JPS61134441A JP25420084A JP25420084A JPS61134441A JP S61134441 A JPS61134441 A JP S61134441A JP 25420084 A JP25420084 A JP 25420084A JP 25420084 A JP25420084 A JP 25420084A JP S61134441 A JPS61134441 A JP S61134441A
Authority
JP
Japan
Prior art keywords
building
ground
pile
pipes
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP25420084A
Other languages
Japanese (ja)
Other versions
JPH0330654B2 (en
Inventor
Yoshio Wakamei
善雄 若命
Hideo Kobayashi
英雄 小林
Hiroaki Senoo
博明 妹尾
Yoshiaki Nagataki
慶明 長瀧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP25420084A priority Critical patent/JPS61134441A/en
Publication of JPS61134441A publication Critical patent/JPS61134441A/en
Publication of JPH0330654B2 publication Critical patent/JPH0330654B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/48Foundations inserted underneath existing buildings or constructions

Abstract

PURPOSE:To increase the bearing power of a ground right under a structure, to prevent the occurrence of unequal sinking, and to increase a lateral force, by a method wherein a pile, surrounding the underground part of a building in a range from the outside of a building to the interior of a ground, is formed in the building ground of the building. CONSTITUTION:A hydraulic unit 1 is located outside a building A on a ground B, and a circular casing pipe 2 is penetrated into a soft ground B right below the building A. A mounting device 3 is mounted to the forward end of the pipe 2 for excavation, and excavation is progressed through connection of the following circular pipes 2 along with the progress of excavation within the soft ground B. the underground part of the building is surrounded with the pipes 2, and after reinforcing bar or steel pipe is inserted into the circular pipes 2, the pipes 2 are pulled off as concrete is poured to form a pile D formed in an arc of a circle. Thereafter, the foundation of the building A is coupled to the circular pile D to form the foundation and the pile integrally. This enables a ground reinforcing work to be executed outside the building A while the building is in use.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は既存の建造物の基礎地盤補強工法に係るもので
ある。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a foundation ground reinforcement method for existing buildings.

(従来の技術)及び(発明が解決しようとする問題点)
既存の建造物の基礎地盤の補強工法としてアンダーピン
ニングその他の工法が提案されているが、既存の建造物
直下の地盤に補強のための施工が行なわれるので、同建
造物の床版等、一部に手を加え、施工後修復作業を必要
とする等、工程が煩雑であり、また施工中は既存の建造
物を従来のまま使用することができないことがあった。
(Prior art) and (Problem to be solved by the invention)
Underpinning and other construction methods have been proposed as methods for reinforcing the foundation ground of existing buildings, but since the reinforcement work is carried out on the ground directly beneath the existing building, the floor slabs of the same building, etc. The process was complicated, requiring modifications to sections and post-construction repair work, and it was sometimes impossible to use existing buildings as they were during construction.

(問題点を解決するための手段) 本発明はこのような問題を解決するために提案されたも
のであって、既存の建造物の構築地盤における同建造物
の外側より同地盤内部に、前記建造物の地下部分を囲繞
するパイルを造成することを特徴とする建造物の基礎地
盤補強工法に係るものである。
(Means for Solving the Problems) The present invention has been proposed in order to solve such problems, and the present invention has been proposed to solve the above-mentioned problems. The present invention relates to a method for reinforcing the foundation ground of a building, which is characterized by creating a pile that surrounds the underground part of the building.

(作用)及び(発明の効果) 本発明においては前記したように、既存の建造物の構築
地盤における同建造物の外側より同翅造物の地下部分を
囲繞するパイルを地盤内に造成するようにしたので、同
パイルによって既存の建造物直下の地盤の支持力が増大
し、不等沈下が防止され、且つ横力抵抗が増大するもの
である。
(Operation) and (Effects of the Invention) As described above, in the present invention, a pile is created in the ground to surround the underground part of the winged structure from the outside of the building on the construction ground of the existing building. Therefore, the pile increases the supporting capacity of the ground directly beneath the existing building, prevents uneven settlement, and increases lateral force resistance.

また本発明の工法によれば、既存の建造物の構築地盤に
おける同建造物の外側より、地盤内に建造物の地下部分
を囲繞するメイルを造成するようにしたので、地盤の補
強作業の全部が既存の建造物より外方での作業であシ、
従って建造物の床版等の如き建造物自体の部分に係る工
事がなく、従つて既存の建造物を損傷させることなく、
従来通ル使用している状態°で基礎地盤の補強ができる
In addition, according to the construction method of the present invention, a mail is created in the ground from the outside of the existing building to surround the underground part of the building, so all of the ground reinforcement work is done. However, if the work is outside the existing structure,
Therefore, there is no construction work related to parts of the building itself such as the floor slab of the building, and therefore there is no damage to the existing building.
The foundation ground can be reinforced in the same state as before.

(実施例) 以下本発明を図示の実施例について説明する。(Example) The present invention will be described below with reference to the illustrated embodiments.

囚は軟弱地盤(E)上に構築された既存の建造物、(C
)は軟弱地盤(B)下部の良質地盤である。
The prisoner is an existing structure built on soft ground (E), (C
) is the good quality ground below the soft ground (B).

而して前記地盤(B)上における建造物(B)の外側方
に配設された油圧ユニット(1)によって円弧状のケー
シングパイプ(2)を建造物(4)直下の軟弱地盤(B
)内に買入するとともに、同パイプ(2)の先端に装着
された掘削装置(3)によって掘削し、前記パイプ(2
)の軟弱地盤回内の掘進に伴って次位の円弧状パイプ(
2)を継接して掘進を継続し、第2図に示すように軟弱
地盤(鞠内に、建造物(4)の−側より他側に亘って同
建造物囚の地下部分を囲繞する円弧状のケーシングパイ
プを貫通させる。
The hydraulic unit (1) installed on the outside of the building (B) on the ground (B) moves the arc-shaped casing pipe (2) to the soft ground (B) directly below the building (4).
), and excavated by the excavation device (3) attached to the tip of the pipe (2).
), the next arcuate pipe (
2) and continued excavation, as shown in Figure 2, the soft ground (a circle surrounding the underground part of the structure (4) from the - side to the other side) Penetrate the arc-shaped casing pipe.

次いで同ケーシングノ(イブ内に鉄筋または鋼管を挿入
したのち、ケーシングパイプ内にコンクリートを注入し
ながら同パイプを引抜き、軟弱地盤(B)内に建造物(
4)の地下部分を囲繞する円弧状パイル(D)を形成す
る。(第1図参照) 次いで既存の建造物(4)の基礎と前記円弧状パイル(
D)とを連結基礎(g)によって結合し一体化する。
Next, reinforcing bars or steel pipes are inserted into the casing pipe, and then the pipe is pulled out while pouring concrete into the casing pipe, and the building is placed in the soft ground (B).
4) Form an arcuate pile (D) surrounding the underground part. (See Figure 1) Next, the foundation of the existing building (4) and the arc-shaped pile (
D) are connected and integrated by the connecting foundation (g).

なお前記円弧状パイル(DJの半径r及び本数は既存の
建造物囚の規模、良質地盤(C1の深さ等によって適宜
選定する。
The radius r and number of the arc-shaped piles (DJ) are appropriately selected depending on the scale of the existing building, the quality of the ground (depth of C1, etc.).

前記実施例の方法によれば、軟弱地盤(B)内に既存の
建造物(4)の地下部分を囲繞するように形成された円
弧状パイル(D)によって、既存の建造物の直下地盤の
支持力を増大し、不等沈下を防止し、横力抵抗を増大し
、また地盤の補強作業がすべて建造物(4)の外部での
作業であ夛、従って建造物囚の床版等、同建造物自体の
部分に関する施工が全くないので、建造物(4)を損傷
させることなく、従来通シ使用している状態において地
盤の補強が行なわれる。
According to the method of the embodiment, the arcuate pile (D) formed in the soft ground (B) so as to surround the underground part of the existing building (4) allows the ground directly below the existing building to be covered. In order to increase the bearing capacity, prevent uneven settlement, increase lateral force resistance, and all the ground reinforcement work is done outside the structure (4), therefore, the floor slab of the structure, etc. Since there is no construction work on parts of the building itself, the ground can be reinforced while the building (4) is in regular use without damaging the building (4).

なお第3図に示すように軟弱地盤(B)における既存の
建造物囚の両側より夫々既存の建造物囚の直下に指向し
て、軟弱地盤(BJ内に直線状パイル(D′)グ)を施
工するようにしてもよい。
As shown in Figure 3, from both sides of the existing structure on the soft ground (B), directly below the existing structure, a straight pile (D') is placed on the soft ground (BJ). You may also construct it.

以上本発明を実施例について説明したが、本発明は勿論
このような実施例にだけ局限されるものではなく、本発
明の精神を逸脱しない範囲内で種々の設計の改変を施し
うるものである。
Although the present invention has been described above with reference to embodiments, the present invention is, of course, not limited to such embodiments, and can be modified in various ways without departing from the spirit of the present invention. .

【図面の簡単な説明】[Brief explanation of the drawing]

第1図及び第2図は本発明に係る建造物の基礎地盤補強
工法の一実施例の工程を示す縦断面図で、第1図は施工
完了時の状態を、第2図は円弧状ケーシング・セイプの
掘進状態を示す。第3図は本発明の他の実施例の実施状
況を示す縦断面図である。 (A)・・・既存の建造物、(B)・・・軟弱地盤、(
DJ・・・円弧状パイル、(D′)・・・直線状メイル 代理人 弁理士 岡 本 重 文 外3名 第10 −−−−−騨−――−−―−−− 第2記
Figures 1 and 2 are longitudinal cross-sectional views showing the steps of an embodiment of the foundation ground reinforcement method for buildings according to the present invention, with Figure 1 showing the state at the completion of construction, and Figure 2 showing the arc-shaped casing.・Indicates the excavation status of Seipu. FIG. 3 is a longitudinal sectional view showing the implementation status of another embodiment of the present invention. (A)...Existing buildings, (B)...Soft ground, (
DJ...Circular pile, (D')...Straight mail agent Patent attorney Shigeru Okamoto Three outsiders No. 10 --------Kin------------- Part 2

Claims (1)

【特許請求の範囲】[Claims]  既存の建造物の構築地盤における同建造物の外側より
同地盤内部に、前記建造物の地下部分を囲繞するパイル
を造成することを特徴とする建造物の基礎地盤補強工法
1. A method for reinforcing the foundation ground of a building, which comprises constructing a pile surrounding the underground part of an existing building from the outside of the building to the inside of the ground.
JP25420084A 1984-12-03 1984-12-03 Method of reinforcing foundation ground of building Granted JPS61134441A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25420084A JPS61134441A (en) 1984-12-03 1984-12-03 Method of reinforcing foundation ground of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25420084A JPS61134441A (en) 1984-12-03 1984-12-03 Method of reinforcing foundation ground of building

Publications (2)

Publication Number Publication Date
JPS61134441A true JPS61134441A (en) 1986-06-21
JPH0330654B2 JPH0330654B2 (en) 1991-05-01

Family

ID=17261638

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25420084A Granted JPS61134441A (en) 1984-12-03 1984-12-03 Method of reinforcing foundation ground of building

Country Status (1)

Country Link
JP (1) JPS61134441A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63268809A (en) * 1987-04-24 1988-11-07 Nkk Corp Ground fortifying work
FR2724956A1 (en) * 1994-09-22 1996-03-29 Setec Travaux Publics Et Ind Method of excavating tree having roots

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63268809A (en) * 1987-04-24 1988-11-07 Nkk Corp Ground fortifying work
FR2724956A1 (en) * 1994-09-22 1996-03-29 Setec Travaux Publics Et Ind Method of excavating tree having roots

Also Published As

Publication number Publication date
JPH0330654B2 (en) 1991-05-01

Similar Documents

Publication Publication Date Title
KR100618597B1 (en) Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this
JPH11303087A (en) Retaining wall using corrosion-resistant structure anchor
JP2000352296A (en) Method o constructing passage just under underground structure
JPH1136338A (en) Construction method of underground structure
JP2816741B2 (en) How to build a large cavity
JPS61134441A (en) Method of reinforcing foundation ground of building
KR20010026028A (en) Shaft construction system using precasted segment block
KR200296444Y1 (en) Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method
JPH1077644A (en) Earthquake resisting pile foundation construction method
JPH10317374A (en) Method for constructing underground column made of reinforced concrete
JP3407168B2 (en) Foundation of new building using existing pile foundation
JP2697762B2 (en) Tunnel structure and construction method
JPH0584773B2 (en)
JP3030622B2 (en) How to build a tunnel
KR20040023915A (en) Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method and construction method thereof
JP3896003B2 (en) Connection method and structure of shaft
JP2996113B2 (en) How to build a shaft
JP2693027B2 (en) Pile head treatment method for cast-in-place concrete pile
JP2828786B2 (en) Casing shaft
JP3171716B2 (en) Foundation construction method on inclined surface
JP3020882B2 (en) Construction method of building structure with underground space
JPH1088567A (en) Improving method for ground for building and construction method for foundation for building
JP4399062B2 (en) Construction method of viaduct underground beam
JPH10195886A (en) Foundation construction method
JP3865468B2 (en) How to build a tunnel