JPH0234298Y2 - - Google Patents

Info

Publication number
JPH0234298Y2
JPH0234298Y2 JP1983201144U JP20114483U JPH0234298Y2 JP H0234298 Y2 JPH0234298 Y2 JP H0234298Y2 JP 1983201144 U JP1983201144 U JP 1983201144U JP 20114483 U JP20114483 U JP 20114483U JP H0234298 Y2 JPH0234298 Y2 JP H0234298Y2
Authority
JP
Japan
Prior art keywords
toilet
floor
case
japanese
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1983201144U
Other languages
Japanese (ja)
Other versions
JPS60111969U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP20114483U priority Critical patent/JPS60111969U/en
Publication of JPS60111969U publication Critical patent/JPS60111969U/en
Application granted granted Critical
Publication of JPH0234298Y2 publication Critical patent/JPH0234298Y2/ja
Granted legal-status Critical Current

Links

Description

【考案の詳細な説明】[Detailed explanation of the idea] 【産業上の利用分野】[Industrial application field]

本考案は、平坦なコンクリートスラブ上に和風
便器を所謂乾式工法で施工する際に用いる和風便
器ユニツトに関する。
The present invention relates to a Japanese-style toilet unit used when constructing a Japanese-style toilet on a flat concrete slab using a so-called dry construction method.

【従来の技術】[Conventional technology]

従来、和風便器を設置する工法としては、湿式
工法と乾式工法とがある。 湿式工法にあつては、第1図に示す如く、先
ず、コンクリート打設時に型枠(図示せず)上へ
便器スペース確保用の箱入れをし、コンクリート
スラブ1に和風便器2を挿入するための嵌挿孔3
を穿設している。そして、該嵌挿孔3の周囲に支
えブロツク4を配置して和風便器2を嵌合配置
し、然る後にコンクリートスラブ1上へ防水層5
等を設けて給水管6を配管接続し、その後所定の
コンクリート層7、タイル8等を設けている。 また乾式工法にあつては、第2図a,bに示す
如く、コンクリートスラブ1に和風便器2を設置
するための開口部10を凹設し、該開口部10に
給・排水管6,9を配置した後、プレート11を
開口部10の上部に掛止させ、該プレート11の
便器取付け孔12に和風便器2を取付けるように
している。
Conventionally, there are two methods for installing Japanese-style toilets: a wet method and a dry method. In the wet method, as shown in Figure 1, first, when pouring concrete, a box is placed on top of the formwork (not shown) to secure space for the toilet, and then a Japanese-style toilet 2 is inserted into the concrete slab 1. insertion hole 3
is installed. Then, a support block 4 is arranged around the fitting hole 3, a Japanese-style toilet bowl 2 is fitted and arranged, and then a waterproof layer 5 is placed on the concrete slab 1.
etc. are provided to connect the water supply pipe 6, and then a predetermined concrete layer 7, tiles 8, etc. are provided. In addition, in the case of the dry construction method, as shown in Fig. 2a and b, an opening 10 for installing a Japanese-style toilet 2 is recessed in the concrete slab 1, and the supply/drainage pipes 6, 9 are inserted into the opening 10. After arranging the plate 11, the plate 11 is hung on the upper part of the opening 10, and the Japanese style toilet 2 is attached to the toilet attachment hole 12 of the plate 11.

【考案が解決しようとする課題】[Problem that the idea aims to solve]

ところが、上記従来の湿式工法にあつては、コ
ンクリートスラブ1に嵌挿孔3を穿設しているの
で、階下との防火区画は不完全となり、火災の延
焼等が起る虞があつた。またコンクリートスラブ
1に予め設けた嵌挿孔3へ和風便器2を取付ける
構成なので、トイレ室の改造等の場合にそのレイ
アウトを変更することができなかつた。またコン
クリートスラブ1に嵌挿孔3を形成する建築工事
と該嵌挿孔3に和風便器2を設置する設備工事と
は、別々に行なう必要があり、しかも両工事の業
者間で綿密な打ち合わせをしなければならなかつ
た。このため、連絡が悪いと工期が長引くことが
あり、また、トラブルが発生することがあつた。
それに、排水管9は、コンクリートスラブ1と階
下の天井(図示せず)との間に配管する必要があ
り、そのスペース分(およそ600〜700mm)だけ階
高が高くなつて建築コストが嵩むという欠点があ
つた。更に、和風便器2はその大部分がスラブ下
であり、しかも配管は前述の如くコンクリートス
ラブ1と階下天井との間に設置されるので、メン
テナンス、配管の取替え等に際しては大工事とな
る欠点があつた。 前記従来の乾式工法にあつては、コンクリート
スラブ1に嵌挿孔3を穿設する必要がないので、
階下の火災が上階に伝わるということがなく、完
全な防火区画を形成することが出来ると共に、建
築工事と設備工事との綿密な打ち合せも不要で、
両業者間のトラブルを避けることが可能ではあ
る。然しながら、開口部10は階下天井との間へ
凹設する必要があるので、前記湿式工法同様に階
高が高くなる欠点がある。また開口部10は、建
築工事をもつて形成されるので、和風便器2のレ
イアウトを変更することも不可能である。更にこ
の乾式工法にあつては、プレート11に点検孔1
3を設けてメンテナンス性をある程度良くするこ
とが可能であるが、給・排水管6,9が開口部1
0の便器2よりも下方にあるので、やはりメンテ
ナンス及び取替え等に際しては、大掛りな工事と
なつていた。 要するに従来の湿式及び乾式工法では、満足で
きる和風便器の取付けが出来ないものであつた。 本考案は、上記問題点を解決するために、平坦
なコンクリートスラブ上に乾式工法で和風便器を
設置することができるものであつて、殊にコンク
リートスラブ上からトイレ室床面までの上下スペ
ース(以下、「床下スペース」という)を非常に
低いものとしながら且つ該床下スペースで行なう
配管等の設備工事が簡単にできる和風便器ユニツ
トの提供を目的とする。
However, in the above-mentioned conventional wet construction method, since the insertion holes 3 are bored in the concrete slab 1, the fireproof division from the downstairs is incomplete, and there is a risk that a fire may spread. Furthermore, since the Japanese-style toilet bowl 2 is attached to a fitting hole 3 previously provided in the concrete slab 1, the layout cannot be changed when the toilet room is remodeled or the like. Furthermore, the construction work to form the insertion hole 3 in the concrete slab 1 and the equipment work to install the Japanese-style toilet bowl 2 in the insertion hole 3 need to be carried out separately, and detailed discussions must be held between the contractors for both works. I had to. For this reason, poor communication could prolong the construction period and cause problems.
In addition, the drain pipe 9 needs to be installed between the concrete slab 1 and the ceiling (not shown) on the floor below, which increases the floor height by the space required (approximately 600 to 700 mm), which increases construction costs. There were flaws. Furthermore, most of the Japanese-style toilet 2 is located under the slab, and as mentioned above, the piping is installed between the concrete slab 1 and the ceiling of the floor below, so maintenance, replacement of the piping, etc. requires major construction work. It was hot. In the conventional dry construction method, there is no need to drill holes 3 in the concrete slab 1.
A fire on the floor below does not spread to the upper floor, making it possible to create a complete fireproof zone, and eliminating the need for detailed discussions between building work and equipment work.
It is possible to avoid trouble between the two companies. However, since the opening 10 needs to be recessed between the floor and the ceiling, there is a drawback that the floor height becomes high, similar to the wet construction method. Further, since the opening 10 is formed through construction work, it is also impossible to change the layout of the Japanese-style toilet bowl 2. Furthermore, in this dry construction method, an inspection hole 1 is provided in the plate 11.
Although it is possible to improve maintenance to some extent by providing openings 1 and 3, the supply/drainage pipes 6 and 9 are
Since it is located below toilet bowl 2, maintenance and replacement would be a major undertaking. In short, conventional wet and dry construction methods have not been able to install satisfactory Japanese-style toilets. In order to solve the above-mentioned problems, the present invention allows a Japanese-style toilet to be installed on a flat concrete slab using a dry construction method. The purpose of the present invention is to provide a Japanese-style toilet unit that has a very low space (hereinafter referred to as "underfloor space") and allows equipment work such as piping to be easily performed in the underfloor space.

【課題を解決するための手段】[Means to solve the problem]

上記課題を解決するたの本考案の要旨は、平坦
なコンクリートスラブ上に取付けられるものであ
つて、内部に給水管、排水管、通気管等を組込ん
だ配管ケースと、該コンクリートスラブ上におい
て配管ケースに隣接させて取付けられるものであ
つて、上面の床面に便器挿入孔を開設した床ケー
スと、便器挿入孔を介して床ケース内に下半部を
挿入した和風便器とを備え、和風便器は、便器使
用者と対面する便器長手方向の前方側寄りを配管
ケースに対向させて配置すると共に、この前方側
寄りの上面に給水口を設け、更に給水口と同一側
の下半部における便器長手方向の前端部よりその
延長方向に略々水平に排水口を設け、和風便器の
給水口と前記給水管とは、直接または床ケース内
を介して給水接続管で接続し、和風便器の排水口
と前記排水管とは、床ケース内を介して排水接続
管で接続し、床ケースは、排水接続管の上方に位
置する床面部位に、蓋付き点検口を設けたことで
ある。
The gist of the present invention for solving the above problems is to provide a piping case that is installed on a flat concrete slab and that incorporates a water supply pipe, a drainage pipe, a ventilation pipe, etc. on the concrete slab. It is installed adjacent to the piping case, and includes a floor case with a toilet insertion hole in the upper floor surface, and a Japanese-style toilet with the lower half inserted into the floor case through the toilet insertion hole, Japanese-style toilets are arranged so that the front side of the toilet in the longitudinal direction facing the toilet user faces the piping case, and a water inlet is provided on the upper surface of this front side, and the lower half of the toilet is located on the same side as the water inlet. A drain port is provided approximately horizontally in the extending direction from the front end in the longitudinal direction of the toilet, and the water supply port of the Japanese-style toilet and the water supply pipe are connected by a water supply connection pipe either directly or through the floor case. The drain port and the drain pipe are connected by a drain connecting pipe through the inside of the floor case, and the floor case is provided with an inspection port with a lid on the floor area located above the drain connecting pipe. .

【作用】[Effect]

配管ケース及び床ケースは、コンクリートスラ
ブ上に取付けられると、トイレ室内の内側面と床
面とを形成する。 和風便器は、床ケース内に挿入された下半部の
便器長手方向の前端部よりその延長方向に略々水
平に便器排水口を設けてあるので、下半部の高さ
が低くなる。更に、和風便器は、便器使用者と対
面する便器長手方向の前方側寄りを配管ケースに
対向させて配置すると共に、この前方側寄りの上
面に給水口を設け、更に給水口と同一側の下半部
における便器長手方向の前端部よりその延長方向
に略々水平に排水口を設けてあるので、給水口及
び排水口と、配管ケースに組込んだ対応する給水
管及び排水管との距離が短くなる。 排水接続管の上方に位置する床面部位に、蓋付
き点検口を設けてあるので、和風便器の排水口と
排水管とを排水接続管で接続する際には、点検口
を介して接続作業を行なうことができる。 和風便器の排水口と前記排水管とを床ケース内
を介して排水接続管で接続してあるので、排水接
続管等は、便器使用者の目にふれるトイレ室内に
露出することがない。
When installed on the concrete slab, the piping case and floor case form the interior surface and floor surface of the toilet compartment. In Japanese-style toilets, the height of the lower half is low because the toilet drain is provided approximately horizontally in the extending direction from the front end in the longitudinal direction of the toilet in the lower half inserted into the floor case. Furthermore, Japanese-style toilets are arranged so that the front side of the toilet in the longitudinal direction facing the toilet user faces the piping case, and a water inlet is provided on the upper surface of this front side, and a water inlet is provided at the bottom on the same side as the water inlet. Since the drain port is provided approximately horizontally in the extending direction from the front end of the toilet in the longitudinal direction in the half part, the distance between the water supply port and drain port and the corresponding water supply pipe and drain pipe incorporated in the piping case is Becomes shorter. An inspection port with a lid is provided on the floor above the drain connection pipe, so when connecting the drain port of a Japanese-style toilet and the drain pipe with the drain connection pipe, connect through the inspection port. can be done. Since the drain port of the Japanese-style toilet bowl and the drain pipe are connected by the drain connection pipe through the interior of the floor case, the drain connection pipe etc. are not exposed in the toilet room where the toilet user can see them.

【実施例】【Example】

以下、本考案に係る和風便器ユニツト(以下、
「本案ユニツト」という)を実施例の側面を示す
第3図及びユニツトを上方から見た第4図に基づ
いて説明する。 配管ケース16は、内部に給水管17、排水管
18及び通気管19等が組込まれ、壁面20に沿
つてコンクリートスラブ21上に載置され、アン
カーボルト等適当な手段にて固定される。配管ケ
ース16は、前面を前面パネル34で覆うと共
に、上面を天板35で覆つてある。 床ケース22は、コンクリートスラブ21上
に、配管ケース16に隣接させて固定される。床
ケース22と配管ケース16とは、ボルト等にて
連結固定する。床ケース22の床面を形成する床
パネル23は、石綿セメント板の表面にタイル貼
り等にて化粧したものである。この床パネル23
は、便器挿入孔24と、便器挿入孔24と配管ケ
ース16との間に開設され、床ケース22内にお
ける給排水接続部の点検等をするための蓋付き点
検口25とを備え、更に必要に応じて給水配管用
の孔28とを備えている。床パネル23は、便器
挿入孔24に和風便器26の下半部26bを挿入
した後、床ケース枠体22aに接着又はビス止め
等適当な手段で固定される。 和風便器26は、便器使用者と対面する便器長
手方向の前方側寄り26aを配管ケース16に対
向させた状態で床ケース22に取付けられる。和
風便器26は、リム29上縁より上方で前方寄り
26aの上面に給水口30を設けると共に、リム
19上縁ツバ部より下方にて給水口30と同一側
の便器長手方向の前端部よりその延長方向に略々
水平に排水口31を設けてある。 和風便器26の給水口30と配管ケース16に
組込まれた給水管17との間の配管は、給水口3
0に接続したフラツシユバルブ等の給水器具(図
示は省略)と床ケース22内に配した給水配管2
7とを床パネル23の孔28を介して接続すると
共に、この給水配管27と給水管17から分岐し
た給水接続管33とを接続して行なう。この給水
配管27と給水管17から分岐した給水接続管3
3との接続作業は、床パネル23の点検口25を
利用して行なう。なお、和風便器26の給水口3
0と配管ケース16に組込まれた給水管17との
接続は、床ケース22内の給水配管27を用いる
ことなく、図示は省略したが、トイレ室内Rに露
出した接続管を用いて直接に接続することもあ
る。和風便器26の排水口31と配管ケース16
に組込まれた排水管18との間の配管は、排水管
18から床ケース22内に分岐した排水接続管3
2を和風便器26の排水口31に接続して行な
う。この排水接続管32と排水口31との接続作
業は、床パネル23の点検口25を利用して行な
う。
Below, the Japanese-style toilet unit (hereinafter referred to as
The "proposed unit") will be explained based on FIG. 3, which shows a side view of the embodiment, and FIG. 4, which shows the unit from above. The piping case 16 has a water supply pipe 17, a drain pipe 18, a ventilation pipe 19, etc. built therein, is placed on a concrete slab 21 along a wall surface 20, and is fixed with appropriate means such as anchor bolts. The piping case 16 has a front surface covered with a front panel 34 and an upper surface covered with a top plate 35. The floor case 22 is fixed on the concrete slab 21 adjacent to the piping case 16. The floor case 22 and the piping case 16 are connected and fixed with bolts or the like. The floor panel 23 forming the floor surface of the floor case 22 is made of an asbestos cement board decorated with tiles or the like. This floor panel 23
is provided with a toilet insertion hole 24 and an inspection port 25 with a lid, which is opened between the toilet insertion hole 24 and the piping case 16, and for inspecting the water supply and drainage connection in the floor case 22, and furthermore, as necessary. Accordingly, a hole 28 for water supply piping is provided. After the lower half 26b of the Japanese-style toilet 26 is inserted into the toilet insertion hole 24, the floor panel 23 is fixed to the floor case frame 22a by adhesive, screws, or other suitable means. The Japanese-style toilet 26 is attached to the floor case 22 with the front side 26a in the longitudinal direction of the toilet facing the toilet user facing the piping case 16. The Japanese-style toilet 26 has a water supply port 30 on the upper surface of the front side 26a above the upper edge of the rim 29, and a water supply port 30 located below the upper edge brim of the rim 19 from the front end in the longitudinal direction of the toilet on the same side as the water supply port 30. A drain port 31 is provided substantially horizontally in the extension direction. The piping between the water supply port 30 of the Japanese-style toilet 26 and the water supply pipe 17 incorporated in the piping case 16 is connected to the water supply port 3
Water supply equipment such as a flush valve (not shown) connected to the water supply pipe 2 arranged in the floor case 22
7 through the hole 28 of the floor panel 23, and this water supply pipe 27 is connected to a water supply connecting pipe 33 branched from the water supply pipe 17. This water supply pipe 27 and a water supply connection pipe 3 branched from the water supply pipe 17
The connection work with 3 is performed using the inspection hole 25 in the floor panel 23. In addition, the water supply port 3 of the Japanese-style toilet 26
0 and the water supply pipe 17 built into the piping case 16 are directly connected using a connecting pipe exposed in the toilet room R, although not shown, without using the water supply pipe 27 inside the floor case 22. Sometimes I do. Drain port 31 of Japanese-style toilet 26 and piping case 16
The piping between the drain pipe 18 incorporated in the drain pipe 18 and the drain pipe 18 is a drain connecting pipe 3 branched from the drain pipe 18 into the floor case 22.
2 is connected to the drain port 31 of the Japanese-style toilet bowl 26. The connection between the drain connection pipe 32 and the drain port 31 is performed using the inspection hole 25 in the floor panel 23.

【考案の効果】[Effect of the idea]

以上詳述の如く、本案ユニツトは、次の如き実
用的効果を有する。 全ての工事をコンクリートスラブ上にて行な
え、しかも乾式工法なので施工が容易である。 全ての工事を平坦なコンクリートスラブ上に
て行なえるので、和風便器のレイアウトの変更
等に対して容易に対応できる。 全ての工事を平坦なコンクリートスラブ上に
て行なえるので、従来不完全になりがちな和風
便器設置箇所における防火区画の問題を解決で
き、たとえ階下で火災が発生しても上階へ延焼
することが無い。 コンクリートスラブを貫通させることなく和
風便器が設置できるので、階下へ漏水すること
はない。 床ケース内における排水管との取り合いを含
めた和風便器の必要収納高さ寸法を300mm程度
と小さくできると共に、全ての工事が平坦なコ
ンクリートスラブ上にて行なえるので、和風便
器設置に要する床下スペースを従来必要とした
寸法(600〜700mm)の約半分にまで大幅に小さ
くできる。その結果、本案ユニツトは、その分
だけ建物の階高を節約でき、建築コストの飛躍
的な低減が可能となる。 和風便器は、便器長手方向の前方側寄りを配
管ケースに対向させ且つ前方側寄りに給水口及
び排水口を設けてあるので、給水口及び排水口
から配管ケースに組込んだ対応する給水管及び
排水管までの距離が短くなると共にベンド配管
箇所を少なくすることが可能となる。その結
果、本案ユニツトは、配管工事及び保守点検が
簡単となる。 排水接続管の上方に位置する床面部位に蓋付
き点検口を設けてあるので、点検口を介して和
風便器の配管作業が行なうことができる。その
結果、本案ユニツトは、配管工事及び保守点検
が簡単となる。
As detailed above, the present unit has the following practical effects. All construction work can be done on concrete slabs, and the dry construction method makes construction easy. Since all construction work can be done on a flat concrete slab, changes in the layout of the Japanese-style toilet can be easily accommodated. Since all construction work can be carried out on a flat concrete slab, it is possible to solve the problem of fire protection compartments where Japanese-style toilets are installed, which tends to be incomplete in the past, and even if a fire breaks out downstairs, it will not spread to the upper floors. There is no A Japanese-style toilet can be installed without penetrating the concrete slab, so there is no chance of water leaking downstairs. The required storage height of the Japanese-style toilet, including the connection with the drain pipe in the floor case, can be reduced to approximately 300 mm, and all construction work can be done on a flat concrete slab, reducing the under-floor space required to install the Japanese-style toilet. The size can be significantly reduced to about half of the conventionally required size (600 to 700 mm). As a result, the proposed unit can save the floor height of the building by that much, making it possible to dramatically reduce construction costs. In a Japanese-style toilet, the front side in the longitudinal direction of the toilet faces the piping case, and the water supply port and drain port are provided on the front side. The distance to the drain pipe becomes shorter and the number of bend piping points can be reduced. As a result, the proposed unit simplifies piping work and maintenance inspection. Since an inspection port with a lid is provided on the floor above the drain connection pipe, piping work for the Japanese-style toilet can be performed through the inspection port. As a result, the proposed unit simplifies piping work and maintenance inspection.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来の湿式工法により和風便器を設置
した場合の縦断面図、第2図a,bは従来の乾式
工法により和風便器を設置した状態を示すもので
あつて、同図aは便器後方から正視した図、同図
bは断面斜視図、第3図及び第4図は本案ユニツ
トを施工した状態を示すものであつて、第3図は
側面図、第4図はユニツトを上方から見た図であ
る。 16……配管ケース、17……給水管、18…
…排水管、19……通気管、21……コンクリー
トスラブ、22……床ケース、24……便器挿入
孔、25……点検口、26……和風便器、26a
……前方側寄り、30……給水口、31……排水
口。
Figure 1 is a vertical cross-sectional view of a Japanese-style toilet installed using the conventional wet method, and Figures 2 a and b show a Japanese-style toilet installed using the conventional dry method. Figure b is a cross-sectional perspective view, Figure 3 is a side view of the proposed unit, and Figure 4 is a side view of the unit, and Figure 4 is a view of the unit from above. This is the view. 16... Piping case, 17... Water supply pipe, 18...
... Drain pipe, 19 ... Ventilation pipe, 21 ... Concrete slab, 22 ... Floor case, 24 ... Toilet insertion hole, 25 ... Inspection port, 26 ... Japanese-style toilet, 26a
... Near the front side, 30 ... Water supply port, 31 ... Drain port.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 平坦なコンクリートスラブ上に取付けられるも
のであつて、内部に給水管、排水管、通気管等を
組込んだ配管ケースと、該コンクリートスラブ上
において配管ケースに隣接させて取付けられるも
のであつて、上面の床面に便器挿入孔を開設した
床ケースと、便器挿入孔を介して床ケース内に下
半部を挿入した和風便器とを備え、和風便器は、
便器使用者と対面する便器長手方向の前方側寄り
を配管ケースに対向させて配置すると共に、この
前方側寄りの上面に給水口を設け、更に給水口と
同一側の下半部における便器長手方向の前端部よ
りその延長方向に略々水平に排水口を設け、和風
便器の給水口と前記給水管とは、直接または床ケ
ース内を介して給水接続管で接続し、和風便器の
排水口と前記排水管とは、床ケース内を介して排
水接続管で接続し、床ケースは、排水接続管の上
方に位置する床面部位に、蓋付き点検口を設けた
ことを特徴とする和風便器ユニツト。
A piping case that is installed on a flat concrete slab and that incorporates a water supply pipe, a drainage pipe, a ventilation pipe, etc., and a piping case that is installed adjacent to the piping case on the concrete slab, The Japanese-style toilet includes a floor case with a toilet insertion hole in the upper floor surface, and a Japanese-style toilet with the lower half inserted into the floor case through the toilet insertion hole.
The front side of the toilet in the longitudinal direction that faces the toilet user is placed facing the piping case, and a water inlet is provided on the upper surface of this front side, and the lower half of the toilet on the same side as the water inlet in the longitudinal direction A drain is provided approximately horizontally in the extending direction from the front end of the toilet. A Japanese-style toilet characterized by connecting the drain pipe with a drain connecting pipe through the inside of the floor case, and the floor case having an inspection port with a lid in a floor area located above the drain connecting pipe. unit.
JP20114483U 1983-12-29 1983-12-29 Japanese style toilet unit Granted JPS60111969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20114483U JPS60111969U (en) 1983-12-29 1983-12-29 Japanese style toilet unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20114483U JPS60111969U (en) 1983-12-29 1983-12-29 Japanese style toilet unit

Publications (2)

Publication Number Publication Date
JPS60111969U JPS60111969U (en) 1985-07-29
JPH0234298Y2 true JPH0234298Y2 (en) 1990-09-14

Family

ID=30762653

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20114483U Granted JPS60111969U (en) 1983-12-29 1983-12-29 Japanese style toilet unit

Country Status (1)

Country Link
JP (1) JPS60111969U (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5135158U (en) * 1974-09-09 1976-03-16

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5791877U (en) * 1980-11-18 1982-06-05
JPS57193763U (en) * 1981-05-30 1982-12-08

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5135158U (en) * 1974-09-09 1976-03-16

Also Published As

Publication number Publication date
JPS60111969U (en) 1985-07-29

Similar Documents

Publication Publication Date Title
JPS5996346A (en) Fabricated core of building
JP2537260B2 (en) Japanese-style toilet construction method
US2644203A (en) Prefabricated bathroom structure
US5233808A (en) Method of constructing a building
JPH0234298Y2 (en)
JPH0338304Y2 (en)
JP4749247B2 (en) Housing housing structure and piping pit structure
JP3140229B2 (en) Dwelling unit variable housing system
JPH0223658Y2 (en)
JP2001254413A (en) Piping structure of multiple dwelling house
JPH0348306Y2 (en)
CN214531420U (en) Ultra-thin type intermediate layer system in building room
JPH0223660Y2 (en)
KR100453352B1 (en) Operation method and operation structure of a tile for waterprofing
JP2984738B2 (en) Installation structure of sprinkler equipment in buildings
JP3062810B2 (en) Assembling method of plumbing unit in building and plumbing unit
JP4339441B2 (en) Piping structure and piping construction method for unit building
KR100244019B1 (en) A construction system of the assembly bath room
JP2598448B2 (en) Toilet bowl unit
KR200173551Y1 (en) Improved piping installation structure
JPH026148Y2 (en)
JPS6348852Y2 (en)
KR200267040Y1 (en) Operation structure of a tile for waterprofing
CN117738374A (en) Building component manufacturing method and building construction method
JP2915655B2 (en) Bathroom unit construction method