Driving method for pile

Info

Publication number
JPS5754623A
JPS5754623A JP12982380A JP12982380A JPS5754623A JP S5754623 A JPS5754623 A JP S5754623A JP 12982380 A JP12982380 A JP 12982380A JP 12982380 A JP12982380 A JP 12982380A JP S5754623 A JPS5754623 A JP S5754623A
Authority
JP
Japan
Prior art keywords
steel pipe
pile
cap
bulb
driven
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP12982380A
Other languages
Japanese (ja)
Inventor
Hiroyuki Araki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP12982380A priority Critical patent/JPS5754623A/en
Publication of JPS5754623A publication Critical patent/JPS5754623A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE: To enable the stable production of a bulb which is equal to a spherical shape and excellent in size accuracy, by a method wherein, after a cap is driven togetherwith a steel pipe pile, only the cap, which is previously separated from the steel pipe pile, is driven in, and mortar is then poured to form a bulb.
CONSTITUTION: An arrowhead-shaped cap 2 is attached to the forward head of a steel pipe pile 1, and the steel pipe pile 1 is struck by means of a pile driving device to drive it to a given depth. A rammer 3 is inserted into the steel pile pipe 1, and only the cap 2, which is separated from the end of steel pipe pile 1, is driven to a given depth. Mortar 4 is poured into the steel pipe to strike it by means of the rammer 3 for the formation of a bulb 5, and this forms a composite pile in which concrete and the steel pipe 1 are united into a monolithical unity.
COPYRIGHT: (C)1982,JPO&Japio
JP12982380A 1980-09-17 1980-09-17 Driving method for pile Pending JPS5754623A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12982380A JPS5754623A (en) 1980-09-17 1980-09-17 Driving method for pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12982380A JPS5754623A (en) 1980-09-17 1980-09-17 Driving method for pile

Publications (1)

Publication Number Publication Date
JPS5754623A true JPS5754623A (en) 1982-04-01

Family

ID=15019097

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12982380A Pending JPS5754623A (en) 1980-09-17 1980-09-17 Driving method for pile

Country Status (1)

Country Link
JP (1) JPS5754623A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63500732A (en) * 1985-09-03 1988-03-17 フォーカス・リミテッド fuel injection monitoring device
KR100455064B1 (en) * 2001-05-22 2004-11-09 (주)종합건축사사무소환경건축 Construction Method of Prestressed spun High strength Concrete Pile
KR100481149B1 (en) * 2002-04-26 2005-04-07 이창남 Concrete Filled Thin Tube Pile, CFTTP
JP2014134008A (en) * 2013-01-09 2014-07-24 Ohbayashi Corp Creating method for solidified body and burying method for steel pipe pile using the same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63500732A (en) * 1985-09-03 1988-03-17 フォーカス・リミテッド fuel injection monitoring device
KR100455064B1 (en) * 2001-05-22 2004-11-09 (주)종합건축사사무소환경건축 Construction Method of Prestressed spun High strength Concrete Pile
KR100481149B1 (en) * 2002-04-26 2005-04-07 이창남 Concrete Filled Thin Tube Pile, CFTTP
JP2014134008A (en) * 2013-01-09 2014-07-24 Ohbayashi Corp Creating method for solidified body and burying method for steel pipe pile using the same

Similar Documents

Publication Publication Date Title
JPS559953A (en) Method and apparatus for installing steel pipe pile
JPS5754623A (en) Driving method for pile
JPS5670324A (en) Concrete crushing body and crushing method of concrete structure
JPS53140798A (en) Precast concrete block and method of building structure thereby
JPS57169134A (en) Foundation construction work for housing using blocks and blocks therefor
GB749979A (en) Improved pile anchorage of submerged structures
JPS5616727A (en) Submarine anchor and method of producing the same
JPS55105028A (en) Method and apparatus for crushing concrete pile
JPS5641914A (en) Preparation of reinforced slag pile made mainly of converter slag
JPS56105016A (en) Executing method for reinforced foundation pile and reinforcing steel pipe
JPS57151729A (en) Driving work for steel pipe pile
JPS573915A (en) Method and apparatus for construction of reaction resistor body underground
JPS5724720A (en) Increasing method for pull resistance of structure material driven into ground
JPS5592423A (en) Pile driving method and the said pile
JPS56131716A (en) Removal of pile
JPS5516176A (en) Method for forming culvert using bullet
JPS55161118A (en) Pile driving method and pile
SU899973A1 (en) Apparatus for driving mine workings
JPS57165524A (en) Stay anchor
JPS5715721A (en) Driving method for driving anchor for supporting wire and driving anchor for supporting wire
JPS55161119A (en) Pile driving method and pile
GB605962A (en) Improvements relating to processes for the production of foundation piles in reinforced concrete or the like
JPS56146513A (en) Burying method of guy anchor
JPS5229627A (en) Working method for burying underground pipe into concrete construction
JPS5724733A (en) Basement construction method