as described above.

본 발명에 따른 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 시공방법은 지반(10)에 소정의 직경 및 길이를 갖는 강관케이싱(20)을 바이브로 햄머(30)를 이용하여 소정의 깊이로 근입하는 단계(Ⅰ); 상기 강관케이싱(20)내의 지반(10)을 햄머그래브(40)와 역환드릴(RCD)(50)을 이용하여 소정의 깊이로 굴착하는 단계(Ⅱ); 상기 강관케이싱(20)내에 길이방향으로 소정의 직경 및 길이를 갖는 인너튜브(60)를 소정의 깊이로 근입하는 단계(Ⅲ); 상기 인너튜브(60)내 에 길이방향으로 소정의 크기로 이루어진 철근망(70)을 소정의 깊이로 근입하는 단계(Ⅳ); 상기 철근망(70)내 가운데에 트레미관(80)을 설치하고, 상기 트레미관(80)에 콘크리트(90)를 타설함과 동시에 강관케이싱(20)을 인발하는 단계(Ⅴ)로 이루어진다.In-site casting concrete pile construction method using the inner tube and the concrete rise prevention device according to the present invention by using a steel pipe casing 20 having a predetermined diameter and length on the ground (10) using a vibro hammer (30) Entering into (I); Excavating the ground (10) in the steel pipe casing (20) to a predetermined depth by using a hammer grab (40) and a reverse drill (RCD) (II); Inserting an inner tube (60) having a predetermined diameter and length in a longitudinal direction into the steel pipe casing (20) to a predetermined depth (III); A step (IV) of reinforcing the reinforcing bar network 70 having a predetermined size in the longitudinal direction in the inner tube 60 to a predetermined depth; Step (V) is installed in the center of the reinforcing bar 70, the concrete (90) is placed in the tremi pipe (80) and the steel pipe casing (20) at the same time.

여기서, 상기 지반(10) 굴착단계(Ⅱ)는 1차로 토사층(12) 또는 자갈층(14)으로 이루어진 지반(10)을 햄머그래브(40)를 이용하여 굴착하고, 2차로 풍화암(16) 또는 연암(18)으로 이루어진 지반(10)을 역환드릴(50)을 이용하여 굴착함과 동시에 슬라임을 제거한다.Here, in the excavation step (II) of the ground 10, the ground 10, which is composed of the soil layer 12 or the gravel layer 14, is excavated using the hammer grab 40, and the weathered rock 16 or the secondary is Excavating the ground (10) consisting of the soft rock (18) using a reverse drill (50) and removes slime at the same time.

또한, 상기 인너튜브(60) 근입단계(Ⅳ)는 인너튜브(60)의 하단부에 공기 주입식 콘크리트 오름방지장치(120)을 부착한 상태로 강관케이싱(20)내 지반(10)의 풍화암(16) 상단까지 근입한다.In addition, the inner tube 60 indentation step (IV) is a weathered rock (16) of the ground 10 in the steel pipe casing 20 in the state that the air injection type concrete rise prevention device 120 is attached to the lower end of the inner tube (60) ) Enter to the top.

그리고, 상기 인너튜브(60)를 강관케이싱(20)내에 근입시킨 후, 공기 주입식 콘크리트 오름방지장치(120)의 파이프(128)를 통해 공기를 주입하여 에어튜브(120)를 팽창시키는 단계를 추가한다.In addition, after the inner tube 60 is inserted into the steel pipe casing 20, the air tube 120 is expanded by injecting air through the pipe 128 of the air injection type concrete rise prevention device 120. do.

여기서, 상기 공기 주입식 콘크리트 오름방지장치(120)의 에어튜브(120)에 공기를 주입하여 팽창시키면, 인너튜브(60)내에 콘크리트 타설로 인한 콘크리트의 차오름을 방지할 수 있는 작용효과가 있다.Here, when the air is injected into the air tube 120 of the air-injected concrete rise prevention device 120 to expand, there is an effect that can prevent the filling of the concrete due to the concrete pouring in the inner tube (60).

즉, 본 발명에 따른 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 시공방법은 강관케이싱(20)을 바이브로 햄머(30)로 지반(10)에 근입시킨 후, 상기 강관케이싱(20)내를 햄머그래브(40)로 1차로 토사층(12), 자갈층(14)을 굴착하며, 역환드릴(RCD)로 2차로 암반(16, 18)을 굴착하면서 슬라임을 제거하고, 상기 강관케이싱(20)내에 인너튜브(60)를 근입하되, 상기 인너튜브(60)의 하단에 콘크리트 오름방지장치(110, 120)를 취부한 상태로 하여 풍화암(16) 상단까지 근입하며, 상기 인너튜브(60)내에 철근망(70)을 근입하며, 트레미관(80)을 통해 콘크리트(90)를 타설함과 동시에 강관케이싱(20)을 인발하여 지중에 현장타설 콘크리트 말뚝을 형성하는 것이다.That is, in-situ concrete pile construction method using the inner tube and the concrete rise prevention device according to the present invention after the steel pipe casing 20 to the ground (10) by vibro hammer 30, the steel pipe casing (20) Excavate the soil layer 12 and the gravel layer 14 primarily with the hammer grab 40, and remove the slime while digging the rocks 16 and 18 secondly with a reverse drill (RCD), and the steel pipe casing ( 20, the inner tube 60 is indented, and the concrete rise prevention device (110, 120) is attached to the lower end of the inner tube (60) to the upper end of the weathered rock (16), the inner tube (60) Into the reinforcing steel bar 70, and to cast concrete 90 through the tremi pipe 80 and at the same time to draw the steel pipe casing 20 to form a cast-in-place concrete pile in the ground.

따라서, 상기한 바와 같은 구성 및 시공으로 이루어진 본 발명에 따른 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 및 이의 시공방법은 토목 구조물이 설치되는 지반의 지지력을 강화하기 위하여 설치하는 현장타설 콘크리트말뚝 시공을 위한 강관케이싱(20)과 인너튜브(60) 및 공기 주입식 콘크리트 오름방지장치(120)를 유기적으로 결합시켜 콘크리트 타설 및 토목 구조물의 시공이 용이하며, 강관케이싱(20)의 지중 관입시 변형 또는 파손을 방지하면서 이 강관케이싱(20)이 순차적으로 관입됨과 동시에 관입 과정중 지중의 장애물을 절단하면서 관입할 수 있으며, 격한 마찰환경에서도 강관케이싱(20)의 반복 사용이 가능하며, 강관케이싱(20)의 관입효율이 향상되고, 말뚝 시공기간을 단축시킬 수 있으며, 강관케이싱(20)내에 완벽한 철재 거푸집 형식을 갖는 인너튜브(60) 및 공기 주입식 콘크리트 오름방지장치(120)를 사용함으로써, 콘크리트의 유실을 방지할 뿐만 아니라 슬라임의 과대발생을 막을 수 있는 작용효과가 있다.Therefore, the site-casting concrete pile and the construction method using the inner tube and the concrete rise prevention device according to the present invention made of the configuration and construction as described above and the construction method is installed to strengthen the bearing capacity of the ground on which the civil structure is installed Steel pipe casing (20) and inner tube (60) and air-injected concrete rise prevention device (120) for pile construction are organically combined to facilitate the construction of concrete pouring and civil structures, and when the underground pipe penetration of steel pipe casing (20) The steel pipe casing 20 is introduced in sequence while preventing deformation or breakage, and the steel pipe casing 20 can be infiltrated while cutting the obstacles in the ground during the penetration process, and the steel pipe casing 20 can be repeatedly used even in a severe friction environment. Penetration efficiency of (20) can be improved, the pile construction period can be shortened, and perfect in the steel pipe casing (20) By using the inner tube 60 and the inflatable concrete rise prevention device 120 has a die steel type, the functions and effects which can not only prevent the loss of concrete prevent excessive generation of slime.

이상에서 설명한 바와 같이, 본 발명에 따른 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 및 이의 시공방법은 다음과 같은 효과가 있다.As described above, the cast-in-place concrete pile and the construction method using the inner tube and the concrete rise prevention device according to the present invention has the following effects.

첫째, 본 발명은 토목 구조물이 설치되는 지반의 지지력을 강화하기 위하여 설치하는 현장타설 콘크리트말뚝 시공을 위한 강관케이싱과 인너튜브 및 콘크리트 오름 방지장치를 유기적으로 결합시켜 콘크리트 타설 및 토목 구조물의 시공을 용이하게 하여 공사기간을 단축시킬 뿐만 아니라 토목 구조물의 품질이 향상되는 이점이 있다.First, the present invention facilitates the construction of concrete pouring and civil structures by organically combining the steel pipe casing and the inner tube and concrete rise prevention device for the construction of the site-placed concrete pile installed to strengthen the bearing capacity of the ground on which the civil structure is installed This shortens the construction period and has the advantage of improving the quality of civil engineering structures.

둘째, 본 발명은 강관케이싱의 지중 관입시 변형 또는 파손을 방지하면서 이 강관케이싱이 순차적으로 관입됨과 동시에 관입 과정중 지중의 장애물을 절단하면서 관입할 수 있으며, 격한 마찰환경에서도 반복 사용이 가능하며, 관입효율이 향상되고, 말뚝 시공기간을 단축시킬 수 있는 이점이 있다. Secondly, the present invention can be intrusive while cutting the obstacles in the ground during the penetration process while the steel pipe casing is sequentially infiltrated while preventing deformation or breakage during the underground penetration of the steel pipe casing, it can be used repeatedly in a severe friction environment, Penetration efficiency is improved, there is an advantage that can shorten the pile construction period.

셋째, 본 발명은 강관케이싱내에 완벽한 철재 거푸집 형식을 갖는 인너튜브를 사용함으로써, 콘크리트의 유실을 방지할 뿐만 아니라 슬라임의 과대발생을 막을 수 있는 이점이 있다.Third, the present invention has the advantage of preventing the loss of concrete as well as preventing the loss of concrete by using an inner tube having a perfect formwork of steel in the steel pipe casing.

Claims (9)

지반(10)에 소정의 깊이로 근입되며, 소정의 직경 및 길이를 갖는 강관케이싱(20)과; A steel pipe casing 20 which is recessed in the ground 10 to a predetermined depth and has a predetermined diameter and length; 상기 강관케이싱(20)내에 길이방향으로 소정의 깊이로 근입되며, 소정의 직경 및 길이를 갖는 인너튜브(60)와;An inner tube 60 inserted into the steel pipe casing 20 at a predetermined depth in a longitudinal direction and having a predetermined diameter and length; 상기 인너튜브(60)내에 길이방향으로 소정의 깊이로 근입되며, 소정의 크기로 이루어진 철근망(70)과; A reinforcing bar network 70 formed in the inner tube 60 at a predetermined depth in a longitudinal direction and made of a predetermined size; 상기 철근망(70)내에 타설됨과 동시에 경화되는 콘크리트(90)로 구성됨을 특징으로 하는 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝.Cast-in-place concrete pile using the inner tube and the concrete rise prevention device, characterized in that consisting of concrete 90 is being cast and hardened at the same time in the rebar network (70). 제 1항에 있어서, The method of claim 1, 상기 인너튜브(60)는 그 단면형상이 원형관, 파형관, 나선관, 평활관, 주름관 중 어느 하나로 구성됨을 특징으로 하는 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝.The inner tube 60 is a cast-in-place concrete pile using an inner tube and a concrete rise prevention device, characterized in that the cross-sectional shape is composed of any one of a circular tube, corrugated tube, spiral tube, smooth tube, corrugated tube. 제 1항에 있어서, The method of claim 1, 상기 인너튜브(60)는 그 외주면에 콘크리트 오름방지장치(110)이 설치되되, 상기 콘크리트 오름방지장치(110)은 가운데가 중공(112)으로 이루어지며, 외주면에 날개부(114)가 형성된 링형 콘크리트 오름방지장치(110)로 구성됨을 특징으로 하는 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝.The inner tube 60 is a concrete rise prevention device 110 is installed on its outer circumferential surface, the concrete rise prevention device 110 is made of a hollow 112 in the center, the ring portion 114 is formed on the outer circumferential surface Cast-in-place concrete pile using the inner tube and the concrete rise prevention device, characterized in that consisting of the concrete rise prevention device (110). 제 1항에 있어서, The method of claim 1, 상기 인너튜브(60)는 그 외주면에 콘크리트 오름방지장치(120)가 철판(122)을 매개로 하여 고정 설치되되, 상기 콘크리트 오름방지장치(120)는 에어밸브(126)가 설치된 에어튜브(124)와; 상기 에어밸브(126)를 통해 에어튜브(124)에 공기를 주입하기 위한 파이프(128)로 구성되는 공기 주입식 콘크리트 오름방지장치(120)로 구성됨을 특징으로 하는 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝.The inner tube 60 is installed on the outer circumferential surface of the concrete rise prevention device 120 via the iron plate 122, the concrete rise prevention device 120 is an air tube 124 air valve 126 is installed )Wow; Using an inner tube and a concrete rise prevention device, characterized in that the air injection-type concrete rise prevention device 120 is composed of a pipe 128 for injecting air into the air tube 124 through the air valve 126 Cast-in-place concrete piles. 제 3항에 있어서,The method of claim 3, wherein 상기 콘크리트 오름 방지링(110)은 그 단면형상이 원형, 콘형, 보스형 중 어느 하나의 형상으로 형성됨을 특징으로 하는 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝.The concrete rise prevention ring 110 is a cast-in-place concrete pile using an inner tube and a concrete rise prevention device, characterized in that the cross-sectional shape is formed in any one of a circular, cone-shaped, boss type. 지반(10)에 소정의 직경 및 길이를 갖는 강관케이싱(20)을 바이브로 햄머(30)를 이용하여 소정의 깊이로 근입하는 단계(Ⅰ);Injecting a steel pipe casing (20) having a predetermined diameter and length into the ground (10) to a predetermined depth using a vibro hammer (30); 상기 강관케이싱(20)내의 지반(10)을 햄머그래브(40)와 역환드릴(RCD)(50)을 이용하여 소정의 깊이로 굴착하는 단계(Ⅱ); Excavating the ground (10) in the steel pipe casing (20) to a predetermined depth by using a hammer grab (40) and a reverse drill (RCD) (II); 상기 강관케이싱(20)내에 길이방향으로 소정의 직경 및 길이를 갖는 인너튜브(60)를 소정의 깊이로 근입하는 단계(Ⅲ); Inserting an inner tube (60) having a predetermined diameter and length in a longitudinal direction into the steel pipe casing (20) to a predetermined depth (III); 상기 인너튜브(60)내에 길이방향으로 소정의 크기로 이루어진 철근망(70)을 소정의 깊이로 근입하는 단계(Ⅳ); Step (IV) incorporating a reinforcing bar network 70 having a predetermined size in a longitudinal direction in the inner tube 60 to a predetermined depth; 상기 철근망(70)내 가운데에 트레미관(80)을 설치하고, 상기 트레미관(80)에 콘크리트(90)를 타설함과 동시에 강관케이싱(20)을 인발하는 단계(Ⅴ)로 이루어짐을 특징으로 하는 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 시공방법.Step (V) is installed in the center of the reinforcing bar (70), the concrete (90) is placed in the tremi pipe (80) and the steel pipe casing (20) is drawn out at the same time. In-cast concrete pile construction method using inner tube and concrete rise prevention device. 제 6항에 있어서, The method of claim 6, 상기 지반(10) 굴착단계(Ⅱ)는 1차로 토사층(12) 또는 자갈층(14)으로 이루어진 지반(10)을 햄머그래브(40)를 이용하여 굴착하고, 2차로 풍화암(16) 또는 연암(18)으로 이루어진 지반(10)을 역환드릴(50)을 이용하여 굴착함과 동시에 슬라임을 제거함을 특징으로 하는 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 시공방법. In the excavation step (II) of the ground 10, the ground 10 consisting of the soil layer 12 or the gravel layer 14 is excavated using the hammer grab 40, and the weathered rock 16 or the soft rock (secondary) ( 18) the method of constructing concrete piles using the inner tube and the concrete rise prevention device, characterized in that the ground (10) consisting of excavation and removal of slime at the same time using the reverse drill (50). 제 6항에 있어서, The method of claim 6, 상기 인너튜브(60) 근입단계(Ⅳ)는 인너튜브(60)의 하단부에 공기 주입식 콘크리트 오름방지장치(120)을 부착한 상태로 강관케이싱(20)내 지반(10)의 풍화암(16) 상단까지 근입함을 특징으로 하는 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 시공방법. The inner tube 60 indentation step (IV) is the upper end of the weathered rock (16) of the ground (10) in the steel pipe casing (20) with the air-injected concrete rise prevention device (120) attached to the lower end of the inner tube (60) Construction method of cast-in-place concrete pile using inner tube and concrete rise prevention device characterized in 제 6항 또는 제 8항에 있어서,The method according to claim 6 or 8, 상기 인너튜브(60)를 강관케이싱(20)내에 근입시킨 후, 공기 주입식 콘크리트 오름방지장치(120)의 파이프(128)를 통해 공기를 주입하여 에어튜브(120)를 팽창시키는 단계를 추가함을 특징으로 하는 인너튜브와 콘크리트 오름방지장치를 사용한 현장타설 콘크리트말뚝 시공방법.After the inner tube 60 is inserted into the steel pipe casing 20, the air tube 120 is expanded by injecting air through the pipe 128 of the air-injected concrete rise prevention device 120. Construction method of cast-in-place concrete piles using inner tube and concrete rise prevention device.
KR1020040093366A 2004-11-16 2004-11-16 Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this KR100618597B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040093366A KR100618597B1 (en) 2004-11-16 2004-11-16 Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040093366A KR100618597B1 (en) 2004-11-16 2004-11-16 Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0032366U Division KR200375610Y1 (en) 2004-11-16 2004-11-16 Cast in place concrete pile using vibro magnetic shovel hammer

Publications (2)

Publication Number Publication Date
KR20060054711A KR20060054711A (en) 2006-05-23
KR100618597B1 true KR100618597B1 (en) 2006-09-04

Family

ID=37151000

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040093366A KR100618597B1 (en) 2004-11-16 2004-11-16 Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this

Country Status (1)

Country Link
KR (1) KR100618597B1 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100758113B1 (en) 2006-11-03 2007-09-11 김지용 Cast-in-place large diameter piling method by casing rotator in underwater rock conditions
KR100846874B1 (en) 2007-05-11 2008-07-16 은성기초건설(주) Methode of ground drilling for pier foundation
KR101039554B1 (en) * 2010-11-08 2011-06-09 이승수 Combination pile having a cast in place concrete pile combined with a phc or steel pile and the construction method using the same
WO2011126170A1 (en) * 2010-04-09 2011-10-13 Kim Sung-Kyu Construction method of pre-stressed cast-in -place concrete pile and structure thereof
KR101543209B1 (en) * 2015-04-28 2015-08-07 박을재 Boring and grouting constructuring method and post with Geo tube
KR101664368B1 (en) 2016-04-27 2016-10-24 박을재 A cast-in place pile arrangement method for head of concrete pile exposed to outside using geo tube
KR101710363B1 (en) 2015-09-11 2017-02-27 박을재 Geo tube for Concrete Pile driven in field and the seaming method
KR101878832B1 (en) * 2018-06-05 2018-07-17 대림산업 주식회사 Tremie Plate Having a Crane Function of Reinforcing Bar and Verticality Maintaining Method for Reinforcing Bar of the Reinforced Concrete Pile Using the Same
KR102358223B1 (en) 2021-04-22 2022-02-08 에스오씨기술지주 주식회사 Sacrificial steel pipe saving cast in placed pile and the construction method therefor
KR102456454B1 (en) 2021-11-26 2022-10-19 에스오씨기술지주 주식회사 Sacrificial steel pipe saving cast in placed pile and the construction method therefor

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101022045B1 (en) * 2010-06-08 2011-03-16 주식회사 지앤지테크놀러지 A tidal current generator
JP2017141607A (en) * 2016-02-10 2017-08-17 清水建設株式会社 Ground improvement method
CN106337414A (en) * 2016-09-20 2017-01-18 上海振中机械制造有限公司 Method for vibration impact holing and pile forming

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5837223A (en) 1981-08-27 1983-03-04 Taisei Corp Constructing method for cast-in-place concrete pile
JPH0453831U (en) * 1990-09-13 1992-05-08
JPH068435U (en) * 1992-07-06 1994-02-04 大成建設株式会社 Pile head reinforcement structure
KR0148437B1 (en) * 1995-07-14 1998-11-02 노명관,성학중 Pile construction method in underground boulder zone
KR200325151Y1 (en) 2003-05-16 2003-09-02 주식회사 대왕 이엔씨 The isolated footing type under-Reamed

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5837223A (en) 1981-08-27 1983-03-04 Taisei Corp Constructing method for cast-in-place concrete pile
JPH0453831U (en) * 1990-09-13 1992-05-08
JPH068435U (en) * 1992-07-06 1994-02-04 大成建設株式会社 Pile head reinforcement structure
KR0148437B1 (en) * 1995-07-14 1998-11-02 노명관,성학중 Pile construction method in underground boulder zone
KR200325151Y1 (en) 2003-05-16 2003-09-02 주식회사 대왕 이엔씨 The isolated footing type under-Reamed

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100758113B1 (en) 2006-11-03 2007-09-11 김지용 Cast-in-place large diameter piling method by casing rotator in underwater rock conditions
KR100846874B1 (en) 2007-05-11 2008-07-16 은성기초건설(주) Methode of ground drilling for pier foundation
WO2011126170A1 (en) * 2010-04-09 2011-10-13 Kim Sung-Kyu Construction method of pre-stressed cast-in -place concrete pile and structure thereof
KR101152265B1 (en) 2010-04-09 2012-06-14 김성규 Prestressed bored pile construction method and structures
KR101039554B1 (en) * 2010-11-08 2011-06-09 이승수 Combination pile having a cast in place concrete pile combined with a phc or steel pile and the construction method using the same
KR101543209B1 (en) * 2015-04-28 2015-08-07 박을재 Boring and grouting constructuring method and post with Geo tube
WO2016175445A1 (en) * 2015-04-28 2016-11-03 주식회사 서호아이씨피 건설 Cast-in-place concrete post using geotube and damage prevention device therefor, and construction method therefor
KR101710363B1 (en) 2015-09-11 2017-02-27 박을재 Geo tube for Concrete Pile driven in field and the seaming method
KR101664368B1 (en) 2016-04-27 2016-10-24 박을재 A cast-in place pile arrangement method for head of concrete pile exposed to outside using geo tube
KR101878832B1 (en) * 2018-06-05 2018-07-17 대림산업 주식회사 Tremie Plate Having a Crane Function of Reinforcing Bar and Verticality Maintaining Method for Reinforcing Bar of the Reinforced Concrete Pile Using the Same
KR102358223B1 (en) 2021-04-22 2022-02-08 에스오씨기술지주 주식회사 Sacrificial steel pipe saving cast in placed pile and the construction method therefor
KR102456454B1 (en) 2021-11-26 2022-10-19 에스오씨기술지주 주식회사 Sacrificial steel pipe saving cast in placed pile and the construction method therefor

Also Published As

Publication number Publication date
KR20060054711A (en) 2006-05-23

Similar Documents

Publication Publication Date Title
KR100964796B1 (en) Method for constructing the steel pipe-concrete composite pile structurized of burying and unifying into the bedrock, and a pile construction
KR101664368B1 (en) A cast-in place pile arrangement method for head of concrete pile exposed to outside using geo tube
JP5584542B2 (en) Ground deformation prevention method and underground structure construction method using the same
KR100618597B1 (en) Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this
JP2018024982A (en) Reinforcement method and reinforcement structure of existing pile foundation
KR100927186B1 (en) Method of constructing cantilevered continuous wallsfor retaining earth and cutting off water
KR100914158B1 (en) Process of blocking water penetration and blocking earth collapsing by using impermeable wall without strut
KR20110041391A (en) Pile structure
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
KR102173079B1 (en) Composite phc pile for soil retaining wall
KR20100035349A (en) Construction method of retaining wall using cast-in-place pile
JP2000352296A (en) Method o constructing passage just under underground structure
KR102113291B1 (en) Soil retaining wall using phc pile and construction method thererof
KR101974826B1 (en) The Precast Pile Having Interlocking Secant and The Earth Retaining Wall Method Constructed by It's Continuous Pile
JP4485006B2 (en) Construction method for underground structures
KR102082495B1 (en) Low part cast in place pile construction method
KR200375610Y1 (en) Cast in place concrete pile using vibro magnetic shovel hammer
JP2790038B2 (en) Reinforcement method of existing pile foundation building
JP3919852B2 (en) Method for construction of cast-in-place pile
KR101047257B1 (en) Construction method of earth wall using composite sheet pile
KR200296444Y1 (en) Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method
KR100429283B1 (en) Construction Method using Precast Concrete for Diaphragm Wall
KR200373276Y1 (en) Steel pipe pile of support structure
JP2000178966A (en) Structure of diaphragm wall
JP4344733B2 (en) Seismic reinforcement structure for existing pile foundation structures

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120827

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20130826

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140812

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150603

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20160620

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20170811

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20180811

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20190715

Year of fee payment: 14