Prior art keywords
station
train
switch
control device
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP57161232A
Other languages
Japanese (ja)
Other versions
JPH0148188B2 (en
Inventor
饗庭 秀明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Tokyo Shibaura Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Shibaura Electric Co Ltd filed Critical Tokyo Shibaura Electric Co Ltd
Priority to JP57161232A priority Critical patent/JPS5950859A/en
Publication of JPS5950859A publication Critical patent/JPS5950859A/en
Publication of JPH0148188B2 publication Critical patent/JPH0148188B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔発明の技術分野〕 本発明は各駅に分散させた駅制御装置と中央に設けた中
央制御装置とによって列車の運行側かvを自動化するよ
うにした分散式列車運行制御装置直において、特に運行
ゾログラムの性能向上や運転指令員の=++線用に供す
るシミュレータ機能金偏えた列車運行制御装置に関する
[Detailed Description of the Invention] [Technical Field of the Invention] The present invention provides a distributed train operation in which the train operation side is automated by station control devices distributed at each station and a central control device provided at the center. This invention relates to a train operation control system that has a simulator function that is directly connected to the control system, particularly for improving the performance of the operation zologram and for the =++ line of the train dispatcher.

〔発明の技術的背景〕[Technical background of the invention]

従来のこの種列車運行制御装置としてtよ、第1図に示
すように中央には中央fftlJ呻装置t 7 a a
lbと、この中央制御装置J tL # l bの何れ
が一方に切換器3を介して選択接続される】用信颯局2
が設けられ、また各駅には継電連動装置46a # 6
b・・・との間で情報の受渡しを行なう駅子局5 a 
* 5 b・・・を設けてこれら各駅子局5a。
As a conventional train operation control device of this type, as shown in Fig. 1, there is a central fftlJ control device in the center.
lb and this central control device JtL#lb are selectively connected to one side via a switch 3] Telecommunications station 2
A relay interlocking device 46a #6 is installed at each station.
Station slave station 5 a that exchanges information with b...
* 5 b... will be provided as slave stations 5a at each of these stations.

5b・・・と前述した通信親局2とを伝送線14a。5b... and the communication master station 2 described above are connected to the transmission line 14a.

14b・・・によ多接続している。14b... is connected to many.

しかして通常の列車運行制御は次のように行なわれる。Normal train operation control is performed as follows.

すなわち、例えば継電連動装置R6aに制御対象路線1
5上に存在する列車12および信号機13の情報が信号
線10h′f:通して入力されると、これらの情報を駅
子局5aから伝送線14mを介して通信親局2に伝送さ
れ、さらに通信親局2から切換器3を介して中央制御装
置JaK入力すると同時に通信親局2より切換器8f:
経て運行表示盤1にも情報を入力して路線上の列車位置
、信号機の現示ff4報を表示する。
That is, for example, if the relay interlocking device R6a is connected to the control target line 1.
When information on the train 12 and signal 13 existing on station 5 is input through the signal line 10h'f:, this information is transmitted from the station slave station 5a to the communication master station 2 via the transmission line 14m, and further At the same time as the central control unit JaK is input from the communication master station 2 via the switch 3, the communication master station 2 inputs the signal to the switch 8f:
Information is also input to the operation display panel 1 to display the train position on the route and signal status FF4 information.

一方、中央制御装置i1Jmでは先はど読み取った列車
位置、G Ji+ti%現示情報によりダ・fヤ記憶装
置daよシ駅出発、入場する列車のダイヤ情報を取出し
て列車の進路設定出力を切換器3を経て前述とは逆に通
信親局2から伝送線14aを介して駅子局5aに伝送し
、さらにこの駅子局58から絹;電連動装置6aに出力
することで信号線11aを介して信号機13を制御して
列車の運行が行なわれる。なお、中央制御装f41bお
よびダイヤ記憶装置4bは中央制御装置1aが故障した
ときのために必要な設備である。
On the other hand, the central control unit i1Jm retrieves the timetable information of the train departing from and entering the station from the data storage device based on the previously read train position and G Ji+ti% display information, and switches the train route setting output. Contrary to the above, the signal is transmitted from the communication master station 2 to the station slave station 5a via the transmission line 14a, and is further output from the station slave station 58 to the electric interlocking device 6a, thereby connecting the signal line 11a. The train is operated by controlling the signal 13 via the train. Note that the central control unit f41b and the diagram storage device 4b are necessary equipment in case the central control unit 1a fails.

このような列車運行制御装置において、シミュレーショ
ンを行なうときには次のようになる。
In such a train operation control device, when performing a simulation, the process is as follows.

中央制御装置1 a # 1 bにシミュレーションを
行なう旨をオペレータコンソール9で操作すると、中央
制御装置J a # 1 bは通信親局2への入出力信
号をカットして中央制御装置1 a h 1 b間で通
信を信号線19を介して行なう。オだ切換器3は開放位
置、切換器8は中央制御装置1b側に接続しておく。中
央制御装置ね11aは列車運行制御1′fc%また中央
制御装#り1bはシミュレータ機能を有し、列車位ft
f信号機fjll示1νぜ報%H(7,’i擬して中央
制rI9装置fllbよυ中央制御装fl:21 * 
Ic信号線19を介して与える。同時にその177報を
信号線17よりプロセス入出力装置70を軒゛C切換器
8を通して運行表示盤7に表示する。中央制御装置1a
が進路設定出力を信号線19を介して中央制御装@Jb
に伝送すると中央制御装置Jb内ではこの進路設定出力
情報に従って列車の移動を模擬するようにしている。
When the operator console 9 instructs the central controller 1 a # 1 b to perform a simulation, the central controller J a # 1 b cuts the input/output signal to the communication master station 2 and controls the central controller 1 a h 1. Communication is carried out between the terminals b via the signal line 19. The switch 3 is in the open position, and the switch 8 is connected to the central control device 1b. The central control device 11a has a train operation control function 1'fc%, and the central control device 1b has a simulator function, and the train position ft.
f signal fjll shows 1ν signal %H (7,'i simulates central control rI9 device fllb υ central control device fl:21 *
It is applied via the Ic signal line 19. At the same time, the 177th report is displayed on the operation display panel 7 through the signal line 17, the process input/output device 70, and the Eaves C switch 8. Central control device 1a
sends the route setting output to the central control unit @Jb via signal line 19.
When the route setting output information is transmitted to the central control unit Jb, the movement of the train is simulated in accordance with this route setting output information.

〔背景技術の問題点〕[Problems with background technology]

上記のようなシミュレータ機能を備えた列車運行制御装
置では、 ■ 列車の乱れを中心とした運行整理に関するプログラ
ムの性能向上が主目的で伝送装置を介した精度の高いシ
ミュレーションを行なうことができない。
The train operation control device equipped with the above-mentioned simulator function cannot perform highly accurate simulations via the transmission device, whose main purpose is to improve the performance of programs related to traffic reorganization centered on train disturbances.

■ 中央制御装置Jamzb相互間で中育報を伝送する
ようにしているため、その伝送装置uに障害があるとシ
ミュレーションを行なうことができない。
(2) Since the middle school information is transmitted between the central control units Jamzb, if there is a failure in the transmission unit u, the simulation cannot be performed.

■ 運行鴨″・C水盤への表示は制御対象路線全域に亘
り列車位置、(J号機現示情報が多4′9あシ、シミュ
レーションのために高価な入出力装置が必要となり、経
済的でFi表い。
■ The display on the C basin is not economical as it requires expensive input/output equipment for simulation. Fi table.

αン 伝送装置を介してシミュレーションを行なおうと
すると各駅に模擬試験装置が必要となり、経済的ではな
い。
Attempting to perform simulations via transmission equipment would require a mock test equipment at each station, which would be uneconomical.

〔発明の目的〕[Purpose of the invention]

本発明は上記のような事情に鑑みなされたもので、その
目的とするところは列車運行制御に必要な各構成機器を
全て使用して実運行に最も近い形で、しかもシミュレー
タのために何んら機器を付加しないでシミュレーション
を行なうことができる経済的でしかも蒋妾の高いシミュ
レータ機能を備えた列車運行制御用rit、を提供する
ものである。
The present invention was made in view of the above circumstances, and its purpose is to use all the components necessary for train operation control in a form that is closest to actual operation, and to provide a simulator that does not require anything. The purpose of the present invention is to provide a RIT for train operation control that is economical and has a high simulator function that allows simulation to be performed without adding any additional equipment.

〔発明の概要〕[Summary of the invention]

本楯明は上記の目的を達成するため、中央。 This shield is central to achieve the above purpose.

伝送、駅の各装置を2系統用意してその内の1系統を列
車運行制御用、他の1系統を列車および信号機の動作を
模擬するシミュレータ用として構成するものでぷる。
Two systems of transmission and station equipment are prepared, one of which is used for train operation control, and the other system is used for a simulator that simulates the operation of trains and signals.

〔発明の実施例〕[Embodiments of the invention]

以下本発明の一実施例を第2図乃至第4図について説明
する。第2図に示すように中央には、ダイヤ記憶装R4
a K接続された中央制御装置1aとダイヤ記憶装置4
bおよびオペレータコンソール9に接続された中央制御
装R1bとが設けらiすると共にこれら中央制御装置1
phmlbの何れかに切換器3aを介して選択接続され
る通信親局2aと中央制御装置Ja、Jbの何れかに切
換器3bを介して選択接続される通信親局2bとが設け
られる。これら通信親局2a。
An embodiment of the present invention will be described below with reference to FIGS. 2 to 4. As shown in FIG. 2, in the center is a diamond memory device R4.
a K-connected central control device 1a and diamond storage device 4
b and a central control unit R1b connected to the operator console 9.
A communication master station 2a is selectively connected to one of the central control units Ja and Jb via a switch 3a, and a communication master station 2b is selectively connected to one of the central control units Ja and Jb via a switch 3b. These communication master stations 2a.

2bは切換器8を介して運行表示盤7釦接続されている
。一方、各駅には継電連動装置6a。
2b is connected to the operation display panel 7 button via a switch 8. On the other hand, each station has a relay interlocking device 6a.

6b・・・が設けられ、これら各継電連動装置6@。6b... are provided, and each of these relay interlocking devices 6@.

6b・・・に対応させて21個の駅制御装R20&と2
0b、21gと21b・・・がそれぞれ設′けられてい
る。そして各継電連動装置6 a 、 6 b・・・の
出力がそれぞれ対応する駅制御装置20hと20b、2
1mと21b・・・に加えられるように接続され、また
駅制御装置20aと20b121hと21b・・・の出
力の一方が切換器601L l60b・・・を介して加
えられるように接続される。
21 station control equipment R20 & and 2 corresponding to 6b...
0b, 21g and 21b... are provided, respectively. The outputs of the relay interlocking devices 6a, 6b... are connected to the corresponding station control devices 20h, 20b, 2, respectively.
1m and 21b..., and one of the outputs of the station control devices 20a, 20b, 121h, 21b... is connected via the switch 601L, 160b....

また各駅に設備される2個の駅制御装置213aと20
b、21mと21b・・・にはそれぞれダイヤ記憶装置
80 aと1jOb、87aと81b・・・が接続さノ
しるとともに駅制御装fi 20 mと20bとの間・
2111と21bとの間、・・・は信号線18m、18
b・・・によシそれぞれ接続される。
In addition, two station control devices 213a and 20 installed at each station
The diagram storage devices 80a and 1jOb, 87a and 81b... are connected to the stations fi 20m and 21b, respectively, and the station control equipment fi 20m and 20b are connected to each other.
Between 2111 and 21b, ... are signal lines 18m, 18
b... are connected to each other.

さらに駅制御装9j、20 mと2θbt 2Jaと2
1b・・・にそれぞれ対応させて切換器30gと、90
b、31mと31b・・・が設けられると共に切換器、
? Oa 、 31 m−によりIiJぐ制御装(71
20mと20 b 、J 1 aとJJb・・・のそれ
ぞれの倒れか一方が駅側の結合器40m+41h・・・
に選択切換可能に接続され、また同様に切換器30b。
Furthermore, station control equipment 9j, 20 m and 2θbt 2Ja and 2
Switches 30g and 90g corresponding to 1b...
b, 31m and 31b... are provided, and a switch,
? Oa, 31 m- by IiJ control system (71
20m and 20b, J1a and JJb... each collapsed, or one of them is the coupler 40m + 41h on the station side...
Similarly, the switch 30b is selectively connected to the switch 30b.

J 1 b ・・・によシ駅制御装置20gと20 b
、21*と21b・・・のそれぞれの何れか一方が駅側
の結合器4θb、41b・・・に選択切換可能に接続さ
れる。そして前述した通信玉l1局2aに対しては駅側
の結合器40h+41m・・・が伝送4.Jd 14 
nを介して接続された中央側の結合器50mを+I’、
1して接続され、また同様に通信親局2bに対しては駅
側の結合器40h、41b・・・が伝送線14bを介し
て接続された中央側の結合器5ob全通して接続される
J 1 b...Yoshi station control device 20g and 20b
, 21* and 21b... are selectively connected to the couplers 4θb, 41b... on the station side. Then, for the communication ball 11 station 2a mentioned above, the coupler 40h+41m on the station side transmits 4. Jd 14
The central coupler 50m connected via n is +I',
Similarly, to the communication master station 2b, the couplers 40h, 41b, . .

次に上記のように構成された列車;It!行制1111
装置の作用について述べる。まず通常の列車運行制御t
よ次のように行なわれる。例えば継′#1(連動装置6
aから路線上に存在する列車および信号機現示情報が駅
制御装置20m、20bに入力されると、ダイヤ記憶装
置80mよシ駅出発。
Next, a train configured as above; It! Gyosei 1111
The operation of the device will be described. First, normal train operation control
It is done as follows. For example, joint '#1 (interlocking device 6
When train and signal display information existing on the route is input to the station control devices 20m and 20b from a, the train departs from the timetable storage device 80m.

入場する列車のダイヤ情報が取出され、進路゛設定を例
えば駅制御装置fji 20 aよシ切換器60gを介
して継電連動装置6aに出力すると共に先IIど入力し
た情報を駅制御装置2oaより切換器、90 m 、 
30 bの2系統を介して結合器40m 。
The timetable information of the incoming train is extracted, and the route setting is output from the station control device fji 20a to the relay interlocking device 6a via the switch 60g, and the information input in the previous step is output from the station control device 2oa. Switch, 90 m,
Combiner 40m via two systems of 30b.

40bと伝送線14m+14bを経て結合器50h、5
0hより通信親局2&、2bへ出カ戸る。通信親局2 
a m j bではその情報を切換器Ja、Jbtl−
経て中央制御装置iJ、 1 mに出方すると同時に列
車位置、信号機現示情報は]li]信親局2&よ勺切換
器8を介して運行表示盤7へ表示させる。
40b and transmission line 14m+14b to coupler 50h, 5
Output from 0h to communication master stations 2&, 2b. Communication master station 2
In a m j b, the information is transferred to the switch Ja, Jbtl-
At the same time as the central control unit iJ arrives at 1 m, the train position and signal display information are displayed on the operation display panel 7 via the train station 2 & signal switch 8.

一方各駅のダイヤ情報を変更する場合には、中央制御装
FL1 aよシ上述と全く逆の峰路をたどって駅制御装
置20 aに送出すると同時にダイヤ記憶装置4aの該
当するダイヤ情報を変更する。
On the other hand, when changing the timetable information of each station, the central control unit FL1a sends it to the station control unit 20a by following the completely opposite route to the above, and at the same time changes the corresponding timetable information in the timetable storage device 4a. .

なお、中央制御装置1bJI′i中央制却装置1aが故
障した時に代って制御を継続するためにあシ、また駅制
御装置20bも同様である。
The central control device 1bJI'i has a reel for continuing control in place of the central control device 1a when it fails, and the same applies to the station control device 20b.

次に上記列lit運行制御装置において、シミュレーシ
ョンを行なう場合について述べる。まず、切換器、? 
aは中央制御装置Gtla側に、また切換器3bは中央
制御装R1b側にそれぞれ切換える。同様に切換器30
t h 31 a・・・は駅制御装fl 20 a 、
 21 h−側に、また切換器30b。
Next, a case will be described in which a simulation is performed in the above-mentioned train lit operation control device. First, the switch?
a is switched to the central control unit Gtla side, and the switch 3b is switched to the central control unit R1b side. Similarly, the switch 30
th31a... is the station control system fl20a,
21 There is also a switch 30b on the h- side.

、9 l b・・・は駅制御装置20b、21b・・・
側にそれぞれ切換える。さらに切換器60g、60h・
・・1.1継電連動装fi、 6 a 、 6 b・・
・への出力をカットするために開放位置としである。こ
のような状態で、まずオイレータコンソール9よυシミ
ュレーション開始指令を中央制御装置1bへ出力すると
、例えば第3図に示す列R1位置を模Jシj(して軌道
回路A、〜A、、B1〜IS 、などにいる列車’r、
−T、の存在する個所が切換器3b全通して通信崩局2
b、結合器50b、伝送子114b、結合器41b、4
0bを経て切換器30bよシ駅制御装置i¥20bに与
えられる。この場合駅制御装置20 b I/Cは列車
の存在するr、’=’+所として軌道回路A1.A4が
与えられるので、駅制御装置1イ20bではA駅の制御
テーブルTAInTA2の軌道回路AHIA4に列iu
−存在を71モすフラグ1″′を立てる。同様にして駅
制御装置It21bに列車が存在する軌道回路B3が与
えられるとB駅の制御テーブル’l’ I(1の軌道回
路B1にも列車の存在を示すフラグ11111を立てる
, 9 l b... are station control devices 20b, 21b...
Switch to each side. Furthermore, the switching device 60g, 60h・
・・1.1 Relay interlocking device fi, 6 a, 6 b・・
- Open position to cut output to. In this state, when the oilator console 9 first outputs a simulation start command to the central controller 1b, for example, the position of row R1 shown in FIG. Trains in B1~IS, etc.
- The location where T is present is the communication breakdown point 2 through the switch 3b.
b, coupler 50b, transmitter 114b, coupler 41b, 4
The signal is sent to the station control device i\20b via the switch 30b via 0b. In this case, the station control device 20b I/C determines the track circuit A1.r,'='+ location where the train is present. Since A4 is given, the station control device 1-20b adds column iu to the track circuit AHIA4 of the control table TAInTA2 of station A.
- Set a flag 1'' to indicate the existence of a train.Similarly, when the station control device It21b is given the track circuit B3 where a train exists, the control table 'l' I of station B (the track circuit B1 of 1 also has a train A flag 11111 indicating the existence of is set.

今、A駅の制御テーブルTAJの軌道回路A、にいる列
車TIを出発させるには列車位1d情報(制御テーブル
TA7.TAjの軌道回路A、−ASのフラグの状態)
を第2図の駅制御装置20bよシ信号線18rnf:通
して駅制和11装(+”t、 20 aに転送する。駅
制御装置20mはダイヤ記憶装置、ll0aより列車ダ
イヤ情報を取出して信号機S1の進路設定出力を信号線
18aを通して駅制御装置20bに転送すると共に列車
位置情報や後述する信号機現示情報を切換器30&を通
して結合器40a、伝送線14a。
To depart the train TI currently on track circuit A of control table TAJ at A station, train position 1d information (state of flag of track circuit A, -AS of control table TA7.TAj)
is transferred to the station controller 11 (+"t, 20a) through the station controller 20b and the signal line 18rnf in Figure 2. The station controller 20m retrieves the train schedule information from the schedule storage device, ll0a. Route setting output from the signal S1 is transferred to the station control device 20b through the signal line 18a, and train position information and signal display information (to be described later) are transferred through the switch 30& to the coupler 40a and the transmission line 14a.

結合器41a、結合器50af:経て通信All’15
211に入力する。すると、列車位置情報は切換器3a
を通して中央制御装711 mに出力されると同時に切
換器8を通して運行表示盤7へ出力される。一方駅制御
装置20bにおいては駅制御装520thから転送され
てきた信号機S!の進路設定出力に対して軌道回路A2
+A5に列車の存在の有無などをチェックしていなけれ
ば、A駅の制御テーブルTAJの信号機S1に゛7ラグ
l I+を立てると共に駅制御装置i 20 aにf、
−1号機S皇の現示情報を転送する。すると第41・4
に示すように次の軌道回路に列1■の頭が′J16人す
る時間tα1を、また軌道回路AIを完全に抜ける時間
tβ1をA駅の制御テーブルTAIから予めセットされ
ているデータを取出してtα1時1110′を過後にA
駅の制御テーブルTA、?にフラグ11111を立て、
tβ1時間経過後に軌道回路A1のフラグをθ″にする
。このようにして列jlj T1はA1+A3 と進み
、軌道回路A3からB1への移動は軌道回路A3に完全
に進入(A2フラグパ0#、A3フラグ″1”)してか
ら時間trχ3経過後に?r42図に示す駅制御装置2
011から切換器30b1結合器40b、伝送線14b
、結合器50b、結合器41bを経て切換器、9 l 
b鴫0通して駅制御装置21bK第3図に示す軌道回路
B1に列車存在有り(フラグ″’1’ )を送出する。
Coupler 41a, coupler 50af: Communication via All'15
211. Then, the train position information is transferred to the switch 3a.
It is output to the central control unit 711m through the switch 8, and at the same time, it is output to the operation display panel 7 through the switch 8. On the other hand, in the station control device 20b, the signal S! transferred from the station control device 520th! Track circuit A2 for the course setting output of
+If the presence or absence of a train at A5 is not checked, set 7 lag l I+ to the signal S1 of the control table TAJ at station A, and set f to the station control device i 20 a.
-Transfer the current information of Unit 1 S Emperor. Then the 41st and 4th
As shown in Figure 2, the time tα1 for the head of column 1 to enter the next track circuit 'J16 people, and the time tβ1 for the train to completely leave the track circuit AI, are obtained from the preset data from the control table TAI at station A. A after tα1:1110'
Station control table TA,? Set flag 11111 on
After tβ1 time has elapsed, the flag of track circuit A1 is set to θ''. In this way, the column jlj T1 progresses as A1+A3, and the movement from track circuit A3 to B1 completely enters track circuit A3 (A2 flag P0#, A3 After the time trχ3 has elapsed since the flag "1"), the station control device 2 shown in diagram ?r42
011 to switch 30b1 coupler 40b, transmission line 14b
, a coupler 50b, a switch via a coupler 41b, 9 l
A signal indicating the presence of a train (flag ``1'') is sent to the station control device 21bK through the track circuit B1 shown in FIG.

このようにして模擬的に列車を駅制徊1装置id。In this way, the train can be simulated by station system ID.

2Ob内で進路設定出力に従って移dIbさせることが
できる。
It is possible to shift dIb within 2Ob according to the course setting output.

〔発明の効果〕〔Effect of the invention〕

以上述べたように本発明によれば、列:lt :+i!
 ?7制御に必要な各構成機器を全て使用して実運1テ
に最も近い形で、しかもシミュレータσ)ために何ら機
器を付加しないで、シミュレーションを行なうことがで
きる経済的でしかも精度C)品いシミュレータ機能を備
えた列車運行制御装Vt −1)1提供できる。
As described above, according to the present invention, the sequence:lt:+i!
? 7) An economical and accurate product that can perform simulations in the form closest to actual operation by using all of the component equipment necessary for control, and without adding any equipment for the simulator. It is possible to provide a train operation control system Vt-1) with a simulator function.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は従来のシミュレータ機能を令;付、えた夕11
車運行制御装置Iを示すブロック図、第2図6よ本発明
によるシミュレータ機能を備えた分iji、式夕(j車
運行制御装置の一実施例を示すブロック図、第3図は同
実織例によるシミュレータに必要な制御テーブルの構成
図、第4図は列車力(移ルbに要する所要時間を示す説
明図である。 1a、lb・・・中央制御装U:(、ss**sb*s
・・・切換器、2 a h j b・・・通信親局、7
・・・31テi%示盤、6 !116 b−継電連動装
置、20m+20bh21 m 、 2 l b−駅制
御装置、14t+、14b・・・伝送線、T、−T、・
・・列車、S1+82・・・信号機、A、〜A、、B、
〜B5・・・軌道回路。
Figure 1 shows the conventional simulator functions;
A block diagram showing a vehicle operation control device I, FIG. 2 is a block diagram showing an embodiment of the vehicle operation control device I, and FIG. The configuration diagram of the control table necessary for the simulator according to the example, and FIG. 4 is an explanatory diagram showing the time required for train force (transfer b. *s
...Switcher, 2 a h j b...Communication master station, 7
...31% display board, 6! 116 b-relay interlocking device, 20m+20bh21 m, 2l b-station control device, 14t+, 14b...transmission line, T, -T,...
...Train, S1+82...Signal, A, ~A,,B,
~B5...Orbital circuit.

Claims (1)

【特許請求の範囲】[Claims] 制御対象路線全域の列車の運行を統括管理する中央制御
装置と各駅の制御を行なう駅制呻装6iとを伝送装置を
介して接続し、かつ闘接する駅制御装置全圧いに接続し
てなる系統を2系統設ける構成とし、シミュレータ3フ
時にはその一方の系統全列車運行制御用とし、また他方
の系統をシミュレータ用として機能させるようにしたこ
とを特徴とする列車運行制御装置。
A central control unit that centrally manages the operation of trains on the entire route to be controlled and a station control system 6i that controls each station are connected via a transmission device, and are also connected to the station control system in full control. A train operation control device characterized in that it has a configuration in which two systems are provided, and when the simulator is in operation, one of the systems is used for controlling all train operations, and the other system is used for the simulator.
JP57161232A 1982-09-16 1982-09-16 Train operation controller Granted JPS5950859A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP57161232A JPS5950859A (en) 1982-09-16 1982-09-16 Train operation controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP57161232A JPS5950859A (en) 1982-09-16 1982-09-16 Train operation controller

Publications (2)

Publication Number Publication Date
JPS5950859A true JPS5950859A (en) 1984-03-24
JPH0148188B2 JPH0148188B2 (en) 1989-10-18

Family

ID=15731140

Family Applications (1)

Application Number Title Priority Date Filing Date
JP57161232A Granted JPS5950859A (en) 1982-09-16 1982-09-16 Train operation controller

Country Status (1)

Country Link
JP (1) JPS5950859A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS628857A (en) * 1985-07-08 1987-01-16 株式会社日立製作所 Train service control system having training function
JPS63102335A (en) * 1986-10-20 1988-05-07 Tokyo Electron Ltd Ion implanting system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5050835A (en) * 1973-09-05 1975-05-07

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5050835A (en) * 1973-09-05 1975-05-07

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS628857A (en) * 1985-07-08 1987-01-16 株式会社日立製作所 Train service control system having training function
JPS63102335A (en) * 1986-10-20 1988-05-07 Tokyo Electron Ltd Ion implanting system

Also Published As

Publication number Publication date
JPH0148188B2 (en) 1989-10-18

Similar Documents

Publication Publication Date Title
CN103926843B (en) Realize rail traffic signal system general purpose simulation and analogue system
US8894020B2 (en) Block module for model train layout control
JPS5950859A (en) Train operation controller
CN211149757U (en) Real standard system of rail transit simulation driving
JPH05316652A (en) Training simulator for electric power system
CN206370189U (en) Track traffic signal turnout simulation training device
JP3183783B2 (en) Train operation management system
JP4180893B2 (en) Electronic interlocking system
CN102271160B (en) Transponder message transmitting stimulation device and method
JP2002059835A (en) Railway power administrating system
JP2004148971A (en) Train operation comprehensive training device
JPS60174359A (en) Train operation control system
CN216145295U (en) Spliced track signal and control simulation device
CN213458521U (en) Subway rail side ATP experimental device based on single chip microcomputer
JP2868247B2 (en) Simulator device
JPS628857A (en) Train service control system having training function
JPS63227464A (en) Train centralized controller
JPH08169341A (en) Dispersion type course control device
JPS6212455A (en) Train service control system
JPS60259566A (en) Train service control system
JPS5830588B2 (en) Online Hiyouji Seigyo System
JPS60107456A (en) Train operation simulation method in dispersion type operation control system
JPS58139862A (en) Controller for operation of train
JPH0457538B2 (en)
CN109765835A (en) Railway signal emergent control system