KR100557349B1 - Method for Manufacturing for mash with iron wire and there's Apparatus for Manutacturing - Google Patents

Method for Manufacturing for mash with iron wire and there's Apparatus for Manutacturing Download PDF

Info

Publication number
KR100557349B1
KR100557349B1 KR1020030069832A KR20030069832A KR100557349B1 KR 100557349 B1 KR100557349 B1 KR 100557349B1 KR 1020030069832 A KR1020030069832 A KR 1020030069832A KR 20030069832 A KR20030069832 A KR 20030069832A KR 100557349 B1 KR100557349 B1 KR 100557349B1
Authority
KR
South Korea
Prior art keywords
clip
guide
wire
longitudinal
cylinder
Prior art date
Application number
KR1020030069832A
Other languages
Korean (ko)
Other versions
KR20050034047A (en
Inventor
유재순
Original Assignee
유재순
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유재순 filed Critical 유재순
Priority to KR1020030069832A priority Critical patent/KR100557349B1/en
Priority to CNB2004800289872A priority patent/CN100396398C/en
Priority to PCT/KR2004/002540 priority patent/WO2005032742A1/en
Publication of KR20050034047A publication Critical patent/KR20050034047A/en
Application granted granted Critical
Publication of KR100557349B1 publication Critical patent/KR100557349B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F27/00Making wire network, i.e. wire nets
    • B21F27/12Making special types or portions of network by methods or means specially adapted therefor
    • B21F27/20Making special types or portions of network by methods or means specially adapted therefor of plaster-carrying network
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F27/00Making wire network, i.e. wire nets
    • B21F27/08Making wire network, i.e. wire nets with additional connecting elements or material at crossings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F15/00Connecting wire to wire or other metallic material or objects; Connecting parts by means of wire
    • B21F15/02Connecting wire to wire or other metallic material or objects; Connecting parts by means of wire wire with wire
    • B21F15/06Connecting wire to wire or other metallic material or objects; Connecting parts by means of wire wire with wire with additional connecting elements or material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F23/00Feeding wire in wire-working machines or apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Wire Processing (AREA)

Abstract

본 발명은 횡와이어공급부(A)와, 상기 횡와이어공급부(A)의 전면 중앙 일측면에 형성된 종와이어공급부(B)와, 상기 종와이어공급부(B)의 상하부에 형성되며, 프레스(100)와 클립공급기(6)로 구비된 결속부(C)와, 상기 결속부(C) 하부에 형성된 철망탈리부(D), 상기 결속부(C)의 후면에 형성된 철망인출부(E)로 구성된 철망의 제조장치에 관한 것이다.   The present invention is formed on the upper and lower portions of the horizontal wire supply unit (A), the longitudinal wire supply unit (B) formed on one side of the front center of the horizontal wire supply unit (A), and the longitudinal wire supply unit (B), press (100) And a binding portion (C) provided with a clip feeder (6), a wire mesh tally portion (D) formed at the lower portion of the binding portion (C), and a wire mesh lead portion (E) formed at a rear surface of the binding portion (C). The present invention relates to a wire mesh manufacturing apparatus.

철망의 제조장치. 클립. 결속장치. 종와이어 인출기.Manufacturing equipment of wire mesh. Clip. Binding device. Long wire dispenser.

Description

철망의 제조방법 및 제조장치{Method for Manufacturing for mash with iron wire and there's Apparatus for Manutacturing}Method for manufacturing and manufacturing apparatus for wire mesh {Method for Manufacturing for mash with iron wire and there's Apparatus for Manutacturing}

도 1은 본 발명의 철망제조장치 전체도1 is an overall view of the wire mesh manufacturing apparatus of the present invention

도 2는 본 발명의 종와이어공급 1단계 평면 및 측단면 상세도Figure 2 is a plan view of the longitudinal wire supply step 1 and side cross-sectional view of the present invention

도 3은 본 발명의 종와이어공급 2단계 평면 및 측단면 상세도Figure 3 is a detailed view of the two-phase longitudinal wire supply and side cross-sectional view of the present invention

도 4는 본 발명의 종와이어공급 3단계 평면 및 측단면 상세도Figure 4 is a three-dimensional plane and side cross-sectional detail view of the longitudinal wire supply of the present invention

도 5는 본 발명의 종와이어공급 4단계 평면 및 측단면 상세도5 is a longitudinal view of the four-phase longitudinal supply of the present invention and the side cross-sectional view

도 6은 본 발명의 결속부(C) 상세도6 is a detailed view of the binding portion (C) of the present invention.

도 7은 본 발명의 결속부(C) 측단면 상세도Figure 7 is a side cross-sectional view of the binding portion (C) of the present invention

도 8은 본 발명의 결속부(C) 정단면 일부 상세도8 is a partial detailed cross-sectional view of the binding portion (C) of the present invention

도 9는 본 발명의 결속부(C)의 클립공급1단계 상세도Figure 9 is a detailed view of the clip supply step 1 of the binding unit (C) of the present invention

도 10은 본 발명의 결속부(C)의 클립공급2단계 상세도10 is a detailed view of the clip supply step 2 of the binding unit (C) of the present invention.

도 11은 본 발명의 결속부(C)의 클립공급3단계 상세도11 is a detailed view of the clip supply step 3 of the binding unit (C) of the present invention.

도 12는 본 발명의 결속부(C)의 클립공급4단계 상세도12 is a detailed view of the clip supply step 4 of the binding unit (C) of the present invention.

도 13은 본 발명의 결속부(C)의 클립공급5단계 상세도Figure 13 is a detailed view of the clip supply step 5 of the binding unit (C) of the present invention

도 14는 본 발명의 결속부(C)의 클립공급6단계 상세도14 is a detailed view of a six step supply of the clip of the binding portion (C) of the present invention

도 15는 본 발명의 결속부(C)의 프레스 초기단계 상세도15 is a detailed view of the initial stage of the press of the binding portion (C) of the present invention.

도 16은 본 발명의 결속부(C)의 프레스 1단계 하강 상세도Figure 16 is a detailed view of pressing down one step of the binding unit (C) of the present invention.

도 17은 본 발명의 결속부(C)의 프레스 2단계 하강 상세도Figure 17 is a detailed view of pressing down two stages of the binding portion (C) of the present invention.

도 18은 본 발명의 결속부(C)의 프레스 1단계 상승 상세도18 is a detailed view of pressing step 1 of the binding unit C of the present invention.

도 19는 본 발명의 결속부(C)의 프레스 2단계 상승 상세도19 is a detailed view of pressing two steps of the binding unit C of the present invention.

도 20은 본 발명의 철망탈리부(D) 작동 상세도20 is a detailed view of the operation of the wire mesh tally (D) of the present invention

도 21은 본 발명의 철망인출부(E)의 인출1단계 상세도21 is a detailed drawing step 1 of the wire mesh lead-out portion (E) of the present invention

도 22는 본 발명의 철망인출부(E)의 인출2단계 상세도Figure 22 is a detailed drawing withdrawal step 2 of the wire mesh lead-out portion (E) of the present invention

도 23은 본 발명의 철망인출부(E)의 인출3단계 상세도Figure 23 is a three-step detailed drawing of the wire mesh lead-out portion (E) of the present invention

도 24는 본 발명의 철망인출부(E)의 인출4단계 상세도24 is a detailed drawing withdrawal step 4 of the wire mesh lead-out portion (E) of the present invention

도 25는 본 발명의 철망상세도25 is a detailed view of the wire mesh of the present invention

도 26은 본 발명의 클립공급기(6)에 내장된 클립(Z)의 측면 상세도26 is a detailed side view of the clip Z embedded in the clip feeder 6 of the present invention.

도 27은 본 발명의 클립공급기(6)에 내장된 클립(Z)의 상세도27 is a detailed view of the clip Z embedded in the clip feeder 6 of the present invention.

<도면 부호의 설명><Description of Drawing>

고정대(1,1-2,1-3,1-4), 보빈(2,2'), 정렬기(3), 정렬롤라(4,5), 클립공급기 (6), 안내롤러(7), 모터(8), 체인(9), 정렬롤라기어(10), 종와이어안내기(21), 종와이어고정기(22)와, 종와이어정렬기(23), 종와이어인출기(25), 종와이어실린더 (26), 로드(27), 집게(28), 집게상하강실린더(29), 종와이어상하강실린더(29'), 제1클립가이드(61), 클립안내가이드홈(62), 제1클립가이드전후실린더(63), 클립1-1가이드(64), 클립1가이드상하이동판(65), 클립1가이드상하이동판실린더(66), 제2 클럽가이드(67), 클립2가이드상하이동판실린더(68), 인출상하실린더(72), 인출판1 (73), 인출몸체부(74), 인출판2(75), 인출기전후진실린더(76), 인출기스토퍼(77), 프레스(100), 프레스실린더(101), 프레스 상부(102), 프레스하부(103), 프레스기둥 (104), 수평고정대상부(105), 수평고정대하부(106), 브라켓(110), 제1중간프레스판상부(120), 클립절단핀(121), 완충기둥(124), 제1중간프레스판하부(125), 스프링 (126), 종와이어상하부절단칼날(130,131), 받침대(150), 이탈실린더(151), 인출상승판(152), 인출상승핀(153), 횡와이어공급부(A), 종와이어공급부(B), 결속부(C), 철망탈리부(D)철망인출부(E), 횡와이어(X), 종와이어(Y), 클립(Z)Fixture (1,1-2,1-3,1-4), Bobbin (2,2 '), Aligner (3), Alignment Roller (4,5), Clip Feeder (6), Guide Roller (7) , Motor 8, chain 9, alignment roller gear 10, longitudinal wire guide 21, longitudinal wire fixer 22, longitudinal wire aligner 23, longitudinal wire extractor 25, longitudinal Wire cylinder 26, rod 27, tongs 28, tongs up and down cylinder 29, vertical wire up and down cylinder 29 ', the first clip guide 61, clip guide groove 62, Before and after the first clip guide cylinder (63), the clip 1-1 guide (64), the clip 1 guide up and down plate 65, the clip 1 guide up and down plate cylinder (66), the second club guide (67), clip 2 guide up and down Copper plate cylinder 68, drawer upper cylinder 72, drawer plate 1 (73), drawer body portion 74, drawer plate 2 (75), drawer front and rear cylinder 76, drawer stopper 77, press ( 100), the press cylinder 101, the upper press 102, the press lower portion 103, the press column 104, the horizontal fixing target portion 105, the horizontal fixing lower portion 106, the bracket 110, the first intermediate press An upper 120, a clip-cut pin 121, the buffer pillar 124, a first intermediate press plate lower 125, a spring 126, a longitudinal wire upper and lower cutting blades (130 131), the base 150 and the release cylinder ( 151, withdrawal lift plate 152, withdrawal lift pin 153, lateral wire supply (A), longitudinal wire supply (B), binding (C), wire mesh tally (D) wire mesh withdraw (E), Cross Wire (X), Long Wire (Y), Clip (Z)

본 발명은 철망의 제조방법 및 제조장치에 관한 것으로서, 보다 상세히 설명하면, 횡와이어를 횡으로 공급하고, 공급되는 횡와이어에 일정 간격을 두고 종와이어를 공급하며, 횡와이어와 종와이어가 맞닿는 곳에 클립을 공급한 후에 클립으로 횡와이어와 종와이어를 결속시키는 장치와 결속된 철망을 인출하는 장치로 구성된 콘크리트보강용으로 사용되는 철망의 제조방법 및 제조장치에 관한 것이다.The present invention relates to a method for manufacturing a wire mesh and a manufacturing apparatus, which will be described in more detail, where the horizontal wire is supplied laterally, the longitudinal wire is supplied at regular intervals to the supplied horizontal wire, and where the horizontal wire and the longitudinal wire are in contact with each other. The present invention relates to a method and a manufacturing apparatus for a wire mesh used for reinforcing concrete composed of a device for binding the lateral wire and the longitudinal wire to the clip after the supply of the clip and a device for drawing the bound wire mesh.

일반적으로 롤상태로 감겨진 앤드리스 와이어를 종방향와이어(일명 "씨줄"이라고도 함)로 하여서 이것을 간헐적으로 이송시키면서, 종방향와이어 위에 미리 절단한 횡방향와이어(일명 "날줄" 이라고도 함)를 간헐적으로 공급하고, 이들의 접촉부위를 스폿 용접하여서 앤드리스와이어매쉬를 제조하고, 이것을 일정한 길이로 절 단하여 건축용 패널의 철망을 제조해왔었다.Generally, the endless wire wound in a roll state is longitudinal wire (sometimes called "seed"), and is intermittently transferred, and the transverse wire (also called "nape") cut in advance on the longitudinal wire is intermittently. And wire-welded parts were manufactured by spot welding the contact wires, and the wire mesh of the building panel was manufactured by cutting them to a constant length.

그러나 상기와 같은 종래의 철망제조장치의 경우 종과 횡방향이 교차되는 와이어의 교차부위가 스폿용접에 의해 결합된 상태이므로 외부 충격에 취약한 접점을 안고 있어 작은 충격에도 쉽게 떨어져 탈리되거나 훼손되는 등 철망의 내구성이 떨어지는 문제점이 발생되었다.However, in the conventional wire mesh manufacturing apparatus as described above, since the intersections of the wires crossing the longitudinal and transverse directions are coupled by spot welding, the wire meshes are vulnerable to external impacts and are easily detached or damaged even in small impacts. The problem of poor durability was generated.

이러한 문제점을 해결하고자 종방향와이어를 위아래로 꼬여 벌리도록 하고 벌어진 공간사이에 횡방향와이어를 관통시켜 철망을 제조하는 등의 개선된 방안이 많은 연구자에 의해 개발되고 있다.In order to solve this problem, many researchers have developed an improved method, such as twisting the longitudinal wires up and down and penetrating the transverse wires between the gaps to produce a wire mesh.

예를 들면, 대한민국공개특허공보 공개번호 특2002-0029183호에는 미리 절단한 종방향와이어를 일정한 간격으로 요입구가 형성된 여러 개의 와이어 받침대위에서 평행하게 올려놓는 공정과, 종방향 와이어의 길이 방향쪽으로 운동하는 와이어 정렬대로 종방향와이어들의 선단부가 동일 직선상에 위치하도록 가지런히 정렬시킴과 아울러 횡방향와이어가 공급 및 용접될 위치까지 이동시켜주는 공정과, 종방향와이어에 스폿 용접된 횡방향 와이어를 잡고서 간헐적으로 끌어당기면서 이송시켜주는 공정으로 와이어 매쉬를 제조하는 건축용 패널용 와이어 메쉬의 제조방법 및 그 장치가 기재되어 있고,For example, Korean Laid-Open Patent Publication No. 2002-0029183 discloses a process of placing a longitudinally cut wire in parallel on a plurality of wire pedestals formed with recesses at regular intervals, and moving in the longitudinal direction of the longitudinal wire. Aligning the ends of the longitudinal wires so that the ends of the longitudinal wires are aligned on the same straight line and moving the transverse wires to the position to be supplied and welded, and holding the transverse wires spot-welded to the longitudinal wires A method for manufacturing a wire mesh for a building panel and a device for manufacturing a wire mesh in a process of intermittently pulling and transferring the same are described.

동 공보 공개번호 특2003-0014314호에는 날줄공급부와, 상기 날줄을 안내하는 가이드부와, 상기 가이드부의 레벨리들과 연동되며 일정한 주기로 회전되는 제2전동모터의 동력을 받아 회전되는 다수의 회동체들로 이루어진 트위스트부와, 상기 트위스트부의 일측으로 설치되어 일정한 주기로 작동되는 컨베어와, 씰줄공급실린 더의 작동에 의해 씨줄을 공급하도록 된 씨줄공급기와, 상기 트위스트부에서 직조된 철망을 전후 작동실린더의 작동에 의해 이송되는 이송부와, 상기 이송부에서 이송된 철망을 절단 권취하는 장치로 구성된 철망 및 철망의 제조장치가 기재되어 있으며,Publication No. 2003-0014314 discloses a plurality of rotating bodies that are rotated by the power of a second electric motor that is interlocked with a leveling unit, a guide unit for guiding the blade, and leveling units of the guide unit and rotates at a constant cycle. Twist part consisting of, the conveyor is installed to one side of the twist part is operated at regular intervals, the seed line feeder to supply the seed line by the operation of the seal string supply cylinder, and the wire mesh woven in the twisted portion of the front and rear operation cylinder There is described a wire mesh and a wire mesh manufacturing apparatus consisting of a conveying portion conveyed by a; and a device for cutting and winding the wire mesh conveyed from the conveying portion,

대한민국등록실용신안공보 등록번호 제20-0321877호에는 다수의 보빈으로 구성된 공급부와, 강선 인출기 및 가로선 공급수단이 구비됨과 아울러 가압실린더에 의해 작동되며 다수의 가동전극이 구성된 용접장치와, 다단으로 형성된 받침구와 그 상측에 형성되어 각각의 실린더에 의하여 작동되는 고정구 및 성형구로 구성된 소켓부성형장치와, 상하복수로 좌우한쌍을 형성한 가압실린더에 의하여 작동되는 가동전극 및 상기 가동전극의 사이에 형성된 실린더에 의하여 작동되는 모서리 성형구가 구비된 소켓부 용접장치와 통상의 전단기로 구성된 절단장치와, 소켓부 누름대가 형성된 누름대 및 한쌍의 가동지지대가 실린더에 의하여 작동되도록 프레임에 힌지 결합된 절곡장치를 구성된 콘크리트제 배수로의 와이어매쉬제조장치가 기술되어 있고,Korea Utility Model Registration No. 20-0321877 No. 20-0321877 is provided with a supply unit consisting of a plurality of bobbins, a wire drawing machine and a horizontal line supply means, a welding device which is operated by a pressure cylinder and composed of a plurality of movable electrodes, and formed in multiple stages A socket formed by a socket and a molding device formed on a support port and an upper side thereof and operated by each cylinder, and a movable electrode operated by a pressurized cylinder formed by a pair of left and right plurals, and a cylinder formed between the movable electrodes. A cutting device consisting of a socket welding device and a conventional shearing device equipped with a corner forming tool operated by the press, and a bending device hinged to the frame so that the socket and the pair of movable supports are operated by a cylinder Described is a wire mesh manufacturing apparatus for concrete gutters consisting of

동 공보 등록번호 제20-0143145호에는 크랭크캠을 고정한 크랭크캠사프트를 바디 짚의 하단 전방에 설치하여 크랭크캠의 편심안내홀에 바디집의 로울러를 삽입 작동하며, 크랭크캠사프트 일측에 고정하는 편심캠편에는 다관절작동대를 고정하여 씨줄절단도가 하단에서 상단으로 작동되며 절단하고, 타측 끝단 편심캠편에는 다수의 돌출편을 일정 간격으로 배열 고정한 회전작동편 다수개를 회전샤프트에 각각 삽입하며, 회전샤프트에 역회전 방지용 랙크기어를 걸림편에 걸려지게 한 작동대를 관절대로 결합된 철망자동제조기의 철망이송장치가 기재되어 있으며, The publication No. 20-0143145 has a crank cam shaft fixed with a crank cam installed at the front of the bottom of the body straw to insert a roller of the body zip into an eccentric guide hole of the crank cam, and to fix it to one side of the crank cam shaft. The joint piece is fixed to the cam piece so that the cutting of the string line is operated from the bottom to the top, and the eccentric cam piece on the other end is inserted into the rotary shaft with a plurality of rotating operation pieces arranged at fixed intervals. The wire mesh transfer device of the wire mesh automatic manufacturing machine which combines the operation shaft which hangs the rack gear for the anti-reverse rotation on the rotating shaft to the rotating shaft is described.

동 공보 등록번호 제20-0287784호에는 상하커버에 형성된 라운드 홈에 와이어를 수용하여 견고히 결착될수 있도록 상기 라운드 홈상측과 좌우측에 별도의 보강너트와 고정돌기를 복수로 형성하여 와이어를 보다 견고히 하는 낙석방지용 와이어의 고정장치가 기술되어 있고,The publication No. 20-0287784 is a rockfall to more secure the wire by forming a plurality of separate reinforcing nuts and fixing protrusions on the upper and left and right sides of the round groove so as to receive the wire in the round groove formed on the upper and lower covers The fixing device of the prevention wire is described,

대한민국 실용신안공보 등록번호 실1984-0001399호에는 씨줄공급기어의 일측 풀리를 구동모터와 연결 설치된 전자클러치장치의 풀리와 타이밍벨트로 연결하고 크랭크 샤우드의 작동편과 마주보게 설치된 근접스위치를 전자 클러치장치와 연결하고 바디살의 전면에는 상부가 개방된 이탈방지공을 형성하여서된 철망제조장치가 기재되어 있으나,In Korea Utility Model Publication No. 1984-0001399, a pulley and a timing belt of an electronic clutch device connected to one side of a string feed gear connected to a drive motor are connected to a pulley and a timing belt of an electronic clutch device. The wire mesh manufacturing apparatus is described by connecting with the apparatus and forming a separation prevention hole with an open top at the front of the body flesh.

상기와 같은 종래의 기술들은 철선을 이용하여 철망은 제조하나, 용접에 의해 접합부가 약하고, 트위스트로 다수개의 철선을 꼬아 그사이에 철선을 관통시키거나, 별도의 결착구로 결착하는 등 제조공정이 복잡하여 실제 사용되지 못하는 문제점이 있어 왔다. Conventional techniques as described above, but the wire mesh is manufactured by using a wire, but the joint is weak by welding, the manufacturing process is complicated, such as twisting a plurality of iron wire with a twist, penetrating the wire between them, or binding with a separate binder There has been a problem that cannot be used in practice.

상기와 같은 문제점을 해결하기 위하여, 본 발명은 일정 속도로 공급되는 횡와이어의 일측에 종와이어를 공급한 다음, 겹쳐지는 부분에 클립을 공급하고, 공급된 클립을 프레스에 의해 클립을 결속시킨 다음, 결속된 철망을 인출시키는 장치로 구성된 철망의 제조방법 및 제조장치를 제공하는 것이 본 발명이 이루고자 하는 기 술적 과제인 것이다.
In order to solve the above problems, the present invention supplies a longitudinal wire to one side of the lateral wire is supplied at a constant speed, then supply a clip to the overlapping portion, and binds the clip by the press the supplied clip It is a technical object of the present invention to provide a method and apparatus for manufacturing a wire mesh, which is composed of a device for drawing out the bound wire mesh.

상기와 같은 목적을 달성하기 위하여, 본 발명은 횡와이어공급부(A)와, 상기 횡와이어공급부(A)의 전면 중앙 일측면에 형성된 종와이어공급부(B)와, 상기 종와이어공급부(B)의 상하부에 형성된 결속부(C)와, 상기 결속부(C)의 하부에 형성된 철망인출부(D)와, 상기 결속부(C)의 후면에 형성된 철망인출부(E)로 구성된 철망의 제조장치에 관한 것이다.In order to achieve the above object, the present invention provides a horizontal wire supply unit (A), a longitudinal wire supply unit (B) formed on one side of the front center of the horizontal wire supply unit (A), and the longitudinal wire supply unit (B) Apparatus for producing a wire mesh comprising a binding portion (C) formed in the upper and lower portions, a wire mesh lead portion (D) formed on the lower portion of the binding portion (C), and a wire mesh lead portion (E) formed on the rear surface of the binding portion (C). It is about.

본 발명의 횡와이어공급부(A)는 도1에 도시된 바와 같이 횡와이어(X)를 횡으로 공급하기 위하여 고정대(1)의 상부에 설치된 장치로서, 통상의 알려진 철망의 제조에 사용되는 장치를 사용하는 것이며, 사용자의 필요에 따라 철망의 넓이에 따라 횡와이어의 숫자를 가감하여 설치할 수 있다.As shown in FIG. 1, the lateral wire supply unit A of the present invention is a device installed on the upper part of the holder 1 to supply the lateral wire X laterally. According to the needs of the user, the number of transverse wires can be added or subtracted according to the width of the wire mesh.

본 발명의 종와이어공급부(B)는 철망을 제조하기 위하여, 횡으로 공급되는 횡와이어(X)에 일정간격으로 종와이어(Y)를 공급하는 장치로서,The longitudinal wire supply unit (B) of the present invention is a device for supplying the longitudinal wire (Y) at a predetermined interval to the transverse wire (X) to be supplied laterally in order to manufacture a wire mesh,

장치의 측면에 별도로 설치되어 있으며, 종와이어(Y)가 권취된 두 개의 보빈(2')과, 상기 두 개의 보빈(2')에 권취된 종와이어(Y)를 안내하며 고정대(1-3)의 일측면에 설치된 종와이어안내기(21)와, 상기 종와이어안내기(21)의 반대편이며, 고정대(1-3)의 다른 일측면에 형성된 종와이어인출기(25)로 구성되며, 상기 종와이어안내기(21)는 두 개의 보빈(2')에서 인출된 종와이어(Y)를 고정시키는 종와이어고정기(22)와, 종와이어(Y)를 정렬시키며 상부에는 종와이어상하강실린더(29') 가 구비된 종와이어정렬기(23)와, 상기 종와이어인출기(25)는 에어에 의해 작동되는 종와이어실린더(26)의 일측에 형성되며 끝단에 집게(28)가 형성된 로드(27)로 구성되어 있다.It is installed separately on the side of the device, guides the two bobbin (2 ') wound around the longitudinal wire (Y), and the longitudinal wire (Y) wound on the two bobbin (2'), Longitudinal wire guide 21 is installed on one side of the), and the other side of the longitudinal wire guide 21, the longitudinal wire drawer 25 formed on the other side of the fixed base (1-3), the longitudinal wire The guide 21 aligns the longitudinal wire stabilizer 22 which fixes the longitudinal wires Y drawn from the two bobbins 2 'with the longitudinal wires Y, and the longitudinal wires lower cylinder 29' at the top thereof. A longitudinal wire aligner (23) equipped with: The longitudinal wire extractor 25 is formed on one side of the longitudinal wire cylinder 26 which is operated by air, and is composed of a rod 27 having a tong 28 formed at an end thereof.

본 발명의 결속부(C)는 횡와이어(X)의 상부에 위치된 종와이어(Y)를 바둑판형태로 홈이 형성된 받침대(150)에 안치한 후에, 상기 받침대(150)의 상부에 안치된 횡와이어(X)의 상부에 위치된 종와이어(Y)가 겹치는 부분에 클립(Z)을 공급한 다음, 프레스(100)를 하강시켜 결속시켜 철망을 제조하는 장치로서,In the binding unit C of the present invention, the longitudinal wire Y positioned on the upper side of the transverse wire X is placed on the pedestal 150 formed with a groove in the form of a checker board, and then the transverse seated on the upper side of the pedestal 150. As a device for manufacturing a wire mesh by supplying a clip (Z) to the overlapping portion of the longitudinal wire (Y) located in the upper portion of the wire (X), and then by pressing down the press 100,

상기 종와이어공급부(B)의 전후면에 위치되며 권취된 클립이 내장되며 권취된 클립을 받침대(150)의 상부에 안치된 횡와이어(X)와 두 개의 종와이어(Y)가 맞닿는 두줄에 공급하는 두 개의 클립공급기(6)와, 상기 클립공급기(6)는 횡와이어 (X)수와 동일한 개수의 클립(Z)이 각각 권치되어 내장되어 있으며, 상기 클립공급기(6)의 전면에 위치되며, 권취된 각각의 클립(Z)을 안내하며, "ㄴ"자 앵글형상이며 전후상하 이동하는 제1클립가이드(61)와, 상기 제1클립가이드(61)의 상부에 다수개의 홈이 형성되어 클립(Z)을 안내하는 클립안내가이드홈(62)과, 상기 제1클립가이드(61)의 전면에 제1클립가이드(61)와 일정간격 이격되어 위치되며 "ㄴ"자 앵글형상으로서 유입된 클립을 정지 및 지지하는 제2클립가이드(67)와, 제1중간프레스판하부(125)의 상부일측에 두 개 형성되어 있으며, 제1중간프레스판하부(125) 통공에 실린더가 삽입되어 상기 통공을 통해 상하로 작동시키는 클립2가이드상하이동판실린더(68)로 구성되어 있다.Located on the front and rear surfaces of the longitudinal wire supply unit (B) is a built-in wound clip and supply the wound clip to two lines in which the horizontal wire (X) and two longitudinal wire (Y) abuts on the upper portion of the pedestal 150 abuts The two clip feeders 6 and the clip feeders 6 are each wound with the same number of clips Z as the number of transverse wires (X), and are located in front of the clip feeder 6. To guide each of the wound clips (Z), the first clip guide 61 of "b" shaped angle and moving up and down and up and down, and a plurality of grooves are formed in the upper portion of the first clip guide 61 The clip guide guide groove 62 for guiding the clip Z and the front surface of the first clip guide 61 are positioned at a predetermined distance from the first clip guide 61 and are introduced as an "b" shaped angle. Two clip guides 67 for stopping and supporting the clip, and two formed on an upper side of the lower portion of the first intermediate press plate 125 Air, and is the first intermediate press plate in the lower cylinder 125 is inserted into the through hole it consists of a second guide clip Shanghai copper cylinder 68, for operating up and down through the holes.

프레스(100)는 에어에 의해 작동되며, 상부에 두 개의 프레스실린더(101)가 형성되며 판상의 형태이며 프레스(100)에 프레스기둥(104)을 따라 상하로 이동되는 인 프레스 상부(102)와, The press 100 is operated by air, and the two press cylinders 101 are formed on the upper part and the in press upper part 102 which moves up and down along the press column 104 in the form of a plate and is formed in the press 100. ,

상기 프레스상부(101)의 하부에 형성된 라운드형상의 수평고정대상하부 (105,106)와, 상기 수평고정대하부(106)의 하부에 형성된 제1중간프레스판상하부 (120,125)와, 상기 제1중간프레스판상하부(120,125)의 일측 끝단에 형성되어 종와이어(Y)를 절단하는 종와이어상하부절단칼날(130,131)과, 상기 제1중간프레스판상부(120)의 하부에 형성되며 클립(Z)을 절단하는 다수개의 클립절단핀(121) 및 완충기둥(124)과, 상기 제1중간프레스판하부(125)에 형성된 스프링(126)으로 구비되어 있으며, Round horizontal fixing target lower portions 105 and 106 formed under the press upper portion 101, upper and lower first intermediate press plates 120 and 125 formed under the horizontal fixing lower portion 106, and upper and lower first intermediate press plate portions. Upper and lower cutting blades 130 and 131 formed at one end of the 120 and 125 to cut the longitudinal wires Y, and a plurality of clips to cut the clips Z formed at the lower portion of the first intermediate press plate 120. Two clip cutting pins 121 and buffer columns 124, and springs 126 formed on the lower portion of the first intermediate press plate 125.

본 발명의 철망탈리부(D)는 상기 받침대(150)의 하부에 형성되어 있으며, 이탈실린더(151)와, 상기 이탈실린더(151)의 끝단에 형성된 인출상승판(152)이 상승됨과 동시에 인출상승판(152)의 상부 일측에 형성된 인출상승핀(153)이 상기 받침대(150)의 홈을 따라 상승하면서 철망을 상부로 탈리시키는 것이다. Wire mesh tally portion (D) of the present invention is formed in the lower portion of the pedestal 150, the withdrawal cylinder 151, withdrawal rise plate 152 formed at the end of the departure cylinder 151 is raised and at the same time withdrawal The withdrawal lift pin 153 formed on the upper side of the rising plate 152 ascends along the groove of the pedestal 150 to detach the wire mesh to the top.

본 발명의 철망인출부(E)는 결속부(C)의 후면에 형성되어 있으며, 결속부(C)에서 결속된 철망을 인출하는 장치로서, 상부에 형성되며 상하로 이동시키는 인출상하실린더(72)와, 상기 인출상하실린더(72)의 하부에 형성된 인출몸체부(74)와, 상기 인출몸체부(74)의 일측에 형성되며 인출몸체부(74)를 전후진 시키는 인출기 전후진실린더(76)와, 상기 인출몸체부(74)의 하부 일측에 형성되어 이동되는 인출몸체부(74)를 안내하는 인출기가이드(75)와, 상기 인출기 가이드(75)의 전면에 형성된 인출기스토퍼(77)로 구성되어 있다.Wire mesh withdrawing portion (E) of the present invention is formed on the back of the binding portion (C), as a device for withdrawing the wire mesh bound in the binding portion (C), formed on the upper and withdrawal upper cylinder 72 to move up and down 72 ), A drawer body portion 74 formed at the lower portion of the drawer upper and lower cylinders 72, and a drawer front and rear vibration cylinder 76 formed at one side of the drawer body portion 74 to advance back and forth the drawer body portion 74; ), A withdrawal guide 75 for guiding the withdrawal body portion 74 formed and moved on the lower side of the withdrawal body portion 74, and with a withdrawal stopper 77 formed on the front side of the withdrawal guide 75; Consists of.

본 발명에서 공급되는 횡와이어와 제조된 철망은 모터에 의해 공급되며, 종와이어를 인출하는 종와이어공급부(B)와, 프레스 등의 장치들은 고압콤퓨레샤의 고압에어에 의해 에어실린더가 작동된다.The horizontal wire supplied in the present invention and the manufactured wire mesh are supplied by a motor, and the device such as a longitudinal wire supply unit B for drawing a longitudinal wire and a press is operated by an air cylinder by a high pressure air of a high pressure compressor. .

본 발명은 하기에 실시 예에 의하여 보다 더 잘 이해될 수 있으며, 하기의 실시 예는 본 발명을 예시하기 위한 것이며 첨부된 특허청구범위에 의하여 한정되는 보호범위를 제한하고자 하는 것은 아니다.The invention can be better understood by the following examples, which are intended to illustrate the invention and are not intended to limit the scope of protection defined by the appended claims.

실시예Example

제1공정(횡와이어(X)공급공정)1st process (cross wire (X) supply process)

횡와이어(X)를 횡으로 공급하는 공정으로서, 중간에 설치된 고정대(1)의 하부의 모터(8)를 구동시키면 체인(9)에 의해 모터(8)축과 연결된 정렬롤라(4)의 정렬롤라기어(10)가 회전되어 정렬롤라(4)가 회전됨과 동시에 고정대(1)의 상부에 거치되며, 각각에 횡와이어(X)가 다수 권취된 다수개의 보빈(2)에서 횡와이어(X)가 정렬기(3)를 통해 정렬롤라(4)로 인출되며, In the process of supplying the horizontal wire (X) laterally, when the motor 8 of the lower part of the fixing stand 1 installed in the middle is driven, the alignment roller 4 connected to the shaft of the motor 8 by the chain 9 is aligned. The roll gear 10 is rotated so that the alignment roller 4 is rotated and mounted on the upper part of the fixing stand 1, and the plurality of bobbins 2 in which a plurality of transverse wires X are wound around the transverse wires X Is drawn out to the alignment roller (4) through the sorter (3),

인출된 횡와이어(X)는 상기 정렬롤라(4)를 통과하여 전면 하부에 설치된 안내롤라(7)에 안내되어 한 쌍의 다른 정렬롤라(5)를 통과하고, 상기 다른 정렬롤라 (5)의 전면에 형성된 다른 안내롤라(7)를 통과하여 종와이어(Y)공급기에 도달하면, The drawn transverse wire (X) is guided to the guide roller (7) installed in the lower portion of the front through the alignment roller (4) and passes through a pair of other alignment roller (5), the other of the alignment roller (5) When passing through the other guide roller (7) formed in the front to reach the longitudinal wire (Y) feeder,

제2공정(종와이이어(Y)공급공정)2nd process (Jong wire supply process)

철망을 제조하기 위하여, 횡으로 공급되는 횡와이어(X)의 상부에 일정간격으로 종와이어(Y)를 공급하는 공정으로서,In order to manufacture the wire mesh, a step of supplying the longitudinal wire (Y) at a predetermined interval to the upper portion of the horizontal wire (X) supplied laterally,

상기와 같이 횡와이어(X)가 공급되면 장치의 측면에 별도로 설치된 종와이어(Y)가 권취된 두 개의 보빈(2')에서 종와이어안내기(21)의 반대편에 설치된(도2참조(종와이어공급1단계)) 종와이어인출기(25)의 종와이어실린더(26)가 작동되어 로드(27)가 전진하여 상기 종와이어안내기(21)의 전면에 설치된 종와이어정렬기(23)에 정렬된 두가닥의 종와이어(Y)를 로드(27)의 끝단에 형성된 집게(28)로 집은 다음(도3참조(종와이어공급2단계)), 종와이어실린더(26)가 원위치(도4참조(종와이어공급3단계))되면, 횡와이어(X)의 상부에 종와이어(Y)가 두가닥 위치되게 한 후에, 상기 종와이어실린더(26)의 상부에 부착된 집게상하강실린더(29)를 하강시킴과 동시에, 다른 한쪽에 위치한 종와이어정렬기(23)의 상부에 형성된 종와이어상하강실린더(29')를 하강시켜, 하부의 받침대(150)의 홈에 횡와이어(X)의 상부에 종와이어(Y)를 위치시킨(도5참조(종와이어공급4단계)) 다음, When the lateral wire X is supplied as described above, two bobbins 2 'wound separately on the side of the apparatus are installed on opposite sides of the longitudinal wire guide 21 in two bobbins 2' (see Fig. 2 (the longitudinal wire) Supply step 1) The longitudinal wire cylinder 26 of the longitudinal wire extractor 25 is operated so that the rod 27 is advanced so that the two aligned with the longitudinal wire aligner 23 installed at the front of the longitudinal wire guide 21. The longitudinal wire Y of the strand is picked up with tongs 28 formed at the end of the rod 27 (see FIG. 3 (supplying the longitudinal wire 2)), and the longitudinal wire cylinder 26 is returned to its original position (see FIG. 4 ( When the longitudinal wire supply step 3)) is made, two longitudinal wires Y are positioned on the upper side of the horizontal wire X, and then the forceps up and down cylinder 29 attached to the upper part of the longitudinal wire cylinder 26 is removed. At the same time, the vertical wire lowering cylinder 29 'formed on the upper portion of the vertical wire aligner 23 located on the other side is lowered, and the lower pedestal 150 After placing the longitudinal wire (Y) in the upper portion of the transverse wire (X) in the groove of () (see Fig. 5 (four longitudinal wire supply step)),

제3공정(클립(Z)공급공정)3rd process (Clip (Z) supply process)

두 개의 클립공급기(6)에서 다수개의 권취된 연결된 클립(Z)이 각각 In each of the two clip feeders 6 a plurality of wound connected clips Z

제1클립가이드(61)의 클립안내가이드홈(62)을 따라 안내된 후에, After being guided along the clip guide guide groove 62 of the first clip guide 61,

상기 제1클립1가이드(61)에 부착된 클립1-1가이드(64)와 일정간격 이격되어 형성된 제2클럽가이드(67)에 도달하면, (클립공급1단계;도9참조),When reaching the second club guide 67 formed to be spaced apart from the clip 1-1 guide (64) attached to the first clip 1 guide 61, (clip supply step 1; see Fig. 9),

상기 제1클립가이드 및 클럽1-1가이드(61,64)의 상부에 설치된 클립1가이드상하이동판실린더(66)와 제2클럽가이드(67)의 상부에 형성된 클립2가이드상하이동판실린더(68)를 하강시켜, 상기 제1클립가이드 및 클럽1-1가이드(61,64)와 제2클럽가이드(67)를 하강시켜 클립(Z)과 클립가이드를 해체시킨 다음(클립공급2단계;도10참조), Clip 2 guide upper and lower movable plate cylinder 68 formed on the upper portion of the clip 1 guide upper and lower movable plate cylinder 66 and the second club guide 67 installed on the upper portion of the first clip guide and the club 1-1 guide (61, 64) To lower the first clip guide, club 1-1 guide (61, 64) and the second club guide (67) to dismantle the clip (Z) and the clip guide (clip supply step 2; Fig. 10). Reference),

상기 제1클립가이드(61)의 전면 일측에 형성된 두 개의 제1클립가이드전후실린더(63)를 작동시켜 제1클립가이드 및 클럽1-1가이드(61,64)를 후진시킨 후에(클립공급3단계;도11참조),After operating the two first clip guide cylinders 63 formed on one side of the front surface of the first clip guide 61 to reverse the first clip guide and the club 1-1 guides 61 and 64 (clip supply 3 Step; see Fig. 11),

상기 제1클립가이드 및 클럽1-1가이드(61,64)의 상부에 설치된 클립1가이드상하이동판실린더(66)를 상승시켜 제1클립가이드 및 클럽1-1가이드(61,64)를 상승시켜 클립(Z)의 하부에 클립1-1가이드(64)를 고정시킨 다음(클립공급4단계;도12참조),The first clip guide and the club 1-1 guides 61 and 64 are raised by raising the clip 1 guide upper and lower plate cylinders 66 installed on the upper portions of the first clip guide and the club 1-1 guides 61 and 64. The clip 1-1 guide 64 is fixed to the lower part of the clip Z (clip supply step 4; see Fig. 12),

상기 제1클립가이드(61)의 전면 일측에 형성된 두 개의 제1클립가이드전후실린더(63)를 작동시켜 제1클립가이드 및 클럽1-1가이드(61,64)를 전진시켜 클립(Z)을 전진시킨 후에(클립공급5단계;도13참조),The first clip guide and the club 1-1 guides 61 and 64 are advanced by operating the two first clip guide cylinders 63 formed on one side of the front surface of the first clip guide 61 to thereby clip Z. After advancing (clip feeding step 5; see Fig. 13),

상기 제2클럽가이드(67)의 상부에 형성된 클립2가이드상하이동판실린더(68)를 조작하여, 제2클럽가이드(67)를 상승시켜 클립(Z)의 하부에 제2클럽가이드(67)의 고정과 제1클립가이드 및 클럽1-1가이드(61,64)를 고정시켜 ((클립공급6단계;도14참조(1단계와 동일한 상태)로 클립을 공급한 다음,(상기와 같은 동작을 반복하여 클립공급)By operating the clip 2 guide upper and lower movable plate cylinder 68 formed on the upper portion of the second club guide 67, the second club guide 67 is raised to lower the second club guide 67 on the lower portion of the clip (Z). After fixing the first clip guide and the club 1-1 guides 61 and 64, supply the clip with ((Supply step 6; see Fig. 14 (same state as step 1)), and then ( Repeatedly supplying clips)

제4공정(클립핑공정)4th process (clipping process)

받침대(150)위에서 수행되며, 상기와 같이 클립(Z)이 받침대(150)위의 횡와이어(X)의 상부에 종와이어(Y)가 안치되고, 상기 횡종와이어(Y.X)가 겹치는 부분에 클립(Z)이 공급된(프레스 초기단계;도15참조) 다음, 프레스실린더(101)의 작동에 의해 프레스상부(101)의 중앙하부에 형성된 라운드형상의 수평고정대상,하부 (105,106)에 의해 수평을 유지하면서 프레스 상부(100)가 모서리에 형성된 4개의 프레스기둥(104)을 따라 하강하면,Is carried out on the pedestal 150, the clip Z is placed on top of the transverse wire (X) on the pedestal 150, as described above, the longitudinal wire (Y) is placed, the transverse longitudinal wire (YX) overlaps in the clip (Z) was supplied (press initial stage; see Fig. 15), and then horizontally formed by the horizontal horizontal fixing object, the lower part 105, 106 formed in the lower center of the press upper part 101 by the operation of the press cylinder 101. If the press top 100 is lowered along the four press pillars 104 formed at the corners while maintaining the

상기 수평고정대하부(106)의 하부에 형성된 제1중간프레스판상하부(120,125)가 하강하면서, 일정위치에 도달하면 제1중간프레스판하부(125)의 돌출된부위가 받침대에 닿아 1차 하강하여(프레스 1단계 하강;도16참조), 제1중간프레스판하부 (125)는 더 이상 하강하지 않고 정지하며, 제1중간프레스판상부(120)와 상기 제1중간프레스판상부(120)의 하부에 부착된 클립절단핀(121)은 완충기둥(124)을 따라 계속하강하고, 상기 제1중간프레스판상하부(120,125)사이에 위치된 다수개의 클립절단핀(121)이 다수개의 통공이 형성된 제1중간프레스판하부(125)의 통공을 통과하여 공급된 클립(Z)의 상부에 압력을 가하여 다수개의 인출 연결된 클립(Z)을 각각 독립되게 절단되면서, 동시에 클립핑되며, 이와 동시에 제1중간프레스판상부(120)의 일측에 형성된 종와이어상부절단칼날(130)과, 제1중간프레스판하부(125)의 일측에 형성된 종와이어하부절단칼날(131)에 의해 종와이어(Y)를 절단 시킨 다음(프레스2단계하강;도17참조), (상기 종와이어하부절단칼날(131)의 두 개의 홈이 형성되어 두 개의 종와이어(Y)가 삽입된 상태에서 상부에서 종와이어상부절단칼날(130)이 하강하면서 상기 두 개의 종와이어(Y)를 절단하는 것이다.)While the upper and lower first intermediate press plates 120 and 125 formed at the lower portion of the horizontal fixing base 106 descend, when reaching a predetermined position, the protruding portion of the first intermediate press plate 125 reaches the pedestal and descends first. (Press 1 step lower; see Fig. 16), the first intermediate press plate lower portion 125 stops without lowering anymore, the first intermediate press plate upper portion 120 and the first intermediate press plate portion 120 The clip cutting pin 121 attached to the lower portion continues to descend along the buffer column 124, and the plurality of clip cutting pins 121 positioned between the upper and lower portions 120 and 125 of the first intermediate press plate are formed with a plurality of holes. The plurality of pulled-out clips Z are independently cut and simultaneously clipped by applying pressure to the upper portion of the clip Z supplied through the through hole of the lower portion of the first intermediate press plate 125, and at the same time Longitudinal wire cutting blade 13 formed on one side of the press plate upper portion 120 0) and the longitudinal wire Y is cut by the longitudinal wire lower cutting blade 131 formed on one side of the lower portion of the first intermediate press plate 125 (pressing step 2; lowering (see FIG. 17)), (the species Two grooves of the lower wire cutting blade 131 are formed to cut the two longitudinal wires Y while the vertical wire upper cutting blade 130 descends from the upper state while the two longitudinal wires Y are inserted. will be.)

제1중간프레스판하부(125)는 계속 정지된 상태에서 프레스(100)가 역으로 작동되어 상부로 상승하면, 프레스상부(102)와, 제1중간프레스판상부(120) 및 다수개 의 클립절단핀(121)이 다수개의 통공이 형성된 제1중간프레스판하부(125)의 통공을 통과하여 상승하며(프레스1단계 상승;도18참조), 제1중간프레스판하부(125)의 하부에 부착된 스프링(126)에 의해 제1중간프레스판하부(125)가 상승하면서 제1중간프레스판하부(125) 상부에 설치된 완충기둥(124)도 함께 상승한 다음,(프례스2단계 상승;도19참조) When the first intermediate press plate lower portion 125 continues to be stopped and the press 100 is operated reversely and ascends upward, the upper press portion 102, the first intermediate press plate upper portion 120, and the plurality of clips The cutting pin 121 rises through the through hole of the first intermediate press plate 125 having a plurality of holes formed therein (press 1 step up; see FIG. 18), and below the first intermediate press plate 125. As the lower portion of the first intermediate press plate 125 is raised by the attached spring 126, the buffer column 124 installed on the upper portion of the first intermediate press plate 125 is also raised together, and then (the second step of rising the example; See 19)

제5공정 (철망탈리공정)5th process (wire mesh desorption process)

상기 받침대(150)에서 클램핑이 형성된 후에, 받침대(150)의 바둑판모양의 홈에 고정된 철망은 하부에 형성된 이탈실린더(151)의 작동에 의해 이탈실린더 (151)의 끝단에 형성된 인출상승판(152)이 상승됨과 동시에 인출상승판(152)의 상부 일측에 형성된 인출상승핀(153)이 상기 받침대(150)의 홈을 따라 상승하면서 철망을 상부로 탈리시킨 후에, After the clamping is formed in the pedestal 150, the wire mesh fixed to the checkerboard-shaped groove of the pedestal 150 is a pull-up plate formed at the end of the release cylinder 151 by the operation of the release cylinder 151 formed in the lower ( At the same time as the 152 is lifted up and the withdrawal rising pin 153 formed on the upper side of the withdrawal riser plate 152 ascends along the groove of the pedestal 150 to detach the wire mesh to the top,

제6공정(철망인출공정)6th process (wire mesh drawing process)

결속부(C)의 후면에 형성된 인출몸체부(74)의 후방에 설치된 전후진실린더 (76)를 작동시켜 인출몸체부(74)를 전진시킨 후에(도21참조), 인출몸체부(74)의 상부에 형성된 인출상하실린더(72)를 하강시켜 상기 인출상하실린더(72)의 끝단에 형성된 인출판1(73)과 인출몸체부(74)의 상부에 형성된 인출판2(75)사이에 철망을 위치시켜 고정시킨 다음(도22참조), 다시 상기 전후진실린더(76)를 작동시켜 인출몸체부(74)를 후진시키면 고정된 철망도 함께 인출되며(도23참조), 다시 상기 인출상하실린더(72)작동시켜 인출상하실린더를 상승시킨 후(도24참조)에, 상기와 같은 동작을 반복하여 철망을 인출시키는 것이다. After operating the forward and backward cylinder 76 provided at the rear of the drawout body portion 74 formed at the back of the binding portion C to advance the drawout body portion 74 (see FIG. 21), the drawout body portion 74 The wire mesh is lowered between the drawer plate 1 (73) formed at the end of the drawer holder 72 and the drawer plate 2 (75) formed at the top of the drawer body portion 74 by lowering the drawer holder 72 formed at the top of And fix it (see Fig. 22), and then operate the forward and backward cylinder 76 again to reverse the drawing body portion 74, and the fixed wire mesh is also drawn out (see Fig. 23). (72) After the operation raises the drawer cylinder (see Fig. 24), the above operation is repeated to draw out the wire mesh.

도면을 참고하여 본 발명을 상세히 설명하면, Referring to the drawings in detail the present invention,

도1은 본 발명의 철망제조장치 전체도, 도2는 본 발명의 종와이어공급 1단계 평면 및 측단면 상세도, 도3은 본 발명의 종와이어공급 2단계 평면 및 측단면 상세도, 도4는 본 발명의 종와이어공급 3단계 평면 및 측단면 상세도, 도5는 본 발명의 종와이어공급 4단계 평면 및 측단면 상세도, 도6은 본 발명의 결속부(C) 상세도, 도7은 본 발명의 결속부(C) 측단면 상세도, 도8은 본 발명의 결속부(C) 정단면 일부 상세도, 도9는 본 발명의 결속부(C)의 클립공급1단계 상세도, 도10은 본 발명의 결속부(C)의 클립공급2단계 상세도, 도11은 본 발명의 결속부(C)의 클립공급3단계 상세도, 도12는 본 발명의 결속부(C)의 클립공급4단계 상세도, 도13은 본 발명의 결속부(C)의 클립공급5단계 상세도, 도14는 본 발명의 결속부(C)의 클립공급6단계 상세도, 도 15는 본 발명의 결속부(C)의 프레스 초기단계 상세도, 도16은 본 발명의 결속부(C)의 프레스 1단계 하강 상세도, 도17은 본 발명의 결속부(C)의 프레스 2단계 하강 상세도, 도18은 본 발명의 결속부(C)의 프레스 1단계 상승 상세도, 도19는 본 발명의 결속부(C)의 프레스 2단계 상승 상세도, 도20은 본 발명의 철망탈리부(D) 작동 상세도, 도21은 본 발명의 철망인출부(E)의 인출1단계 상세도, 도22는 본 발명의 철망인출부(E)의 인출2단계 상세도, 도23은 본 발명의 철망인출부(E)의 인출3단계 상세도, 도24는 본 발명의 철망인출부(E)의 인출4단계 상세도, 도25는 본 발명의 철망상세도, 도26은 본 발명의 클립공급기(6)에 내장된 클립(Z)의 측면 상세도, 도27은 본 발명의 클립공급기(6)에 내장된 클립(Z)의 상세도를 도시한 것이며, 고정대(1,1-2,1-3,1-4), 보빈(2), 정렬기(3), 정렬롤라(4,5), 클립 공급기(6), 안내롤러(7), 모터(8), 체인(9), 정렬롤라기어(10), 종와이어안내기 (21), 종와이어고정기(22)와, 종와이어정렬기(23), 종와이어인출기(25), 종와이어실린더(26), 로드(27), 집게(28), 집게상하강실린더(29), 제1클립가이드(61), 클립안내가이드홈(62), 제1클립가이드전후실린더(63), 클립1-1가이드(64), 클립1가이드상하이동판(65), 클립1가이드상하이동판실린더(66), 제2클럽가이드(67), 클립2가이드상하이동판실린더(68), 인출상하실린더(72), 인출판1(73), 인출몸체부(74), 인출판2(75), 인출기전후진실린더(76), 인출기스토퍼(77), 프레스(100), 프레스실린더(101), 프레스 상부(102), 프레스하부(103), 프레스기둥(104), 수평고정대상부 (105), 수평고정대하부(106), 브라켓(110), 제1중간프레스판상부(120), 클립절단핀 (121), 완충기둥(124), 제1중간프레스판하부(125), 스프링(126), 종와이어절단칼날 (130), 받침대(150), 이탈실린더(151), 인출상승판(152), 인출상승핀(153), 횡와이어공급부(A), 종와이어공급부(B), 결속부(C), 철망탈리부(D)철망인출부(E), 횡와이어(X), 종와이어(Y), 클립(Z)을 나타낸 것임을 알 수 있다.Figure 1 is an overall view of the wire mesh manufacturing apparatus of the present invention, Figure 2 is a one-phase plane and side cross-sectional detail of the longitudinal wire supply of the present invention, Figure 3 is a two-dimensional plane and side cross-sectional view of the longitudinal wire supply of the present invention, Figure 4 Figure 3 is a plan and side cross-sectional detail of the three-step longitudinal wire supply of the present invention, Figure 5 is a plan and side cross-sectional detail of the four-step longitudinal wire supply of the present invention, Figure 6 is a detailed view of the binding portion (C) of the present invention, Figure 7 Figure 9 is a side cross-sectional detail of the binding portion (C) of the present invention, Figure 8 is a partial detailed cross-sectional view of the binding portion (C) of the present invention, Figure 9 is a detailed view of the first step of supplying the clip of the binding portion (C) of the present invention, Fig. 10 is a detailed view of the second step of supplying the clip of the binding part C of the present invention, Fig. 11 is a detailed view of the third step of supplying the clip of the binding part C of the present invention. Detailed clip supply step 4, Figure 13 is a detailed view of the clip supply step 5 of the binding unit (C) of the present invention, Figure 14 is a detailed view of the clip supply step 6 of the binding unit (C) of the present invention, Figure 15 Of the binding part (C) Details of the initial stage of the press, Fig. 16 is a detailed drawing of the press 1st step of the binding part C of the present invention, Fig. 17 is a detailed drawing of the press 2 steps of the binding part C of the present invention. Detailed press 1st step elevation of binding part C, FIG. 19 is a detailed press 2 step elevation view of the binding part C of this invention, FIG. 20 is a detailed view of the operation | movement of the wire mesh tally part D of this invention, FIG. 2 is a detailed drawing of the drawing step 1 of the wire mesh lead-out portion (E) of the present invention, FIG. 22 is a detailed drawing of the drawing step 2 of the wire drawing-out portion (E) of the present invention, and FIG. 3 is a detailed view of the wire mesh drawing part E of the present invention, and FIG. 24 is a detailed four-step drawing of the wire mesh drawing part E of the present invention, FIG. 25 is a detailed view of the wire mesh of the present invention, and FIG. A detailed side view of Z), and FIG. 27 shows a detailed view of the clip Z embedded in the clip feeder 6 of the present invention, and the holders 1,1-2,1-3,1-4, Bobbin (2), aligner (3), alignment roller (4, 5), clip feeder (6), guide Roller (7), motor (8), chain (9), alignment roller gear (10), bell wire guide (21), bell wire stabilizer (22), bell wire sorter (23), bell wire extractor ( 25), longitudinal wire cylinder 26, rod 27, tongs 28, tongs up and down cylinder 29, the first clip guide 61, clip guide guide groove 62, the first clip guide cylinder before and after (63), Clip 1-1 guide (64), Clip 1 guide up and down plate 65, Clip 1 guide up and down plate cylinder (66), 2nd club guide (67), Clip 2 guide up and down plate plate cylinder (68), Drawer upper cylinder 72, drawer plate 1 (73), drawer body portion 74, drawer plate 2 (75), drawer front and rear cylinder 76, drawer stopper 77, press 100, press cylinder ( 101), the upper press 102, the press lower portion 103, the press pillar 104, the horizontal fixing target portion 105, the horizontal fixing lower portion 106, the bracket 110, the first intermediate press plate 120, Clip cutting pin 121, buffer column 124, the first intermediate press plate lower portion 125, spring 126, longitudinal wire cutting blade (130) , Stand 150, release cylinder 151, pull-up plate 152, pull-up pin 153, lateral wire supply (A), longitudinal wire supply (B), binding (C), wire mesh tally ( D) It can be seen that the wire mesh lead portion E, the lateral wire X, the longitudinal wire Y, and the clip Z are shown.

구성을 살펴보면, 본 발명의 장치는 도1에 도시된 바와 같이, 횡와이어공급부(A)와, 상기 횡와이어공급부(A)의 전면 중앙 일측면에 형성된 종와이어공급부(B)와, 상기 종와이어공급부(B)의 상하부에 형성되며, 프레스(100)와 클립공급기(6)로 구비된 결속부(C)와, 상기 결속기(C) 하부에 형성된 철망탈리부(D), 상기 결속부(C)의 후면에 형성된 철망인출부(E)로 구성된 철망의 제조장치에 관한 것이다.Looking at the configuration, the device of the present invention, as shown in Figure 1, the horizontal wire supply portion (A), the longitudinal wire supply portion (B) formed on one side of the front center of the horizontal wire supply portion (A), and the longitudinal wire It is formed in the upper and lower portions of the supply portion (B), the binding portion (C) provided with the press 100 and the clip feeder (6), the wire mesh desorption portion (D) formed below the binder (C), the binding portion (C) It relates to a wire mesh manufacturing apparatus consisting of a wire mesh lead portion (E) formed on the back of the).

상기 횡와이어공급부(A)는 도1에 도시된 바와 같이 횡와이어(X)를 횡으로 공급하기 위하여 고정대(1)의 상부에 설치된 장치로서,The lateral wire supply unit (A) is a device installed on the upper portion of the fixed base (1) to supply the lateral wire (X) laterally, as shown in FIG.

최후방 고정대(1)에 거치되어 있으며, 각각에 횡와이어(X)가 다수 권취된 다수개의 보빈(2)과, 상기 보빈(2)의 전면에 설치되어 있으며, 다수개의 보빈(2)을 통해서 인출된 다수개의 횡와이어(X)를 가이드하여 정렬하는 정렬기(3)와, 상기 정렬기(3)의 전면에 설치되어 있으며, 한쌍으로 형성된 정렬롤라(4)와, 상기 정렬롤라(4)의 하부롤라는 다수개의 홈이 형성되어 있어 상기 홈으로 횡와이어(X)가 각각 통과되도록 하며, 상기 하부의 정렬롤라(4)의 일측에 형성된 정렬롤라기어(10)와, 상기 정렬롤라기어(10)와 체인(9)에 의해 연결되어 있으며 고정대(1)의 하부 일측에 형성되어 정렬롤라(4)를 구동시키는 모터(8)와, 상기 정렬롤라(4)의 전면 하부에 설치된 안내롤라(7)와, 상기 안내롤라(7)의 전면에 형성된 한 쌍의 다른 정렬롤라(5)와, 상기 다른 정렬롤라(5)의 전면에 형성된 다른 안내롤라(7)로 구비되어 있으며, It is mounted on the rearmost support (1), and each of the plurality of bobbins (2) wound around a plurality of wires (X), and is installed on the front of the bobbin (2), through a plurality of bobbins (2) Aligner (3) for guiding and aligning the plurality of drawn wires (X), the alignment roller (4) formed on the front of the aligner (3) and a pair of alignment roller (4) The lower roller of the plurality of grooves are formed so that the horizontal wire (X) passes through each of the grooves, the alignment roller gear 10 formed on one side of the lower alignment roller 4 and the alignment roller gear ( 10 and a motor (8) connected to the chain (9) and formed on one side of the lower support (1) to drive the alignment roller (4), and a guide roller installed in the lower front of the alignment roller (4) ( 7), a pair of other alignment rollers 5 formed on the front surface of the guide roller 7, and a front surface of the other alignment roller 5 It is provided with another guide roller (7) formed in

상기 종와이어공급부(B)는 도1 및 도2내지 도5에 도시된 바와 같이, 철망을 제조하기 위하여, 횡으로 공급되는 횡와이어(X)에 일정간격으로 종와이어(Y)를 공급하는 장치로서,1 and 2 to 5, the longitudinal wire supply unit (B) is a device for supplying the longitudinal wire (Y) at regular intervals to the horizontal wire (X) supplied in the horizontal, in order to manufacture the wire mesh as,

장치의 측면에 별도로 설치되어 있으며, 종와이어(Y)가 권취된 두 개의 보빈(2')과, 상기 두 개의 보빈(2')에 권취된 종와이어(Y)를 안내하며 고정대(1-3)의 일측면에 설치된 종와이어안내기(21)와, 상기 종와이어안내기(21)의 반대편이 며, 고정대(1-3)의 다른 일측면에 형성된 종와이어인출기(25)로 구성되며,It is installed separately on the side of the device, guides the two bobbin (2 ') wound around the longitudinal wire (Y), and the longitudinal wire (Y) wound on the two bobbin (2'), Longitudinal wire guide 21 is installed on one side of the), and the other side of the longitudinal wire guide 21, and consists of a longitudinal wire extractor 25 formed on the other side of the fixed base (1-3),

상기 종와이어안내기(21)는 상기 종와이어안내기(21)는 두 개의 보빈(2')에서 인출된 종와이어(Y)를 고정시키는 종와이어고정기(22)와, 종와이어(Y)를 정렬시키며 상부에는 종와이어상하강실린더(29')가 구비된 종와이어정렬기(23)와, The longitudinal wire guide 21 is the longitudinal wire guide 21 is aligned with the longitudinal wire fixing device 22, which fixes the longitudinal wire (Y) drawn out from the two bobbin (2 '), longitudinal wire (Y) And a longitudinal wire aligner 23 having a vertical wire up and down cylinder 29 'provided thereon;

상기 종와이어인출기(25)는 에어에 의해 작동되는 종와이어실린더(26)와, 상기 종와이어실린더(26)의 일측에 형성되어 전후진 운동을 하는 로드(27)와, 상기 로드(27)의 끝단에 형성되어 전진시에는 벌어지며 후진시 오므라지는 집게(28)와, 상기 종와이어실린더(26)의 상부에 부착되어 종와이어실린더(26)를 상하강 시키는 집게상하강실린더(29)로 구비되고, 상기 집게(28)는 3개의 삼지창형태이며 중간부는 고정되고 양측은 "L"자 형태의 클램프가 힌지결합되어 전후진시 벌어지거나 오므려지도록 구성되어 있다.The longitudinal wire extractor 25 includes a longitudinal wire cylinder 26 operated by air, a rod 27 formed on one side of the longitudinal wire cylinder 26 to move back and forth, and the rod 27. It is formed at the end and is formed when the advance and the retracted forceps 28 when retracted, and attached to the upper portion of the longitudinal wire cylinder 26 is provided with a forceps up and down cylinder 29 to raise and lower the longitudinal wire cylinder 26 The tongs 28 are formed in three tridents, the middle part of which is fixed, and both sides are configured such that the clamps of the "L" shape are hinged and opened or closed during forward and backward advancement.

상기 결속부(C)는 도1 및 도6내지 도20에 도시된 바와 같이, 상기 횡와이어 (X)의 상부에 위치된 종와이어(Y)를 바둑판형태로 홈이 형성된 받침대(150)에 안치한 후에, 상기 받침대(150)의 상부에 안치된 횡와이어(X)의 상부에 위치된 종와이어(Y)가 겹치는 부분에 클립(Z)을 공급한 다음, 프레스(100)를 하강시켜 결속시켜 철망을 제조하는 장치로서,As shown in FIGS. 1 and 6 to 20, the binding part C is provided with a longitudinal wire Y positioned on an upper portion of the transverse wire X on a pedestal 150 having a groove formed in a checkerboard shape. Subsequently, the clip Z is supplied to a portion where the longitudinal wires Y positioned at the upper portion of the transverse wires X placed at the upper portion of the pedestal 150 overlap, and then the press 100 is lowered to bind the wire mesh. As a device for manufacturing

상기 종와이어공급부(B)의 전후면에 위치되며 권취된 클립이 내장되며 권취된 클립을 받침대(150)의 상부에 안치된 횡아이어(X)와 두 개의 종와이어(Y)가 맞닿는 두줄에 공급하는 두 개의 클립공급기(6)와,Located on the front and rear surfaces of the longitudinal wire supply unit (B) is a built-in wound clip and supply the wound clip to two rows where the horizontal eye (X) and two longitudinal wires (Y) abutted on the upper portion of the pedestal 150 abuts Two clip feeders (6),

상기 클립공급기(6)는 도8내지 도12에 도시된 바와 같이 횡와이어(X)수와 동일한 개수의 클립(Z)이 각각 권치되어 내장되어 있으며, As shown in FIGS. 8 to 12, the clip feeder 6 has the same number of clips Z as the number of transverse wires X, respectively, and is wound therein.

상기 클립공급기(6)의 전면에 위치되며, 권취된 각각의 클립(Z)을 안내하며, "ㄴ"자 앵글형상이며 전후상하 이동하는 제1클립가이드(61)와, 상기 제1클립가이드 (61)의 상부에 다수개의 홈이 형성되어 클립(Z)을 안내하는 클립안내가이드홈(62)과, 상기 제1클립가이드(61)의 전면 일측에 형성된 두 개의 제1클립가이드전후실린더(63)와,Located in the front of the clip feeder 6, and guides each of the wound clip (Z), the first clip guide 61 of "b" shaped angle and moving up and down and up and down, and the first clip guide ( A plurality of grooves are formed on the upper part of the upper part of the upper part of the 61 and the clip guide guide groove 62 for guiding the clip Z, and the two first clip guide front and rear cylinders 63 formed on one side of the front surface of the first clip guide 61. )Wow,

상기 제1클립가이드(61)와 마주보게 형성된 "ㄴ"자 앵글형상이며 상기 제1클립가이드(61)와 함께 전후 상하 이동하는 클립1-1가이드(64)와,A clip 1-1 guide 64 having an angle shape of “b” shaped to face the first clip guide 61 and moving up and down together with the first clip guide 61;

상기 제1클립가이드 및 클럽1-1가이드(61,64)의 상부에 판상으로 구비되며 상기 제1클립가이드 및 클럽1-1가이드(61,64)를 상하 이동시키는 클립1가이드상하이동판(65)과, 상기 클립1가이드상하이동판(65)의 상부일측에 두 개 형성되어 있으며, 클립1가이드상하이동판 (65)에 형성된 통공에 실린더가 관통되어 클립1가이드상하이동판(65)을 상하로 작동시키는 클립1가이드상하이동판실린더(66)와,The first clip guide and the club 1-1 guides 61 and 64 are provided in a plate shape and the clip 1 guide vertically moving plate 65 which moves the first clip guide and the club 1-1 guides 61 and 64 up and down 65 And two upper one side of the clip 1 guide up and down plate 65, the cylinder is penetrated through the through hole formed in the clip 1 guide up and down plate 65 to operate the clip 1 guide up and down plate 65 up and down Clip 1 guide upper and lower movable plate cylinder (66),

상기 제1클립가이드(61)의 전면에 제1클립가이드(61)와 일정간격 이격되어 위치되며 "ㄴ"자 앵글형상으로서 유입된 클립을 정지 및 지지하는 제2클립 가이드(67)와, 상기 제2클럽가이드(67)의 상부에 다수개 통공이 구비된 제1중간프레스판하부(125)와, 상기 제1중간프레스판하부(125)의 상부일측에 두 개 형성되어 있으며, 제1중간프레스판하부(125) 통공에 실린더가 관통하여 상하로 작동시키는 클립2가이드상하이동판실린더(68)로 구비되어 있다.A second clip guide 67 positioned at a predetermined interval on the front surface of the first clip guide 61 and stopping and supporting the clip introduced as an “b” angle angle; It is formed on the upper side of the first middle press plate lower portion 125 and the first intermediate press plate lower portion 125 having a plurality of through holes on the upper portion of the second club guide 67, the first middle The press plate lower portion 125 is provided with a clip 2 guide upper and lower movable plate cylinder 68 for operating the cylinder vertically through the through hole.

프레스(100)는 도16내지 도20에 의해 도시된 바와 같이, 에어에 의해 작동되며, 두 개의 프레스실린더(101)가 형성되며 판상의 형태이며 프레스(100)에 프레스기둥(104)을 따라 상하로 이동되는 인 프레스 상부(102)와, 상기 프레스상부의 4개의 모서리에 형성된 통공에 관통되며 프레스하부(103)의 상부에 형성된 4개의 프레스기둥(104)과, The press 100 is operated by air, as shown by Figs. 16 to 20, and two press cylinders 101 are formed and are in the form of plates and are formed up and down along the press column 104 in the press 100. In press upper portion 102 to be moved to, four press pillars 104 formed in the upper portion of the press lower portion 103 and penetrates through holes formed in the four corners of the press upper portion,

상기 프레스상부(101)의 중앙하부에 형성되어 라운드형상으로 형성되며, 중앙의 브라켓에 의해 하부에 형성된 수평고정대하부(106)와 연결되는 수평고정대상부(105)와,A horizontal fixing target portion 105 formed in the center lower portion of the press upper portion 101 and formed in a round shape and connected to the horizontal fixing lower portion 106 formed at a lower portion by a central bracket;

상기 수평고정대상부(105)와 브라켓(110)에 의해 연결된 수평고정대하부 (106)와, 상기 수평고정대하부(106)의 하부에 형성되며 상기 프레스상부(101)와 함께 상하강하는 제1중간프레스판상부(120)와, 상기 제1중간프레스판상부(120)과, 상기 제1중간프레스판상부(120)의 하부에 부착되며 클립(Z)을 절단하는 다수개의 클립절단핀(121)과, 상기 제1중간프레스판상부(120)에 일정간격 이격되어 형성된 2개의 완충기둥(124)이 관통되는 완충기둥통공(미도시)과, 상기 제1중간프레스판상부 (120)의 하부에 일정간격 이격되며 형성되어 있으며 상부에 일정간격 이격되어 형성된 2개의 완충기둥(124)이 구비되며 상하부를 관통하여 형성된 다수개의 클립절단핀(121)이 관통되도록 형성된 동일한 개수의 통공(미도시)이 구비되며, 하부중앙부가 돌출된 구조를 갖는 제1중간프레스판하부(125)와,A first intermediate press formed in a lower portion of the horizontal fixing base 106 connected to the horizontal fixing target part 105 and the bracket 110 and a lower portion of the horizontal fixing lower part 106 and moving up and down together with the upper press portion 101; Plate-shaped portion 120, the first intermediate press plate 120, a plurality of clip cutting pins 121 are attached to the lower portion of the first intermediate press plate 120 and cut the clip (Z) and A buffer column through hole (not shown) through which two buffer pillars 124 formed to be spaced apart at regular intervals from the upper portion of the first intermediate press plate 120, and a lower portion of the upper portion of the first intermediate press plate 120. It is formed spaced apart and is provided with two buffer pillars 124 formed at a predetermined interval spaced at the top and the same number of through holes (not shown) formed to pass through a plurality of clip cutting pins 121 formed through the upper and lower parts The first intermediate press has a structure in which the lower center portion protrudes. And a lower plate 125,

상기 제1중간프레스상하부(120,125)의 일측 끝단에 형성되어 종와이어(Y)를 절단하는 종와이어상하부절단칼날(130,131)과,Upper and lower vertical cutting blades 130 and 131 formed at one end of the first middle press upper and lower portions 120 and 125 to cut the longitudinal wires Y;

상기 제1중간프레스판상부(120)와 제1중간프레스판하부(125)의 사이에는 연결된 다수 개의 스프링(126)으로 구비되어 있으며, It is provided with a plurality of springs 126 connected between the first intermediate press plate upper portion 120 and the first intermediate press plate lower portion 125,

상기 철망탈리부(D)는 도20에 도시된 바와 같이, 철망이 형성되며, 받침대 (150)의 상부에 바둑판모양의 홈이 형성되어 있으며, 상기 홈의 일측 하부에 형성된 인출상승핀(153)과, 상기 인출상승핀(153)하부에 부착된 이탈상승판(152)과, 상기 이탈상승판(152)의 중앙하부는 이탈실린더(151)의 끝단에 형성된 구조로 구비되어 있다. The wire mesh tally portion (D) is shown in Figure 20, the wire mesh is formed, a checkerboard-shaped groove is formed on the upper portion of the pedestal 150, the withdrawal lift pin 153 formed on one side lower portion of the groove And, the lifting riser plate 152 attached to the lower portion of the withdrawal rise pin 153, and the center lower portion of the release riser plate 152 is provided with a structure formed at the end of the release cylinder 151.

철망인출부(E)는 도1 및 도21내지 도24에 도시된 바와 같이, 결속부(C)의 후면에 형성되어 있으며, 결속부(C)에서 결속된 철망을 인출하는 장치로서, 상부에 형성되며 상하로 이동시키는 인출상하실린더(72)와, 상기 인출상하실린더(72)의 끝단에 형성된 인출판1(73)과, 상기 인출판1(73)의 하부에 형성된 인출몸체부(74)와, 상기 인출몸체부(74)의 상부에 형성되며 상기 인출판1(73)과 함께 철망을 지지하는 인출판2(75)와, 상기 인출몸체부(74)의 일측에 형성되며 인출몸체부(74)를 전후진 시키는 인출기 전후진실린더(76)와, 상기 인출몸체부(74)의 하부 일측에 형성되어 이동되는 인출몸체부(74)를 안내하는 인출기가이드(75)와, 상기 인출기 가이드(75)의 전면에 형성된 인출기스토퍼(77)로 구성되어 있다.As shown in FIGS. 1 and 21 to 24, the wire mesh lead-out part E is formed at the rear side of the binding part C, and is a device for drawing out the wire mesh bound in the binding part C. A drawer upper and lower cylinder 72 formed to move up and down, a drawer plate 1 73 formed at an end of the drawer upper holder 72, and a drawer body portion 74 formed at a lower portion of the drawer plate 173; And a drawing plate 2 75 formed at an upper portion of the drawing body portion 74 and supporting the wire mesh together with the drawing plate 1 73, and formed at one side of the drawing body portion 74. A front and rear oscillation cylinder (76) for advancing and retreating 74, a withdrawal guide 75 for guiding the withdrawal body portion 74 which is formed and moved on the lower side of the withdrawal body portion 74, and the withdrawal guide It is comprised by the extractor stopper 77 formed in the front surface of 75. As shown in FIG.

도25는 본 발명의 철망을 상세히 도시한 것으로서, 다수개의 횡와이어(X) 상부에 일정간격 넓게 거리를 두고 두줄의 종와이어(Y)가 좁은 간격으로 이격되며, 상기와 같은 모양이 반복되어 연속적으로 구성되어 있으며, 상기 횡와이어(X)와 종 와이어(Y)가 겹치는 곳에 형성된 클립(Z)으로 구성되어 있다.25 is a detailed view of the wire mesh of the present invention, in which a plurality of horizontal wires (X) are spaced at regular intervals and two rows of longitudinal wires (Y) are spaced at narrow intervals, and the same shape is repeated and continuous. It is comprised by the clip Z formed in the place where the said horizontal wire X and the longitudinal wire Y overlap.

도26은 본 발명의 클립공급기(6)에 내장된 클립(Z)의 측면 상세도로서, 횡와이어(X)의 숫자만큼 클립이 권취되어 있으며, Fig. 26 is a detailed side view of the clip Z embedded in the clip feeder 6 of the present invention, in which clips are wound by the number of the transverse wires X,

도27은 본 발명의 클립공급기(6)에 내장된 클립(Z)을 상세히 도시한 것이다.Fig. 27 shows in detail the clip Z embedded in the clip feeder 6 of the present invention.

본 발명에 따른 다수의 자동화장치로 구성되어 노동력이 절감되고, 균일한 철망을 제조하여 불량률을 감소시키며, 작업시간을 단축하여 생산성을 향상시킬 수 있으며, 클립에 의해 결속됨으로서, 와이어 상호간의 결속력이 향상되어 철망의 내구성 및 견고성이 상승된 철망을 확보하는 효과가 있는 것이다.It is composed of a plurality of automation devices according to the present invention can reduce the labor force, reduce the defect rate by producing a uniform wire mesh, improve the productivity by shortening the working time, by binding by the clip, the binding force between wires It is to improve the durability and robustness of the wire mesh is to have an effect to secure the wire mesh.

Claims (14)

삭제delete 철망의 제조장치에 있어서,In the manufacturing apparatus of wire mesh, 횡와이어공급부(A)와, 상기 횡와이어공급부(A)의 전면 중앙 일측면에 형성된 종와이어공급부(B)와, 상기 종와이어공급부(B)의 상하부에 형성되며, 프레스(100)와 클립공급기(6)로 구비된 결속부(C)와, 상기 결속부(C) 하부에 형성된 철망탈리부(D), 상기 결속부(C)의 후면에 형성된 철망인출부(E)로 구성되어 있음을 특징으로 하는 철망의 제조장치.A horizontal wire supply part (A), a longitudinal wire supply part (B) formed on one side of the front center of the horizontal wire supply part (A), and formed on the upper and lower portions of the longitudinal wire supply part (B), press 100 and the clip feeder The binding part (C) provided with (6), the wire mesh tally portion (D) formed on the bottom of the binding portion (C), and the wire mesh lead-out portion (E) formed on the back of the binding portion (C) Apparatus for manufacturing wire mesh characterized in that. 청구항 2에 있어서, 상기 횡와이어공급부(A)는 횡와이어(X)를 횡으로 공급하기 위하여 고정대(1)의 상부에 설치된 장치로서,The apparatus of claim 2, wherein the horizontal wire supply part A is an apparatus installed on an upper portion of the holder 1 to supply the horizontal wire X horizontally. 최후방 고정대(1)에 거치되어 있으며, 각각에 횡와이어(X)가 다수 권취된 다수개의 보빈(2)과, 상기 보빈(2)의 전면에 설치되어 있으며, 다수개의 보빈(2)을 통해서 인출된 다수개의 횡와이어(X)를 가이드하여 정렬하는 정렬기(3)와, 상기 정 렬기(3)의 전면에 설치되어 있으며, 한 쌍으로 형성된 정렬롤라(4)와, 상기 정렬롤라(4)의 하부롤라는 다수개의 홈이 형성되어 있어 상기 홈으로 횡와이어(X)가 각각 통과되도록 하며, 상기 하부의 정렬롤라(4)의 일측에 형성된 정렬롤라기어(10)와, 상기 정렬롤라기어(10)와 체인(9)에 의해 연결되어 있으며 고정대(1)의 하부 일측에 형성되어 정렬롤라(4)를 구동시키는 모터(8)와, 상기 정렬롤라(4)의 전면 하부에 설치된 안내롤라(7)와, 상기 안내롤라(7)의 전면에 형성된 한 쌍의 다른 정렬롤라(5)와, 상기 다른 정렬롤라(5)의 전면에 형성된 다른 안내롤라(7)로 구성되어 있음을 특징으로 하는 철망의 제조장치.It is mounted on the rearmost support (1), and each of the plurality of bobbins (2) wound around a plurality of wires (X), and is installed on the front of the bobbin (2), through a plurality of bobbins (2) Aligner (3) for guiding and aligning the plurality of drawn wire (X), the alignment roller (4) formed in the front of the aligner (3) formed in a pair, and the alignment roller (4) The lower roll of the) is formed with a plurality of grooves so that the horizontal wire (X) passes through each of the grooves, the alignment roller gear 10 formed on one side of the alignment roller 4 of the lower and the alignment roller gear It is connected by a chain (10) and the chain (9) and formed on the lower side of the fixed base (1) to drive the motor (8) and the guide roller installed in the lower front of the alignment roller (4) (7), a pair of other alignment rollers 5 formed on the front surface of the guide roller 7, and the front of the other alignment rollers 5 Apparatus for manufacturing a wire mesh, characterized in that it is made up of different guide roller 7 formed on. 청구항 2에 있어서, 상기 종와이어공급부(B)는 철망을 제조하기 위하여, 횡으로 공급되는 횡와이어(X)에 일정간격으로 종와이어(Y)를 공급하는 장치로서,The method of claim 2, wherein the longitudinal wire supply unit (B) is a device for supplying the longitudinal wire (Y) at a predetermined interval to the transverse wire (X) supplied laterally, in order to manufacture a wire mesh, 장치의 측면에 별도로 설치되어 있으며, 종와이어(Y)가 권취된 두 개의 보빈(2')과, 상기 두 개의 보빈(2')에 권취된 종와이어(Y)를 안내하며 고정대(1-3)의 일측면에 설치된 종와이어안내기(21)와, 상기 종와이어안내기(21)의 반대편이며, 고정대(1-3)의 다른 일측면에 형성된 종와이어인출기(25)로 구성되며,It is installed separately on the side of the device, guides the two bobbin (2 ') wound around the longitudinal wire (Y), and the longitudinal wire (Y) wound on the two bobbin (2'), Longitudinal wire guide 21 is installed on one side of the), and the other side of the longitudinal wire guide 21, and consists of a longitudinal wire extractor 25 formed on the other side of the fixing stand (1-3), 상기 종와이어안내기(21)는 상기 종와이어안내기(21)는 두 개의 보빈(2')에서 인출된 종와이어(Y)를 고정시키는 종와이어고정기(22)와, 종와이어(Y)를 정렬시키며 상부에는 종와이어상하강실린더(29')가 구비된 종와이어정렬기(23)와,The longitudinal wire guide 21 is the longitudinal wire guide 21 is aligned with the longitudinal wire fixing device 22, which fixes the longitudinal wire (Y) drawn out from the two bobbin (2 '), longitudinal wire (Y) And a longitudinal wire aligner 23 having a vertical wire up and down cylinder 29 'provided thereon; 상기 종와이어인출기(25)는 에어에 의해 작동되는 종와이어실린더(26)와, 상기 종와이어실린더(26)의 일측에 형성되어 전후진 운동을 하는 로드(27)와, 상기 로드(27)의 끝단에 형성되어 전진시에는 벌어지며 후진시 오므라지는 집게(28)와, 상기 종와이어실린더(26)의 상부에 부착되어 종와이어실린더(26)를 상하강 시키는 집게상하강실린더(29)로 구비되고, 상기 집게(28)는 3개의 삼지창형태이며 중간부는 고정되고 양측은 "L"자 형태의 클램프가 힌지결합되어 전후진시 벌어지거나 오므려지도록 구성되어 있음을 특징으로 하는 철망의 제조장치.The longitudinal wire extractor 25 includes a longitudinal wire cylinder 26 operated by air, a rod 27 formed on one side of the longitudinal wire cylinder 26 to move back and forth, and the rod 27. It is formed at the end and is formed when the advance and the retracted forceps 28 when retracted, and attached to the upper portion of the longitudinal wire cylinder 26 is provided with a forceps up and down cylinder 29 to raise and lower the longitudinal wire cylinder 26 Wherein, the tongs 28 is three tridents and the middle portion is fixed and both sides of the "L" shaped clamp is hinged coupled to the device for producing a wire mesh, characterized in that it is configured to open or retract during forward and backward movement. 청구항 2에 있어서, 상기 결속부(C)는 횡와이어(X)의 상부에 위치된 종와이어(Y)를 바둑판형태로 홈이 형성된 받침대(150)에 안치한 후에, 상기 받침대(150)의 상부에 안치된 횡와이어(X)의 상부에 위치된 종와이어(Y)가 겹치는 부분에 클립(Z)을 공급한 다음, 프레스(100)를 하강시켜 결속시켜 철망을 제조하는 장치로서,The method of claim 2, wherein the binding portion (C) is placed on the pedestal 150 formed with a groove in the form of a checkerboard (Y) located on the upper side of the cross-wire (X), the top of the pedestal 150 An apparatus for manufacturing a wire mesh by supplying a clip (Z) to the overlapping portion of the longitudinal wire (Y) located on the upper side of the set horizontal wire (X), and then bound by pressing down the press (100), 상기 종와이어공급부(B)의 전후면에 위치되며 권취된 클립이 내장되며 권취된 클립을 받침대(150)의 상부에 안치된 횡아이어(X)와 두 개의 종와이어(Y)가 맞닿는 두줄에 공급하는 두 개의 클립공급기(6)와, Located on the front and rear surfaces of the longitudinal wire supply unit (B) is a built-in wound clip and supply the wound clip to two rows where the horizontal eye (X) and two longitudinal wires (Y) abutted on the upper portion of the pedestal 150 abuts Two clip feeders (6), 상기 클립공급기(6)는 횡와이어(X)수와 동일한 개수의 클립(Z)이 각각 권치되어 내장되어 있으며, The clip feeder 6 has a number of clips (Z) equal to the number of transverse wires (X) are wound and built therein, 상기 클립공급기(6)의 전면에 위치되며, 권취된 각각의 클립(Z)을 안내하며, "ㄴ"자 앵글형상이며 전후상하 이동하는 제1클립가이드(61)와, 상기 제1클립가이드 (61)의 상부에 다수개의 홈이 형성되어 클립(Z)을 안내하는 클립안내가이드홈(62)과, 상기 제1클립가이드(61)의 전면 일측에 형성된 두 개의 제1클립가이드전후실린더(63)와,Located in the front of the clip feeder 6, and guides each of the wound clip (Z), the first clip guide 61 of "b" shaped angle and moving up and down and up and down, and the first clip guide ( A plurality of grooves are formed on the upper part of the upper part of the upper part of the 61 and the clip guide guide groove 62 for guiding the clip Z, and the two first clip guide front and rear cylinders 63 formed on one side of the front surface of the first clip guide 61. )Wow, 상기 제1클립가이드(61)와 마주보게 형성된 "ㄴ"자 앵글형상이며 상기 제1클립가이드(61)와 함께 전후 상하 이동하는 클립1-1가이드(64)와,A clip 1-1 guide 64 having an angle shape of “b” shaped to face the first clip guide 61 and moving up and down together with the first clip guide 61; 상기 제1클립가이드 및 클럽1-1가이드(61,64)의 상부에 판상으로 구비되며 상기 제1클립가이드 및 클럽1-1가이드(61,64)를 상하 이동시키는 클립1가이드상하이동판(65)과, 상기 클립1가이드상하이동판(65)의 상부일측에 두 개 형성되어 있으며, 클립1가이드상하이동판 (65)에 형성된 통공에 실린더가 관통되어 클립1가이드상하이동판(65)을 상하로 작동시키는 클립1가이드상하이동판실린더(66)와,The first clip guide and the club 1-1 guides 61 and 64 are provided in a plate shape and the clip 1 guide vertically moving plate 65 which moves the first clip guide and the club 1-1 guides 61 and 64 up and down 65 And two upper one side of the clip 1 guide up and down plate 65, the cylinder is penetrated through the through hole formed in the clip 1 guide up and down plate 65 to operate the clip 1 guide up and down plate 65 up and down Clip 1 guide upper and lower movable plate cylinder (66), 상기 제1클립가이드(61)의 전면에 제1클립가이드(61)와 일정간격 이격되어 위치되며 "ㄴ"자 앵글형상으로서 유입된 클립을 정지 및 지지하는 제2클립가이드(67)와, 상기 제2클럽가이드(67)의 상부에 다수개 통공이 구비된 제1중간프레스판하부(125)와, 상기 제1중간프레스판하부(125)의 상부일측에 두 개 형성되어 있으며, 제1중간프레스판하부(125) 통공에 실린더가 관통하여 상하로 작동시키는 클립2가이드상하이동판실린더(68)로 구성되어 있음을 특징으로 하는 철망의 제조장치.A second clip guide 67 positioned at a predetermined interval on the front surface of the first clip guide 61 and stopping and supporting the clip introduced as an “b” angle angle; It is formed on the upper side of the first middle press plate lower portion 125 and the first intermediate press plate lower portion 125 having a plurality of through holes on the upper portion of the second club guide 67, the first middle Press plate lower portion 125 is a device for manufacturing a wire mesh, characterized in that the cylinder is penetrated through the through hole and the clip 2 guide up and down moving plate cylinder (68) to operate up and down. 청구항 2에 있어서, 상기 프레스(100)는 에어에 의해 작동되며,The method according to claim 2, wherein the press 100 is operated by air, 두 개의 프레스실린더(101)가 형성되며 판상의 형태이며 프레스(100)에 프레스기둥(104)을 따라 상하로 이동되는 인 프레스 상부(102)와, 상기 프레스상부의 4개의 모서리에 형성된 통공에 관통되며 프레스하부(103)의 상부에 형성된 4개의 프레스기둥(104)과,Two press cylinders 101 are formed and formed in a plate shape and penetrate through the in-press upper portion 102 that moves up and down along the press pillar 104 in the press 100 and through holes formed at four corners of the press upper portion. Four press pillars 104 formed on the upper part of the press lower part 103, 상기 프레스상부(101)의 중앙하부에 형성되어 라운드형상으로 형성되며, 중앙의 브라켓에 의해 하부에 형성된 수평고정대하부(106)와 연결되는 수평고정대상부(105)와,A horizontal fixing target portion 105 formed in the center lower portion of the press upper portion 101 and formed in a round shape and connected to the horizontal fixing lower portion 106 formed at a lower portion by a central bracket; 상기 수평고정대상부(105)와 브라켓(110)에 의해 연결된 수평고정대하부 (106)와, 상기 수평고정대하부(106)의 하부에 형성되며 상기 프레스상부(101)와 함께 상하강하는 제1중간프레스판상부(120)와, 상기 제1중간프레스판상부(120)과, 상기 제1중간프레스판상부(120)의 하부에 부착되며 클립(Z)을 절단하는 다수개의 클립절단핀(121)과, 상기 제1중간프레스판상부(120)에 일정간격 이격되어 형성된 2개의 완충기둥(124)이 관통되는 완충기둥통공(미도시)과, 상기 제1중간프레스판상부 (120)의 하부에 일정간격 이격되며 형성되어 있으며 상부에 일정간격 이격되어 형성된 2개의 완충기둥(124)이 구비되며 상하부를 관통하여 형성된 다수개의 클립절단핀(121)이 관통되도록 형성된 동일한 개수의 통공(미도시)이 구비되며, 하부중앙부가 돌출된 구조를 갖는 제1중간프레스판하부(125)와,A first intermediate press formed in a lower portion of the horizontal fixing base 106 connected to the horizontal fixing target part 105 and the bracket 110 and a lower portion of the horizontal fixing lower part 106 and moving up and down together with the upper press portion 101; Plate-shaped portion 120, the first intermediate press plate 120, a plurality of clip cutting pins 121 are attached to the lower portion of the first intermediate press plate 120 and cut the clip (Z) and A buffer column through hole (not shown) through which two buffer pillars 124 formed to be spaced apart at regular intervals from the upper portion of the first intermediate press plate 120, and a lower portion of the upper portion of the first intermediate press plate 120. It is formed spaced apart and is provided with two buffer pillars 124 formed at a predetermined interval spaced at the top and the same number of through holes (not shown) formed to pass through a plurality of clip cutting pins 121 formed through the upper and lower parts The first intermediate press has a structure in which the lower center portion protrudes. And a lower plate 125, 상기 제1중간프레스상하부(120,125)의 일측 끝단에 형성되어 종와이어(Y)를 절단하는 종와이어상하부절단칼날(130,131)과,Upper and lower vertical cutting blades 130 and 131 formed at one end of the first middle press upper and lower portions 120 and 125 to cut the longitudinal wires Y; 상기 제1중간프레스판상부(120)와 제1중간프레스판하부(125)의 사이에는 연결된 다수 개의 스프링(126)으로 구성되어 있음을 특징으로 하는 철망의 제조장치.Apparatus for manufacturing a wire mesh, characterized in that composed of a plurality of springs (126) connected between the first intermediate press plate upper portion (120) and the first intermediate press plate lower portion (125). 청구항 2에 있어서, 상기 철망탈리부(D)는 받침대(1)의 하부에 형성되어 있으며, 상기 받침대(150)의 상부에 바둑판모양의 홈이 형성되어 있고, 상기 홈의 일 측 하부에 형성된 인출상승핀(153)과, 상기 인출상승핀(153)하부에 부착된 이탈상승판(152)과, 상기 이탈상승판(152)의 중앙하부는 이탈실린더(151)의 끝단에 형성된 구조로 구성되어 있음을 특징으로 하는 철망의 제조장치.The wire mesh tally portion (D) is formed in the lower portion of the pedestal (1), a checkerboard-shaped groove is formed on the upper portion of the pedestal 150, the drawer formed on one side lower portion of the groove The lift pin 153, the lift-up plate 152 attached to the bottom of the lift-up pin 153, and the center lower portion of the lift-up plate 152 are configured at the end of the release cylinder 151. Apparatus for producing a wire mesh, characterized in that there is. 청구항 2에 있어서, 상기 철망인출부(D)는 결속부(C)의 후면에 형성되어 있으며, 결속부(C)에서 결속된 철망을 인출하는 장치로서, 상부에 형성되며 상하로 이동시키는 인출상하실린더(72)와, 상기 인출상하실린더(72)의 끝단에 형성된 인출판1(73)과, 상기 인출판1(73)의 하부에 형성된 인출몸체부(74)와, 상기 인출몸체부(74)의 상부에 형성되며 상기 인출판1(73)과 함께 철망을 지지하는 인출판2(75)와, 상기 인출몸체부(74)의 일측에 형성되며 인출몸체부(74)를 전후진 시키는 인출기 전후진실린더(76)와, 상기 인출몸체부(74)의 하부 일측에 형성되어 이동되는 인출몸체부(74)를 안내하는 인출기가이드(75)와, 상기 인출기 가이드(75)의 전면에 형성된 인출기스토퍼(77)로 구성되어 있음을 특징으로 하는 철망의 제조장치.The method of claim 2, wherein the wire drawing device (D) is formed on the back of the binding portion (C), the device for drawing out the wire mesh bound in the binding portion (C), is formed on the upper and lowered up and down to move up and down A cylinder 72, a drawing plate 1 73 formed at the end of the drawing upper cylinder 72, a drawing body portion 74 formed below the drawing plate 1 73, and the drawing body portion 74. Is formed on the upper side of the drawer plate 1 (73) to support the wire mesh together with the drawer plate 2 (75), the drawer body formed on one side of the drawer body portion 74 and advances the drawer body portion 74 back and forth Front and rear vibration cylinder 76, a drawer guide 75 for guiding the drawer body portion 74 which is formed and moved on the lower side of the drawer body portion 74, and a drawer formed on the front surface of the drawer guide 75. Apparatus for producing a wire mesh, characterized in that composed of a stopper (77). 철망의 제조방법에 있어서.In the manufacturing method of wire mesh. 제1공정(횡와이어(X)공급공정)1st process (cross wire (X) supply process) 횡와이어(X)를 횡으로 공급하는 공정으로서, 중간에 설치된 고정대(1)의 하부의 모터(8)를 구동시키면 체인(9)에 의해 모터(8)축과 연결된 정렬롤라(4)의 정렬롤라기어(10)가 회전되어 정렬롤라(4)가 회전됨과 동시에 고정대(1)의 상부에 거치되며, 각각에 횡와이어(X)가 다수 권취된 다수개의 보빈(2)에서 횡와이어(X)가 정렬기(3)를 통해 정렬롤라(4)로 인출되며, In the process of supplying the horizontal wire (X) laterally, when the motor 8 of the lower part of the fixing stand 1 installed in the middle is driven, the alignment roller 4 connected to the shaft of the motor 8 by the chain 9 is aligned. The roll gear 10 is rotated so that the alignment roller 4 is rotated and mounted on the upper part of the fixing stand 1, and the plurality of bobbins 2 in which a plurality of transverse wires X are wound around the transverse wires X Is drawn out to the alignment roller (4) through the sorter (3), 인출된 횡와이어(X)는 상기 정렬롤라(4)를 통과하여 전면 하부에 설치된 안내롤라(7)에 안내되어 한 쌍의 다른 정렬롤라(5)를 통과하고, 상기 다른 정렬롤라(5)의 전면에 형성된 다른 안내롤라(7)를 통과하여 종와이어(Y)공급기에 도달하면, The drawn transverse wire (X) is guided to the guide roller (7) installed in the front lower portion through the alignment roller (4) and passes through a pair of other alignment roller (5), the other of the alignment roller (5) When passing through the other guide roller (7) formed in the front to reach the longitudinal wire (Y) feeder, 제2공정(종와이이어(X)공급공정)2nd process (long wire (X) supply process) 철망을 제조하기 위하여, 횡으로 공급되는 횡와이어(X)의 상부에 일정간격으로 종와이어(Y)를 공급하는 공정으로서,In order to manufacture the wire mesh, a step of supplying the longitudinal wire (Y) at a predetermined interval to the upper portion of the horizontal wire (X) supplied laterally, 상기와 같이 횡와이어(X)가 공급되면 장치의 측면에 별도로 설치된 종와이어(Y)가 권취된 두 개의 보빈(2')에서 종와이어안내기(21)의 반대편에 설치된(종와이어공급1단계) 종와이어인출기(25)의 종와이어실린더(26)가 작동되어 로드(27)가 전진하여 상기 종와이어안내기(21)의 전면에 설치된 종와이어정렬기 (23)에 정렬된 두가닥의 종와이어(Y)를 로드(27)의 끝단에 형성된 집게(28)로 집은 다음(종와이어공급2단계), 종와이어실린더(26)가 원위치(종와이어공급3단계)되면, 횡와이어(X)의 상부에 종와이어(Y)가 두가닥 위치되게 한 후에, 상기 종와이어실린더(26)의 상부에 부착된 집게상하강실린더(29)를 하강시킴과 동시에, 다른 한쪽에 위치한 종와이어정렬기(23)의 상부에 형성된 종와이어상하강실린더(29')를 하강시켜, 하부의 받침대(150)의 홈에 횡와이어(X)의 상부에 종와이어(Y)를 위치시킨(종와이어공급4단계) 다음, When the lateral wire (X) is supplied as described above, the two longitudinal bobbins (2 '), which are separately installed on the side of the apparatus, are installed on opposite sides of the longitudinal wire guide (21) in two bobbins (2') (the longitudinal wire supply step 1). The longitudinal wire cylinder 26 of the longitudinal wire extractor 25 is operated to advance the rod 27 so that two longitudinal longitudinal wires aligned with the longitudinal wire aligner 23 installed at the front of the longitudinal wire guide 21 are formed. Y) is picked up by the tongs 28 formed at the end of the rod 27 (two stages of longitudinal wire supply), and when the longitudinal wire cylinder 26 is in the original position (three stages of longitudinal wire feeding), the horizontal wire (X) After two longitudinal wires Y are positioned in the upper portion, the forceps up-down cylinder 29 attached to the upper portion of the longitudinal wire cylinder 26 is lowered, and at the same time, the longitudinal wire aligner 23 located on the other side. Vertical wire lowering cylinder (29 ') formed in the upper portion of the lower), the upper side of the horizontal wire (X) in the groove of the pedestal 150 Place the longitudinal wire (Y) to (transversal wire supplying step 4) and then, 제3공정(클립(Z)공급공정)3rd process (Clip (Z) supply process) 두 개의 클립공급기(6)에서 다수개의 권취된 연결된 클립(Z)이 각각 제1클립가이드(61)의 클립안내가이드홈(62)을 따라 안내된 후에, After the plurality of wound connected clips Z in the two clip feeders 6 are guided along the clip guide guide grooves 62 of the first clip guide 61, respectively, 상기 제1클립1가이드(61)에 부착된 클립1-1가이드(64)와 일정간격 이격되어 형성된 제2클럽가이드(67)에 도달하면, (클립공급1단계),When reaching the second club guide 67 formed to be spaced apart from the clip 1-1 guide (64) attached to the first clip 1 guide 61, (clip supply step 1), 상기 제1클립가이드 및 클럽1-1가이드(61,64)의 상부에 설치된 클립1가이드상하이동판실린더(66)와 제2클럽가이드(67)의 상부에 형성된 클립2가이드상하이동판실린더(68)를 하강시켜, 상기 제1클립가이드 및 클럽1-1가이드(61,64)와 제2클럽가이드(67)를 하강시켜 클립(Z)과 클립가이드를 해체시킨 다음(클립공급2단계), Clip 2 guide upper and lower movable plate cylinder 68 formed on the upper portion of the clip 1 guide upper and lower movable plate cylinder 66 and the second club guide 67 installed on the upper portion of the first clip guide and the club 1-1 guide (61, 64) To lower the first clip guide and club 1-1 guides (61, 64) and the second club guide (67) to dismantle the clip (Z) and the clip guide (clip supply step 2), 상기 제1클립가이드(61)의 전면 일 측에 형성된 두 개의 제1클립가이드전후실린더(63)를 작동시켜 제1클립가이드 및 클럽1-1가이드(61,64)를 후진시킨 후에(클립공급3단계),After the first clip guide and the club 1-1 guides 61 and 64 are reversed by operating the two first clip guide cylinders 63 formed on one side of the front surface of the first clip guide 61 (clip supply Step 3), 상기 제1클립가이드 및 클럽1-1가이드(61,64)의 상부에 설치된 클립1가이드상하이동판실린더(66)를 상승시켜 제1클립가이드 및 클럽1-1가이드(61,64)를 상승시켜 클립(Z)의 하부에 클립1-1가이드(64)를 고정시킨 다음(클립공급4단계),The first clip guide and the club 1-1 guides 61 and 64 are raised by raising the clip 1 guide upper and lower plate cylinders 66 installed on the upper portions of the first clip guide and the club 1-1 guides 61 and 64. After fixing the clip 1-1 guide (64) to the lower part of the clip (Z) (clip supply step 4), 상기 제1클립가이드(61)의 전면 일 측에 형성된 두 개의 제1클립가이드전후실린더(63)를 작동시켜 제1클립가이드 및 클럽1-1가이드(61,64)를 전진시켜 클립(Z)를 전진시킨 후에(클립공급5단계),By operating two first clip guide cylinders 63 formed on one side of the front surface of the first clip guide 61, the first clip guide and the club 1-1 guides 61 and 64 are advanced to the clip Z. After advancing the 상기 제2클럽가이드(67)의 상부에 형성된 클립2가이드상하이동판실린더(68)를 조작하여, 제2클럽가이드(67)를 상승시켜 클립(Z)의 하부에 제2클럽가이드(67)의 고정과 제1클립가이드 및 클럽1-1가이드(61,64)를 고정시켜 ((클립공급6단계)(1단계와 동일한 상태)로 클립을 공급한 다음,(상기와 같은 동작을 반복하여 클립공급)By operating the clip 2 guide upper and lower movable plate cylinder 68 formed on the upper portion of the second club guide 67, the second club guide 67 is raised to lower the second club guide 67 on the lower portion of the clip (Z). Fix the clip and the first clip guide and the club 1-1 guides 61 and 64 to supply the clip in ((Supply step 6) (same as step 1), and then repeat the operation as described above. supply) 제4공정(클립핑공정)4th process (clipping process) 받침대(150)위에서 수행되며, 상기와 같이 클립(Z)이 받침대(150)위의 횡와이어(X)의 상부에 종와이어(Y)가 안치되고, 상기 횡종와이어(Y.X)가 겹치는 부분에 클립(Z)이 공급된(프레스 초기단계) 다음, 프레스실린더(101)의 작동에 의해 프레스상부(101)의 중앙하부에 형성된 라운드형상의 수평고정대상,하부(105,106)에 의해 수평을 유지하면서 프레스 상부(100)가 모서리에 형성된 4개의 프레스기둥(104)을 따라 하강하면,Is carried out on the pedestal 150, the clip Z is placed on top of the transverse wire (X) on the pedestal 150, as described above, the longitudinal wire (Y) is placed, the transverse longitudinal wire (YX) overlaps in the clip (Z) is supplied (press initial stage), and then presses while maintaining the horizontal by the horizontal fixing object, the lower portion 105, 106 formed in the center lower portion of the upper press portion 101 by the operation of the press cylinder 101 When the upper portion 100 descends along the four press pillars 104 formed at the corners, 상기 수평고정대하부(106)의 하부에 형성된 제1중간프레스판상하부(120,125)가 하강하면서, 일정위치에 도달하면 제1중간프레스판하부(125)의 돌출된부위가 받침대에 닿아 1차 하강하여(프레스 1단계 하강), 제1중간프레스판하부(125)는 더 이상 하강하지 않고 정지하며, 제1중간프레스판상부(120)와 상기 제1중간프레스판상부(120)의 하부에 부착된 클립절단핀(121)은 완충기둥(124)을 따라 계속하강하고, 상기 제1중간프레스판상하부(120,125)사이에 위치된 다수개의 클립절단핀(121)이 다수개의 통공이 형성된 제1중간프레스판하부(125)의 통공을 통과하여 공급된 클립(Z)의 상부에 압력을 가하여 다수개의 인출 연결된 클립(Z)을 각각 독립되게 절단되면서, 동시에 클립핑되며, 이와 동시에 제1중간프레스판상부(120)의 일측에 형성된 종와이어상부절단칼날(130)과, 제1중간프레스판하부(125)의 일측에 형성된 종와이어하부절단칼날(131)에 의해 종와이어(Y)를 절단 시킨 다음(프레스2단계하강),While the upper and lower first intermediate press plates 120 and 125 formed at the lower portion of the horizontal fixing base 106 descend, when reaching a predetermined position, the protruding portion of the first intermediate press plate 125 reaches the pedestal and descends first. (Press 1 step down), the first intermediate press plate 125 stops without lowering anymore, and is attached to the first intermediate press plate upper portion 120 and the lower portion of the first intermediate press plate upper portion 120. The clip cutting pin 121 continues to descend along the buffer column 124, and the plurality of clip cutting pins 121 positioned between the upper and lower portions of the first intermediate press plate 120 and 125 form a plurality of through holes. By applying pressure to the upper portion of the clip Z supplied through the through hole of the lower plate 125, each of the plurality of pull-out clips Z is independently cut and simultaneously clipped, and at the same time, the first intermediate press plate portion ( Longitudinal wire cutting blade 130 formed on one side of 120, and the first Between which cutting wire species (Y) by the lower longitudinal wire cutting blade 131 formed at one side of the lower press plate 125 is then (step 2 the press fall), 제1중간프레스판하부(125)는 계속 정지된 상태에서 프레스(100)가 역으로 작동되어 상부로 상승하면, 프레스상부(102)와, 제1중간프레스판상부(120) 및 다수개의 클립절단핀(121)이 다수개의 통공이 형성된 제1중간프레스판하부(125)의 통공을 통과하여 상승하며(프레스1단계 상승), 제1중간프레스판하부(125)의 하부에 부착된 스프링(126)에 의해 제1중간프레스판하부(125)가 상승하면서 제1중간프레스판하부(125) 상부에 설치된 완충기둥(124)도 함께 상승(프례스2단계 상승)한 후에, When the press part 100 is operated in reverse and rises upward in the state where the first intermediate press plate lower part 125 is still stopped, the upper press part 102, the first intermediate press plate upper part 120, and the plurality of clip cuttings The pin 121 rises through the through hole of the lower portion of the first intermediate press plate 125 in which a plurality of holes are formed (up one step press), and a spring 126 attached to the lower portion of the lower portion of the first intermediate press plate 125. After the first intermediate press plate 125 is raised by), the buffer column 124 installed on the upper portion of the first intermediate press plate 125 is also raised (the second step of the example), 제5공정 (철망탈리공정)5th process (wire mesh desorption process) 상기 받침대(150)에서 클램핑이 형성된 후에, 받침대(150)의 바둑판모양의 홈에 고정된 철망은 하부에 형성된 이탈실린더(151)의 작동에 의해 이탈실린더 (151)의 끝단에 형성된 인출상승판(152)이 상승됨과 동시에 인출상승판(152)의 상부 일측에 형성된 인출상승핀(153)이 상기 받침대(150)의 홈을 따라 상승하면서 철망을 상부로 탈리시킨 후에, After the clamping is formed in the pedestal 150, the wire mesh fixed to the checkerboard-shaped groove of the pedestal 150 is a pull-up plate formed at the end of the release cylinder 151 by the operation of the release cylinder 151 formed in the lower ( At the same time as the 152 is lifted up and the withdrawal rising pin 153 formed on the upper side of the withdrawal riser plate 152 ascends along the groove of the pedestal 150 to detach the wire mesh to the top, 제6공정(철망인출공정)6th process (wire mesh drawing process) 결속부(C)의 후면에 형성된 인출몸체부(74)의 후방에 설치된 전후진실린더 (76)를 작동시켜 인출몸체부(74)를 전진시킨 후에, 인출몸체부(74)의 상부에 형성된 인출상하실린더(72)를 하강시켜 상기 인출상하실린더(72)의 끝단에 형성된 인출판1(73)과 인출몸체부(74)의 상부에 형성된 인출판2(75)사이에 철망을 위치시켜 고정시킨 다음, 다시 상기 전후진실린더(76)를 작동시켜 인출몸체부(74)를 후진시키면 고정된 철망도 함께 인출되며, 다시 상기 인출상하실린더(72)작동시켜 인출상하실린더를 상승시킨 후에, 상기와 같은 동작을 반복 인출하여 철망을 제조함을 특징으로 하는 철망의 제조방법. After operating the forward and backward cylinder 76 provided at the rear of the drawout body portion 74 formed at the back of the binding portion C to advance the drawout body portion 74, the drawout formed at the upper portion of the drawout body portion 74. Lowering the upper and lower cylinders 72 to position and fix the wire mesh between the drawer plate 1 (73) formed at the end of the drawer upper and lower holder 72 and the drawer plate 2 (75) formed on the upper portion of the drawer body portion 74 Next, when the forward and backward cylinder 76 is operated again, the withdrawal body portion 74 is retracted, and the fixed wire mesh is withdrawn, and the withdrawal upper cylinder 72 is operated again to raise the withdrawal upper cylinder. Method of producing a wire mesh, characterized in that the wire mesh is manufactured by repeatedly drawing the same operation. 청구항 9에 있어서, 상기 제2공정(종와이이어(X)공급공정)은 철망을 제조하기 위하여, 횡으로 공급되는 횡와이어(X)의 상부에 일정간격으로 종와이어(Y)를 공급하는 공정으로서,The method of claim 9, wherein the second step (the longitudinal wire (X) supplying step) is a step of supplying the longitudinal wire (Y) at regular intervals on top of the horizontal wire (X) supplied laterally, in order to manufacture the wire mesh As 상기와 같이 횡와이어(X)가 공급되면 장치의 측면에 별도로 설치된 종와이어(Y)가 권취된 두 개의 보빈(2')에서 종와이어안내기(21)의 반대편에 설치된(종와이어공급1단계) 종와이어인출기(25)의 종와이어실린더(26)가 작동되어 로드(27)가 전진하여 상기 종와이어안내기(21)의 전면에 설치된 종와이어정렬기 (23)에 정렬된 두가닥의 종와이어(Y)를 로드(27)의 끝단에 형성된 집게(28)로 집은 다음(종와이어공급2단계), 종와이어실린더(26)가 원위치(종와이어공급3단계)되면, 횡와이어(X)의 상부에 종와이어(Y)가 두가닥 위치되게 한 후에, 상기 종와이어실린더(26)의 상부에 부착된 집게상하강실린더(29)를 하강시킴과 동시에, 다른 한쪽에 위치한 종와이어정렬기(23)의 상부에 형성된 종와이어상하강실린더(29')를 하강시켜, 하부의 받침대(150)의 홈에 횡와이어(X)의 상부에 종와이어(Y)를 위치시켜(종와이어공급4단계) 제조함을 특징으로 하는 철망의 제조방법. When the lateral wire (X) is supplied as described above, the two longitudinal bobbins (2 '), which are separately installed on the side of the apparatus, are installed on opposite sides of the longitudinal wire guide (21) in two bobbins (2') (the longitudinal wire supply step 1). The longitudinal wire cylinder 26 of the longitudinal wire extractor 25 is operated to advance the rod 27 so that two longitudinal longitudinal wires aligned with the longitudinal wire aligner 23 installed at the front of the longitudinal wire guide 21 are formed. Y) is picked up by the tongs 28 formed at the end of the rod 27 (two stages of longitudinal wire supply), and when the longitudinal wire cylinder 26 is in the original position (three stages of longitudinal wire feeding), the horizontal wire (X) After two longitudinal wires Y are positioned in the upper portion, the forceps up-down cylinder 29 attached to the upper portion of the longitudinal wire cylinder 26 is lowered, and at the same time, the longitudinal wire aligner 23 located on the other side. Vertical wire lowering cylinder (29 ') formed in the upper portion of the lower), the upper side of the horizontal wire (X) in the groove of the pedestal 150 By placing the transversal wire (Y) in the process for producing a wire mesh, it characterized in that the production (transversal wire supplying step 4). 청구항 9에 있어서, 상기 제3공정(클립(Z)공급공정)은,The method according to claim 9, wherein the third step (clip (Z) supply step), 두 개의 클립공급기(6)에서 다수개의 권취된 연결된 클립(Z)이 각각 제1클립가이드(61)의 클립안내가이드홈(62)을 따라 안내된 후에, After the plurality of wound connected clips Z in the two clip feeders 6 are guided along the clip guide guide grooves 62 of the first clip guide 61, respectively, 상기 제1클립가이드(61)에 부착된 클립1-1가이드(64)와 일정간격 이격되어 형성된 제2클럽가이드(67)에 도달하면, (클립공급1단계),When reaching the second club guide 67 formed to be spaced apart from the clip 1-1 guide 64 attached to the first clip guide 61, (clip supply step 1), 상기 제1클립가이드 및 클럽1-1가이드(61,64)의 상부에 설치된 클립1가이드상하이동판실린더(66)와 제2클럽가이드(67)의 상부에 형성된 클립2가이드상하이동판실린더(68)를 하강시켜, 상기 제1클립가이드 및 클럽1-1가이드(61,64)와 제2클럽가이드(67)를 하강시켜 클립(Z)과 클립가이드를 해체시킨 다음(클립공급2단계), Clip 2 guide upper and lower movable plate cylinder 68 formed on the upper portion of the clip 1 guide upper and lower movable plate cylinder 66 and the second club guide 67 installed on the upper portion of the first clip guide and the club 1-1 guide (61, 64) To lower the first clip guide and club 1-1 guides (61, 64) and the second club guide (67) to dismantle the clip (Z) and the clip guide (clip supply step 2), 상기 제1클립가이드(61)의 전면 일측에 형성된 두 개의 제1클립가이드전후실린더(63)를 작동시켜 제1클립가이드 및 클럽1-1가이드(61,64)를 후진시킨 후에(클립공급3단계),After operating the two first clip guide cylinders 63 formed on one side of the front surface of the first clip guide 61 to reverse the first clip guide and the club 1-1 guides 61 and 64 (clip supply 3 step), 상기 제1클립가이드 및 클럽1-1가이드(61,64)의 상부에 설치된 클립1가이드상하이동판실린더(66)를 상승시켜 제1클립가이드 및 클럽1-1가이드(61,64)를 상승시켜 클립(Z)의 하부에 클립1-1가이드(64)를 고정시킨 다음(클립공급4단계),The first clip guide and the club 1-1 guides 61 and 64 are raised by raising the clip 1 guide upper and lower plate cylinders 66 installed on the upper portions of the first clip guide and the club 1-1 guides 61 and 64. After fixing the clip 1-1 guide (64) to the lower part of the clip (Z) (clip supply step 4), 상기 제1클립가이드(61)의 전면 일측에 형성된 두 개의 제1클립가이드전후실린더(63)를 작동시켜 제1클립가이드 및 클럽1-1가이드(61,64)를 전진시켜 클립(Z)을 전진시킨 후에(클립공급5단계),The first clip guide and the club 1-1 guides 61 and 64 are advanced by operating the two first clip guide cylinders 63 formed on one side of the front surface of the first clip guide 61 to thereby clip Z. After advancing 상기 제2클럽가이드(67)의 상부에 형성된 클립2가이드상하이동판실린더(68)를 조작하여, 제2클럽가이드(67)를 상승시켜 클립(Z)의 하부에 제2클럽가이드(67)의 고정과 제1클립가이드 및 클럽1-1가이드(61,64)를 고정시켜 ((클립공급6단계)(1단계와 동일한 상태)로 클립을 공급하여제조함을 특징으로 하는 철망의 제조방법. By operating the clip 2 guide upper and lower movable plate cylinder 68 formed on the upper portion of the second club guide 67, the second club guide 67 is raised to lower the second club guide 67 on the lower portion of the clip (Z). Fixing and fixing the first clip guide and the club 1-1 guides (61, 64) ((clip supply 6 steps) (same state as step 1) to supply the clip to manufacture a wire mesh manufacturing method characterized in that the manufacturing. 청구항 9에 있어서, 상기 제4공정(클립핑공정)은,The method according to claim 9, wherein the fourth step (clipping process), 받침대(150)위에서 수행되며, 상기와 같이 클립(Z)이 받침대(150)위의 횡와이어(X)의 상부에 종와이어(Y)가 안치되고, 상기 횡종와이어(Y.X)가 겹치는 부분에 클립(Z)이 공급된(프레스 초기단계) 다음, 프레스실린더(101)의 작동에 의해 프레스상부(101)의 중앙하부에 형성된 라운드형상의 수평고정대상,하부(105,106)에 의해 수평을 유지하면서 프레스 상부(100)가 모서리에 형성된 4개의 프레스기둥(104)을 따라 하강하면,Is carried out on the pedestal 150, the clip Z is placed on top of the transverse wire (X) on the pedestal 150, as described above, the longitudinal wire (Y) is placed, the transverse longitudinal wire (YX) overlaps in the clip (Z) is supplied (press initial stage), and then presses while maintaining the horizontal by the horizontal fixing object, the lower portion 105, 106 formed in the center lower portion of the upper press portion 101 by the operation of the press cylinder 101 When the upper portion 100 descends along the four press pillars 104 formed at the corners, 상기 수평고정대하부(106)의 하부에 형성된 제1중간프레스판상하부(120,125)가 하강하면서, 일정위치에 도달하면 제1중간프레스판하부(125)의 돌출된부위가 받침대에 닿아 1차 하강하여(프레스 1단계 하강), 제1중간프레스판하부(125)는 더 이상 하강하지 않고 정지하며, 제1중간프레스판상부(120)와 상기 제1중간프레스판상부(120)의 하부에 부착된 클립절단핀(121)은 완충기둥(124)을 따라 계속하강하고, 상기 제1중간프레스판상하부(120,125)사이에 위치된 다수개의 클립절단핀(121)이 다수개의 통공이 형성된 제1중간프레스판하부(125)의 통공을 통과하여 공급된 클립(Z)의 상부에 압력을 가하여 다수개의 인출 연결된 클립(Z)을 각각 독립되게 절단되면서, 동시에 클립핑되며, 이와 동시에 제1중간프레스판상부(120)의 일측에 형성된 종와이어상부절단칼날(130)과, 제1중간프레스판하부(125)의 일측에 형성된 종와이어하부절단칼날(131)에 의해 종와이어(Y)를 절단 시킨 다음(프레스2단계하강),While the upper and lower first intermediate press plates 120 and 125 formed at the lower portion of the horizontal fixing base 106 descend, when reaching a predetermined position, the protruding portion of the first intermediate press plate 125 reaches the pedestal and descends first. (Press 1 step down), the first intermediate press plate 125 stops without lowering anymore, and is attached to the first intermediate press plate upper portion 120 and the lower portion of the first intermediate press plate upper portion 120. The clip cutting pin 121 continues to descend along the buffer column 124, and the plurality of clip cutting pins 121 positioned between the upper and lower portions of the first intermediate press plate 120 and 125 form a plurality of through holes. By applying pressure to the upper portion of the clip Z supplied through the through hole of the lower plate 125, each of the plurality of pull-out clips Z is independently cut and simultaneously clipped, and at the same time, the first intermediate press plate portion ( Longitudinal wire cutting blade 130 formed on one side of 120, and the first Between which cutting wire species (Y) by the lower longitudinal wire cutting blade 131 formed at one side of the lower press plate 125 is then (step 2 the press fall), 제1중간프레스판하부(125)는 계속 정지된 상태에서 프레스(100)가 역으로 작동되어 상부로 상승하면, 프레스상부(102)와, 제1중간프레스판상부(120) 및 다수개의 클립절단핀(121)이 다수개의 통공이 형성된 제1중간프레스판하부(125)의 통공을 통과하여 상승하며(프레스1단계 상승), 제1중간프레스판하부(125)의 하부에 부착된 스프링(126)에 의해 제1중간프레스판하부(125)가 상승하면서 제1중간프레스판하부(125) 상부에 설치된 완충기둥(124)도 함께 상승(프례스2단계 상승)하여 제조함을 특징으로 하는 철망의 제조방법. When the press part 100 is operated in reverse and rises upward in the state where the first intermediate press plate lower part 125 is still stopped, the upper press part 102, the first intermediate press plate upper part 120, and the plurality of clip cuttings The pin 121 rises through the through hole of the lower portion of the first intermediate press plate 125 in which a plurality of holes are formed (up one step press), and a spring 126 attached to the lower portion of the lower portion of the first intermediate press plate 125. Wire mesh characterized in that the first intermediate press plate lower portion 125 is raised by raising the buffer column 124 installed on the lower portion of the first intermediate press plate 125 together (raised 2 steps) Manufacturing method. 청구항 9에 있어서, 상기 제5공정 (철망탈리공정)은 상기 받침대(150)에서 클램핑이 형성된 후에, 받침대(150)의 바둑판모양의 홈에 고정된 철망은 하부에 형성된 이탈실린더(151)의 작동에 의해 이탈실린더(151)의 끝단에 형성된 인출상승판 (152)이 상승됨과 동시에 인출상승판(152)의 상부 일측에 형성된 인출상승핀(153)이 상기 받침대(150)의 홈을 따라 상승하면서 철망을 상부로 탈리시켜 철망을 제조함을 특징으로 하는 철망의 제조방법. 10. The method of claim 9, wherein the fifth step (wire mesh desorption process) after the clamping is formed in the pedestal 150, the wire mesh fixed to the checkerboard groove of the pedestal 150 is the operation of the release cylinder 151 formed at the bottom The withdrawal lift plate 152 formed at the end of the separation cylinder 151 is raised by the withdrawal lift pin 153 formed on the upper side of the withdrawal lift plate 152 and ascends along the groove of the pedestal 150. Method of manufacturing a wire mesh, characterized in that the wire mesh to the upper part to produce a wire mesh. 청구항 9에 있어서, 상기 제6공정(철망인출공정)은,The method according to claim 9, wherein the sixth step (wire mesh drawing step), 결속부(C)의 후면에 형성된 인출몸체부(74)의 후방에 설치된 전후진실린더 (76)를 작동시켜 인출몸체부(74)를 전진시킨 후에, 인출몸체부(74)의 상부에 형성된 인출상하실린더(72)를 하강시켜 상기 인출상하실린더(72)의 끝단에 형성된 인출판1(73)과 인출몸체부(74)의 상부에 형성된 인출판2(75)사이에 철망을 위치시켜 고 정시킨 다음, 다시 상기 전후진실린더(76)를 작동시켜 인출몸체부(74)를 후진시키면 고정된 철망도 함께 인출되며, 다시 상기 인출상하실린더(72)작동시켜 인출상하실린더를 상승시킨 후에, 상기와 같은 동작을 반복 인출하여 철망을 제조함을 특징으로 하는 철망의 제조방법.After operating the forward and backward cylinder 76 provided at the rear of the drawout body portion 74 formed at the back of the binding portion C to advance the drawout body portion 74, the drawout formed at the upper portion of the drawout body portion 74. Lowering the upper and lower cylinders 72 to fix the wire mesh between the drawer plate 1 (73) formed at the end of the drawer upper holder 72 and the drawer plate 2 (75) formed on the upper portion of the drawer body portion 74 Then, when the forward and backward cylinder 76 is operated again to reverse the drawing body portion 74, the fixed wire mesh is also drawn out together, and the drawing upper cylinder 72 is operated again to raise the drawing upper cylinder, Method of producing a wire mesh, characterized in that to produce a wire mesh by repeatedly withdrawing the same operation.
KR1020030069832A 2003-10-08 2003-10-08 Method for Manufacturing for mash with iron wire and there's Apparatus for Manutacturing KR100557349B1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
KR1020030069832A KR100557349B1 (en) 2003-10-08 2003-10-08 Method for Manufacturing for mash with iron wire and there's Apparatus for Manutacturing
CNB2004800289872A CN100396398C (en) 2003-10-08 2004-10-05 Apparatus for and method of manufacturing wire-net
PCT/KR2004/002540 WO2005032742A1 (en) 2003-10-08 2004-10-05 Apparatus for and method of manufacturing wire-net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030069832A KR100557349B1 (en) 2003-10-08 2003-10-08 Method for Manufacturing for mash with iron wire and there's Apparatus for Manutacturing

Publications (2)

Publication Number Publication Date
KR20050034047A KR20050034047A (en) 2005-04-14
KR100557349B1 true KR100557349B1 (en) 2006-03-06

Family

ID=34420545

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030069832A KR100557349B1 (en) 2003-10-08 2003-10-08 Method for Manufacturing for mash with iron wire and there's Apparatus for Manutacturing

Country Status (3)

Country Link
KR (1) KR100557349B1 (en)
CN (1) CN100396398C (en)
WO (1) WO2005032742A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210031280A (en) * 2019-09-11 2021-03-19 변장호 Wire mesh press apparatus

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105562564B (en) * 2016-03-10 2018-07-06 兖州煤业股份有限公司 Netting cutter and automatic braiding net machine
CN106944580B (en) * 2017-03-30 2018-12-14 浦江开丰广告设计有限公司 A kind of isolation protective net production equipment
CN111687350B (en) * 2018-05-14 2022-03-01 台山市伟辉五金制品有限公司 Weaving module of metal net processing device
CN110534593B (en) * 2019-08-30 2020-12-29 无锡携创新能源科技有限公司 Processing system, processing method and application method of copper mesh for non-main-grid battery plate
CN110883278A (en) * 2019-12-11 2020-03-17 深圳市启赋小智科技有限公司 Back-to-back terminal wire drawing machine and wire drawing method
CN111112512B (en) * 2020-02-14 2021-07-16 河北恒拓机械设备有限公司 Horizontal gabion net machine
KR102546538B1 (en) * 2020-12-03 2023-06-22 주식회사 주원이앤에스 Functional mask manufacturing apparatus
CN113914630B (en) * 2021-09-26 2023-04-14 青岛一建集团有限公司 Self-walking type steel bar binding device for construction site and binding method thereof
CN115178695A (en) * 2022-07-11 2022-10-14 福州大学 Automatic cutting machine for wire mesh and using method thereof
KR102522010B1 (en) * 2022-08-04 2023-04-14 주식회사 건승테크 Loznege-shaped wire net manufacturing apparatus

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0654906U (en) * 1993-01-11 1994-07-26 新日本製鐵株式会社 PC Reinforcing Bar Cage Knitting Fitting and Its Mounting Device
JPH1015634A (en) * 1996-07-01 1998-01-20 Kajima Corp Manufacture of reinforcement cage
JPH1157917A (en) * 1997-08-14 1999-03-02 Shimizu Corp Method for assembling reinforcing bar unit and assembling device
KR100221468B1 (en) * 1996-12-30 1999-09-15 박동환 Apparatus for manufacturing wire mesh
KR100270277B1 (en) * 1999-04-19 2000-10-16 이태수 Device for solidarity of wire
KR20020043391A (en) * 2000-12-04 2002-06-10 정기관 A manufacture apparatus of barbed wire entanglement

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57154343A (en) * 1981-03-19 1982-09-24 Asahi Chem Ind Co Ltd Method and device for forming wire net
JPS60179755U (en) * 1984-05-08 1985-11-29 棚橋 基 Welded wire mesh connection fittings
AT402033B (en) * 1992-02-20 1997-01-27 Evg Entwicklung Verwert Ges METHOD AND SYSTEM FOR PRODUCING REINFORCEMENT GRIDS
JP3615636B2 (en) * 1996-12-19 2005-02-02 積水樹脂株式会社 Mesh fence
US5785097A (en) * 1997-04-01 1998-07-28 Bmci, Inc. Apparatus and method for forming a flat-top chain link material in a chain link weaving machine
JP2002186907A (en) * 2000-12-20 2002-07-02 Sanshin Kogyo Kk Manufacturing method of screen net for bundled vibration screen
JP2004025241A (en) * 2002-06-26 2004-01-29 Asahi Steel Industry Net for fence

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0654906U (en) * 1993-01-11 1994-07-26 新日本製鐵株式会社 PC Reinforcing Bar Cage Knitting Fitting and Its Mounting Device
JPH1015634A (en) * 1996-07-01 1998-01-20 Kajima Corp Manufacture of reinforcement cage
KR100221468B1 (en) * 1996-12-30 1999-09-15 박동환 Apparatus for manufacturing wire mesh
JPH1157917A (en) * 1997-08-14 1999-03-02 Shimizu Corp Method for assembling reinforcing bar unit and assembling device
KR100270277B1 (en) * 1999-04-19 2000-10-16 이태수 Device for solidarity of wire
KR20020043391A (en) * 2000-12-04 2002-06-10 정기관 A manufacture apparatus of barbed wire entanglement

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210031280A (en) * 2019-09-11 2021-03-19 변장호 Wire mesh press apparatus
KR102245268B1 (en) 2019-09-11 2021-04-26 변장호 Wire mesh press apparatus

Also Published As

Publication number Publication date
WO2005032742A1 (en) 2005-04-14
CN1863619A (en) 2006-11-15
CN100396398C (en) 2008-06-25
KR20050034047A (en) 2005-04-14

Similar Documents

Publication Publication Date Title
KR100557349B1 (en) Method for Manufacturing for mash with iron wire and there&#39;s Apparatus for Manutacturing
CN108756251A (en) A kind of reinforced mesh binding machine
CN211661506U (en) Sheet metal component automatic cutout welding production line
CN210388079U (en) Machine parts processing welding set
CN216212862U (en) Automatic inductance winding machine
CN204954277U (en) Full -automatic electric capacity package adhesive -tape dispenser
CN109014961A (en) Compound insulation system steel bar truss welding forming production line and the method for producing the truss
CN109648919A (en) A kind of Paper handbag threading machine and its wire rope handling method
CN113783074A (en) Full-automatic double-end welding machine of skinning of data line
CN105057968B (en) Full automatic capacitance bag adhesive tape machine
CN104368919A (en) Straight longitudinal bar attracting, grasping and feeding mechanism of steel bar mesh welding production line
EP1996348B1 (en) Method to feed bars to a working machine and relative device
CN110523881B (en) Reinforcing bar material loading device of buckling
CN111835160A (en) Full-automatic production line for motor stator
CN208772967U (en) Compound insulation system steel bar truss welding forming production line
CN111865009A (en) Automatic end plate pressing machine for motor stator
CN204195105U (en) The vertical bar of reinforcing steel bar welding net production line indulges muscle suction material grasping pay-off
CN102806281A (en) Automatic lifting, locating and clamping device for irregular tubing
KR102358140B1 (en) Bending machine of welded steel mesh
CN210041596U (en) Winding device of motor stator
CN210063513U (en) Automatic wire binding machine
CN113862908A (en) Zigzag automatic pattern sewing machine for shoe fabric
CN112277112A (en) Fence or fence production line capable of realizing full-automatic threading
CN208992347U (en) Deburred mechanism for precision component welding center
CN213918760U (en) Fence or fence production line capable of realizing full-automatic threading

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130225

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140224

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150224

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20160222

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20170220

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20180226

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20190225

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20200219

Year of fee payment: 15