JPS5592423A - Pile driving method and the said pile - Google Patents
Pile driving method and the said pileInfo
- Publication number
- JPS5592423A JPS5592423A JP16535578A JP16535578A JPS5592423A JP S5592423 A JPS5592423 A JP S5592423A JP 16535578 A JP16535578 A JP 16535578A JP 16535578 A JP16535578 A JP 16535578A JP S5592423 A JPS5592423 A JP S5592423A
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- ground
- hardening agent
- proper
- pipe proper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
PURPOSE: To solidly build in the ground a short and small-scaled pile, by hammering into the ground a pipe proper equipped with a conical cap at the tip thereof and by filling by pressure with a hardening agent after pulling out the pipe for a distance of a given length.
CONSTITUTION: A pipe proper 1 with a conical cap 5 at the point thereof is hammered into the ground to a given depth. A foundation space is formed above the cap 5 by pulling out the pipe body for a distance of a given length, a reinforcing material 15 such as a reinforcing rod is inserted into the pipe proper 1. As a result of a hollow portion of the pipe proper 1 and the foundation space being filled by pressure with a liquid hardener 16 such as mortar, the hardening agent 16 so filled penetrates into an earth wall whereby to form the foundation space, a bulbous foundation being formed resulting from the expansion of the foundation space. After filling of the hardening agent 16 is completed, a sealing cap 4 is fitted in the upper portion of the pipe proper 1 to prevent a backward flow of the hardener 16. After the hardening agent 16 is hardened, a fence 21 or the like is located in line with a projection pirtion of the pipe proper 1 emerging from the ground.
COPYRIGHT: (C)1980,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16535578A JPS6047411B2 (en) | 1978-12-30 | 1978-12-30 | Pile installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16535578A JPS6047411B2 (en) | 1978-12-30 | 1978-12-30 | Pile installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS5592423A true JPS5592423A (en) | 1980-07-12 |
JPS6047411B2 JPS6047411B2 (en) | 1985-10-22 |
Family
ID=15810783
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP16535578A Expired JPS6047411B2 (en) | 1978-12-30 | 1978-12-30 | Pile installation method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6047411B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0331227Y2 (en) * | 1987-11-06 | 1991-07-02 |
-
1978
- 1978-12-30 JP JP16535578A patent/JPS6047411B2/en not_active Expired
Also Published As
Publication number | Publication date |
---|---|
JPS6047411B2 (en) | 1985-10-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB1308209A (en) | Method and apparatus for setting anchors in soil or rock | |
JPS5592423A (en) | Pile driving method and the said pile | |
JPS5736214A (en) | Reinforcing construction work of lock bolt for soft ground | |
JPS56142923A (en) | Construction of foundation pile and case auger used therefor | |
JPS57151722A (en) | Filling work for space formed after drawing out sheet pile | |
JPS6439417A (en) | Execution method of foundation pile | |
JPS55161117A (en) | Constructing method for underground continuous wall by precast concrete member | |
JPS55116923A (en) | Method for construction of pile foundation | |
JPS573915A (en) | Method and apparatus for construction of reaction resistor body underground | |
JPS57108313A (en) | Construction work and device for cut-off wall of in-site driven pile row and head of earth auger therefor | |
JPS57112513A (en) | Construction of foundation pile for ground improvement | |
JPS5545910A (en) | Pile pulling method | |
JPS6417920A (en) | Construction of precast pile with bag | |
JP2802137B2 (en) | Pile expansion method and the equipment used in the method | |
JPS5754623A (en) | Driving method for pile | |
JPS56135621A (en) | Sand pile construction work in underwater ground | |
JPS56105016A (en) | Executing method for reinforced foundation pile and reinforcing steel pipe | |
JPS6112053B2 (en) | ||
JPS55105021A (en) | High pressure chemichal liquid grouting method utilizing high frequency vibration pressure | |
JPS57146833A (en) | Pressure-driving work of knotted pile | |
JPS57216A (en) | Internal excavation and foot protection work for pile | |
JPS56153016A (en) | Application of reinforced foundation pile | |
JPS576019A (en) | Installating method for foundation pile | |
JPS5631924A (en) | Constructing method for water stop wall | |
JPS55111531A (en) | Method of constructing artificial impermeable stratum at construction of underground tank |