JPS62125136A - Waterproof construction in multistaired multiple dwelling house - Google Patents
Waterproof construction in multistaired multiple dwelling houseInfo
- Publication number
- JPS62125136A JPS62125136A JP26149485A JP26149485A JPS62125136A JP S62125136 A JPS62125136 A JP S62125136A JP 26149485 A JP26149485 A JP 26149485A JP 26149485 A JP26149485 A JP 26149485A JP S62125136 A JPS62125136 A JP S62125136A
- Authority
- JP
- Japan
- Prior art keywords
- water
- floor
- floor slab
- multistaired
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 33
- 238000004078 waterproofing Methods 0.000 claims description 6
- 235000008429 bread Nutrition 0.000 claims description 3
- 230000000630 rising effect Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 description 5
- 238000009408 flooring Methods 0.000 description 4
- 239000010426 asphalt Substances 0.000 description 3
- 239000004567 concrete Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 239000005028 tinplate Substances 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Landscapes
- Panels For Use In Building Construction (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
(産業上の利用分野)
この発明は、マンションなどの多層集合住宅において、
ウォーターセクション部の漏水による下の階への被害を
防止するための防水施工方法に関する。[Detailed Description of the Invention] (Industrial Application Field) The present invention is applicable to multi-story housing complexes such as condominiums.
This article relates to a waterproofing construction method to prevent damage to the lower floor due to water leakage in the water section.
(従来の技術)
通常集合住宅のキッチン、洗面所、バスルームおにびト
イレット等の水を多く使用する部分ではウォーターセク
ションとして一つにまとめられている。(Prior art) Usually, parts of apartment buildings that use a lot of water, such as kitchens, washrooms, bathrooms, and toilets, are combined into a water section.
このウォーターセクションでは、鉄筋コンクリート床面
上に共有のパイプスペースより分離された給水管および
排水管、ガス管等を配管し、その上部にフローリング材
を設けである。In this water section, water supply pipes, drainage pipes, gas pipes, etc. are laid out on a reinforced concrete floor surface separated by a common pipe space, and flooring material is installed above them.
(発明が解決しようとする問題点)
これらのウォーターセクション部ではおうあうにして取
り扱い上の不注意により水漏れを生ずることがある。(Problems to be Solved by the Invention) Water leakage may occur in these water sections due to carelessness in handling.
例えば洗t71 mの排水ホースを外したままで給水を
行ない、排水ホースから水が床面にこぼれたり、排水口
が目詰りをおこし、オーバーフローするなどといったこ
とがある。For example, if water is supplied to a washing machine with the drain hose disconnected, water may spill from the drain hose onto the floor, or the drain port may become clogged and overflow.
こうした水漏れが生じた場合、従来の現場打ちコンクリ
ート床では、防水が充分なされていないために、亀裂な
どから下の階へ漏水し、階下の住戸の天井部や壁面を汚
したり、ここから漏水するといったトラブルが発生して
いる。When such water leaks occur, conventional cast-in-place concrete floors are not sufficiently waterproof, so water leaks to the floor below through cracks, stains the ceilings and walls of the units below, and water leaks from here. There are some problems that occur.
また、ブレキVスト構造の建物では、プレキャスト版相
互には防水性があるものの、その周縁部の継目から漏水
する慣れが充分にある。Furthermore, in buildings with a V-strength structure, although the precast plates are waterproof, water often leaks from the joints around their edges.
これに対し、ウォーターセクション部の床面全体をアス
ファルト防水することも一部行なわれているが、この種
の防水施工はコスト面や工事の煩雑さのために一般には
行なわれていないのが現状であった。In response, the entire floor surface of the water section is sometimes waterproofed with asphalt, but this type of waterproofing is not generally carried out due to cost and complexity of construction. Met.
この発明は以上の如き背tjlに基づきなされたもので
あって、簡単な施工方法によりウォーターセクション部
を完全な防水床面とすることおよび給排水管などの配管
および設備機器の設置、施工の合理化を図ることを目的
としている。This invention was made based on the above-mentioned circumstances, and it is possible to make the water section part a completely waterproof floor surface using a simple construction method, and to streamline the installation and construction of piping and equipment such as water supply and drainage pipes. The purpose is to
(問題点を解決するための手段)
前記目的を達成するため、この発明では、多層集合住宅
のウォーターセクション部に対応する床面形状であって
、周縁に立ち上がりを設けてパン形に成形されたプレキ
ャスト床版上に、予め設備機器ユニットの配直に応じた
先行配管を行ない、該配管部みのプレキャスト床版を吊
り上げて前記ウォーターセクシ」ン部周縁の饗、スラブ
に嵌合固定するようにしたことを特徴とする。(Means for Solving the Problems) In order to achieve the above object, the present invention provides a floor surface shape corresponding to the water section of a multi-story housing complex, which is formed into a bread shape with a rising edge on the periphery. Piping is performed in advance on the precast floor slab in accordance with the layout of the equipment units, and the precast floor slab with only the piping section is lifted and fitted and fixed to the wall and slab around the water sex section. It is characterized by what it did.
(実施例)
以下、この発明方法の一実施例を図面を用いて詳細に説
明する。(Example) Hereinafter, an example of the method of this invention will be described in detail using the drawings.
第1図はこの発明を適用したブリキヤス1〜床版1を示
すものである。FIG. 1 shows a tin plate 1 to a floor slab 1 to which the present invention is applied.
該床版1は、ウォーターセクション部の床面形状に対応
して長方形に形成されたもので、その床面の四周に立ち
上げ部3を設け、全体としてパン形に形成しである。ま
た、立ち上げ部3の一部には排水用の切欠4が形成され
ており、床版1の床面2はこの切欠4に向【ブて下り勾
配となる傾斜面に形成されている。The floor slab 1 is formed in a rectangular shape corresponding to the shape of the floor surface of the water section section, and has raised portions 3 provided around the four circumferences of the floor surface, and is formed into a bread shape as a whole. Further, a notch 4 for drainage is formed in a part of the rising portion 3, and the floor surface 2 of the floor slab 1 is formed into an inclined surface that slopes downward toward this notch 4.
さらに、立ら上げ部3の適宜位置には所定の間隔でコツ
タ取付は用の切欠5が形成されている。Furthermore, cutouts 5 for attaching a clasp are formed at appropriate positions on the upright portion 3 at predetermined intervals.
以上の如く形成されたブリキヤス1〜床版1には第2図
に示すように給、排水およびガスパイプ7がその床面上
に設備機器ユニットの配置に応じて配管され、その端部
を共通配管の引き込み部分に集中させている。As shown in Fig. 2, supply, drainage and gas pipes 7 are installed on the floor surface of the tin plate 1 to the floor slab 1 formed as described above according to the arrangement of the equipment units, and the ends thereof are connected to common piping. The focus is on the attraction part.
なお、図示はしないが、各バイブ7は取付金具などによ
り固定され、特に排水バイブは所定の勾配で出口側に向
けて下がり勾配となるようにしている。Although not shown, each vibrator 7 is fixed with a mounting bracket or the like, and in particular, the drainage vibrator has a predetermined slope that slopes downward toward the exit side.
以上の先行配管終了接床面の適宜位置に根太等を介して
フローリングFを取付け、ざらに第3図に示すように浴
室ユニットやキッチンセット洗面ユニット、および便器
等の設備ユニット8の梱包体を設置した状態で、施工現
場に移送し、これを吊り上げ冶具9を介してクレーン等
で吊り上げ、下階から順次床版1を嵌合固定することに
よりその設置作業を終了する。Attach the flooring F via joists, etc. to appropriate positions on the ground surface where the preceding piping ends, and as roughly shown in Figure 3, package the equipment unit 8 such as the bathroom unit, kitchen set vanity unit, and toilet bowl. The installed state is transferred to the construction site, lifted by a crane or the like via the lifting jig 9, and the installation work is completed by fitting and fixing the floor slabs 1 sequentially from the lower floor.
第4図はその取付は状態を示すもので、プレキャスト床
版1の周縁部は各階層毎に設けた梁10の縁部に形成し
た段部10aに係合した状態となっている。また、フロ
ーリングFは点検用として取外し可能となっている。FIG. 4 shows the installation state, in which the peripheral edge of the precast floor slab 1 is engaged with a step 10a formed on the edge of a beam 10 provided for each floor. Furthermore, the flooring F can be removed for inspection.
第5図はプレキャスト床版1の取付は部分の詳細を示ず
もので、梁10には前記コツター挿通用の切欠部5にi
l応する位置に同じくコツター挿通用の穴10Bが形成
されており、両者間にまたがるようにして所定厚みのコ
ツターブレー1へ11を嵌合し、その上部をコンクリー
トまたはモルタルで覆ってしまうことによりコツタープ
レート11の横効果によりプレキャスト床版1と梁1o
との接合部は補強状態で一体に接合することになる。FIG. 5 does not show the details of the installation of the precast floor slab 1, and the beam 10 has a notch 5 for inserting the roof slab.
A hole 10B for inserting the blade is also formed at the corresponding position, and by fitting the blade 11 into the blade 1 of a predetermined thickness so as to span between the two, and covering the upper part with concrete or mortar, Due to the lateral effect of the tar plate 11, the precast floor slab 1 and the beam 1o
The joints with the two will be joined together in a reinforced state.
なお、他の接合部にもコンクリートまたはモルタルある
いはアスファルト施工等により接合する。Other joints will also be joined using concrete, mortar, asphalt, etc.
そして、パイプ7の端部を対向する共通配管からの引き
込み配管部(図示略)と継手を介して接合すれば、完全
に各バイブ7は共通の配管部と接続されることになる。Then, by joining the ends of the pipes 7 to an opposing lead-in piping section (not shown) from the common piping via a joint, each vibrator 7 is completely connected to the common piping section.
モの後、設備ユニット8の梱包を解き、各パイプ7にそ
の給排水部を接続し、所定の場所に設置すれば各階層の
ウォーターセクション部の施工を終了することになるの
である。After that, the equipment unit 8 is unpacked, its water supply and drainage section is connected to each pipe 7, and the installation is installed at a predetermined location, thereby completing the construction of the water section section on each floor.
なお、IJF水用の切欠部4の部分は共通の排水溝等に
連絡するものであり、この接合部分を十分に防水施工す
れば万が一床面2上に漏水があったとしてら階下にその
水がしみ出たり、滴下する惧れはない。しかしながら、
さらに安全性を増すために、この部分に漏水センサー等
を配置しておき、漏水時に警報出力を発生させるように
すれば、漏水状態を早期に発見でき、さらに安全性を増
すことができる。Note that the IJF water notch 4 connects to a common drainage ditch, etc., and if this joint is sufficiently waterproofed, even if there is water leakage on the floor 2, the water will flow downstairs. There is no risk of it seeping or dripping. however,
To further increase safety, if a water leakage sensor or the like is placed in this area and an alarm output is generated in the event of water leakage, water leakage conditions can be detected early and safety can be further increased.
また、前記実施例では設備ユニット8を単にプレキャス
ト床版1上にフローリングFを介して設置しておくのみ
であったが、予め前記各パイプ類7と接合した状態で床
版1上に予め組付けておいた模に各隅角に配置すること
もできる。Further, in the above embodiment, the equipment unit 8 was simply installed on the precast floor slab 1 via the flooring F, but it is pre-assembled on the floor slab 1 in a state where it is connected to each of the pipes 7. You can also place them at each corner of the attached pattern.
(発明の効果)
以上実施例により詳細に説明したように、この発明の多
層集合住宅における防水施工方法によれば、従来に比べ
て漏水による階下への影響がなく、しかも工期が長く、
高価なアスファルト防水施工によらず簡易に防水を行な
えるので、施工が簡単で工期も極めて短くできる。(Effects of the Invention) As described above in detail using the embodiments, according to the waterproofing construction method for a multi-story apartment building of the present invention, there is no influence on the downstairs due to water leakage compared to the conventional method, and the construction period is longer.
Since waterproofing can be easily performed without using expensive asphalt waterproofing, construction is easy and the construction period can be extremely short.
また、この発明では地上で先行配管を行なえるようにな
っているため、配管の継手部分などで生ずる漏水に対し
ても、検査が容易であり、施工のバラツキおよびこれに
伴う漏水等を未然に防止できる。さらに、床版上に予め
設備ユニツ1−を前記配管とともに設置固定しておけば
ざらに工期が短縮するものとなる。In addition, since this invention allows preliminary piping to be performed above ground, it is easy to inspect water leaks that occur at pipe joints, etc., and prevents variations in construction and water leaks that occur due to this. It can be prevented. Furthermore, if the equipment unit 1- is installed and fixed together with the piping on the floor slab in advance, the construction period will be greatly shortened.
第1図はこの発明を適用したブーキヤス1−床版1の全
体構成を示す斜視図、第2図は同プレキャスト床版1上
に先行配管をした状態を示す斜視図、第3図は同プレキ
ャスト床版1を吊り上げるときの状態を示す側面図、第
4図は同プレキャスト床版1を各隅角に固定した状態を
示す断面図、第5図はプレキャスト床版1ど梁との接合
状態を示す断面図である。
1・・・プレキャスト床版 2・・・床 而3・・・立
上げ部 7・・・パイプ9・・・吊り上げ冶具
10・・・梁特許出願人 株式会社
大 林 組成 理 人 弁理士 −色 健
輔第1図
第2図Fig. 1 is a perspective view showing the overall configuration of the Bukiyasu 1-floor slab 1 to which the present invention is applied, Fig. 2 is a perspective view showing a state in which preliminary piping is installed on the precast floor slab 1, and Fig. 3 is a perspective view of the same precast floor slab 1. A side view showing the state when the floor slab 1 is lifted, Fig. 4 is a sectional view showing the state where the precast floor slab 1 is fixed at each corner, and Fig. 5 shows the state of the precast floor slab 1 being joined to the beams. FIG. 1... Precast floor slab 2... Floor 3... Standing part 7... Pipe 9... Lifting jig 10... Beam patent applicant Co., Ltd.
Obayashi, composition attorney, patent attorney - Ken Iro
Figure 1 Figure 2
Claims (1)
る床面形状であって、周縁に立ち上がりを設けてパン形
に成形されたプレキャスト床版上に、予め設備機器ユニ
ットの配置に応じた先行配管を行ない、該配管済みのプ
レキャスト床版を吊り上げて前記ウォーターセクション
部周縁の梁、スラブに嵌合固定するようにしたことを特
徴とする多層集合住宅における防水施工方法。(1) Precast floor slabs with a floor shape corresponding to the water section of a multi-story apartment complex and formed into a bread shape with rising edges are provided with preliminary piping in accordance with the arrangement of equipment units. A waterproofing construction method for a multi-story housing complex, characterized in that the piped precast floor slab is lifted up and fitted and fixed to a beam or slab around the water section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP26149485A JPS62125136A (en) | 1985-11-22 | 1985-11-22 | Waterproof construction in multistaired multiple dwelling house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP26149485A JPS62125136A (en) | 1985-11-22 | 1985-11-22 | Waterproof construction in multistaired multiple dwelling house |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS62125136A true JPS62125136A (en) | 1987-06-06 |
JPH0579778B2 JPH0579778B2 (en) | 1993-11-04 |
Family
ID=17362687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP26149485A Granted JPS62125136A (en) | 1985-11-22 | 1985-11-22 | Waterproof construction in multistaired multiple dwelling house |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS62125136A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62197547A (en) * | 1986-02-25 | 1987-09-01 | 大成建設株式会社 | Floor structure |
JPH01169038A (en) * | 1987-12-23 | 1989-07-04 | Toto Ltd | Wall panel with piping |
JP2008111250A (en) * | 2006-10-30 | 2008-05-15 | Nippon Steel Corp | Hat steel sheet pile having spacing part and method of stacking hat steel sheet piles |
-
1985
- 1985-11-22 JP JP26149485A patent/JPS62125136A/en active Granted
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62197547A (en) * | 1986-02-25 | 1987-09-01 | 大成建設株式会社 | Floor structure |
JPH01169038A (en) * | 1987-12-23 | 1989-07-04 | Toto Ltd | Wall panel with piping |
JP2008111250A (en) * | 2006-10-30 | 2008-05-15 | Nippon Steel Corp | Hat steel sheet pile having spacing part and method of stacking hat steel sheet piles |
Also Published As
Publication number | Publication date |
---|---|
JPH0579778B2 (en) | 1993-11-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7694462B2 (en) | Construction industry pods | |
JPH0348990B2 (en) | ||
CA1282570C (en) | Building system for multi-storey buildings | |
US2644203A (en) | Prefabricated bathroom structure | |
US20180238046A1 (en) | Prefab Utility Wall | |
JPS62125136A (en) | Waterproof construction in multistaired multiple dwelling house | |
JP3140229B2 (en) | Dwelling unit variable housing system | |
JP3245457U (en) | modular drainage structure | |
JP2502319Y2 (en) | Pipe connection structure | |
JPH0745658Y2 (en) | Piping set jig | |
JP2000080797A (en) | Assembling method for water using unit in building to building frame by platform frame method | |
TWI783442B (en) | Hygiene unit structure and method for implementing same | |
JP2007231561A (en) | Double waterproofing construction method of outdoor floor | |
EP0229460B1 (en) | Improved building system for multi-storey buildings | |
JPS59150865A (en) | House having sanitary equipment in upper floor | |
CN105507471B (en) | Premade bath room building block | |
JPH0112889B2 (en) | ||
JPS62268460A (en) | Underfloor inspection device of woody structure floor | |
JP2570176Y2 (en) | Floor panel | |
JPH0234298Y2 (en) | ||
JP2001342732A (en) | Floor structure of entrance | |
IE20040709U1 (en) | Construction industry pods | |
JPH0542139Y2 (en) | ||
JPH10176464A (en) | Floor construction of entrance | |
IES83983Y1 (en) | Construction industry pods |