JP3140229B2 - Dwelling unit variable housing system - Google Patents

Dwelling unit variable housing system

Info

Publication number
JP3140229B2
JP3140229B2 JP04337873A JP33787392A JP3140229B2 JP 3140229 B2 JP3140229 B2 JP 3140229B2 JP 04337873 A JP04337873 A JP 04337873A JP 33787392 A JP33787392 A JP 33787392A JP 3140229 B2 JP3140229 B2 JP 3140229B2
Authority
JP
Japan
Prior art keywords
floor
dwelling unit
floor base
base material
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP04337873A
Other languages
Japanese (ja)
Other versions
JPH06158878A (en
Inventor
渡辺  孝
Original Assignee
株式会社西原衛生工業所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社西原衛生工業所 filed Critical 株式会社西原衛生工業所
Priority to JP04337873A priority Critical patent/JP3140229B2/en
Publication of JPH06158878A publication Critical patent/JPH06158878A/en
Application granted granted Critical
Publication of JP3140229B2 publication Critical patent/JP3140229B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、戸建・集合住宅にお
ける住戸部分の戸境壁や間仕切壁および床ならびに設備
床下搬送経路などを容易に構成できる住戸可変ハウジン
グシステムに関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a dwelling unit variable housing system which can easily form a door wall, a partition wall, a floor, and a transportation route under equipment floor of a dwelling unit portion in a detached house or apartment house.

【0002】[0002]

【従来の技術】従来のハウジングシステムにおいて、住
戸の戸境壁や間仕切壁あるいは床を構成する際、まず、
戸境壁の場合は、躯体打設時に柱・梁と合わせて戸境壁
を一体的に構築するための型枠を組み立て、該型枠内に
躯体コンクリートを流し込み、これによって躯体コンク
リートの戸境壁、あるいは特殊構法として工場加工され
たPC版やALC版などによる床、戸境壁を構成する乾
式構法がある。また、上記躯体コンクリート等の住戸空
間における内装の床については、乾式置床、ころばし根
太組床、直床等の構法がある。
2. Description of the Related Art In a conventional housing system, when constructing a door or partition wall or floor of a dwelling unit, first,
In the case of a door boundary wall, a formwork for integrally constructing the door boundary wall together with the pillars and beams at the time of casting of the skeleton is assembled, and the skeleton concrete is poured into the formwork. There is a dry construction method for constructing a wall or a floor or a door with a specially constructed factory-processed PC plate or ALC plate. As for the floor of the interior in the dwelling unit space such as the skeleton concrete, there are construction methods such as a dry flooring, a rolled joist floor, and a straight floor.

【0003】図10は乾式置床を示す構成説明図であ
り、図において、1はモジュール化された床パネル、2
はその床パネル1を例えば4点支持する床レベル調整
脚、3は前記床パネル1と躯体床スラブ4との間の空間
部に敷設された設備配管であり、これらによって乾式置
床が構成されている。
FIG. 10 is an explanatory view showing the structure of a dry-type flooring. In the figure, reference numeral 1 denotes a modularized floor panel;
Is a floor level adjusting leg for supporting the floor panel 1 at, for example, four points, and 3 is equipment piping laid in a space between the floor panel 1 and the skeleton floor slab 4, and these form a dry flooring. I have.

【0004】図11はころばし根太組床を示す構成説明
図であり、図において、1は床パネル、3は設備配管、
4は躯体床スラブ、5は根太、6は床レベル調整機構で
あり、前記床パネル1と下地とが分離し、躯体床スラブ
4上に根太5をころがして、その上に床パネル1を張っ
た構成となっている。
[0004] Fig. 11 is an explanatory view showing the structure of a rolled joist floor, in which 1 is a floor panel, 3 is equipment piping,
4 is a frame floor slab, 5 is a joist, and 6 is a floor level adjusting mechanism. The floor panel 1 is separated from the base, and the joist 5 is rolled on the frame floor slab 4 and the floor panel 1 is stretched thereon. Configuration.

【0005】図12はころばし根太床の壁の構成を示し
斜視図であり、図において、7は支柱、7aは胴縁受
け、8は間柱、9は胴縁、10は合板ベニヤなどの羽目
板であり、これらによって前記ころばし根太床の壁が構
成されている。
[0005] Fig. 12 is a perspective view showing the configuration of a wall of a roller joist floor. In the figure, 7 is a column, 7a is a rim support, 8 is a stud, 9 is a rim, and 10 is a siding panel such as plywood veneer. Yes, these form the walls of the roller joist floor.

【0006】以上のような住戸内の間仕切壁について、
図10に示した乾式置床構法では、軽量鉄骨材と耐火ボ
ードの組合せ、また、図11および図12に示したころ
ばし床根太組床では、支柱7と間柱8および胴縁9と合
板ベニヤ10などで構成されている。一方、床下に敷設
される給排水管などは、各々の構成材の隙間を縫って搬
送経路が形成され、床暖房配管も床板一体か根太上の専
用材と床板とのサンドイッチ状に構成されている。
[0006] The partition wall in the dwelling unit as described above,
In the dry floor type construction method shown in FIG. 10, a combination of a lightweight steel frame material and a fire-resistant board is used. In the rolled floor joist floor shown in FIG. 11 and FIG. 12, a column 7 and a stud 8 and a trunk 9 and a plywood veneer 10 are used. It is composed of On the other hand, the water supply and drain pipes laid under the floor are formed with a conveyance path formed by sewing the gaps between the respective components, and the floor heating piping is also configured as a sandwich between the floor plate and the dedicated material on the joist and the floor plate. .

【0007】従来のハウジングシステムの構法における
戸境壁は、当該階の打設済み床上コンクリートスラブの
上に、当該階の柱・梁と共に型枠材で形成し、天井スラ
ブコンクリート(上階床スラブ)と共にコンクリートを
流し込むことによるコンクリート打設方式か、あるいは
前記方式で当該階と上階の床スラブの打設後に工場加工
されたPC版やALC版などを固定金物によって上下ス
ラブに取り付ける乾式構法で構成される。
[0007] The door border wall in the conventional housing system construction method is formed of a form material together with columns and beams of the floor on the cast-in-place concrete slab of the floor, and the ceiling slab concrete (upper floor slab) is formed. ) Together with the concrete pouring method by pouring concrete, or the dry construction method in which a PC plate or ALC plate, etc., which has been factory-processed after the floor slab of the relevant floor and the upper floor is cast by the above method, is fixed to the upper and lower slabs by fixed hardware. Be composed.

【0008】さらに、このような躯体コンクリートなど
による住戸空間の内装間仕切・床は、各々の内装業者に
よって大量生産材を納り寸法に合わせて現場で二次加工
し、間仕切壁→天井→床の順序で施工される。例えば、
乾式置床方式における内装工事においては、前記躯体コ
ンクリート打設後の養成期間を経て型枠材をばらし、間
仕切壁などのスミ出し→床上・床下(天井)スラブへチ
ャンネルの取付け→同チャンネル部へ軽量鉄骨間仕切材
の建て方→軽量天井下地→天井仕上げボード貼→床パネ
ルの敷設・不陸調整→壁仕上げ貼(または塗装)の施工
順序で各内装業者によって施工される。
[0008] Further, the interior partition and floor of the dwelling unit space made of such skeleton concrete and the like are subjected to secondary processing at the site in accordance with the dimensions of mass-produced materials by the respective interior contractors, and the partition wall → ceiling → floor. It is constructed in order. For example,
In the interior construction work using the dry flooring method, the formwork material is separated after the training period after the concrete placement, and the partition walls, etc. are exposed. → The channels are mounted on the slab on the floor and under the floor (ceiling) → Lightweight on the channel. It is constructed by each interior contractor in the order of construction of steel frame partitioning material → lightweight ceiling foundation → ceiling finishing board → floor panel laying / adjusting unevenness → wall finishing pasting (or painting).

【0009】一方、給排水・換気・電気の各設備は、上
記内装工事の流れに沿って、軽量鉄骨間仕切壁の建て方
と軽量天井下地との内装作業の間に天井内換気ダクトの
吊込み、配線、同天井内設備作業の完了後に給排水・冷
暖房(または床暖房)などの配管をし、天井仕上げボー
ド貼の完了時点で換気ギャラリの取付け・接続や照明器
具の取付け・結線が行われ、更に、壁仕上げ貼の内奏工
事の完了時点から衛生器具などの取付け、接続配管など
が各設備の作業者によって順次に施工される。
On the other hand, the water supply / drainage / ventilation / electric facilities are installed in accordance with the flow of the above-mentioned interior construction work by suspending a ventilation duct in the ceiling between the way of constructing the lightweight steel partition wall and the interior work of the lightweight ceiling base. After completing the wiring and equipment work in the ceiling, plumbing such as water supply and drainage, cooling and heating (or floor heating) is performed, and when the ceiling finishing board is pasted, installation and connection of the ventilation gallery and installation and connection of lighting equipment are performed. From the point of completion of the internal finishing work of the wall finishing, installation of sanitary fixtures, connection pipes, and the like are sequentially performed by workers of each facility.

【0010】そして、上記各設備の配管、ダクト、配線
などの天井、床下、壁内の設備搬送ルート・スペースに
ついては、施工図上へ反映されるため、内装仕上げ図を
ベースに衛生・空調・電気の各設備業者が相互に打合せ
をし、限られたルート・スペースの按分、施工上のルー
ルを取り決め、施工図を作成する。
The ceiling, under the floor, and the space for transporting the equipment inside the walls, such as the pipes, ducts, and wiring of the above facilities, are reflected on the construction drawings. Electricity equipment contractors make arrangements with each other, apportion the limited route space and rules for construction, and create construction drawings.

【0011】また、水場廻りは重力排水とする排水方式
により床下設備搬送スペースに応じて住戸内床の凸凹が
発生し、高齢者にとっては転倒などの危険性を含むもの
であった。
[0011] In addition, unevenness of the floor inside the dwelling unit is generated around the water place by a drainage method using gravity drainage depending on the underfloor equipment transport space, and the elderly people may fall over.

【0012】このほか、暖房配管に替わる床暖房配管に
あっては、天井仕上げボード貼と床パネルの敷設との間
で、各設備工事と同様に専門業者によって施工されてい
る。
[0012] In addition, floor heating piping, which replaces heating piping, is installed between a ceiling finishing board and floor panel laying by a specialized company as in the case of each facility.

【0013】[0013]

【発明が解決しようとする課題】以上のように、従来の
ハウジングシステムの構法による戸境壁は、躯体コンク
リート造り、あるいはPC・ALC版とするため、躯体
コンクリート造りでは、型枠の造作・バラシ、養成を必
要とするほか、作業経験・技術のある型枠大工や雑工に
よる人と手間が掛かり、PC・ALC版では型枠大工の
替わりに専門工によって施工しなければならない。
As described above, since the door wall by the conventional housing system construction method is made of a skeleton concrete or a PC / ALC plate, in the case of the skeleton concrete construction, the formwork and variance of the formwork are required. In addition to the need for training, it takes time and effort to work with formwork carpenters and technicians who have work experience and skills, and in the PC / ALC version, construction must be carried out by professional workers instead of formwork carpenters.

【0014】また、戸境壁と同様に、内装工事における
間仕切壁、床においても専門工による人と手間が掛かっ
ていた。さらに、前述の内装間仕切壁、天井、床の作業
の流れにおいては、天井・床・壁の各々の部位ごとに内
装作業と設備作業、さらに、給排水、空調、電気の各設
備作業に先行・同時・後行作業が発生し、いずれの職種
の作業を分断されるばかりか、内装作業の遅れは設備作
業に影響を与え、各設備作業においても同様な様相を呈
する結果となっている。
[0014] Similarly to the door border wall, the partition wall and floor in the interior construction work also require time and labor by specialized workers. Furthermore, in the above-mentioned work flow for interior partition walls, ceilings, and floors, the interior work and equipment work for each part of the ceiling, floor, and wall, as well as the water supply and drainage, air conditioning, and electricity equipment work are performed at the same time. -The following work has occurred, and not only the work of any occupation has been divided, but also the delay of the interior work has affected the equipment work, and each equipment work has a similar appearance.

【0015】つまり、このような順番待ち作業によっ
て、相互に無理・無駄・斑な作業状況を発生させ、その
結果として、遅れを取り戻すために制約時間内に人間を
投入し、いわゆる建設業者の3K(キツイ・キタナイ・
キケン)の1つとなるキツイ作業を強いられている。
[0015] That is, such waiting work causes mutually unreasonable / wasteful / uneven work situations. As a result, humans are thrown in within a limited time in order to catch up the delay. (Kitsui Kitani,
I am forced to work hard, which is one of the key issues.

【0016】加えて、前記戸境壁、間仕切壁について
は、居住者のライフステージ、ライフサイクルへの対応
に対して可変が尽ならず、あたら住宅ストックの質を下
げるか、内装間仕切壁の可変対応には大幅な改修工事が
必要となり、居住者のニーズも実現する上で大きな負担
を強いられている。
[0016] In addition, as for the above-mentioned door boundary walls and partition walls, the variability in responding to the resident's life stage and life cycle is not exhausted. The rehabilitation requires significant renovation work, which places a heavy burden on realizing the needs of residents.

【0017】一方、床下に隠蔽配管・配線される設備床
下搬送経路については、壁・床などの内装下地材を回避
しながら、しかも、狭いスペース内をクロス配管させて
収めている。従って、漏れ・詰まりや管材の経年変化に
よって発生する赤水の発生にあっては、内装の取り壊し
を発生させる改修工事によって対応している。まして、
居住者のライフステージやライフステージの変化に対応
した水場の可変などは内装を取り壊さずに行うことが不
可能であった。
On the other hand, the equipment underfloor transfer route to be concealed piping and wiring under the floor is accommodated by cross piping in a narrow space while avoiding interior base materials such as walls and floors. Therefore, in response to the generation of red water caused by leakage, clogging, and aging of pipe materials, repair work is performed to cause the interior to be demolished. not to mention,
It was impossible to change the life stage of the resident or change the water place in response to changes in the life stage without demolishing the interior.

【0018】この発明は上記のような問題点を解消する
ためになされたもので、戸境壁を始めとして、間仕切壁
や水場廻りの可変を可能にすると共に、それに伴う床下
設備搬送経路に自由に選択でき、かつ、スペースも充分
に確保して居住者のライフスタイル、ライフステージに
対応させ、さらに、高齢社会に向けて高齢者に優しいフ
ルフラット床の住戸空間を任意かつ容易に形成すること
ができる住戸可変ハウジングシステムを提供することを
目的とする。
The present invention has been made in order to solve the above-mentioned problems, and it is possible to change the surroundings of a door, a partition wall and a water area, and to provide a transfer route for underfloor equipment. It can be freely selected and has sufficient space to accommodate the lifestyles and life stages of residents, and furthermore, it is possible to easily and arbitrarily form an elderly-friendly full flat floor dwelling unit space for an aging society. It is an object of the present invention to provide a variable dwelling unit system.

【0019】[0019]

【課題を解決するための手段】この発明に係る可変住戸
ハウジングシステムは、住戸部分にモジュール化された
床基材をグリッド状(格子状)に敷設し、前記グリッド
ライン上に住戸の戸境壁や間仕切壁、水場廻りを自由に
レイアウト可能にし、前記床基材を自由に取り外し当該
部分を設備床下搬送経路にあてて配管経路の自由度と内
装を傷めることなく配管更新性の向上が図れ、加えて前
記床下設備搬送経路の適当な個所にワンタッチ継手内装
の蓋付配管コンセントを設けることで水場の増設をも可
能にするものである。
A variable dwelling unit housing system according to the present invention lays a modular floor substrate on a dwelling unit in a grid pattern (lattice pattern), and places a dwelling unit wall of the dwelling unit on the grid line. And the partition wall, around the water area can be freely laid out, the floor base material can be freely removed and the relevant portion can be placed on the equipment underfloor transfer path to improve the freedom of the pipe path and the pipe renewability without damaging the interior. In addition, by providing a pipe outlet with a lid inside the one-touch joint at an appropriate place on the underfloor equipment transfer route, it is possible to expand the water area.

【0020】[0020]

【作用】この発明における住戸可変ハウジングシステム
の床下地は、床下設備搬送経路に合わせて住宅部分にモ
ジュール化された床基材をグリッド状(格子状)に敷設
し、さらに、各床基材を連結用爪で固定し、各床基材間
の戸境壁、住戸内間仕切壁用の各部材を受けるチャンネ
ル凹状部をグリッドライン上に形成すると共に、設備床
下搬送経路と同床基材の上部凸状平面の略半円状の配管
溝によって床暖房配管経路も一体的に構成する。 さら
に、前記設備床下搬送経路には、将来の水場の増設に備
えて予め予定の位置付近にワンタッチ継手を収納する箱
体の蓋付配管コンセントを設けて、前記配管コンセント
と配管用鞘管をコネクタを介して連結して予備設備搬送
経路をも形成する。
The floor substrate of the variable dwelling unit housing system according to the present invention is constructed by laying a modular floor substrate in a housing portion in a grid shape (lattice shape) in accordance with the underfloor equipment transport route, and further laying down each floor substrate. A channel recessed part that is fixed with a connecting claw and receives each member for a partition wall between floor substrates and a partition wall in a dwelling unit is formed on a grid line, and a transportation path under the equipment floor and an upper part of the same floor substrate. The floor heating piping path is also integrally formed by the substantially semicircular piping groove of the convex flat surface. Further, the underfloor transport path is provided with a boxed pipe outlet with a lid for storing a one-touch joint near a predetermined position in advance in preparation for the expansion of the water site in the future, and the pipe outlet and the pipe sheath pipe are provided. It also connects via a connector to form a spare equipment transport path.

【0021】[0021]

【実施例】以下、この発明の一実施例を図について説明
する。図1はこの発明の一実施例による床基材の斜視
図、図2は図1の断面図である。図において、11は中
空ブロック形状にモジュール化された床基材であり、こ
の床基材11の表面にはグリッド状(格子状)に区切ら
れた複数の凸状部12が一体形成され、これらの凸状部
12のグリッド状の区切部は、図2に示すように床暖房
用配管を収納敷設するための略半円形状の配管溝13と
して形成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a perspective view of a floor substrate according to an embodiment of the present invention, and FIG. 2 is a sectional view of FIG. In the figure, reference numeral 11 denotes a floor base material modularized into a hollow block shape, and a plurality of convex portions 12 partitioned in a grid shape (grid shape) are integrally formed on the surface of the floor base material 11. As shown in FIG. 2, the grid-shaped partition of the convex portion 12 is formed as a substantially semicircular pipe groove 13 for storing and laying a floor heating pipe.

【0022】ここで、前記凸状部12における前記配管
溝13の交叉部のコーナー部は、ワンパス方式などの可
撓性管材による曲げ配管に適合するようにアール状12
aに形成されている。
Here, the corners of the intersections of the pipe grooves 13 in the convex portions 12 are rounded so as to be compatible with a bent pipe made of a flexible pipe material such as a one-pass type.
a.

【0023】そして、前記凸状部12の表面および前記
配管溝13の内面には、アルミシート14(図2参照)
が一連に貼着されている。
An aluminum sheet 14 (see FIG. 2) is provided on the surface of the convex portion 12 and the inner surface of the pipe groove 13.
Are attached in series.

【0024】また、前記床基材11において、前記凸状
部12全体の周辺部廻りは下段面12bとなっており、
かかる下段面12bを有する前記床基材12のコーナー
部には不陸調整用ナット15が垂直方向へ上下8個所に
一体的に設けられている。
In the floor base material 11, a lower surface 12b is formed around the entire periphery of the convex portion 12.
At the corners of the floor base material 12 having the lower step surface 12b, non-adjustment nuts 15 are integrally provided vertically at eight locations in the vertical direction.

【0025】さらに、前記床基材11の凸状部12の周
辺部適当個所には、床基材11相互を連結するための蟻
溝状をなした係合孔16が設けられ、該係合孔16の上
端は前記下段面12bに開口している。
Further, an engaging hole 16 having a dovetail shape for connecting the floor substrates 11 to each other is provided at an appropriate portion around the convex portion 12 of the floor substrate 11. The upper end of the hole 16 is open to the lower step surface 12b.

【0026】図3は床基材の敷設状態を示す断面図であ
り、集合住宅における各住戸内の階床コンクリートスラ
ブ4上に複数の床基材11がグリッド状に隣接敷設され
ている。即ち、集合住宅建物における階床コンクリート
スラブ4と柱4A(図4,図9参照)および天井コンク
リートスラブ4B(図8参照)と梁(図示せず)、なら
びに諸設備のための各階床下共同溝4C(図8参照)と
で構成された躯体空間において、前記柱4A間を長スパ
ンあるいはアンポンドテンド構法として住戸内空間を柱
なしとし、この住戸内空間の階床コンクリートスラブ4
上の全面に複数の床基材11をグリッド状に隣接敷設す
る。
FIG. 3 is a sectional view showing a laid state of the floor base material. A plurality of floor base materials 11 are laid adjacent to each other on a concrete floor slab 4 in each dwelling unit in an apartment house. That is, the floor concrete slab 4 and the pillar 4A (see FIGS. 4 and 9) and the ceiling concrete slab 4B (see FIG. 8) and the beam (not shown) in the apartment building, and each underfloor common groove for various facilities. 4C (see FIG. 8), the interior space of the dwelling unit has no columns by using a long span or unpounded tending method between the columns 4A, and the floor concrete slab 4 of the dwelling space is constructed.
A plurality of floor substrates 11 are laid adjacently on the entire upper surface in a grid shape.

【0027】この状態において、前記床基材11の係合
孔16には、図5および図6に示すように、その上端開
口部からH型蟻状の係合爪17を着脱可能に差込み係合
することによって、隣接する床基材11相互が連結され
ている。
In this state, as shown in FIGS. 5 and 6, an H-shaped dovetail-shaped engaging claw 17 is removably inserted into the engaging hole 16 of the floor base material 11 from its upper end opening. By joining, the adjacent floor substrates 11 are connected to each other.

【0028】このような床基材11相互の連結状態で
は、各床基材11の下段面12b相互によってグリッド
状の凹状部18(図3参照)が形成される。そこで、住
戸内の間仕切りすべき個所の凹状部18を選択し、選択
した個所の凹状部18内には、図8に示す軽量鉄骨間仕
切材21の下端部を受けるためのルーズ長穴付チャネル
19(図3参照)を嵌込む。
In such a state where the floor substrates 11 are connected to each other, a lower portion 12b of each floor substrate 11 forms a grid-shaped concave portion 18 (see FIG. 3). Therefore, a concave portion 18 at a location to be partitioned in the dwelling unit is selected, and a channel 19 with a loose slot for receiving the lower end portion of the lightweight steel partition member 21 shown in FIG. 8 is provided in the concave portion 18 at the selected location. (See FIG. 3).

【0029】そして、床基材11に一体の不陸調整用ナ
ット15と前記チャネル19のルーズ長穴とを合せたの
ち、該ルーズ長穴を介して前記不陸調整用ナット15に
長ボルト20を螺合して緊締することにより、前記チャ
ネル19の固定と前記床基材11の不陸調整を行う。
Then, after the unevenness adjusting nut 15 integrated with the floor base material 11 and the loose long hole of the channel 19 are aligned, a long bolt 20 is attached to the unevenness adjusting nut 15 through the loose long hole. Is screwed and tightened, thereby fixing the channel 19 and adjusting the unevenness of the floor substrate 11.

【0030】次いで、図8に示す天井スラブコンクリー
ト(上階床スラブ)4Aにもアンカーボルト(図示せ
ず)の穿孔をし、天井側チャンネルを取付け固定する。
Next, anchor bolts (not shown) are also drilled in the ceiling slab concrete (upper floor slab) 4A shown in FIG. 8, and the ceiling-side channel is attached and fixed.

【0031】そして、前記床基材11の凹状部18に嵌
込まれたチャンネル19および天井スラブコンクリート
(上階床スラブ)に取付け固定されたチャンネルに軽量
鉄骨間仕切材21を嵌込みセットする。この要領によっ
て、住戸内の間仕切壁21は勿論、住戸の戸境壁22
(図4参照)も取付けられる。
Then, a lightweight steel partitioning member 21 is fitted and set in the channel 19 fitted in the concave portion 18 of the floor base material 11 and the channel fixed to the ceiling slab concrete (upper floor slab). According to this procedure, the partition wall 21 in the dwelling unit as well as the partition wall 21 in the dwelling unit
(See FIG. 4).

【0032】また、図5に示すように、床基材11の敷
設領域間には床下設備搬送経路23が形成される。この
床下設備搬送経路23は、前記床基材11の敷設全域に
おける任意個所の床基材11を取り外すことによって容
易に形成することができる。なお、この場合、居住者の
ライフスタイルやライフステージに応じて任意個所の取
り外し床基材11を再セット可能とするものである。
As shown in FIG. 5, an underfloor equipment transport path 23 is formed between the laying areas of the floor base material 11. The underfloor equipment transport path 23 can be easily formed by removing the floor substrate 11 at an arbitrary position in the entire area where the floor substrate 11 is laid. In this case, the detachable floor base material 11 can be reset at any position according to the lifestyle and the life stage of the resident.

【0033】そして、前記床下設備搬送経路23には、
浴室・圧送式ユニットトイレ・洗面所や台所等の給水・
給湯・圧送排水管等の各種配管24,25,26および
電気配線用ガイド管となる鞘管を敷設する。この場合、
前記床下設備搬送経路23には、居住者のライフスタイ
ルやライフステージに合せた水場の増設プランによっ
て、予備鞘管がコネクタを介して接続される箱型形状の
設備床コンセント27を据え付ける。
In the underfloor equipment transport path 23,
Water supply for bathrooms, pressure-feed unit toilets, washrooms, kitchens, etc.
Various pipes 24, 25, 26 such as hot water supply / pressure drainage pipes and a sheath pipe serving as a guide pipe for electric wiring are laid. in this case,
In the underfloor equipment transport path 23, a box-shaped equipment floor outlet 27 to which a spare sheath pipe is connected via a connector is installed according to a plan for adding a water place according to the lifestyle and life stage of the resident.

【0034】この設備床コンセント27は開閉蓋28を
備えているもので、この設備床コンセント27内には、
前記各種配管24〜26を接続するためのワンタッチ継
手30と、電気配線接続用の電気コンセント33とを組
合せ収納した構成となっている。
The facility floor outlet 27 is provided with an opening / closing lid 28.
A one-touch joint 30 for connecting the various pipes 24 to 26 and an electric outlet 33 for electric wiring connection are combined and housed.

【0035】前記ワンタッチ継手30は、雄継手31と
雌継手32とから成り、前者の雄継手31は接続パイプ
31aの外周に一体突設された係合ピン31bを有し、
且つ後者の雌継手32は、前記係合ピン31bを差し込
むための差込み溝32aと、この差込み溝32aを通過
した前記係合ピン31bを回転させて係合させる回転係
合溝32bとを有する構成となっている。従って、かか
るワンタッチ継手30により、前記各種配管24〜26
を容易に接続配管できる。また、前記電気コンセント3
3には、電気配線のプラグを差し込むことによって、電
気系統配線を容易に行うことができる。
The one-touch joint 30 comprises a male joint 31 and a female joint 32. The former male joint 31 has an engaging pin 31b integrally projecting from the outer periphery of a connection pipe 31a.
The latter female joint 32 has an insertion groove 32a for inserting the engagement pin 31b, and a rotation engagement groove 32b for rotating and engaging the engagement pin 31b passing through the insertion groove 32a. It has become. Therefore, with the one-touch joint 30, the various pipes 24-26 can be used.
Can be easily connected and piped. The electric outlet 3
The electrical wiring can be easily performed by inserting a plug of the electrical wiring into 3.

【0036】なお、前記床基材11の凸状部12間に形
成された配管溝13内には床暖房用配管(図示せず)が
押し嵌め配管される。
A floor heating pipe (not shown) is press-fitted into a pipe groove 13 formed between the convex portions 12 of the floor base material 11.

【0037】以上のようにして、床下地、壁下地および
予備配管を含めた配管と配線等の設備床下搬送経路を完
成させた後は、従来構法によって軽量天井下地→壁仕上
げ貼→床仕上げ貼と配管コンセントのセット→天井照明
の取付け・結線→換気ギャラリの取付け・接続→衛生器
具の取付けおよび前記鞘管内を抽送配管して各種配管・
器具との接続あるいは床暖房用熱源器の取付け、接続配
管や結線がなされる。尚、戸境壁と間仕切壁について
は、仕上げ貼付のユニットパネルとしてもよい。
As described above, after completing the underfloor transport path for the piping and wiring, including the floor underfloor, the wall underfloor, and the preliminary plumbing, the lightweight underfloor base → wall finish → floor finish paste by the conventional construction method. And installation of piping outlets → installation and connection of ceiling lighting → installation and connection of ventilation gallery → installation of sanitary fixtures and extraction piping inside the sheath pipe
Connection with appliances or installation of a floor heating heat source device, connection piping and wiring are performed. It should be noted that the door wall and the partition wall may be unit panels to which finishing is attached.

【0038】[0038]

【発明の効果】以上のように、この発明によれば、柱な
し住戸空間のスラブ全面にモジュール化された床基材を
グリッド状(格子状)に隣接敷設して連結することによ
り、これらの床基材相互の連結部表面に形成されたグリ
ッド状の凹状部に戸境壁や住戸内間仕切壁用の各部材を
任意に嵌合設置できる構成としたので、次にような優れ
た種々の効果が得られる。 (1)従来工法における戸境壁の型枠工事・コンクリー
ト打設・養成および型枠ばらしが省略でき、戸境壁や住
戸内間仕切壁が自由に設置できる。 (2)床基材の敷設に合わせて、予備を含めて設備床下
搬送経路が自由に設定でき、併せて床暖房経路も確保で
きる。 (3)従来方式における間仕切壁などのスミ出し→軽量
鉄骨間仕切壁の建て方→天井内換気ダクトの吊込み・配
線・給排水および冷暖房配管→天井下地→天井ボード貼
→換気ギャラリの取付け・接続・照明器具の取付け・結
線→床パネルの敷設・不陸調整→壁仕上げ貼→永逝器具
の取付け・接続配管などが、床基材の敷設・不りく調整
と鞘管、予備鞘管と配管・コンセントの敷設、取付け・
床暖房配管→軽量間仕切壁の建て方→天井内換気ダクト
の吊込み・配線→天井下地→天井仕上げボード貼→壁仕
上げ貼→床仕上げ貼→換気ギャラリの取付け、接続・照
明器具の取付け、結線→給排水配管、衛生器具の取付
け、接続配管の如く給排水および冷暖房配管作業の先行
工事を無くし、しかも、あらかたの設備作業を天井下地
前に完了させ、天井・壁・床の内装工事を連続的に作業
させるばかりか、住戸内の給排水配管、衛生器具の取付
け、接続にも連続的な作業性を持たせて、同時作業の初
せいによる無理・無駄・斑を省略すると共に、順番待ち
作業とする分散工法によって発生する工数を削減して大
幅な省人化と工期短縮を果たすことができる。 (4)設備配管方式については、給水・給湯・ガス等の
各種配管がマルチヘツダ方式、排水管系統が浴室・トイ
レ・洗面所に対して屎尿破砕圧送装置(実願昭61−9
9675号)と台所流しに対しては厨芥破砕圧送装置
(実願昭61−183582号)による圧送排水方式に
より、各種配管を細径化することができるので、住戸部
分の床をフルフラットさせて老齢者の安全性を高め得る
ほか、前記配管方式によって配管経路の自由度を高め、
さらに、その波及効果から居住者のライフスタイルやラ
イフステージに応じた水場廻りの自由度も飛躍的に向上
するなどの効果がある。
As described above, according to the present invention, modularized floor base materials are laid adjacent to each other on the entire slab of a pillarless dwelling space in a grid-like (lattice-like) manner and connected. Since each member for the door boundary wall or the partition wall in the dwelling unit can be arbitrarily fitted and installed in the grid-shaped concave portion formed on the surface of the connecting portion between the floor base materials, the following excellent various The effect is obtained. (1) Formwork, concrete casting, training and separation of the formwork of the border wall in the conventional construction method can be omitted, and the border wall and the partition wall in the dwelling unit can be freely installed. (2) In accordance with the laying of the floor base material, the underfloor transport route including the spare can be freely set, and the floor heating route can be secured at the same time. (3) Sumi out of partition walls in the conventional method → How to build a lightweight steel partition wall → Hanging / wiring / supply / drainage of ventilation ducts in the ceiling and cooling / heating piping in the ceiling → Ceiling base → Paste ceiling board → Installation and connection of ventilation gallery Installation and connection of lighting equipment → Floor panel laying and unevenness adjustment → Wall finishing sticking → Installation and connection piping of eternal fixtures, etc. Laying and installing outlets
Floor heating piping → How to build a lightweight partition wall → Hanging and wiring of ventilation ducts in the ceiling → Ceiling base → Paste ceiling finish board → Wall finish paste → Floor finish paste → Installation of ventilation gallery, installation and connection of lighting equipment, wiring → Eliminate the prior work of plumbing and cooling / heating piping work such as plumbing and plumbing, installation of sanitary fixtures, and connection plumbing.Moreover, complete new equipment work before the ceiling foundation and continuously perform interior work on ceilings, walls and floors. In addition to the work, the installation and connection of plumbing pipes and sanitary fixtures in the dwelling unit have continuous workability, eliminating unnecessary, wasteful and uneven spots due to the first time of simultaneous work, and making the work waiting in order. The man-hours required by the distributed method can be reduced, thereby achieving significant labor savings and a shortened construction period. (4) Regarding the equipment piping method, various pipes for water supply, hot water supply, gas, etc. are multi-header type, and the drainage pipe system is a human waste crushing / pumping device for bathrooms, toilets, and washrooms (Mitsugan Sho 61-9).
No. 9675) and the kitchen sink can be reduced in diameter by using a pumping and draining system using a garbage crushing / pumping device (Japanese Utility Model Application No. 61-183852), so that the floor of the dwelling unit can be fully flattened. In addition to being able to enhance the safety of the elderly, the piping system increases the flexibility of the piping route,
Furthermore, the ripple effect has the effect of dramatically improving the degree of freedom around the water area according to the resident's lifestyle and life stage.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の一実施例による床基材の斜視図であ
る。
FIG. 1 is a perspective view of a floor substrate according to an embodiment of the present invention.

【図2】図1の断面図である。FIG. 2 is a sectional view of FIG.

【図3】図1および図2の床基材の隣接敷設状態を示す
断面図である。
FIG. 3 is a cross-sectional view showing a state in which the floor substrates of FIGS. 1 and 2 are laid adjacent to each other.

【図4】住戸内の床基材敷設図である。FIG. 4 is a diagram showing floor laying in a dwelling unit.

【図5】床基材の敷設および床下設備搬送経路と配管コ
ンセントの納り状態を示す斜視図である。
FIG. 5 is a perspective view showing a laying state of a floor base material, a transfer route of an underfloor facility, and a receiving state of a pipe outlet;

【図6】図5における床基材相互の連結部を拡大して示
す斜視図である。
FIG. 6 is an enlarged perspective view showing a connecting portion between floor substrates in FIG. 5;

【図7】ワンタッチ継手の分解斜視図である。FIG. 7 is an exploded perspective view of a one-touch joint.

【図8】床基材に間仕切壁を取付けセットした状態の断
面図である。
FIG. 8 is a sectional view showing a state in which a partition wall is attached to and set on a floor base material.

【図9】別の住戸内の床基材敷設図である。FIG. 9 is a floor substrate laying diagram in another dwelling unit.

【図10】従来の乾式置床を示す構成説明図である。FIG. 10 is a configuration explanatory view showing a conventional dry-type floor placement.

【図11】従来のころばし根太組床を示す構成説明図で
ある。
FIG. 11 is a configuration explanatory view showing a conventional roller joist floor.

【図12】従来のころばし根太床の壁の構成を示し斜視
図である。
FIG. 12 is a perspective view showing a configuration of a wall of a conventional roller joist floor.

【符号の説明】[Explanation of symbols]

11 床基材 12 凸状部 12a アール状部分 12b 下段面 13 床暖房用配管溝 14 アルミシート 15 不陸調整用ナット 16 係合孔 17 係合爪 18 凹状部 19 チャネル 21 軽量鉄骨間仕切材 22 戸境壁 23 床下設備搬送経路 24 配管 25 配管 26 配管 DESCRIPTION OF SYMBOLS 11 Floor base material 12 Convex part 12a R-shaped part 12b Lower surface 13 Floor heating piping groove 14 Aluminum sheet 15 Non-adjustment nut 16 Engagement hole 17 Engagement claw 18 Concave part 19 Channel 21 Lightweight steel partition member 22 Door Boundary wall 23 Underfloor equipment transport route 24 Piping 25 Piping 26 Piping

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 集合住宅建物の躯体空間内の床面にブロ
ック形状の複数の床基材をグリッド状に隣接敷設して連
結することにより、該床基材相互の連結部表面にグリッ
ド状の凹状部を形成し、この凹状部に住戸区画用の戸境
壁や住戸内仕切壁を任意に嵌合設置できるようにしたこ
とを特徴とする住戸可変ハウジングシステム。
1. A plurality of block-shaped floor base materials are laid adjacent to each other in a grid shape on the floor surface in the skeleton space of an apartment building and connected to each other, so that a grid-like surface is formed on the connection portion between the floor base materials. A variable dwelling unit system, wherein a concave portion is formed, and a partition wall for a dwelling unit or a partition wall in a dwelling unit can be arbitrarily fitted and installed in the concave portion.
【請求項2】 前記床基材相互の連結部表面に形成され
たグリッド状の凹状部には、そのグリッドライン上に位
置して軽量鉄骨間仕切材を受けるためのルーズ長穴付の
チャンネルが嵌込まれ、そのルーズ長穴を介して前記ナ
ットに長ボルトが螺合され、これによって前記チャンネ
ルの固定および床基材の不陸調整が同時に行えるように
構成されていることを特徴とする請求項1記載の住戸可
変ハウジングシステム。
2. A channel having a loose long hole for receiving a lightweight steel frame partition member located on the grid line is fitted in a grid-shaped concave portion formed on the surface of the connecting portion between the floor substrates. The nut is screwed into the nut through the loose long hole, so that the channel can be fixed and the irregularity of the floor substrate can be adjusted at the same time. 2. The dwelling unit variable housing system according to 1.
【請求項3】 前記床基材は、表面がグリッド状に区切
られた凸状部を一体に有するモジュール化された構成と
なっていることを特徴とする請求項1または2記載の住
戸可変ハウジングシステム。
3. The variable dwelling unit housing according to claim 1, wherein the floor base material has a modularized structure integrally having a convex portion whose surface is partitioned in a grid shape. system.
【請求項4】 前記床基材の凸状部表面には、床暖房用
配管を収納敷設するための配管溝が形成され、この配管
溝はワンパス方式などの可撓性管材による曲げ配管に適
合するようアール状に形成され、且つ、前記凸状部表面
および前記配管溝の内面にはアルミシートが一連に貼着
されていることを特徴とする請求項2または3記載の住
戸可変ハウジングシステム。
4. A pipe groove for accommodating and laying a floor heating pipe is formed on the surface of the convex portion of the floor base material, and the pipe groove is adapted to a bending pipe made of a flexible pipe material such as a one-pass type. The variable dwelling unit system according to claim 2 or 3, wherein an aluminum sheet is formed on the surface of the convex portion and the inner surface of the pipe groove in a series.
【請求項5】 前記床基材の周辺部適当個所には、該床
基材相互を連結するための係合孔が形成され、この係合
孔は前記床基材における前記凸状部全体の周辺廻りの下
段面に上端が開口し、該上端開口部から前記係合孔内に
前記床基材相互の跨る係合爪が着脱可能に差込み係合さ
れて前記床基材相互が連結され、且つ、該床基材の周辺
廻りの各コーナー部には軽量鉄骨間仕切材の受け固定お
よび床基材敷設時に発生する不陸調整用ナットが垂直方
向へ一体的に設けられていることを特徴とする請求項2
〜4いずれか1記載の住戸可変ハウジングシステム。
5. An engaging hole for connecting the floor substrates to each other is formed at an appropriate position in a peripheral portion of the floor substrate, and the engaging hole is formed in the entire convex portion of the floor substrate. The upper end is opened at the lower step surface around the periphery, and the floor base members are connected to each other by detachably inserting and engaging the engaging claws between the floor base members into the engagement holes from the upper end openings, Further, at each corner around the periphery of the floor base material, a nut for adjusting unevenness generated at the time of receiving and fixing the lightweight steel partition member and laying the floor base material is integrally provided in a vertical direction. Claim 2
5. The variable dwelling unit housing system according to any one of items 1-4.
JP04337873A 1992-11-26 1992-11-26 Dwelling unit variable housing system Expired - Fee Related JP3140229B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04337873A JP3140229B2 (en) 1992-11-26 1992-11-26 Dwelling unit variable housing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04337873A JP3140229B2 (en) 1992-11-26 1992-11-26 Dwelling unit variable housing system

Publications (2)

Publication Number Publication Date
JPH06158878A JPH06158878A (en) 1994-06-07
JP3140229B2 true JP3140229B2 (en) 2001-03-05

Family

ID=18312797

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04337873A Expired - Fee Related JP3140229B2 (en) 1992-11-26 1992-11-26 Dwelling unit variable housing system

Country Status (1)

Country Link
JP (1) JP3140229B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006097434A (en) * 2004-09-30 2006-04-13 Kumahira Safe Co Inc Automatic safe-deposit box system
EP3311709A1 (en) * 2016-10-21 2018-04-25 Bulthaup GmbH & Co. KG Furniture system made of construction elements

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594531B (en) * 2015-01-19 2016-08-24 北京振利节能环保科技股份有限公司 A kind of modular lightweight band muscle partition wall and construction method thereof
JP6987565B2 (en) * 2017-08-02 2022-01-05 株式会社竹中工務店 Room unit structure
CN111608360A (en) * 2020-06-23 2020-09-01 田东海 Assembly decoration system and ground system thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006097434A (en) * 2004-09-30 2006-04-13 Kumahira Safe Co Inc Automatic safe-deposit box system
EP3311709A1 (en) * 2016-10-21 2018-04-25 Bulthaup GmbH & Co. KG Furniture system made of construction elements

Also Published As

Publication number Publication date
JPH06158878A (en) 1994-06-07

Similar Documents

Publication Publication Date Title
US7765745B2 (en) Reusable worker housing and methods relating thereto
US2168725A (en) Building construction
US4919164A (en) Method of installing piping, ducts and conduits in a prefabricated framed wall for a building structure and partition made thereby
EP1682730B1 (en) Construction industry pods
EP3889374B1 (en) Method for constructing buildings
CA1282570C (en) Building system for multi-storey buildings
JPH0660524B2 (en) Floor structure and method of arranging partitions and wiring
JP3140229B2 (en) Dwelling unit variable housing system
JPS6019181Y2 (en) Shower room installation structure
AU2011201797B2 (en) Prefabricated Room Assembly
JP6775138B2 (en) Building unit
TWI783442B (en) Hygiene unit structure and method for implementing same
JPH06158879A (en) Dwelling unit variable housing system
JP2005076282A (en) Indoor construction method including wiring work
JPS6241008B2 (en)
JP3004619U (en) Temporary sanitary unit
JP2001123681A (en) Unit type kitchen and sanitary space facility
JPH08218654A (en) Temporary house and method of building the same
JPH10311050A (en) Underground living room of dwelling house
JP2001193287A (en) Remodeling method for framework building
JPH0913576A (en) Toilet pc panel and executing method therefor
JPH08312168A (en) Unitized multiple dwelling house and method of construction thereof
CA2514436A1 (en) Reusable worker housing and methods relating thereto
JP2001098679A (en) Structure of ceiling and partition wall
JPH0562605U (en) Room waterproof compartment structure

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20001107

LAPS Cancellation because of no payment of annual fees