KR101039554B1 - Combination pile having a cast in place concrete pile combined with a phc or steel pile and the construction method using the same - Google Patents

Combination pile having a cast in place concrete pile combined with a phc or steel pile and the construction method using the same Download PDF

Info

Publication number
KR101039554B1
KR101039554B1 KR1020100110540A KR20100110540A KR101039554B1 KR 101039554 B1 KR101039554 B1 KR 101039554B1 KR 1020100110540 A KR1020100110540 A KR 1020100110540A KR 20100110540 A KR20100110540 A KR 20100110540A KR 101039554 B1 KR101039554 B1 KR 101039554B1
Authority
KR
South Korea
Prior art keywords
pile
hole
ground
cast
buried
Prior art date
Application number
KR1020100110540A
Other languages
Korean (ko)
Inventor
이승수
Original Assignee
이승수
(주)하경엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이승수, (주)하경엔지니어링 filed Critical 이승수
Priority to KR1020100110540A priority Critical patent/KR101039554B1/en
Application granted granted Critical
Publication of KR101039554B1 publication Critical patent/KR101039554B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder

Abstract

PURPOSE: A composite pile composed of a cast-in-place pile and a buried pile and a construction method thereof are provided to improve the bearing capacity of a cast-in-place pile by introducing an IGM ground theory, and to heighten constructability and to construct economically by securing the quality of manufactured goods and promoting the improvement of constructability simultaneously. CONSTITUTION: A composite pile(100) composed of a cast-in-place pile and a buried pile contains: a cast-in-place pile portion(110) formed on the lower part and provided with a reinforcement cage(114) inserted to a hole formed in the ground and concrete surrounding the reinforcement cage in the hole; a buried pile portion(130) formed on the upper part and including a pre-tensioned spun high strength concrete pile or a steel pipe pile which is opened upward; and a connector(160) connecting the top of the cast-in-place pile portion and the bottom of the buried pile portion integrally and including a pressure plate(162) dispersing the concentrated load caused by the buried pile portion equally to the whole surface of the cast-in-place pile portion.

Description

현장타설말뚝과 매입말뚝을 결합한 혼합말뚝 및 그 시공방법{COMBINATION PILE HAVING A CAST IN PLACE CONCRETE PILE COMBINED WITH A PHC OR STEEL PILE AND THE CONSTRUCTION METHOD USING THE SAME}Technical Field [0001] The present invention relates to a pile incorporating a pile and a pile, and a method of constructing the pile. [0002]

본 발명은 지중에 설치되는 말뚝 및 그 시공방법에 관한 것으로, 보다 상세히는 하부측에 현장타설 파일부를 형성하고, 상부측에 기성제품의 매입 파일부를 형성하며, 그 사이에는 이들을 일체로 연결시키는 연결수단을 설치하여 현장타설말뚝의 높은 지지력과, 기성제품(PHC말뚝, 강관말뚝)의 품질보증과 시공성으로 경제성이 우수한 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝 및 그 시공방법에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a pile installed in the ground and a method of constructing the pile, and more particularly, to a pile installed on the lower side and a buried pile of the finished product on the upper side, (PHC pile, steel pipe pile), and a method for constructing the mixed pile. The present invention also relates to a method for constructing a mixed pile,

일반적으로 말뚝은 연약한 지반에서 구조물을 거치할 때 부족한 지지력을 보완하기 위하여, 높은 강도의 깊은 지반에 하중을 전달할 때 사용되는 구조체이다.Generally, a pile is a structure used to transfer loads to deep grounds with high strength to compensate for insufficient bearing capacity when mounting structures on soft grounds.

이때, 말뚝의 지지력은 말뚝 선단과 말뚝 전체 길이의 주변 지반 조건에 따라 결정되어 진다. 종래에는 말뚝의 지지력을 산정할 때 지반조건을 점성토, 사질토와 암반으로 분류하여 적용하였다. In this case, the bearing capacity of the pile depends on the surrounding ground conditions of the pile tip and the entire length of the pile. Conventionally, when estimating the bearing capacity of piles, the ground conditions are classified into clayey soil, sandy soil and rock.

그러나 점성토와 암반, 사질토와 암반의 중간 특성을 갖는 IGM 지반(IGM,Intermediate GeoMaterial, 국내는 대개 풍화암에 해당)의 조건에 적합한 지지력 산정방법이 제시되지 않아 부득이 사질토나 점성토 지지력 산정방법을 적용하였고, 풍화암에서는 실제보다 저평가된 지지력이 산출되었다. However, since the method of estimating the bearing capacity suitable for the conditions of IGM (Intermediate GeoMaterial, IGM, which is mostly weathered in Korea) with intermediate characteristics between clayey soil and rock, sandy soil and rock mass is not suggested, inevitably, sandy soil or clay soil bearing force calculation method is applied, In weathered rock, bearing capacity less than actual was calculated.

이러한 지지력 결과에 의해 설계자는 풍화암에 말뚝을 지지하는 것을 회피하고, 가급적 연암이나 경암의 기반암에 지지하도록 설계하여 일부 지반에서는 매우 비경제적인 설계가 되었다.As a result of this bearing capacity, the designers have been designed to avoid supporting piles in weathered rocks and to support the bedrock of soft rocks or light rocks as much as possible.

최근에는 이러한 불합리성을 해결하고자 지반의 분류를 점성토, 사질토, 암반에 IGM 지반을 추가하여 4가지로 분류하였고, 지지력도 별도의 공식을 적용하도록 합리화하였다. 이러한 IGM 지반의 지지력은 타입이나 매입말뚝이 아닌 현장타설말뚝에 적용되도록 고안되어 최근에는 현장타설말뚝 설계에 일부 반영하고 있다. Recently, in order to solve this irrationality, IGM ground is classified into 4 types of clay soils, sandy soil and rock bed, and rationalization of bearing capacity is applied. The bearing capacity of IGM ground is designed to be applied to excavated pile instead of type or embedded pile.

이 IGM 이론에 근거하여 풍화암에서 중구경의 현장타설말뚝의 지지력을 산정하면 사질토와 점성토에 해당하는 기존이론에 따른 타입이나 매입말뚝보다 2~3배의 지지력 증가 효과가 있는 것으로 검토되었다.Based on this IGM theory, it is considered that the bearing capacity of the drilled pile of medium size in weathered rock is estimated to be 2 ~ 3 times higher than that of the conventional type according to the theories of sandy soil and clayey soil.

도 1에는 기존이론과 IGM 이론에 의한 현장타설말뚝(1)의 지지력 비교를 위한 일례가 도시되어 있다.FIG. 1 shows an example for comparing the bearing capacity of the drilled pile 1 according to the existing theory and the IGM theory.

즉, 0.5m의 직경으로, 토사층(10) 8m 깊이와, 풍화암층(20) 1.5m 깊이로 시공된 현장타설말뚝(1)에 대하여 기존이론과 IGM 이론의 비교 결과 아래 [표 1]과 같은 결과를 얻었다.The results of the comparison between the existing theory and the IGM theory for a drilled pile (1) with a diameter of 0.5 m and a depth of 8 m for the soil layer (10) and a depth of 1.5 m for the weathered rock layer (20) .

구 분         division 기존 이론        Existing theory IGM 이론       IGM theory 극한 지지력        Ultimate bearing capacity 211 tonf        211 tonf 570 tonf       570 tonf 허용 지지력       Allowable bearing capacity 70 tonf         70 tonf 190 tonf       190 tonf 검토 결과        Review the results 풍화암 1.5m까지 말뚝을 근입하여 기존 이론과 IGM 이론을 비교한 결과 지지력이 2.7배 증가 Comparing the existing theory with the IGM theory by applying the pile up to 1.5 m of weathered rock, the bearing capacity increased 2.7 times

현장타설말뚝은 내부를 굴착하고 조립된 보강 철근망을 삽입하며, 콘크리트를 타설하여 말뚝을 형성시키므로 대구경(φ800mm 이상)에 주로 적용되고 있다.Field drilled piles are mainly applied to large diameter (φ800mm or more) because they drill the inside, insert the assembled reinforcing steel net, and form concrete by piling concrete.

그리고, 구조물의 기초에 주로 적용되는 중구경 이하의 말뚝(φ300~600mm)에는 현장타설말뚝을 적용할 경우 말뚝 보강체 보강 철근망의 제작 및 설치에 따른 품질관리가 어렵고, 시간 및 비용이 많이 소요되어 기성제품(PHC말뚝, 강관말뚝)을 이용한 매입말뚝이나 타입말뚝이 주로 적용되고 있다.In case of pile (φ300 ~ 600mm), which is mainly applied to the foundations of the structure, the quality of pile reinforcing steel reinforcement network is difficult to control and the time and cost are high (PHC pile, steel pipe pile), and pile and type pile are mainly applied.

이때, 상기 매입말뚝을 시공하기 위해서는 지반을 천공하는데 천공경은 매입말뚝보다 50~100mm 크게 하고 말뚝을 삽입하므로 천공경에 비해 적은 면적으로 지지력이 산정되어 손실이 발생한다. 그러나 현장타설 말뚝은 천공경 전체를 지지면으로 사용할 수 있으므로 IGM 지반 이론에 의한 지지력 증가와 더불어 천공경 전단면의 활용에 따른 지지력의 증가도 기대할 수 있다.In this case, in order to construct the embedded pile, the ground is punctured, and the pierced hole is 50 to 100 mm larger than the pile and the pile is inserted. Therefore, the bearing capacity is estimated to be less than the pile diameter. However, since the drilled pile can be used as a supporting surface, it is expected that the bearing capacity of the pile will increase with the increase of the bearing capacity by the IGM ground theory.

발명의 목적은 상기와 같은 종래의 문제점을 해소시키기 위한 것으로서, IGM 지반이론을 도입하여 현장타설말뚝의 지지력을 개선하고, 기성제품(PHC말뚝, 강관말뚝)을 이용한 매입말뚝의 장점인 품질보증과 시공성 향상을 동시에 도모할 수 있어, 시공성을 높이고 경제적인 구축이 가능한 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝 및 그 시공방법을 제공함에 있다. It is an object of the present invention to overcome the above-mentioned problems of the prior art by introducing the IGM ground theory to improve the bearing capacity of the cast-in-place pile and to provide quality assurance which is an advantage of a pile using an existing product (PHC pile, steel pipe pile) The present invention also provides a method for constructing a mixed pile in which a castable pile is combined with a buried pile so as to improve the workability and improve the workability and economical construction.

상기와 같은 목적을 달성하기 위하여 본 발명은, 풍화암층이 형성된 지중에 설치되는 말뚝에 있어서,According to an aspect of the present invention, there is provided a pile installed in a ground where a weathering-resistant layer is formed,

지반을 천공하여 형성된 구멍내에 하부는 높은 지지력 확보가 용이한 현장타설말뚝을, 상부측은 시공성과 경제성이 양호한 PHC말뚝 또는 강관말뚝을 포함하는 기성제품의 매입말뚝을 설치하는 것을 특징으로 하는 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝을 제공한다.Wherein the lower pile is provided with a cast-in-place pile which is easy to secure a high supporting force in a hole formed by perforating the ground, and the upper side is a pile of a ready-made product including a PHC pile or a steel pipe pile having good workability and economic efficiency. And a mixed pile combining the pile and the pile.

즉, 지중의 풍화암층까지 구멍을 천공하여 하부측은 풍화암층에 형성된 구멍에서 선단지지력과 주변마찰력에 의한 지지력 확보가 용이한 현장타설말뚝을, 상부측은 PHC 말뚝 또는 강관말뚝을 포함하는 기성제품의 매입말뚝을 설치하되, 상기 현장타설말뚝은 구멍의 하부측에 현장타설말뚝용 콘크리트를 타설하여 현장타설 파일부로 형성시키고, 상기 매입말뚝은 현장타설 파일부의 상부측에 삽입되는 보강 철근망이 하부에 부착된 PHC말뚝 또는 강관말뚝을 포함하는 매입 파일부로 형성시키며, 상기 현장타설 파일부의 상단과 매입 파일부의 하단 사이에 매입 파일부에 의한 하중을 현장타설 파일부에 원활하게 전달시키는 지압판을 포함하는 연결수단을 설치하되,In other words, a hole is drilled up to the weathered rock layer in the ground, and the lower part is a pile of a field drilled pile which is easy to secure the bearing capacity by the end bearing force and the peripheral frictional force in the hole formed in the weathered rock layer, The pile of the excavated pile is formed as a site pile by pouring concrete for piling into the lower side of the pore, and the pile of reinforced concrete inserted into the upper side of the pile of the pile is connected to a PHC A connection means including a pressure plate for smoothly transferring the load caused by the embedment pile portion to the site pile is provided between the upper end of the site pile and the lower end of the embedding pile portion However,

또한 본 발명은 바람직하게는 상기 연결수단은 상기 현장타설말뚝용 콘크리트가 양생 되어 강도를 발현하기 전까지 매입 파일부의 자중을 지지할 수 있도록 보강 철근망의 하단에는 구멍의 굴착 선단부에 접하도록 배치된 철제 보강링을 포함하는 보강재가 일체로 형성된 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝을 제공한다.In addition, the present invention is also advantageous in that the connecting means is provided at the lower end of the rebar reinforcing net so as to support the weight of the buried pile until the concrete for the cast-in-place pile is cured and exhibits strength, The present invention provides a combined pile combining a field drilled pile integrally formed with a reinforcing member including a reinforcing ring and a buried pile.

그리고 본 발명은 바람직하게는 상기 지압판의 하단에는 볼트식 또는 용접식으로 보강 철근망이 일체화되어 연결되며, 상기 보강 철근망은 다수의 수직 철근들과 이들 수직 철근을 에워싸는 나선 철근으로 이루어지며, 상기 수직 철근의 상단은 지압판의 하부 구멍에 볼트식 또는 용접식으로 연결된 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝을 제공한다.In the present invention, preferably, the reinforcing steel net is connected to the lower end of the pivot plate by bolting or welding, and the reinforcing steel net comprises a plurality of vertical reinforcing bars and a spiral reinforcing bar surrounding the vertical reinforcing bars, The upper end of the vertical reinforcement provides a blended pile that combines a cast-in-place pile coupled with a bolt or welded connection to the lower hole of the pavement.

또한 본 발명은 바람직하게는 상기 지압판의 상부측으로는 상기 매입 파일부의 내측으로 현장타설말뚝용 콘크리트가 일정높이 충전되어 상기 현장타설 파일부와 매입 파일부가 서로 일체로 연결하는 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝을 제공한다.The present invention is also characterized in that, at the upper side of the above-mentioned platen, a concrete for a cast-in-place pile is filled at a predetermined height into the inside of the embossed pile portion so that the cast- Providing a combined pile.

상기와 같은 목적을 달성하기 위하여 본 발명은, 지중에 설치되는 말뚝의 시공방법에 있어서,
풍화암층 상부에 토사층이 형성된 지중에 본 발명의 혼합말뚝을 시공하는 방법에 있어서,
지중의 풍화암층까지 구멍을 형성시키고,
상기 구멍에 PHC말뚝 또는 강관말뚝을 포함하는 매입 파일부의 하단에 연결수단을 통하여 보강 철근망이 결합된 매입 말뚝을 구멍의 굴착 선단부에 지지될 때까지 자중으로 삽입하고,
상기 구멍의 하부측에 현장타설말뚝용 콘크리트를 타설하여 현장타설말뚝을 형성시키고,
According to an aspect of the present invention, there is provided a method of constructing a pile installed in the ground,
A method for constructing a mixed pile of the present invention in a ground where a soil layer is formed on a weathered rock layer,
A hole is formed up to the weathered rock layer in the ground,
The pile having a reinforcing steel net is inserted into the hole through the connecting means at the lower end of the embedding pile including the PHC pile or the steel pipe pile is inserted in its own weight until it is supported at the piercing end of the hole,
A concrete pouring pouring machine for pouring the casting pour into the lower side of the pouring hole,

상기 매입 파일부의 외면과 지반의 구멍 사이에 공극 시멘트 밀크를 충전시켜 양생시키는 단계들을 포함하는 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝의 시공방법을 제공한다.
또한 바람직하게는 풍화암층 상부에 토사층이 형성된 지중에 본 발명의 혼합말뚝을 시공하는 방법에 있어서,
지중의 풍화암층까지 구멍을 형성시키고,
상기 구멍에 PHC말뚝 또는 강관말뚝을 포함하는 매입 파일부의 하단에 연결수단을 통하여 보강 철근망이 결합된 매입 말뚝을 구멍의 굴착 선단부에 지지될 때까지 자중으로 삽입하고,
상기 구멍의 하부측에 현장타설말뚝용 콘크리트를 타설하여 현장타설말뚝을 형성시키고,
The method comprising the steps of filling a gap cement milk between an outer surface of the embossed pile and an opening of the ground to cure the concrete, and cementing the pile with the embedded pile.
Also, preferably, a method for constructing a mixed pile of the present invention in a ground where a soil layer is formed on a weathered rock layer,
A hole is formed up to the weathered rock layer in the ground,
The pile having a reinforcing steel net is inserted into the hole through the connecting means at the lower end of the embedding pile including the PHC pile or the steel pipe pile is inserted in its own weight until it is supported at the piercing end of the hole,
A concrete pouring pouring machine for pouring the casting pour into the lower side of the pouring hole,

삭제delete

삭제delete

삭제delete

상기 매입 파일부의 외면과 지반의 구멍 사이에 공극 시멘트 밀크를 충전시켜 양생시키는 단계들을 포함하는 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝의 시공방법을 제공한다.The method comprising the steps of filling a gap cement milk between an outer surface of the embossed pile and an opening of the ground to cure the concrete, and cementing the pile with the embedded pile.

삭제delete

삭제delete

삭제delete

본 발명에 의하면 지반을 천공하고, 상기 천공된 지반의 구멍으로는 현장타설 파일부 콘크리트를 타설하며, 상기 지반의 구멍으로는 PHC말뚝 또는 강관말뚝을 포함하는 매입 파일부의 하단에 연결수단을 통하여 보강 철근망이 결합된 말뚝을 굴착 선단부에 지지될 때까지 자중으로 콘크리트 내로 삽입하고, 그리고 상기 매입 파일부의 외면과 지반의 구멍 사이에 공극 시멘트 밀크를 충전시켜 양생시키는 공정을 통하여, 하부는 현장타설 파일부와 그 상부측은 매입 파일부를 결합시킨 혼합말뚝을 시공하게 된다.According to the present invention, the ground is pierced, and the pores of the pierced ground are poured with concrete pierced by the pier. The pier of the pier is reinforced with connecting means at the lower end of the pier containing the PHC pile or steel pipe pile The pile with the reinforcing net is inserted into the concrete by its own weight until it is supported at the front end of the excavation and the gap cement milk is charged between the outer surface of the buried pile and the hole of the ground, The upper part of the part and the pile of the combined pile are constructed.

따라서 본 발명에 의하면 중구경(φ300~600mm) 말뚝의 선단에서 일정높이(풍화암층 1~2m)까지 현장타설말뚝을 적용하여 지지력을 극대화시키고, 그 상부는 기성제품(PHC말뚝 또는 강관말뚝)을 적용하여 시공하기 때문에, 구조적인 품질보증과 시공성 향상을 도모하고, 경제적으로 구축이 가능한 우수한 효과를 얻을 수 있다.Therefore, according to the present invention, a pile of drilled pile is applied at a certain height from the tip of a pile of 300 to 600 mm in diameter (1 to 2 m of weathered rock layer) to maximize the bearing capacity, and the upper part of the pile is subjected to a PHC pile or a steel pipe pile Therefore, structural quality assurance and workability can be improved, and an excellent effect that can be constructed economically can be obtained.

도 1은 기존이론과 IGM 이론에 의한 현장타설말뚝의 지지력 비교를 위한 일례를 도시한 설명도이다.
도 2는 본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝의 상세 구조를 도시한 분해 단면도이다.
도 3a는 본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝을 도시한 종단면도이다.
도 3b는 본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝이 지반에 시공된 상태를 도시한 종단면도이다.
도 4a는 기존의 매입파일에서 얻을 수 있는 지지력을 나타낸 설명도이다.
도 4b는 본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝에서 얻을 수 있는 지지력을 나타낸 설명도이다.
도 5a 내지 도 5d는 본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝의 시공방법 일부를 도시한 설명도이다.
도 6a 내지 도 6d는 본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝의 시공방법 일부를 도시한 설명도이다.
1 is an explanatory view showing an example for comparing the bearing capacity of an excavated pile according to the existing theory and the IGM theory.
FIG. 2 is a fragmentary sectional view showing a detailed structure of a mixed pile combining a field drilled pile and a buried pile according to the present invention.
FIG. 3A is a longitudinal sectional view showing a mixed pile combining a field drilled pile and a buried pile according to the present invention.
FIG. 3B is a longitudinal sectional view showing a state in which a mixed pile having ground drilled pile and buried pile is combined with the ground according to the present invention.
FIG. 4A is an explanatory view showing the bearing capacity obtained from the existing embedded file. FIG.
FIG. 4B is an explanatory view showing a bearing force obtained from a mixed pile combining a field drilled pile and a buried pile according to the present invention.
FIGS. 5A to 5D are explanatory views showing a part of a method of constructing a mixed pile in which a cast-in-place pile and a buried pile are combined according to the present invention.
FIGS. 6A to 6D are explanatory diagrams showing a part of a construction method of a mixed pile combining a field drilled pile and a buried pile according to the present invention.

이하, 본 발명의 바람직한 실시 예를 도면을 참조하여 보다 상세히 설명한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.

본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝(100)은 도 2에 도시된 바와 같이, 하부측에 현장타설 파일부(110)가 형성되고, 그 상부측에 매입 파일부(130)가 형성되며, 상기 현장타설 파일부(110)의 상단과 매입 파일부(130)의 하단 사이에는 이들을 일체로 연결시키는 연결수단(160)을 구비한다.As shown in FIG. 2, the mixed pile 100, which is a combination of a cast-in-place pile and a buried pile according to the present invention, is formed with a buried pile 110 on the lower side, And connecting means 160 for integrally connecting the upper end of the field installation pile 110 and the lower end of the pile 130.

본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝(100)은 현장타설 파일부(110)가 지반(G)을 천공하여 형성된 구멍(Ga) 내에 삽입되는 보강 철근망(114)을 구비하고, 상기 보강 철근망(114)을 구멍(Ga) 내에서 에워싸는 콘크리트(116)를 구비한다.The mixed pile 100 in which the field drilled pile and the embedded pile are combined according to the present invention has a reinforced reinforcing net 114 inserted into the hole Ga formed by perforating the ground G in the field pile 110 , And a concrete (116) surrounding the reinforcing steel net (114) in the hole (Ga).

또한 상기 매입 파일부(130)는 상단부가 개방된 PHC(Pre-Tensioned Spun High Strength Concrete Pile)말뚝 또는 강관말뚝을 포함하는데, 연결수단(160)을 통하여 현장타설 파일부(110)와 결합된다.The buried pile 130 includes a PHC pile or a steel pipe pile having an open upper end and is coupled to the pile 110 via the connecting means 160. [

상기 매입 파일부(130)가 PHC 말뚝으로 이루어지는 경우, 도 2에서 단면 A-A로 도시된 바와 같이, 그 내부에는 다수의 PC 강봉(132)들이 원주방향 일정간격으로 배치된 원통형의 구조로 이루어지고, 그 하단에는 철제원판의 보강판(136)이 일체로 형성된다.When the embedded pile 130 is made of PHC pile, as shown in section AA in FIG. 2, a plurality of PC steel rods 132 are formed in a cylindrical structure with a constant spacing in the circumferential direction, And a reinforcing plate 136 of a steel disk is integrally formed at the lower end thereof.

그리고 상기 연결수단(160)은 현장타설 파일부(110)의 상단에 배치되는 철제 고리원판으로 이루어진 높은 강성의 지압판(162)을 포함하는데, 상기 지압판(162)은 도 2에서 단면 B-B로 도시된 바와 같이 철제 고리원판으로 이루어진 것으로서, 중앙에는 관통공(166)이 형성되며, 그 하부면에는 볼트식 또는 용접식으로 현장타설 파일부(110)의 보강 철근망(114)이 일체로 연결된다.The connecting means 160 includes a high rigidity padding 162 made of an iron ring disc disposed at the top of the field piling file portion 110. The padding 162 is shown in cross section BB in Fig. A through hole 166 is formed at the center and a reinforcing steel net 114 of the field installation pile 110 is integrally connected to a lower surface of the through hole 166 by a bolt or welding method.

이와 같은 지압판(162)은 도 3a에 도시된 바와 같이, 상기 현장타설 파일부(110)의 상단과 매입 파일부(130)의 하단 사이에서 상기 매입 파일부(130) 하단의 보강판(136)에 볼트식 또는 용접식으로 일체화하여 연결되며, 상기 매입 파일부(130)에 의한 하중을 현장타설 파일부(110)의 전면에 원할하게 전달시키게 되고, 그 중앙에 형성된 관통공(166)을 통하여 도 3b에 도시된 바와 같이, 현장타설 파일부(110)의 콘크리트(116)가 매입 파일부(130)의 내부에 일정높이 충전되어 상기 현장타설 파일부(110)와 매입 파일부(130)가 서로 일체로 연결된다.3A, the reinforcing plate 136 at the lower end of the embedding pile 130 between the upper end of the field-inserted pile 110 and the lower end of the embedding pile 130, And the load caused by the embedment pile 130 is smoothly transmitted to the front surface of the field pile 110. Through the through hole 166 formed at the center of the pile 110, 3B, the concrete 116 of the site-laid pile 110 is filled in the inside of the pile 130 so that the site-pile 110 and the pile 130 can be separated from each other, And are integrally connected to each other.

그리고 상기 현장타설 파일부(110)는 그 보강 철근망(114)이 현장타설 파일부(110)의 콘크리트(116)가 양생 되어 강도를 발현하기 전까지 상기 매입 파일부(130)의 자중을 지지할 수 있는 강도 이상이고, 지반(G)에 소정의 지지력을 확보할 수 있도록 상기 보강 철근망(114)의 하단에는 도 2에서 단면 C-C로 도시된 바와 같은 철제 보강링(122)과 같은 보강재가 일체로 연결된다.The reinforced reinforcing net 114 supports the weight of the embedded pile 130 until the concrete 116 of the pile 110 is cured and exhibits strength A reinforcing member such as an iron reinforcing ring 122 as shown in a cross section CC in FIG. 2 is integrally formed at the lower end of the reinforcing steel net 114 so as to secure a predetermined supporting force to the ground G Lt; / RTI >

또한 이와 같은 보강 철근망(114)은 다수의 수직 철근(114a)들과 이들 수직 철근(114a)을 에워싸는 나선 철근(114b)으로 이루어지며, 상기 수직 철근(114a)의 상단은 지압판(162)의 하부 구멍(162a)에 볼트식 또는 용접식으로 연결되고, 수직 철근(114a)의 하단은 철제 보강링(122)에 용접으로 일체로 연결되는 구조이다.The reinforcing steel net 114 includes a plurality of vertical reinforcing bars 114a and a plurality of helical reinforcing bars 114b surrounding the vertical reinforcing bars 114a. And the lower end of the vertical reinforcing bar 114a is integrally connected to the iron reinforcing ring 122 by welding.

이와 같은 철제 보강링(122)은 상기 매입 파일부(130)의 자중에 의한 하중에 대해 현장타설말뚝이 양생되기 전까지 지지력을 확보하고 보강 철근망(114)을 보호하기 위하여 일체로 형성된 것이다.The steel reinforcing ring 122 is integrally formed to secure a supporting force until the pouring of the on-site casting pile with respect to the load due to the self weight of the embedding pile 130 and to protect the reinforcing steel net 114.

상기와 같이 본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝(100)은 지반(G)에 구멍(Ga)을 굴착한 후, 상기 구멍(Ga)의 굴착 선단부에 일정높이까지 현장콘크리트(116)를 타설하며, 그 상부의 매입 파일부(130)에는 기성제품의 PHC(Pre-Tensioned Spun High Strength Concrete Pile)말뚝 또는 강관말뚝을 형성하고, 그 하부에는 연결수단(160)을 통하여 현장타설 파일부(110)와 일체로 형성한다.As described above, the mixed pile 100 in which the cast-in-place pile according to the present invention is combined with the embedded pile is constructed such that a hole Ga is drilled in the ground G, 116 and a PHC (Pre-Tensioned Spin High Strength Concrete Pile) pile or a steel pipe pile of a finished product is formed in the upper part of the embossed pile 130, And is integrally formed with the pile portion 110.

이와 같은 본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝(100)을 적용하기 위해서는 두 개의 분리된 구조를 완전히 일체화하여 하중전달이 원활하도록 연결수단(160)이 장착되는데, 이와 같은 연결수단(160)은 중앙에는 관통공(166)이 형성된 철제 고리원판으로 이루어진 것이어서, 상기 매입 파일부(130)에 의한 하중을 현장타설 파일부(110)의 전면에 원할하게 전달시키게 된다.In order to apply the mixed pile 100 in which the ground drilled pile and the embedded pile are combined according to the present invention, the coupling means 160 is installed to completely integrate the two separated structures and smoothly transmit the load. The load 160 is made of an iron ring circular plate having a through hole 166 formed at the center thereof so that the load by the buried pile 130 can be smoothly transmitted to the entire surface of the pile 110.

본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝(100)은 중구경(φ300~600mm)을 갖추고, 그 선단에서 일정높이(풍화암층 1~2m)까지 현장타설 파일부(110)를 적용하여 지지력을 극대화시키고, 그 상부는 기성제품, 즉 PHC말뚝 또는 강관말뚝과 같은 매입 파일부(130)를 적용한 것이다.The mixed pile (100) combining the field drilled pile and the embedded pile according to the present invention has a medium diameter (300 to 600 mm) and a field pile 110 is applied at a predetermined height (weathered rock layer 1 to 2 m) To maximize the bearing capacity, and to apply the embossed pile 130 such as a PHC pile or a steel pipe pile to the upper part thereof.

도 4a에는 지반(G)에 구멍(Ga)을 굴착 후, 기존의 매입공법을 적용한 매입 파일(100a)이 도시되어 있고, 도 4b에는 본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝(100)이 도시되어 있다.FIG. 4A shows a buried pile 100a to which a conventional buried pile method is applied after excavating a hole Ga in the ground G and FIG. 4B shows a mixed pile in which a ground drilled pile according to the present invention is combined with a buried pile 100 are shown.

도 4a에 도시된 기존의 매입파일(100a)에서는 아래 [수식 1]과 같은 지지력을 얻을 수 있다.In the conventional embedment file 100a shown in FIG. 4A, the support force shown in the following Equation 1 can be obtained.

[수식 1][Equation 1]

Qu1 = Q1 + Q2Qu1 = Q1 + Q2

여기서, Qu1 : 매입말뚝의 지지력, Q1 : 말뚝의 선단지지력Where Qu1 is the bearing capacity of the embedded pile, Q1 is the bearing capacity of the pile

Q2 : 말뚝의 주면마찰력, Q1 >> Q2 이다.Q2: Friction force of the pile, Q1 >> Q2.

그리고, 도 4b에 도시된 본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝(100)은 아래 [수식 2]과 같은 지지력을 얻을 수 있다.The mixed pile 100, which is a combination of the cast-in-place pile and the buried pile according to the present invention shown in FIG. 4B, can have the following bearing capacity.

[수식 2][Equation 2]

Qu2 = Q3 + Q4 + Q5Qu2 = Q3 + Q4 + Q5

여기서, Qu2 : 혼합말뚝(100)의 지지력, Q3 : 현장타설말뚝의 선단지지력Where Qu2 is the bearing capacity of the mixed pile 100, Q3 is the bearing capacity of the cast-in-place pile

Q4 : 현장말뚝의 주면마찰력, Q5 : 매입말뚝의 주면마찰력Q4: Main surface friction force of field pile, Q5: Main surface friction force of pile

Q3, Q4 >> Q5 이다.Q3 and Q4 >> Q5.

상기 [수식 1]과 [수식 2]에서 알 수 있는 바와 같이, Qu1 << Qu2 ≒ 2.0~3.0 Qu1으로서, 본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝(100)이 기존의 매입파일(100a)에 비하여, 2 내지 3배의 높은 지반 지지력을 갖추고 있음을 알 수 있다.As can be seen from the above-mentioned equations 1 and 2, the mixed pile 100 in which the ground drilled pile according to the present invention and the buried pile are combined as Qu1 << Qu2 << 2.0 to 3.0 Qu1, It can be seen that it has a high ground supporting force of 2 to 3 times as compared with the ground supporting portion 100a.

이하, 본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝의 시공방법(200)에 대해서, 도 5a 내지 도 5d, 및 도 6a 내지 도 6d를 참조하여 보다 상세히 설명한다.Hereinafter, a method 200 for constructing a mixed pile in which a ground drilled pile and a buried pile are combined will be described in detail with reference to FIGS. 5A to 5D and FIGS. 6A to 6D.

본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝의 시공방법(200)은 도 5a에 도시된 바와 같이, 지반(G) 천공을 준비하는 단계(S1)가 이루어진다.As shown in FIG. 5A, a method 200 for constructing a mixed pile in which a ground drilled pile and a buried pile are combined according to the present invention includes a step S1 of preparing the ground G for drilling.

이와 같이 지반(G) 천공을 준비하는 단계(S1)는 오거 장치(210)를 준비하게 되는데, 이와 같은 오거 장치(210)는 지반(G)을 수직으로 천공하는 것으로서, 천공내 지반(G)의 자립이 가능하면 케이싱(220) 없이 오거 장치(210)만을 준비한다.The auger unit 210 prepares the auger unit G. The auger unit 210 is a unit for vertically perforating the ground G, Only the auger unit 210 is prepared without the casing 220.

만일 지반(G)이 연약하여 구멍(Ga) 천공후에 구멍(Ga)의 자립이 어려운 구조에서는 케이싱(220)을 상기 오거 장치(210)와 동축(同軸)으로 설치하여 준비한다.The casing 220 is provided coaxially with the auger unit 210 in a structure where the ground G is soft and the hole Ga is difficult to self-sustain after the hole Ga is pierced.

그리고 다음으로는 이와 같이 준비된 오거 장치(210)를 통하여 도 5b에 도시된 바와 같이, 수직으로 지반(G)에 구멍(Ga)을 천공하는 단계(S2)가 이루어지게 된다. 이때 지반(G)의 구멍(Ga)을 형성하면서 발생되는 토사는 오거 장치(210)를 따라서 구멍(Ga)의 외부로 취출(取出)되어 제거된다.Next, a step S2 of drilling a hole Ga in the ground G vertically through the auger device 210 prepared as described above is performed, as shown in FIG. 5B. At this time, the soil generated while forming the hole Ga of the ground G is taken out to the outside of the hole Ga along the auger device 210 and removed.

또한 이와 같이 오거 장치(210)에 의해서 지반(G)을 천공하게 되면, 지반(G) 천공과 동시에 구멍(Ga) 내부에 케이싱(220)을 삽입 설치한다.When the ground G is punctured by the auger 210 as described above, the casing 220 is inserted into the hole Ga at the same time as the ground G is perforated.

그리고 다음으로는, 도 5c에 도시된 바와 같이, 상기 지반(G)의 구멍(Ga)으로부터 오거 장치(210)를 취외(取外)하여 제거하는 단계(S3)가 이루어진다. 이때에는 지반(G)의 구멍(Ga)으로 삽입된 케이싱(220)은 그 내부에 위치되어 지반(G) 구멍(Ga)이 붕괴되는 것을 효과적으로 방지한다.Next, as shown in Fig. 5C, a step (S3) of removing the auger device 210 from the hole Ga of the ground G and removing it is performed. At this time, the casing 220 inserted into the hole G of the ground G is positioned inside the casing 220 to effectively prevent the ground G from collapsing.

또한 다음으로는 상기 천공된 지반(G)의 구멍(Ga)으로, 그리고 구멍(Ga)에 케이싱(220)이 배치된 경우에는 케이싱(220)의 내부에 현장타설 파일부(110)의 콘크리트(116)를 타설하는 단계(S4)가 이루어진다.In the case where the casing 220 is disposed in the hole Ga and then in the hole Ga of the perforated ground G, the concrete of the putting pile 110 in the casing 220 (Step S4) is carried out.

이와 같은 단계(S4)가 도 5d에 도시되어 있다. 여기서는 콘크리트 차량(230)을 이용하여 상기 지반(G)의 구멍(Ga) 또는 케이싱(220)의 내부에 일정량의 콘크리트(116)를 타설하게 되며, 이와 같은 콘크리트(116)는 이후에 설명되는 바와 같이, 현장타설 파일부(110)의 상기 콘크리트(116)에 보강 철근망(114)이 설치되고, 상기 지압판(162)의 중앙에 형성된 관통공(166)을 통하여 매입 파일부(130)의 내부에 일정높이 충전되어 상기 현장타설 파일부(110)와 매입 파일부(130)가 서로 일체로 연결될 수 있는 사전에 정해진 량(量)으로 충전된다.Such step S4 is shown in Figure 5d. A concrete amount of concrete 116 is laid in the hole Ga of the ground G or in the casing 220 by using the concrete vehicle 230. Such concrete 116 is used in a manner described later A reinforcing steel net 114 is installed on the concrete 116 of the site placing pile 110 and the inside of the embedded pile 130 is formed through a through hole 166 formed in the center of the pile 162. [ And is charged to a predetermined amount so that the field-inserted file unit 110 and the embedded file unit 130 can be integrally connected to each other.

또한 다음으로는, 도 6a에 도시된 바와 같이, 상기 지반(G)의 구멍(Ga) 또는 케이싱(220)으로 PHC말뚝 또는 강관말뚝을 포함하는 매입 파일부(130)의 하단에 연결수단(160)을 통하여 보강 철근망(114)이 결합된 본 발명의 혼합말뚝(100)을 콘크리트(116) 내로 삽입하는 단계(S5)가 이루어지게 되는데, 이때에는 매입 파일부(130)의 하단에 연결된 보강 철근망(114)의 하단이 굴착 선단부에 지지될 때까지 자중(自重)으로, 또는 상기 매입 파일부(130)의 상단을 경타(輕打)하여 매립시키게 된다.Next, as shown in FIG. 6A, a connection means 160 (see FIG. 6A) is provided at the lower end of the embedding pile 130 including the PHC pile or the steel pipe pile with the hole Ga of the ground G or the casing 220 A step S5 of inserting the mixed pile 100 according to the present invention in which the reinforcing steel net 114 is coupled through the reinforcing steel reinforcing net 114 into the concrete 116 is performed. The lower end of the reinforcing net 114 is buried with its own weight until the lower end of the reinforcing net 114 is supported by the excavation front end or with the upper end of the embedding pile 130 being burnt.

그리고 이와 같은 보강 철근망(114)이 결합된 본 발명의 혼합말뚝(100)을 콘크리트(116)의 내부로 삽입한 다음에는 상기 케이싱(220)을 인발하는 단계(S6)가 도 6b에 도시된 바와 같이, 이루어지게 된다.After the mixed pile 100 of the present invention having the rebar reinforcing net 114 is inserted into the concrete 116, step S6 of pulling out the casing 220 is shown in FIG. 6B As shown in FIG.

이때, 보강 철근망(114)이 결합된 본 발명의 혼합말뚝(100)을 콘크리트(116)가 타설된 후에 콘크리트 내로 삽입하지만, 이와는 다르게, 보강 철근망(114)이 결합된 본 발명의 혼합말뚝(100)을 지반(G)의 구멍(Ga)에 먼저 삽입하고 현장타설말뚝의 콘크리트(116)를 채우는 순서로 이루어질 수도 있다.At this time, the mixed pile 100 of the present invention having the reinforced reinforcing net 114 is inserted into the concrete after the concrete 116 is laid. Alternatively, the mixed pile 100 of the present invention, (100) is first inserted into the hole (Ga) of the ground (G), and the concrete (116) of the cast-in-place pile is filled.

또한 다음으로는 도 6c에 도시된 바와 같이, 상기 매입 파일부(130)의 외면과 지반(G)의 구멍(Ga) 사이에 공극 시멘트 밀크(240)를 충전시켜 양생시키는 단계(S7)가 이루어진다.Next, as shown in FIG. 6C, a step (S7) of filling and curing the void cement milk 240 between the outer surface of the embossed pile 130 and the hole Ga of the ground G is performed .

이와 같이 공극 시멘트 밀크(240)를 충전시켜 양생시키게 되면, 도 6d에 도시된 바와 같이, 하부에는 보강 철근망(114)을 구비하고, 상기 보강 철근망(114)을 에워싸는 콘크리트(116)를 구비하여 형성된 현장타설 파일부(110)가 형성되고, 그 상부측에는 PHC 말뚝 또는 강관 말뚝을 포함하는 매입 파일부(130)가 구비되며, 상기 현장타설 파일부(110)의 상단과 매입 파일부(130)의 하단 사이에는 이들을 일체로 연결시켜서 상기 매입 파일부(130)에 의한 하중을 현장타설 파일부(110)의 전면에 원할히 전달시키는 지압판(162)을 구비한 연결수단(160)이 설치된 본 발명의 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝(100)이 지반(G)에 시공 완료된다.As shown in FIG. 6D, when the void cement milk 240 is charged and cured, the reinforced reinforcing net 114 is provided at the lower part of the hollow cement milk 240, and the concrete 116 surrounding the reinforcing reinforcing net 114 is provided And a PHC pile or a steel pipe pile is provided at an upper portion of the pile 110. The top of the pile 110 and the pile 130 of the pile 130 And a connecting means 160 having a pair of pivotal connection plates 162 for connecting the lower ends of the piling pile 110 to the entire surface of the pile 110, (100) is combined with the ground (G).

상기와 같이 본 발명에 따른 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝(100) 및 그 시공방법(200)은 지반(G)을 천공하고, 상기 천공된 지반(G)의 구멍(Ga)으로는 현장타설 파일부(110)의 콘크리트(116)를 타설하며, 상기 지반(G)의 구멍(Ga)으로는 PHC말뚝 또는 강관말뚝을 포함하는 매입 파일부(130)의 하단에 연결수단(160)을 통하여 보강 철근망(114)이 결합된 본 발명의 혼합말뚝(100)을 굴착 선단부에 지지될 때까지 자중으로 콘크리트(116) 내로 삽입하고, 그리고 상기 매입 파일부(130)의 외면과 지반(G)의 구멍(Ga) 사이에 공극 시멘트 밀크(240)를 충전시켜 양생시키는 공정을 통하여, 현장타설 파일부(110)와 그 상부측의 매입 파일부(130)를 연결수단(160)으로서 결합시킨 혼합말뚝(100)을 시공하게 된다.As described above, the mixed pile 100 in which the cast-in-place pile and the embedded pile according to the present invention are combined and the method 200 for constructing the same pierces the ground G, and the hole Ga of the perforated ground G The connecting means 160 is installed at the lower end of the embossed pile portion 130 including the PHC pile or the steel pipe pile as the hole Ga of the ground G, The mixed pile 100 according to the present invention in which the reinforcing steel net 114 is coupled is inserted into the concrete 116 by its own weight until it is supported at the excavation front end and the outer surface of the embedded pile 130 and the ground G and filling the gap cement milk 240 between the holes Ga of the field pile 110 and the buried pile 130 on the upper side thereof as coupling means 160 And the mixed pile 100 is constructed.

따라서 본 발명에 의하면 중구경(φ300~600mm) 말뚝의 선단에서 일정높이(풍화암층 1~2m)까지 현장타설말뚝을 적용하여 지지력을 극대화시키고, 그 상부는 기성제품(PHC말뚝 또는 강관말뚝)을 적용하여 시공하기 때문에, 구조적인 품질보증과 시공성 향상을 도모하고, 경제적으로 구축이 가능하게 된다.Therefore, according to the present invention, a pile of drilled pile is applied at a certain height from the tip of a pile of 300 to 600 mm in diameter (1 to 2 m of weathered rock layer) to maximize the bearing capacity, and the upper part of the pile is subjected to a PHC pile or a steel pipe pile Therefore, structural quality assurance and workability can be improved, and construction can be made economically.

본 발명은 상기에서 도면을 참조하여 특정 실시 예에 관련하여 상세히 설명하였지만 본 발명은 이와 같은 특정 구조에 한정되는 것은 아니다. 당 업계의 통상의 지식을 가진 자라면 이하의 실용신안등록청구범위에 기재된 본 발명의 기술 사상 및 권리범위를 벗어나지 않고서도 본 발명을 다양하게 수정 또는 변경시킬 수 있을 것이다. 그렇지만 그와 같은 수정 또는 변형 구조들은 모두 명백하게 본 발명의 권리범위 내에 속하게 됨을 미리 밝혀 두고자 한다.Although the present invention has been described in detail with reference to specific embodiments thereof with reference to the accompanying drawings, the present invention is not limited to such specific structures. It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as set forth in the appended claims. However, it is intended that the present invention covers all such modifications and variations as fall within the true scope of the invention.

예컨대 시공성을 위하여 본 발명은 지반을 천공하고, 상기 지반의 구멍으로는 PHC말뚝 또는 강관말뚝을 포함하는 매입 파일부의 하단에 연결수단을 통하여 보강 철근망이 결합된 말뚝을 굴착 선단부에 지지될 때까지 자중으로 삽입하고, 상기 천공된 지반의 구멍으로는 현장타설 파일부 콘크리트를 타설하고, 상기 매입 파일부의 외면과 지반의 구멍 사이에 공극 시멘트 밀크를 충전시켜 양생시키는 단계들을 포함하는 시공방법을 함께 제공할 수 있다(청구항 7 관련)For example, in the present invention, for the sake of constructability, the present invention is characterized in that the ground is pierced, and a pile having a reinforcing steel mesh connected to a lower end of a buried pile including a PHC pile or a steel pipe pile is connected to the excavation front end And cementing the cement mortar by filling voids of the cement mortar between the outer surface of the buried pile and the holes of the ground, (Relating to claim 7)

1....... 현장타설말뚝 10....... 토사층
20...... 풍화암층 100...... 혼합말뚝
100a...... 매입파일 110...... 현장타설 파일부
114..... 보강 철근망 114a..... 수직 철근
114b...... 나선 철근 116....... 현장타설말뚝 콘크리트
122..... 철제 보강링 130....... 매입 파일부
132..... PC 강봉 136....... 보강판
160...... 연결수단 162..... 지압판
162a..... 하부 구멍 166....... 관통공
200..... 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝의 시공방법
220..... 케이싱 240...... 공극 시멘트 밀크
G....... 지반 Ga....... 구멍
S1...... 지반 천공을 준비하는 단계
S2...... 지반의 구멍 천공 단계
S3...... 오거 장치를 취외(取外)하여 제거하는 단계
S4...... 콘크리트를 타설하는 단계
S5...... 혼합말뚝을 콘크리트 내로 삽입하는 단계
S6...... 케이싱을 인발하는 단계
S7...... 지반의 구멍 사이에 공극 시멘트 밀크를 충전시켜 양생
S8...... 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝의 완성 단계
1 ......... Cast-in-place pile 10 ....... Earth layer
20 ...... Weathered rock layer 100 ...... Mixed pile
100a ...... embedded file 110 ...... field embedded file unit
114 ..... Reinforcing mesh 114a ..... Vertical reinforcement
114b ...... Spiral reinforcement 116 .......... In-situ pile concrete
122 ..... iron reinforcing ring 130 ......... embedding pile portion
132 ..... PC steel rods 136 ......... reinforcing plate
160 ...... Connection means 162 ..... Pressure plate
162a ..... lower hole 166 ...... through hole
200 ..... Construction method of mixed pile which combines field drilled pile and buried pile
220 ..... Casing 240 ...... Pore Cement Milk
G ....... ground Ga ....... hole
Step S1: Prepare for ground penetration
S2 ...... Steps to drill holes in the ground
Step S3: removing the auger device by removing it
Step S4: Placing concrete
S5 ... step of inserting the mixed pile into the concrete
S6 ...... Drawing out the casing
S7 ...... Cement milk filled in the gap between the holes in the ground,
S8 ...... Completion stage of mixed pile which combines field drilled pile and buried pile

Claims (11)

풍화암층이 형성된 지중에 설치되는 말뚝에 있어서
지중의 풍화암층까지 구멍을 천공하여 하부측은 풍화암층에 형성된 구멍에서 선단지지력과 주변마찰력에 의한 지지력 확보가 용이한 현장타설말뚝을, 상부측은 PHC 말뚝 또는 강관말뚝을 포함하는 기성제품의 매입말뚝을 설치하되,
상기 현장타설말뚝은 구멍의 하부측에 현장타설말뚝용 콘크리트를 타설하여 현장타설 파일부(110)로 형성시키고, 상기 매입말뚝은 현장타설 파일부의 상부측에 삽입되는 보강 철근망(114)이 하부에 부착된 PHC말뚝 또는 강관말뚝을 포함하는 매입 파일부(130)로 형성시키며,
상기 현장타설 파일부의 상단과 매입 파일부의 하단 사이에 매입 파일부에 의한 하중을 현장타설 파일부에 원활하게 전달시키는 지압판을 포함하는 연결수단(160)을 설치하여,
상기 현장타설말뚝용 콘크리트가 양생 되어 강도를 발현하기 전까지 매입 파일부의 자중을 지지할 수 있도록 보강 철근망(114)의 하단에는 구멍의 굴착 선단부에 접하도록 배치된 철제 보강링(122)을 포함하는 보강재가 일체로 형성되도록 하는 것임을 특징으로 하는 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝.
In piles installed in the ground where the weathered rock layer is formed
The pile shall be pierced to the weathered rock layer in the ground. The lower part shall be provided with a pile of ready-made pile including PHC pile or steel pipe pile at the upper side and a pile installed at the upper side for facilitating the support force by the end bearing force and peripheral frictional force at the hole formed in the weathered rock layer. ,
The buried pile is formed by a reinforced reinforcing net (114) inserted into an upper side of a pile of a site to be buried, And a PHC pile or a steel pipe pile attached to the pile,
A connection means (160) including a pressure plate for smoothly transferring a load due to the embedment pile portion to the site pile is provided between the upper end of the site pile and the lower end of the pile file,
And an iron reinforcing ring (122) disposed at the lower end of the reinforcing steel net (114) so as to be able to support the weight of the buried pile portion until the concrete for the cast pile is cured and exhibits strength, And the stiffener is formed integrally with the pile.
삭제delete 제 1항에 있어서,
상기 연결수단은 상기 매입 파일부의 하단에 상기 현장타설 파일부의 상단에 배치되는 철제 고리원판으로 이루어진 지압판을 볼트식 또는 용접식으로 일체화하여 연결되도록 한 것임을 특징으로 하는 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝.
The method according to claim 1,
Wherein the connecting means is formed by connecting a piercing plate made of an iron ring circular plate disposed at the upper end of the site pile to a bottom end of the pile of the pile to be integrated by bolt or welding. pile.
제 3항에 있어서,
상기 지압판의 하단에는 볼트식 또는 용접식으로 보강 철근망이 일체화되어 연결되며, 상기 보강 철근망은 다수의 수직 철근들과 이들 수직 철근을 에워싸는 나선 철근으로 이루어지며, 상기 수직 철근의 상단은 지압판의 하부 구멍에 볼트식 또는 용접식으로 연결되도록 한 것임을 특징으로 하는 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝.
The method of claim 3,
The reinforcing steel net is composed of a plurality of vertical reinforcing bars and a helical reinforcing bar surrounding the vertical reinforcing bars, and the upper end of the vertical reinforcing bars is connected to the lower reinforcing bars Wherein the pile is connected to the lower hole by a bolt or welding method.
제 4항에 있어서,
상기 지압판의 상부측으로는 상기 매입 파일부의 내측으로 현장타설말뚝용 콘크리트가 일정높이 충전되어 상기 현장타설 파일부와 매입 파일부가 서로 일체로 연결된 것임을 특징으로 하는 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝.
5. The method of claim 4,
Wherein the concrete for the sharply casting pile is filled at a predetermined height to the inside of the embossed pile portion at the upper side of the carpet pile so that the site pile and the embedding pile are integrally connected to each other.
풍화암층 상부에 토사층이 형성된 지중에 제 1항의 혼합말뚝(100)을 시공하는 방법에 있어서,
지중의 풍화암층까지 구멍을 형성시키고,
상기 구멍의 하부측에 현장타설말뚝용 콘크리트를 타설하여 현장타설말뚝을 형성시키고,
PHC말뚝 또는 강관말뚝을 포함하는 매입 파일부의 하단에 연결수단을 통하여 보강 철근망이 결합된 매입 말뚝을 구멍의 굴착 선단부에 지지될 때까지 자중으로 상기 양생 이전의 현장타설말뚝용 콘크리트 내로 삽입되도록 하고,
상기 매입 파일부의 외면과 구멍 사이에 공극 시멘트 밀크를 충전시켜 양생시키는 단계들을 포함하는 것임을 특징으로 하는 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝의 시공방법.
A method for constructing the mixed pile (100) according to claim 1 in a ground where a soil layer is formed on a weathered rock layer,
A hole is formed up to the weathered rock layer in the ground,
A concrete pouring pouring machine for pouring the casting pour into the lower side of the pouring hole,
PHC pile or steel pipe pile is connected to the lower end of the embedding pile through the connecting means through the reinforcing steel net so that it is inserted into the concrete for the piling pile before the curing by its own weight until it is supported at the excavation front end of the hole ,
And curing and curing the gap cement milk between the outer surface of the embossed pile and the hole to cure the mixed pile.
풍화암층 상부에 토사층이 형성된 지중에 제 1항의 혼합말뚝(100)을 시공하는 방법에 있어서,
지중의 풍화암층까지 구멍을 형성시키고,
상기 구멍에 PHC말뚝 또는 강관말뚝을 포함하는 매입 파일부의 하단에 연결수단을 통하여 보강 철근망이 결합된 매입 말뚝을 구멍의 굴착 선단부에 지지될 때까지 자중으로 삽입하고,
상기 구멍의 하부측에 현장타설말뚝용 콘크리트를 타설하여 현장타설말뚝을 형성시키고,
상기 매입 파일부의 외면과 지반의 구멍 사이에 공극 시멘트 밀크를 충전시켜 양생시키는 단계들을 포함하는 것임을 특징으로 하는 현장타설말뚝과 매입말뚝을 결합한 혼합말뚝의 시공방법.
A method for constructing the mixed pile (100) according to claim 1 in a ground where a soil layer is formed on a weathered rock layer,
A hole is formed up to the weathered rock layer in the ground,
The pile having a reinforcing steel net is inserted into the hole through the connecting means at the lower end of the embedding pile including the PHC pile or the steel pipe pile is inserted in its own weight until it is supported at the piercing end of the hole,
A concrete pouring pouring machine for pouring the casting pour into the lower side of the pouring hole,
And filling cement milk between the outer surface of the embossed pile and the hole of the ground by filling void cement milk to cure the pile.
삭제delete 삭제delete 삭제delete 삭제delete
KR1020100110540A 2010-11-08 2010-11-08 Combination pile having a cast in place concrete pile combined with a phc or steel pile and the construction method using the same KR101039554B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100110540A KR101039554B1 (en) 2010-11-08 2010-11-08 Combination pile having a cast in place concrete pile combined with a phc or steel pile and the construction method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100110540A KR101039554B1 (en) 2010-11-08 2010-11-08 Combination pile having a cast in place concrete pile combined with a phc or steel pile and the construction method using the same

Publications (1)

Publication Number Publication Date
KR101039554B1 true KR101039554B1 (en) 2011-06-09

Family

ID=44405133

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100110540A KR101039554B1 (en) 2010-11-08 2010-11-08 Combination pile having a cast in place concrete pile combined with a phc or steel pile and the construction method using the same

Country Status (1)

Country Link
KR (1) KR101039554B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101147510B1 (en) * 2011-08-18 2012-05-21 백규호 Complex pile with improved end bearing capacity and piling method of complex pile using the same
WO2013024999A2 (en) * 2011-08-18 2013-02-21 Paik Kyu Ho Complex pile with improved end bearing capacity and piling method of complex pile using the same
KR101448145B1 (en) 2013-03-12 2014-10-07 (주)센벡스 Column Integrated Footing
KR101844550B1 (en) * 2016-03-30 2018-04-03 삼보이엔씨 주식회사 Method for cast-in-place pile construction using hanging structure and hanging structure
KR20210148685A (en) 2020-06-01 2021-12-08 송채연 Pile removal device and removal method
KR20220140120A (en) 2021-04-09 2022-10-18 민용 the composite pile stucture for a soft groud in facility installation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000240069A (en) * 1999-02-18 2000-09-05 Nkk Corp Faying structure and faying method between cast-in- place steel pipe concrete pile and src column
KR100549088B1 (en) * 2003-05-16 2006-02-10 김명률 Method for isolated footing type under-Reamed pile and the isolated footing type under-Reamed thereof
KR100553478B1 (en) * 2005-06-14 2006-02-22 (주)진산이엔지 The drilled shaft and its construction method with the application of perforated metal tubing as drilled shaft reinforcement
KR100618597B1 (en) * 2004-11-16 2006-09-04 민경건설 주식회사 Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000240069A (en) * 1999-02-18 2000-09-05 Nkk Corp Faying structure and faying method between cast-in- place steel pipe concrete pile and src column
KR100549088B1 (en) * 2003-05-16 2006-02-10 김명률 Method for isolated footing type under-Reamed pile and the isolated footing type under-Reamed thereof
KR100618597B1 (en) * 2004-11-16 2006-09-04 민경건설 주식회사 Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this
KR100553478B1 (en) * 2005-06-14 2006-02-22 (주)진산이엔지 The drilled shaft and its construction method with the application of perforated metal tubing as drilled shaft reinforcement

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101147510B1 (en) * 2011-08-18 2012-05-21 백규호 Complex pile with improved end bearing capacity and piling method of complex pile using the same
WO2013024999A2 (en) * 2011-08-18 2013-02-21 Paik Kyu Ho Complex pile with improved end bearing capacity and piling method of complex pile using the same
WO2013024999A3 (en) * 2011-08-18 2013-06-13 Paik Kyu Ho Complex pile with improved end bearing capacity and piling method of complex pile using the same
CN103732830A (en) * 2011-08-18 2014-04-16 白圭浩 Complex pile with improved end bearing capacity and piling method of complex pile using the same
CN103732830B (en) * 2011-08-18 2016-10-19 白圭浩 Composite pile that bearing capacity of pile tip is strengthened and utilize this composite pile embedment method
KR101448145B1 (en) 2013-03-12 2014-10-07 (주)센벡스 Column Integrated Footing
KR101844550B1 (en) * 2016-03-30 2018-04-03 삼보이엔씨 주식회사 Method for cast-in-place pile construction using hanging structure and hanging structure
KR20210148685A (en) 2020-06-01 2021-12-08 송채연 Pile removal device and removal method
KR20220140120A (en) 2021-04-09 2022-10-18 민용 the composite pile stucture for a soft groud in facility installation

Similar Documents

Publication Publication Date Title
KR101039554B1 (en) Combination pile having a cast in place concrete pile combined with a phc or steel pile and the construction method using the same
KR101302743B1 (en) Phc pile and its using the same soil cement wall construction methode
KR101014796B1 (en) Top-down underground construction method using prefabricated concrete column member as temporary bridge column
CN110042716B (en) Widening construction method for high-fill roadbed with foamed light soil
CN102966119B (en) Geogrid reinforced wall and construction method thereof
CN110777836A (en) Reinforced concrete plate-anchor rod composite foundation and using method thereof
CN101761085A (en) Inbuilt anchor head embedded-type anchoring pile
CN110777806B (en) Multi-connecting-rod plane frame permanent supporting structure and construction process thereof
JP5937488B2 (en) Temporary support method for foundation
KR20110041391A (en) Pile structure
JP5229913B2 (en) Slope reinforcement method
KR100923290B1 (en) Abutment structure of bridge
CN111593757A (en) Circuit pole tower and tower loop-shaped pile anchor composite foundation suitable for karst region and construction method thereof
KR101974826B1 (en) The Precast Pile Having Interlocking Secant and The Earth Retaining Wall Method Constructed by It&#39;s Continuous Pile
KR101324231B1 (en) Soil cement wall structure and method for constructing thereof
KR101227680B1 (en) Connection method for cast-in-place concrete pile and drilled pile
JP5124007B2 (en) Retaining wall construction method
CN106609509A (en) Self-balancing foundation pit enclosure structure and construction method thereof
KR101195235B1 (en) Underground structure construction method using composite pile
JP2008308945A (en) Concrete foundation combined with tension pile, and construction method thereof
KR100974513B1 (en) Caisson type pile method
KR101021913B1 (en) A method for constructing cut-off temporary structure for sheathing work
KR100910884B1 (en) Multistaged cone foundation
RU2390609C1 (en) Method for erection of slab-pile foundation
KR20130073336A (en) Pile structure and construction methods

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140513

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160418

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170425

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20180425

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20190425

Year of fee payment: 9