JPS58153899A - シ−ルド工法における覆工リングの固定支持方法 - Google Patents

シ−ルド工法における覆工リングの固定支持方法

Info

Publication number
JPS58153899A
JPS58153899A JP57035329A JP3532982A JPS58153899A JP S58153899 A JPS58153899 A JP S58153899A JP 57035329 A JP57035329 A JP 57035329A JP 3532982 A JP3532982 A JP 3532982A JP S58153899 A JPS58153899 A JP S58153899A
Authority
JP
Japan
Prior art keywords
segment
bag
lining ring
shield
bulging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP57035329A
Other languages
English (en)
Japanese (ja)
Other versions
JPS636719B2 (enrdf_load_stackoverflow
Inventor
瀧川 徹也
池川 孝志
香山 昌男
加納 洋一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nishimatsu Construction Co Ltd
Original Assignee
Nishimatsu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nishimatsu Construction Co Ltd filed Critical Nishimatsu Construction Co Ltd
Priority to JP57035329A priority Critical patent/JPS58153899A/ja
Publication of JPS58153899A publication Critical patent/JPS58153899A/ja
Publication of JPS636719B2 publication Critical patent/JPS636719B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
JP57035329A 1982-03-05 1982-03-05 シ−ルド工法における覆工リングの固定支持方法 Granted JPS58153899A (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP57035329A JPS58153899A (ja) 1982-03-05 1982-03-05 シ−ルド工法における覆工リングの固定支持方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP57035329A JPS58153899A (ja) 1982-03-05 1982-03-05 シ−ルド工法における覆工リングの固定支持方法

Publications (2)

Publication Number Publication Date
JPS58153899A true JPS58153899A (ja) 1983-09-13
JPS636719B2 JPS636719B2 (enrdf_load_stackoverflow) 1988-02-10

Family

ID=12438781

Family Applications (1)

Application Number Title Priority Date Filing Date
JP57035329A Granted JPS58153899A (ja) 1982-03-05 1982-03-05 シ−ルド工法における覆工リングの固定支持方法

Country Status (1)

Country Link
JP (1) JPS58153899A (enrdf_load_stackoverflow)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60164600A (ja) * 1984-02-01 1985-08-27 西松建設株式会社 シ−ルド掘進方法
JP2006342629A (ja) * 2005-06-10 2006-12-21 Shimizu Corp 充填材の空洞への充填手段および充填方法
JP2008163597A (ja) * 2006-12-27 2008-07-17 Keisei Electric Railway Co Ltd 埋設管体の背面充填方法
JP2011252352A (ja) * 2010-06-03 2011-12-15 Taisei Corp トンネルライニング構造の構築方法およびトンネルライニング構造
JP2018193689A (ja) * 2017-05-12 2018-12-06 鹿島建設株式会社 気泡入り減摩材、気泡入り流動化材およびそれらの製造方法並びにシールド工法
JP2019044417A (ja) * 2017-08-31 2019-03-22 清水建設株式会社 裏込め材

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03234012A (ja) * 1990-02-09 1991-10-18 Matsushita Electric Ind Co Ltd 金属化フィルムコンデンサ

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56159499A (en) * 1980-05-09 1981-12-08 Doken Shizai Kk Filling of excavated opening for tunnel work

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56159499A (en) * 1980-05-09 1981-12-08 Doken Shizai Kk Filling of excavated opening for tunnel work

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60164600A (ja) * 1984-02-01 1985-08-27 西松建設株式会社 シ−ルド掘進方法
JP2006342629A (ja) * 2005-06-10 2006-12-21 Shimizu Corp 充填材の空洞への充填手段および充填方法
JP2008163597A (ja) * 2006-12-27 2008-07-17 Keisei Electric Railway Co Ltd 埋設管体の背面充填方法
JP2011252352A (ja) * 2010-06-03 2011-12-15 Taisei Corp トンネルライニング構造の構築方法およびトンネルライニング構造
JP2018193689A (ja) * 2017-05-12 2018-12-06 鹿島建設株式会社 気泡入り減摩材、気泡入り流動化材およびそれらの製造方法並びにシールド工法
JP2019044417A (ja) * 2017-08-31 2019-03-22 清水建設株式会社 裏込め材

Also Published As

Publication number Publication date
JPS636719B2 (enrdf_load_stackoverflow) 1988-02-10

Similar Documents

Publication Publication Date Title
CN208965598U (zh) 灌浆帷幕与地下洞室相交部位的防渗处理结构
CN109356596A (zh) 利用可回收地下连续墙和钢套筒始发及接收盾构机的方法
US4911578A (en) Process for making a tunnel and advancing a tunneling read with a wall-supporting shield
JPS58153899A (ja) シ−ルド工法における覆工リングの固定支持方法
CN113217037A (zh) 一种单护盾tbm或盾构管片壁后的回填系统及回填方法
CN210509213U (zh) 一种小净距隧道中岩柱加固系统
JP3974090B2 (ja) 長尺フェイスボルトの施工方法
JP3890528B2 (ja) トンネル施工法
JP3715968B2 (ja) 急曲線掘削工法
JPS60188597A (ja) 通行不能な長く延びた空洞をクローズド工法で掘進し且囲壁を形成するための方法及び装置
WO2021151289A1 (zh) 水下隧道及其施工方法和施工用水盾构机
JP3113635B2 (ja) 複合注入無拡幅鋼管先受工法
JP4313487B2 (ja) 裏込め材の打設方法
JP3818572B2 (ja) 注入工法
JPS6042157Y2 (ja) シ−ルド工法にて使用する裏込め材遮断用セグメント
KR101452180B1 (ko) 프리캐스트 중공블록을 이용한 비 개착식 지하구조물 시공방법
CN221002747U (zh) 一种富水液化砂层的盾构端头加固体结构
JPS621354Y2 (enrdf_load_stackoverflow)
JPH02311700A (ja) ロックボルト
JPS63118493A (ja) シ−ルドトンネル地中ドツキング工法
JPH01174800A (ja) 地中にコンクリート覆工体を構築する方法およびその構築に用いられるセグメント
JP3634820B2 (ja) 硬化材充填型枠および硬化材の充填方法
JP3595278B2 (ja) シールド工法
JP2000248896A (ja) Tbm工法における裏込材注入工法
JPS62319B2 (enrdf_load_stackoverflow)