JPS5595729A - Construction of substructure of building - Google Patents
Construction of substructure of buildingInfo
- Publication number
- JPS5595729A JPS5595729A JP351279A JP351279A JPS5595729A JP S5595729 A JPS5595729 A JP S5595729A JP 351279 A JP351279 A JP 351279A JP 351279 A JP351279 A JP 351279A JP S5595729 A JPS5595729 A JP S5595729A
- Authority
- JP
- Japan
- Prior art keywords
- substructure
- columns
- studs
- cast
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
PURPOSE: To construct substructure efficiently and safely by a method wherein precast concrete columns connecting through substructure and superstructure are set simultaneously with the casting of cast-in-place piles, and the ground is progressively excavated while spanning breast boards by use of the columns.
CONSTITUTION: For construction of substructure, vertical holes 1 are first excavated at predetermined locations along the periphry of a building including the substructure. Then a cast-in-place pile or consolidating concrete 2 is cast in each of the holes 1 to the level of the foundation of substructure. Before the concrete 2 is hardened, precast concrete main columns 3 and studs 4 are suspended in the holes 1, and main reinforcements 5 at the lower ends of the columns and studs are embedded in the concrete 2. The area surrounded by the columns 3 and studs 4 is excavated from the ground surface; each time the ground 8 is exposed, breast boards 7 are spanned to prevent collapse of earth, before further excavation. In connection with the columns 3 and studs 4, a floor spanning beam 9 for the first floor and a portion of the basement outside wall are cast, and a spanning beam 10 for the basement is constructed at a predetermined depth.
COPYRIGHT: (C)1980,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP351279A JPS5595729A (en) | 1979-01-16 | 1979-01-16 | Construction of substructure of building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP351279A JPS5595729A (en) | 1979-01-16 | 1979-01-16 | Construction of substructure of building |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS5595729A true JPS5595729A (en) | 1980-07-21 |
Family
ID=11559407
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP351279A Pending JPS5595729A (en) | 1979-01-16 | 1979-01-16 | Construction of substructure of building |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5595729A (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4939769A (en) * | 1972-08-28 | 1974-04-13 |
-
1979
- 1979-01-16 JP JP351279A patent/JPS5595729A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4939769A (en) * | 1972-08-28 | 1974-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110424372A (en) | Along road interval method in a row remove obstacles after construct diaphram wall construction method | |
CN207211158U (en) | Assembled pile board wall foundation pit supporting construction | |
CN207211176U (en) | A kind of big open caisson of superelevation | |
CN110080234A (en) | A method of it is excavated in the secondary central island of deep foundation pit of soft soil foundation | |
CN216194845U (en) | Pebble covering layer steel sheet pile cofferdam system | |
JP2000144769A (en) | Method of landslide protection work for preparing housing lot | |
JPS5595729A (en) | Construction of substructure of building | |
GB2067623A (en) | Method for supporting buildings | |
JP3099040B2 (en) | Embankment culvert | |
JPS5530039A (en) | Method for constructing underground structures | |
SU773206A1 (en) | Method of erecting foundation for structures on weak water-saturated soils | |
JPH02311620A (en) | Underground structure construction method | |
JPH0886117A (en) | Building installation method | |
JPS5664028A (en) | Sheathing construction work by antecedent support framework | |
RU2044838C1 (en) | Structure for strengthening pile foundation of a building, construction | |
RU1791541C (en) | Method for erection of padded support structure in soil | |
SU903485A1 (en) | Method of constructing foundation for a tank | |
JPS6049734B2 (en) | How to form a basement | |
RU2065001C1 (en) | Method for reconstruction of buildings, constructions | |
CN105386519B (en) | Utilize the building construction method of soil body reverse construction frame structure | |
JPS59233028A (en) | Residential land formation work on sloped ground | |
TW418274B (en) | A pre-cast and site-cast combined construction method of retaining and waterproof diaphragm wall | |
SU652274A1 (en) | Method of constructing a sunken-in well | |
JP2711748B2 (en) | Construction method of large-scale underground space | |
JPS59177422A (en) | Construction work of underground continuous wall using disposable formwork |