JPH1121916A - Basement made of steel and construction method thereof - Google Patents
Basement made of steel and construction method thereofInfo
- Publication number
- JPH1121916A JPH1121916A JP9177210A JP17721097A JPH1121916A JP H1121916 A JPH1121916 A JP H1121916A JP 9177210 A JP9177210 A JP 9177210A JP 17721097 A JP17721097 A JP 17721097A JP H1121916 A JPH1121916 A JP H1121916A
- Authority
- JP
- Japan
- Prior art keywords
- steel
- wall
- roof
- basement
- slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】この発明は、おもに住宅の地
下室として構築される鋼製地下室およびその構築工法に
関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a steel basement mainly constructed as a basement of a house and a construction method thereof.
【0002】[0002]
【従来の技術および発明が解決しようとする課題】最近
では、一般の住宅にも地下室を設けることが多い。当出
願人はこれまで、この種の地下室として工期の短縮化、
施工の省力化などを図るために屋根用、壁用および床用
としてそれぞれ構成された各鋼製パネルを接合ボルトで
互いに接合しながら設置して構築する鋼製地下室を開発
し、既にこれまでいくつも出願もしている。2. Description of the Related Art Recently, an ordinary house is often provided with a basement. The applicant has so far constructed this kind of basement, shortening the construction period,
In order to save labor, the steel basement was constructed by installing and constructing steel panels for roofs, walls, and floors while connecting them with joining bolts. Has also filed an application.
【0003】しかし、地下室の床部分、壁部分および屋
根部分の全てを鋼製パネルで構築すると、鉄骨材の使用
量が大幅に増えて建設コストが嵩み、なかなかコストダ
ウンが図れない等の課題があった。また、床部分には地
下階と地上階からの大きな荷重が作用するので、床部分
を今まで通りに鋼製床パネルで構築したのでは、地下階
を含む地上階からの大きな荷重を地盤に確実に伝達でき
ず、あまり大きな地下室、さらには地上階を構築できな
い等の課題もあった。[0003] However, if the floor, wall, and roof of the basement are all made of steel panels, the use of steel frames increases significantly, construction costs increase, and it is difficult to reduce costs. was there. In addition, large loads from the basement floor and the ground floor act on the floor, so if the floor was constructed with steel floor panels as before, large loads from the ground floor including the basement floor would be applied to the ground. There was also a problem that it was not possible to reliably transmit the information, and it was not possible to build a very large basement or a ground floor.
【0004】この発明は、以上の課題を解決するために
なされたもので、施工の省力化および建設コストの低減
化などを可能にした鋼製地下室およびその構築工法を提
供することを目的とする。[0004] The present invention has been made to solve the above problems, and an object of the present invention is to provide a steel basement and a method of constructing the same, which enable labor saving of construction and reduction of construction cost. .
【0005】[0005]
【課題を解決するための手段】以上の課題を解決するた
めに、この発明に係る鋼製地下室は、所定の深さに掘り
下げられた根切り底に鉄筋コンクリートの基礎スラブを
構築し、この基礎スラブに鋼製壁パネルを互いに接合
し、下端部を前記基礎スラブに複数本のアンカーボルト
でそれぞれ固定しながら複数設置して壁部を構築し、こ
の壁部の上端部間に屋根部を構築してなる。その際、鋼
製壁パネルの下端部を基礎スラブのコンクリート中に埋
設するとよい。SUMMARY OF THE INVENTION In order to solve the above problems, a steel basement according to the present invention is constructed by constructing a reinforced concrete base slab at a root cut down to a predetermined depth. A steel wall panel is joined to each other, a lower end is fixed to the base slab with a plurality of anchor bolts, respectively, and a plurality is installed to construct a wall, and a roof is constructed between the upper ends of the wall. It becomes. At this time, the lower end of the steel wall panel is preferably embedded in the concrete of the foundation slab.
【0006】また、この発明に係る鋼製地下室は、所定
の深さに掘り下げられた根切り底に、鉄筋コンクリート
の基礎スラブを構築し、この基礎スラブに金属製の土台
をその一部を前記基礎スラブのコンクリート中に埋設し
て設置し、この土台の上に鋼製壁パネルを互いに接合
し、下端部を前記基礎スラブに接合金具でそれぞれ固定
しながら複数設置して壁部を構築し、かつ前記壁部の上
端部間に屋根部を構築してなる。Further, in the steel basement according to the present invention, a reinforced concrete foundation slab is constructed on a root bottom dug down to a predetermined depth, and a metal base is partially mounted on the foundation slab. It is buried and installed in the concrete of the slab, steel wall panels are joined to each other on this foundation, and a plurality of lower ends are fixed to the base slab with the joint fittings to install a plurality of walls to construct a wall portion, and A roof is constructed between the upper ends of the walls.
【0007】さらに、この発明に係る鋼製地下室の構築
工法は、所定の深さに掘り下げられた根切り底に、基礎
スラブの補強鉄筋を配筋し、次にこの補強鉄筋の上に鋼
製壁パネルを互いに接合しながら立設して壁部を構築
し、次に前記根切り底にコンクリートを打設して前記壁
部と一体をなす基礎スラブを構築し、次に前記壁部の上
端部間に屋根部を構築することを特徴とする。Further, according to the method of constructing a steel basement according to the present invention, a reinforcing steel bar of a foundation slab is arranged at a root bottom dug down to a predetermined depth, and then a steel reinforcing bar is formed on the reinforcing steel bar. The wall panels are erected while being joined together to form a wall, and then concrete is poured into the root bottom to form a foundation slab integral with the wall, and then the upper end of the wall It is characterized in that a roof part is constructed between the parts.
【0008】[0008]
【発明の実施の形態】図1〜図7は、この発明の実施の
一形態を示し、図において、符号1は所定の深さに掘り
下げられた根切り底に鉄筋コンクリートによって構築さ
れた基礎スラブ、2はこの基礎スラブ1の上の周囲に互
いに接合しながら立設して鋼製地下室の壁部を構成する
鋼製壁パネル、3は基礎スラブ1の上の周囲に所定間隔
に突設されて鋼製壁パネル2を基礎スラブ1の周囲に固
定するアンカーボルト、そして、符号4は鋼製壁パネル
2からなる壁部の上端部間に架け渡されて鋼製地下室の
屋根部を構成する鋼製屋根パネルである。1 to 7 show an embodiment of the present invention. In the drawings, reference numeral 1 denotes a foundation slab constructed of reinforced concrete at a root bottom dug down to a predetermined depth. Reference numeral 2 denotes a steel wall panel which stands on the base slab 1 while being joined to each other to constitute a wall of the steel basement. Anchor bolts for fixing the steel wall panel 2 around the foundation slab 1, and reference numeral 4 denotes a steel bridged between the upper ends of the wall composed of the steel wall panel 2 and constituting the roof of the steel basement. It is a roof panel made of.
【0009】基礎スラブ1は、支持地盤の支持力、地下
階および地上階から作用する積載荷重などを考慮して必
要量の補強鉄筋1aを配筋し、かつコンクリート1bを打設
する場所打ちコンクリートによって所定の厚さ(30〜40
cm)に構築されている。The foundation slab 1 is provided with a necessary amount of reinforcing reinforcing bar 1a in consideration of the supporting force of the supporting ground, the load acting on the basement floor and the ground floor, and the cast-in-place concrete on which the concrete 1b is poured. Depending on the predetermined thickness (30-40
cm).
【0010】鋼製壁パネル2と鋼製屋根パネル4はいず
れも、例えば矩形状に枠組みされた複数本の外枠材5
と、この対向する外枠材5,5 間に平行に設置された複数
本の中枠材6と、これらの外枠材5と中枠材6とからな
る軸組の外側部に張りつけられた面板7とから構成され
ている(図2,3参照)。Each of the steel wall panel 2 and the steel roof panel 4 has a plurality of outer frame members 5 framed in a rectangular shape, for example.
And a plurality of middle frame members 6 installed in parallel between the facing outer frame members 5, 5, and attached to an outer portion of a shaft set including the outer frame members 5 and the middle frame members 6. And a face plate 7 (see FIGS. 2 and 3).
【0011】外枠材5どうしおよび外枠材5と中枠材6
とは互いに溶接またはボルト止めする等してそれぞれ連
結され、面板7は外枠材5および中枠材6に溶接するこ
とにより張りつけられている。また、外枠材5にはボル
ト孔5aが所定間隔おきに形成されている。なお、外枠材
5と中枠材6は溝形鋼、H形鋼、山形鋼または帯鋼など
から、面板7は鋼板からそれぞれ形成され、いずれも入
念な防錆処理が施されている。The outer frame members 5 and the outer frame member 5 and the middle frame member 6
Are connected to each other by welding or bolting, and the face plate 7 is attached to the outer frame member 5 and the middle frame member 6 by welding. Further, bolt holes 5a are formed in the outer frame member 5 at predetermined intervals. The outer frame member 5 and the middle frame member 6 are formed from a channel steel, an H-section steel, an angle steel or a strip steel, and the face plate 7 is formed from a steel plate.
【0012】このように構成された鋼製壁パネル2と
2、鋼製屋根パネル4と4は、外枠材5のボルト孔5aを
貫通する複数本の接合ボルト(図省略)によって互いに
ボルト止めして接合され、また鋼製壁パネル2は基礎ス
ラブ1の周囲に外枠材5のボルト孔5aを貫通する複数本
のアンカーボルト3によって固定しながら立設されてい
る。さらに、隣接する鋼製壁パネル2,2 間、隣接する鋼
製屋根パネル4,4 の外枠材5,5 間および鋼製壁パネル2
と鋼製屋根パネル4との外枠材5どうしの接合部には止
水用のシール材(図省略)が介在されている。The steel wall panels 2 and 2 and the steel roof panels 4 and 4 thus configured are bolted to each other by a plurality of joint bolts (not shown) penetrating through the bolt holes 5a of the outer frame member 5. The steel wall panel 2 is erected around the base slab 1 while being fixed by a plurality of anchor bolts 3 penetrating through bolt holes 5a of the outer frame member 5. In addition, between adjacent steel wall panels 2,2, between outer frame members 5,5 of adjacent steel roof panels 4,4, and between steel wall panels 2,4.
At the joint between the outer frame members 5 and the steel roof panel 4, a sealing material (not shown) for stopping water is interposed.
【0013】また、地下室の規模が大きくなる場合、あ
るいは上屋の重量が嵩む場合など、特に必要な場合に
は、基礎スラブ1と屋根部間に耐力壁を兼ねる間仕切り
壁aが構築されている(図1参照)。この間仕切り壁a
も鋼製壁パネル2を先に述べたような構成で互いに接合
し、かつ基礎スラブ1と鋼製屋根パネル4にそれぞれ固
定して複数設置することにより構築されている。When the size of the basement is large or the shed is heavy, a partition wall a is also provided between the base slab 1 and the roof to double as a bearing wall. (See FIG. 1). This partition wall a
The steel wall panels 2 are connected to each other in the above-described configuration, and are fixed to the base slab 1 and the steel roof panel 4 to be installed.
【0014】図4〜図7は、特に鋼製壁パネル2を基礎
スラブ1に固定する方法を示し、以下順に説明する。FIGS. 4 to 7 show a method of fixing the steel wall panel 2 to the foundation slab 1 in particular.
【0015】図4(a) においては、基礎スラブ1の上に
アンカーボルト3が所定間隔おきに突設され、このアン
カーボルト3が鋼製壁パネル4の外枠材5のボルト孔5a
にそれぞれ貫通され、かつこのアンカーボルト3の貫通
部分にアンカーナット8が螺合されている。In FIG. 4 (a), anchor bolts 3 are provided on the base slab 1 at predetermined intervals, and the anchor bolts 3 are bolt holes 5a of the outer frame member 5 of the steel wall panel 4.
And an anchor nut 8 is screwed into a penetrating portion of the anchor bolt 3.
【0016】図4(b) においては、鋼製壁パネル2の下
端部が基礎スラブ1の上にアンカーボルト3によって固
定されているとともに、基礎スラブ1の上の周囲に所定
深さの水切り溝9が鋼製地下室の壁部にそって連続して
形成され、この水切り溝9の中に鋼製壁パネル2の面板
7の下端部7aが突出されている。In FIG. 4 (b), the lower end of the steel wall panel 2 is fixed on the base slab 1 by the anchor bolts 3 and a drain groove having a predetermined depth is formed around the base slab 1. 9 is formed continuously along the wall of the steel basement, into which the lower end 7a of the face plate 7 of the steel wall panel 2 projects.
【0017】図4(c) においては、鋼製壁パネル2の下
端部が基礎スラブ1の上にアンカーボルト3によって固
定されているとともに、基礎スラブ1の上の周囲に水切
り溝9が鋼製地下室の壁部にそって連続して形成され、
かつこの水切り溝9の中にシール材10が基礎スラブ1と
鋼製壁パネル2との間を完全に塞ぐように充填されてい
る。In FIG. 4 (c), the lower end of the steel wall panel 2 is fixed on the base slab 1 by the anchor bolt 3, and a drain groove 9 is formed around the base slab 1 by the steel. It is formed continuously along the wall of the basement,
In addition, a sealing material 10 is filled in the drain groove 9 so as to completely close the gap between the base slab 1 and the steel wall panel 2.
【0018】図4(d) においては、鋼製壁パネル2の下
端部が基礎スラブ1の上の周囲にアンカーボルト3によ
って固定されているとともに、基礎スラブ1の上の周囲
に水切り溝9が鋼製地下室の壁部にそって二重に連続し
て形成され、この水切り溝9にシール材10が基礎スラブ
1と鋼製壁パネル2との間を完全に塞ぐようにそれぞれ
充填されている。In FIG. 4 (d), the lower end of the steel wall panel 2 is fixed around the base slab 1 by anchor bolts 3, and a drain groove 9 is formed around the base slab 1. It is formed in a double continuous manner along the wall of the steel basement, and this drain groove 9 is filled with a sealing material 10 so as to completely close the space between the base slab 1 and the steel wall panel 2. .
【0019】また、図5(a) においては、鋼製壁パネル
2の下端部が基礎スラブ1の上にアンカーボルト3によ
って固定されているとともに、基礎スラブ1の上の周囲
に水切り溝9が鋼製地下室の壁部にそって二重に連続し
て形成され、この水切り溝9の一方に鋼製壁パネル2の
面板7の下端部7aが突出され、かつ他方の水切り溝9に
シール材10が基礎スラブ1と鋼製壁パネル2との間を完
全に塞ぐように充填されている。In FIG. 5 (a), the lower end of the steel wall panel 2 is fixed on the base slab 1 by the anchor bolt 3, and a drain groove 9 is formed around the base slab 1. The lower end portion 7a of the face plate 7 of the steel wall panel 2 projects from one of the drainage grooves 9 along the wall of the steel basement, and a sealing material is inserted into the other drainage groove 9. 10 is filled so as to completely cover the space between the foundation slab 1 and the steel wall panel 2.
【0020】図5(b) においては、基礎スラブ1の上の
周囲に所定深さの建て込み溝11が連続して形成され、こ
の建て込み溝11内に鋼製壁パネル2が立設され、かつこ
の建て込み溝11内に突設されたアンカーボルト3によっ
て鋼製壁パネル2の下端部が固定されている。In FIG. 5 (b), a built-in groove 11 having a predetermined depth is continuously formed around the foundation slab 1, and a steel wall panel 2 is erected in the built-in groove 11. The lower end of the steel wall panel 2 is fixed by an anchor bolt 3 protruding into the recess 11.
【0021】図5(c) においては、鋼製壁パネル2の下
端部が基礎スラブ1の上にアンカーボルト3によって固
定されているとともに、鋼製壁パネル2の面板7の下端
部7aが基礎スラブ1のコンクリート1b中に挿入されてい
る。In FIG. 5C, the lower end of the steel wall panel 2 is fixed on the foundation slab 1 by the anchor bolt 3, and the lower end 7a of the face plate 7 of the steel wall panel 2 is It is inserted into the concrete 1b of the slab 1.
【0022】また、図6(a) においては、鋼製壁パネル
2の下端部が基礎スラブ1にアンカーボルト3によって
固定されているとともに、基礎スラブ1のコンクリート
1b中に完全に埋設されている。In FIG. 6 (a), the lower end of the steel wall panel 2 is fixed to the foundation slab 1 by the anchor bolts 3 and the concrete of the foundation slab 1 is formed.
It is completely buried in 1b.
【0023】図6(b) においては、鋼製壁パネル2の下
端部が基礎スラブ1にL字状に形成されたアンカーボル
ト3によって固定され、かつコンクリート1b中に埋設さ
れている。In FIG. 6 (b), the lower end of the steel wall panel 2 is fixed to the foundation slab 1 by an anchor bolt 3 formed in an L-shape, and is embedded in the concrete 1b.
【0024】さらに、図7(a),(b) においては、基礎ス
ラブ1の周囲に、一部を基礎スラブ1のコンクリート中
に埋設して設置された溝形鋼又は山形鋼などからなる土
台12が設置され、この土台12の上に鋼製壁パネル2が立
設され、かつ土台12のフランジ12a に形成されたボルト
孔12b と外枠材5のボルト孔5aとを貫通する接合金具と
しての複数本の固定ボルト13によって鋼製壁パネル2の
下端部が土台12に固定されている。7 (a) and 7 (b), a base made of a channel steel or an angle iron, which is partially installed in the concrete of the base slab 1 around the base slab 1, is shown. A steel wall panel 2 is erected on the base 12 and serves as a joint fitting that penetrates a bolt hole 12b formed in a flange 12a of the base 12 and a bolt hole 5a of the outer frame member 5. The lower end of the steel wall panel 2 is fixed to the base 12 by a plurality of fixing bolts 13.
【0025】次に、この発明に係る鋼製地下室の構築方
法の一例を順を追って説明する(図8および図9参
照)。Next, an example of a method of constructing a steel basement according to the present invention will be described step by step (see FIGS. 8 and 9).
【0026】 最初に、所定の深さに掘り下げられた
根切り底14に割り栗石15を敷き詰め、この割り栗石15の
上に捨てコンクリート16を打設する。そして、この捨て
コンクリート16の上に補強鉄筋1aを配筋する(図8(a),
(b) 参照)。First, a split stone 15 is spread on a root bottom 14 dug down to a predetermined depth, and a discarded concrete 16 is poured on the split stone 15. Then, reinforcing bars 1a are arranged on the discarded concrete 16 (FIG. 8 (a),
(b)).
【0027】 次に、補強鉄筋1aの上に鋼製壁パネル
2を互いに接合しながら立設して鋼製地下室の壁部を構
築する(図8(c) 参照)。また、各鋼製壁パネル2の外
枠材5のボルト孔5aから補強鉄筋1a内にアンカーボルト
3をそれぞれ垂設する。その際、アンカーボルト3はそ
の上端の雄ねじ部にアンカーナット8を螺合してボルト
孔5aから抜け落ちないようにする(図9(a) 参照)。ま
た、鋼製壁パネル2を補強鉄筋1aの上に直接載せず、補
強鉄筋1aと鋼製壁パネル2との間に、例えばコンクリー
トブロック等からなるスペーサ(図省略)を介在して鋼
製壁パネル2を補強鉄筋1aから若干浮かせる。Next, the steel wall panels 2 are erected on the reinforcing steel bar 1a while being joined to each other to construct the wall of the steel basement (see FIG. 8 (c)). Further, the anchor bolts 3 are respectively suspended from the bolt holes 5a of the outer frame member 5 of each steel wall panel 2 into the reinforcing steel bar 1a. At this time, the anchor bolt 3 is screwed with the anchor nut 8 to the male screw portion at the upper end so as not to fall out from the bolt hole 5a (see FIG. 9A). Further, the steel wall panel 2 is not placed directly on the reinforcing steel bar 1a, but a spacer (not shown) made of, for example, a concrete block or the like is interposed between the reinforcing steel bar 1a and the steel wall panel 2. The panel 2 is slightly lifted from the reinforcing bar 1a.
【0028】 次に、壁を構成する鋼製壁パネル2,2
間に鋼製屋根パネル4を架け渡し、鋼製屋根パネル4ど
うしを互いに接合し、かつ鋼製屋根パネル4の端部を鋼
製壁パネル2の上端部に接合して鋼製地下室の屋根部を
構築する(図9(a) 参照)。Next, steel wall panels 2, 2 constituting the wall
A steel roof panel 4 is interposed between the steel roof panels 4, the steel roof panels 4 are joined to each other, and an end of the steel roof panel 4 is joined to an upper end of the steel wall panel 2 to form a roof of the steel basement. Is constructed (see FIG. 9 (a)).
【0029】 次に、捨てコンクリート16の上にコン
クリート1bを打設して基礎スラブ1を構築する。その
際、鋼製壁パネル2の下端部をコンクリート1b内に埋設
して鋼製壁パネル2の下端部を基礎スラブ1に一体的に
固定する(図9(b) 参照)。Next, the concrete slab is cast on the discarded concrete 16 to construct the foundation slab 1. At this time, the lower end of the steel wall panel 2 is embedded in the concrete 1b, and the lower end of the steel wall panel 2 is integrally fixed to the foundation slab 1 (see FIG. 9B).
【0030】 そして、最後に鋼製壁パネル2の外側
および鋼製屋根パネル4の上に保護コンクリート17を所
定の厚さに打設する(図9(c) 参照)。Finally, protective concrete 17 is cast to a predetermined thickness on the outside of the steel wall panel 2 and on the steel roof panel 4 (see FIG. 9C).
【0031】なお、発明の実施の形態において、屋根部
は鋼製屋根パネルで構築されているが、PC板または場
所打ちコンクリートで構築することもできる。場所打ち
コンクリートで構築する場合、例えば壁部の上端部間に
鉄骨ばりを架け渡し、その上にデッキプレートを敷設
し、かつこのデッキプレートの上にコンクリートを打設
する等の方法によって容易に構築できる。In the embodiment of the present invention, the roof is constructed of steel roof panels, but may be constructed of PC board or cast-in-place concrete. When constructing with cast-in-place concrete, for example, a steel beam is bridged between the upper ends of the walls, a deck plate is laid thereon, and concrete is easily cast on the deck plate. it can.
【0032】[0032]
【発明の効果】この発明に係る鋼製地下室は、以上説明
した構成からなり、所定の深さに掘り下げられた根切り
底に鉄筋コンクリートの基礎スラブを構築し、この基礎
スラブの周囲に鋼製壁パネルを互いに接合し、下端部を
前記基礎スラブに複数本のアンカーボルトでそれぞれ固
定しながら複数設置して壁部を構築し、かつこの壁部の
上端部間に屋根部を構築してなるので、特に床部分の鋼
材を節約できて大幅なコストダウンが図れる等の効果が
ある。The steel basement according to the present invention has the above-described structure, and a reinforced concrete foundation slab is constructed at a root bottom dug down to a predetermined depth, and a steel wall is provided around the foundation slab. Since the panels are joined to each other and the lower end is fixed to the base slab with a plurality of anchor bolts and installed plurally to form a wall, and a roof is constructed between the upper ends of the walls. In particular, there is an effect that the steel material of the floor portion can be saved and the cost can be significantly reduced.
【0033】また、基礎スラブの上に形鋼からなる土台
を設置し、この土台の上に鋼製壁パネルを接合金具で固
定してあるので、鋼製壁パネルのレベルだしおよび建て
込みを精度よく行うことができるとともに、鋼製壁パネ
ルを基礎スラブに確実・強固に固定でき、かつ基礎スラ
ブと鋼製壁パネル下端部間の止水を確実に行うことがで
きる等の効果がある。Further, since a base made of shaped steel is installed on the base slab, and a steel wall panel is fixed on this base with a joint, the leveling and embedding of the steel wall panel can be performed accurately. In addition to the effect, the steel wall panel can be securely and firmly fixed to the foundation slab, and the water can be reliably stopped between the foundation slab and the lower end of the steel wall panel.
【0034】この発明に係る鋼製地下室の構築工法は、
所定の深さに掘り下げられた根切り底に基礎スラブの補
強鉄筋を配筋し、次にこの補強鉄筋の上に鋼製壁パネル
を互いに接合しながら立設して壁部を構築し、次に前記
根切り底にコンクリートを打設して基礎スラブを壁部と
一体的に構築し、次に壁部の上端部間に、例えば鋼製屋
根パネルを設置するなどして屋根部を構築するので、大
幅な施工の省力化などが図れる効果がある。The construction method of the steel basement according to the present invention comprises:
Reinforcing bars of the foundation slab are arranged on the root of the root cut down to a predetermined depth, and then steel wall panels are erected on the reinforcing bars while joining them to construct a wall. Then, concrete is poured into the root and the foundation slab is integrally formed with the wall, and then, for example, a steel roof panel is installed between the upper ends of the walls to construct the roof. Therefore, there is an effect that a large labor saving of construction can be achieved.
【図1】鋼製地下室の縦断面図である。FIG. 1 is a longitudinal sectional view of a steel basement.
【図2】鋼製屋根パネルの一部斜視図である。FIG. 2 is a partial perspective view of a steel roof panel.
【図3】鋼製壁パネルの斜視図である。FIG. 3 is a perspective view of a steel wall panel.
【図4】(a),(b),(c),(d) は、鋼製壁パネルを基礎スラ
ブの上に固定する方法を示す縦断面図である。4 (a), (b), (c) and (d) are longitudinal sectional views showing a method of fixing a steel wall panel on a foundation slab.
【図5】(a),(b),(c) は、鋼製壁パネルを基礎スラブの
上に固定する方法を示す縦断面図である。5 (a), (b) and (c) are longitudinal sectional views showing a method of fixing a steel wall panel on a foundation slab.
【図6】(a),(b) は、鋼製壁パネルを基礎スラブの上に
固定する方法を示す縦断面図である。FIGS. 6 (a) and 6 (b) are longitudinal sectional views showing a method of fixing a steel wall panel on a foundation slab.
【図7】(a),(b) は、鋼製壁パネルを基礎スラブの上に
固定する方法を示す縦断面図である。FIGS. 7A and 7B are longitudinal sectional views showing a method of fixing a steel wall panel on a foundation slab.
【図8】(a),(b),(c) は、鋼製地下室の施工方法を示す
工程図である。8 (a), (b), and (c) are process diagrams showing a method of constructing a steel basement.
【図9】(a),(b),(c) は、鋼製地下室の施工方法を示す
工程図である。FIGS. 9 (a), (b), and (c) are process drawings showing a method of constructing a steel basement.
1…基礎スラブ、2…鋼製壁パネル、3…アンカーボル
ト、4…鋼製屋根パネル、5…外枠材、6…中枠材、7
…面板、8…アンカーナット、9…水切り溝、10…シー
ル材、11…建て込み溝、12…土台、13…固定ボルト、14
…根切り底、15…割り栗石、16…捨てコンクリート、17
…保護コンクリート。DESCRIPTION OF SYMBOLS 1 ... Foundation slab, 2 ... Steel wall panel, 3 ... Anchor bolt, 4 ... Steel roof panel, 5 ... Outer frame material, 6 ... Middle frame material, 7
... face plate, 8 ... anchor nut, 9 ... drain groove, 10 ... sealing material, 11 ... built-in groove, 12 ... base, 13 ... fixing bolt, 14
… Root cut-off, 15… Rich stone, 16… Concrete, 17
... protective concrete.
Claims (4)
に、鉄筋コンクリートの基礎スラブを構築し、この基礎
スラブに、鋼製壁パネルを互いに接合し、下端部を前記
基礎スラブに複数本のアンカーボルトでそれぞれ固定し
ながら複数設置して壁部を構築し、この壁部の上端部間
に屋根部を構築してなることを特徴とする鋼製地下室。1. A reinforced concrete foundation slab is constructed on a root excavated to a predetermined depth, a steel wall panel is joined to the foundation slab, and a plurality of lower ends are connected to the foundation slab. A steel basement, wherein a wall is constructed by installing a plurality of walls while fixing them with anchor bolts, and a roof is constructed between upper ends of the walls.
ンクリート中に埋設してなることを特徴とする請求項第
1項記載の鋼製地下室。2. The steel basement according to claim 1, wherein the lower end of the steel wall panel is embedded in the concrete of the foundation slab.
に、鉄筋コンクリートの基礎スラブを構築し、この基礎
スラブに金属製の土台をその一部を前記基礎スラブのコ
ンクリート中に埋設して設置し、この土台の上に鋼製壁
パネルを互いに接合し、下端部を前記基礎スラブに接合
金具でそれぞれ固定しながら複数設置して壁部を構築
し、かつ前記壁部の上端部間に屋根部を構築してなるこ
とを特徴とする鋼製地下室。3. A reinforced concrete base slab is constructed at a root bottom dug down to a predetermined depth, and a metal base is buried in the base slab and a part thereof is buried in the concrete of the base slab. Then, steel wall panels are joined to each other on this base, and a plurality of lower ends are fixed to the base slab with joining metal fittings, respectively, and a plurality of the lower ends are installed to construct a wall, and a roof is provided between upper ends of the wall. The basement made of steel, characterized by the construction of a part.
に、基礎スラブの補強鉄筋を配筋し、次にこの補強鉄筋
の上に鋼製壁パネルを互いに接合しながら立設して壁部
を構築し、次に前記根切り底にコンクリートを打設して
前記壁部と一体をなす基礎スラブを構築し、次に前記壁
部の上端部間に屋根部を構築することを特徴とする鋼製
地下室の構築工法。4. A reinforcing bar of a foundation slab is arranged on a root bottom dug down to a predetermined depth, and a steel wall panel is erected on the reinforcing bar while being joined to each other. Constructing a part, and then casting concrete on the root bottom to construct a foundation slab integral with the wall, and then constructing a roof between the upper ends of the wall. Steel basement construction method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP9177210A JPH1121916A (en) | 1997-07-02 | 1997-07-02 | Basement made of steel and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP9177210A JPH1121916A (en) | 1997-07-02 | 1997-07-02 | Basement made of steel and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH1121916A true JPH1121916A (en) | 1999-01-26 |
Family
ID=16027103
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP9177210A Pending JPH1121916A (en) | 1997-07-02 | 1997-07-02 | Basement made of steel and construction method thereof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH1121916A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001279687A (en) * | 2000-03-31 | 2001-10-10 | Daiwa House Ind Co Ltd | Structure of slab-shaped foundation |
JP2003003492A (en) * | 2001-06-25 | 2003-01-08 | Tamada Kogyo Kk | Outer wall structure for basement |
US7918056B2 (en) | 2006-05-01 | 2011-04-05 | Nihon Shelter System Co., Ltd. | Underground shelter |
-
1997
- 1997-07-02 JP JP9177210A patent/JPH1121916A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001279687A (en) * | 2000-03-31 | 2001-10-10 | Daiwa House Ind Co Ltd | Structure of slab-shaped foundation |
JP2003003492A (en) * | 2001-06-25 | 2003-01-08 | Tamada Kogyo Kk | Outer wall structure for basement |
US7918056B2 (en) | 2006-05-01 | 2011-04-05 | Nihon Shelter System Co., Ltd. | Underground shelter |
KR101277967B1 (en) * | 2006-05-01 | 2013-06-27 | 니혼 쉘터 시스템 가부시키가이샤 | Underground shelter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5493838A (en) | Method of constructing a concrete basement from prefabricated concrete panels | |
US20030056460A1 (en) | Engineered wall system | |
JP3465026B2 (en) | Forming method of pressure plate type foundation | |
JPH1121916A (en) | Basement made of steel and construction method thereof | |
JP3140397B2 (en) | Steel basement | |
JP2001040675A (en) | Foundation structure for building | |
JP2577973B2 (en) | How to build a building with a basement | |
KR102372473B1 (en) | Constuction Structure for Joint of PC-Colunm and PC-Girder Using Temporay Bracket | |
JPS63300124A (en) | Wall panel of basement and the like | |
JP2905449B2 (en) | Underground reservoir and its construction method | |
JP2941893B2 (en) | Concrete basement basement | |
JP2877896B2 (en) | Concrete basement basement | |
JP2593770B2 (en) | How to connect the underground unit to the upper building | |
JP2000178985A (en) | Basement | |
JP2506484B2 (en) | Concrete assembled basement | |
JP2960479B2 (en) | Building block for concrete underground unit | |
JPH10252083A (en) | Assembly type concrete structure and its execution method | |
JP2936492B2 (en) | Concrete assembling basement and concrete assembling basement construction method | |
JPH10331171A (en) | Concrete foundation for building and method for constructing concrete foundation | |
JPH0427023A (en) | Structure of concrete assembly-type basement | |
JPH11131657A (en) | Foundation form | |
JP2003293449A (en) | Reference structure of building and foundation assembling method | |
JPH1121911A (en) | Continuous footng for residence | |
JPS62220663A (en) | Building with basement | |
JPH0427077A (en) | House with concrete built-up type basement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20010313 |