JPS6411918A - Control method for recovery turbine of blast furnace gas energy - Google Patents
Control method for recovery turbine of blast furnace gas energyInfo
- Publication number
- JPS6411918A JPS6411918A JP16595587A JP16595587A JPS6411918A JP S6411918 A JPS6411918 A JP S6411918A JP 16595587 A JP16595587 A JP 16595587A JP 16595587 A JP16595587 A JP 16595587A JP S6411918 A JPS6411918 A JP S6411918A
- Authority
- JP
- Japan
- Prior art keywords
- signal
- governor
- computing element
- delay
- gas pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Blast Furnaces (AREA)
Abstract
PURPOSE:To recover the total load through a recovery turbine by delaying an output signal from a top gas pressure regulator by transmission delay of a control system by a primary delay computing element, synchronizing the delay signal with a governor output signal and preventing a septum valve from being opened by a transmission delay of the control system. CONSTITUTION:The deviation of a set value SV of the top gas pressure from a top gas pressure PV is inputted into the governor 12 as an output signal MV. Then, an output signal E1 of the governor 12 is transmitted to a driving circuit 15 through an A/V converter 14 to switch and control the governor valve 4. On one hand, the signal MV out of the top gas pressure regulator 10 is transmitted by the primary delay computing element 18 to an computing element 17 as a delay signal E2, signals E2 and E1 are subtracted, the septum valve 6 switched and controlled by the subtraction signal E0 through a comparative setter 19. When a transmission delay time on the control system side of the governor 12 is set by the computing element 18 in advance, both signals E1 and E2 inputted into the computing element 17 are synchronized when a trip signal 20 is not inputted. Accordingly the subtraction output of said signal becomes zero, the valve 6 is closed and the loss by the bypath can be avoided as regards the quantity of the passing gas.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16595587A JPS6411918A (en) | 1987-07-02 | 1987-07-02 | Control method for recovery turbine of blast furnace gas energy |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16595587A JPS6411918A (en) | 1987-07-02 | 1987-07-02 | Control method for recovery turbine of blast furnace gas energy |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS6411918A true JPS6411918A (en) | 1989-01-17 |
Family
ID=15822192
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP16595587A Pending JPS6411918A (en) | 1987-07-02 | 1987-07-02 | Control method for recovery turbine of blast furnace gas energy |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6411918A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5378085A (en) * | 1993-10-01 | 1995-01-03 | S. M. W. Seiko | Methods for in situ construction of deep soil-cement structures |
-
1987
- 1987-07-02 JP JP16595587A patent/JPS6411918A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5378085A (en) * | 1993-10-01 | 1995-01-03 | S. M. W. Seiko | Methods for in situ construction of deep soil-cement structures |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
IN156043B (en) | ||
JPS6411918A (en) | Control method for recovery turbine of blast furnace gas energy | |
JPS55100907A (en) | Control of pressure at top of blast furnace | |
JPS5395402A (en) | Pressure controller for atomic turbine | |
JPS57195805A (en) | Load controller | |
JPS5625914A (en) | Control method of top pressure of blast furnace | |
JPS53105609A (en) | System for reducing steam turbine by-pass pressure and temperature | |
JPS5625913A (en) | Control method of top pressure of blast furnace | |
JPS5549702A (en) | Trip reliability improving system | |
JPS6472466A (en) | Combustion air flow controller | |
JPS56162228A (en) | Control system for two axle type gas turbine | |
JPS5625911A (en) | Controlling method of top pressure of blast furnace | |
JPS55146203A (en) | Controlling system for steam turbine | |
JPS5692306A (en) | Main steam pressure controlling system for turbine | |
JPS5444104A (en) | Extraction turbine plant controlling method | |
JPS5349603A (en) | Valve switching system | |
JPS5736303A (en) | Digital operation controller for hydraulic power plant | |
JPS5752606A (en) | Automatic control system for turbine | |
JPS57131828A (en) | Control method of furnace pressure recovery turbine generator system | |
JPS5681607A (en) | Controlling method of blast furnace top pressure | |
JPS5776211A (en) | Turbine control apparatus | |
JPS5250404A (en) | Control system of nuclear gas turbvine | |
JPS57211998A (en) | Generated output controller | |
JPS5635207A (en) | Automatic operation control device for power generation plant | |
JPS5749730A (en) | Combustion control system for solid fuel combustion furnace |