JP3099040B2 - Embankment culvert - Google Patents
Embankment culvertInfo
- Publication number
- JP3099040B2 JP3099040B2 JP08341519A JP34151996A JP3099040B2 JP 3099040 B2 JP3099040 B2 JP 3099040B2 JP 08341519 A JP08341519 A JP 08341519A JP 34151996 A JP34151996 A JP 34151996A JP 3099040 B2 JP3099040 B2 JP 3099040B2
- Authority
- JP
- Japan
- Prior art keywords
- embankment
- tunnel
- soft rock
- culvert
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、山間の谷間部など
に盛土によって道路を構築する場合の盛土下カルバート
に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an underfill embankment culvert when a road is constructed by embankment in a mountain valley or the like.
【0002】[0002]
【従来の技術】例えば、日本のように山国で、かつ、国
土が狭い所では、道路の建設用地を平野部などの平坦部
にのみ確保することは困難で、特に高速自動車道路を建
設する場合、山岳に建設することになり、道路は谷間部
を横断して山岳を貫通するようになる。2. Description of the Related Art For example, it is difficult to secure a road construction site only in a flat area such as a plain in a mountainous country and in a place where the land is narrow as in Japan. , And the road will penetrate the mountains across the valleys.
【0003】このような谷間部に道路を構築する場合、
図3に示すように道路1は山岳2の山腹3を貫通して構
築されることになるため、谷間部4に盛土5を造成する
必要があるが、盛土5の下部には沢水を流すための小さ
な河川である水路6や従来から存在し使用している農道
などの道路7を確保する必要がある。When building a road in such a valley,
As shown in FIG. 3, since the road 1 is constructed through the hillside 3 of the mountain 2, it is necessary to form the embankment 5 in the valley portion 4, but the drainage water flows under the embankment 5. It is necessary to secure a waterway 6, which is a small river, and a road 7 such as a farm road which has existed and is used.
【0004】そして水路6や道路7の確保のために、従
来、例えば幅10m、高さ5〜10m、長さ100 〜200 m規
模の盛土下カルバート8をトンネルとして構築し、この
盛土下カルバート8を水路6や道路7として使用してい
る。この盛土下カルバート8の構築方法として従来は、
例えば、現場打ちの鉄筋コンクリートでアーチ状に構築
していたが、最近では施工期間を短縮でき、建設コスト
も比較的安価にできるものとして、セメント安定処理土
(強化土あるい人工軟岩)リングによる盛土下カルバー
トがある。In order to secure the waterway 6 and the road 7, a culvert 8 under the embankment having a width of, for example, 10 m, a height of 5 to 10 m, and a length of 100 to 200 m is constructed as a tunnel, and the culvert 8 under the embankment is conventionally constructed. Are used as the waterway 6 and the road 7. Conventionally, as a construction method of the culvert 8 under the embankment,
For example, arches were constructed from cast-in-place reinforced concrete, but recently the construction period can be shortened and the construction cost can be made relatively inexpensive. The embankment using cement stabilized soil (reinforced soil or artificial soft rock) ring There is a lower culvert.
【0005】この盛土下カルバート8は、図4に示すよ
うにセメントと骨材との混合材(ソイルセメント)を人
工軟岩リング(強化土リング)9となる部分に十分に転
圧しながらまき出し、また、この人工軟岩リング9の内
側の部分に一般の土砂(現場発生土であるトンネルの掘
削ずり)20を十分に転圧しながらまき出し、このソイル
セメントと一般の土砂20とを所定の高さ(道路面の高
さ)まで盛り立てたならば、人工軟岩リング9で囲まれ
た内側の一般の土砂20を掘削してトンネルを構築し、水
路6や道路7を造成する。図中10は人工軟岩リング9の
外側に盛り立てた現地発生の一般土砂である。[0005] As shown in FIG. 4, the underfill embankment culvert 8 squeezes out a mixture of cement and aggregate (soil cement) while sufficiently rolling it into a portion to be an artificial soft rock ring (reinforced soil ring) 9. In addition, general soil (excavation of a tunnel, which is soil generated in the field) 20 is sufficiently rolled into the inside of the artificial soft rock ring 9 while being rolled out, and the soil cement and the general soil 20 are brought to a predetermined height. When the height is raised to (the height of the road surface), the general soil 20 surrounded by the artificial soft rock ring 9 is excavated to construct a tunnel, and the waterway 6 and the road 7 are constructed. In the figure, reference numeral 10 denotes general soil generated locally on the outside of the artificial soft rock ring 9.
【0006】一般の土砂20を掘削した後は、一般のトン
ネルを構築する場合と同様にして、図5に示すようにト
ンネル内面に吹き付けコンクリート21を施工し、さらに
その内面に二次覆工として覆工コンクリート22を施工す
る。After excavating the general earth and sand 20, in the same manner as in the case of constructing a general tunnel, as shown in FIG. 5, a concrete 21 is sprayed on the inner surface of the tunnel, and a secondary lining is formed on the inner surface. The lining concrete 22 is constructed.
【0007】[0007]
【発明が解決しようとする課題】かかる方法で構築する
盛土下カルバート8は、人工軟岩リング9の内側に一
旦、一般の土砂20を転圧した後、トンネル構築のために
今度は掘削するもので、施工に無駄がある。また、トン
ネル内の二次覆工の覆工コンクリート22の施工が完了す
るまで、トンネルとしての使用が不可能で、従来から存
在して使用していた農道としての道路7も交通止めの状
態となって使用できず、地域住民にとって非常に不便で
あると同時に、トンネルの内面を別途覆工するため工事
費も嵩む。The culvert 8 under the embankment to be constructed by the above-mentioned method is obtained by first rolling general earth and sand 20 inside the artificial soft rock ring 9 and then digging for tunnel construction. There is waste in construction. Until the construction of the lining concrete 22 for the secondary lining in the tunnel is completed, it cannot be used as a tunnel. It is very inconvenient for the local residents, and at the same time, the construction cost increases because the inside of the tunnel is lining separately.
【0008】また、人工軟岩リング9がソイルセメント
のみによって構築されるため、セメントと骨材の混合具
合によって人工軟岩リング9の品質、特に強度が大きく
左右されることが多く、強度的に安定した人工軟岩リン
グ9を確保しにくかった。Further, since the artificial soft rock ring 9 is constructed only of soil cement, the quality, especially the strength, of the artificial soft rock ring 9 is often largely influenced by the mixing condition of the cement and the aggregate, and the strength is stable. It was difficult to secure the artificial soft rock ring 9.
【0009】さらに、混合材と一般土砂のまき出し及び
転圧作業を行った後に、人工軟岩リング9内の一般の土
砂20を掘削してトンネルを貫通するため、大型掘削機な
どを必要として、工事が大規模なものとなる。[0009] Furthermore, after the mixture material and general earth and sand are unrolled and compacted, the general earth and sand 20 in the artificial soft rock ring 9 is excavated and penetrated through a tunnel. Construction becomes large-scale.
【0010】本発明の目的は前記従来例の不都合を解消
し、トンネル内部の一般土砂の転圧や掘削の作業が省略
でき、大掛かりな仮設材や機械を必要とせず、また、肌
落ちや安定性の確保及び化粧の目的で行うトンネル内周
面のコンクリート吹き付けや二次覆工コンクリートの施
工も省略でき、施工が容易で短期間に安価に施工でき、
人工軟岩リングの剪断抵抗力を増加できて構造体として
の盛土の安定性が向上して、強度的にも信頼できる盛土
下カルバートを提供することにある。[0010] An object of the present invention is to eliminate the disadvantages of the prior art, eliminate the need for compacting and excavating general earth and sand inside the tunnel, eliminate the need for large-scale temporary materials and machines, and remove the surface and stabilize the skin. The spraying of concrete on the inner surface of the tunnel and the construction of secondary lining concrete, which are performed for the purpose of securing the property and making up, can be omitted.
An object of the present invention is to provide an embankment under embankment that can increase the shear resistance of the artificial soft rock ring, improve the stability of the embankment as a structural body, and can also be reliable in strength.
【0011】[0011]
【課題を解決するための手段】本発明は前記目的を達成
するため、壁体をアーチ状の頂部以外の部分に建て込
み、頂部にプレキャスト(PC)板を配し、壁体の外側
に帯状補強材を設置するとともに、壁体とプレキャスト
(PC)板の外側にソイルセメントを転圧または流し込
んで人工軟岩リングを構築し、その外側に一般土砂を盛
り立てることを要旨とするものである。According to the present invention, in order to achieve the above object, a wall is erected on a portion other than the arched top, a precast (PC) plate is arranged on the top, and a strip is provided outside the wall. The gist of the present invention is to install a reinforcing material, and to roll or pour soil cement outside the wall and the precast (PC) plate to construct an artificial soft rock ring, and to lay general earth and sand outside the ring.
【0012】請求項1記載の本発明によれば、盛土下に
構築されるトンネルの内面に位置する個所に予め壁体と
PC板を設置することで、トンネル内部の一般土砂の転
圧や掘削の作業が省略でき、また、トンネル内周面のコ
ンクリート吹き付けや二次覆工コンクリートの施工も省
略できる。According to the first aspect of the present invention, the compaction and excavation of general earth and sand inside the tunnel is performed by installing a wall and a PC board in advance at a location located on the inner surface of the tunnel constructed under the embankment. Work can be omitted, and spraying of concrete on the inner peripheral surface of the tunnel and construction of secondary lining concrete can be omitted.
【0013】そして、人工軟岩リングの中に帯状補強材
を設置することにより剪断抵抗力が増大し構造体として
の安定性が増す。By providing the belt-like reinforcing material in the artificial soft rock ring, the shear resistance increases and the stability of the structure increases.
【0014】[0014]
【発明の実施の形態】以下、図面について本発明の実施
の形態を詳細に説明する。図1は本発明の盛土下カルバ
ートの実施の形態を示す縦断正面図で、図4に示した従
来例と同一の構成要素には同一の参照符号を付してあ
る。図中、11は谷間部4などに構築するトンネルの施工
場所に設置するコンクリートスキン(土止め材となるコ
ンクリートパネル)による壁体を示し、アーチ状のトン
ネルの頂部以外の部分をこのコンクリートの壁体11で構
成し、頂部をプレキャスト(PC)板12で構成する。Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a longitudinal sectional front view showing an embodiment of a submerged culvert according to the present invention, and the same components as those of the conventional example shown in FIG. In the figure, reference numeral 11 denotes a wall made of concrete skin (concrete panel serving as a retaining material) to be installed at a construction site of a tunnel to be constructed in the valley 4 or the like. It is composed of a body 11 and the top is composed of a precast (PC) plate 12.
【0015】壁体11の外側にストリップである例えば鋼
製の帯状補強材13を設置するとともに、壁体11とプレキ
ャスト(PC)板12の外側にセメントと骨材の混合材
(ソイルセメント)を転圧または流し込んで人工軟岩リ
ング(強化土リング)9を構築し、その外側に現地発生
の一般土砂10を盛り立てる。A strip reinforcing member 13 made of, for example, steel, which is a strip, is provided outside the wall 11, and a mixture of cement and aggregate (soil cement) is provided outside the wall 11 and the precast (PC) plate 12. An artificial soft rock ring (reinforced soil ring) 9 is constructed by rolling or pouring, and general soil 10 generated locally is erected outside the ring.
【0016】かかる壁体11、プレキャスト(PC)板1
2、ソイルセメント、一般土砂10により盛土下カルバー
ト8であるトンネルを施工する方法を説明する。壁体11
の外側に鋼製の帯状補強材13を配設し、ここにソイルセ
メントを転圧または流し込む方法は、図2に示すように
周知のテールアルメ工法を利用するものであり、基盤14
の上にコンクリートスキンである壁体11をアーチ状のト
ンネルの頂部以外の部分に建て込む。この壁体11の建て
込みはトンネルの全長(例えば200 m)にわたって、全
体として例えば幅10mに構築する。The wall 11 and the precast (PC) plate 1
2. A method of constructing a tunnel which is a culvert 8 under embankment using soil cement and general earth and sand 10 will be described. Wall 11
A steel strip reinforcing material 13 is disposed outside the steel plate, and a method of rolling or pouring the soil cement into the steel plate using a well-known tail arming method as shown in FIG.
A concrete skin wall 11 is erected on the part other than the top of the arched tunnel. The wall 11 is built over the entire length of the tunnel (for example, 200 m), for example, with a width of, for example, 10 m.
【0017】次に壁体11の外側にストリップである例え
ば鋼製の帯状補強材13を複数、上下方向に水平に設置す
る。これは盛土に発生すると想定されるひずみの方向に
配設する引張補強材であり、ここに打設するソイルセメ
ントと補強材との間に働く摩擦力を介してひずみの発生
を拘束して補強効果を得るものである。Next, a plurality of strip-like reinforcing members 13 made of, for example, steel, which are strips, are installed horizontally outside the wall body 11 in the vertical direction. This is a tensile reinforcement that is placed in the direction of the strain that is expected to occur on the embankment, and restrains the generation of strain through the frictional force that acts between the soil cement that is cast here and the reinforcement, and reinforces it. The effect is obtained.
【0018】次に壁体11の外側にセメントと骨材との混
合材(ソイルセメント)を人工軟岩リング(強化土リン
グ)9となる部分に充填し、同時にその外側に現地発生
の一般土砂10を盛り立てる。Next, the outside of the wall 11 is filled with a mixture of cement and aggregate (soil cement) into a portion to be an artificial soft rock ring (reinforced soil ring) 9, and at the same time, on the outside thereof, general soil 10 generated locally. Serve.
【0019】このソイルセメントの充填は、一般的には
転圧施工により行うが、流動化ソイルセメントの使用の
可能である。この場合には施工時に材料自身が流動化す
るため、型枠が必要となるが、これに対しては内側の壁
体11と外側の一般土砂10による盛土を型枠として利用
し、また、コンクリートポンプやシュートを使用して行
い、トンネルの両側部から頂点方向に向けて同時に平行
して行う。The filling of the soil cement is generally carried out by rolling, but fluidized soil cement can be used. In this case, since the material itself is fluidized at the time of construction, a formwork is necessary, but for this, the embankment with the inner wall body 11 and the outer general earth and sand 10 is used as a formwork, This is done using a pump or a chute, and from the both sides of the tunnel toward the vertex at the same time.
【0020】使用するソイルセメントは、現地に設置さ
れた製造プラントで製造するものであり、その特性を下
記の表1に記す。The soil cement to be used is manufactured at a manufacturing plant installed on site, and its characteristics are shown in Table 1 below.
【0021】[0021]
【表1】 [Table 1]
【0022】次に壁体11の上部に続けてトンネルのアー
チ状の頂部の部分にプレキャスト(PC)板12を建て込
む。プレキャスト(PC)板12は予め工場で製作、加工
したもので、レッカーなどにより吊り込んで、トンネル
の長さ方向に複数枚を順次組み立て、接合部は樹脂を注
入して止水する。Next, a precast (PC) plate 12 is erected on the arched top of the tunnel following the upper part of the wall 11. The precast (PC) plate 12 is manufactured and processed in a factory in advance, is suspended by a wrecker or the like, and a plurality of precast (PC) plates are sequentially assembled in the length direction of the tunnel.
【0023】そして、最後に壁体11の外側に施工したソ
イルセメントの上部に続くようにしてこのプレキャスト
(PC)板12の外側にもソイルセメントを施工して、人
工軟岩リング9を構築する。このようにして人工軟岩リ
ング9による盛土下カルバート8が構築される。Then, soil cement is applied to the outside of the precast (PC) plate 12 so as to follow the upper portion of the soil cement finally applied to the outside of the wall 11, thereby constructing the artificial soft rock ring 9. In this way, the culvert 8 under the embankment by the artificial soft rock ring 9 is constructed.
【0024】[0024]
【発明の効果】以上述べたように本発明の盛土下カルバ
ートは、盛土下に構築されるトンネルの内面に位置する
個所に予め壁体とPC板を設置することで、トンネル内
部の一般土砂の転圧や掘削の作業が省略でき、大掛かり
な仮設材や機械を必要とせず、また、肌落ちや安定性の
確保及び化粧の目的で行うトンネル内周面のコンクリー
ト吹き付けや二次覆工コンクリートの施工も省略でき
る。As described above, the culvert under the embankment of the present invention is constructed by installing a wall and a PC board in advance at a location located on the inner surface of the tunnel constructed under the embankment, so that the general earth and sand inside the tunnel can be removed. The compaction and excavation work can be omitted, large-scale temporary materials and machines are not required, and concrete spraying on the inner surface of the tunnel and secondary concrete Construction can also be omitted.
【0025】また、壁体とPC板によるトンネル空間の
構築が終了すれば、トンネルとしての使用が一応可能と
なり、この時点で従来から谷間部に存在している農道な
どの交通止めを解除でき、交通止め期間を短縮できる。When the construction of the tunnel space with the wall and the PC board is completed, the tunnel can be used for a time, and at this time, the traffic stop such as the agricultural road existing in the valley can be released at this time. Traffic suspension period can be shortened.
【0026】そして、人工軟岩リングの中にストリップ
である鋼製の帯状補強材を埋設することにより剪断抵抗
力が増加、構造体としての盛土の安定性が向上するもの
である。By embedding a strip-shaped steel reinforcing material as a strip in the artificial soft rock ring, the shear resistance is increased, and the stability of the embankment as a structure is improved.
【図1】本発明の盛土下カルバートの実施の形態を示す
縦断正面図である。FIG. 1 is a longitudinal sectional front view showing an embodiment of an underfill embankment of the present invention.
【図2】本発明の盛土下カルバートの施工に利用するテ
ールアルメ工法の説明図である。FIG. 2 is an explanatory diagram of a tail army method used for construction of an underfill embankment of the present invention.
【図3】本発明の盛土下カルバートの施工例を示す一部
切欠いた斜視図である。FIG. 3 is a partially cutaway perspective view showing a construction example of an underfill embankment of the present invention.
【図4】従来の盛土下カルバートを示す縦断正面図であ
る。FIG. 4 is a vertical sectional front view showing a conventional underfill culvert.
【図5】従来の盛土下カルバートの要部の縦断正面図で
ある。FIG. 5 is a vertical sectional front view of a main part of a conventional embankment culvert.
1…道路 2…山岳 3…山腹 4…谷間部 5…盛土 6…水路 7…道路 8…盛土下カルバー
ト 9…人工軟岩リング 10…一般土砂 11…壁体 12…プレキャスト
(PC)板 13…帯状補強材 14…基盤 20…一般の土砂 21…吹き付けコンク
リート 22…覆工コンクリートDESCRIPTION OF SYMBOLS 1 ... Road 2 ... Mountains 3 ... Hillside 4 ... Valley 5 ... Embankment 6 ... Waterway 7 ... Road 8 ... Culvert under embankment 9 ... Artificial soft rock ring 10 ... General earth and sand 11 ... Wall 12 ... Precast (PC) plate 13 ... Belt Reinforcing material 14 ... Base 20 ... General earth and sand 21 ... Sprayed concrete 22 ... Concrete lining
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭59−85099(JP,A) 特開 平9−78584(JP,A) (58)調査した分野(Int.Cl.7,DB名) E02D 29/05 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-59-85099 (JP, A) JP-A-9-78584 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) E02D 29/05
Claims (1)
込み、頂部にプレキャスト(PC)板を配し、壁体の外
側に帯状補強材を設置するとともに、壁体とプレキャス
ト(PC)板の外側にソイルセメントを転圧または流し
込んで人工軟岩リングを構築し、その外側に一般土砂を
盛り立てることを特徴とする盛土下カルバート。1. A wall body is erected on a part other than the arch-like top part, a precast (PC) plate is arranged on the top part, a belt-like reinforcing material is installed outside the wall body, and the wall body and the precast (PC) are installed. A culvert under embankment characterized by rolling or pouring soil cement into the outside of the board to construct an artificial soft rock ring, and embankment of general earth and sand outside the ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP08341519A JP3099040B2 (en) | 1996-12-20 | 1996-12-20 | Embankment culvert |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP08341519A JP3099040B2 (en) | 1996-12-20 | 1996-12-20 | Embankment culvert |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH10183653A JPH10183653A (en) | 1998-07-14 |
JP3099040B2 true JP3099040B2 (en) | 2000-10-16 |
Family
ID=18346701
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP08341519A Expired - Fee Related JP3099040B2 (en) | 1996-12-20 | 1996-12-20 | Embankment culvert |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3099040B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2531547C (en) * | 2005-12-23 | 2014-02-18 | Ail International Inc. | Reinforcement for arch type structure with beveled/skewed ends |
WO2011114507A1 (en) * | 2010-03-19 | 2011-09-22 | 日本環境製造株式会社 | Method of constructing underground structure to be newly built |
CN103821164B (en) * | 2014-01-28 | 2016-08-17 | 中铁二院工程集团有限责任公司 | Mountain area cheuch backfill tunnel construction |
-
1996
- 1996-12-20 JP JP08341519A patent/JP3099040B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH10183653A (en) | 1998-07-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2006225926A (en) | Banking construction method utilizing backfilling material such as fluidized soil, pit sand, local soil and crushed stone | |
CN110004991A (en) | Underground structure anti-floating system and construction method based on raised type tangs plate | |
RU2392387C2 (en) | Device and method for reinforcement of mast base | |
JP2000008394A (en) | Construction method for underground structure such as underground pit for installation of parking lot | |
CN108457289A (en) | A kind of open caisson construction method of complex condition | |
KR100289256B1 (en) | Tunnel construction method in shallow toffee area | |
CN106988337B (en) | It is a kind of for reducing the reinforcement means of bar shaped shallow foundation house differential settlement | |
KR20020022446A (en) | Repairing method of earth-fill dam | |
JP3099040B2 (en) | Embankment culvert | |
JP4029191B2 (en) | Subsidence suppression structure, construction method of settlement suppression structure | |
JP2597116B2 (en) | Embankment foundation and its construction method | |
JP2000144769A (en) | Method of landslide protection work for preparing housing lot | |
JP2653731B2 (en) | Embankment slope steepening method | |
JP3702435B2 (en) | How to build the foundation | |
CN1514073A (en) | Supporitng structure of breast wall | |
CN110106930B (en) | Iron tower foundation reinforcement protection method | |
JP3099039B2 (en) | Embankment culvert | |
CN110130399A (en) | Tilt trapezoidal piping lane system and its construction method of the supporting in conjunction with main structure | |
JPH10204883A (en) | Execution method of reinforcing bank wall | |
JP2797066B2 (en) | Solid foundation method with stabilizer | |
JP2991115B2 (en) | Embankment culvert and its construction method | |
JPH0359222A (en) | Steep slope banking | |
JPS5996320A (en) | Improvement of soft ground | |
JPS6016535B2 (en) | How to form retaining walls and underground walls | |
JP2004232232A (en) | Reinforced earth method with impervious function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |