JP2012122190A - Underground structure and construction method for the same - Google Patents

Underground structure and construction method for the same Download PDF

Info

Publication number
JP2012122190A
JP2012122190A JP2010270990A JP2010270990A JP2012122190A JP 2012122190 A JP2012122190 A JP 2012122190A JP 2010270990 A JP2010270990 A JP 2010270990A JP 2010270990 A JP2010270990 A JP 2010270990A JP 2012122190 A JP2012122190 A JP 2012122190A
Authority
JP
Japan
Prior art keywords
side flange
coupler
reinforcing bar
core material
housing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010270990A
Other languages
Japanese (ja)
Other versions
JP5779343B2 (en
Inventor
Yasuo Nishida
泰夫 西田
Yosiyuki Yatsunami
悌朗 八浪
Hiroshi Mashiba
浩 真柴
Takashi Kato
隆 加藤
Masamichi Ito
勝通 伊藤
Takuya Sekino
卓也 関野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Tokyo Tekko Co Ltd
Original Assignee
Taisei Corp
Tokyo Tekko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp, Tokyo Tekko Co Ltd filed Critical Taisei Corp
Priority to JP2010270990A priority Critical patent/JP5779343B2/en
Publication of JP2012122190A publication Critical patent/JP2012122190A/en
Application granted granted Critical
Publication of JP5779343B2 publication Critical patent/JP5779343B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an underground structure which is formed by connecting a core material in an earth retaining wall with a RC skeleton and which can perform exposure work of a core material simply and quickly.SOLUTION: An underground structure is formed by connecting a core material 1 in an earth retaining wall W with a RC skeleton S, and the core material 1 is provided with a skeleton side flange 11 having a reinforcement insertion hole, a natural ground side flange 12 facing the skeleton side flange 11, a reinforcement for core material 2 fixed to the natural ground side flange 12 and a coupler for mechanical joint 3 fitted to the reinforcement for core material 2. The coupler 3 is arranged between the skeleton side flange 11 and the natural ground side flange 12, and the RC skeleton S has an anchoring reinforcement 4 reaching the core material 1, and the anchoring reinforcement 4 is connected with the coupler 3 through the reinforcement insertion hole.

Description

本発明は、山留壁の芯材にRC躯体を接続してなる地中構造物に関し、さらには、この種の地中構造物を構築する方法に関する。   The present invention relates to an underground structure formed by connecting an RC frame to a core material of a mountain retaining wall, and further relates to a method for constructing this kind of underground structure.

特許文献1に開示されているように、山留壁の芯材にRC躯体(鉄筋コンクリート製の躯体)を接続し、RC躯体に作用する力の一部を山留壁に負担させる場合がある。   As disclosed in Patent Document 1, there is a case where an RC frame (a reinforced concrete frame) is connected to the core material of the mountain retaining wall and a part of the force acting on the RC frame is borne on the mountain retaining wall.

特許文献1に開示された技術は、芯材用鉄筋が組み込まれた芯材を地中に建て込んで山留壁を構築し、地盤を掘り下げて芯材を露出させた後、芯材用鉄筋に機械式継手用のカプラーを装着し、カプラーを介してRC躯体の鉄筋と芯材用鉄筋とを連結する、というものである。なお、芯材用鉄筋は、芯材の地山側フランジおよび躯体側フランジに貫設されており、芯材用鉄筋の一端は、地山側フランジに固定されている。また、芯材用鉄筋の他端は、躯体側フランジから突出していて、当該突出部分にカプラーが接続されている。   The technique disclosed in Patent Document 1 is to build a mountain retaining wall by building a core material in which a core reinforcing bar is incorporated into the ground, expose the core material by digging the ground, and then rebar the core material. A coupler for a mechanical joint is attached to the RC, and the reinforcing bar of the RC housing is connected to the reinforcing bar for the core material through the coupler. In addition, the reinforcing rod for core material is penetrated by the ground-side flange and the frame-side flange of the core material, and one end of the reinforcing rod for core material is fixed to the ground-side flange. The other end of the core reinforcing bar protrudes from the housing side flange, and a coupler is connected to the protruding portion.

特許第2673634号公報Japanese Patent No. 2673634

特許文献1の技術では、躯体側フランジを露出させる作業(芯材を取り巻く土砂やソイルセメント等を取り除く作業)を行う必要があるところ、躯体側フランジから突出した芯材用鉄筋が前記作業の妨げになる虞がある。   In the technique of Patent Document 1, it is necessary to perform an operation of exposing the frame side flange (an operation to remove earth and sand surrounding the core material, soil cement, etc.). There is a risk of becoming.

このような観点から、本発明は、山留壁の芯材にRC躯体を接続してなる地中構造物であって、芯材を露出させる作業を簡易迅速に実施することが可能な地中構造物を提供することを課題とし、さらには、このような地中構造物の構築方法を提供することを課題とする。   From such a viewpoint, the present invention is an underground structure in which an RC frame is connected to a core material of a mountain retaining wall, and the work for exposing the core material can be performed easily and quickly. It is an object to provide a structure, and further to provide a method for constructing such an underground structure.

本発明に係る地中構造物は、山留壁の芯材にRC躯体を接続してなる地中構造物であって、前記芯材は、鉄筋挿通孔を有する躯体側フランジと、当該躯体側フランジに対峙する地山側フランジと、当該地山側フランジに固定された芯材用鉄筋と、当該芯材用鉄筋に装着された機械式継手用のカプラーとを備えており、前記カプラーは、前記躯体側フランジと前記地山側フランジとの間に配置されており、前記RC躯体は、前記芯材に至る定着用鉄筋を備えており、前記定着用鉄筋は、前記鉄筋挿通孔を通って前記カプラーに接続されている、ことを特徴とする。   The underground structure according to the present invention is an underground structure formed by connecting an RC frame to a core material of a mountain retaining wall, and the core material includes a frame side flange having a reinforcing bar insertion hole, and the frame side. A natural ground flange facing the flange, a core rebar fixed to the natural flange, and a coupler for a mechanical joint attached to the core rebar, the coupler comprising the body It is arranged between a side flange and the natural ground side flange, and the RC housing is provided with a fixing reinforcing bar that reaches the core material, and the fixing reinforcing bar passes through the reinforcing bar insertion hole to the coupler. It is connected.

本発明に係る地中構造物を構築する際には、カプラー(スリーブと称される場合もある)と芯材用鉄筋とを組み込んだ芯材を地中に建て込み、当該芯材を利用して山留壁を構築した後、RC躯体の定着用鉄筋をカプラーに接続することになるが、芯材用鉄筋およびカプラーが躯体側フランジから突出していないので、躯体側フランジを露出させる作業(芯材を取り巻く土砂やソイルセメント等を取り除く作業)を行うにあたり、芯材用鉄筋およびカプラーが前記作業の妨げになることはない。   When constructing an underground structure according to the present invention, a core material incorporating a coupler (sometimes referred to as a sleeve) and a core reinforcing bar is built in the ground, and the core material is used. After constructing the mountain retaining wall, the RC reinforcing bar fixing rods will be connected to the coupler, but the core reinforcing bar and coupler do not protrude from the frame side flange, so the work to expose the frame side flange (core In the operation of removing earth and sand surrounding the material, soil cement, and the like, the core reinforcing bars and couplers do not hinder the operation.

本発明に係る地中構造物においては、前記カプラーと前記躯体側フランジとの間にシール材を介設してもよい。このようにすると、鉄筋挿通孔からの漏水を防ぐことが可能となる。   In the underground structure according to the present invention, a sealing material may be interposed between the coupler and the housing side flange. If it does in this way, it will become possible to prevent the water leak from a reinforcing-bar insertion hole.

前記カプラーに雌ネジが形成されており、前記定着用鉄筋に雄ネジが形成されている場合には、前記躯体側フランジよりも前記RC躯体側の前記雄ネジに止水用ナットを螺合し、前記止水用ナットと前記躯体側フランジとの間にシール材を介設するか、あるいは、前記止水用ナットおよび前記定着用鉄筋に対して吹付け防水処理を施すとよい。このようにすると、鉄筋挿通孔からの漏水を防ぐことが可能となる。なお、止水用ナットと躯体側フランジとの間に加えて、カプラーと躯体側フランジとの間にもシール材を介設すれば、どちらか一方のみにシール材を配置した場合に比べて、止水性能が向上するようになる。   When a female screw is formed on the coupler and a male screw is formed on the fixing reinforcing bar, a water stop nut is screwed onto the male screw on the RC housing side of the housing side flange. A sealing material may be interposed between the water-stop nut and the housing-side flange, or a waterproofing treatment may be performed on the water-stop nut and the fixing rebar. If it does in this way, it will become possible to prevent the water leak from a reinforcing-bar insertion hole. In addition, if a sealing material is interposed between the coupler and the housing side flange in addition to the water stop nut and the housing side flange, compared to the case where the sealing material is arranged only on either side, The water stop performance is improved.

本発明に係る地中構造物の構築方法は、山留壁の芯材にRC躯体を接続してなる地中構造物を構築する方法であって、前記芯材の躯体側フランジと地山側フランジとの間に機械式継手用のカプラーを配置するとともに、前記カプラーから前記地山側フランジに至る芯材用鉄筋を前記地山側フランジに固定しておき、前記躯体側フランジに形成した鉄筋挿通孔に仮ボルトの軸部を挿通するとともに、当該軸部を前記カプラーに螺入し、前記仮ボルトで前記カプラーを塞いだ状態で前記芯材を地中に建て込み、地盤を掘り下げて前記躯体側フランジを露出させた後、前記仮ボルトに換えて、前記RC躯体に至る定着用鉄筋を前記鉄筋挿通孔に挿通して前記カプラーに接続し、その後、前記RC躯体のコンクリートを打設する、ことを特徴とする。   An underground structure construction method according to the present invention is a method of constructing an underground structure in which an RC frame is connected to a core member of a mountain retaining wall, wherein the frame side flange and the ground mountain side flange of the core member are provided. A mechanical joint coupler between the coupler and the core-side flange from the coupler to the ground-side flange is fixed to the ground-side flange, and the reinforcing bar insertion hole formed in the housing-side flange The shaft portion of the temporary bolt is inserted, the shaft portion is screwed into the coupler, the core material is built in the ground with the coupler being closed by the temporary bolt, and the ground side flange is dug down to the ground side flange. Is exposed, and, instead of the temporary bolts, fixing reinforcing bars reaching the RC frame are inserted into the reinforcing bar insertion holes and connected to the coupler, and then the concrete of the RC frame is placed. Features.

本発明によれば、芯材用鉄筋および機械式継手用のカプラーが躯体側フランジから突出していないので、躯体側フランジを露出させる作業を行うにあたり、芯材用鉄筋およびカプラーが前記作業の妨げになることはない。なお、本発明においては、仮ボルトの頭部が躯体側フランジから突出するものの、その突出量は僅かであるため、前記作業に大きな影響を及ぼすことはない。   According to the present invention, since the core reinforcing bar and the coupler for the mechanical joint do not protrude from the casing side flange, the core reinforcing bar and the coupler obstruct the operation when the casing side flange is exposed. Never become. In the present invention, although the head of the temporary bolt protrudes from the housing side flange, the amount of protrusion is small, so that the work is not greatly affected.

本発明によれば、躯体側フランジを露出させる作業を簡易迅速に実施することが可能となる。   According to the present invention, it is possible to easily and quickly carry out the operation of exposing the housing side flange.

(a)は本発明の実施形態に係る地中構造物の横断面図、(b)は(a)のB−B線断面図である。(A) is a cross-sectional view of the underground structure which concerns on embodiment of this invention, (b) is the BB sectional drawing of (a). 芯材の構成を説明するための平面図である。It is a top view for demonstrating the structure of a core material. 本発明の実施形態に係る地中構造物の構築手順を説明するための図であって、(a)は山留壁を構築した状態を示す横断面図、(b)は芯材を露出させた状態を示す横断面図である。It is a figure for demonstrating the construction procedure of the underground structure which concerns on embodiment of this invention, Comprising: (a) is a cross-sectional view which shows the state which constructed | assembled the mountain wall, (b) has exposed the core material FIG. 同じく(a)はRC躯体である頂版を構築した状態を示す横断面図、(b)は頂版の下方を掘り下げた状態を示す横断面図である。Similarly, (a) is a cross-sectional view showing a state in which a top plate that is an RC frame is constructed, and (b) is a cross-sectional view showing a state in which the bottom of the top plate is dug down.

本発明の実施形態に係る地中構造物は、図1の(a)および(b)に示すように、山留壁Wの芯材1にRC躯体Sを接続してなるものである。なお、図1の(a)は、図1の(b)のA−A線断面図である。   The underground structure according to the embodiment of the present invention is formed by connecting an RC housing S to the core material 1 of the mountain wall W as shown in FIGS. FIG. 1A is a cross-sectional view taken along line AA in FIG.

山留壁Wは、一般的には仮設構造物であるが、本実施形態では、本設構造物として利用する。RC躯体Sを山留壁Wと一体化し、山留壁Wを本設構造物とみなしてRC躯体Sを設計すれば、RC躯体Sのスリム化を図ることができ、ひいては、工期や工費を削減することが可能となる。   The mountain wall W is generally a temporary structure, but is used as a permanent structure in this embodiment. If the RC frame S is designed by integrating the RC frame S with the mountain retaining wall W and considering the mountain retaining wall W as a permanent structure, the RC frame S can be slimmed down. It becomes possible to reduce.

本実施形態の山留壁Wは、図1の(b)に示すように、いわゆる柱列式連続地中壁であり、複数の芯材1,1,…とソイルセメントとにより構成されている。   As shown in FIG. 1 (b), the mountain retaining wall W of the present embodiment is a so-called columnar continuous underground wall, and is composed of a plurality of core members 1, 1,... And soil cement. .

芯材1は、H型鋼からなる芯材本体に、芯材用鉄筋2と機械式継手用のカプラー3とを組み込んで形成したものである。すなわち、芯材1は、芯材本体を構成する躯体側フランジ11、地山側フランジ12およびウェブ13のほか、地山側フランジ12に固定された芯材用鉄筋2と、芯材用鉄筋2に装着されたカプラー3とを備えている。本実施形態では、一の芯材本体につき四つの芯材用鉄筋2,2,…が配置されており、四つの芯材用鉄筋2,2,…のそれぞれにカプラー3が装着されている。なお、I型鋼、溝型鋼、角鋼管などを芯材本体としても勿論差し支えない。   The core material 1 is formed by incorporating a core material reinforcing bar 2 and a mechanical joint coupler 3 into a core material body made of H-shaped steel. That is, the core material 1 is mounted on the core material reinforcing bar 2 fixed to the natural ground side flange 12 and the core material reinforcing bar 2 in addition to the frame side flange 11, the natural ground side flange 12 and the web 13 constituting the core material main body. The coupler 3 is provided. In this embodiment, four core rebars 2, 2,... Are arranged per one core material body, and the coupler 3 is mounted on each of the four core rebars 2, 2,. Of course, I-shaped steel, groove-shaped steel, square steel pipe, etc. may be used as the core material body.

躯体側フランジ11は、掘削領域(RC躯体Sが構築される領域)に面するように配置されていて、躯体側フランジ11の表面は、RC躯体Sの側面に当接している。   The housing side flange 11 is disposed so as to face the excavation region (region where the RC housing S is constructed), and the surface of the housing side flange 11 is in contact with the side surface of the RC housing S.

地山側フランジ12は、掘削領域外の地山Gに面するように配置されている。すなわち、地山側フランジ12は、躯体側フランジ11よりも地山G側に位置していて、躯体側フランジ11と対峙している。   The natural mountain side flange 12 is arranged so as to face the natural mountain G outside the excavation area. That is, the natural ground side flange 12 is located on the natural ground G side with respect to the structural body side flange 11 and is opposed to the structural body side flange 11.

図2に示すように、躯体側フランジ11には、鉄筋挿通孔1aが形成されている。また、地山側フランジ12には、躯体側フランジ11の鉄筋挿通孔1aに対応して、鉄筋挿通孔1bが形成されている。鉄筋挿通孔1a,1bは、芯材用鉄筋2およびカプラー3の設置位置に合わせて形成されている。   As shown in FIG. 2, a reinforcing bar insertion hole 1 a is formed in the housing side flange 11. The natural mountain side flange 12 is formed with a reinforcing bar insertion hole 1 b corresponding to the reinforcing bar insertion hole 1 a of the frame side flange 11. The reinforcing bar insertion holes 1 a and 1 b are formed in accordance with the installation positions of the core reinforcing bar 2 and the coupler 3.

ウェブ13は、躯体側フランジ11と地山側フランジ12との間に介在していて、両フランジ11,12の幅方向中央部同士を繋いでいる。   The web 13 is interposed between the frame side flange 11 and the natural ground side flange 12 and connects the center portions in the width direction of both flanges 11 and 12.

芯材用鉄筋2は、地山側フランジ12と交差するように配置されている。本実施形態の芯材用鉄筋2は、ネジ節鉄筋からなり、地山側フランジ12と直角に交差し、かつ、ウェブ13と平行となるように配置されている。   The core rebar 2 is disposed so as to intersect the natural mountain side flange 12. The core reinforcing bar 2 according to the present embodiment is formed of a threaded reinforcing bar, and is disposed so as to intersect the natural mountain side flange 12 at a right angle and to be parallel to the web 13.

本実施形態の芯材用鉄筋2は、地山側フランジ12の鉄筋挿通孔1bに挿通されており、芯材用鉄筋2の地山G側の端部(以下「基端部」という。)は、地山側フランジ12の外側(地山G側)に突出している。芯材用鉄筋2の基端部は、地山側フランジ12を挟持する一対の固定用ナット21,22によって地山側フランジ12に固定されている。固定用ナット21,22と地山側フランジ12との間には、座金23,24が介設されている。なお、図示は省略するが、溶接等の手段により、芯材用鉄筋2を地山側フランジ12に固定してもよい。この場合、地山側フランジ12の鉄筋挿通孔1b、固定用ナット21,22および座金23,24は不要となる。   The core material reinforcing bar 2 of the present embodiment is inserted into the reinforcing bar insertion hole 1b of the ground mountain side flange 12, and the end (hereinafter referred to as "base end part") of the core material reinforcing bar 2 on the ground mountain G side. It protrudes to the outside of the natural ground side flange 12 (the natural ground G side). The proximal end portion of the core reinforcing bar 2 is fixed to the natural ground flange 12 by a pair of fixing nuts 21 and 22 that sandwich the natural ground flange 12. Washers 23 and 24 are interposed between the fixing nuts 21 and 22 and the natural mountain side flange 12. In addition, although illustration is abbreviate | omitted, you may fix the reinforcing bar 2 for core materials to the natural ground side flange 12 by means, such as welding. In this case, the reinforcing bar insertion hole 1b, the fixing nuts 21 and 22 and the washers 23 and 24 of the natural mountain side flange 12 are not necessary.

芯材用鉄筋2の長さは、躯体側フランジ11と地山側フランジ12との離隔距離よりも短く、芯材用鉄筋2のRC躯体S側の端部(以下「先端部」という。)は、躯体側フランジ11と地山側フランジ12との間に位置している。   The length of the core material reinforcing bar 2 is shorter than the separation distance between the frame side flange 11 and the natural mountain side flange 12, and the end of the core material reinforcing bar 2 on the RC frame S side (hereinafter referred to as "tip portion"). It is located between the frame side flange 11 and the natural ground side flange 12.

カプラー3は、芯材用鉄筋2の先端部に装着された状態で、躯体側フランジ11と地山側フランジ12との間に配置されている。   The coupler 3 is disposed between the frame-side flange 11 and the natural ground-side flange 12 in a state where the coupler 3 is attached to the tip of the core reinforcing bar 2.

カプラー3は、両端が開口した筒状を呈している。カプラー3の内部には、その全長に亘って雌ネジが形成されている。カプラー3の雌ネジには、地山G側から芯材用鉄筋2の雄ネジが螺入される。芯材用鉄筋2の先端部は、カプラー3の内部に留まっており、カプラー3のうち、芯材用鉄筋2の先端面よりも躯体RCS側には、仮ボルト33または定着用鉄筋4を挿入するための空間が確保されている。なお、図示は省略するが、溶接等の手段により、芯材用鉄筋2の先端部をカプラー3の内部に固定してもよい。   The coupler 3 has a cylindrical shape with both ends opened. Inside the coupler 3, a female thread is formed over its entire length. The male screw of the core rebar 2 is screwed into the female screw of the coupler 3 from the natural ground G side. The tip of the core material reinforcing bar 2 remains inside the coupler 3, and the temporary bolt 33 or the fixing reinforcing bar 4 is inserted into the coupler 3 on the side of the housing RCS from the tip surface of the core material reinforcing bar 2. Space to do this is secured. In addition, although illustration is abbreviate | omitted, you may fix the front-end | tip part of the reinforcing bar 2 for cores inside the coupler 3 by means, such as welding.

カプラー3は、躯体側フランジ11に隣接するように配置されていて、カプラー3のRC躯体S側の端面(以下「先端面」という。)は、躯体側フランジ11の裏面に突き合わされている。カプラー3を躯体側フランジ11に突き合わせると、カプラー3の雌ネジが鉄筋挿通孔1aと連通するようになる。   The coupler 3 is disposed so as to be adjacent to the housing-side flange 11, and the end surface (hereinafter referred to as “tip surface”) of the coupler 3 on the RC housing S side is abutted against the back surface of the housing-side flange 11. When the coupler 3 is abutted against the housing-side flange 11, the female screw of the coupler 3 communicates with the reinforcing bar insertion hole 1a.

カプラー3を挟んで躯体側フランジ11の反対側には、ロックナット31が配置されている。
ロックナット31は、カプラー3の緩み止めであり、芯材用鉄筋2に装着されている。ロックナット31は、カプラー3に近づく方向に締め付けられていて、カプラー3の地山G側の端面(以下「基端面」という。)に密着している。
A lock nut 31 is disposed on the opposite side of the housing side flange 11 with the coupler 3 interposed therebetween.
The lock nut 31 is used to prevent the coupler 3 from loosening, and is attached to the core rebar 2. The lock nut 31 is tightened in a direction approaching the coupler 3, and is in close contact with the end face (hereinafter referred to as “base end face”) of the coupler 3 on the ground mountain G side.

カプラー3と躯体側フランジ11との間には、シール材32が介設されている。
シール材32は、鉄筋挿通孔1aからの漏水を防ぐ目的で配置されるものであり、リング状を呈していて、鉄筋挿通孔1aを囲むように配置される。シール材32は、カプラー3の締結力によって押し潰され、カプラー3の先端面に密着するとともに、鉄筋挿通孔1aの開口縁部(躯体側フランジ11の裏面)に密着する。
A seal material 32 is interposed between the coupler 3 and the housing side flange 11.
The sealing material 32 is disposed for the purpose of preventing water leakage from the reinforcing bar insertion hole 1a, has a ring shape, and is disposed so as to surround the reinforcing bar insertion hole 1a. The sealing material 32 is crushed by the fastening force of the coupler 3 and is in close contact with the front end surface of the coupler 3 and is in close contact with the opening edge of the reinforcing bar insertion hole 1a (the back surface of the housing side flange 11).

仮ボルト33は、カプラー3の雌ネジ内に土砂や固化材等が浸入することを防ぐ目的で配置されるものであり、最終的には取り外される。仮ボルト33の軸部は、RC躯体S側から鉄筋挿通孔1aに挿入され、カプラー3の雌ネジに螺入される。   The temporary bolt 33 is disposed for the purpose of preventing earth and sand, a solidified material, and the like from entering the female screw of the coupler 3, and is finally removed. The shaft portion of the temporary bolt 33 is inserted into the reinforcing bar insertion hole 1 a from the RC housing S side and is screwed into the female screw of the coupler 3.

仮ボルト33の軸部には、リング状のシール材34が嵌められる。
シール材34は、鉄筋挿通孔1aからの漏水を防ぐ目的で配置されるものであり、リング状を呈していて、鉄筋挿通孔1aを囲むように配置される。シール材34は、仮ボルト33の締結力によって押し潰され、仮ボルト33の頭部の座面に密着するとともに、鉄筋挿通孔1aの開口縁部(躯体側フランジ11の表面)に密着する。
A ring-shaped sealing material 34 is fitted to the shaft portion of the temporary bolt 33.
The sealing material 34 is arranged for the purpose of preventing water leakage from the reinforcing bar insertion hole 1a, has a ring shape, and is arranged so as to surround the reinforcing bar insertion hole 1a. The sealing material 34 is crushed by the fastening force of the temporary bolt 33, and is in close contact with the seating surface of the head of the temporary bolt 33, and is in close contact with the opening edge of the reinforcing bar insertion hole 1a (the surface of the housing side flange 11).

RC躯体Sは、図1の(a)に示すように、鉄筋コンクリート製のボックスカルバートであり、頂版S1や側壁S2のほか、図示は省略するが、底版などを備えている。頂版S1には、図示せぬ主筋や配力筋のほか、芯材1に至る定着用鉄筋4が配筋されている。   As shown in FIG. 1A, the RC housing S is a box culvert made of reinforced concrete, and includes a top plate S1 and a side wall S2, but a bottom plate, etc., although not shown. The top plate S1 is provided with a reinforcing bar 4 for fixing to the core material 1 in addition to a main reinforcing bar and a reinforcing bar (not shown).

定着用鉄筋4は、大きな曲げモーメントが発生するRC躯体Sの隅角部に配筋されていて、鉄筋挿通孔1a(図2参照)を通ってカプラー3に接続されている。なお、定着用鉄筋4は、仮ボルト33(図2参照)を取り外した後に配筋される。定着用鉄筋4は、ネジ節鉄筋であり、その全長に亘って雄ネジが形成されている。定着用鉄筋4の雄ネジは、カプラー3の雌ネジに螺入されている。ここで、折れ曲がりの無い直線状の定着用鉄筋4を使用すると、定着用鉄筋4の位置が芯材1の施工精度に制約されることとなり、施工精度が悪い場合には、RC躯体Sの配筋に影響を及ぼす虞がある。このような場合には、屈曲部を有する定着用鉄筋4’(図1の(b)参照)を使用するとよい。なお、屈曲部は、鉄筋加工の際に予め形成しておくとよい。定着用鉄筋4’を使用すれば、カプラー3に回転挿入する際に、正規の位置に調整することができる。   The fixing reinforcing bars 4 are arranged at the corners of the RC housing S where a large bending moment is generated, and are connected to the coupler 3 through the reinforcing bar insertion holes 1a (see FIG. 2). The fixing reinforcing bars 4 are arranged after the temporary bolts 33 (see FIG. 2) are removed. The fixing reinforcing bar 4 is a screw joint reinforcing bar, and a male screw is formed over the entire length thereof. The male screw of the fixing reinforcing bar 4 is screwed into the female screw of the coupler 3. Here, when the straight fixing reinforcing bar 4 without bending is used, the position of the fixing reinforcing bar 4 is restricted by the construction accuracy of the core material 1. May affect muscles. In such a case, a fixing reinforcing bar 4 ′ (see FIG. 1B) having a bent portion may be used. In addition, it is good to form a bending part previously in the case of a reinforcing bar process. If the fixing reinforcing bar 4 ′ is used, it can be adjusted to a normal position when it is rotationally inserted into the coupler 3.

図2に示すように、定着用鉄筋4には、止水用ナット41とシール材42とが装着される。   As shown in FIG. 2, a water stop nut 41 and a sealing material 42 are attached to the fixing reinforcing bar 4.

止水用ナット41は、躯体側フランジ11よりもRC躯体S側において、定着用鉄筋4の雄ネジに螺合していて、止水用ナット41の座面は、シール材42に密着する。   The water stop nut 41 is screwed into the male screw of the fixing reinforcing bar 4 on the RC housing S side of the housing side flange 11, and the seat surface of the water stop nut 41 is in close contact with the sealing material 42.

シール材42は、鉄筋挿通孔1aからの漏水を防ぐ目的で配置されるものであり、リング状を呈していて、鉄筋挿通孔1aを囲むように配置される。シール材42は、止水用ナット41の締結力によって押し潰され、止水用ナット41の座面に密着するとともに、鉄筋挿通孔1aの開口縁部(躯体側フランジ11の表面)に密着する。   The sealing material 42 is disposed for the purpose of preventing water leakage from the reinforcing bar insertion hole 1a, has a ring shape, and is disposed so as to surround the reinforcing bar insertion hole 1a. The sealing material 42 is crushed by the fastening force of the water stopping nut 41 and is in close contact with the seating surface of the water stopping nut 41, and is in close contact with the opening edge of the reinforcing bar insertion hole 1a (the surface of the housing side flange 11). .

定着用鉄筋4に作用する軸力は、躯体側フランジ11と地山側フランジ12に伝達される。すなわち、定着用鉄筋4に螺合させたカプラー3と止水用ナット41とで躯体側フランジ11を挟持しているので、定着用鉄筋4は、躯体側フランジ11に固定(定着)されることとなり、したがって、定着用鉄筋4に作用する軸力は、躯体側フランジ11に伝達されるようになる。また、定着用鉄筋4は、カプラー3を介して芯材用鉄筋2に接続されているところ、芯材用鉄筋2は、地山側フランジに固定(定着)されているので、定着用鉄筋4に作用する軸力は、地山側フランジ12にも伝達されるようになる。   The axial force acting on the fixing reinforcing bar 4 is transmitted to the frame side flange 11 and the natural ground side flange 12. That is, since the housing-side flange 11 is sandwiched between the coupler 3 screwed into the fixing rebar 4 and the water stop nut 41, the fixing rebar 4 is fixed (fixed) to the housing-side flange 11. Accordingly, the axial force acting on the fixing reinforcing bar 4 is transmitted to the housing-side flange 11. Further, the fixing reinforcing bar 4 is connected to the core reinforcing bar 2 via the coupler 3, and the core reinforcing bar 2 is fixed (fixed) to the ground-side flange. The acting axial force is also transmitted to the natural mountain side flange 12.

本実施形態に係る地中構造物の構築方法は、次のとおりである。なお、本実施形態においては、逆巻き工法によりRC躯体Sを構築する場合を例示するが、RC躯体Sの構築順序を限定する趣旨ではない。   The construction method of the underground structure according to the present embodiment is as follows. In addition, in this embodiment, although the case where the RC housing | casing S is constructed | assembled by a reverse winding method is illustrated, it is not the meaning which limits the construction order of RC housing S.

図3の(a)に示すように、まず、掘削領域Kの外縁に沿って山留壁Wを構築する。具体的には、掘削領域に隣接する位置をアースオーガで掘削しつつ、原位置にて掘削土とセメントスラリーを混合・攪拌してソイルセメントを形成し、掘削孔からアースオーガを引き上げた後、ソイルセメントが固まらないうちに、芯材1を地中(掘削孔)に建て込めばよい。   As shown in FIG. 3A, first, a mountain retaining wall W is constructed along the outer edge of the excavation region K. Specifically, while excavating the position adjacent to the excavation area with the earth auger, mixing and stirring the excavated soil and cement slurry at the original position to form a soil cement, after lifting the earth auger from the excavation hole, The core material 1 may be built in the ground (excavation hole) before the soil cement is hardened.

なお、芯材1を地中に建て込む前に、芯材本体であるH型鋼に芯材用鉄筋2およびカプラー3を組み込み、さらに、仮ボルト33の軸部を躯体側フランジ11の鉄筋挿通孔1a(図2参照)に挿通し、当該軸部をカプラー3に螺入することで、カプラー3の雌ネジを塞いでおき、芯材1を地中に建て込む際には、仮ボルト33でカプラー3を塞いだ状態で芯材1をソイルセメント内に沈設する。   Before building the core material 1 in the ground, the core material reinforcing bar 2 and the coupler 3 are incorporated into the H-shaped steel that is the core material body, and the shaft portion of the temporary bolt 33 is inserted into the reinforcing bar insertion hole of the housing side flange 11. 1a (see FIG. 2) is inserted and the shaft portion is screwed into the coupler 3, so that the female screw of the coupler 3 is closed, and when the core material 1 is built in the ground, a temporary bolt 33 is used. The core material 1 is set in the soil cement with the coupler 3 closed.

山留壁Wが構築されたならば、図3の(b)に示すように、床版S1を構築できる深さまで掘削領域Kを掘り下げるとともに、躯体側フランジ11の前側にあるソイルセメントを削り取り、躯体側フランジ11を露出させる。本実施形態では、仮ボルト33の頭部が僅かに躯体側フランジ11から突出しているものの、芯材用鉄筋2およびカプラー3が躯体側フランジ11よりも地山G側に位置し、躯体側フランジ11から突出していないので、躯体側フランジ11を露出させる作業を行うにあたり、芯材用鉄筋2およびカプラー3が前記作業の妨げになることはない。   When the mountain wall W is constructed, as shown in FIG. 3 (b), the excavation area K is dug down to a depth where the floor slab S1 can be constructed, and the soil cement on the front side of the frame-side flange 11 is scraped off, The housing side flange 11 is exposed. In this embodiment, although the head of the temporary bolt 33 slightly protrudes from the housing side flange 11, the core reinforcing bar 2 and the coupler 3 are located on the ground mountain G side of the housing side flange 11, and the housing side flange 11 does not protrude, the rebar for core material 2 and the coupler 3 do not hinder the work when the work for exposing the housing flange 11 is performed.

躯体側フランジ11が露出したならば、仮ボルト33をカプラー3から取り外し、仮ボルト33に換えて、RC躯体Sの隅角部に至る定着用鉄筋4をカプラー3に接続する。具体的には、止水用ナット41およびシール材42を定着用鉄筋4に装着した後、定着用鉄筋4の端部を鉄筋挿通孔1a(図2参照)に挿通し、カプラー3に螺入すればよい。なお、必要に応じて、カプラー3の内部にグラウト材等の充填材を注入してもよい。定着用鉄筋4をカプラー3に接続したならば、止水用ナット41を締め付け、止水用ナット41の座面と鉄筋挿通孔1aの開口縁部にシール材42を密着させる。   When the housing-side flange 11 is exposed, the temporary bolt 33 is removed from the coupler 3, and the fixing rebar 4 reaching the corner of the RC housing S is connected to the coupler 3 in place of the temporary bolt 33. Specifically, after attaching the water stop nut 41 and the sealing material 42 to the fixing reinforcing bar 4, the end of the fixing reinforcing bar 4 is inserted into the reinforcing bar insertion hole 1 a (see FIG. 2) and screwed into the coupler 3. do it. Note that a filler such as a grout material may be injected into the coupler 3 as necessary. When the fixing reinforcing bar 4 is connected to the coupler 3, the water stopping nut 41 is tightened, and the sealing material 42 is brought into close contact with the seating surface of the water stopping nut 41 and the opening edge of the reinforcing bar insertion hole 1a.

なお、鉄筋挿通孔1aの内部(鉄筋挿通孔1aの孔壁と定着用鉄筋4との隙間)および止水用ナット41の内部(定着用鉄筋4の雄ネジと止水用ナット41の雌ネジとの隙間)にエポキシ樹脂やグラウト材等の止水材を充填してもよい。このようにすると、鉄筋挿通孔1aや止水用ナット41の内部を水みちとする漏水を防ぐことができるので、止水性能をより一層高めることができる。   In addition, the inside of the reinforcing bar insertion hole 1a (the gap between the hole wall of the reinforcing bar insertion hole 1a and the fixing reinforcing bar 4) and the inside of the water stopping nut 41 (the male screw of the fixing reinforcing bar 4 and the female screw of the water stopping nut 41). A water-stopping material such as an epoxy resin or a grout material may be filled in the gap). If it does in this way, since the water leak which makes the inside of the reinforcing-bar insertion hole 1a and the nut 41 for water stop water will be prevented, water stop performance can be improved further.

また、止水用ナット41を締め付けた後、定着用鉄筋4の基端部および止水用ナット41に対して発泡ウレタン等の防水材を吹き付けてもよい。止水用ナット41を覆うように吹付け防水処理を施すことでも、鉄筋挿通孔1aや止水用ナット41の内部を水みちとする漏水を防ぐことができるので、止水性能を高めることができる。なお、吹付け防水処理を施した場合には、シール材42を省略してもよい。   In addition, after tightening the water stop nut 41, a waterproof material such as urethane foam may be sprayed on the proximal end portion of the fixing reinforcing bar 4 and the water stop nut 41. Even if the waterproofing treatment is performed so as to cover the water stop nut 41, water leakage can be prevented from leaking inside the reinforcing bar insertion hole 1a and the water stop nut 41, so that the water stop performance can be improved. it can. Note that the sealing material 42 may be omitted when the spray waterproofing process is performed.

図示は省略するが、定着用鉄筋4の接続作業と並行して、あるいは接続作業の前後に、頂版S1の主筋や配力筋を配筋するとともに、頂版S1の下面および妻面に型枠等を設置する。   Although illustration is omitted, the main bar and the distribution bar of the top plate S1 are arranged in parallel with or before and after the connection work of the fixing reinforcing bars 4, and the mold is formed on the lower surface and the wife surface of the top plate S1. Install a frame.

頂版S1の配筋工および型枠工が完了したならば、頂版S1のコンクリートを打設し、所定強度に達した後、型枠を脱型する(図4の(a)参照)。   When the arrangement of the top plate S1 and the formwork are completed, the concrete of the top plate S1 is placed, and after reaching a predetermined strength, the formwork is removed (see FIG. 4A).

頂版S1が構築されたならば、頂版S1の下方において掘削領域Kを掘り下げ、必要に応じて躯体側フランジ11にスタッドなどを溶接する(図4の(b)参照)。なお、頂版S1は、芯材1に支持されているので、頂版S1を支持する仮設の中間杭等を省略あるいは削減することができる。   When the top plate S1 is constructed, the excavation area K is dug down below the top plate S1, and a stud or the like is welded to the housing side flange 11 as required (see FIG. 4B). In addition, since the top plate S1 is supported by the core material 1, the temporary intermediate pile etc. which support the top plate S1 can be omitted or reduced.

その後、底版(図示略)を構築し、さらに、頂版S1と底版との間に側壁S2を構築すると、図1に示すように、山留壁Wの芯材1にRC躯体Sを接続してなる地中構造物が構築される。   After that, when a bottom plate (not shown) is constructed and a side wall S2 is constructed between the top plate S1 and the bottom plate, the RC frame S is connected to the core material 1 of the mountain wall W as shown in FIG. An underground structure is constructed.

本実施形態に係る地中構造物およびその構築方法によれば、芯材用鉄筋2とカプラー3とを事前に組み込んだ芯材1を使いながらも、芯材用鉄筋2およびカプラー3が躯体側フランジ11から突出していないので、躯体側フランジ11を露出させる作業を簡易迅速に実施することが可能となる。   According to the underground structure and the construction method thereof according to the present embodiment, the core rebar 2 and the coupler 3 are connected to the housing side while using the core 1 in which the core rebar 2 and the coupler 3 are preliminarily incorporated. Since it does not protrude from the flange 11, the operation of exposing the housing side flange 11 can be carried out simply and quickly.

また、定着用鉄筋4をカプラーに接続するとともに、カプラー3を躯体側フランジ11に固定し、カプラー3に接続された芯材用鉄筋2を地山側フランジ12に固定しているので、定着用鉄筋4に作用する軸力を躯体側フランジ11および地山側フランジ12に伝達することができ、ひいては、RC躯体Sの隅角部に作用する曲げモーメントを効率よく芯材1に伝達することが可能となる。つまり、本実施形態によれば、RC躯体Sの隅角部の曲げ剛性を効率よく向上させることが可能となる。   Further, since the fixing reinforcing bar 4 is connected to the coupler, the coupler 3 is fixed to the housing-side flange 11, and the core material reinforcing bar 2 connected to the coupler 3 is fixed to the ground mountain side flange 12. The axial force acting on 4 can be transmitted to the frame side flange 11 and the natural mountain side flange 12, and as a result, the bending moment acting on the corner of the RC frame S can be efficiently transmitted to the core material 1. Become. That is, according to the present embodiment, the bending rigidity of the corner portion of the RC housing S can be efficiently improved.

さらに、カプラー3と止水用ナット41とを利用して、定着用鉄筋4を躯体側フランジ11に固定しているので、定着用鉄筋4を躯体側フランジ11に固定するにあたり、溶接作業が不要になる。なお、定着用鉄筋4を溶接により躯体側フランジ11に固定する場合には、横向き溶接となるので、熟練工を配するとともに、高い品質管理が必要になるので、工期の長期化やコスト増を招く虞がある。   Further, since the fixing rebar 4 is fixed to the housing side flange 11 using the coupler 3 and the water stop nut 41, no welding work is required to fix the fixing rebar 4 to the housing side flange 11. become. In addition, when fixing the reinforcing bar 4 to the housing side flange 11 by welding, since it becomes sideways welding, a skilled worker is arranged and high quality control is required, leading to an increase in construction period and cost. There is a fear.

また、躯体側フランジ11とカプラー3との間にシール材32を介在させるとともに、躯体側フランジ11と仮ボルト33の座面との間にシール材34を介在させており、仮ボルト33に換えて定着用鉄筋4を装着した後においては、躯体側フランジ11と止水用ナット41との間にシール材42を介在させているので、鉄筋挿通孔1aからの漏水を防ぐことができる。   Further, a sealing material 32 is interposed between the housing side flange 11 and the coupler 3, and a sealing material 34 is interposed between the housing side flange 11 and the seating surface of the temporary bolt 33. After the fixing reinforcing bar 4 is mounted, the sealing material 42 is interposed between the housing-side flange 11 and the water stop nut 41, so that leakage from the reinforcing bar insertion hole 1a can be prevented.

なお、本実施形態では、柱列式連続地中壁を山留壁Wとし、柱列式連続地中壁の芯材1にRC躯体Sを接続する場合を例示したが、山留壁の種類や構造を限定する趣旨ではない。図示は省略するが、連続する掘削溝に複数の芯材を建て込んで形成する等厚式のソイルセメント連続地中壁を山留壁としても差し支えないし、複数の鋼製芯材を連接して形成する鋼製地中連続壁を山留壁とし、鋼製地中連続壁の鋼製芯材にRC躯体を接続してもよい。   In the present embodiment, the case where the columnar continuous underground wall is the mountain retaining wall W and the RC frame S is connected to the core material 1 of the columnar continuous underground wall is exemplified. It is not intended to limit the structure. Although not shown in the drawings, a constant thickness soil cement continuous underground wall formed by building a plurality of core materials in a continuous excavation groove may be used as a mountain retaining wall, or a plurality of steel core materials may be connected. The steel underground continuous wall to be formed may be a mountain retaining wall, and the RC housing may be connected to the steel core of the steel underground continuous wall.

本実施形態では、芯材用鉄筋2および定着用鉄筋4をネジ節鉄筋とした場合を例示したが、鉄筋の種類を限定する趣旨ではない。図示は省略するが、異形鉄筋や鋼棒の端部に雄ネジ加工を施したものや、異形鉄筋や鋼棒の端部に雄ネジ部品を圧接したものを芯材用鉄筋や定着用鉄筋としてもよい。   In this embodiment, the case where the core reinforcing bar 2 and the fixing reinforcing bar 4 are screw joint reinforcing bars is illustrated, but the type of reinforcing bars is not limited. Although not shown in the figure, the end of the deformed bar or steel bar is processed with a male thread, or the end of the deformed bar or the bar is pressed with a male screw part as the core rebar or anchoring bar. Also good.

本実施形態では、主筋とは別の鉄筋を定着用鉄筋4とした場合を例示したが、主筋自体を定着用鉄筋としてもよい。   In the present embodiment, the case where the reinforcing bar 4 is a reinforcing bar different from the main bar, but the main bar itself may be the fixing bar.

本実施形態では、機械式継手がネジ節鉄筋継手である場合を例示したが、機械式継手の形式を限定する趣旨ではない。例えば、芯材用鉄筋および定着用鉄筋を異形鉄筋とした場合には、図示は省略するが、カプラー(スリーブ)と鉄筋との間に無収縮モルタルを充填するモルタル充填式継手を採用してもよい。芯材用鉄筋側については、カプラーを芯材用鉄筋に圧着する鋼管圧着継手を採用することもできる。   In the present embodiment, the case where the mechanical joint is a threaded joint is illustrated, but the type of the mechanical joint is not limited. For example, when the reinforcing bar for core material and the reinforcing bar for fixing are deformed reinforcing bars, although not shown, a mortar-filled joint that fills non-shrink mortar between the coupler (sleeve) and the reinforcing bar may be adopted. Good. A steel pipe crimp joint that crimps the coupler to the core rebar can also be employed on the core rebar side.

W 山留壁
1 芯材
11 躯体側フランジ
1a 鉄筋挿通孔
12 地山側フランジ
2 芯材用鉄筋
3 カプラー
31 ロックナット
32 シール材
33 仮ボルト
S RC躯体
4 定着用鉄筋
41 止水用ナット
42 シール材
W Yamato wall 1 Core material 11 Frame side flange 1a Reinforcing bar insertion hole 12 Natural mountain side flange 2 Core material rebar 3 Coupler 31 Lock nut 32 Seal material 33 Temporary bolt S RC frame 4 Fixing rebar 41 Water stop nut 42 Seal material

Claims (4)

山留壁の芯材にRC躯体を接続してなる地中構造物であって、
前記芯材は、鉄筋挿通孔を有する躯体側フランジと、当該躯体側フランジに対峙する地山側フランジと、当該地山側フランジに固定された芯材用鉄筋と、当該芯材用鉄筋に装着された機械式継手用のカプラーとを備えており、
前記カプラーは、前記躯体側フランジと前記地山側フランジとの間に配置されており、
前記RC躯体は、前記芯材に至る定着用鉄筋を備えており、
前記定着用鉄筋は、前記鉄筋挿通孔を通って前記カプラーに接続されている、ことを特徴とする地中構造物。
An underground structure formed by connecting an RC frame to the core of the mountain wall,
The core material is attached to a frame side flange having a reinforcing bar insertion hole, a ground mountain side flange facing the frame side flange, a core material reinforcing bar fixed to the ground mountain side flange, and the core material reinforcing bar. With a coupler for mechanical joints,
The coupler is disposed between the housing side flange and the natural ground side flange,
The RC housing includes a reinforcing bar that reaches the core material,
The underground structure according to claim 1, wherein the fixing rebar is connected to the coupler through the rebar insertion hole.
前記カプラーと前記躯体側フランジとの間にシール材が介設されている、ことを特徴とする請求項1に記載の地中構造物。   The underground structure according to claim 1, wherein a sealing material is interposed between the coupler and the housing-side flange. 前記カプラーには、雌ネジが形成されており、
前記定着用鉄筋には、前記雌ネジに螺入される雄ネジが形成されており、
前記躯体側フランジよりも前記RC躯体側の前記雄ネジには、止水用ナットが螺合しており、
前記止水用ナットと前記躯体側フランジとの間にシール材が介設されているか、あるいは、前記止水用ナットおよび前記定着用鉄筋に対して吹付け防水処理が施されていることを特徴とする請求項1又は請求項2に記載の地中構造物。
The coupler is formed with a female thread,
The fixing rebar is formed with a male screw that is screwed into the female screw,
A water-stop nut is screwed onto the male screw on the RC housing side of the housing-side flange,
A sealing material is interposed between the water-stop nut and the housing-side flange, or spray water-proofing treatment is applied to the water-stop nut and the fixing reinforcing bar. The underground structure according to claim 1 or 2.
山留壁の芯材にRC躯体を接続してなる地中構造物を構築する方法であって、
前記芯材の躯体側フランジと地山側フランジとの間に機械式継手用のカプラーを配置するとともに、前記カプラーから前記地山側フランジに至る芯材用鉄筋を前記地山側フランジに固定しておき、
前記躯体側フランジに形成した鉄筋挿通孔に仮ボルトの軸部を挿通するとともに、当該軸部を前記カプラーに螺入し、前記仮ボルトで前記カプラーを塞いだ状態で前記芯材を地中に建て込み、
地盤を掘り下げて前記躯体側フランジを露出させた後、前記仮ボルトに換えて、前記RC躯体に至る定着用鉄筋を前記鉄筋挿通孔に挿通して前記カプラーに接続し、その後、前記RC躯体のコンクリートを打設する、ことを特徴とする地中構造物の構築方法。
A method for constructing an underground structure formed by connecting an RC frame to the core of a mountain wall,
A coupler for a mechanical joint is disposed between the frame-side flange and the ground-side flange of the core material, and a core-material reinforcing rod from the coupler to the ground-side flange is fixed to the ground-side flange,
The shaft portion of the temporary bolt is inserted into the reinforcing bar insertion hole formed in the housing side flange, the shaft portion is screwed into the coupler, and the core material is put into the ground in the state where the coupler is closed with the temporary bolt. Built,
After excavating the ground and exposing the frame side flange, instead of the temporary bolts, the fixing reinforcing bars reaching the RC frame are inserted into the reinforcing bar insertion holes and connected to the coupler, and then the RC frame A construction method of an underground structure characterized by placing concrete.
JP2010270990A 2010-12-06 2010-12-06 Underground structure and method for constructing underground structure Active JP5779343B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010270990A JP5779343B2 (en) 2010-12-06 2010-12-06 Underground structure and method for constructing underground structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010270990A JP5779343B2 (en) 2010-12-06 2010-12-06 Underground structure and method for constructing underground structure

Publications (2)

Publication Number Publication Date
JP2012122190A true JP2012122190A (en) 2012-06-28
JP5779343B2 JP5779343B2 (en) 2015-09-16

Family

ID=46503917

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010270990A Active JP5779343B2 (en) 2010-12-06 2010-12-06 Underground structure and method for constructing underground structure

Country Status (1)

Country Link
JP (1) JP5779343B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017206882A (en) * 2016-05-19 2017-11-24 鹿島建設株式会社 Method of constructing underground structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6310683Y2 (en) * 1979-07-26 1988-03-30
JP2673634B2 (en) * 1992-05-29 1997-11-05 新日本製鐵株式会社 How to connect the underground wall to the floor
JP2000073363A (en) * 1998-08-31 2000-03-07 Nippon Steel Corp Structure of joining part of steel underground continuous wall with main reinforcement of reinforced concrete slab
JP2001234913A (en) * 2000-02-23 2001-08-31 Teruaki Masuoka Bolt and nut with sealing mechanism
JP2001254353A (en) * 2000-03-08 2001-09-21 Hanshin Expressway Public Corp Earth retaining wall/rc composite structure and its construction method
JP2003113823A (en) * 2001-10-09 2003-04-18 Nippon Soda Co Ltd Fastening tool

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6310683Y2 (en) * 1979-07-26 1988-03-30
JP2673634B2 (en) * 1992-05-29 1997-11-05 新日本製鐵株式会社 How to connect the underground wall to the floor
JP2000073363A (en) * 1998-08-31 2000-03-07 Nippon Steel Corp Structure of joining part of steel underground continuous wall with main reinforcement of reinforced concrete slab
JP2001234913A (en) * 2000-02-23 2001-08-31 Teruaki Masuoka Bolt and nut with sealing mechanism
JP2001254353A (en) * 2000-03-08 2001-09-21 Hanshin Expressway Public Corp Earth retaining wall/rc composite structure and its construction method
JP2003113823A (en) * 2001-10-09 2003-04-18 Nippon Soda Co Ltd Fastening tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017206882A (en) * 2016-05-19 2017-11-24 鹿島建設株式会社 Method of constructing underground structure

Also Published As

Publication number Publication date
JP5779343B2 (en) 2015-09-16

Similar Documents

Publication Publication Date Title
JP5308116B2 (en) How to build a tunnel
JP2011122386A (en) Method of construction of underground structure, underground structure, and precast concrete side wall or intermediate wall/column for the same
US20100319280A1 (en) Precast Temporary Facility Structure and a Construction Method for the Same
KR100862977B1 (en) Precast concrete file and method for constructing thereof
KR20110132909A (en) Underpass using precast concrete pile and method for constructing the same
JP2018003270A (en) Construction method of underground structure, and underground structure
JP5779343B2 (en) Underground structure and method for constructing underground structure
JP2009185487A (en) Septic tank foundation structural body and its construction method
JP4440497B2 (en) Construction method of underground continuous wall and construction method of underground structure
JP2011032637A (en) Joint structure and joint method for steel pipe pole
JP2006057312A (en) Joint method of pile body and pre-cast slab
JP2004019100A (en) Construction method for underground structure, and underground structure
JP7079645B2 (en) How to remove piles and upper piles
JP2612522B2 (en) Tunnel lining method and tunnel lining structure
JP3114141B2 (en) Basement
JP5559075B2 (en) Underground structure
JP2579120B2 (en) garage
JP2964127B2 (en) How to build a basement
JP6019096B2 (en) Concrete structure, method for constructing concrete structure
JP2764252B2 (en) Underground concrete structure repair material and repair method
CN111501832B (en) Two-in-one underground pipe gallery construction method and two-in-one underground pipe gallery structure
KR20190081605A (en) Installation structure and method of precast concrete culvert
JP2001164559A (en) Construction method of continuous underground wall guide wall making use of l-type precast member
JP5548146B2 (en) Segmented joint structure and underground structure
JP6374736B2 (en) Underground structure and construction method of underground structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130814

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140320

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140401

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140602

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20141202

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150623

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150713

R150 Certificate of patent or registration of utility model

Ref document number: 5779343

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250