JP2000178985A - Basement - Google Patents

Basement

Info

Publication number
JP2000178985A
JP2000178985A JP10361122A JP36112298A JP2000178985A JP 2000178985 A JP2000178985 A JP 2000178985A JP 10361122 A JP10361122 A JP 10361122A JP 36112298 A JP36112298 A JP 36112298A JP 2000178985 A JP2000178985 A JP 2000178985A
Authority
JP
Japan
Prior art keywords
basement
anchor
cast
precast concrete
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10361122A
Other languages
Japanese (ja)
Other versions
JP3114141B2 (en
Inventor
Taizo Okano
泰三 岡野
Hiroyuki Matsumoto
弘行 松本
Takao Iwasaki
喬夫 岩崎
Satoshi Minamizawa
聡 南澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Hume Pipe Co Ltd
Mitsui Home Co Ltd
Original Assignee
Nippon Hume Pipe Co Ltd
Mitsui Home Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Hume Pipe Co Ltd, Mitsui Home Co Ltd filed Critical Nippon Hume Pipe Co Ltd
Priority to JP10361122A priority Critical patent/JP3114141B2/en
Publication of JP2000178985A publication Critical patent/JP2000178985A/en
Application granted granted Critical
Publication of JP3114141B2 publication Critical patent/JP3114141B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a basement equipped with an anchor bolt which can sufficiently bear a stress applied by a building on the ground. SOLUTION: A precast concrete member 1 having an L-shaped longitudinal cross section is obtained by combining a wall structure 2 and a base plate structure in one body, which is then linked to an adjacent member 1, to thereby construct a side wall of a basement. Anchor bolts 23 each having an anchor portion 23a buried in the wall structure 2 are vertically arranged, and a slipout preventing member 24 is attached to a screw portion 2b of each of the anchor bolts 23. Further, the slipout preventing member 24 of each anchor bolt 23 is arranged in an annular space of a spiral reinforcement 25 arranged along the upper surface of each wall structure 2, and an anchor portion 26a is positioned in the annular space, whereby above-ground building linking anchor bolts 26 are vertically arranged in the longitudinal direction of the spiral reinforcement 25 at predetermined intervals. A cast-in-place concrete ceiling slab 32 is arranged on a ceiling of an internal space 11 of the basement in a manner of burying the entire spiral reinforcement 25 and a lower half of each above- ground building linking anchor bolt 26.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、小形のプレキャス
ト・コンクリート部材で側壁を構成する地下室に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a basement whose side wall is formed by a small-sized precast concrete member.

【0002】[0002]

【従来の技術】最近、地価の高騰や騒音等のため、一般
住宅においても地下室に対する需要が高まっている。
2. Description of the Related Art Recently, demand for basements has been increasing in general houses due to soaring land prices and noise.

【0003】従来、地下室は、現場打ちコンクリートに
より構築されていた。しかしながら、現場打ちコンクリ
ートによる地下室を構築する場合は、型枠、配筋等の高
度の熟練工が必要となる問題点があった。また、大きな
土圧が作用する側壁を含めた全体を現場打ちコンクリー
トで構築すると、品質管理が大変であり、また工期も長
くなる問題点があった。
[0003] Conventionally, basements have been constructed of cast-in-place concrete. However, in the case of constructing a basement made of cast-in-place concrete, there is a problem that highly skilled workers such as formwork and reinforcing bars are required. In addition, when the entire structure including the side wall on which a large earth pressure acts is constructed of cast-in-place concrete, quality control is difficult and the construction period is long.

【0004】このような問題点を解決するため、最近、
縦断面形状がL字形で小形のプレキャスト・コンクリー
ト部材を用いて地下室の側壁を構築する工法が提案され
ている。
In order to solve such problems, recently,
A construction method has been proposed in which a side wall of a basement is constructed using a small-sized precast concrete member having an L-shaped vertical cross section.

【0005】このプレキャスト・コンクリート部材を用
いた地下室は、掘削された地下空間に、縦向きの壁構成
部と水平向きの底盤構成部が一体化された縦断面形状が
L字形のプレキャスト・コンクリート部材が、隣接相互
間を互いに接合して設置されて地下室の側壁が構成さ
れ、該地下室の内部空間の底部に現場打ちコンクリート
による底盤が各プレキャスト・コンクリート部材の底盤
構成部に連続する形で構築され、また各プレキャスト・
コンクリート部材の壁構成部の頂面上には該壁構成部に
アンカー部が埋設されたアンカーボルトのネジ部が突設
されている構造になっていた。
[0005] A basement using this precast concrete member is a precast concrete member having an L-shaped longitudinal section in which a vertical wall component and a horizontal base component are integrated into an excavated underground space. Adjacent to each other are installed to form a side wall of the basement, and a base made of cast-in-place concrete is built at the bottom of the internal space of the basement in a form that is continuous with the base structure of each precast concrete member. , And each precast
On the top surface of the wall component of the concrete member, a screw portion of an anchor bolt having an anchor buried in the wall component protrudes.

【0006】[0006]

【発明が解決しようとする課題】このような構造の地下
室では、大きな土圧が作用する側壁が、工場で十分な品
質管理を受けて構築された複数のプレキャスト・コンク
リート部材で構築されるので、熟練工でなくても十分な
機械的強度を持つ地下室側壁を構築することができる利
点がある。
In the basement having such a structure, the side wall on which a large earth pressure acts is constructed by a plurality of precast concrete members constructed under a sufficient quality control in a factory. There is an advantage that it is possible to construct a basement side wall having sufficient mechanical strength even without a skilled worker.

【0007】本発明の目的は、地上建物からの応力を十
分に負担できるアンカーボルトを備えた地下室を提供
し、かつ、地下室の天井の機械的強度を向上し、更に、
地上建物との一体化を強化することによって天井高の高
い地下室を提供することにある。
[0007] It is an object of the present invention to provide a basement provided with anchor bolts that can sufficiently bear the stress from the above-ground building, and to improve the mechanical strength of the ceiling of the basement.
It is an object of the present invention to provide a basement with a high ceiling by strengthening integration with a building above the ground.

【0008】[0008]

【課題を解決するための手段】上記の如き従来の問題点
を解決し、所期の目的を達成するため本発明の特徴は、
掘削された地下空間に、縦向きの壁構成部と水平向きの
底盤構成部が一体化された縦断面形状がL字形のプレキ
ャスト・コンクリート部材が、隣接相互間を互いに接合
して設置されて地下室の側壁が構成され、前記地下室の
内部空間の底部に現場打ちコンクリートによる底盤が前
記各プレキャスト・コンクリート部材の底盤構成部に連
続されて構築されてなる地下室において、前記側壁の互
いに対向するプレキャストコンクリート部材の頂部間
に、鉄骨梁を掛け渡し、該鉄骨粱及び前記各プレキャス
トコンクリート部材の頂部と一体化させて、鉄筋コンク
リート天井スラブが設けられていることにある。
SUMMARY OF THE INVENTION In order to solve the conventional problems as described above and achieve the intended purpose, the features of the present invention are as follows.
In an excavated underground space, a precast concrete member having an L-shaped vertical cross-section, in which a vertical wall component and a horizontal base component are integrated, is installed by adjoining each other between adjacent basements. In the basement, a bottom plate made of cast-in-place concrete is continuously formed on the bottom portion of each of the precast concrete members at the bottom of the internal space of the basement, and the side walls of the precast concrete members oppose each other. A reinforced concrete ceiling slab is provided between the tops of the steel beams, and is integrated with the tops of the steel beams and each of the precast concrete members.

【0009】このような構成になっていると、各プレキ
ャストコンクリート部材は、上端がコンクリート天井ス
ラブにより一体化されて、相互間の結合が強化され、し
かも、鉄骨粱で補強された鉄筋コンクリート天井スラブ
が、側壁と一体化されるため、高強度の地下室が得られ
る。
[0009] With this configuration, each precast concrete member has a reinforced concrete ceiling slab in which the upper ends are integrated by a concrete ceiling slab, the connection between them is strengthened, and the steel slab is reinforced with steel beams. In addition, since it is integrated with the side wall, a high-strength basement can be obtained.

【0010】また、本発明では、各プレキャストコンク
リート部材の壁構成部頂面上には、該壁構成部にアンカ
ー部が埋設されたアンカーボルトのネジ部が突設され、
該アンカーボルトのネジ部には抜止め部材がそれぞれ取
り付けられ、前記各プレキャスト・コンクリート部材の
各壁構成部の上面にはこれらに沿ってスパイラル筋がそ
の環状空間内に前記各アンカーボルトの前記抜止め部材
がそれぞれ存在するようにして設置され、また前記スパ
イラル筋内からは該スパイラル筋内にアンカー部を位置
決めした地上建物締結用アンカーボルトが所定間隔で立
設され、前記地下室の内部空間の天井には前記スパイラ
ル筋の全体と前記各地上建物締結用アンカーボルトの下
半部を埋設するようにして現場打ち鉄筋コンクリート天
井スラブが設けられていることが好ましく、このような
構造になっていると、各地上建物締結用アンカーボルト
は、現場打ち鉄筋コンクリート天井スラブ内に埋設され
ているスパイラル筋内にアンカー部がそれぞれ設けられ
て該現場打ち鉄筋コンクリート天井スラブで一体化され
ているので、機械的強度が従来に比べて遥かに向上し、
地上建物からの応力を十分に負担することができる。
[0010] In the present invention, a screw portion of an anchor bolt in which an anchor portion is embedded in the wall forming portion is protruded from the top surface of the wall forming portion of each precast concrete member.
A retaining member is attached to a screw portion of the anchor bolt, and a spiral streak is provided along an upper surface of each wall component of each of the precast concrete members along an annular space in the annular space. A fixing member is installed so as to be present, and an anchor bolt for fastening a building above the ground, in which an anchor portion is positioned within the spiral muscle, is erected from the spiral muscle at predetermined intervals, and a ceiling of the internal space of the basement is provided. It is preferable that a cast-in-place reinforced concrete ceiling slab is provided so as to bury the whole of the spiral streaks and the lower half of each of the above-ground building fastening anchor bolts. The anchor bolts for fastening each above-ground building are spiral buried in the cast-in-place reinforced concrete ceiling slab Since the anchor portion are integrated with the developing field beating reinforced concrete ceiling slab respectively provided within the mechanical strength is much improved as compared with the conventional,
It can sufficiently bear the stress from the building above the ground.

【0011】また、地下室の内部空間の天井に、スパイ
ラル筋の全体と各地上建物締結用アンカーボルトの下半
部を埋設するように現場打ち鉄筋コンクリート天井スラ
ブが設けられていると、各プレキャスト・コンクリート
部材に作用する大きな土圧を該現場打ち鉄筋コンクリー
ト天井スラブでも負担することになって、地下室の側壁
上部の土圧に対して十分な機械的強度をもつ地下室を得
ることができる。
In addition, if a cast-in-place reinforced concrete ceiling slab is provided on the ceiling of the interior space of the basement so as to bury the entire spiral streaks and the lower half of the anchor bolts for fastening each building above ground, each precast concrete The large earth pressure acting on the member is also borne by the cast-in-place reinforced concrete ceiling slab, so that a basement having sufficient mechanical strength against the earth pressure on the upper side wall of the basement can be obtained.

【0012】[0012]

【発明の実施の形態】図1乃至図12は本発明に係る地
下室における実施の形態の一例を示したものである。
1 to 12 show one embodiment of a basement according to the present invention.

【0013】本例では、地下室を構築するに際し、従来
と同様に、図1及び図2(A)(B)に示すプレキャス
ト・コンクリート部材1を用いる。このプレキャスト・
コンクリート部材(以下、PCa部材と称する)1は、
縦向きの壁構成部2と水平向きの底盤構成部3が一体化
されて縦断面形状がL字形に形成されている。このPC
a部材1の内面の幅方向の両側には、連結金具4が固着
されている。連結金具4は、図3に示すように、ボルト
孔があけられたコ字形の鋼板により形成されており、こ
れに溶接されたアンカー鉄筋5と共にPCa部材1内に
埋設されて固定されている。そして、この連結金具4に
ボルトを装着するためのボルトボックス6が形成されて
いる。また、このPCa部材1の接合側面には、シール
材を充填するための深溝7が、図2(B)に示すよう
に、壁構成部2または底盤構成部3に対して平行に形成
されている。深溝7の注入口7iは壁構成部2の頂面に
開口するように設けられ、空気抜き口7oは底盤構成部
3の上面に開口するように設けられている。さらに、P
Ca部材1の接合側面には、弾性材を装着するための1
対の浅溝8が、図4及び図5に示すように深溝7の両側
に段状に配置された形で深溝7に連続して形成されてい
る。
In this embodiment, when constructing a basement, a precast concrete member 1 shown in FIGS. 1 and 2A and 2B is used as in the prior art. This precast
Concrete member (hereinafter referred to as PCa member) 1
The vertical wall component 2 and the horizontal bottom component 3 are integrated to form an L-shaped vertical cross section. This PC
On both sides of the inner surface of the a member 1 in the width direction, connecting fittings 4 are fixed. As shown in FIG. 3, the connection fitting 4 is formed of a U-shaped steel plate having bolt holes, and is embedded and fixed in the PCa member 1 together with the anchor rebar 5 welded thereto. Further, a bolt box 6 for mounting a bolt to the connection fitting 4 is formed. In addition, a deep groove 7 for filling a sealing material is formed in the joining side surface of the PCa member 1 in parallel with the wall constituting portion 2 or the bottom plate constituting portion 3 as shown in FIG. I have. The inlet 7i of the deep groove 7 is provided so as to open on the top surface of the wall component 2, and the air vent 7o is provided so as to open on the upper surface of the bottom component 3. Furthermore, P
On the joint side surface of the Ca member 1, a 1
As shown in FIGS. 4 and 5, a pair of shallow grooves 8 are formed on both sides of the deep groove 7 so as to be continuous with the deep groove 7.

【0014】このように構成されたPCa部材1によっ
て地下室を構築するには、図6に示すように、掘削され
た地下空間に、割栗地業9,捨てコンクリート10の施
工を行った後に、必要な種類及び数のPCa部材1を搬
入、設置して、例えば図1に示すように地下室を構築す
る。
In order to construct a basement using the PCa member 1 constructed as described above, as shown in FIG. The necessary type and number of PCa members 1 are carried in and installed, and a basement is constructed, for example, as shown in FIG.

【0015】そして、この地下室の内部空間11の底部
に、現場打ちコンクリート12を打設して底盤13をP
Ca部材1による地下側壁と一体化させる形で構築す
る。
Then, cast-in-place concrete 12 is poured into the bottom of the inner space 11 of the basement, and
It is constructed so as to be integrated with the underground side wall made of the Ca member 1.

【0016】PCa部材1の搬入、設置に際しては、各
PCa部材1が小形(例えば、幅910mm,高さ281
0mm)に形成されているので、敷地や周辺道路の狭い一
般住宅であっても容易に作業を行うことができる。
When the PCa member 1 is loaded and installed, each PCa member 1 is small (for example, 910 mm in width and 281 in height).
(0 mm), so that it is easy to work even in a general house with a narrow site and surrounding roads.

【0017】PCa部材1を設置するには、まず、隣接
するPCa部材1の接合面の浅溝8間に形成される前後
1対の隙間に天然ゴムや合成ゴム等のゴム状弾性材14
を装着し、このゴム状弾性材14を隣接するPCa部材
1によって挟んで圧縮する形で、各PCa部材1を捨て
コンクリート10上に設置する。
To install the PCa member 1, first, a rubber-like elastic material 14 such as natural rubber or synthetic rubber is inserted into a pair of front and rear gaps formed between the shallow grooves 8 on the joining surface of the adjacent PCa member 1.
Are mounted, and each PCa member 1 is disposed on the concrete 10 in such a manner that the rubber-like elastic material 14 is sandwiched between the adjacent PCa members 1 and compressed.

【0018】そして、図8に示すように、隣接するPC
a部材1を互いに接合させ、その接合端面の各連結金具
4をハイテンションボルト15で締結して一体化する。
Then, as shown in FIG.
The members a are joined to each other, and the connecting metal fittings 4 on the joining end faces are fastened with high tension bolts 15 to be integrated.

【0019】次に、隣接するPCa部材1の接合端面の
深溝7が対向することによって形成される孔16内に、
2液性反応硬化軟質エポキシ樹脂等のシール材17を注
入若しくは充填する。シール材17を注入する際には、
上端面の注入口7iから注入し、下方の空気抜き口7o
から深溝7間の孔16内の空気を排出することにより、
シール材17を密実に充填することができる。深溝7間
の孔16内にシール材17を充填すると、浅溝8間の隙
間のゴム状弾性材14のバックアップ材の効果として、
シール材17が深溝7間の孔16から漏れるのを防止で
きると共に、地下水があるような場所ではゴム状弾性材
14,シール材17,ゴム状弾性材14の順序で3段階
に止水することができる。
Next, in the hole 16 formed by the deep groove 7 of the joining end face of the adjacent PCa member 1 facing each other,
A sealing material 17 such as a two-component reaction-curing soft epoxy resin is injected or filled. When injecting the sealing material 17,
Inject from the inlet 7i on the upper end face and the air vent 7o below.
By discharging the air in the hole 16 between the deep grooves 7 from the
The sealing material 17 can be filled densely. When the sealing material 17 is filled in the hole 16 between the deep grooves 7, the effect of the backup material of the rubber-like elastic material 14 in the gap between the shallow grooves 8 is as follows.
It is possible to prevent the sealing material 17 from leaking from the hole 16 between the deep grooves 7, and to stop the water in three stages in the order of the rubber-like elastic material 14, the sealing material 17, and the rubber-like elastic material 14 where there is groundwater. Can be.

【0020】PCa部材1による地下側壁の内部空間1
1の底盤13を構築するに、まずPCa部材1の底盤構
成部3と接続形で配筋18を行う。そして、現場打ちコ
ンクリート12を打設して、各PCa部材1の底盤構成
部3と現場打ちコンクリート12を一体化させる形で、
底盤13を構築する。
Internal space 1 of underground side wall by PCa member 1
In order to construct the bottom 13 of the PCa 1, first, the reinforcing members 18 are connected to the bottom component 3 of the PCa member 1 in a connected manner. Then, the cast-in-place concrete 12 is cast, and the bottom component 3 of each PCa member 1 and the cast-in-place concrete 12 are integrated.
Build the bottom plate 13.

【0021】従って、最も応力が大きくなる地下側壁と
底盤13の接合部分は、工場製作されるPCa部材1に
より構築されるので、工期を短縮できると共に、構造的
な信頼性を高くすることができる。即ち、地下側壁と底
盤13の接合部分に十分な強度を確保でき、また、確実
に止水することができる。
Therefore, since the joint between the underground side wall and the bottom plate 13 where the stress is the largest is constructed by the PCa member 1 manufactured at the factory, the construction period can be shortened and the structural reliability can be increased. . That is, sufficient strength can be secured at the joint between the underground side wall and the bottom plate 13, and water can be reliably stopped.

【0022】また、図6に示すように、底盤13に排水
溝22を設け、耐水石膏ボード,ロックウール等からな
る内壁19を設置する。すると、PCa部材1の壁構成
部2と内壁19の間に空間21が形成されるので、内壁
19に結露が生じることが防止される。また、万一、壁
構成部2に結露が生じた場合にも、この排水溝22を介
して排水することができる。
As shown in FIG. 6, a drain groove 22 is provided in the bottom plate 13 and an inner wall 19 made of a waterproof gypsum board, rock wool or the like is provided. Then, since the space 21 is formed between the wall constituting portion 2 of the PCa member 1 and the inner wall 19, dew condensation on the inner wall 19 is prevented. In addition, even if dew condensation occurs on the wall component 2, it can be drained through the drain groove 22.

【0023】図9及び図10に示すように、各PCa部
材1の壁構成部2には従来と同様に予めアンカーボルト
23のアンカー部23aがそれぞれ埋設され、これらア
ンカーボルト23のネジ部23bは壁構成部2の頂面上
にそれぞれ突設されている。本例では、これらアンカー
ボルト23のネジ部23bにダブルナットと座金により
抜止め部材24をそれぞれ取り付ける。
As shown in FIGS. 9 and 10, anchor portions 23a of anchor bolts 23 are respectively buried in the wall constituting portion 2 of each PCa member 1 in the same manner as in the prior art. The projections are respectively provided on the top surface of the wall component 2. In this example, the retaining members 24 are respectively attached to the screw portions 23b of the anchor bolts 23 by using double nuts and washers.

【0024】かかる状態で、各PCa部材1の壁構成部
2の上面には、これらに沿って図9及び図10に示すよ
うに、スパイラル筋25を、その環状空間内に各アンカ
ーボルト23の抜止め部材24がそれぞれ存在するよう
にして設置する。また、スパイラル筋25内からは該ス
パイラル筋25内にアンカー部26aを溶接等で位置決
めした地上建物締結用アンカーボルト26を所定間隔で
立設する。
In such a state, a spiral streak 25 is provided on the upper surface of the wall constituting portion 2 of each PCa member 1 along these lines, as shown in FIGS. It is installed so that the retaining members 24 are present. In addition, from the inside of the spiral streak 25, anchor bolts 26 for fastening a building above the ground where the anchor portions 26a are positioned by welding or the like are erected at predetermined intervals in the spiral streak 25.

【0025】また、各PCa部材1の壁構成部2の上面
の内側コーナ部には、予め受け金物27を設けておく。
これらの受け金物27に沿ってFデッキ受け金物28を
配置し、このフラットデッキ受け金物28を各受け金物
27に溶接で固定する。
A metal receiving member 27 is provided in advance at an inner corner of the upper surface of the wall constituting portion 2 of each PCa member 1.
An F-deck receiving member 28 is arranged along these receiving members 27, and the flat deck receiving member 28 is fixed to each receiving member 27 by welding.

【0026】PCa部材1による地下側壁の内部空間1
1の上には、対向するフラットデッキ受け金物28に跨
がるようにしてフラットデッキプレート29を掛け渡
す。また、対向するPCa部材1の頂部間には、所定間
隔で鉄骨梁30を掛け渡す。
Internal space 1 of underground side wall by PCa member 1
A flat deck plate 29 is laid over the flat deck receiving member 28 so as to straddle the flat deck receiving hardware 28 facing the flat deck receiving member 28. Further, a steel beam 30 is stretched at predetermined intervals between the tops of the opposing PCa members 1.

【0027】フラットデッキプレート29上には、図1
1に示すようにスラブ筋31を配筋し、かかる状態で図
12に示すようにスパイラル筋25の全体と各地上建物
締結用アンカーボルト26の下半部を埋設するように現
場打ち鉄筋コンクリート天井スラブ32を打設する。こ
の現場打ち鉄筋コンクリート天井スラブ32上から、各
地上建物締結用アンカーボルト26のネジ部26bが突
設されている。
On the flat deck plate 29, FIG.
1, slab streaks 31 are arranged, and in this state, a reinforced concrete ceiling slab is cast in place so as to bury the entire spiral streaks 25 and the lower half of each anchor bolt 26 for fastening a building above the ground as shown in FIG. 32 is cast. From above the cast-in-place reinforced concrete ceiling slab 32, a screw portion 26b of each anchor bolt 26 for fastening a building above the ground is protruded.

【0028】これら地上建物締結用アンカーボルト26
のネジ部26bには、地上建物の一階の木材よりなる土
台33をナット34で締結する。
These anchor bolts 26 for fastening the above-ground buildings
The base 33 made of wood on the first floor of the above-ground building is fastened to the screw portion 26b by a nut 34.

【0029】このような構造になっていると、各地上建
物締結用アンカーボルト26は、現場打ち鉄筋コンクリ
ート天井スラブ32内に埋設されているスパイラル筋2
5内にアンカー部26aがそれぞれ設けられて該現場打
ち鉄筋コンクリート天井スラブ32で一体化されている
ので、機械的強度が従来に比べて遥かに向上し、地上建
物からの応力を十分に負担することができる。
With such a structure, the anchor bolts 26 for fastening the above-ground buildings are connected to the spiral reinforcement 2 embedded in the cast-in-place reinforced concrete ceiling slab 32.
5, since the anchor portions 26a are respectively provided and integrated with the cast-in-place reinforced concrete ceiling slab 32, the mechanical strength is much improved as compared with the related art, and the stress from the ground building is sufficiently borne. Can be.

【0030】また、地下室の内部空間11の天井に、ス
パイラル筋25の全体と各地上建物締結用アンカーボル
ト26の下半部を埋設するように現場打ち鉄筋コンクリ
ート天井スラブ32が設けられているので、各PCa部
材1に作用する大きな土圧を該現場打ち鉄筋コンクリー
ト天井スラブ32でも負担することになって、地下室の
側壁上部の土圧に対して十分な機械的強度をもち、か
つ、天井高の高い地下室を得ることができる。
In addition, a cast-in-place reinforced concrete ceiling slab 32 is provided on the ceiling of the internal space 11 of the basement so as to bury the entire spiral streak 25 and the lower half of the anchor bolt 26 for fastening each above-ground building. The large earth pressure acting on each PCa member 1 is also borne by the cast-in-place reinforced concrete ceiling slab 32, so that it has sufficient mechanical strength against the earth pressure at the upper part of the side wall of the basement and has a high ceiling height. You can get a basement.

【0031】また、現場打ち鉄筋コンクリート天井スラ
ブ32は、各PCa部材1の対向する頂部間に掛け渡さ
れた鉄骨梁30で補強しているので、現場打ち鉄筋コン
クリート天井スラブ32の機械的強度を一層向上させる
ことができる。
Since the cast-in-place reinforced concrete ceiling slab 32 is reinforced by the steel beam 30 bridged between the opposing tops of the PCa members 1, the mechanical strength of the cast-in-place reinforced concrete ceiling slab 32 is further improved. Can be done.

【0032】尚、フラットデッキ受け金物28の代わり
にH形鋼等を用いることもできる。
It is to be noted that an H-shaped steel or the like can be used instead of the flat deck receiving hardware 28.

【0033】[0033]

【発明の効果】本発明における地下室では、側壁を構成
している各プレキャストコンクリート部材の頂部を一体
に鉄骨粱で補強された鉄骨コンクリート製の天井スラブ
と一体化されているため、地下室全体が一体化された箱
状となって全体の機械的強度が高くなり、従来の天井ス
ラブ枠組工法では対応が不可能であった構造、デザイン
にも対応でき、大幅に設計対応が向上した地下室が得ら
れる。
In the basement according to the present invention, the top of each precast concrete member constituting the side wall is integrated with the steel-framed concrete ceiling slab reinforced with steel beams, so that the entire basement is integrated. The overall mechanical strength is increased due to the simplified box shape, and the structure and design that could not be handled by the conventional ceiling slab framework method can be handled, and a basement with greatly improved design support can be obtained. .

【0034】また、本発明に係る地下室では、各地上建
物締結用アンカーボルトは、現場打ち鉄筋コンクリート
天井スラブ内に埋設されているスパイラル筋内にアンカ
ー部がそれぞれ設けられて該現場打ち鉄筋コンクリート
天井スラブで一体化されているので、機械的強度が従来
に比べて遥かに向上し、地上建物からの応力を十分に負
担することができる。また、地下室の内部空間の天井に
は、スパイラル筋の全体と各地上建物締結用アンカーボ
ルトの下半部を埋設するように現場打ち鉄筋コンクリー
ト天井スラブが設けられているので、各プレキャスト・
コンクリート部材に作用する大きな土圧を該現場打ち鉄
筋コンクリート天井スラブでも負担することになって、
地下室の側壁上部の土圧に対して十分な機械的強度をも
ち、かつ、天井高の高い地下室を得ることができる。
In the basement according to the present invention, each anchor bolt for fastening a building above the ground is provided with an anchor portion in a spiral bar buried in the cast-in-place reinforced concrete ceiling slab. Since they are integrated, the mechanical strength is much improved as compared with the related art, and the stress from the building above the ground can be sufficiently borne. On the ceiling of the basement interior space, cast-in-place reinforced concrete ceiling slabs are provided so that the entire spiral streaks and the lower half of each ground building anchor bolt are buried.
The large earth pressure acting on the concrete members will also be borne by the cast-in-place reinforced concrete ceiling slab,
It is possible to obtain a basement having sufficient mechanical strength against the earth pressure at the upper part of the side wall of the basement and having a high ceiling height.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る地下室における実施の形態の一例
の要部斜視図である。
FIG. 1 is a perspective view of a main part of an example of an embodiment in a basement according to the present invention.

【図2】(A)(B)は本例で用いているプレキャスト
・コンクリート部材の正面図及び側面図である。
FIGS. 2A and 2B are a front view and a side view of a precast concrete member used in this example.

【図3】図2中の連結金具部分の拡大正面図である。FIG. 3 is an enlarged front view of a connecting metal part in FIG. 2;

【図4】図2(B)に示す溝部分の拡大平面図である。FIG. 4 is an enlarged plan view of a groove portion shown in FIG. 2 (B).

【図5】図2(B)に示す溝部分の拡大側面図である。FIG. 5 is an enlarged side view of a groove portion shown in FIG. 2 (B).

【図6】プレキャスト・コンクリート部材による地下室
の内側に構築される内壁を示す垂直断面図である。
FIG. 6 is a vertical sectional view showing an inner wall constructed inside a basement by a precast concrete member.

【図7】プレキャスト・コンクリート部材の接合端面へ
の弾性材,シール材の装着状態を示す水平断面図であ
る。
FIG. 7 is a horizontal sectional view showing a state in which an elastic material and a sealing material are attached to a joint end surface of a precast concrete member.

【図8】プレキャスト・コンクリート部材の接合方法を
示す垂直断面図である。
FIG. 8 is a vertical sectional view showing a method of joining precast concrete members.

【図9】本発明でプレキャスト・コンクリート部材の上
部にスパイラル筋,地上建物締結用アンカーボルト及び
フラットデッキプレートを設けた状態の一例を示す斜視
図である。
FIG. 9 is a perspective view showing an example of a state in which a spiral streak, an anchor bolt for fastening a building above the ground, and a flat deck plate are provided above a precast concrete member according to the present invention.

【図10】本発明でプレキャスト・コンクリート部材の
上部にスパイラル筋,地上建物締結用アンカーボルト及
びフラットデッキプレートを設けた状態の一例を示す垂
直断面図である。
FIG. 10 is a vertical sectional view showing an example of a state in which a spiral streak, an anchor bolt for fastening a building above the ground, and a flat deck plate are provided above a precast concrete member according to the present invention.

【図11】本発明でフラットデッキプレート上にスラブ
筋を配筋した状態の一例を示す斜視図である。
FIG. 11 is a perspective view showing an example of a state in which slab streaks are arranged on a flat deck plate in the present invention.

【図12】本発明で地下室の内部空間の天井に、スパイ
ラル筋の全体と各地上建物締結用アンカーボルトの下半
部を埋設するように現場打ち鉄筋コンクリート天井スラ
ブを設けた状態の一例を示す垂直断面図である。
FIG. 12 is a vertical view showing an example of a state in which a cast-in-place reinforced concrete ceiling slab is provided on the ceiling of the inner space of the basement according to the present invention so as to bury the entire spiral streak and the lower half of the anchor bolt for fastening each above-ground building. It is sectional drawing.

【符号の説明】[Explanation of symbols]

1 プレキャスト・コンクリート部材(PCa部材) 2 壁構成部 3 底盤構成部 4 連結金具 5 アンカー鉄筋 6 ボルトボックス 7 深溝 7i 注入口 7o 空気抜き口 8 浅溝 9 割栗地業 10 捨てコンクリート 11 内部空間 12 現場打ちコンクリート 13 底盤 14 ゴム状弾性材 15 ハイテンションボルト 16 孔 17 シール材 18 配筋 19 内壁 21 空間 22 排水溝 23 アンカーボルト 23a アンカー部 23b ネジ部 24 抜止め部材 25 スパイラル筋 26 地上建物締結用アンカーボルト 26a アンカー部 26b ネジ部 27 受け金物 28 フラットデッキ受け金物 29 フラットデッキプレート 30 鉄骨梁 31 スラブ筋 32 現場打ち鉄筋コンクリート天井スラブ DESCRIPTION OF SYMBOLS 1 Precast concrete member (PCa member) 2 Wall constituent part 3 Bottom part constituent part 4 Connection metal fittings 5 Anchor reinforcement 6 Bolt box 7 Deep groove 7i Inlet 7o Air vent 8 Shallow groove 9 Split chestnut ground 10 Discarded concrete 11 Internal space 12 Site Casting concrete 13 Bottom board 14 Rubbery elastic material 15 High tension bolt 16 Hole 17 Sealing material 18 Arrangement 19 Inner wall 21 Space 22 Drainage groove 23 Anchor bolt 23a Anchor part 23b Screw part 24 Detachment member 25 Spiral streak 26 Anchor for ground building fastening Bolt 26a Anchor part 26b Screw part 27 Bracket 28 Flat deck bracket 29 Flat deck plate 30 Steel beam 31 Slab bar 32 Cast-in-place reinforced concrete ceiling slab

─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成11年12月3日(1999.12.
3)
[Submission date] December 3, 1999 (1999.12.
3)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】全文[Correction target item name] Full text

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【書類名】 明細書[Document Name] Statement

【発明の名称】 地下室[Title of the Invention] Basement

【特許請求の範囲】[Claims]

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、小形のプレキャス
ト・コンクリート部材で側壁を構成する地下室に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a basement whose side wall is formed by a small-sized precast concrete member.

【0002】[0002]

【従来の技術】最近、地価の高騰や騒音等のため、一般
住宅においても地下室に対する需要が高まっている。
2. Description of the Related Art Recently, demand for basements has been increasing in general houses due to soaring land prices and noise.

【0003】従来、地下室は、現場打ちコンクリートに
より構築されていた。しかしながら、現場打ちコンクリ
ートによる地下室を構築する場合は、型枠、配筋等の高
度の熟練工が必要となる問題点があった。また、大きな
土圧が作用する側壁を含めた全体を現場打ちコンクリー
トで構築すると、品質管理が大変であり、また工期も長
くなる問題点があった。
[0003] Conventionally, basements have been constructed of cast-in-place concrete. However, in the case of constructing a basement made of cast-in-place concrete, there is a problem that highly skilled workers such as formwork and reinforcing bars are required. In addition, when the entire structure including the side wall on which a large earth pressure acts is constructed of cast-in-place concrete, quality control is difficult and the construction period is long.

【0004】このような問題点を解決するため、最近、
縦断面形状がL字形で小形のプレキャスト・コンクリー
ト部材を用いて地下室の側壁を構築する工法が提案され
ている。
In order to solve such problems, recently,
A construction method has been proposed in which a side wall of a basement is constructed using a small-sized precast concrete member having an L-shaped vertical cross section.

【0005】このプレキャスト・コンクリート部材を用
いた地下室は、掘削された地下空間に、縦向きの壁構成
部と水平向きの底盤構成部が一体化された縦断面形状が
L字形のプレキャスト・コンクリート部材が、隣接相互
間を互いに接合して設置されて地下室の側壁が構成さ
れ、該地下室の内部空間の底部に現場打ちコンクリート
による底盤が各プレキャスト・コンクリート部材の底盤
構成部に連続する形で構築され、また各プレキャスト・
コンクリート部材の壁構成部の頂面上には該壁構成部に
アンカー部が埋設されたアンカーボルトのネジ部が突設
されている構造になっていた。
[0005] A basement using this precast concrete member is a precast concrete member having an L-shaped longitudinal section in which a vertical wall component and a horizontal base component are integrated into an excavated underground space. Adjacent to each other are installed to form a side wall of the basement, and a base made of cast-in-place concrete is built at the bottom of the internal space of the basement in a form that is continuous with the base structure of each precast concrete member. , And each precast
On the top surface of the wall component of the concrete member, a screw portion of an anchor bolt having an anchor buried in the wall component protrudes.

【0006】[0006]

【発明が解決しようとする課題】このような構造の地下
室では、大きな土圧が作用する側壁が、工場で十分な品
質管理を受けて構築された複数のプレキャスト・コンク
リート部材で構築されるので、熟練工でなくても十分な
機械的強度を持つ地下室側壁を構築することができる利
点がある。
In the basement having such a structure, the side wall on which a large earth pressure acts is constructed by a plurality of precast concrete members constructed under a sufficient quality control in a factory. There is an advantage that it is possible to construct a basement side wall having sufficient mechanical strength even without a skilled worker.

【0007】本発明の目的は、地上建物からの応力を十
分に負担できるアンカーボルトを備えた地下室を提供
し、かつ、地下室の天井の機械的強度を向上し、更に、
地上建物との一体化を強化することによって天井高の高
い地下室を提供することにある。
[0007] It is an object of the present invention to provide a basement provided with anchor bolts that can sufficiently bear the stress from the above-ground building, and to improve the mechanical strength of the ceiling of the basement.
It is an object of the present invention to provide a basement with a high ceiling by strengthening integration with a building above the ground.

【0008】[0008]

【課題を解決するための手段】上記の如き従来の問題点
を解決し、所期の目的を達成するため本発明の特徴は、
掘削された地下空間に、縦向きの壁構成部と水平向きの
底盤構成部が一体化された縦断面形状がL字形のプレキ
ャスト・コンクリート部材が、隣接相互間を互いに接合
して設置されて地下室の側壁が構成され、前記地下室の
内部空間の底部に現場打ちコンクリートによる底盤が前
記各プレキャスト・コンクリート部材の底盤構成部に連
続されて構築されてなる地下室において、前記側壁の互
いに対向するプレキャストコンクリート部材の頂部間
に、鉄骨梁を掛け渡し、該鉄骨の上部を埋め込むととも
前記各プレキャストコンクリート部材の頂部と一体化
させて、現場打ち鉄筋コンクリート天井スラブが設けら
れ、前記各プレキャストコンクリート部材の壁構成部頂
面上には、該壁構成部にアンカー部が埋設されたアンカ
ーボルトのネジ部が突設され、該アンカーボルトのネジ
部には抜止め部材が取り付けられ、前記各プレキャスト
・コンクリート部材の各壁構成部の上面にはこれらに沿
ってスパイラル筋がその環状空間内に前記各アンカーボ
ルトの前記抜止め部材がそれぞれ存在するようにして設
置され、前記スパイラル筋内からは該スパイラル筋内に
アンカー部を位置決めした地上建物締結用アンカーボル
トが所定間隔で立設され、前記地下室の内部空間の天井
には前記スパイラル筋の全体と前記各地上建物締結用ア
ンカーボルトの下半部を埋設するようにして前記現場打
ち鉄筋コンクリート天井スラブが設けられ、該天井スラ
ブ内にはコ字状に折り返されたU字型鉄筋を、該U字型
鉄筋の両端の平行部で前記スパイラル筋を跨ぎ、該平行
部の先端をスラブ筋に重ねる配置に埋設されていること
にある。
SUMMARY OF THE INVENTION In order to solve the conventional problems as described above and achieve the intended purpose, the features of the present invention are as follows.
In an excavated underground space, a precast concrete member having an L-shaped vertical cross-section, in which a vertical wall component and a horizontal base component are integrated, is installed by adjoining each other between adjacent basements. In the basement, a bottom plate made of cast-in-place concrete is continuously formed on the bottom portion of each of the precast concrete members at the bottom of the internal space of the basement, and the side walls of the precast concrete members oppose each other. Between the tops of the steel beams and embed the upper part of the steel frame
The be integrated with the top of the precast concrete parts, the cast-in-place reinforced concrete ceiling slab is provided, said wall component top of the precast concrete parts
On the surface, an anchor in which an anchor portion is embedded in the wall constituting portion
-The screw portion of the anchor bolt is projected and the screw of the anchor bolt is
A retaining member is attached to the part,
・ Along the top surface of each wall component of the concrete member
Therefore, the spiral streaks are placed in the annular space by the anchor bolts.
It is set up so that each of the retaining members of the
Placed in the spiral muscle from within the spiral muscle
Anchor bolts for fastening ground buildings with anchors positioned
Are installed at predetermined intervals, and the ceiling of the internal space of the basement is
The whole of the spiral streaks and the ground building fastening
The lower part of the anchor bolt is buried in the
A reinforced concrete ceiling slab is provided.
The U-shaped rebar folded in a U-shape is
Straddling the spiral streaks at the parallel portions at both ends of the reinforcing bar,
The part is buried in an arrangement in which the tip of the part overlaps the slab streaks .

【0009】このような構成になっていると、各プレキ
ャストコンクリート部材は、上端がコンクリート天井ス
ラブにより一体化されて、相互間の結合が強化され、し
かも、鉄骨粱で補強された鉄筋コンクリート天井スラブ
が、側壁と一体化されるため、高強度の地下室が得られ
る。
[0009] With this configuration, each precast concrete member has a reinforced concrete ceiling slab in which the upper ends are integrated by a concrete ceiling slab, the connection between them is strengthened, and the steel slab is reinforced with steel beams. In addition, since it is integrated with the side wall, a high-strength basement can be obtained.

【0010】また、各地上建物締結用アンカーボルト
は、現場打ち鉄筋コンクリート天井スラブ内に埋設され
ているスパイラル筋内にアンカー部がそれぞれ設けられ
て該現場打ち鉄筋コンクリート天井スラブで一体化され
ているので、機械的強度が従来に比べて遥かに向上し、
地上建物からの応力を十分に負担することができる。
[0010]In addition, anchor bolts for fastening each ground building
Is buried in a cast-in-place reinforced concrete ceiling slab
Anchors are provided in the spiral muscles
Integrated with the cast-in-place reinforced concrete ceiling slab
The mechanical strength is much higher than before,
It can sufficiently bear the stress from the ground building.

【0011】更に、地下室の内部空間の天井に、スパイ
ラル筋の全体と各地上建物締結用アンカーボルトの下半
部を埋設するように現場打ち鉄筋コンクリート天井スラ
ブが設けられていると、各プレキャスト・コンクリート
部材に作用する大きな土圧を該現場打ち鉄筋コンクリー
ト天井スラブでも負担することになって、地下室の側壁
上部の土圧に対して十分な機械的強度をもつ地下室を得
ることができる。
Furthermore, if a cast-in-place reinforced concrete ceiling slab is provided on the ceiling of the interior space of the basement so as to bury the entire spiral streaks and the lower half of each ground building anchor bolt, each precast concrete The large earth pressure acting on the member is also borne by the cast-in-place reinforced concrete ceiling slab, so that a basement having sufficient mechanical strength against the earth pressure on the upper side wall of the basement can be obtained.

【0012】[0012]

【発明の実施の形態】図1乃至図12は本発明に係る地
下室における実施の形態の一例を示したものである。
1 to 12 show one embodiment of a basement according to the present invention.

【0013】本例では、地下室を構築するに際し、従来
と同様に、図1及び図2(A)(B)に示すプレキャス
ト・コンクリート部材1を用いる。このプレキャスト・
コンクリート部材(以下、PCa部材と称する)1は、
縦向きの壁構成部2と水平向きの底盤構成部3が一体化
されて縦断面形状がL字形に形成されている。このPC
a部材1の内面の幅方向の両側には、連結金具4が固着
されている。連結金具4は、図3に示すように、ボルト
孔があけられたコ字形の鋼板により形成されており、こ
れに溶接されたアンカー鉄筋5と共にPCa部材1内に
埋設されて固定されている。そして、この連結金具4に
ボルトを装着するためのボルトボックス6が形成されて
いる。また、このPCa部材1の接合側面には、シール
材を充填するための深溝7が、図2(B)に示すよう
に、壁構成部2または底盤構成部3に対して平行に形成
されている。深溝7の注入口7iは壁構成部2の頂面に
開口するように設けられ、空気抜き口7oは底盤構成部
3の上面に開口するように設けられている。さらに、P
Ca部材1の接合側面には、弾性材を装着するための1
対の浅溝8が、図4及び図5に示すように深溝7の両側
に段状に配置された形で深溝7に連続して形成されてい
る。
In this embodiment, when constructing a basement, a precast concrete member 1 shown in FIGS. 1 and 2A and 2B is used as in the prior art. This precast
Concrete member (hereinafter referred to as PCa member) 1
The vertical wall component 2 and the horizontal bottom component 3 are integrated to form an L-shaped vertical cross section. This PC
On both sides of the inner surface of the a member 1 in the width direction, connecting fittings 4 are fixed. As shown in FIG. 3, the connection fitting 4 is formed of a U-shaped steel plate having bolt holes, and is embedded and fixed in the PCa member 1 together with the anchor rebar 5 welded thereto. Further, a bolt box 6 for mounting a bolt to the connection fitting 4 is formed. In addition, a deep groove 7 for filling a sealing material is formed in the joining side surface of the PCa member 1 in parallel with the wall constituting portion 2 or the bottom plate constituting portion 3 as shown in FIG. I have. The inlet 7i of the deep groove 7 is provided so as to open on the top surface of the wall component 2, and the air vent 7o is provided so as to open on the upper surface of the bottom component 3. Furthermore, P
On the joint side surface of the Ca member 1, a 1
As shown in FIGS. 4 and 5, a pair of shallow grooves 8 are formed on both sides of the deep groove 7 so as to be continuous with the deep groove 7.

【0014】このように構成されたPCa部材1によっ
て地下室を構築するには、図6に示すように、掘削され
た地下空間に、割栗地業9,捨てコンクリート10の施
工を行った後に、必要な種類及び数のPCa部材1を搬
入、設置して、例えば図1に示すように地下室を構築す
る。
In order to construct a basement using the PCa member 1 constructed as described above, as shown in FIG. The necessary type and number of PCa members 1 are carried in and installed, and a basement is constructed, for example, as shown in FIG.

【0015】そして、この地下室の内部空間11の底部
に、現場打ちコンクリート12を打設して底盤13をP
Ca部材1による地下側壁と一体化させる形で構築す
る。
Then, cast-in-place concrete 12 is poured into the bottom of the inner space 11 of the basement, and
It is constructed so as to be integrated with the underground side wall made of the Ca member 1.

【0016】PCa部材1の搬入、設置に際しては、各
PCa部材1が小形(例えば、幅910mm,高さ281
0mm)に形成されているので、敷地や周辺道路の狭い一
般住宅であっても容易に作業を行うことができる。
When the PCa member 1 is loaded and installed, each PCa member 1 is small (for example, 910 mm in width and 281 in height).
(0 mm), so that it is easy to work even in a general house with a narrow site and surrounding roads.

【0017】PCa部材1を設置するには、まず、隣接
するPCa部材1の接合面の浅溝8間に形成される前後
1対の隙間に天然ゴムや合成ゴム等のゴム状弾性材14
を装着し、このゴム状弾性材14を隣接するPCa部材
1によって挟んで圧縮する形で、各PCa部材1を捨て
コンクリート10上に設置する。
To install the PCa member 1, first, a rubber-like elastic material 14 such as natural rubber or synthetic rubber is inserted into a pair of front and rear gaps formed between the shallow grooves 8 on the joining surface of the adjacent PCa member 1.
Are mounted, and each PCa member 1 is disposed on the concrete 10 in such a manner that the rubber-like elastic material 14 is sandwiched between the adjacent PCa members 1 and compressed.

【0018】そして、図8に示すように、隣接するPC
a部材1を互いに接合させ、その接合端面の各連結金具
4をハイテンションボルト15で締結して一体化する。
Then, as shown in FIG.
The members a are joined to each other, and the connecting metal fittings 4 on the joining end faces are fastened with high tension bolts 15 to be integrated.

【0019】次に、隣接するPCa部材1の接合端面の
深溝7が対向することによって形成される孔16内に、
2液性反応硬化軟質エポキシ樹脂等のシール材17を注
入若しくは充填する。シール材17を注入する際には、
上端面の注入口7iから注入し、下方の空気抜き口7o
から深溝7間の孔16内の空気を排出することにより、
シール材17を密実に充填することができる。深溝7間
の孔16内にシール材17を充填すると、浅溝8間の隙
間のゴム状弾性材14のバックアップ材の効果として、
シール材17が深溝7間の孔16から漏れるのを防止で
きると共に、地下水があるような場所ではゴム状弾性材
14,シール材17,ゴム状弾性材14の順序で3段階
に止水することができる。
Next, in the hole 16 formed by the deep groove 7 of the joining end face of the adjacent PCa member 1 facing each other,
A sealing material 17 such as a two-component reaction-curing soft epoxy resin is injected or filled. When injecting the sealing material 17,
Inject from the inlet 7i on the upper end face and the air vent 7o below.
By discharging the air in the hole 16 between the deep grooves 7 from the
The sealing material 17 can be filled densely. When the sealing material 17 is filled in the hole 16 between the deep grooves 7, the effect of the backup material of the rubber-like elastic material 14 in the gap between the shallow grooves 8 is as follows.
It is possible to prevent the sealing material 17 from leaking from the hole 16 between the deep grooves 7, and to stop the water in three stages in the order of the rubber-like elastic material 14, the sealing material 17, and the rubber-like elastic material 14 where there is groundwater. Can be.

【0020】PCa部材1による地下側壁の内部空間1
1の底盤13を構築するに、まずPCa部材1の底盤構
成部3と接続形で配筋18を行う。そして、現場打ちコ
ンクリート12を打設して、各PCa部材1の底盤構成
部3と現場打ちコンクリート12を一体化させる形で、
底盤13を構築する。
Internal space 1 of underground side wall by PCa member 1
In order to construct the bottom 13 of the PCa 1, first, the reinforcing members 18 are connected to the bottom component 3 of the PCa member 1 in a connected manner. Then, the cast-in-place concrete 12 is cast, and the bottom component 3 of each PCa member 1 and the cast-in-place concrete 12 are integrated.
Build the bottom plate 13.

【0021】従って、最も応力が大きくなる地下側壁と
底盤13の接合部分は、工場製作されるPCa部材1に
より構築されるので、工期を短縮できると共に、構造的
な信頼性を高くすることができる。即ち、地下側壁と底
盤13の接合部分に十分な強度を確保でき、また、確実
に止水することができる。
Therefore, since the joint between the underground side wall and the bottom plate 13 where the stress is the largest is constructed by the PCa member 1 manufactured at the factory, the construction period can be shortened and the structural reliability can be increased. . That is, sufficient strength can be secured at the joint between the underground side wall and the bottom plate 13, and water can be reliably stopped.

【0022】また、図6に示すように、底盤13に排水
溝22を設け、耐水石膏ボード,ロックウール等からな
る内壁19を設置する。すると、PCa部材1の壁構成
部2と内壁19の間に空間21が形成されるので、内壁
19に結露が生じることが防止される。また、万一、壁
構成部2に結露が生じた場合にも、この排水溝22を介
して排水することができる。
As shown in FIG. 6, a drain groove 22 is provided in the bottom plate 13 and an inner wall 19 made of a waterproof gypsum board, rock wool or the like is provided. Then, since the space 21 is formed between the wall constituting portion 2 of the PCa member 1 and the inner wall 19, dew condensation on the inner wall 19 is prevented. In addition, even if dew condensation occurs on the wall component 2, it can be drained through the drain groove 22.

【0023】図9及び図10に示すように、各PCa部
材1の壁構成部2には従来と同様に予めアンカーボルト
23のアンカー部23aがそれぞれ埋設され、これらア
ンカーボルト23のネジ部23bは壁構成部2の頂面上
にそれぞれ突設されている。本例では、これらアンカー
ボルト23のネジ部23bにダブルナットと座金により
抜止め部材24をそれぞれ取り付ける。
As shown in FIGS. 9 and 10, anchor portions 23a of anchor bolts 23 are respectively buried in the wall constituting portion 2 of each PCa member 1 in the same manner as in the prior art. The projections are respectively provided on the top surface of the wall component 2. In this example, the retaining members 24 are respectively attached to the screw portions 23b of the anchor bolts 23 by using double nuts and washers.

【0024】かかる状態で、各PCa部材1の壁構成部
2の上面には、これらに沿って図9及び図10に示すよ
うに、スパイラル筋25を、その環状空間内に各アンカ
ーボルト23の抜止め部材24がそれぞれ存在するよう
にして設置する。また、スパイラル筋25内からは該ス
パイラル筋25内にアンカー部26aを溶接等で位置決
めした地上建物締結用アンカーボルト26を所定間隔で
立設する。
In such a state, a spiral streak 25 is provided on the upper surface of the wall constituting portion 2 of each PCa member 1 along these lines, as shown in FIGS. It is installed so that the retaining members 24 are present. In addition, from the inside of the spiral streak 25, anchor bolts 26 for fastening a building above the ground where the anchor portions 26a are positioned by welding or the like are erected at predetermined intervals in the spiral streak 25.

【0025】また、各PCa部材1の壁構成部2の上面
の内側コーナ部には、予め受け金物27を設けておく。
これらの受け金物27に沿ってFデッキ受け金物28を
配置し、このフラットデッキ受け金物28を各受け金物
27に溶接で固定する。
A metal receiving member 27 is provided in advance at an inner corner of the upper surface of the wall constituting portion 2 of each PCa member 1.
An F-deck receiving member 28 is arranged along these receiving members 27, and the flat deck receiving member 28 is fixed to each receiving member 27 by welding.

【0026】PCa部材1による地下側壁の内部空間1
1の上には、対向するフラットデッキ受け金物28に跨
がるようにしてフラットデッキプレート29を掛け渡
す。また、対向するPCa部材1の頂部間には、所定間
隔で鉄骨梁30を掛け渡す。
Internal space 1 of underground side wall by PCa member 1
A flat deck plate 29 is laid over the flat deck receiving member 28 so as to straddle the flat deck receiving hardware 28 facing the flat deck receiving member 28. Further, a steel beam 30 is stretched at predetermined intervals between the tops of the opposing PCa members 1.

【0027】フラットデッキプレート29上には、図1
、図12に示すようにスラブ筋31を配筋するととも
にコ字状に折り返された形状のU字型鉄筋35を配管
し、前記鉄骨梁30の上部、スパイラル筋25の全体
各地上建物締結用アンカーボルト26の下半部を埋設
するように現場打ち鉄筋コンクリート天井スラブ32を
打設する。これによって形成される現場打ち鉄筋コンク
リート天井スラブ32内にはU字型鉄筋35の両端の平
行部35a,35bで前記スパイラル筋25を跨ぎ、該
平行部35a,35bの先端をスラブ筋31に重ねる配
置に埋設させるとともに、該天井スラブ32上から、各
地上建物締結用アンカーボルト26のネジ部26bが
設させる。
On the flat deck plate 29, FIG.
1, Haisuji Then together the slab muscle 31 as shown in FIG. 12
U-shaped rebar 35 with a U-shape folded into a pipe
The upper part of the steel beam 30 and the entire spiral streaks 25
And a cast-in-place reinforced concrete ceiling slab 32 is laid so as to bury the lower half of each ground building anchor bolt 26. Cast-in-place steel bar conc formed by this
In the REIT ceiling slab 32, flat ends at both ends of the U-shaped
In the row portions 35a, 35b, the spiral streaks 25 are straddled.
An arrangement in which the tips of the parallel portions 35a and 35b are overlapped on the slab streaks 31
At the same time, the screw portions 26 b of the anchor bolts 26 for fastening the above-ground buildings protrude from above the ceiling slab 32.
Set up.

【0028】これら地上建物締結用アンカーボルト26
のネジ部26bには、地上建物の一階の木材よりなる土
台33をナット34で締結する。
These anchor bolts 26 for fastening the above-ground buildings
The base 33 made of wood on the first floor of the above-ground building is fastened to the screw portion 26b by a nut 34.

【0029】このような構造になっていると、各地上建
物締結用アンカーボルト26は、現場打ち鉄筋コンクリ
ート天井スラブ32内に埋設されているスパイラル筋2
5内にアンカー部26aがそれぞれ設けられて該現場打
ち鉄筋コンクリート天井スラブ32で一体化されている
ので、機械的強度が従来に比べて遥かに向上し、地上建
物からの応力を十分に負担することができる。
With such a structure, the anchor bolts 26 for fastening the above-ground buildings are connected to the spiral reinforcement 2 embedded in the cast-in-place reinforced concrete ceiling slab 32.
5, since the anchor portions 26a are respectively provided and integrated with the cast-in-place reinforced concrete ceiling slab 32, the mechanical strength is much improved as compared with the related art, and the stress from the ground building is sufficiently borne. Can be.

【0030】また、地下室の内部空間11の天井に、ス
パイラル筋25の全体と各地上建物締結用アンカーボル
ト26の下半部を埋設するように現場打ち鉄筋コンクリ
ート天井スラブ32が設けられているので、各PCa部
材1に作用する大きな土圧を該現場打ち鉄筋コンクリー
ト天井スラブ32でも負担することになって、地下室の
側壁上部の土圧に対して十分な機械的強度をもち、か
つ、天井高の高い地下室を得ることができる。
In addition, a cast-in-place reinforced concrete ceiling slab 32 is provided on the ceiling of the internal space 11 of the basement so as to bury the entire spiral streak 25 and the lower half of the anchor bolt 26 for fastening each above-ground building. The large earth pressure acting on each PCa member 1 is also borne by the cast-in-place reinforced concrete ceiling slab 32, so that it has sufficient mechanical strength against the earth pressure at the upper part of the side wall of the basement and has a high ceiling height. You can get a basement.

【0031】また、現場打ち鉄筋コンクリート天井スラ
ブ32は、各PCa部材1の対向する頂部間に掛け渡さ
れた鉄骨梁30で補強しているので、現場打ち鉄筋コン
クリート天井スラブ32の機械的強度を一層向上させる
ことができる。
Since the cast-in-place reinforced concrete ceiling slab 32 is reinforced by the steel beam 30 bridged between the opposing tops of the PCa members 1, the mechanical strength of the cast-in-place reinforced concrete ceiling slab 32 is further improved. Can be done.

【0032】尚、フラットデッキ受け金物28の代わり
にH形鋼等を用いることもできる。
It is to be noted that an H-shaped steel or the like can be used instead of the flat deck receiving hardware 28.

【0033】[0033]

【発明の効果】本発明における地下室では、掘削された
地下空間に、縦向きの壁構成部と水平向きの底盤構成部
が一体化された縦断面形状がL字形のプレキャスト・コ
ンクリート部材が、隣接相互間を互いに接合して設置さ
れて地下室の側壁が構成され、前記地下室の内部空間の
底部に現場打ちコンクリートによる底盤が前記各プレキ
ャスト・コンクリート部材の底盤構成部に連続されて構
築されてなる地下室において、前記側壁の互いに対向す
るプレキャストコンクリート部材の頂部間に、鉄骨梁を
掛け渡し、該鉄骨の上部を埋め込むとともに前記各プレ
キャストコンクリート部材の頂部と一体化させて、現場
打ち鉄筋コンクリート天井スラブが設けられ、前記各プ
レキャストコンクリート部材の壁構成部頂面上には、該
壁構成部にアンカー部が埋設されたアンカーボルトのネ
ジ部が突設され、該アンカーボルトのネジ部には抜止め
部材が取り付けられ、前記各プレキャスト・コンクリー
ト部材の各壁構成部の上面にはこれらに沿ってスパイラ
ル筋がその環状空間内に前記各アンカーボルトの前記抜
止め部材がそれぞれ存在するようにして設置され、前記
スパイラル筋内からは該スパイラル筋内にアンカー部を
位置決めした地上建物締結用アンカーボルトが所定間隔
で立設され、前記地下室の内部空間の天井には前記スパ
イラル筋の全体と前記各地上建物締結用アンカーボルト
の下半部を埋設するようにして前記現場打ち鉄筋コンク
リート天井スラブが設けられ、該天井スラブ内にはコ字
状に折り返されたU字型鉄筋を、該U字型鉄筋の両端の
平行部で前記スパイラル筋を跨ぎ、該平行部の先端をス
ラブ筋に重ねる配置に埋設されていることにより、地下
室全体が一体化された箱状となって全体の機械的強度が
高くなり、従来の天井スラブ枠組工法では対応が不可能
であった構造、デザインにも対応でき、大幅に設計対応
が向上した地下室が得られる。
In the basement according to the present invention, the excavated
Underground space, vertical wall component and horizontal base component
Is an L-shaped pre-cast
Concrete members are installed with adjacent
And the side wall of the basement is constructed.
The bottom plate made of cast-in-place concrete is placed at the bottom
It is connected to the bottom
In the basement that is being constructed,
Steel beams between the tops of the precast concrete members
Embed the upper part of the steel frame and
Integrated with the top of the cast concrete member,
A reinforced concrete ceiling slab is provided and
On the top surface of the wall component of the recast concrete member,
Anchor bolts with anchors embedded in the wall component
And the anchor bolt has a screw
The members are attached, and each of the precast concrete
The top of each wall component of the
When the anchor bolts are
It is installed so that each stop member is present, and
From inside the spiral muscle, insert the anchor part into the spiral muscle.
Predetermined spacing of the anchor bolts for fastening the above-ground buildings
And the ceiling of the inner space of the basement has the spa
Anchor bolts for fastening all of the above-mentioned building and the whole of the iral bar
Bury the lower half of the
A REIT ceiling slab is provided, and a U-shaped
The U-shaped rebar folded in a shape is connected to both ends of the U-shaped rebar.
Straddle the spiral muscle with the parallel part, and slide the tip of the parallel part
By being buried in an arrangement that overlaps the lab muscle, the entire basement has a box shape that is integrated, increasing the overall mechanical strength, a structure that was not possible with the conventional ceiling slab framework method, A basement that can respond to design and has greatly improved design response can be obtained.

【0034】また、本発明に係る地下室では、各地上建
物締結用アンカーボルトは、現場打ち鉄筋コンクリート
天井スラブ内に埋設されているスパイラル筋内にアンカ
ー部がそれぞれ設けられて該現場打ち鉄筋コンクリート
天井スラブで一体化されているので、機械的強度が従来
に比べて遥かに向上し、地上建物からの応力を十分に負
担することができる。また、地下室の内部空間の天井に
は、スパイラル筋の全体と各地上建物締結用アンカーボ
ルトの下半部を埋設するように現場打ち鉄筋コンクリー
ト天井スラブが設けられているので、各プレキャスト・
コンクリート部材に作用する大きな土圧を該現場打ち鉄
筋コンクリート天井スラブでも負担することになって、
地下室の側壁上部の土圧に対して十分な機械的強度をも
ち、かつ、天井高の高い地下室を得ることができる。
In the basement according to the present invention, each anchor bolt for fastening a building above the ground is provided with an anchor portion in a spiral bar buried in the cast-in-place reinforced concrete ceiling slab. Since they are integrated, the mechanical strength is much improved as compared with the related art, and the stress from the building above the ground can be sufficiently borne. On the ceiling of the basement interior space, cast-in-place reinforced concrete ceiling slabs are provided so that the entire spiral streaks and the lower half of each ground building anchor bolt are buried.
The large earth pressure acting on the concrete members will also be borne by the cast-in-place reinforced concrete ceiling slab,
It is possible to obtain a basement having sufficient mechanical strength against the earth pressure at the upper part of the side wall of the basement and having a high ceiling height.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る地下室における実施の形態の一例
の要部斜視図である。
FIG. 1 is a perspective view of a main part of an example of an embodiment in a basement according to the present invention.

【図2】(A)(B)は本例で用いているプレキャスト
・コンクリート部材の正面図及び側面図である。
FIGS. 2A and 2B are a front view and a side view of a precast concrete member used in this example.

【図3】図2中の連結金具部分の拡大正面図である。FIG. 3 is an enlarged front view of a connecting metal part in FIG. 2;

【図4】図2(B)に示す溝部分の拡大平面図である。FIG. 4 is an enlarged plan view of a groove portion shown in FIG. 2 (B).

【図5】図2(B)に示す溝部分の拡大側面図である。FIG. 5 is an enlarged side view of a groove portion shown in FIG. 2 (B).

【図6】プレキャスト・コンクリート部材による地下室
の内側に構築される内壁を示す垂直断面図である。
FIG. 6 is a vertical sectional view showing an inner wall constructed inside a basement by a precast concrete member.

【図7】プレキャスト・コンクリート部材の接合端面へ
の弾性材,シール材の装着状態を示す水平断面図であ
る。
FIG. 7 is a horizontal sectional view showing a state in which an elastic material and a sealing material are attached to a joint end surface of a precast concrete member.

【図8】プレキャスト・コンクリート部材の接合方法を
示す垂直断面図である。
FIG. 8 is a vertical sectional view showing a method of joining precast concrete members.

【図9】本発明でプレキャスト・コンクリート部材の上
部にスパイラル筋,地上建物締結用アンカーボルト及び
フラットデッキプレートを設けた状態の一例を示す斜視
図である。
FIG. 9 is a perspective view showing an example of a state in which a spiral streak, an anchor bolt for fastening a building above the ground, and a flat deck plate are provided above a precast concrete member according to the present invention.

【図10】本発明でプレキャスト・コンクリート部材の
上部にスパイラル筋,地上建物締結用アンカーボルト及
びフラットデッキプレートを設けた状態の一例を示す垂
直断面図である。
FIG. 10 is a vertical sectional view showing an example of a state in which a spiral streak, an anchor bolt for fastening a building above the ground, and a flat deck plate are provided above a precast concrete member according to the present invention.

【図11】本発明でフラットデッキプレート上にスラブ
筋を配筋した状態の一例を示す斜視図である。
FIG. 11 is a perspective view showing an example of a state in which slab streaks are arranged on a flat deck plate in the present invention.

【図12】本発明で地下室の内部空間の天井に、スパイ
ラル筋の全体と各地上建物締結用アンカーボルトの下半
部を埋設するように現場打ち鉄筋コンクリート天井スラ
ブを設けた状態の一例を示す垂直断面図である。
FIG. 12 is a vertical view showing an example of a state in which a cast-in-place reinforced concrete ceiling slab is provided on the ceiling of the inner space of the basement according to the present invention so as to bury the entire spiral streak and the lower half of the anchor bolt for fastening each above-ground building. It is sectional drawing.

【符号の説明】 1 プレキャスト・コンクリート部材(PCa部材) 2 壁構成部 3 底盤構成部 4 連結金具 5 アンカー鉄筋 6 ボルトボックス 7 深溝 7i 注入口 7o 空気抜き口 8 浅溝 9 割栗地業 10 捨てコンクリート 11 内部空間 12 現場打ちコンクリート 13 底盤 14 ゴム状弾性材 15 ハイテンションボルト 16 孔 17 シール材 18 配筋 19 内壁 21 空間 22 排水溝 23 アンカーボルト 23a アンカー部 23b ネジ部 24 抜止め部材 25 スパイラル筋 26 地上建物締結用アンカーボルト 26a アンカー部 26b ネジ部 27 受け金物 28 フラットデッキ受け金物 29 フラットデッキプレート 30 鉄骨梁 31 スラブ筋 32 現場打ち鉄筋コンクリート天井スラブ[Description of Signs] 1 Precast concrete member (PCa member) 2 Wall constituent part 3 Bottom base constituent part 4 Connecting bracket 5 Anchor bar 6 Bolt box 7 Deep groove 7i Inlet 7o Air vent 8 Shallow groove 9 Split chestnut ground 10 Disposable concrete DESCRIPTION OF SYMBOLS 11 Internal space 12 Cast-in-place concrete 13 Bottom board 14 Rubber-like elastic material 15 High tension bolt 16 Hole 17 Sealing material 18 Reinforcement arrangement 19 Inner wall 21 Space 22 Drainage groove 23 Anchor bolt 23a Anchor part 23b Screw part 24 Retaining member 25 Spiral streak 26 Anchor bolts for fastening above-ground buildings 26a Anchors 26b Screws 27 Receiving hardware 28 Flat deck receiving hardware 29 Flat deck plate 30 Steel beam 31 Slab reinforcement 32 Cast-in-place reinforced concrete ceiling slab

【手続補正2】[Procedure amendment 2]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図12[Correction target item name] FIG.

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【図12】 FIG.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 松本 弘行 東京都新宿区西新宿二丁目1番1号 三井 ホーム株式会社内 (72)発明者 岩崎 喬夫 東京都港区新橋5丁目33番11号 日本ヒュ ーム管株式会社内 (72)発明者 南澤 聡 東京都港区新橋5丁目33番11号 日本ヒュ ーム管株式会社内 Fターム(参考) 2D047 AA06  ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Hiroyuki Matsumoto 2-1-1 Nishi Shinjuku, Shinjuku-ku, Tokyo Mitsui Home Co., Ltd. (72) Inventor Takao Iwasaki 5-33-11, Shimbashi, Minato-ku, Tokyo (72) Inventor Satoshi Minamizawa 5-33-11, Shimbashi, Minato-ku, Tokyo F-term (reference) in Japan Hume Pipe Co., Ltd. 2D047 AA06

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】掘削された地下空間に、縦向きの壁構成部
と水平向きの底盤構成部が一体化された縦断面形状がL
字形のプレキャスト・コンクリート部材が、隣接相互間
を互いに接合して設置されて地下室の側壁が構成され、
前記地下室の内部空間の底部に現場打ちコンクリートに
よる底盤が前記各プレキャスト・コンクリート部材の底
盤構成部に連続されて構築されてなる地下室において、 前記側壁の互いに対向するプレキャストコンクリート部
材の頂部間に、鉄骨梁を掛け渡し、該鉄骨粱及び前記各
プレキャストコンクリート部材の頂部と一体化させて、
鉄筋コンクリート天井スラブが設けられていることを特
徴としてなる地下室。
An excavated underground space has a vertical cross-sectional shape in which a vertical wall component and a horizontal bottom component are integrated.
The precast concrete members in the shape of a letter are installed by adjoining each other to form the side wall of the basement,
In the basement, a base made of cast-in-place concrete is continuously formed on the bottom part of each precast concrete member at the bottom of the inner space of the basement, and a steel frame is provided between the tops of the opposing precast concrete members on the side wall. Spanning the beam, integrating it with the top of the steel beam and each of the precast concrete members,
Basement featuring a reinforced concrete ceiling slab.
【請求項2】各プレキャストコンクリート部材の壁構成
部頂面上には、該壁構成部にアンカー部が埋設されたア
ンカーボルトのネジ部が突設され、該アンカーボルトの
ネジ部には抜止め部材がそれぞれ取り付けられ、前記各
プレキャスト・コンクリート部材の各壁構成部の上面に
はこれらに沿ってスパイラル筋がその環状空間内に前記
各アンカーボルトの前記抜止め部材がそれぞれ存在する
ようにして設置され、また前記スパイラル筋内からは該
スパイラル筋内にアンカー部を位置決めした地上建物締
結用アンカーボルトが所定間隔で立設され、前記地下室
の内部空間の天井には前記スパイラル筋の全体と前記各
地上建物締結用アンカーボルトの下半部を埋設するよう
にして現場打ち鉄筋コンクリート天井スラブが設けられ
ている請求項1に記載の地下室。
2. A threaded portion of an anchor bolt having an anchor buried in the wall constituting portion protrudes from a top surface of a wall constituting portion of each precast concrete member, and the threaded portion of the anchor bolt is prevented from coming off. Spiral streaks are installed along the upper surface of each wall component of each of the precast concrete members so that the retaining members of the anchor bolts are present in the annular space. An anchor bolt for fastening a building above the ground where an anchor portion is positioned within the spiral muscle is erected from the spiral muscle at a predetermined interval, and the entire spiral muscle and the various locations are located on the ceiling of the internal space of the basement. The cast-in-place reinforced concrete ceiling slab is provided so as to bury the lower half of the anchor bolt for fastening the upper building. Basement of the mounting.
JP10361122A 1998-12-18 1998-12-18 Basement Expired - Lifetime JP3114141B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10361122A JP3114141B2 (en) 1998-12-18 1998-12-18 Basement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10361122A JP3114141B2 (en) 1998-12-18 1998-12-18 Basement

Publications (2)

Publication Number Publication Date
JP2000178985A true JP2000178985A (en) 2000-06-27
JP3114141B2 JP3114141B2 (en) 2000-12-04

Family

ID=18472297

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10361122A Expired - Lifetime JP3114141B2 (en) 1998-12-18 1998-12-18 Basement

Country Status (1)

Country Link
JP (1) JP3114141B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015001133A (en) * 2013-06-18 2015-01-05 祐徳設備株式会社 Protection concrete body for digestion tank, and method for constructing protection concrete body for digestion tank
CN109184026A (en) * 2018-10-30 2019-01-11 江苏华实装配式建筑技术有限公司 A kind of prefabricated assembled concrete can breathe the big sleeve-board part of exterior wall
CN115288194A (en) * 2022-09-15 2022-11-04 中铁第四勘察设计院集团有限公司 Underground structure entrance and exit channel assembly type superimposed structure and process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015001133A (en) * 2013-06-18 2015-01-05 祐徳設備株式会社 Protection concrete body for digestion tank, and method for constructing protection concrete body for digestion tank
CN109184026A (en) * 2018-10-30 2019-01-11 江苏华实装配式建筑技术有限公司 A kind of prefabricated assembled concrete can breathe the big sleeve-board part of exterior wall
CN115288194A (en) * 2022-09-15 2022-11-04 中铁第四勘察设计院集团有限公司 Underground structure entrance and exit channel assembly type superimposed structure and process

Also Published As

Publication number Publication date
JP3114141B2 (en) 2000-12-04

Similar Documents

Publication Publication Date Title
KR101708760B1 (en) Construction method for precast concrete wall
JPS6114322A (en) Method for decorating and supporting natural or artificial inclined surface
KR20110132909A (en) Underpass using precast concrete pile and method for constructing the same
JP2000265458A (en) Floor slab connecting structure for underground structure with precast pile underground wall
JP3114141B2 (en) Basement
JPH1113072A (en) Basement structural body, and construction method thereof
JP2964127B2 (en) How to build a basement
KR20220001271A (en) Noise barrier construction system using block module
JP2985049B2 (en) How to build a basement
JP2506484B2 (en) Concrete assembled basement
JPH08302689A (en) Construction method for skeleton of underground exterior wall
JP3515744B2 (en) Repair method for wooden buildings
JPH1121916A (en) Basement made of steel and construction method thereof
JPH10252083A (en) Assembly type concrete structure and its execution method
JP2960479B2 (en) Building block for concrete underground unit
JPS61117321A (en) Method of building pc underground continuous wall
JPH0796845B2 (en) Concrete prefabricated house with basement
JPS6262206B2 (en)
KR20230096674A (en) Seismic resistant slurry wall with joint pilaster
JP2001020230A (en) Precast concrete sound insulation wall for use of special place and its execution method
JP2004162350A (en) Underground pit using soil-cement column-row wall, and core material for soil-cement column-row wall
JP2854168B2 (en) Structural structure of concrete basement
JPH0833015B2 (en) Concrete assembling basement skeleton structure
JP2012122190A (en) Underground structure and construction method for the same
JPS6046216B2 (en) Pile foundation with underground brace made of triangular members

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080929

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090929

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100929

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110929

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120929

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130929

Year of fee payment: 13

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term