RU2044838C1 - Structure for strengthening pile foundation of a building, construction - Google Patents

Structure for strengthening pile foundation of a building, construction Download PDF

Info

Publication number
RU2044838C1
RU2044838C1 SU5009906A RU2044838C1 RU 2044838 C1 RU2044838 C1 RU 2044838C1 SU 5009906 A SU5009906 A SU 5009906A RU 2044838 C1 RU2044838 C1 RU 2044838C1
Authority
RU
Russia
Prior art keywords
foundation
wall
piles
reinforced
building
Prior art date
Application number
Other languages
Russian (ru)
Inventor
Иван Александрович Узун
Original Assignee
Иван Александрович Узун
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Иван Александрович Узун filed Critical Иван Александрович Узун
Priority to SU5009906 priority Critical patent/RU2044838C1/en
Application granted granted Critical
Publication of RU2044838C1 publication Critical patent/RU2044838C1/en

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

FIELD: civil engineering. SUBSTANCE: structure for strengthening includes additional pile foundation attached to one being strengthened as monolithic. The new foundation is made of bored piles placed in 3 m steps. The piles are integrated with piles of the foundation being strengthened with common foundation mat. The structure includes also reinforced concrete beam-wall strengthened with reinforced concrete buttress. The wall is attached as monolithic to the foundation mats and placed under wall shed formed when the wall was displaced about foundation center- line. EFFECT: foundation strengthening. 3 dwg

Description

Изобретение относится к строительным конструкциям и может быть реализовано на строительной площадке или в жилых районах. The invention relates to building structures and can be implemented at a construction site or in residential areas.

Известна конструкция усиления свайного фундамента здания, сооружения, включающая примоноличенный к усиливаемому фундаменту дополнительный свайный фундамент. A known construction of reinforcing the pile foundation of a building, structure, including additional pile foundation monolithic to the reinforced foundation.

Недостатком данной конструкции является то, что не обеспечивается совместная работа свай усиливаемого фундамента и дополнительного фундамента при использовании в случае смещения стены здания, сооружения относительно оси фундамента. The disadvantage of this design is that it is not ensured that the piles of the reinforced foundation and the additional foundation work together when used in case of displacement of the wall of the building, structure relative to the axis of the foundation.

Целью изобретения является обеспечение совместности работы свай усиливаемого фундамента и дополнительного фундамента в условиях смещения стены здания, сооружения относительно оси фундамента. The aim of the invention is to ensure the compatibility of the piles of the reinforced foundation and the additional foundation under conditions of displacement of the wall of the building, structure relative to the axis of the foundation.

Цель решается за счет того, что в конструкции усиления свайного фундамента здания, сооружения, включающей примоноличенный к усиливаемому фундаменту дополнительный свайный фундамент, последний выполнен из расположенных с шагом 3 м трех буронабивных свай, объединенных со сваями усиливаемого фундамента общим ростверком, и снабжен железобетонной подкрепленной железобетонным контрфорсом балкой-стенкой, примоноличенной к нему и ростверку усиливаемого фундамента и расположенной под образованным при смещении стены относительно оси фундамента свесом этой стены. The goal is achieved due to the fact that in the construction of reinforcing the pile foundation of the building, the structure, including an additional pile foundation, monolithic to the reinforced foundation, the latter is made of three bored piles located at 3 m increments, combined with piles of the reinforced foundation with a common grillage, and equipped with reinforced concrete reinforced concrete buttress with a beam-wall, monololic to it and a grillage of the reinforced foundation and located under the formed by the displacement of the wall relative to the axis NTA overhang of the wall.

На фиг. 1 изображена предлагаемая конструкция до усиления, продольный разрез; на фиг. 2 то же, после усиления, продольный разрез; на фиг. 3 конструкция, вид со стороны фасада. In FIG. 1 shows the proposed design to gain, a longitudinal section; in FIG. 2 the same, after amplification, a longitudinal section; in FIG. 3 construction, view from the front of the facade.

Конструкция усиления существующего фундамента, состоящего из свай 1 и ростверка 2, на который оперта со смещением относительно оси 3 фундамента стена 4 здания, сооружения, состоит из примоноличиваемого к усиливаемому фундаменту дополнительного фундамента, выполненного из расположенных с шагом 3 м трех буронабивных свай 5, объедненных со сваями 1 общим ростверком 6, и железобетонной подкрепленной железобетонным контрофорсом 7 балки-стенки 8, примоноличенной к ростверкам 6 и 2 и расположенной под образованным при смещении стены 4 относительно оси 3 фундамента свесом 9 этой стены 4. The reinforcement design of the existing foundation, consisting of piles 1 and grillage 2, on which the wall 4 of the building, structure, is supported with offset relative to the axis 3 of the foundation, consists of an additional foundation, made of three bored piles 5, spaced 3 m apart, connected with piles 1 with a common grillage 6, and reinforced concrete reinforced with concrete reinforcements 7 of the beam-wall 8, monolithic to grillages 6 and 2 and located under the wall 4 formed with the displacement B 3 foundation overhang 9 of the wall 4.

Работы по усилению осуществляют в следующей последовательности. Strengthening work is carried out in the following sequence.

Рядом с усиливаемой стеной 4, свайным фундаментом со сваями 1 выбирают грунт, например, экскаватором (не показано) на глубине 2 м от поверхности земли. С помощью бурового станка были пробурены по три шурфа на глубине до 9 м диаметром 60 см с шагом 3 м между будущими сваями 5 (т.е. перпендикулярно к существующему усиляемому ряду свай 1). В шурфы опускают стальные каркасы (не показано) и методом подъема трубы бетонируют каждую сваю 5. Затем по сваям 5 с выступающими арматурными стержнями опирают арматурный каркас 10 общего ростверка 6 и соединяют его в обхват со сваей 1. Над каркасом и сбоку от него устанавливают опалубку (не показана). Над ростверком 6 устанавливают армокаркасы 4 для балки-стенки 8 и армокаркасы 12 контрфорса 7, сваривают их и также устанавливают вертикальную деревянную опалубку (не показана). Затем в опалубку заливают подвижную бетонную смесь из бетона прочностью 300 кг/см2 (30 МПа).Next to the reinforced wall 4, pile foundation with piles 1 choose soil, for example, an excavator (not shown) at a depth of 2 m from the surface of the earth. Using a drilling rig, three pits were drilled at a depth of 9 m with a diameter of 60 cm with a step of 3 m between future piles 5 (i.e., perpendicular to the existing reinforced row of piles 1). Steel frames (not shown) are lowered into the pits and each pile 5 is concreted by lifting pipes. Then, on piles 5 with protruding reinforcing rods, support the reinforcing frame 10 of the general grillage 6 and connect it to the girth with the pile 1. A formwork is installed above and on the side of the frame (not shown). Over the grillage 6, reinforcement frames 4 are installed for the beam-wall 8 and reinforcement frames 12 of the buttress 7, welded and also a vertical wooden formwork (not shown) is installed. Then a movable concrete mixture of concrete with a strength of 300 kg / cm 2 (30 MPa) is poured into the formwork.

Конструкцию усиления, покрытую мешковиной, поливают водой 7 сут. Через 28 сут опалубку снимают, засыпают пазухи грунтом (песком), утрамбовывают с щебнем, выполняют бетонную подготовку и асфальтобетонную отмостку (не показано). The reinforcement structure covered with burlap is watered with water for 7 days. After 28 days, the formwork is removed, the sinuses are covered with soil (sand), tamped with crushed stone, concrete preparation and asphalt concrete blind area (not shown) are performed.

Предлагаемая конструкция усиления позволяет обеспечить при смещении стены относительно оси фундамента совместную работу свай усиливаемого и дополнительного фундаментов, а также дополнительно усилить стену здания, сооружения, ослабленную вследствие свеса ее относительно фундамента. The proposed reinforcement design makes it possible to ensure joint work of piles of the reinforced and additional foundations when the wall is offset relative to the foundation axis, as well as additionally strengthen the wall of the building, structure, weakened due to its overhang relative to the foundation.

Claims (1)

КОНСТРУКЦИЯ УСИЛЕНИЯ СВАЙНОГО ФУНДАМЕНТА ЗДАНИЯ, СООРУЖЕНИЯ, включающая примоноличенный к усиливаемому фундаменту дополнительный свайный фундамент, отличающаяся тем, что дополнительный свайный фундамент выполнен из расположенных с шагом 3 м трех буронабивных свай, объединенных со сваями усиливаемого фундамента общим ростверком, и снабжен железобетонной и подкрепленной железобетонным контрфорсом балкой-стенкой, примоноличенной к нему и ростверку усиливаемого фундамента и расположенной под образованным при смещении стены относительно оси фундамента с весом этой стены. STRUCTURE FOR STRENGTHENING THE PILED FOUNDATION OF THE BUILDING, STRUCTURES, including an additional pile foundation, monolithic to the reinforced foundation, characterized in that the additional pile foundation is made of three bored piles spaced 3 m apart, combined with piles of the reinforced foundation with a common grillage, and is reinforced with reinforced concrete beam-wall, monolithic to it and the grillage of the reinforced foundation and located under the relative wall formed by the displacement But the axis of the foundation with the weight of this wall.
SU5009906 1991-09-23 1991-09-23 Structure for strengthening pile foundation of a building, construction RU2044838C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU5009906 RU2044838C1 (en) 1991-09-23 1991-09-23 Structure for strengthening pile foundation of a building, construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU5009906 RU2044838C1 (en) 1991-09-23 1991-09-23 Structure for strengthening pile foundation of a building, construction

Publications (1)

Publication Number Publication Date
RU2044838C1 true RU2044838C1 (en) 1995-09-27

Family

ID=21589159

Family Applications (1)

Application Number Title Priority Date Filing Date
SU5009906 RU2044838C1 (en) 1991-09-23 1991-09-23 Structure for strengthening pile foundation of a building, construction

Country Status (1)

Country Link
RU (1) RU2044838C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU189644U1 (en) * 2019-01-09 2019-05-29 Федеральное государственное бюджетное образовательное учреждение высшего образования "Сибирский государственный университет путей сообщения" (СГУПС) The construction of the strengthening of the foundation of the building
RU2771359C1 (en) * 2021-10-26 2022-05-04 Александр Николаевич Власов Method for restoring buildings with a ventilated underground after thawing of the foundation soils

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Шоклич А. Основания и фундаменты. ОНТИ, 1936, с.472,473, рис.686. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU189644U1 (en) * 2019-01-09 2019-05-29 Федеральное государственное бюджетное образовательное учреждение высшего образования "Сибирский государственный университет путей сообщения" (СГУПС) The construction of the strengthening of the foundation of the building
RU2771359C1 (en) * 2021-10-26 2022-05-04 Александр Николаевич Власов Method for restoring buildings with a ventilated underground after thawing of the foundation soils

Similar Documents

Publication Publication Date Title
US4697955A (en) Method of constructing reinforced concrete works such as underground galleries, road tunnels, et cetera; pre-fabricated contrete elements for constructing such works
US4843658A (en) Swimming pool and method of construction
US20110142550A1 (en) Method for constructing a chair-type, self-supported earth retaining wall
AU2007100294A5 (en) Earth Retention and Piling Systems
US4365451A (en) Poured adobe building construction and method of forming same
CN112554198B (en) Construction method of deep foundation pit protection structure adjacent to high-rise building
JP2012107479A (en) Method for constructing underground and aboveground structure
US7025537B2 (en) Subterranean structures and methods for constructing subterranean structures
CN216194901U (en) Unloading plate type retaining wall structure for large-span underground garage
WO2011009219A1 (en) Shoring free excavation and basement construction apparatus and method
KR200492883Y1 (en) Braced wall
RU2044838C1 (en) Structure for strengthening pile foundation of a building, construction
CN105569329A (en) Unilateral formwork support basement construction method and basement
CN110924404A (en) Construction method for deep backfill filling wall foundation
Edens et al. Foundation retrofit of three structures utilizing micropiles
KR100592397B1 (en) storey spacing support ssoldier pile soil retaining wall
KR960016755B1 (en) Working method and working apparatus of underground structure
RU2809049C1 (en) Method for constructing bridge support in water area
CN216891934U (en) Steel trestle bridge anchoring pile for hard stratum of sea area tidal zone
CN220377311U (en) Triangular lattice support row pile foundation pit supporting structure
KR200291370Y1 (en) Concrete caisson structure for earth and sand guard of pier's basis
AU603257B2 (en) A precast diaphragm wall method
JP2555838B2 (en) Independent panel mountain retaining method
RU1791541C (en) Method for erection of padded support structure in soil
RU2211289C2 (en) Procedure of reinforcement of foundation and footing of existing construction structures