CN106944580B - A kind of isolation protective net production equipment - Google Patents
A kind of isolation protective net production equipment Download PDFInfo
- Publication number
- CN106944580B CN106944580B CN201710204214.4A CN201710204214A CN106944580B CN 106944580 B CN106944580 B CN 106944580B CN 201710204214 A CN201710204214 A CN 201710204214A CN 106944580 B CN106944580 B CN 106944580B
- Authority
- CN
- China
- Prior art keywords
- iron wire
- motor
- instrument arm
- pedestal
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000002955 isolation Methods 0.000 title claims abstract description 15
- 230000001681 protective effect Effects 0.000 title claims abstract description 15
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 13
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 343
- 229910052742 iron Inorganic materials 0.000 claims abstract description 170
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 47
- 210000000080 chela (arthropods) Anatomy 0.000 claims abstract description 12
- 238000009730 filament winding Methods 0.000 claims 1
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 241000190589 Rickettsia sp. Bar29 Species 0.000 description 1
- 241000469816 Varus Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21F—WORKING OR PROCESSING OF METAL WIRE
- B21F27/00—Making wire network, i.e. wire nets
- B21F27/12—Making special types or portions of network by methods or means specially adapted therefor
Abstract
The present invention provides a kind of isolation protective net production equipments, including pedestal, iron wire storage unit, iron wire is around portion, knot portion, clamp disconnected portion and control portion, the iron wire storage unit is fixed to be installed on rear side of pedestal upper surface, the iron wire is installed in below cross bar around portion, including pneumatic cylinder, first motor, second motor, iron wire drum, first instrument arm, draw piece, around iron and the first support plate, the knot portion includes lopping portion, iron wire head positioning region and drive knot portion, the lopping portion is located at the left side of iron wire drum, iron wire head positioning region is located at the front in lopping portion, the left side for driving knot portion to be installed in lopping portion, it includes driving bar, 6th motor, tooth-like wheel, third instrument arm and sliding rail pedestal, the portion of breaking that clamps is installed in around the middle part of iron wire ring, it includes two the 4th instrument arms and iron wire pincers, 4th instrument arm is left The iron wire pincers are arranged in right setting between the 4th instrument arm, and the control portion is installed in the forward right side position of pedestal upper surface, connect respectively with the control switching circuit of the first to the 6th motor, first to third instrument arm and pneumatic cylinder.
Description
Technical field
This application involves antitheft safeguard field, specially a kind of isolation protective net production equipment.
Background technique
The ground such as plant area, cell building Stall, prison need to carry out antitheft protection, usually using isolation such as barbed wire, thorn ropes
Protective net carries out enclosing, and this kind of isolation protective nets twist into bifilar steel wire rope by iron wire and thorn rope is then wrapped in bifilar iron wire again
On, the knot technique that iron wire twists into bifilar steel wire rope at present more falls behind, and finished product efficiency is low, higher cost, causes it using not
It is enough extensive.
Summary of the invention
Present invention defect in view of the prior art, and a kind of isolation protective net production equipment is provided, structure is simple, mentions
High productivity.
The scheme that the present invention uses are as follows: a kind of isolation protective net production equipment, including pedestal, iron wire storage unit, iron wire around
Portion, knot portion clamp disconnected portion and control portion, and the upright bar of cross bar is provided on the right side of the pedestal, is provided with up and down in the middle part of cross bar
The sliding rail chamber in direction, through there is wheel shaft, the wheel shaft and the pedestal turn connect for front and back respectively for the base bottom left and right sides
It connects, the wheel shaft both ends are fixedly installed idler wheel, and the iron wire storage unit is fixed to be installed on rear side of pedestal upper surface, iron wire storage
Portion is provided with two groups, including iron wire storage wheel and wheel base, and iron wire storage wheel is that turn connects with wheel base, and the iron wire is installed around portion
Below cross bar, including pneumatic cylinder, the first motor, the second motor, iron wire drum, the first instrument arm, draw piece, around iron and first
Support plate, the knot portion include lopping portion, iron wire head positioning region and drive knot portion, and the lopping portion is located at iron wire drum
Left side comprising the second support plate is splitted valve, chain belt, gib head, third motor, support base, the 4th motor and whorl bar and driven
Portion, the support base is fixed on the base, and the second support plate is fixed in support base upper surface, and the 4th motor is installed in a left side for support base
Side, the whorl bar portion of driving are installed between the 4th motor and the second support plate, and the 4th motor turn drives the second support plate left
The right side moves repeatedly, described to split protrusion there are two valve left and right settings, is provided on the outside of protrusion for drawing to the chain belt
The sliding rail led, the valve of splitting synthesizes a long cylinder, and is installed in the hole of the second support plate, and two neighbours two split the protrusion of valve
Between form a groove, the groove portion is opposite with the circumferential groove on iron wire ring, installs the chain belt in the groove portion, peace on the outside of chain belt
If multiple gib heads, third motor are installed in the right side of the second support plate, and drive chain belt to transmit kinetic energy, the iron wire head is fixed
Position portion is located at the front in lopping portion, and the portion of breaking that clamps is installed in around the middle part of iron wire ring comprising two the 4th instrument arms and iron
The iron wire pincers are arranged in silk pincers, the 4th instrument arm left and right settings between the 4th instrument arm, and the control portion installs on the base
The forward right side position on surface, respectively with the control switching circuit of the first to the 6th motor, first to third instrument arm and pneumatic cylinder
Connection.
Further technical solution, pneumatic cylinder are installed on the outside of upright bar at towards cross bar, and the first motor is installed on cross bar,
Its end is fixed to install described around iron, and the lower end of iron is provided with one and wears iron wire hole, and it is intracavitary that the draw piece is installed in sliding rail,
Draw piece one end is sleeved on the end of the first motor, and the other end is fixedly connected with pneumatic cylinder end, and iron wire drum setting is the
The lower section of one motor is provided with the first support plate behind iron wire drum, is provided with the second motor on rear side of the first support plate, and second
Motor and iron wire drum are located on an axis, and can drive iron wire drum turn, and iron wire drum is square column, and peripheric surface is provided with
With curved surface slot around iron wire ring, around the lower end of iron wear iron wire hole with it is contour around iron wire ring, be provided with circumferential groove on iron wire ring,
Install the first instrument arm in each angle of iron wire drum front end face.
Further technical solution, iron wire head positioning region include sliding rail, the second instrument arm, the 5th motor, whorl
Bar and third support plate, the sliding rail install pedestal upper surface, and third support plate is installed on the slide rail, and institute is installed in the middle part of sliding rail
State whorl bar, on the pedestal for the left end that the 5th motor is installed in sliding rail, the 5th motor turn drives third by whorl bar
Support plate side-to-side movement, the second instrument arm are installed in the upper end of third support plate, and, second device contour with the first instrument arm
Tool arm be span-adjustable instrument arm, the left side for driving knot portion to be installed in lopping portion,
Further technical solution, it is described drive knot portion include drive bar, the 6th motor, tooth-like wheel, third instrument arm and
Sliding rail pedestal, the sliding rail pedestal upper surface right side are provided with tooth-like wheel chamber, tooth-like wheel, the rear side of sliding rail pedestal are installed in the slot
It is located at an axis with tooth-like wheel and installs the 6th motor, setting one is for installing the drive in the middle part of sliding rail pedestal upper surface
The bar slot of bar drives bar right side and installs third instrument arm, drives bar center and iron wire around the contour around iron wire ring center of disc side.
The isolation protective net production equipment includes the following steps:
A. by bundled iron wire sleeve in iron wire storage wheel;
B. two strands of steel wire ropes are penetrated into wearing in iron wire hole around iron lower end manually, and stretches out 5 centimetres or so;
C. start control portion, pneumatic cylinder moves downward;
D. the first motor turn counterclockwise drives around 110 degree of iron turn, iron wire is made to be caught in the clamping jaw of the first instrument arm
It is interior, and clamp;
E. pneumatic cylinder moves to right 10 centimetres, 450 degree of turn that the first motor is counterclockwise, completes to act around iron wire;
F. 90 degree of the second motor turn, it is former located above around iron wire ring turn to left side;
G. the second instrument arm is moved to the first instrument arm, and after completing iron wire head switching motion, the second instrument arm is retracted;
H. lopping portion moves under the driving of the 4th motor to iron wire drum, and protrudes into iron wire ring;
I. third motor turn drives gib head to be flipped up from lower part by chain belt, to hook iron wire;
J. the 4th motor reversion moves to left lopping portion, meanwhile, the second instrument arm also moves to right one under the driving of the 5th motor
Section distance;
K. repeat D-J, complete tie around iron wire;
L. after circle number needed for reaching, the first motor makes to be located in around iron around the right side of iron wire ring;
M. pneumatic cylinder pushes the first motor and to the left around iron, moves downward the lower end edge circumferential groove around iron to around iron wire
The left side of ring;
N. the 4th instrument arm is clamped, and the movement of iron wire pincers clamps disconnected iron wire;
O. the 4th instrument arm of left side, iron wire drum 90 degree of turn under the driving of the second motor are unclamped;
P. lopping portion moves under the driving of the 4th motor to iron wire drum, and protrudes into iron wire ring;
Q. third motor turn drives gib head to be flipped up from lower part by chain belt, to hook iron wire;
R. bar is driven under the driving of the 6th motor and tooth-like wheel, across the middle part for splitting valve, drives the third instrument of bar front end
Arm clamps iron wire on the 4th instrument arm;
S. after the 4th instrument arm unclamps, lopping portion and drive bar move to left a distance simultaneously;
T. it drives bar to continue to move to left, while third motor turn, drives gib head inwardly to overturn from top by chain belt, put by ring
Fall iron wire, at the same time, the second instrument arm gradually moves right;
U. after the iron wire in the lopping portion is all bled off, the second instrument arm and third instrument arm continue to keep a level pressure
Power, dwell time are 2 seconds;
V. the second instrument arm is unclamped, the iron wire for the completion that knots is pulled out in the middle part of valve under the pulling of third instrument arm from splitting;
So far, operation is fully completed.
Detailed description of the invention
Fig. 1 is main view of the invention;
Fig. 2 is top view of the invention;
Fig. 3 is left view of the invention;
Fig. 4 is the structural schematic diagram in lopping portion of the invention;
Fig. 5 is the disconnected portion's partial enlarged view of pincers of the invention;
Fig. 6 is the structural schematic diagram of wheel shaft and idler wheel of the invention.
Specific embodiment
A kind of isolation protective net production equipment, including pedestal 1, iron wire storage unit, iron wire around portion, knot portion, clamp disconnected portion and
Control portion 37 is provided with the upright bar 2 of cross bar 5 on the right side of the pedestal 1, the sliding rail chamber of up and down direction is provided in the middle part of cross bar 5
12, through there is wheel shaft 101, the wheel shaft 101 is connect with 1 turn of pedestal for front and back respectively for 1 bottom of the pedestal left and right sides,
101 both ends of wheel shaft are fixedly installed idler wheel 102, and the iron wire storage unit is fixed to be installed on rear side of 1 upper surface of pedestal, iron wire
Storage unit is provided with two groups, including iron wire storage wheel 3 and wheel base 4, and iron wire storage wheel 3 is that turn connects with wheel base 4, the iron wire
5 lower section of cross bar, including pneumatic cylinder 6, the first motor 7, the second motor 8, iron wire drum 9, the first instrument arm 10, drawing are installed in around portion
Part 11, around iron 38 and the first support plate 13, the knot portion includes lopping portion, iron wire head positioning region and drives knot portion, institute
State the left side that lopping portion is located at iron wire drum 9 comprising the second support plate 16 splits valve 17, chain belt 18, gib head 19, third horse
Portion 23 is driven up to 20, support base 21, the 4th motor 22 and whorl bar, the support base 21 is fixed on pedestal 1, support base 21
The second support plate 16 is fixed in upper surface, and the 4th motor 22 is installed in the left side of support base 21, and whorl bar drives portion 23 to be installed in
Between 4th motor 22 and the second support plate 16,22 turn of the 4th motor drives the second support plate 16 or so to move repeatedly, described
17 left and right settings of valve is splitted there are two protrusion, the sliding rail for guiding to the chain belt 18, institute are provided on the outside of protrusion
It states and splits the one long cylinder of synthesis of valve 17, and be installed in the hole of the second support plate 16, shape between the two neighboring protrusion for splitting valve
At groove portion, the groove portion is opposite with the circumferential groove on iron wire ring 14, and the chain belt 18 is installed in the groove portion, is installed on the outside of chain belt
Multiple gib heads 19, third motor 20 are installed in the right side of the second support plate 16, and chain belt is driven to transmit kinetic energy, the iron wire
Head positioning region is located at the front in lopping portion, and the portion of breaking that clamps is installed in around the middle part of iron wire ring 14 comprising two the 4th instruments
The iron wire pincers 35, the pipe is arranged in arm 34 and iron wire pincers 35,34 left and right settings of the 4th instrument arm between the 4th instrument arm 34
Control portion 37 is installed in the forward right side position of 1 upper surface of pedestal, respectively with the first to the 6th motor 7,8,20,22,26,30, first
It is connected to third instrument arm 10,25,32 with the control switching circuit of pneumatic cylinder 6.
Beneficial, pneumatic cylinder 6 is installed on the outside of upright bar 2 at towards cross bar 5, and the first motor 7 is installed on cross bar 5, end
Portion is fixed to install described around iron 38, and the lower end of iron 38 is provided with one and wears iron wire hole 36, the draw piece 11 is installed in sliding rail
In chamber 12,11 one end of draw piece is sleeved on the end of the first motor 7, and the other end is fixedly connected with 6 end of pneumatic cylinder, the iron wire around
The lower section of the first motor 7 is arranged in disk 9, and the first support plate 13 is provided with behind iron wire drum 9, and the rear side of the first support plate 13 is set
It is equipped with the second motor 8, the second motor 8 and iron wire drum 9 are located on an axis, and can drive 9 turn of iron wire drum, iron wire drum
9 are square column, peripheric surface be provided with curved surface slot around iron wire ring 14, around the lower end of iron 38 wear iron wire hole 36 with around iron wire
Ring 14 is contour, and circumferential groove 15 is provided on iron wire ring 14, and the first instrument arm is installed at each angle of 9 front end face of iron wire drum
10。
Beneficial, iron wire head positioning region includes sliding rail 24, the second instrument arm 25, the 5th motor 26, whorl bar 27
With third support plate 28, the sliding rail 24 installs 1 upper surface of pedestal, and third support plate 28 is installed on sliding rail 24, sliding rail 24
The whorl bar 27 is installed at middle part, and the 5th motor 26 is installed on the pedestal 1 of the left end of sliding rail 24,26 turn of the 5th motor,
28 side-to-side movement of third support plate is driven by whorl bar 27, the second instrument arm 25 is installed in the upper of third support plate 28
End, and it is contour with the first instrument arm 10, and the second instrument arm 25 is span-adjustable instrument arm, described that knot portion is driven to be installed in lopping portion
Left side,
Beneficial, it is described that knot portion is driven to include drive bar 29, the 6th motor 30, tooth-like wheel 31, third instrument arm 32 and slide
Base of the rail seat 33,33 upper surface of the sliding rail pedestal right side are provided with tooth-like wheel chamber, tooth-like wheel 31, sliding rail pedestal 33 are installed in the slot
Rear side and tooth-like wheel 31 be located at an axis and install the 6th motor 30,33 upper surface middle part of sliding rail pedestal setting one is used
In installing the bar slot for driving bar 29, drives 29 right side of bar and install third instrument arm 32, drive 29 center of bar and 9 side of iron wire drum
It is contour around 14 center of iron wire ring.
The isolation protective net production equipment includes the following steps:
A. by bundled iron wire sleeve in iron wire storage wheel 3;
B. two strands of steel wire ropes are penetrated into wearing in iron wire hole 36 around 38 lower end of iron manually, and stretches out 5 centimetres or so;
C. start control portion, pneumatic cylinder 6 moves downward;
D. the turn counterclockwise of the first motor 7 is viewed from above, drives around 110 degree of 38 turn of iron, iron wire is made to be caught in first
In the clamping jaw of instrument arm 10, and clamp;
E. pneumatic cylinder 6 moves to right 10 centimetres, and the first motor 7 450 degree of turn counterclockwise is completed to act around iron wire;
F. 90 degree of 8 turn of the second motor, it is former located above around 14 turn of iron wire ring to left side;
G. the second instrument arm 25 is moved to the first instrument arm 10, after completing iron wire head switching motion, the second instrument arm 25
It retracts;
H. lopping portion moves under the driving of the 4th motor 22 to iron wire drum 9, and protrudes into iron wire ring 14;
I. 20 turn of third motor drives gib head 19 to be flipped up from lower part, to hook iron wire by chain belt 18;
J. the 4th motor 22 reversion moves to left lopping portion, meanwhile, the second instrument arm 25 is also right under the driving of the 5th motor
Move a distance;
K. repeat D-J, complete tie around iron wire;
L. after circle number needed for reaching, the first motor 7 makes to be located in around iron 38 around the right side of iron wire ring 14;
M. pneumatic cylinder 6 pushes the first motor 7 and to the left around iron 38, moves downward the lower end edge circumferential groove 15 around iron 38
To around the left side of iron wire ring 14;
N. the 4th instrument arm 34 is clamped, and 35 movement of iron wire pincers clamps disconnected iron wire;
O. the 4th instrument arm 34 of left side is unclamped, iron wire drum 9 is 90 degree of turn under the driving of the second motor 8;
P. lopping portion moves under the driving of the 4th motor 22 to iron wire drum 9, and protrudes into iron wire ring 14;
Q. 20 turn of third motor drives gib head 19 to be flipped up from lower part, to hook iron wire by chain belt 18;
R. bar 29 is driven under the driving of the 6th motor 30 and tooth-like wheel 31, across the middle part for splitting valve 17, drives 29 front end of bar
Third instrument arm 32 clamp iron wire on the 4th instrument arm 34;
S. after the 4th instrument arm 34 unclamps, lopping portion and drive bar 29 move to left a distance simultaneously;
T. it drives bar 29 to continue to move to left, while 20 turn of third motor, drives gib head 19 from top to varus by chain belt 18
Turn, bleeds off iron wire by ring, at the same time, the second instrument arm 25 gradually moves right;
U. after the iron wire in the lopping portion is all bled off, the second instrument arm 25 and third instrument arm 32 continue holding one
Constant-pressure, dwell time are 2 seconds;
V. the second instrument arm 25 is unclamped, the iron wire for the completion that knots is drawn in the middle part of valve under the pulling of third instrument arm 32 from splitting
Out;
So far, operation is fully completed.
Claims (4)
1. a kind of isolation protective net production equipment, including pedestal, iron wire storage unit, iron wire are around portion, knot portion, the disconnected portion of pincers and control
Portion (37), it is characterised in that: be provided with the upright bar (2) of cross bar (5) on the right side of the pedestal (1), be provided in the middle part of cross bar (5)
The sliding rail chamber (12) of up and down direction, at left and right sides of pedestal (1) bottom respectively front and back through having wheel shaft (101), the wheel shaft
(101) it is connect with the pedestal (1) turn, wheel shaft (101) both ends are fixedly installed idler wheel (102), the iron wire storage
Portion is fixed to be installed on rear side of pedestal (1) upper surface, and iron wire storage unit is provided with two groups, including iron wire storage wheel (3) and wheel base
(4), iron wire storage wheel (3) is that turn connects with wheel base (4);The iron wire is installed in below cross bar (5) around portion, including pneumatic cylinder
(6), the first motor (7), the second motor (8), iron wire drum (9), the first instrument arm (10), draw piece (11), around iron (38) and
First support plate (13), the knot portion include lopping portion, iron wire head positioning region and drive knot portion, and the lopping portion is located at iron
The left side of filament winding disk (9) comprising the second support plate (16) splits valve (17), chain belt (18), gib head (19), third motor
(20), support base (21), the 4th motor (22) and whorl bar drive portion (23), and the support base (21) is fixed on pedestal (1)
On, support base (21) upper surface is fixed the second support plate (16), and the 4th motor (22) is installed in the left side of support base (21), spiral shell shape
Rasp bar drives portion (23) to be installed between the 4th motor (22) and the second support plate (16), and the 4th motor (22) turn drives second
Support plate (16) left and right moves repeatedly, described to split protrusion there are two valve (17) left and right settings, is provided with and is used on the outside of protrusion
To the sliding rail that the chain belt (18) guides, described split valve (17) synthesize a long cylinder, and are installed in the second support plate
(16) it in hole, is formed a groove between two adjacent two protrusions for splitting valve, the groove portion and the circumferential groove phase on iron wire ring (14)
It is right, it is installed in the groove portion chain belt (18), installs multiple gib heads (19) on the outside of chain belt, third motor (20) is installed in
The right side of second support plate (16), and chain belt is driven to transmit kinetic energy, iron wire head positioning region is located at the front in lopping portion, described
It clamps disconnected portion and is installed in the middle part around iron wire ring (14) comprising two the 4th instrument arms (34) and iron wire pincers (35), the 4th instrument
Arm (34) left and right settings, is arranged the iron wire pincers (35) between the 4th instrument arm (34), and the control portion (37) is installed in base
Seat (1) upper surface forward right side position, respectively with the first to the 6th motor (7,8,20,22,26,30), first to third instrument
Arm (10,25,32) is connected with the control switching circuit of pneumatic cylinder (6).
2. a kind of isolation protective net production equipment as claimed in claim 1, it is characterised in that: pneumatic cylinder (6) is installed in vertical
On the outside of bar (2) towards cross bar (5) at, the first motor (7) is installed on cross bar (5), end is fixed install it is described around iron
(38), the lower end of iron (38) is provided with one to wear iron wire hole (36), the draw piece (11) is installed in sliding rail chamber (12), draw piece
(11) one end is sleeved on the end of the first motor (7), and the other end is fixedly connected with pneumatic cylinder (6) end, the iron wire drum (9)
Lower section in the first motor (7) is set, and iron wire drum (9) is provided with the first support plate (13) below, the first support plate (13)
Rear side is provided with the second motor (8), and the second motor (8) and iron wire drum (9) are located on an axis, and can drive iron wire drum
(9) turn, iron wire drum (9) are square column, peripheric surface be provided with curved surface slot around iron wire ring (14), under iron (38)
End wear iron wire hole (36) with it is contour around iron wire ring (14), be provided on iron wire ring (14) circumferential groove (15), before iron wire drum (9)
Install the first instrument arm (10) in each angle of end face.
3. a kind of isolation protective net production equipment as claimed in claim 1, it is characterised in that: iron wire head positioning region packet
Include sliding rail (24), the second instrument arm (25), the 5th motor (26), whorl bar (27) and third support plate (28), the sliding rail
(24) pedestal (1) upper surface is installed, third support plate (28) is installed on sliding rail (24), and sliding rail installs the spiral shell in the middle part of (24)
Shape rasp bar (27), the 5th motor (26) are installed on the pedestal (1) of the left end of sliding rail (24), and the 5th motor (26) turn passes through
Whorl bar (27) drives third support plate (28) side-to-side movement, and the second instrument arm (25) is installed in third support plate (28)
Upper end, and contour with the first instrument arm (10), the second instrument arm (25) is span-adjustable instrument arm, described that knot portion is driven to install
In the left side in lopping portion.
4. a kind of isolation protective net production equipment as claimed in claim 3, it is characterised in that: described to drive the knot portion to include
Drive bar (29), the 6th motor (30), tooth-like wheel (31), third instrument arm (32) and sliding rail pedestal (33), the sliding rail pedestal
(33) be provided with tooth-like wheel chamber on the right side of upper surface, the tooth-like wheel is intracavitary to be installed tooth-like wheel (31), the rear side of sliding rail pedestal (33) with
Tooth-like wheel (31), which is located at an axis, installs the 6th motor (30), and sliding rail pedestal (33) upper surface middle part setting one is used for
Install the bar slot for driving bar (29), drive bar (29) right side and install third instrument arm (32), drive bar (29) center and iron wire around
Disk (9) side it is contour around iron wire ring (14) center.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710204214.4A CN106944580B (en) | 2017-03-30 | 2017-03-30 | A kind of isolation protective net production equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710204214.4A CN106944580B (en) | 2017-03-30 | 2017-03-30 | A kind of isolation protective net production equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106944580A CN106944580A (en) | 2017-07-14 |
CN106944580B true CN106944580B (en) | 2018-12-14 |
Family
ID=59475180
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710204214.4A Expired - Fee Related CN106944580B (en) | 2017-03-30 | 2017-03-30 | A kind of isolation protective net production equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106944580B (en) |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2127643Y (en) * | 1992-06-08 | 1993-03-03 | 上海交通装卸机械厂 | Bending and knotting machine for wire net rest |
JP3276199B2 (en) * | 1993-04-28 | 2002-04-22 | 株式会社カイエーテクノ | Wire mesh bending device |
CN1282804C (en) * | 2002-04-23 | 2006-11-01 | 六发株式会社 | Net body, method and equipment for producing the same net body and cage using the same net |
KR100557349B1 (en) * | 2003-10-08 | 2006-03-06 | 유재순 | Method for Manufacturing for mash with iron wire and there's Apparatus for Manutacturing |
CN205128804U (en) * | 2015-10-29 | 2016-04-06 | 重庆光明消防设备厂 | Activity direction formula door leaf skeleton woven wire twines auxiliary device |
-
2017
- 2017-03-30 CN CN201710204214.4A patent/CN106944580B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN106944580A (en) | 2017-07-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103253062A (en) | Automatic beading machine with multiple beading needle heads | |
CN106944580B (en) | A kind of isolation protective net production equipment | |
CN107365879A (en) | A kind of clothing making leather cutting equipment | |
CN210558654U (en) | Charger cable winding machine | |
CN107313174A (en) | A kind of knotting method | |
CA2897765C (en) | Mobile soil-working device with protective means | |
CN108213274B (en) | A kind of cutting equipment for cable | |
CN204292097U (en) | Automatically crab machine is tied up | |
CN209608227U (en) | A kind of single hook both arms cord holder | |
CN107309374A (en) | A kind of separation net production equipment | |
CN201872338U (en) | Pipe penetration machine | |
CN107309375A (en) | A kind of protection network production equipment | |
CN203977359U (en) | Emergency flood fighting Liu Shi rests the head on binding apparatus | |
CN103009062A (en) | Steel wire rope peeling, lining-removing and patterning all-in-one machine | |
CN207372214U (en) | Iron wire loop is coiled into machine | |
CN202519513U (en) | Peeling and tuck stitching integrated machine for steel wire ropes | |
CN106968048A (en) | The knotting methods that a kind of bifilar rope is once tied more | |
CN206277109U (en) | A kind of automatic flexible sealing ring assemble mechanism | |
CN102041645B (en) | Stitching-starting thread-drawing device for automatic thread-cutting sewing machine | |
CN207046577U (en) | A kind of horizontal wire storing device | |
CN104952550B (en) | A kind of production system of the cable insulation jacket with overhead wire storage mechanism | |
CN202865469U (en) | Glue wire bunching machine | |
CN107379635A (en) | A kind of hand-strap draft machine | |
CN106965497B (en) | A kind of environmentally friendly hand-strap draft machine | |
CN106894131B (en) | A kind of yarn weaving loom |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20181012 Address after: 322200 18 District two, six Jian village, Yan tou Town, Pujiang, Jinhua, Zhejiang Applicant after: Pujiang Kaifeng Advertising Design Co.,Ltd. Address before: 322204 two, building 21, Qiaotou Qiaotou District, yotun village, Huang Zhai Town, Pujiang, Jinhua, Zhejiang Applicant before: PUJIANG KECHUANG IMPORT AND EXPORT Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181214 |
|
CF01 | Termination of patent right due to non-payment of annual fee |