JPS5847392B2 - Construction and transport method of large structures - Google Patents

Construction and transport method of large structures

Info

Publication number
JPS5847392B2
JPS5847392B2 JP872178A JP872178A JPS5847392B2 JP S5847392 B2 JPS5847392 B2 JP S5847392B2 JP 872178 A JP872178 A JP 872178A JP 872178 A JP872178 A JP 872178A JP S5847392 B2 JPS5847392 B2 JP S5847392B2
Authority
JP
Japan
Prior art keywords
barge
surface plate
see
float
dock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP872178A
Other languages
Japanese (ja)
Other versions
JPS54102794A (en
Inventor
則彦 坂田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Zosen Corp
Original Assignee
Hitachi Zosen Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Zosen Corp filed Critical Hitachi Zosen Corp
Priority to JP872178A priority Critical patent/JPS5847392B2/en
Publication of JPS54102794A publication Critical patent/JPS54102794A/en
Publication of JPS5847392B2 publication Critical patent/JPS5847392B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Ship Loading And Unloading (AREA)

Description

【発明の詳細な説明】 この発明は、大型構造物たとえばプラントを構戒するブ
ロックなどを建造し、これをパージを用いて所要地に運
搬して据え付ける大型構造物建設計画において、建造し
たドックから搬出してパージに搭載する方法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention is applicable to large structure construction projects in which large structures, such as blocks guarding a plant, are constructed and then transported and installed at a desired site using purge. Concerning how to take it out and load it on the purge.

プラント建設方法として、プラントを複数のブロックに
分け、各ブロックを定盤上に組立てたのち、これを建設
地に運搬して予め整地された現場にそのまま据え付け、
現場での基礎工事および組立てを省略しようという方法
が検討されている。
The plant construction method involves dividing the plant into multiple blocks, assembling each block on a surface plate, then transporting it to the construction site and installing it as is on the pre-levelled site.
Methods are being considered to omit foundation work and assembly on site.

この方法を実現するためには、組立てられたプラント・
ブロックの搬出、運搬、および搬入方法が前もって解決
されなければならない。
In order to realize this method, the assembled plant
The method of unloading, transporting and loading the blocks must be worked out in advance.

このようなプラント・ブロックの重量は5 0 0(t
)〜1600(1)程度と推定される。
The weight of such a plant block is 500 (t
)~1600(1).

プラント・ブロックをドック内で組立てると仮定すると
、ドックに装備されている大型クレーンの吊り能力は最
大7 0 0(t)程度であるから、プラントブロック
の重量はクレーンの吊り能力を超える場合が多い。
Assuming that the plant blocks are assembled inside the dock, the maximum lifting capacity of the large crane installed at the dock is approximately 700 (t), so the weight of the plant block often exceeds the crane's lifting capacity. .

この発明は、上記実情に鑑みてなされたものであって、
ドック内で建造した重量がクレーンの吊り能力を超える
大型構造物をドック外に搬出して安全にかつ確実にパー
ジに搭載しうる方法を提供することを目的としている。
This invention was made in view of the above circumstances, and
The purpose of this invention is to provide a method by which a large structure built inside a dock whose weight exceeds the lifting capacity of a crane can be carried out of the dock and safely and reliably loaded onto a purge.

この目的を達成するためにこの発明による大型構造物の
建造搬出方法は、ドッグの底面上に、フロートを少なく
とも両側附近に介在させて定盤を配置し、定盤上に大型
構造物を組立て、ドック内に注水してフロートにより構
造物を定盤ごと浮上させる一方、予めサブマージブル・
パージを所定海域に沈めておき、フロートをドックから
このパージが沈められている直上位置に曳航し、パージ
を浮上させることにより大型構造物をパージ上に搭載す
ることを特徴とする。
In order to achieve this object, the method for constructing and transporting a large structure according to the present invention includes arranging a surface plate on the bottom of a dog with floats interposed at least near both sides, assembling the large structure on the surface plate, While water is injected into the dock and the structure is floated along with the surface plate using a float, submersible
The Purge is submerged in a predetermined sea area, a float is towed from the dock to a position directly above the Purge, and a large structure is mounted on the Purge by floating the Purge.

以下、図面を参照してさらに詳しく説明する。A more detailed explanation will be given below with reference to the drawings.

第1図ないし第12図において、まず、ドツク1の底面
上の所要位置にタンクなどからなるフロート2を配置し
、これらのフロート2上に現地据え付け時の基礎となる
定盤3をクレーン(図示略)によって載置する。
In Figures 1 to 12, floats 2 consisting of tanks, etc. are placed at required positions on the bottom of dock 1, and surface plate 3, which will serve as the basis for on-site installation, is placed on top of these floats 2 using a crane (not shown). (omitted).

このときフロート2は定盤3の両側付近に位置するよう
にする。
At this time, the floats 2 are positioned near both sides of the surface plate 3.

定盤3には盤状のもののみならずたとえば骨組だけのも
のなど現場据え付けの基礎となるもののすべてが含まれ
る。
The surface plate 3 includes not only plate-shaped items but also all items that serve as the basis for installation on site, such as only a frame.

またフロート2は盤木を兼用するものである。そして、
定盤3上に大型構造物Pを組立て、必要な管の配設、お
よひ機器類の設置を行なう(第1図参照)。
The float 2 also serves as a board. and,
A large structure P is assembled on the surface plate 3, and the necessary pipes and equipment are installed (see Figure 1).

構造物Pの完或後、ドツク1内に注水して、フロート2
によって構造物Pを定盤3ごと浮上させる(第2図参照
)。
After the structure P is completed, water is poured into the dock 1 and the float 2 is installed.
The structure P is levitated together with the surface plate 3 (see Fig. 2).

そして、構造物Pを、予めサブマージブル・バージ4が
沈められている海域まで曳航し、バージ4の丁度上方に
位置させる。
Then, the structure P is towed to the ocean area where the submersible barge 4 has been sunk in advance, and positioned just above the barge 4.

バージ4の甲板上には予め受台5が載置されている(第
3図参照)。
A cradle 5 is placed in advance on the deck of the barge 4 (see Fig. 3).

サブマージブル・バージ4の沈下作業は次のよう(こす
るとよい。
The submersible barge 4 can be submerged as follows (scraping is recommended).

すなわち、バージ4を所定海域まで曳航したのちアンカ
を打ってバージ4を係留し(第4図参照)、バージ4内
に海水バラストを注入することによりバージ4を沈下さ
せる(第5図参照)。
That is, after the barge 4 is towed to a predetermined sea area, the barge 4 is moored by anchoring (see FIG. 4), and seawater ballast is injected into the barge 4 to sink the barge 4 (see FIG. 5).

このとき、受台5はその上部が水面上lと突出していて
もよいし、その全部が水面下lこ沈んでいる状態でもよ
い。
At this time, the upper part of the pedestal 5 may protrude above the water surface, or the entire part may be submerged below the water surface.

定盤3上の構造物Pは好ましくはその複数個を一列状に
連結してタグ・ボート6で沈下しているバージ4上方の
位置まで曳航する(第6図参照)。
Preferably, a plurality of structures P on the surface plate 3 are connected in a line and towed by a tug boat 6 to a position above the submerged barge 4 (see FIG. 6).

このさい、受台5はフロート2のガイドの役目も果たす
At this time, the pedestal 5 also serves as a guide for the float 2.

すべての構造物Pをバージ4上方の所定位置にセットし
たのち、バージ4のバラストを排水してバージ4を浮上
させれば定盤3上の構造物Pはその中央部で受台5上に
支持され、フロート2は定盤3から外れる(第7図参照
)。
After all the structures P are set in the predetermined positions above the barge 4, the ballast of the barge 4 is drained and the barge 4 is floated, and the structure P on the surface plate 3 is placed on the pedestal 5 at its center. The float 2 is supported and removed from the surface plate 3 (see FIG. 7).

バージ4からの排水は、バージ4のバラスト・タンク内
に匡縮空気を送り込み、この堕縮空気によって強制的に
かつ逆止弁を通して海水を排出するとよい。
For drainage from the barge 4, condensed air may be sent into the ballast tank of the barge 4, and the seawater may be forcibly discharged by this condensed air through a check valve.

こののち、定盤3の下からフロート2を搬出する(第8
図参照)。
After this, the float 2 is carried out from under the surface plate 3 (8th
(see figure).

このフロート2はドツク1における構造物Pの建造のた
めに再度使用される。
This float 2 is used again for the construction of structure P in dock 1.

そして、フロート2が存在した位置にジャッキ付支持台
7を配置し、ジャッキ・アップして構造物Pを定盤3ご
と持ち上げ、受台5を搬出する(第9図、第10図参照
)。
Then, a support stand 7 with a jack is placed at the position where the float 2 was located, and the structure P is lifted up together with the surface plate 3 by jacking up, and the pedestal 5 is carried out (see FIGS. 9 and 10).

支持台7としては、その上端面に凹所が形成され、この
凹所内lとジャッキ8が収納されているものを用いると
よい。
As the support stand 7, it is preferable to use one having a recess formed in its upper end surface, and in which the jack 8 and the recess are housed.

受台5の搬出後、ジャッキ・ダウンして定盤3上の構造
物Pを支持台7の上端面で支持させ、ジャッキ8を取り
出す(第11図参照)。
After carrying out the cradle 5, it is jacked down to support the structure P on the surface plate 3 on the upper end surface of the support pedestal 7, and the jack 8 is taken out (see FIG. 11).

受台5およひジャッキ8は再度の使用に供される。The pedestal 5 and the jack 8 are used again.

最後に、支持台7により両側部分が支持された構造物P
をワイヤ9等で固縛して海洋航行が可能な状態とする(
第12図参照)。
Finally, the structure P whose both sides are supported by the support stand 7
Secure it with wire 9 etc. to make it possible for ocean navigation (
(See Figure 12).

この後、大型構造物Pを搭載したバージ4は構造物Pが
設置されるべき地域まで曳航される。
Thereafter, the barge 4 carrying the large structure P is towed to the area where the structure P is to be installed.

この例では、大重量の大型構造物Pをクレーンを全く使
用せずにドツク1から搬出およびバージ4への搭載が可
能となっている。
In this example, it is possible to carry out a heavy large structure P from the dock 1 and load it onto the barge 4 without using any crane.

また、複数の大型構造物Pを一挙にバージ4に搭載しう
るので作業能率がきわめて高い。
Further, since a plurality of large structures P can be loaded onto the barge 4 at once, work efficiency is extremely high.

さらlこ受台5、フロート2を伺度も利用できるので経
済的である。
It is economical because the cradle 5 and float 2 can be used at any time.

第13図ないし第20図は他の例を示している。13 to 20 show other examples.

ここでは2種類のフローHL12が用いられており、定
盤3の両側に位置するフロート11よりも中央に位置す
るフロート12の方が高さが高く、かつ巾が広い。
Two types of flows HL12 are used here, and the float 12 located at the center is higher and wider than the floats 11 located on both sides of the surface plate 3.

フロート11は盤木13上にのせ、両フローN1,12
の上端面の高さを一致させた状態でその上に定盤3を載
置し、定盤3上に大型構造物Pを組立てる(第13図参
照)。
The float 11 is placed on the board 13, and both flows N1 and 12
A surface plate 3 is placed on the surface plate 3 with the heights of the upper end surfaces thereof being made the same, and a large structure P is assembled on the surface plate 3 (see FIG. 13).

この後、上記と同様lこドツク1内に注水して構造物P
を浮上させ(第14図参照)、予め沈められているサブ
マージブル・バージ4の上方位置まで曳航する(第15
図参照)。
After that, as above, water is poured into the tank 1 and the structure P
(see Figure 14) and tow it to a position above submersible barge 4, which has been submerged in advance (see Figure 14).
(see figure).

バージ4上には受台は用意されていない。No cradle is provided on the barge 4.

構造物Pをバージ4の上方所定位置にセットしたのち、
バージ4を浮上させれば、構造物Pは中央のフロート1
2によってバージ4上に支持され、両側のフロート11
は高さが低いので定盤3から外れる(第16図参照)。
After setting the structure P at a predetermined position above the barge 4,
If the barge 4 is floated, the structure P will be moved to the center float 1.
2 supported on the barge 4 by floats 11 on both sides.
Since the height is low, it comes off from the surface plate 3 (see Figure 16).

両側のフロート11を搬出し、その位置にジャッキ付支
持台7を挿入し(第17図参照)、ジャッキ・アップし
て中央のフロート12を前後方向に引き出す(第18図
参照)。
The floats 11 on both sides are carried out, the support stand 7 with a jack is inserted in that position (see FIG. 17), and the center float 12 is pulled out in the front-rear direction by jacking it up (see FIG. 18).

以後の作業は上記の例と同様であって、ジャッキ・ダウ
ンして構造物Pを支持台7上端面で支持させ、ジャッキ
8を取り出し(第19図参照)、最後に構造物Pをワイ
ヤ9等で固縛する(第20図参照)。
The subsequent work is the same as in the above example, and the structure P is jacked down to be supported on the upper end surface of the support base 7, the jack 8 is taken out (see Fig. 19), and finally the structure P is attached to the wire 9. (See Figure 20).

もし必要ならば中央部にジャッキ14を介在させて支持
台7による構造物Pの支持を補助する。
If necessary, a jack 14 is interposed in the center to assist support of the structure P by the support base 7.

この例では、2種類のフロ一HL12を用い、定盤3お
よび構造物Pをその両側のみならず中央部においても支
持しているので、構造物の建造時、および建造後の曳航
時に定盤3に加わる構造物Pの荷重が均一となり、定盤
3に無理がかからず、きわめて安全でありかつ設計上も
好都合である。
In this example, two types of floats HL12 are used to support the surface plate 3 and the structure P not only on both sides but also in the center. The load of the structure P applied to the surface plate 3 is uniform, and no strain is placed on the surface plate 3, which is extremely safe and convenient in terms of design.

さらに、中央のフロート12は受台を兼ねているから受
台が不要である。
Furthermore, since the center float 12 also serves as a pedestal, no pedestal is required.

なお、第16図およひ第17図(こおいてフロート12
のみに構造物Pの全荷重が加わるが、一時的なものであ
るから支障はない。
In addition, Fig. 16 and Fig. 17 (here, the float 12
Although the full load of the structure P is applied only to the bridge, there is no problem because it is only temporary.

このようにしてバージ4上に搭載された構造物はその建
設地まで運搬され、次の方法により陸上げされる。
The structure mounted on the barge 4 in this manner is transported to the construction site and brought ashore by the following method.

第21図ないし第23図(こおいて、現地の海岸Sに予
めパージ導入用の堀21を堀っておき、この堀21内に
構造物Pを搭載したバージ4を引き入れる(第21図参
照)。
Figures 21 to 23 (here, a moat 21 for purge introduction is dug in advance on the local coast S, and the barge 4 carrying the structure P is pulled into this moat 21 (see Figure 21) ).

この後、干潮時を利用して堀21の出入口にフルトーザ
により土砂等を積上げて(22で示す)出入口を閉じ、
かつバージ4と陸地との間にも土砂を堆積してトレーラ
が通ることのできる道23をつくる(第22図参照)。
After that, taking advantage of the low tide, earth and sand are piled up at the entrance to the moat 21 using a flutosaur (indicated by 22), and the entrance is closed.
Also, earth and sand is deposited between the barge 4 and the land to create a road 23 through which the trailer can pass (see Figure 22).

出入口の閉鎖22は水門にする方が好ましく、また必要
ならば堀21内の海水を排出するとよい。
It is preferable that the entrance/exit closure 22 is a water gate, and if necessary, the seawater in the moat 21 can be drained.

以上の準備が完了したら、両側の支持台7間にジャッキ
付重量物運搬用トレーラ24を入れ、構造物Pを定盤3
ごとトレーラ24上にのせて搬出し、据え付け場所まで
運搬する(第23図参照)。
When the above preparations are completed, put the trailer 24 for transporting heavy objects with a jack between the support stands 7 on both sides, and move the structure P to the surface plate 3.
The entire unit is loaded onto a trailer 24 and transported to the installation location (see Fig. 23).

干潮時に堀21の出入口を開き、満潮時を利用すれば堀
21内のバージ4を容易に海上に引き出すことができる
By opening the entrance and exit of the moat 21 at low tide and using the high tide, the barge 4 in the moat 21 can be easily pulled out to sea.

バージ4が海岸に直接着底しうる構造のものであれば、
第24図および第25図に示すように、満潮時にバージ
4を海岸Sに乗り上げさせ、干潮時にブルトーザでバー
ジ4と陸地との間に道25をつくり、上記同様にトレー
ラ24で構造物Pをバージ4から搬出することができる
If barge 4 has a structure that allows it to land directly on the shore,
As shown in FIGS. 24 and 25, the barge 4 is run aground on the shore S at high tide, a road 25 is created between the barge 4 and the land using a bulldozer at low tide, and the structure P is moved with the trailer 24 in the same manner as above. It can be carried out from the barge 4.

パージ4の離礁は満朝を利用して行なうとよい。It is best to take advantage of the full morning period for purge 4 when leaving the reef.

以上のようにこの発明によれば、大型構造物の重量がク
レーンの吊り能力を超えていてもより大きな吊り能力を
持つクレーンを新たに建造する必要がなく、容易にかつ
確実に組立てた大型構造物をパージ(こ搭載することが
でき、したがって目的地に運搬することが可能となる。
As described above, according to the present invention, even if the weight of the large structure exceeds the lifting capacity of the crane, there is no need to construct a new crane with a larger lifting capacity, and the large structure can be assembled easily and reliably. Items can be purged and therefore transported to their destination.

しかも犬型構造物絹立て時に使用された定盤の存在によ
り、大型構造物のパージへの搭載が円滑に行なえるし、
定盤自体目的地での大型構造物据え付けの基礎となしう
る利点がある。
In addition, the presence of the surface plate used when standing up the dog-shaped structure allows for smooth loading of large structures onto the purge.
The surface plate itself has the advantage of being able to serve as the basis for installing large structures at the destination.

【図面の簡単な説明】[Brief explanation of drawings]

第1図ないし第12図はこの発明の一例の作業手順を示
し、第1図ないし第3図は正面1タ1、第4図A、第5
図A、およひ第6図Aは平面図、第4図B、第5図Bは
側面図、第6図B、および第7図ないし第9図は正面図
、第10図およひ第11図は支持台の断面図、第12図
は正面図、第13図ないし第20図はこの発明の他の例
の作業手順を示す正面図、第21図ないし第25図は大
型構造物のパージからの陸上げ作業を示し、第21図お
よび第22図は平面図、第23図は正面図、第24図お
よび第25図は側面図である。 1・・・・・・ドック、2,11・・・・・・フロート
、3・・・・・・定盤、4・・・・・・パージ、P・・
・・・・犬型構物。
1 to 12 show the working procedure of an example of the present invention.
Figures A and 6A are plan views, Figures 4B and 5B are side views, Figures 6B and 7 to 9 are front views, and Figures 10 and 9 are front views. FIG. 11 is a sectional view of the support base, FIG. 12 is a front view, FIGS. 13 to 20 are front views showing working procedures of other examples of the present invention, and FIGS. 21 to 25 are large-scale structures. 21 and 22 are plan views, FIG. 23 is a front view, and FIGS. 24 and 25 are side views. 1...Dock, 2,11...Float, 3...Surface plate, 4...Purge, P...
...Dog-shaped structure.

Claims (1)

【特許請求の範囲】[Claims] 1 ドツク1の底面上に、フロート2,11を少なくと
も両側附近lこ介在させて定盤3を配置し、定盤3上に
大型構造物Pを組立て、ドツク1内に注水してフロー1
−2,11により構造物Pを定盤3ごと浮上させる一方
、予めサブマージブル・バージ4を所定海域に沈めてお
き、フロート2,11をドツク1からこのバージ4が沈
められている直上位置に曳航し、バージ4を浮上させる
ことにより定盤3とともに大型構造物Pをバージ4上に
搭載することを特徴とする大型構造物の建造搬出方法。
1 Place the surface plate 3 on the bottom of the dock 1 with the floats 2 and 11 interposed at least near both sides, assemble the large structure P on the surface plate 3, and pour water into the dock 1 to increase the flow 1.
-2, 11 to float the structure P along with the surface plate 3, while submerging the submersible barge 4 in a predetermined sea area, move the floats 2, 11 from the dock 1 to the position directly above where the barge 4 is sunk. A method for constructing and transporting a large structure, which comprises loading the large structure P together with the surface plate 3 onto the barge 4 by towing and levitating the barge 4.
JP872178A 1978-01-27 1978-01-27 Construction and transport method of large structures Expired JPS5847392B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP872178A JPS5847392B2 (en) 1978-01-27 1978-01-27 Construction and transport method of large structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP872178A JPS5847392B2 (en) 1978-01-27 1978-01-27 Construction and transport method of large structures

Publications (2)

Publication Number Publication Date
JPS54102794A JPS54102794A (en) 1979-08-13
JPS5847392B2 true JPS5847392B2 (en) 1983-10-21

Family

ID=11700804

Family Applications (1)

Application Number Title Priority Date Filing Date
JP872178A Expired JPS5847392B2 (en) 1978-01-27 1978-01-27 Construction and transport method of large structures

Country Status (1)

Country Link
JP (1) JPS5847392B2 (en)

Also Published As

Publication number Publication date
JPS54102794A (en) 1979-08-13

Similar Documents

Publication Publication Date Title
JPS6315381Y2 (en)
US4714382A (en) Method and apparatus for the offshore installation of multi-ton prefabricated deck packages on partially submerged offshore jacket foundations
KR100949891B1 (en) On-ground building method for conventional type of ship with transverse load-out
JPS62215711A (en) Ocean structure and method for anchoring the same
US4080916A (en) Maritime platform assemblies
CN211642531U (en) Semi-submersible type mounting and transporting platform for bridge section
JPS5847392B2 (en) Construction and transport method of large structures
JPS59145688A (en) Launching/grounding system for vessel and ocean structure
JPS58218521A (en) Construction, launching and installation of caisson
JP2001003332A (en) Immersion method for caisson and floater for immersing the caisson
JPS60208512A (en) Installation of tower type marine structure
JPS59161521A (en) Setting work of thin shell with superlarge diameter and floater therefor
JPH025852B2 (en)
JPS593318B2 (en) How to transport a large constructed structure from a dock to a floating body for waiting transportation
IE41580B1 (en) Improvements in or relating to martime assemblies
GB2196675A (en) Offshore platform system
JPS5819113Y2 (en) floating trolley
JPH0587647B2 (en)
JPS59190080A (en) Marine platform
JPS5973389A (en) Process of launching concrete structure
JPS5858273B2 (en) How to land large structures
JP3926027B2 (en) Caisson construction method
NO743224L (en)
US3962880A (en) Columns for platforms, piers, causeways and the like, and method of erecting same
JPH0835221A (en) Construction of large scale floating structure