EP2792803B1 - Method for construction of a building - Google Patents

Method for construction of a building Download PDF

Info

Publication number
EP2792803B1
EP2792803B1 EP14397515.9A EP14397515A EP2792803B1 EP 2792803 B1 EP2792803 B1 EP 2792803B1 EP 14397515 A EP14397515 A EP 14397515A EP 2792803 B1 EP2792803 B1 EP 2792803B1
Authority
EP
European Patent Office
Prior art keywords
floor
floors
building
opening
modular unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP14397515.9A
Other languages
German (de)
French (fr)
Other versions
EP2792803A1 (en
Inventor
Hannu Lehto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rakennusliike Lehto Oy
Original Assignee
Rakennusliike Lehto Oy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rakennusliike Lehto Oy filed Critical Rakennusliike Lehto Oy
Publication of EP2792803A1 publication Critical patent/EP2792803A1/en
Application granted granted Critical
Publication of EP2792803B1 publication Critical patent/EP2792803B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34807Elements integrated in a skeleton
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34869Elements for special technical purposes, e.g. with a sanitary equipment

Definitions

  • the invention relates to a method for constructing a building, which building has at least three floors, in which method a frame of the building is erected, which frame comprises at least one intermediate floor and load-bearing structural elements, such as load-bearing walls and/or pillars, supporting the intermediate floors, an opening is formed to at least one intermediate floor simultaneously with the con struction of the intermediate floor and at least one modular unit is lowered to at least one floor under the intermediate floor through said opening.
  • prefabricated structural elements i.e. units.
  • the prefabricated structural elements can be manufactured in plant conditions faster and more efficiently than on the construction site, whereby the construction time of a block of flats shortens bringing savings to the construction costs.
  • the prefabricated structural elements typically used in the construction of blocks of flats are hollow-core slabs, partition elements and façade elements.
  • prefabricated sanitary box elements i.e. bathroom elements, are known, in which elements the entire bathroom is manufactured as one modular unit ready for installation.
  • the finished modular units are typically installed in their places after the construction of the load-bearing frame of the building, i.e. after the construction of load-bearing vertical structures and intermediate floors.
  • Publications FR 2025953 and US 2005/0108957 describe installation methods of modular units, in which methods the modular units are lowered in their places inside the frame of the building from above through the openings in the intermediate floors of the building. The modular units are installed in their places simultaneously with the progress of the construction work or immediately after the frame is finished.
  • Publication WO 2007/085687 describes a repair method for sanitary cabins of a block of flats, in which method the old sanitary cabins and the parts of the intermediate floors of the building limited to them are demolished. New sanitary cabinet elements are lowered inside the building through openings formed in the intermediate floors in connection with the demolishing work.
  • the object of the invention is to provide a method for constructing a building, especially a block of flats, and a building constructed with the method, with which method and building the disadvantages relating to the prior art can be reduced.
  • the invention relates to a method for constructing a building, which has at least three floors.
  • a frame of the building is erected, which frame comprises at least one intermediate floor and structural elements, such as load-bearing walls and/or pillars, supporting the intermediate floors.
  • the frame of the building can be constructed on the site or entirely or partly as prefabricated structure elements.
  • an opening is formed to at least one intermediate floor simultaneously with the construction of the intermediate floor and at least one modular unit is lowered to at least one floor under the intermediate floor through said opening. Through the opening in the intermediate floor the modular unit can be lowered from above directly in its correct place in the floor, whereby it is not necessary to transfer the modular unit anymore in the floor level.
  • a roof covering is substantially ready installed to the building before lowering the modular units to the floors.
  • a substantially ready-made roof covering refers to the fact that the roof covering of the building prevents the rain water to get inside the building through the roof covering.
  • a substantially ready-made roof covering thus comprises at least water-proof underlay and it can also comprise a surface layer of the actual roof covering.
  • An opening is formed to the roof covering, which opening is in alignment with the openings of the intermediate floor, and the modular units are lowered to the floors through the opening of the roof covering.
  • the opening formed in the roof covering can be covered by a temporary cover.
  • the opening of the roof covering is constructed so as to be closed, i.e. covered with the roofing used in the roof covering, whereby the roof covering becomes entirely waterproof and uniform in its appearance.
  • a frame is erected, which frame has several intermediate floors, and at least one opening is formed to substantially each intermediate floor of the frame so that the openings are in alignment with the same vertical line and at least one modular unit is lowered through the openings to substantially each floor.
  • the building to be constructed is thus clearly a block of flats, which has several floors on top of each other, which floors have one or several apartments.
  • the number of the floors is not limited in any way. In typical blocks of flats, the number of the floors can be from three to twelve, but the number of the floors can also be bigger than mentioned above.
  • the number of the intermediate floors depends naturally on the number of the floors of the building.
  • the number of the intermediate floors can be for example 2, 3, 4, 5, 6 or more than 6.
  • the blocks of flats are constructed so that the room spaces in different floors to be constructed from the modular units have substantially the same size and they set exactly on top of each other, i.e. they are in the same place of the intermediate floor in every floor.
  • One floor can have several apartments, wherein each apartment has typically at least one room space to be constructed from the modular unit.
  • the modular units are lowered to the floors from above through the openings of the intermediate floors and the roof covering so that the modular unit of the lowest floor is lowered in its place first. After this the modular unit of the second lowest floor is lowered in its place, and this is continued until the modular units are lowered in their places in all floors. Naturally, the modular unit of the uppermost floor does not need to be lowered through the intermediate floor between the floors.
  • outer walls and roof are constructed to the building.
  • a thermal insulation is installed to the outer walls and roof before lowering the modular units to the floors.
  • a thermally insulated, weatherproof continuous outer coating is provided to the building. Due to the thermally insulated outer coating the inner temperature of the building can be increased with the heating devices to the level of the normal residential temperature, whereby the frame structures start to dry and the humidity and the temperature of the interiors can be kept substantially constant.
  • At least a part of the outer walls of the building can be built substantially ready before lowering the modular units to the floors. This means that the construction of the cladding of the outer walls can be started immediately after installing the thermal insulation layer of the outer walls.
  • the modular units have a floor slab and they are supported from the floor slab to the edges of the opening of the intermediate floor so as to bear the vertical loads after they have been lowered in their places to the right floor inside the block of flats.
  • the dead weight of the modular units and the loads of the modular unit during their use, such as person loads, are transferred through the edges of the floor slab to the edges of the opening of the intermediate floor, wherefrom they transfer through the load-bearing frame of the building to the ground. Vertical loads are thus not at least remarkably transferred from the modular unit located higher in the building to the modular unit underneath it.
  • the openings of the intermediate floors are dimensioned so that they are only slightly bigger in their size than the floor slabs of the modular unit, so that only a clearance which is as small as possible and enables the through passage of the modular units remains between the edges of the floor slab and the edges of the opening.
  • the floor slab is easy to attach from its edges to the edges of the opening without big supporting elements.
  • the modular units are supported in their places so that the upper surface of the floor slab and the upper surface of the intermediate floor set to a substantially same level. In the apartments of the building all floor surfaces of the room spaces are thus substantially on the same level, whereby they fulfil the requirements of unrestricted living.
  • a modular unit comprising a floor slab, ceiling and walls, is lowered to the floor with the method.
  • the walls have a first surface and a second surface, and the first surfaces of the walls define a bathroom inside them.
  • the bathroom has fixed equipment and/or furniture for use in the bathroom.
  • At least a WC seat, hand basin with accessories, shower wall or curtain, shower faucet, bathroom cabinet, lamp, heat distribution system, floor drain and washing machine connections belong typically to the equipment of such modular unit.
  • a modular unit in which a part of said floor slab extends along the length of at least one wall outside the area defined by the second surfaces of said walls, is lowered to the floor with the method.
  • This part of the floor slab and/or the second surface of said at least one wall have second fixed equipment and/or furniture for use in the second room space.
  • the second room space outside the modular unit can be a kitchen, whereby the above-mentioned second equipment and/or furniture are fixed kitchen equipment and/or furniture.
  • Such equipment that typically belong to every kitchen are among others kitchen cupboards, kitchen sink with accessories as well as connections for installing dish washer, stove and refrigeration equipment.
  • the second equipment and/or furniture can also be fixed hall equipment and/or furniture, such as closets.
  • a building constructed with the method has at least three floors, a frame comprising at least one intermediate floor and load-bearing structural elements, such as load-bearing walls and/or pillars, supporting the intermediate floors.
  • the building comprises further at least one modular unit in the floor under at least one intermediate floor.
  • the modular unit has been lowered through the opening in the intermediate floor formed simultaneously with the construction of the intermediate floor.
  • the building is characterized by having a roof covering, which is substantially ready built before lowering the modular units to the floors.
  • An opening which is in alignment with the openings of the intermediate floor is formed to the roof covering, and the modular units have been lowered to the floors through the opening in the roof covering.
  • a preferred embodiment of the building has outer walls and a roof, to which a thermal insulation has been installed before lowering the modular units to the floors.
  • the modular units comprise a floor slab and the modular units are supported from the floor slab to the edges of the opening of the intermediate floor in a manner so as to bear the vertical loads.
  • An advantage of the method according to the invention is that it enables a remarkable increase of the prefabrication degree in the construction of block of flats, what shortens the construction time and brings savings to the construction costs.
  • an advantage of the invention is that it accelerates the installation of the modular units to the building. Before installing the modular units in their places, the openings in the intermediate floors formed for the modular units serve as "channels", which make it easier and faster to heat and dry the building during the construction work. The invention thus shortens the construction time also in this way.
  • an advantage of the invention is that it improves the construction quality, since the major part of the construction-technically demanding construction works is transferred from the construction site to be made in plant conditions.
  • Figures 1a-1d show by way of an example a construction method of a building according to the invention with the aid of a series of pictures.
  • the building to be constructed with the method presented in Figures 1a-1d is a six-storey block of flats.
  • the foundation 28 is constructed first, on which foundation the frame 10 of the block of flats is erected ( Fig. 1 a) .
  • the foundation can be a footing foundation or a pile foundation or any other known foundation.
  • the block of flats has several floors 26 on top of each other, which floors can have one or more apartments.
  • the block of flats presented in Figures 1a-1d has six floors, but it can also have another number of floors. Between each floor there is an intermediate floor 12, which forms the ceiling of the lower floor and the floor of the upper floor.
  • the upper surface of the uppermost floor has a roof 14, which has a substantially same structure as the intermediate floors.
  • the lower surface of the lowest floor has a base floor 16, which in Figure 1a is a ground slab.
  • a base floor 16 which in Figure 1a is a ground slab.
  • the frame of the block of flats is constructed from reinforced concrete, i.e. its load-bearing structures are reinforced concrete structures.
  • the frame can be constructed on the site or entirely or partly as prefabricated structure elements.
  • the construction of the frame of the block of flats is conventional known construction technique, which is not described in more detail in this connection.
  • openings 30 are formed in each intermediate floor 12 so that the openings in the superimposed intermediate floors have substantially the same size and form and they are in alignment with the same vertical line. Openings 30 corresponding to the openings in the intermediate floors are formed to the roof 14. The openings are formed so many, that there is one opening in the place of an apartment to be built in each floor. The openings are dimensioned so that their outer dimensions are slightly bigger than the outer dimensions of the modular unit to be placed in the opening.
  • the thermal insulation layer of the roof 14 and the roof covering 18 as well as the outer walls 24 of the building are constructed after the frame of the building has been finished.
  • the roof covering is constructed to a degree of readiness, where the roof covering becomes rain water proof. This means that at least waterproof underlay is installed to the roof covering.
  • the roof covering can also be substantially ready built in its entirety, i.e. also a final surface layer of the roof covering can be installed therein.
  • Lead-through openings 30a are left in the roof covering in the places of the openings in the roof.
  • the openings of the roof covering are covered by opening covers (the covers are not presented in the Figures), so that the roof covering becomes waterproof.
  • the outer walls can be constructed on site or as prefabricated structure elements.
  • the outer walls are constructed at least to a degree of readiness, where they have a finished thermal insulation and an external wind shield layer covering the thermal insulation from weather.
  • the drying of the structures can be accelerated with separate dryers. Decoration works of the building are made simultaneously with the drying of the structures.
  • the modular units 50 ( Figure 1 c) are transferred inside the building.
  • the modular units are prefabricated structural elements, which have a floor slab, walls and a ceiling.
  • the structure of the modular units is disclosed in more detail in the description of Figure 2 .
  • the modular units are ready built and equipped at the element factory and delivered to the construction site as parts ready to be installed.
  • the openings 30a in the roof covering are opened and the modular units are lowered by a crane 100 through the openings in the roof covering 18, roof 14 and in the intermediate floors 12 to the floors 26.
  • the openings of the roof covering, roof and intermediate floors are dimensioned so that the side dimensions of the openings are slightly bigger than the outer dimensions of the modular unit.
  • the side dimensions of the opening can be for example in both directions 50 mm bigger than the side dimensions of the modular unit.
  • a sufficient clearance which enables a lead-through, remains between the outer surfaces of the walls of the modular unit and the edges of the opening.
  • the installation of modular units is started from the lowest floor, i.e. the modular unit of the lowest floor is lowered first in its place on the base floor 16.
  • the base floor has a cavity 17 ( Figure 1a ) in the lowering point of the modular unit, the outer dimensions of which cavity are the same as the dimensions of the openings in the intermediate floors 12.
  • the depth of the cavity is dimensioned so that the upper surface of the floor slab and the upper surface of the base floor 16 of the modular unit placed in the cavity set substantially on the same level.
  • the modular unit of the lowest floor is attached to the base floor by grouting.
  • the modular unit 50 of the second lowest floor is lowered in its place.
  • the modular unit is lowered down in the manner described above by a crane 100 through the openings in the roof covering 18, roof 14 and the intermediate floors 12.
  • the modular unit is attached from the edges of the floor slab to the edges of the opening 30 of the intermediate floor 12 by appropriate fixing elements so that the dead weight and person loads are transferred through the fixing elements to the edges of the opening of the intermediate floor.
  • the fixing elements can be for example steel fixing plates generally used in concrete elements, which fixing plates are cast with the rod-like attachment parts so as to fix to the edges of the opening 30 of the intermediate floor and to the edges of the floor slab of the modular unit.
  • Steel fixing plates can be attached to each other by welding with the aid of a connector.
  • the gap between the floor slab of the modular unit and the edges of the opening of the intermediate floor is filled with grouting.
  • Modular units are installed in a respective manner to all floors and all apartments of a floor of the block of flats. After the modular units of the uppermost floor have been lowered and fixed in their places, the openings 30a in the roof 14 and roof covering 18 are covered ( Figure 1d ). After the covering of the openings the roof is entirely thermally insulated and the roof covering is waterproof.
  • FIG. 2 shows by way of an example a cross-sectional view of a modular unit 50 in a building constructed with the method.
  • the modular unit is a closed "room-like" space, which has a floor slab 52, walls 54 and a ceiling 56.
  • One wall has an opening door 58 for getting in to the modular unit.
  • the walls 54 of the modular unit are in their structure normal walls having skeleton construction and being coated with lining plates on both sides.
  • the ceiling has horizontal supporting beams, on the under surface of which there is an interior lining plate.
  • the floor slab of the modular unit is dimensioned so that it bears the loads coming from its dead weight as well as the service loads when supported from its edges.
  • the floor slab is manufactured from reinforced concrete.
  • the floor slab is attached from its edges to the edges of the opening 30 of the intermediate floor 12 so that the upper surface of the floor slab and the upper surface of the intermediate floor are substantially set to the same level.
  • the steel fixing plates are welded together with the aid of connectors 68.
  • the gap between the floor slab of the modular unit and the edges of the opening of the intermediate floor is filled with grouting 62.
  • a WC seat Inside the modular unit, there are fixed equipment and/or furniture for use in the bathroom (furniture and equipment are not shown in the Figure). At least a WC seat, hand basin with accessories, shower wall or curtain, shower faucet, bathroom cabinet, lamp, heat distribution system, floor drain and washing machine connections belong typically to the equipment of a bathroom modular unit.
  • the modular unit has in one corner a vertical channel 66, a so-called duct, defined by the walls, the first end of which channel opens through the opening in the floor slab 52 under the floor slab and the second end opens through the opening in the ceiling 56 over the ceiling.
  • the channel is designed for placing the pipes and wires of the heating, plumbing, ventilation and electrical installation systems of the block of flats.
  • Such pipes and wires to be placed in the channel are among others drain pipes, air pipes, pipes for cold and warm service water, pipes for the water circulating heating system, pipes for sprinkler system and electric cables.
  • the channel can have all above-mentioned pipes and wires ready-fitted, wherein the pipes and wires of the superimposed modular units are connected to each other when installing the modular units.
  • the floor height of a block of flats is according to the building regulations at least 3 meters, wherein the clearance between the upper intermediate floor and the lower intermediate floor of the story is about 2700 mm.
  • the modular unit is dimensioned so that the distance between the upper surface of the floor slab and the upper surface of the ceiling is about 2400 mm, i.e. clearly smaller than 2700 mm.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Health & Medical Sciences (AREA)
  • Epidemiology (AREA)
  • Public Health (AREA)
  • Building Environments (AREA)
  • Floor Finish (AREA)

Description

  • The invention relates to a method for constructing a building, which building has at least three floors, in which method a frame of the building is erected, which frame comprises at least one intermediate floor and load-bearing structural elements, such as load-bearing walls and/or pillars, supporting the intermediate floors, an opening is formed to at least one intermediate floor simultaneously with the con struction of the intermediate floor and at least one modular unit is lowered to at least one floor under the intermediate floor through said opening.
  • The concentration of the population in cities and growth centres creates the demand to build new apartments, especially in blocks of flats. The constant price increase of new apartments has led to the situation, in which many of those in need of apartments can't afford their own apartment. The rise of the construction costs also inevitably leads to the rise of the rent level, which also makes it harder to get a rental apartment for a reasonable price. There is thus a clear need for solutions reducing the construction costs of blocks of flats.
  • One known way for reducing the construction costs is to increase the use of prefabricated structural elements, i.e. units. The prefabricated structural elements can be manufactured in plant conditions faster and more efficiently than on the construction site, whereby the construction time of a block of flats shortens bringing savings to the construction costs. The prefabricated structural elements typically used in the construction of blocks of flats are hollow-core slabs, partition elements and façade elements. Also prefabricated sanitary box elements, i.e. bathroom elements, are known, in which elements the entire bathroom is manufactured as one modular unit ready for installation. The finished modular units are typically installed in their places after the construction of the load-bearing frame of the building, i.e. after the construction of load-bearing vertical structures and intermediate floors. Transferring and installing of the modular units between the closed intermediate floors is hard and slow. Furthermore, the floor surface of the modular unit to be placed on the intermediate floor remains higher than the floor surface of the other spaces of the apartment, which makes the use of the space harder and weakens the aesthetic look of the apartment.
  • Publications FR 2025953 and US 2005/0108957 describe installation methods of modular units, in which methods the modular units are lowered in their places inside the frame of the building from above through the openings in the intermediate floors of the building. The modular units are installed in their places simultaneously with the progress of the construction work or immediately after the frame is finished. Publication WO 2007/085687 describes a repair method for sanitary cabins of a block of flats, in which method the old sanitary cabins and the parts of the intermediate floors of the building limited to them are demolished. New sanitary cabinet elements are lowered inside the building through openings formed in the intermediate floors in connection with the demolishing work.
  • Document US 2005/108957 A1 discloses the features of the preamble of claim 1.
  • The object of the invention is to provide a method for constructing a building, especially a block of flats, and a building constructed with the method, with which method and building the disadvantages relating to the prior art can be reduced.
  • The objects of the invention are obtained with a method, which is characterized by what is presented in the independent claims. Some advantageous embodiments of the invention are presented in the dependent claims.
  • The invention relates to a method for constructing a building, which has at least three floors. In the method, a frame of the building is erected, which frame comprises at least one intermediate floor and structural elements, such as load-bearing walls and/or pillars, supporting the intermediate floors. The frame of the building can be constructed on the site or entirely or partly as prefabricated structure elements. In the method, an opening is formed to at least one intermediate floor simultaneously with the construction of the intermediate floor and at least one modular unit is lowered to at least one floor under the intermediate floor through said opening. Through the opening in the intermediate floor the modular unit can be lowered from above directly in its correct place in the floor, whereby it is not necessary to transfer the modular unit anymore in the floor level. In the method, a roof covering is substantially ready installed to the building before lowering the modular units to the floors. A substantially ready-made roof covering refers to the fact that the roof covering of the building prevents the rain water to get inside the building through the roof covering. A substantially ready-made roof covering thus comprises at least water-proof underlay and it can also comprise a surface layer of the actual roof covering. An opening is formed to the roof covering, which opening is in alignment with the openings of the intermediate floor, and the modular units are lowered to the floors through the opening of the roof covering. Before lowering the modular units in their places the opening formed in the roof covering can be covered by a temporary cover. After lowering the modular units in their places, the opening of the roof covering is constructed so as to be closed, i.e. covered with the roofing used in the roof covering, whereby the roof covering becomes entirely waterproof and uniform in its appearance.
  • In a preferred embodiment of the method according to the invention, a frame is erected, which frame has several intermediate floors, and at least one opening is formed to substantially each intermediate floor of the frame so that the openings are in alignment with the same vertical line and at least one modular unit is lowered through the openings to substantially each floor. In this embodiment the building to be constructed is thus clearly a block of flats, which has several floors on top of each other, which floors have one or several apartments. The number of the floors is not limited in any way. In typical blocks of flats, the number of the floors can be from three to twelve, but the number of the floors can also be bigger than mentioned above. The number of the intermediate floors depends naturally on the number of the floors of the building. The number of the intermediate floors can be for example 2, 3, 4, 5, 6 or more than 6.
  • The blocks of flats are constructed so that the room spaces in different floors to be constructed from the modular units have substantially the same size and they set exactly on top of each other, i.e. they are in the same place of the intermediate floor in every floor. One floor can have several apartments, wherein each apartment has typically at least one room space to be constructed from the modular unit. The modular units are lowered to the floors from above through the openings of the intermediate floors and the roof covering so that the modular unit of the lowest floor is lowered in its place first. After this the modular unit of the second lowest floor is lowered in its place, and this is continued until the modular units are lowered in their places in all floors. Naturally, the modular unit of the uppermost floor does not need to be lowered through the intermediate floor between the floors.
  • In another preferred embodiment of the method according to the invention outer walls and roof are constructed to the building. A thermal insulation is installed to the outer walls and roof before lowering the modular units to the floors. In this way, a thermally insulated, weatherproof continuous outer coating is provided to the building. Due to the thermally insulated outer coating the inner temperature of the building can be increased with the heating devices to the level of the normal residential temperature, whereby the frame structures start to dry and the humidity and the temperature of the interiors can be kept substantially constant. At least a part of the outer walls of the building can be built substantially ready before lowering the modular units to the floors. This means that the construction of the cladding of the outer walls can be started immediately after installing the thermal insulation layer of the outer walls.
  • In yet another preferred embodiment of the method of the invention the modular units have a floor slab and they are supported from the floor slab to the edges of the opening of the intermediate floor so as to bear the vertical loads after they have been lowered in their places to the right floor inside the block of flats. The dead weight of the modular units and the loads of the modular unit during their use, such as person loads, are transferred through the edges of the floor slab to the edges of the opening of the intermediate floor, wherefrom they transfer through the load-bearing frame of the building to the ground. Vertical loads are thus not at least remarkably transferred from the modular unit located higher in the building to the modular unit underneath it. The openings of the intermediate floors are dimensioned so that they are only slightly bigger in their size than the floor slabs of the modular unit, so that only a clearance which is as small as possible and enables the through passage of the modular units remains between the edges of the floor slab and the edges of the opening. In this case, the floor slab is easy to attach from its edges to the edges of the opening without big supporting elements. Preferably the modular units are supported in their places so that the upper surface of the floor slab and the upper surface of the intermediate floor set to a substantially same level. In the apartments of the building all floor surfaces of the room spaces are thus substantially on the same level, whereby they fulfil the requirements of unrestricted living.
  • In yet another preferred embodiment of the method according to the invention, a modular unit comprising a floor slab, ceiling and walls, is lowered to the floor with the method. The walls have a first surface and a second surface, and the first surfaces of the walls define a bathroom inside them. The bathroom has fixed equipment and/or furniture for use in the bathroom. At least a WC seat, hand basin with accessories, shower wall or curtain, shower faucet, bathroom cabinet, lamp, heat distribution system, floor drain and washing machine connections belong typically to the equipment of such modular unit.
  • In yet another preferred embodiment of the method according to the invention, a modular unit, in which a part of said floor slab extends along the length of at least one wall outside the area defined by the second surfaces of said walls, is lowered to the floor with the method. This part of the floor slab and/or the second surface of said at least one wall have second fixed equipment and/or furniture for use in the second room space. The essential fact in this embodiment of the invention is thus, that there are first fixed equipment and/or furniture inside of it, which equipment and/or furniture are designed for use in the bathroom inside the modular unit, and that there are second fixed equipment outside the modular unit, which equipment are designed for use in the space outside the modular unit. The second room space outside the modular unit can be a kitchen, whereby the above-mentioned second equipment and/or furniture are fixed kitchen equipment and/or furniture. Such equipment that typically belong to every kitchen are among others kitchen cupboards, kitchen sink with accessories as well as connections for installing dish washer, stove and refrigeration equipment. The second equipment and/or furniture can also be fixed hall equipment and/or furniture, such as closets.
  • A building constructed with the method has at least three floors, a frame comprising at least one intermediate floor and load-bearing structural elements, such as load-bearing walls and/or pillars, supporting the intermediate floors. The building comprises further at least one modular unit in the floor under at least one intermediate floor. The modular unit has been lowered through the opening in the intermediate floor formed simultaneously with the construction of the intermediate floor. The building is characterized by having a roof covering, which is substantially ready built before lowering the modular units to the floors. An opening which is in alignment with the openings of the intermediate floor is formed to the roof covering, and the modular units have been lowered to the floors through the opening in the roof covering. A preferred embodiment of the building has outer walls and a roof, to which a thermal insulation has been installed before lowering the modular units to the floors.
  • In yet another preferred embodiment of the building the modular units comprise a floor slab and the modular units are supported from the floor slab to the edges of the opening of the intermediate floor in a manner so as to bear the vertical loads.
  • An advantage of the method according to the invention is that it enables a remarkable increase of the prefabrication degree in the construction of block of flats, what shortens the construction time and brings savings to the construction costs.
  • Further, an advantage of the invention is that it accelerates the installation of the modular units to the building. Before installing the modular units in their places, the openings in the intermediate floors formed for the modular units serve as "channels", which make it easier and faster to heat and dry the building during the construction work. The invention thus shortens the construction time also in this way.
  • Further, an advantage of the invention is that it improves the construction quality, since the major part of the construction-technically demanding construction works is transferred from the construction site to be made in plant conditions.
  • In the following, the invention will be described in detail. In the description, reference is made to the enclosed drawings, in which
    • Figs. 1a to 1d show by way of an example a construction method of a building according to the invention with the aid of a series of pictures and
    • Figure 2 shows a cross-sectional view of the modular unit in a building constructed with the method.
  • Figures 1a-1d show by way of an example a construction method of a building according to the invention with the aid of a series of pictures.
  • The building to be constructed with the method presented in Figures 1a-1d is a six-storey block of flats. In the method, the foundation 28 is constructed first, on which foundation the frame 10 of the block of flats is erected (Fig. 1 a). The foundation can be a footing foundation or a pile foundation or any other known foundation. The block of flats has several floors 26 on top of each other, which floors can have one or more apartments. The block of flats presented in Figures 1a-1d has six floors, but it can also have another number of floors. Between each floor there is an intermediate floor 12, which forms the ceiling of the lower floor and the floor of the upper floor. The upper surface of the uppermost floor has a roof 14, which has a substantially same structure as the intermediate floors. The lower surface of the lowest floor has a base floor 16, which in Figure 1a is a ground slab. Between the intermediate floors 12 and the uppermost intermediate floor and the roof 14 there are vertical load-bearing walls 20 and pillars 22, which bear the loads of the roofs and intermediate floors and transfer them into the foundation. The frame of the block of flats is constructed from reinforced concrete, i.e. its load-bearing structures are reinforced concrete structures. The frame can be constructed on the site or entirely or partly as prefabricated structure elements. The construction of the frame of the block of flats is conventional known construction technique, which is not described in more detail in this connection.
  • In the method, openings 30 are formed in each intermediate floor 12 so that the openings in the superimposed intermediate floors have substantially the same size and form and they are in alignment with the same vertical line. Openings 30 corresponding to the openings in the intermediate floors are formed to the roof 14. The openings are formed so many, that there is one opening in the place of an apartment to be built in each floor. The openings are dimensioned so that their outer dimensions are slightly bigger than the outer dimensions of the modular unit to be placed in the opening.
  • The thermal insulation layer of the roof 14 and the roof covering 18 as well as the outer walls 24 of the building are constructed after the frame of the building has been finished. The roof covering is constructed to a degree of readiness, where the roof covering becomes rain water proof. This means that at least waterproof underlay is installed to the roof covering. The roof covering can also be substantially ready built in its entirety, i.e. also a final surface layer of the roof covering can be installed therein. Lead-through openings 30a are left in the roof covering in the places of the openings in the roof. The openings of the roof covering are covered by opening covers (the covers are not presented in the Figures), so that the roof covering becomes waterproof.
  • The outer walls can be constructed on site or as prefabricated structure elements. The outer walls are constructed at least to a degree of readiness, where they have a finished thermal insulation and an external wind shield layer covering the thermal insulation from weather. After the construction of the outer walls and roof covering the interiors of the building are protected from the weather and the outer covering of the building is thermally insulated. After this the inner temperature of the building is increased to normal residential temperature with the heating devices, whereby the structures begin to dry. The drying of the structures can be accelerated with separate dryers. Decoration works of the building are made simultaneously with the drying of the structures.
  • After having obtained a sufficiently low relative air humidity concerning the durability of the surface materials the modular units 50 (Figure 1 c) are transferred inside the building. The modular units are prefabricated structural elements, which have a floor slab, walls and a ceiling. The structure of the modular units is disclosed in more detail in the description of Figure 2. The modular units are ready built and equipped at the element factory and delivered to the construction site as parts ready to be installed. In order to transfer the modular units, the openings 30a in the roof covering are opened and the modular units are lowered by a crane 100 through the openings in the roof covering 18, roof 14 and in the intermediate floors 12 to the floors 26. The openings of the roof covering, roof and intermediate floors are dimensioned so that the side dimensions of the openings are slightly bigger than the outer dimensions of the modular unit. The side dimensions of the opening can be for example in both directions 50 mm bigger than the side dimensions of the modular unit. Thus, a sufficient clearance, which enables a lead-through, remains between the outer surfaces of the walls of the modular unit and the edges of the opening.
  • The installation of modular units is started from the lowest floor, i.e. the modular unit of the lowest floor is lowered first in its place on the base floor 16. The base floor has a cavity 17 (Figure 1a) in the lowering point of the modular unit, the outer dimensions of which cavity are the same as the dimensions of the openings in the intermediate floors 12. The depth of the cavity is dimensioned so that the upper surface of the floor slab and the upper surface of the base floor 16 of the modular unit placed in the cavity set substantially on the same level. The modular unit of the lowest floor is attached to the base floor by grouting.
  • Next, the modular unit 50 of the second lowest floor is lowered in its place. The modular unit is lowered down in the manner described above by a crane 100 through the openings in the roof covering 18, roof 14 and the intermediate floors 12. The modular unit is attached from the edges of the floor slab to the edges of the opening 30 of the intermediate floor 12 by appropriate fixing elements so that the dead weight and person loads are transferred through the fixing elements to the edges of the opening of the intermediate floor. The fixing elements can be for example steel fixing plates generally used in concrete elements, which fixing plates are cast with the rod-like attachment parts so as to fix to the edges of the opening 30 of the intermediate floor and to the edges of the floor slab of the modular unit. Steel fixing plates can be attached to each other by welding with the aid of a connector. The gap between the floor slab of the modular unit and the edges of the opening of the intermediate floor is filled with grouting.
  • Modular units are installed in a respective manner to all floors and all apartments of a floor of the block of flats. After the modular units of the uppermost floor have been lowered and fixed in their places, the openings 30a in the roof 14 and roof covering 18 are covered (Figure 1d). After the covering of the openings the roof is entirely thermally insulated and the roof covering is waterproof.
  • Figure 2 shows by way of an example a cross-sectional view of a modular unit 50 in a building constructed with the method. The modular unit is a closed "room-like" space, which has a floor slab 52, walls 54 and a ceiling 56. One wall has an opening door 58 for getting in to the modular unit. The walls 54 of the modular unit are in their structure normal walls having skeleton construction and being coated with lining plates on both sides. The ceiling has horizontal supporting beams, on the under surface of which there is an interior lining plate. The floor slab of the modular unit is dimensioned so that it bears the loads coming from its dead weight as well as the service loads when supported from its edges. The floor slab is manufactured from reinforced concrete. The floor slab is attached from its edges to the edges of the opening 30 of the intermediate floor 12 so that the upper surface of the floor slab and the upper surface of the intermediate floor are substantially set to the same level. For fixing the modular unit, there are steel fixing plates 60 on the edge surfaces of the floor slab and on the edge surface of the opening 30, which fixing plates are cast by rod-like attachment parts so as to fix to the edges of the opening of the intermediate floor and to the edges of the floor slab. The steel fixing plates are welded together with the aid of connectors 68. The gap between the floor slab of the modular unit and the edges of the opening of the intermediate floor is filled with grouting 62.
  • Inside the modular unit, there are fixed equipment and/or furniture for use in the bathroom (furniture and equipment are not shown in the Figure). At least a WC seat, hand basin with accessories, shower wall or curtain, shower faucet, bathroom cabinet, lamp, heat distribution system, floor drain and washing machine connections belong typically to the equipment of a bathroom modular unit. The modular unit has in one corner a vertical channel 66, a so-called duct, defined by the walls, the first end of which channel opens through the opening in the floor slab 52 under the floor slab and the second end opens through the opening in the ceiling 56 over the ceiling. The channel is designed for placing the pipes and wires of the heating, plumbing, ventilation and electrical installation systems of the block of flats. Such pipes and wires to be placed in the channel are among others drain pipes, air pipes, pipes for cold and warm service water, pipes for the water circulating heating system, pipes for sprinkler system and electric cables. The channel can have all above-mentioned pipes and wires ready-fitted, wherein the pipes and wires of the superimposed modular units are connected to each other when installing the modular units. The floor height of a block of flats is according to the building regulations at least 3 meters, wherein the clearance between the upper intermediate floor and the lower intermediate floor of the story is about 2700 mm. The modular unit is dimensioned so that the distance between the upper surface of the floor slab and the upper surface of the ceiling is about 2400 mm, i.e. clearly smaller than 2700 mm. Between the two superimposed modular units installed in their places, i.e. between the upper surface of the ceiling of the lower modular unit and the lower surface of the floor slab of the upper modular unit remains thus an assembly space 64, in which pipes and wires passing in the channels 66 of the modular units can be connected.
  • Some advantageous embodiments of the method according to the invention have been described above. The invention is not limited to the solutions described above, but the inventive idea can be applied in different ways within the scope of the claims.

Claims (7)

  1. A method for constructing a building, which building has at least three floors (26), in which method a frame (10) of the building is erected, which frame comprises at least one intermediate floor (12) and load-bearing structural parts, such as load-bearing walls (20) and/or pillars (22), supporting the intermediate floors, an opening (30) is formed in at least one intermediate floor (12) simultaneously with the construction of the intermediate floor and at least one modular unit (50) is lowered to at least one floor (26) under the intermediate floor through said opening, characterized in that a roof covering (18) is built substantially ready to the building before lowering the modular units (50) to the floors (26), which roof covering comprises at least water-proof underlay and in that an opening (30a) is formed in the roof covering (18), which opening is in alignment with the openings (30) of the intermediate floor (12), and the modular units (50) are lowered to the floors through the opening (30a) of the roof covering (18).
  2. The method according to claim 1, characterized in that a frame (10), which has several intermediate floors (12), is erected and at least one opening (30) is formed in substantially each intermediate floor (12) of the frame (12) simultaneously with the construction of the intermediate floors so that the openings (30) are in alignment with the same vertical line and at least one modular unit (50) is lowered to substantially each floor (26) through the openings (30).
  3. The method according to claim 1 or 2, characterized in that outer walls (24) and a roof (14) are constructed to the building, to which outer walls and roof a thermal insulation is installed before lowering the modular units (50) to the floors (26).
  4. The method according to any of the claims 1-3, characterized in that at least a part of the outer walls (24) of the building is built substantially ready before lowering the modular units (50) to the floors (26).
  5. The method according to any of the claims 1-4, characterized in that the modular units (50) have a floor slab (52) and the modular units are supported from the floor slab to the edges of the opening (30) of the intermediate floor (12) in a manner so as to bear the vertical loads.
  6. The method according to any of the claims 1-5, characterized in that a modular unit (50) is lowered to the floor (26), which modular unit comprises a floor slab (52), a ceiling (56) and walls (54), which walls (54) have a first surface and a second surface, the first surfaces of which walls define a bathroom, which bathroom has fixed equipment and/or furniture for use in the bathroom.
  7. The method according to claim 6, characterized in that a modular unit (50) is lowered to the floor (26), in which modular unit a part of said floor slab (52) extends along the length of at least one wall (54) outside the area defined by the second surfaces of said walls and said part of the floor slab (52) and/or the second surface of at least one wall have second fixed equipment and/or furniture for use in the second room space.
EP14397515.9A 2013-04-18 2014-04-17 Method for construction of a building Not-in-force EP2792803B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FI20135382A FI127802B (en) 2013-04-18 2013-04-18 Method for constructing a building

Publications (2)

Publication Number Publication Date
EP2792803A1 EP2792803A1 (en) 2014-10-22
EP2792803B1 true EP2792803B1 (en) 2015-08-12

Family

ID=50884327

Family Applications (1)

Application Number Title Priority Date Filing Date
EP14397515.9A Not-in-force EP2792803B1 (en) 2013-04-18 2014-04-17 Method for construction of a building

Country Status (3)

Country Link
EP (1) EP2792803B1 (en)
DK (1) DK2792803T3 (en)
FI (1) FI127802B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869328A (en) * 2017-03-07 2017-06-20 广东省建筑设计研究院 A kind of suspension type modular architectural structural and its construction method
FR3076307B1 (en) * 2017-12-28 2020-01-17 Sas Intra & Co CONSTRUCTION EQUIPPED WITH A REMOVABLE TECHNICAL PREMISES AND METHOD FOR REPLACING THE TECHNICAL PREMISES IN SUCH A CONSTRUCTION
US11613887B2 (en) 2020-06-11 2023-03-28 Stackhouse, Inc. Building system for manufactured homes

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1556987A (en) * 1967-08-10 1969-02-14
DE1814164A1 (en) 1968-12-12 1970-07-16 Ramm Bloc Systems Gmbh Install Installation room cell, especially bathroom and / or kitchen
US20050108957A1 (en) 2003-11-25 2005-05-26 Quesada Jorge D. Pre-fabricated building modules and method of installation
FI20060087A0 (en) 2006-01-30 2006-01-30 T T Tyoemaatulos Oy A method for repairing wet rooms in an apartment building
FR2944301A1 (en) * 2009-04-14 2010-10-15 New Concept Building i.e. house, construction process, involves mounting cold water supply pipe and waste water discharge pipes in space, and connecting glazed earthenware to cold water supply pipe or waste water discharge pipes

Also Published As

Publication number Publication date
FI127802B (en) 2019-02-28
EP2792803A1 (en) 2014-10-22
FI20135382A (en) 2014-10-19
DK2792803T3 (en) 2015-11-09

Similar Documents

Publication Publication Date Title
EP3594422B1 (en) Modular integrated building and construction method thereof
US10145103B2 (en) Premanufactured structures for constructing buildings
EP0521890B1 (en) Buildings and methods of constructing buildings
US4513545A (en) Apparatus for and method of constructing, transporting and erecting a structure of two or more stories comprised of a plurality of prefabricated core modules and panelized room elements
CN101654929B (en) Combined type house and assembly method thereof
US9027307B2 (en) Construction system and method for constructing buildings using premanufactured structures
US20210301528A1 (en) Systems and methods for constructing a single-storey building
AU2013201852A1 (en) Modular Building
US20070130841A1 (en) Construction module system and method
US20220049488A1 (en) Systems and methods for constructing a multi-storey building
EP2792803B1 (en) Method for construction of a building
CN110612373A (en) Prefabricated pre-decorated volume construction of buildings
CN201276757Y (en) Combined house
WO2013171772A1 (en) Modular-based, concrete floor or roofing building structure
WO2022067416A1 (en) Method for assembling a modular building
EP2930280A1 (en) Reinforced concrete slab and production method thereof
WO2004106669A1 (en) Ready-to-use containerised house
EP2792802A1 (en) Modular unit
EP2610418A1 (en) Method for renovating a building and a building
RU2140509C1 (en) Domestic house of the first mass series with attic floor of volumetric block-rooms, method for arrangement of attic floor and complex reconstruction of house
RU2288331C2 (en) Composite system including framed structure formed of light-weight prefabricated components
JP3890075B2 (en) Buildings for use in apartment houses
EP4074908A1 (en) Construction system and method for putting same into practice
FI130482B (en) Base structure of a room module for attachment to a building and attachment method for the same
FI20185859A1 (en) Method for constructing a building, and building

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20140417

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

R17P Request for examination filed (corrected)

Effective date: 20141120

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20150306

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 742301

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150815

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602014000134

Country of ref document: DE

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20151106

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20150812

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 742301

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150812

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20150812

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151113

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151214

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151212

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602014000134

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20160513

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160430

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602014000134

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

Ref country code: LU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160417

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20161230

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161101

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160502

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160417

REG Reference to a national code

Ref country code: NO

Ref legal event code: CHAD

Owner name: LEHTO GROUP OYJ, FI

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170430

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20140417

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160430

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150812

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20180417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180417

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20220420

Year of fee payment: 9

Ref country code: NO

Payment date: 20220419

Year of fee payment: 9

Ref country code: DK

Payment date: 20220419

Year of fee payment: 9

REG Reference to a national code

Ref country code: NO

Ref legal event code: MMEP

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

Effective date: 20230430

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230418

Ref country code: NO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230430