JP5322779B2 - Toilet structure and construction method for building units - Google Patents

Toilet structure and construction method for building units Download PDF

Info

Publication number
JP5322779B2
JP5322779B2 JP2009131323A JP2009131323A JP5322779B2 JP 5322779 B2 JP5322779 B2 JP 5322779B2 JP 2009131323 A JP2009131323 A JP 2009131323A JP 2009131323 A JP2009131323 A JP 2009131323A JP 5322779 B2 JP5322779 B2 JP 5322779B2
Authority
JP
Japan
Prior art keywords
floor
toilet
finishing material
toilet room
building unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009131323A
Other languages
Japanese (ja)
Other versions
JP2010275817A (en
Inventor
耕太 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2009131323A priority Critical patent/JP5322779B2/en
Publication of JP2010275817A publication Critical patent/JP2010275817A/en
Application granted granted Critical
Publication of JP5322779B2 publication Critical patent/JP5322779B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は建物ユニットのトイレ構造及び施工方法に関する。   The present invention relates to a toilet structure and a construction method for a building unit.

工場生産された建物ユニットを建築現場に輸送し、建築現場で複数の建物ユニットを組合せてユニット建物を構築するに際し、特許文献1に記載の如く、トイレ構造を備えた建物ユニットを用いる必要がある。   When building units produced in a factory are transported to a building site and a unit building is constructed by combining a plurality of building units at the building site, it is necessary to use a building unit having a toilet structure as described in Patent Document 1. .

従来技術では、建物ユニットのトイレ室内の床、壁、天井の下地までを工場施工し、床、壁、天井の仕上材の敷設と便器の設置は現地施工している。   In the prior art, the floor, walls, and ceiling of the building unit's toilet room are factory-installed, and the floor, wall, and ceiling finish materials and toilets are installed locally.

特開2000-54497JP2000-54497

従来技術には以下の問題点がある。
(1)建物ユニットのトイレ室内の床仕上材等を現地施工するものであるから、この床仕上材の所定位置に取付けられる排水ソケットの取付け、排水ソケットに接続される便器の設置等を現地施工せざるを得ず、工場生産化率を向上できない。
The prior art has the following problems.
(1) Since the floor finishing material in the toilet room of the building unit will be installed locally, installation of drainage sockets that are attached to the floor finishing materials at specified positions, and installation of toilets that are connected to the drainage sockets will be performed locally. Inevitably, the factory production rate cannot be improved.

(2)上述(1)の床仕上材等の大工工事のタイミングと、排水ソケット及び便器の設置等の水道工事のタイミングを合せづらく、現地施工効率も悪い。   (2) It is difficult to match the timing of carpentry work such as floor finishing materials mentioned in (1) above with the timing of water works such as the installation of drain sockets and toilet bowls, and the local construction efficiency is also poor.

(3)上述(1)の床仕上材の大工工事では、トイレ室の出入口に設けられる戸枠のトイレ室内への出張り部に対し、床仕上材の外郭を凹状にして逃げるように加工する必要があり、床仕上材の加工作業性及び意匠性が悪い。この床仕上材の加工はトイレ室の出入口のバリエーションに応じて多様にならざるを得ない。   (3) In the carpentry work of the floor finishing material described in (1) above, it is processed so that the outer wall of the floor finishing material is recessed with respect to the protruding part of the door frame provided at the entrance of the toilet room into the toilet room. It is necessary and the workability and designability of the floor finish are poor. The processing of this floor finish must be varied depending on the variation of the entrance and exit of the toilet room.

本発明の課題は、トイレ室を備えた建物ユニットの工場生産化率を向上し、現地施工効率の向上を図るとともに、床仕上材の加工作業性及び意匠性を向上することにある。   The subject of this invention is improving the factory production rate of the building unit provided with the toilet room, aiming at the improvement of local construction efficiency, and improving the workability | operativity and designability of floor finishing material.

請求項1の発明は、トイレ室内の床下地に、該トイレ室の壁により区画される床寸法に適合する矩形状の輪郭をなす床仕上材を敷設し、次に、床下地及び床仕上材の所定位置に排水ソケットを取付け、次に、便器の排水口を排水ソケットに接続して該便器を床仕上材の上に設置する建物ユニットのトイレ構造の施工方法である。 The invention according to claim 1 lays a floor finishing material having a rectangular outline conforming to the floor size defined by the wall of the toilet room on the floor foundation in the toilet room, and then the floor foundation and the floor finishing material. The drainage socket is attached to a predetermined position, and then the toilet outlet is connected to the drainage socket and the toilet is installed on the floor finishing material .

請求項2の発明は、トイレ室内の床下地に、該トイレ室の壁により区画される床寸法に適合する矩形状の輪郭をなす床仕上材を敷設し、その後、トイレ室の出入口の戸枠を床仕上材勝ちの納まりで該出入口に配設する建物ユニットのトイレ構造の施工方法である。 According to the invention of claim 2, a floor finishing material having a rectangular shape conforming to a floor size defined by a wall of the toilet room is laid on the floor base in the toilet room, and then the door frame of the entrance / exit of the toilet room Is a construction method of a toilet structure of a building unit that is arranged at the entrance in accordance with the winning of floor finish material .

請求項3の発明は、トイレ室内の床下地に、該トイレ室の壁により区画される床寸法に適合する矩形状の輪郭をなす床仕上材を敷設し、次に、床下地及び床仕上材の所定位置に排水ソケットを取付け、次に、便器の排水口を排水ソケットに接続して該便器を床仕上材の上に設置し、次に、トイレ室の出入口の戸枠を床仕上材勝ちの納まりで該出入口に配設する建物ユニットのトイレ構造の施工方法である。 The invention according to claim 3 lays a floor finishing material having a rectangular outline conforming to a floor size defined by a wall of the toilet room on the floor foundation in the toilet room, and then the floor foundation and the floor finishing material. Attach the drain socket at the specified position, then connect the toilet outlet to the drain socket and install the toilet on the floor finish, and then win the door frame of the toilet room entrance and exit to the floor finish It is a construction method of the toilet structure of the building unit arrange | positioned at this doorway in the accommodation .

(請求項1、2、3
(a)床仕上材がトイレ室の床寸法に適合する矩形状の輪郭をなすものとすることにより、床仕上材の加工作業性及び意匠性を確実に向上できる。
(Claims 1 , 2, 3 )
(a) By making the floor finishing material have a rectangular outline that matches the floor dimensions of the toilet room, the workability and design of the floor finishing material can be reliably improved.

(請求項1、2)
(b)建物ユニットのトイレ室内の床下地に工場で先に床仕上材を敷設することにより、この床仕上材の所定位置に取付けられる排水ソケットの取付け、排水ソケットに接続される便器の設置を工場で施工できる。
(Claims 1 and 2)
(b) By laying the floor finishing material first on the floor floor in the toilet room of the building unit at the factory, it is possible to install a drain socket attached to the floor finishing material at a predetermined position and a toilet connected to the drain socket. Can be constructed at the factory.

(請求項2、3)
(c)トイレ室の出入口の戸枠が床仕上材勝ちの納まりで該出入口に配設される。従って、床仕上材の外郭を戸枠の下にて延在させることができ、床仕上材の外郭を戸枠のトイレ室内への出張り部に対して逃げるように凹状に加工する必要がなく、床仕上材の加工作業性及び意匠性を向上できる。
(d)建物ユニットのトイレ室内の床下地に床仕上材を敷設し、その後、トイレ室の出入口の戸枠を床仕上材勝ちの納まりで該出入口に配設することにより、床仕上材を戸枠のない出入口からトイレ室内に容易に搬入し、敷設できる。
(Claims 2 and 3)
(c) The door frame of the entrance / exit of the toilet room is arranged at the entrance / exit so that the floor finish material wins. Therefore, the outer wall of the floor finish can be extended under the door frame, and it is not necessary to process the outer wall of the floor finish into a concave shape so as to escape from the protruding portion of the door frame into the toilet room. The workability and designability of the floor finish can be improved.
(d) The floor finishing material is laid on the floor floor in the toilet room of the building unit, and then the door frame of the toilet room is placed in the doorway with the floor finishing material winning fit, so that the floor finishing material is It can be easily carried into the toilet room from a doorway without a frame and installed.

(請求項
(e)床仕上材の敷設と、排水ソケットの取付けと、便器の設置と、戸枠の配設とが、予め工場でなされるものとすることにより、トイレ室を備えた建物ユニットの工場生産化率を向上し、現地施工効率を向上することができる。
(Claim 3 )
(e) Factory production of building units equipped with toilet rooms by laying floor finishing materials, installing drainage sockets, installing toilet bowls, and arranging door frames in advance at the factory. It is possible to improve the conversion rate and improve the local construction efficiency.

図1は建物ユニットを示す平面図である。FIG. 1 is a plan view showing a building unit. 図2は建物ユニットのトイレ室となる部分を示す平面図である。FIG. 2 is a plan view showing a portion that becomes a toilet room of a building unit. 図3は建物ユニットのトイレ構造における床仕上材の敷設状態を示す平面図である。FIG. 3 is a plan view showing a laying state of the floor finishing material in the toilet structure of the building unit. 図4は床仕上材を示し、(A)は本発明例を示す平面図、(B)は従来例を示す平面図である。4A and 4B show floor finishing materials, FIG. 4A is a plan view showing an example of the present invention, and FIG. 4B is a plan view showing a conventional example. 図5は建物ユニットのトイレ構造における床仕上材の孔加工状態を示す平面図である。FIG. 5 is a plan view showing a state of drilling a floor finishing material in a toilet structure of a building unit. 図6は建物ユニットのトイレ構造における排水ソケットの取付状態を示し、(A)は平面図、(B)は断面図である。FIGS. 6A and 6B show an attached state of the drain socket in the toilet structure of the building unit, where FIG. 6A is a plan view and FIG. 6B is a cross-sectional view. 図7は建物ユニットのトイレ構造における便器の設置状態を示し、(A)は平面図、(B)は断面図である。FIG. 7 shows the installation state of a toilet in the toilet structure of a building unit, where (A) is a plan view and (B) is a cross-sectional view. 図8は建物ユニットのトイレ構造における戸枠の配設状態を示す平面図である。FIG. 8 is a plan view showing an arrangement state of door frames in a toilet structure of a building unit. 図9は建物ユニットのトイレ構造における戸枠の配設状態を示す正面図である。FIG. 9 is a front view showing an arrangement state of door frames in a toilet structure of a building unit. 図10は戸枠の配設状態を示し、(A)は斜視図、(B)は(A)のB−B線に沿う断面図である。FIG. 10 shows an arrangement state of the door frame, (A) is a perspective view, and (B) is a sectional view taken along line BB in (A). 図11は建物ユニットのトイレ構造における床下配管の接続状態を示す断面図である。FIG. 11 is a cross-sectional view showing a connection state of underfloor piping in a toilet structure of a building unit.

図1に示す建物ユニット10は、工場生産された後、建築現場に輸送され、他の建物ユニットと組合わされてユニット建物を構築するものである。建物ユニット10は、木質構造体又は鉄骨構造体からなり、床構造体11の外縁に壁構造体12を設け、壁構造体12の上部に不図示の天井構造体又は天井面材を取付けて構成されたものである。   A building unit 10 shown in FIG. 1 is manufactured at a factory, then transported to a building site, and combined with other building units to construct a unit building. The building unit 10 is made of a wooden structure or a steel structure, and is configured by providing a wall structure 12 on the outer edge of the floor structure 11 and attaching a ceiling structure or a ceiling surface material (not shown) to the top of the wall structure 12. It has been done.

このとき、建物ユニット10は、床構造体11の外縁において直交する2つの壁構造体12、12と、それらの壁構造体12の一方に直交する仕切壁パネル13と、仕切壁パネル13に直交する袖壁パネル14とにより囲まれて区画されるトイレ室15を有する。建物ユニット10のトイレ室15が備えるトイレ構造は、以下の施工手順により以下の如くに構成される。   At this time, the building unit 10 is orthogonal to the two wall structures 12, 12 orthogonal to the outer edge of the floor structure 11, the partition wall panel 13 orthogonal to one of the wall structures 12, and the partition wall panel 13. And a toilet room 15 surrounded by a sleeve wall panel 14. The toilet structure provided in the toilet room 15 of the building unit 10 is configured as follows according to the following construction procedure.

尚、建物ユニット10において、以下の(1)〜(4)は予め工場で施工され、(5)は現地で施工される。   In the building unit 10, the following (1) to (4) are pre-constructed in the factory, and (5) is constructed locally.

(1)建物ユニット10のトイレ室15内の図2に示す床下地11A(床構造体11の床下地11A)に、図3に示す如く、フローリング等の床仕上材20を敷設する。床仕上材20は、図4(A)に示す如く、トイレ室15の前述した2つの壁構造体12、12、仕切壁パネル13、及び袖壁パネル14により区画される床寸法に適合する矩形状の輪郭をなす。床仕上材20は、床遮音材と合板と仕上材をパネル化する等にて構成できる。   (1) A floor finishing material 20 such as flooring is laid on the floor base 11A shown in FIG. 2 (the floor base 11A of the floor structure 11) in the toilet room 15 of the building unit 10 as shown in FIG. As shown in FIG. 4 (A), the floor finish 20 is a rectangular material that fits the floor size defined by the above-described two wall structures 12, 12, the partition wall panel 13, and the sleeve wall panel 14 of the toilet room 15. Outline the shape. The floor finishing material 20 can be configured by forming a floor sound insulating material, a plywood, and a finishing material into a panel.

床仕上材20の所定位置に、図5に示す如く、排水ソケット30の排水管31を挿入するための孔21が、床下地11Aへの敷設前又は敷設後に穿設される。   As shown in FIG. 5, a hole 21 for inserting the drain pipe 31 of the drain socket 30 is drilled at a predetermined position of the floor finish 20 before or after laying on the floor base 11A.

(2)床下地11A及び床仕上材20の孔21に、図6に示す如く、排水ソケット30を取付ける。排水ソケット30は、床仕上材20の上に載置される外筒部30Aと、外筒部30Aの上部に設けられる上筒部30Bと、外筒部30Aの内側に設けられる下筒部30Cを有する。排水ソケット30の下筒部30Cに差し込まれる排水管31が床下地11A及び床仕上材20の孔21に挿入されて床下に突出される。   (2) The drain socket 30 is attached to the hole 21 of the floor base 11A and the floor finish 20 as shown in FIG. The drain socket 30 includes an outer cylinder part 30A placed on the floor finishing material 20, an upper cylinder part 30B provided on the upper part of the outer cylinder part 30A, and a lower cylinder part 30C provided on the inner side of the outer cylinder part 30A. Have A drain pipe 31 inserted into the lower cylinder portion 30C of the drain socket 30 is inserted into the floor base 11A and the hole 21 of the floor finish 20 and protrudes under the floor.

(3)便器40の排水口41を、図7に示す如く、排水ソケット30の上筒部30B内に、パッキン(不図示)を介して接続し、該便器40を床仕上材20の上に設置する。   (3) The drainage port 41 of the toilet bowl 40 is connected to the upper cylindrical portion 30B of the drainage socket 30 via packing (not shown) as shown in FIG. 7, and the toilet bowl 40 is placed on the floor finish 20 Install.

(4)トイレ室15の前述した2つの壁構造体12、12のうちの1つの壁構造体12と、袖壁パネル14の間の出入口15Aの戸枠50を、図8、図9に示す如く、床仕上材20勝ちの納まりで該出入口15Aに配設する。   (4) The door frame 50 of the entrance / exit 15A between the wall structure 12 of the above-described two wall structures 12 and 12 of the toilet room 15 and the sleeve wall panel 14 is shown in FIGS. As described above, the floor finishing material 20 is provided in the entrance 15A with a winning margin.

戸枠50は、図10に示す如く、2つの縦枠材51、51の上部に横枠組52を架け渡した門型をなし、一方の縦枠材51を壁構造体12の木桟12Aにビス止めされ、他方の縦枠材51を袖壁パネル14の木桟14Aにビス止めされる。戸枠50が床仕上材20勝ちの納まりで配設されることにより、両縦枠材51の下端部の下に床仕上材20が延在するものになる(図8、図9)。   As shown in FIG. 10, the door frame 50 has a gate shape in which a horizontal frame set 52 is bridged over two vertical frame members 51, 51. One vertical frame member 51 is used as a wooden crosspiece 12 </ b> A of the wall structure 12. The other vertical frame member 51 is screwed to the wooden crosspiece 14 </ b> A of the sleeve wall panel 14. When the door frame 50 is disposed in such a way that the floor finishing material 20 wins, the floor finishing material 20 extends under the lower ends of the vertical frame materials 51 (FIGS. 8 and 9).

(5)上述(1)〜(4)により工場生産された建物ユニット10を建築現場に輸送し、建築現場で他の建物ユニットと組合せてユニット建物を構築するに際し、建物ユニット10の床下に設けられる床下配管60が、前述(2)で建物ユニット10の床下に突出されている排水ソケット30の排水管31に継手61を介して接続される。   (5) When the building unit 10 manufactured in the factory according to the above (1) to (4) is transported to the building site and combined with other building units at the building site to construct the unit building, it is provided under the floor of the building unit 10 The underfloor pipe 60 is connected to the drain pipe 31 of the drain socket 30 projecting under the floor of the building unit 10 in the above-described (2) via a joint 61.

また、建物ユニット10にあっては、トイレ室15以外の床下地11Aに対する床仕上材の敷設を現地施工される。壁や天井のクロス等の仕上材の敷設も現地施工される。   Further, in the building unit 10, the floor finishing material is laid on the floor foundation 11 </ b> A other than the toilet room 15 on site. Laying of finishing materials such as walls and ceiling cloths will also be carried out locally.

尚、建物ユニット10の上述したトイレ構造の施工手順のうち、上述(4)の戸枠50の配設工程は、上述(1)の床仕上材20の敷設工程の後工程であれば、上述(2)の排水ソケット30の取付工程、及び上述(3)の便器40の設置工程の前工程でなされても良い。   Of the construction procedures for the toilet structure described above for the building unit 10, the above-mentioned (4) door frame 50 placement step is the above-described (1) floor finishing material 20 laying step if it is a subsequent step. It may be performed in the pre-process of the mounting process of the drain socket 30 of (2) and the installation process of the toilet bowl 40 of the above-mentioned (3).

本実施例によれば以下の作用効果を奏する。
(a)トイレ室15の出入口15Aの戸枠50が床仕上材20勝ちの納まりで該出入口15Aに配設される。従って、床仕上材20の外郭を戸枠50の下にて延在させることができ、床仕上材20の外郭を図4(A)に示す如く、戸枠50のトイレ室15内への出張り部に対して逃げるように凹状に加工する必要がなく、床仕上材20の加工作業性及び意匠性を向上できる。図4(B)は戸枠50勝ちの納まりとした場合、床仕上材20の外郭が戸枠50の縦枠材51、51の出張り部に対し逃げるように加工された凹部20A、20Bを示すものである。
According to the present embodiment, the following operational effects can be obtained.
(a) The door frame 50 of the entrance / exit 15A of the toilet room 15 is disposed in the entrance / exit 15A with a floor finishing material of 20 wins. Therefore, the outer wall of the floor covering 20 can be extended under the door frame 50, and the outer wall of the floor covering 20 is extended into the toilet room 15 as shown in FIG. It is not necessary to process into a concave shape so as to escape from the tension portion, and the workability and designability of the floor finish 20 can be improved. In FIG. 4B, when the door frame 50 wins, the recesses 20 </ b> A and 20 </ b> B processed so that the outer wall of the floor finishing material 20 escapes from the protruding portions of the vertical frame members 51 and 51 of the door frame 50 are illustrated. It is shown.

(b)床仕上材20がトイレ室15の床寸法に適合する矩形状の輪郭をなすものとすることにより、上述(a)の床仕上材20の加工作業性及び意匠性を確実に向上できる。   (b) By making the floor finishing material 20 have a rectangular outline that conforms to the floor dimensions of the toilet room 15, the workability and designability of the floor finishing material 20 of the above (a) can be reliably improved. .

(c)床仕上材20の敷設と、排水ソケット30の取付けと、便器40の設置と、戸枠50の配設とが、予め工場でなされるものとすることにより、トイレ室15を備えた建物ユニット10の工場生産化率を向上し、現地施工効率を向上することができる。   (c) The toilet room 15 is provided by laying the floor finishing material 20, attaching the drainage socket 30, installing the toilet bowl 40, and arranging the door frame 50 in advance in the factory. The factory production rate of the building unit 10 can be improved and the local construction efficiency can be improved.

(d)建物ユニット10のトイレ室15内の床下地11Aに工場で先に床仕上材20を敷設することにより、この床仕上材20の所定位置に取付けられる排水ソケット30の取付け、排水ソケット30に接続される便器40の設置を工場で施工できる。   (d) By laying the floor finishing material 20 first on the floor base 11A in the toilet room 15 of the building unit 10 at the factory, the drain socket 30 can be attached to the floor finishing material 20 at a predetermined position. The toilet 40 connected to the can be installed at the factory.

(e)建物ユニット10のトイレ室15内の床下地11Aに床仕上材20を敷設し、その後、トイレ室15の出入口15Aの戸枠50を床仕上材20勝ちの納まりで該出入口15Aに配設することにより、床仕上材20を戸枠50のない出入口15Aからトイレ室15内に容易に搬入し、敷設できる。   (e) The floor finishing material 20 is laid on the floor foundation 11A in the toilet room 15 of the building unit 10, and then the door frame 50 of the entrance 15A of the toilet room 15 is arranged at the entrance 15A with the floor finishing material 20 winning. By installing, the floor finishing material 20 can be easily carried into the toilet room 15 from the entrance / exit 15A without the door frame 50 and laid.

以上、本発明の実施例を図面により詳述したが、本発明の具体的な構成はこの実施例に限られるものではなく、本発明の要旨を逸脱しない範囲の設計の変更等があっても本発明に含まれる。   The embodiment of the present invention has been described in detail with reference to the drawings. However, the specific configuration of the present invention is not limited to this embodiment, and even if there is a design change or the like without departing from the gist of the present invention. It is included in the present invention.

本発明は、建物ユニットのトイレ構造において、建物ユニットのトイレ室内の床下地に床仕上材が敷設され、床下地及び床仕上材の所定位置に排水ソケットが取付けられ、便器の排水口が排水ソケットに接続されて該便器が床仕上材の上に設置され、トイレ室の出入口の戸枠が床仕上材勝ちの納まりで該出入口に配設されるものにした。そして、前記床仕上材の敷設と、前記排水ソケットの取付けと、前記便器の設置と、前記戸枠の配設とが、予め工場でなされるものにした。従って、トイレ室を備えた建物ユニットの工場生産化率を向上し、現地施工効率の向上を図るとともに、床仕上材の加工作業性及び意匠性を向上することができる。   The present invention relates to a toilet structure of a building unit, wherein a floor finishing material is laid on the floor base in the toilet room of the building unit, a drain socket is attached to a predetermined position of the floor base and the floor finishing material, and a drain outlet of the toilet is a drain socket The toilet bowl is installed on the floor finishing material, and the door frame of the entrance / exit of the toilet room is arranged at the entrance with the floor finishing material winning. And the installation of the floor finishing material, the attachment of the drain socket, the installation of the toilet, and the arrangement of the door frame are made in advance in the factory. Therefore, it is possible to improve the factory production rate of the building unit equipped with the toilet room, improve the local construction efficiency, and improve the workability and design of the floor finishing material.

10 建物ユニット
11A 床下地
15 トイレ室
15A 出入口
20 床仕上材
21 孔
30 排水ソケット
31 排水管
40 便器
41 排水口
50 戸枠
51 縦枠材
DESCRIPTION OF SYMBOLS 10 Building unit 11A Floor base 15 Toilet room 15A Entrance / exit 20 Floor finishing material 21 Hole 30 Drain socket 31 Drain pipe 40 Toilet 41 Drain outlet 50 Door frame 51 Vertical frame material

Claims (3)

トイレ室内の床下地に、該トイレ室の壁により区画される床寸法に適合する矩形状の輪郭をなす床仕上材を敷設し、
次に、床下地及び床仕上材の所定位置に排水ソケットを取付け、
次に、便器の排水口を排水ソケットに接続して該便器を床仕上材の上に設置する建物ユニットのトイレ構造の施工方法。
Laying a floor finishing material having a rectangular outline conforming to the floor size defined by the wall of the toilet room on the floor base in the toilet room ,
Next, attach drainage sockets to the specified positions on the floor foundation and floor finish,
Next, a construction method for a toilet structure of a building unit in which the toilet outlet is connected to a drain socket and the toilet is installed on a floor finish.
トイレ室内の床下地に、該トイレ室の壁により区画される床寸法に適合する矩形状の輪郭をなす床仕上材を敷設し、
その後、トイレ室の出入口の戸枠を床仕上材勝ちの納まりで該出入口に配設する建物ユニットのトイレ構造の施工方法。
Laying a floor finishing material having a rectangular outline conforming to the floor size defined by the wall of the toilet room on the floor base in the toilet room ,
Then, the construction method of the toilet structure of the building unit in which the door frame of the entrance / exit of the toilet room is arranged at the entrance / exit with the floor finishing material winning.
トイレ室内の床下地に、該トイレ室の壁により区画される床寸法に適合する矩形状の輪郭をなす床仕上材を敷設し、
次に、床下地及び床仕上材の所定位置に排水ソケットを取付け、
次に、便器の排水口を排水ソケットに接続して該便器を床仕上材の上に設置し、
次に、トイレ室の出入口の戸枠を床仕上材勝ちの納まりで該出入口に配設する建物ユニットのトイレ構造の施工方法。
Laying a floor finishing material having a rectangular outline conforming to the floor size defined by the wall of the toilet room on the floor base in the toilet room ,
Next, attach drainage sockets to the specified positions on the floor foundation and floor finish,
Next, connect the toilet outlet to the drain socket and place the toilet on the floor finish.
Next, a construction method for a toilet structure of a building unit in which the door frame of the entrance and exit of the toilet room is arranged at the entrance in accordance with the floor finishing material winning.
JP2009131323A 2009-05-29 2009-05-29 Toilet structure and construction method for building units Active JP5322779B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009131323A JP5322779B2 (en) 2009-05-29 2009-05-29 Toilet structure and construction method for building units

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009131323A JP5322779B2 (en) 2009-05-29 2009-05-29 Toilet structure and construction method for building units

Publications (2)

Publication Number Publication Date
JP2010275817A JP2010275817A (en) 2010-12-09
JP5322779B2 true JP5322779B2 (en) 2013-10-23

Family

ID=43423026

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009131323A Active JP5322779B2 (en) 2009-05-29 2009-05-29 Toilet structure and construction method for building units

Country Status (1)

Country Link
JP (1) JP5322779B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61165440A (en) * 1985-01-17 1986-07-26 積水化学工業株式会社 Unit building
JPH0415669U (en) * 1990-05-28 1992-02-07
JP3188807B2 (en) * 1994-04-19 2001-07-16 ミサワホーム株式会社 Building unit piping method and piping structure
JP2001279753A (en) * 2000-01-24 2001-10-10 Toto Ltd Functional floor pan
JP2006299711A (en) * 2005-04-22 2006-11-02 Noda Corp Mounting structure of door frame

Also Published As

Publication number Publication date
JP2010275817A (en) 2010-12-09

Similar Documents

Publication Publication Date Title
PT2009187E (en) Sanitary facility with a floor drain and method for assembling such a sanitary facility
KR20120002908U (en) Tile finishes for entrance packing adapter
KR20100070745A (en) Structure of prefabricated bathroom
JP5322779B2 (en) Toilet structure and construction method for building units
KR101580954B1 (en) Sleeve supporting body for plumbing on floor
EP2792803B1 (en) Method for construction of a building
JP6587428B2 (en) Bathing equipment and assembly bath body used therefor
KR101135564B1 (en) Structure of prefabricated bathroom
KR20100081861A (en) Structure of prefabricated bathroom
JP3178601U (en) Partition plate mounting bracket
KR101178115B1 (en) Sleeve
KR20180062087A (en) Prefabrication Wall Of Bathroom And Installation Method Thereof
JP4979441B2 (en) Wall panels
JP4849239B2 (en) Bathroom unit
JP2015137455A (en) Installation structure for piping storage unit
JP7082554B2 (en) Installation method and structure of the lower structure of the joinery frame, joinery frame with the lower structure
KR200450406Y1 (en) A tissue holder steel structure built in the wall
JP6931795B2 (en) Sanitary unit structure and its construction method
WO2015146474A1 (en) Bathroom unit and method for construction thereof
GB2463070A (en) Device for reinforcing a joist
WO2021210193A1 (en) Sanitary unit structure and method for constructing same
JP4974793B2 (en) Hygiene device mounting apparatus and method
KR101740388B1 (en) Drainage plate sag prevention and induction drainage unit, prevention of drainage plate sagging, and installation method of ceiling drain plate using induction drainage unit
JP6649179B2 (en) Building plumbing structures and buildings
JP4341545B2 (en) Hot water / water supply structure in the bathroom

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20111122

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121211

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121218

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130206

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130702

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130716

R151 Written notification of patent or utility model registration

Ref document number: 5322779

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151