JP4339441B2 - Piping structure and piping construction method for unit building - Google Patents

Piping structure and piping construction method for unit building Download PDF

Info

Publication number
JP4339441B2
JP4339441B2 JP12233199A JP12233199A JP4339441B2 JP 4339441 B2 JP4339441 B2 JP 4339441B2 JP 12233199 A JP12233199 A JP 12233199A JP 12233199 A JP12233199 A JP 12233199A JP 4339441 B2 JP4339441 B2 JP 4339441B2
Authority
JP
Japan
Prior art keywords
floor
unit
building
removable
covering box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP12233199A
Other languages
Japanese (ja)
Other versions
JP2000314163A (en
Inventor
弘明 桑原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP12233199A priority Critical patent/JP4339441B2/en
Publication of JP2000314163A publication Critical patent/JP2000314163A/en
Application granted granted Critical
Publication of JP4339441B2 publication Critical patent/JP4339441B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
この発明は、ユニット建物の配管構造および配管施工方法に関するものである。
【0002】
【従来の技術】
工場で予め製造された箱型の建物ユニットを複数組上げて建物(ユニット建物)を構築するユニット工法が行われている。
【0003】
このようなユニット工法による建物は、建物ユニットを予め工場で製造しているために、現場での工期が短くて済みしかも組立て精度が高いという利点がある。
【0004】
このようなユニット工法による建物の例としては、特許第2501707号公報などが知られている。この公報では、1つの建物ユニット内における配管の横引き仕様が開示されている。
【0005】
一方、ユニット工法によって作られる準耐火建築物では、建物ユニット間に跨がって配管が配設されるような場合に、配管の区画貫通部分をモルタルなどで塞ぐことが法規上定められている。
【0006】
【発明が解決しようとする課題】
上記ユニット建物では、建物ユニット間に跨がって配管が配設されるような場合に、上記したように、配管の区画貫通部分をモルタルなどで塞ぐことが定められているが、例えば、建物ユニットに浴室ユニットのバスユニットを設置する場合には、建物ユニットの床板上にバスユニットを構成する防水パンが直接載ることとなるので、床板の上から配管の区画貫通部分をモルタルなどで塞ぐ作業を行うことが困難であった。
【0007】
そこで、本発明の目的は、上記の問題点を解消し、配管の区画貫通部分の処理を床板の上側から行い得るようにしたユニット建物の配管構造および配管施工方法を提供することにある。
【0008】
【課題を解決するための手段】
上記課題を解決するために、請求項1に記載された発明では、建物ユニットの床板の上に、浴槽本体と防水パンとを有するバスユニットが設置されたユニット建物の配管構造および配管施工方法において、前記バスユニット横の床板の少くとも一部を取外し可能な着脱可能床とすると共に、前記浴槽本体下部の床板を取外し可能な着脱可能床とし、前記着脱可能床を取外した部分からバスユニット部分の床板の下側へ挿入して建物ユニットに設置される配管の区画貫通部分を下側から包囲可能な被覆ボックスを設け、該被覆ボックスが、上面に前記床板で閉塞される開口部を有すると共に、一端側に前記着脱可能床近傍位置で不燃材によって閉塞される開口部を有することを特徴としている。
【0009】
このように構成された請求項1にかかる発明によれば、前記床板の上にバスユニットの防水パンが設けられていても、着脱可能床を取外して、着脱可能床を取外した部分からバスユニット部分の床板の下側へ被覆ボックスを挿入し、被覆ボックスで建物ユニットに設置される配管の区画貫通部分を下側から包囲し、被覆ボックス上面の開口部を前記床板に当接させた状態として、被覆ボックス一端側の開口部で不燃材による閉塞を行わせることにより、床板の上側から配管の区画貫通部分を塞ぐ作業を行うことができるようになる。
【0010】
請求項2に記載された発明では、前記バスユニットが、周囲の床板よりもレベルの低い床板の上に落し込み式に設置されたことを特徴としている。
【0011】
このように構成された請求項2にかかる発明によれば、周囲の床板よりもレベルの低い床板の上にバスユニットの防水パンが落し込み式に設置されていても、床板の上側から配管の区画貫通部分を塞ぐ作業を行うことができる。
【0012】
請求項3に記載された発明では、前記被覆ボックスの高さ寸法を、床下の高さとほぼ等しくすることことを特徴としている。
【0013】
このように構成された請求項3にかかる発明によれば、前記被覆ボックスを床下へ挿入配置することのみによって、被覆ボックスの上面の開口部を床板や着脱可能床にほぼ当接させることが可能となり、被覆ボックスの取付け高さの調整を不要とすることができる。
【0014】
請求項4に記載された発明では、前記バスユニット横の床小梁の下面を、バスユニット下の床板の下面と同一レベルまたはそれよりも高く設定することを特徴としている。
【0015】
このように構成された請求項4にかかる発明によれば、前記バスユニット横の床小梁の下面を、バスユニット下の床板の下面と同一レベルまたはそれよりも高く設定することにより、床小梁の下面が下方へ出っ張らなくなるので、バスユニット横の着脱可能床を取外した部分から被覆ボックスを挿入し易くすることができる。
【0016】
請求項5に記載された発明では、建物ユニットの床板の上に、浴槽本体と防水パンとを有するバスユニットを設置するユニット建物の配管施工方法において、前記バスユニット横の床板の少くとも一部を取外すと共に、前記浴槽本体下部の床板を取外し、前記床を取外した部分からバスユニット部分の床板の下側へ被覆ボックスを挿入して建物ユニットに設置される配管の区画貫通部分を下側から包囲し、被覆ボックス上面の開口部を前記床板に当接させた状態として、被覆ボックス一端側の開口部で不燃材による閉塞を行わせるユニット建物の配管施工方法を特徴としている。
【0017】
このように構成された請求項5にかかる発明によれば、請求項1と同様の作用効果を得ることができる。
【0018】
【発明の実施の形態1】
以下、本発明の具体的な実施の形態1について、図示例と共に説明する。
【0019】
図1〜図6は、この発明の実施の形態1を示すものである。
【0020】
まず、構成を説明すると、この実施の形態1のユニット建物1(準耐火建築物)では、箱型をした下階の建物ユニット2の上部に箱型をした上階の建物ユニット3が載置されている。また、上階の建物ユニット3には浴室ユニットのバスユニット5が設置されている。
【0021】
前記下階の建物ユニット2は、水平な2対の天井梁6,6および7,7と、対向する天井梁6,6間に掛渡された複数本の天井根太8と、天井根太8の上部および下部に張設された石膏ボードなどの天井板9,10と、上下の天井板9,10間に充填された断熱材11とを有している。
【0022】
上階の建物ユニット3は、水平な2対の床梁15,15および16,16を有している。そして、上階の建物ユニット3の対向する床梁15,15間におけるバスユニット5の未設置側17には通常サイズのの床小梁18が複数本掛渡され、床小梁18の上部には床小梁18と直交する床根太19を介して床板20が張設されている。
【0023】
また、上階の建物ユニット3の対向する床梁15,15間におけるバスユニット5の設置側21では、前記床小梁18に比べて高さの低い低床小梁22が前記床小梁18と下面を揃えて平行に設けられている。そして、バスユニット5の未設置側17と設置側21との境界部分23には、通常サイズの床小梁18と低床小梁22との差分と同じかより低い高さを有する床小梁24が設けられている。
【0024】
更に、前記バスユニット5の設置側21は、バスユニット5の未設置部分25と設置部分26とに区分けされており、前記未設置部分25では、床根太26などを介して床板29が前記床板20とほぼ同じ高さレベルに張設されている。また、前記バスユニット5の設置部分26では、低床小梁22の上部に床板30が前記床板20,29よりも低いレベルで張設されており、この床板30の上に前記バスユニット5が落し込み式に設置されている。また、床板30の下面に対し、前記境界部分23の床小梁24の下面は、同一レベルaまたはそれよりも高くなっている。
【0025】
そして、前記バスユニット5は、浴槽設置部31と洗い場部32とに区分けされ、浴槽設置部31には浴槽本体33が載置されている。また、洗い場部32には防水パン34が設けられている。そして、洗い場部32の片側にはシャワー水栓35などを備えた洗面台36が設けられている。この洗面台36には、給水管37および給湯管38が接続されている。
【0026】
また、浴槽本体33の排水口41にはトラップ42と、このトラップ42に接続される雑配水管などの配管43とが設けられている。
【0027】
同様に、洗い場部32の2つのコーナー部には、トラップ44,45と、このトラップ44,45に接続される雑配水管などの配管46,47とが設けられている。
【0028】
そして、この実施の形態1のものでは、バスユニット5の未設置側17および未設置部分25の床板20,29におけるバスユニット5の横の部分に、取外し可能な着脱可能床51,52を設けている。
【0029】
また、バスユニット5の設置部分26における浴槽本体33下部の床板30に、部分的に取外し可能な着脱可能床53を設けている。
【0030】
更に、上階の建物ユニット3の着脱可能床51〜53を取外した部分から下階の建物ユニット2の天井裏54へ挿入してトラップ42、トラップ44,45および配管43、配管46,47を部分的に下側から包囲可能な被覆ボックス55〜57をそれぞれ設けている。
【0031】
この被覆ボックス55〜57は、石膏ボードなどの不燃材によって構成され、図5(a)(b)に示すように、上面と一端側が開放されており、上面の開口部58を前記床板30などによって塞ぐようにすると共に、着脱可能床51〜53の近傍位置で一端側の開口部59をモルタルやロックウールや石膏ボードなどの不燃材60によって塞ぎ得るようになっている。また、被覆ボックス55〜57の高さ寸法bは、床下または天井裏54の高さ(前記床板30の下面および前記天井板9の上面間の距離)とほぼ等しくする。例えば、上記被覆ボックス55〜57は、図6(a)〜(c)に示すように、コ字状に形成した木桟61〜63に石膏ボードからなる底板64と3枚の側板65〜67を取付けた構造などとする。
【0032】
なお、図1中、符号71,72は前記床板30に形成したトラップ44,45を通すための切欠である。
【0033】
次に、この実施の形態1の作用について説明する。
【0034】
下階の建物ユニット2の上部に上階の建物ユニット3を据付ける。この際、上階の建物ユニット3には、予め工場で浴室ユニットのバスユニット5が設置された状態となっている。
【0035】
そして、上階の建物ユニット3の据付後、仮置きされた浴槽本体33を一次的に別の場所へ移動し、床板20,29,30から着脱可能床51〜53を取外す。
【0036】
この状態で、上階の建物ユニット3の着脱可能床53を取外した部分から下階の建物ユニット2と床板30との間の天井裏54へ被覆ボックス55を挿入すると共に、トラップ42および配管43を所定の位置に設置し、被覆ボックス55でトラップ42および配管43の一部(区画貫通部分)を下側から包囲させる。
【0037】
同様に、上階の建物ユニット3の着脱可能床51,52を取外した部分から下階の建物ユニット2と床板30との間の天井裏54へ被覆ボックス56,57を挿入すると共に、トラップ44,45および配管46,47を所定の位置に設置し、被覆ボックス56,57でトラップ44,45および配管46,47における、洗い場部32の2つのコーナー部に設けられた切欠71,72の位置から着脱可能床53を取外した部分の近傍までの部分(区画貫通部分)を、下側から包囲させる。
【0038】
被覆ボックス55〜57およびトラップ42、トラップ44,45などの施工後、被覆ボックス55〜57の一端側と配管43、配管46,47との間をモルタルやロックウールや石膏ボードなどの不燃材60によって塞ぐ。
【0039】
最後に、着脱可能床51〜53を取付け、浴槽本体33を所定位置へ戻して浴槽本体33の接続固定を行う。
【0040】
このように、この実施の形態1によれば、バスユニット5横の床板20,29の少くとも一部を取外し可能な着脱可能床51,52とすると共に、浴槽本体33下部の床板30を取外し可能な着脱可能床53とし、着脱可能床51〜53を取外した部分からバスユニット5部分の床板30の下側へ挿入してトラップ42、トラップ44,45および配管43、配管46,47の区画貫通部分を下側から包囲可能な被覆ボックス55〜57をそれぞれ設け、該被覆ボックス55〜57が、上面に前記床板30などで閉塞される開口部58を有すると共に、一端側に前記着脱可能床51〜53近傍位置で不燃材60によって閉塞される開口部59を有しているので、床板30の上にバスユニット5の防水パン34が設けられていても、着脱可能床51〜53を取外して、着脱可能床51〜53を取外した部分から床板30の下側へ被覆ボックス55〜57を挿入し、被覆ボックス55〜57で建物ユニットに設置される配管43、配管46,47の区画貫通部分を下側から包囲し、被覆ボックス55〜57上面の開口部58を前記床板30に当接させた状態として、被覆ボックス55〜57一端側の開口部59で不燃材60による閉塞を行わせることにより、床板20,29,30の上側から配管43、配管46,47の区画貫通部分を塞ぐ作業を行うことができるようになる。
【0041】
前記バスユニット5が、周囲の床板20,29よりもレベルの低い床板30の上に落し込み式に設置されていても、床板20,29,30の上側から配管43、配管46,47の区画貫通部分を塞ぐ作業を行うことができる。
【0042】
また、被覆ボックス55〜57の高さ寸法bを、床下または天井裏54の高さ(前記床板30の下面および前記天井板9の上面間の距離)とほぼ等しくすることにより、被覆ボックス55〜57を床下または天井裏54へ挿入配置することのみによって、被覆ボックス55〜57の上面の開口部58を前記床板30や着脱可能床53にほぼ当接させることが可能となり、被覆ボックス55〜57の取付け高さの調整を不要とすることができる。
【0043】
更に、バスユニット5横(着脱可能床51部分)の床小梁24の下面を、バスユニット5部分の床板30の下面と同一レベルaまたはそれよりも高く設定することにより、床小梁24の下面が下方へ出っ張らなくなるので、バスユニット5横の着脱可能床51を取外した部分から被覆ボックス57を挿入し易くすることができる。
【0044】
以上、この発明の実施の形態を図面により詳述してきたが、具体的な構成はこの実施の形態に限らず、この発明の要旨を逸脱しない範囲の設計の変更等があってもこの発明に含まれる。
【0045】
例えば、1階の建物ユニットと基礎との間に上記構成を適用しても良い。また、洗濯機用防水パンの設置部分に対して適用しても良い。
【0046】
【発明の効果】
以上説明してきたように、請求項1の発明によれば、床板の上にバスユニットの防水パンが設けられていても、着脱可能床を取外して、着脱可能床を取外した部分からバスユニット部分の床板の下側へ被覆ボックスを挿入し、被覆ボックスで建物ユニットに設置される配管の区画貫通部分を下側から包囲し、被覆ボックス上面の開口部を前記床板に当接させた状態として、被覆ボックス一端側の開口部で不燃材による閉塞を行わせることにより、床板の上側から配管の区画貫通部分を塞ぐ作業を行うことができるようになる。
【0047】
請求項2の発明によれば、周囲の床板よりもレベルの低い床板の上にバスユニットの防水パンが落し込み式に設置されていても、床板の上側から配管の区画貫通部分を塞ぐ作業を行うことができる。
【0048】
請求項3の発明によれば、被覆ボックスを床下へ挿入配置することのみによって、被覆ボックスの上面の開口部を床板や着脱可能床にほぼ当接させることが可能となり、被覆ボックスの取付け高さの調整を不要とすることができる。
【0049】
請求項4の発明によれば、バスユニット横の床小梁の下面を、バスユニット下の床板の下面と同一レベルまたはそれよりも高く設定することにより、床小梁の下面が下方へ出っ張らなくなるので、バスユニット横の着脱可能床を取外した部分から被覆ボックスを挿入し易くすることができる。
【0050】
請求項5の発明によれば、請求項1と同様の作用効果を得ることができる、という実用上有益な効果を発揮し得る。
【図面の簡単な説明】
【図1】本発明の実施の形態1の平面図である。
【図2】図1のA−A断面図である。
【図3】図1のB−B断面図である。
【図4】図1のC−C断面図である。
【図5】(a)は被覆ボックスの設置前の斜視図、(b)は被覆ボックスの設置後の斜視図である。
【図6】(a)は被覆ボックスの平面図、(b)は被覆ボックスの側面図、(c)は被覆ボックスの背面図である。
【符号の説明】
2,3 建物ユニット
5 バスユニット
20,29,30 床板
24 床小梁
33 浴槽本体
34 防水パン
43,46,47 配管
51〜53 着脱可能床
55〜57 被覆ボックス
58,59 開口部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a piping structure of a unit building and a piping construction method.
[0002]
[Prior art]
There is a unit construction method in which a plurality of box-shaped building units manufactured in advance in a factory are assembled to construct a building (unit building).
[0003]
Since the building by such a unit method is manufactured in advance at the factory, the construction period at the site is short and the assembly accuracy is high.
[0004]
Japanese Patent No. 2501707 is known as an example of a building by such a unit method. In this publication, a horizontal pulling specification for piping in one building unit is disclosed.
[0005]
On the other hand, in the semi-refractory building made by the unit construction method, when the piping is arranged across the building units, it is stipulated by the law to block the partition penetration part of the piping with mortar etc. .
[0006]
[Problems to be solved by the invention]
In the above unit building, when piping is arranged across building units, as described above, it is stipulated that the partition penetration portion of the piping is blocked with mortar or the like. When installing a bath unit of a bathroom unit in the unit, the waterproof pan that constitutes the bus unit is placed directly on the floor plate of the building unit. It was difficult to do.
[0007]
SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to provide a pipe structure and a pipe construction method for a unit building that can solve the above-described problems and can perform the processing of a partition through portion of the pipe from the upper side of the floor board.
[0008]
[Means for Solving the Problems]
In order to solve the above problem, in the invention described in claim 1, in the piping structure and piping construction method of a unit building in which a bath unit having a bathtub body and a waterproof pan is installed on the floor plate of the building unit And a removable floor on which at least a part of the floorboard beside the bus unit can be removed, and a floorboard on the lower part of the bathtub body can be removed, and the bus unit portion can be removed from the portion where the removable floor is removed. A covering box is provided which can be inserted into the lower side of the floor plate to surround the section through portion of the pipe installed in the building unit from the lower side, and the covering box has an opening which is closed on the upper surface by the floor plate. In addition, an opening that is closed by a non-combustible material at a position near the removable floor is provided on one end side.
[0009]
According to the invention concerning Claim 1 comprised in this way, even if the waterproof pan of a bus unit is provided on the said floor board, a removable floor is removed and a bus unit is removed from the part which removed the removable floor Insert the covering box under the floor of the part, surround the section through the piping installed in the building unit with the covering box from below, and make the opening on the top of the covering box contact the floor By performing the blockage with the non-combustible material at the opening on the one end side of the covering box, it is possible to perform the work of closing the partition penetration portion of the pipe from the upper side of the floor board.
[0010]
The invention described in claim 2 is characterized in that the bus unit is installed in a drop-down manner on a floor board having a lower level than the surrounding floor boards.
[0011]
According to the invention concerning Claim 2 comprised in this way, even if the waterproof pan of the bus unit is installed in a drop-down manner on the floor plate that is lower in level than the surrounding floor plate, It is possible to perform an operation of closing the partition penetrating portion.
[0012]
The invention described in claim 3 is characterized in that the height dimension of the covering box is made substantially equal to the height under the floor.
[0013]
According to the invention according to claim 3 configured as described above, the opening on the upper surface of the covering box can be substantially brought into contact with the floor board or the removable floor only by inserting and arranging the covering box under the floor. Thus, the adjustment of the mounting height of the covering box can be made unnecessary.
[0014]
The invention described in claim 4 is characterized in that the lower surface of the floor beam next to the bus unit is set at the same level as or higher than the lower surface of the floor plate under the bus unit.
[0015]
According to the invention according to claim 4 configured as described above, by setting the lower surface of the floor beam next to the bus unit to the same level as or higher than the lower surface of the floor plate under the bus unit, Since the lower surface of the beam does not protrude downward, the covering box can be easily inserted from the part where the removable floor beside the bus unit is removed.
[0016]
In the invention described in claim 5, in the pipe construction method for a unit building in which a bath unit having a bathtub body and a waterproof pan is installed on the floor plate of the building unit, at least part of the floor plate beside the bus unit. Remove the floor plate at the bottom of the bathtub body, insert a covering box from the part where the floor is removed to the bottom of the floor unit of the bus unit part, and insert the section through the piping installed in the building unit from the bottom side It is characterized by a pipe construction method for a unit building that encloses and closes the opening of the upper surface of the covering box with the floor board, and closes the opening of one end of the covering box with an incombustible material.
[0017]
According to the invention of claim 5 configured as described above, the same effect as that of claim 1 can be obtained.
[0018]
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiment 1
Hereinafter, a specific first exemplary embodiment of the present invention will be described together with illustrated examples.
[0019]
1 to 6 show a first embodiment of the present invention.
[0020]
First, the configuration will be described. In the unit building 1 (semi-refractory building) of the first embodiment, a box-shaped upper-floor building unit 3 is placed on top of a box-shaped lower-floor building unit 2. Has been. Further, a bathroom unit bus unit 5 is installed in the building unit 3 on the upper floor.
[0021]
The building unit 2 on the lower floor includes two horizontal ceiling beams 6, 6, 7, 7, a plurality of ceiling joists 8 spanned between the opposing ceiling beams 6, 6, and ceiling joists 8 It has ceiling boards 9 and 10 such as gypsum boards stretched on the upper and lower parts, and a heat insulating material 11 filled between the upper and lower ceiling boards 9 and 10.
[0022]
The building unit 3 on the upper floor has two horizontal pairs of floor beams 15, 15 and 16, 16. A plurality of normal-sized floor beams 18 are spanned on the non-installed side 17 of the bus unit 5 between the opposing floor beams 15 of the building unit 3 on the upper floor. A floor board 20 is stretched through a floor joist 19 orthogonal to the floor beam 18.
[0023]
On the installation side 21 of the bus unit 5 between the opposing floor beams 15 and 15 of the building unit 3 on the upper floor, the low floor beam 22 having a height lower than that of the floor beam 18 is the floor beam 18. Are arranged in parallel with the bottom surface aligned. The boundary beam 23 between the non-installed side 17 and the installed side 21 of the bus unit 5 has a floor beam having a height equal to or lower than the difference between the floor beam 18 and the low floor beam 22 of normal size. 24 is provided.
[0024]
Further, the installation side 21 of the bus unit 5 is divided into an uninstalled portion 25 and an installed portion 26 of the bus unit 5, and in the uninstalled portion 25, a floor plate 29 is connected to the floor plate via a floor joist 26 or the like. It is stretched at the same level as 20. Further, in the installation portion 26 of the bus unit 5, a floor plate 30 is stretched on the lower floor beam 22 at a level lower than the floor plates 20 and 29, and the bus unit 5 is mounted on the floor plate 30. It is installed in a drop-in manner. In addition, the lower surface of the floor beam 24 in the boundary portion 23 is at the same level a or higher than the lower surface of the floor plate 30.
[0025]
And the said bus unit 5 is divided into the bathtub installation part 31 and the washing place part 32, and the bathtub main body 33 is mounted in the bathtub installation part 31. FIG. Further, the washing area 32 is provided with a waterproof pan 34. A wash basin 36 having a shower faucet 35 and the like is provided on one side of the washing section 32. A water supply pipe 37 and a hot water supply pipe 38 are connected to the washstand 36.
[0026]
Further, a trap 42 and a pipe 43 such as a miscellaneous water pipe connected to the trap 42 are provided at the drain outlet 41 of the bathtub body 33.
[0027]
Similarly, traps 44 and 45 and pipes 46 and 47 such as miscellaneous water pipes connected to the traps 44 and 45 are provided at the two corners of the washing place 32.
[0028]
And in this Embodiment 1, the removable floors 51 and 52 which can be removed are provided in the side part of the bus unit 5 in the floor boards 20 and 29 of the non-installation side 17 of the bus unit 5, and the non-installation part 25. ing.
[0029]
Moreover, the removable floor 53 which can be removed partially is provided in the floor board 30 of the bathtub main body 33 lower part in the installation part 26 of the bath unit 5.
[0030]
Furthermore, the trap 42, the traps 44 and 45, the pipe 43, and the pipes 46 and 47 are inserted into the ceiling back 54 of the building unit 2 on the lower floor from the portion where the removable floors 51 to 53 of the building unit 3 on the upper floor are removed. Covering boxes 55 to 57 that can be partially enclosed from below are provided.
[0031]
The covering boxes 55 to 57 are made of a non-combustible material such as gypsum board, and as shown in FIGS. 5 (a) and 5 (b), the upper surface and one end side are opened, and the opening 58 on the upper surface is provided with the floor plate 30 or the like. In addition, the opening 59 on one end side can be closed with a non-combustible material 60 such as mortar, rock wool or gypsum board in the vicinity of the removable floors 51 to 53. The height dimension b of the covering boxes 55 to 57 is substantially equal to the height of the under floor or the ceiling back 54 (the distance between the lower surface of the floor plate 30 and the upper surface of the ceiling plate 9). For example, as shown in FIGS. 6A to 6C, the covering boxes 55 to 57 include a bottom plate 64 made of gypsum board and three side plates 65 to 67 on wooden bars 61 to 63 formed in a U-shape. A structure with attached.
[0032]
In FIG. 1, reference numerals 71 and 72 are notches through which the traps 44 and 45 formed on the floor plate 30 are passed.
[0033]
Next, the operation of the first embodiment will be described.
[0034]
The building unit 3 on the upper floor is installed on the upper part of the building unit 2 on the lower floor. At this time, the building unit 3 on the upper floor is in a state in which the bathroom unit bus unit 5 is installed in advance at the factory.
[0035]
Then, after the building unit 3 on the upper floor is installed, the temporarily placed bathtub body 33 is temporarily moved to another place, and the removable floors 51 to 53 are removed from the floor plates 20, 29, 30.
[0036]
In this state, the cover box 55 is inserted into the ceiling 54 between the lower floor building unit 2 and the floor board 30 from the portion where the removable floor 53 of the upper floor building unit 3 is removed, and the trap 42 and the pipe 43 Is placed at a predetermined position, and a part of the trap 42 and the pipe 43 (partition through portion) is surrounded from the lower side by the covering box 55.
[0037]
Similarly, the cover boxes 56 and 57 are inserted into the ceiling 54 between the lower floor building unit 2 and the floor board 30 from the portion where the removable floors 51 and 52 of the upper floor building unit 3 are removed, and the trap 44 45 and pipes 46 and 47 at predetermined positions, and positions of notches 71 and 72 provided at two corners of the washing place 32 in the traps 44 and 45 and the pipes 46 and 47 in the covering boxes 56 and 57. To the vicinity of the portion from which the removable floor 53 is removed (partition penetration portion) is surrounded from below.
[0038]
After the construction of the covering boxes 55-57 and the traps 42, 44, 45, etc., a non-combustible material 60 such as mortar, rock wool or gypsum board is provided between one end of the covering boxes 55-57 and the pipes 43, 46, 47. Block by.
[0039]
Finally, the removable floors 51 to 53 are attached, the bathtub body 33 is returned to a predetermined position, and the bathtub body 33 is connected and fixed.
[0040]
As described above, according to the first embodiment, at least a part of the floor boards 20 and 29 beside the bus unit 5 can be removed, and the removable floors 51 and 52 can be removed, and the floor board 30 below the bathtub body 33 can be removed. A removable floor 53 is formed, and the trap 42, the traps 44 and 45, the pipe 43, and the pipes 46 and 47 are partitioned by inserting the removable floors 51 to 53 to the lower side of the floor plate 30 of the bus unit 5 part. Covering boxes 55 to 57 that can surround the penetrating portion from the lower side are provided, respectively, and the covering boxes 55 to 57 have an opening 58 that is closed by the floor plate 30 or the like on the upper surface, and the removable floor on one end side. Since it has the opening part 59 obstruct | occluded by the incombustible material 60 in the 51-53 vicinity position, even if the waterproof pan 34 of the bus unit 5 is provided on the floor board 30, it is a removable floor 1 to 53 are removed, and the covering boxes 55 to 57 are inserted into the lower side of the floor board 30 from the part where the removable floors 51 to 53 are removed, and the piping 43 and piping 46 installed in the building unit by the covering boxes 55 to 57. , 47 is surrounded from below, and the opening 58 on the upper surface of the covering box 55-57 is in contact with the floor plate 30, and the nonflammable material 60 is formed at the opening 59 on one end side of the covering box 55-57. By performing the blockage by the above, it becomes possible to perform the work of closing the partition through portions of the pipe 43 and the pipes 46 and 47 from the upper side of the floor plates 20, 29 and 30.
[0041]
Even if the bus unit 5 is installed on the floor plate 30 having a lower level than the surrounding floor plates 20 and 29 in a drop-down manner, the pipe 43 and the pipes 46 and 47 are partitioned from the upper side of the floor plates 20, 29 and 30. The work of closing the penetration portion can be performed.
[0042]
Further, by making the height dimension b of the covering boxes 55 to 57 substantially equal to the height of the under floor or the ceiling back 54 (the distance between the lower surface of the floor plate 30 and the upper surface of the ceiling plate 9), It is possible to make the opening 58 on the upper surface of the covering box 55-57 almost contact the floor plate 30 or the removable floor 53 only by inserting and arranging 57 under the floor or the ceiling back 54, and the covering boxes 55-57. It is possible to eliminate the need to adjust the mounting height of the.
[0043]
Further, by setting the lower surface of the floor beam 24 next to the bus unit 5 (detachable floor 51 portion) to the same level a or higher than the lower surface of the floor plate 30 of the bus unit 5 portion, Since the lower surface does not protrude downward, the covering box 57 can be easily inserted from the part where the removable floor 51 beside the bus unit 5 is removed.
[0044]
The embodiment of the present invention has been described in detail with reference to the drawings. However, the specific configuration is not limited to this embodiment, and the present invention can be changed even if there is a design change or the like without departing from the gist of the present invention. included.
[0045]
For example, the above configuration may be applied between a building unit on the first floor and a foundation. Moreover, you may apply with respect to the installation part of the waterproof pan for washing machines.
[0046]
【The invention's effect】
As described above, according to the invention of claim 1, even if the waterproof pan of the bus unit is provided on the floor board, the removable floor is removed and the bus unit portion is removed from the portion where the removable floor is removed. Inserting the covering box to the lower side of the floor plate, surrounding the section through part of the pipe installed in the building unit with the covering box from the lower side, and making the opening on the upper surface of the covering box contact the floor plate, By closing the non-combustible material at the opening on the one end side of the covering box, it is possible to perform an operation of closing the partition through portion of the pipe from the upper side of the floor board.
[0047]
According to the invention of claim 2, even if the waterproof pan of the bus unit is installed on the floor plate lower in level than the surrounding floor plate, the work of closing the partition penetration portion of the pipe from the upper side of the floor plate is performed. It can be carried out.
[0048]
According to the invention of claim 3, it is possible to make the opening on the upper surface of the covering box substantially contact the floor plate or the removable floor only by inserting and arranging the covering box under the floor. This adjustment can be made unnecessary.
[0049]
According to the invention of claim 4, by setting the lower surface of the floor beam next to the bus unit at the same level as or higher than the lower surface of the floor plate under the bus unit, the lower surface of the floor beam does not protrude downward. Therefore, it is possible to easily insert the covering box from the part where the removable floor beside the bus unit is removed.
[0050]
According to the invention of claim 5, a practically beneficial effect that the same effect as that of claim 1 can be obtained can be exhibited.
[Brief description of the drawings]
FIG. 1 is a plan view of a first embodiment of the present invention.
FIG. 2 is a cross-sectional view taken along the line AA of FIG.
3 is a cross-sectional view taken along the line BB in FIG.
4 is a cross-sectional view taken along the line CC of FIG.
5A is a perspective view before the installation of the covering box, and FIG. 5B is a perspective view after the installation of the covering box.
6A is a plan view of the covering box, FIG. 6B is a side view of the covering box, and FIG. 6C is a rear view of the covering box.
[Explanation of symbols]
2,3 Building unit 5 Bath unit 20, 29, 30 Floor plate 24 Floor beam 33 Bathtub body 34 Waterproof pan 43, 46, 47 Piping 51-53 Removable floor 55-57 Covering box 58, 59 Opening

Claims (5)

建物ユニットの床板の上に、浴槽本体と防水パンとを有するバスユニットが設置されたユニット建物の配管構造において、
前記バスユニット横の床板の少くとも一部を取外し可能な着脱可能床とすると共に、前記浴槽本体下部の床板を取外し可能な着脱可能床とし、
前記着脱可能床を取外した部分からバスユニット部分の床板の下側へ挿入して建物ユニットに設置される配管の区画貫通部分を下側から包囲可能な被覆ボックスを設け、
該被覆ボックスが、上面に前記床板で閉塞される開口部を有すると共に、一端側に前記着脱可能床近傍位置で不燃材によって閉塞される開口部を有することを特徴とするユニット建物の配管構造。
In the piping structure of a unit building in which a bath unit having a bathtub body and a waterproof pan is installed on the floor plate of the building unit,
At least a part of the floor plate beside the bus unit is a removable floor, and a removable floor is a removable floor plate at the bottom of the bathtub body,
A covering box is provided that can be inserted from the part from which the removable floor is removed to the lower side of the floor plate of the bus unit part and surround the partition penetration part of the pipe installed in the building unit from the lower side,
The piping structure of a unit building, wherein the covering box has an opening portion closed on the upper surface by the floor board and an opening portion closed on one end side by a noncombustible material at a position near the removable floor.
前記バスユニットが、周囲の床板よりもレベルの低い床板の上に落し込み式に設置されたことを特徴とする請求項1記載のユニット建物の配管構造。2. The piping structure of a unit building according to claim 1, wherein the bus unit is installed in a drop-down manner on a floor board having a lower level than the surrounding floor board. 前記被覆ボックスの高さ寸法を、床下の高さとほぼ等しくしたことを特徴とする請求項1または2記載のユニット建物の配管構造。The piping structure for a unit building according to claim 1 or 2, wherein a height dimension of the covering box is substantially equal to a height under the floor. 前記バスユニット横の床小梁の下面を、バスユニット下の床板の下面と同一レベルまたはそれよりも高く設定したことを特徴とする請求項1〜3いずれかに記載のユニット建物の配管構造。The piping structure for a unit building according to any one of claims 1 to 3, wherein the lower surface of the floor beam next to the bus unit is set at the same level as or higher than the lower surface of the floor board under the bus unit. 建物ユニットの床板の上に、浴槽本体と防水パンとを有するバスユニットを設置するユニット建物の配管施工方法において、
前記バスユニット横の床板の少くとも一部を取外すと共に、前記浴槽本体下部の床板を取外し、前記床を取外した部分からバスユニット部分の床板の下側へ被覆ボックスを挿入して建物ユニットに設置される配管の区画貫通部分を下側から包囲し、被覆ボックス上面の開口部を前記床板に当接させた状態として、被覆ボックス一端側の開口部で不燃材による閉塞を行わせることを特徴とするユニット建物の配管施工方法。
In the piping construction method of a unit building in which a bath unit having a bathtub body and a waterproof pan is installed on the floor plate of the building unit,
Remove at least a part of the floorboard beside the bus unit, remove the floorboard at the bottom of the bathtub body, and install the covering box from the part where the floor is removed to the lower side of the floorboard of the bus unit part to install in the building unit The section penetrating part of the pipe to be enclosed is surrounded from the lower side, and the opening on the upper surface of the covering box is brought into contact with the floor plate, and the opening on the one end side of the covering box is closed with a noncombustible material. How to install pipes for unit buildings.
JP12233199A 1999-04-28 1999-04-28 Piping structure and piping construction method for unit building Expired - Fee Related JP4339441B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12233199A JP4339441B2 (en) 1999-04-28 1999-04-28 Piping structure and piping construction method for unit building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12233199A JP4339441B2 (en) 1999-04-28 1999-04-28 Piping structure and piping construction method for unit building

Publications (2)

Publication Number Publication Date
JP2000314163A JP2000314163A (en) 2000-11-14
JP4339441B2 true JP4339441B2 (en) 2009-10-07

Family

ID=14833335

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12233199A Expired - Fee Related JP4339441B2 (en) 1999-04-28 1999-04-28 Piping structure and piping construction method for unit building

Country Status (1)

Country Link
JP (1) JP4339441B2 (en)

Also Published As

Publication number Publication date
JP2000314163A (en) 2000-11-14

Similar Documents

Publication Publication Date Title
JP4339441B2 (en) Piping structure and piping construction method for unit building
WO1995002736A1 (en) A device for supplying and discharging water
JPH11148153A (en) Drainage system for multiple dwelling house
JP4165345B2 (en) Indoor construction methods including wiring work
JP2001254413A (en) Piping structure of multiple dwelling house
JPH0411083Y2 (en)
US3143744A (en) Plumbing aid
CZ288061B6 (en) Device with at least two installation blocks
JPH0234298Y2 (en)
TWI783442B (en) Hygiene unit structure and method for implementing same
JPS6160965A (en) Double floor structure
JPH0725401Y2 (en) Toilet room with pipe space
JP2866807B2 (en) Piping method, body edge and pipe shaft of apartment house
JP3340033B2 (en) Bathroom waterproof pan
JPH0519031Y2 (en)
JP3828373B2 (en) How to install the bus unit
JP2530040B2 (en) Bass room unit manufacturing method
JP3017956U (en) Floor structure of sanitary equipment room unit
JPH03265778A (en) Work execution method for pipe through part
JP2843198B2 (en) Bathroom plumbing structure
JPH0559783A (en) Floor panel
JP5322779B2 (en) Toilet structure and construction method for building units
JP4160744B2 (en) Equipment and building unit with the equipment installed
JPH0128194B2 (en)
JP2004176427A (en) Reform construction method for house

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060119

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071130

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090610

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090702

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120710

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees