JPH10316366A - Luffing jib assembling method - Google Patents
Luffing jib assembling methodInfo
- Publication number
- JPH10316366A JPH10316366A JP13125297A JP13125297A JPH10316366A JP H10316366 A JPH10316366 A JP H10316366A JP 13125297 A JP13125297 A JP 13125297A JP 13125297 A JP13125297 A JP 13125297A JP H10316366 A JPH10316366 A JP H10316366A
- Authority
- JP
- Japan
- Prior art keywords
- jib
- divided
- section
- base
- jib section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Jib Cranes (AREA)
Abstract
Description
【0001】[0001]
【発明が属する技術分野】本発明は、ラフィングジブの
組み立て方法に関する。The present invention relates to a method for assembling a luffing jib.
【0002】[0002]
【従来の技術】周知のように、高揚程あるいは遠隔位置
での荷揚げあるいは荷下ろし作業に用いられる伸縮ブー
ム式のジブとしてラフィングジブがある。ラフィングジ
ブは、例えば、トラッククレーンに装備されているブー
ムの先端にベースジブを取り付け、そのベースジブに対
して作業条件に応じて複数の分割ジブおよびその分割ジ
ブの先端にフックブロックを懸垂させるためのシーブを
装着されたトップジブをそれぞれ連結して構成されてい
る。分割ジブは、複数連結されることでベースジブとト
ップジブとの間に中間ジブセクションを構成するように
なっており、このような中間ジブセクションでの連結段
数に比較して軽量化が図れるラチスジブが多用され、ラ
チスジブ同士の長手方向端部が連結されるようになって
いる。連結のための構成としては、ラチスジブの長手方
向端部の一方に互いに対向するラグ状部を形成し、この
ラグ状部に対し、長手方向の他方に形成されている片部
を挿入し、ラグ状部および片部にそれぞれ形成されてい
る挿通孔にピンを挿通するようにした構成がある(例え
ば、特開平7ー69585号公報)。2. Description of the Related Art As is well known, there is a luffing jib as a telescopic boom type jib used for unloading or unloading work at a high head or a remote position. The luffing jib is, for example, a base jib attached to the tip of a boom mounted on a truck crane, and a plurality of split jib and a sheave for suspending a hook block at the tip of the split jib according to working conditions with respect to the base jib. It is configured by connecting the mounted top jib. The split jib is configured such that an intermediate jib section is formed between the base jib and the top jib by being connected to a plurality of jib.Lattice jib which can achieve weight reduction compared to the number of connection stages in such an intermediate jib section is frequently used. The longitudinal ends of the lattice gibs are connected to each other. As a configuration for connection, a lug-shaped portion facing each other is formed on one of the longitudinal ends of the lattice jib, and a piece formed on the other side in the longitudinal direction is inserted into this lug-shaped portion, and the lug is inserted. There is a configuration in which a pin is inserted into an insertion hole formed in each of the shape portion and the piece portion (for example, JP-A-7-69585).
【0003】ところで、ラフィングジブを組み立てる場
合には、組み立てに要する地上スペースを少なくするこ
とが可能な立組方式と称される組み立て方式が本出願人
により提案されている(例えば、本出願の先願に係る特
許第2524141号)。この組み立て方式は、伸縮ブ
ームを伸長させながら分割ジブを順次ブーム先端から吊
り下げた状態で連結する方式である。図11は、上記の
立組方式を説明するための図であり、同図において、ト
ラッククレーン60に装備されている伸縮ブーム61の
先端部には、ラフィングジブを支持するためのジブサポ
ート62が取り付けられ、そのジブサポート62には、
ベースジブセクションをなすベース分割ジブ63の基端
がピン結合されている。ジブサポート62には、ラフィ
ングジブを任意角度で支持するための第1、第2マスト
64、65が所定角度を以て揺動可能に支持されてお
り、それら第1、第2マスト64、65同士は、その先
端間に連結されている屈曲可能なテンションロッド66
を介して連動可能にされている。トップジブセクション
をなすトップ分割ジブ70の先端と第1マスト64との
間には、ラフィングジブを起伏させるためのテンション
ロッドPの両端がそれぞれ取り付けられ、また第2マス
ト65の先端には、トラッククレーン60側のメインウ
ィンチから繰り出されたメインロープ等により構成され
る牽引手段をなすテンションロープ67の一端が連結さ
れている。ジブサポート62の上端には、第1、第2マ
スト64、65を立ち起こす際に用いられる第3マスト
68が取り付けられており、この第3マスト68の先端
には、テンションロープ67およびサブロープを掛け回
すためのローラが回転自在に支持されている。Incidentally, when assembling a luffing jib, the present applicant has proposed an assembling method called an upright assembly method which can reduce the ground space required for assembling (for example, the prior application of the present application). No. 2,524,141). This assembling method is a method in which the split jib is connected while being sequentially suspended from the end of the boom while extending the telescopic boom. FIG. 11 is a diagram for explaining the above-described vertical assembly method. In FIG. 11, a jib support 62 for supporting a luffing jib is attached to a tip end of a telescopic boom 61 mounted on a truck crane 60. The jib support 62 includes
The base end of the base divided jib 63 forming the base jib section is pin-connected. On the jib support 62, first and second masts 64, 65 for supporting the luffing jib at an arbitrary angle are swingably supported at a predetermined angle, and the first and second masts 64, 65 are mutually connected. Bendable tension rod 66 connected between its tips
Can be interlocked via. Both ends of a tension rod P for raising and lowering the luffing jib are attached between the tip of the top split jib 70 forming the top jib section and the first mast 64, and the truck crane is attached to the tip of the second mast 65. One end of a tension rope 67 which is a traction means constituted by a main rope or the like extended from a main winch on the 60 side is connected. A third mast 68 used to raise the first and second masts 64 and 65 is attached to the upper end of the jib support 62. A tension rope 67 and a sub-rope are attached to the tip of the third mast 68. A roller for hanging around is rotatably supported.
【0004】上記構成を主要部の一部として備えたラフ
ィングジブ付きクレーンは、以下の手順により組み立て
られる。まず、作業現場において伸縮ブーム61の先端
にジブサポート62およびベース分割ジブ63がそれぞ
れピン結合され、ベース分割ジブ63が伸縮ブーム61
の伸長および起仰操作によって吊り下げられる。図11
は、この状態を示しており、この状態において、ベース
分割ジブ63の先端に中間ジブセクションをなす中間分
割ジブ69の一端がその背面側をピン結合される。中間
分割ジブ69の背面およびベース分割ジブ63の背面が
ピン結合されると、伸縮ブーム61の伸長および起仰操
作により中間分割ジブ69が吊り下げられ、ベース分割
ジブ63の腹面に対して中間分割ジブ69の腹面がピン
結合される。中間分割ジブ69は、作業内容に応じた段
数を準備され、上述した吊り下げを繰り返すことにより
全ての中間分割ジブ69が連結されると、最先端の中間
分割ジブ69の先端に対してトップジブセクションをな
すトップ分割ジブ70が、図12に示すように、吊り下
げられている中間分割ジブ69の背面および腹面とピン
結合される。トップ分割ジブ70は、その先端に第1マ
スト64から延長されたテンションロッドPの一端が固
定され、また、サブロープを掛け回すためのシーブが支
持されている。図12は、ベース分割ジブ63、中間分
割ジブ69およびトップ分割ジブ70を順次連結してラ
フィングジブを立て起こす前の状態を示しており、この
状態において、第2マスト65に固定されているテンシ
ョンロープ67が牽引されることにより第2マスト65
およびテンションロッド66を介して第1マスト64が
引き起こされ、第1マスト64とトップ分割ジブ70の
先端に固定されているテンションロッドPが引かれるこ
とによりトップ分割ジブ70が、図中、二点鎖線で示す
ように、振り起こされてラフィングジブが立て起こされ
る。[0004] A crane with a roughing jib having the above configuration as a part of the main part is assembled by the following procedure. First, a jib support 62 and a base split jib 63 are respectively pin-connected to the tip of the telescopic boom 61 at the work site, and the base split jib 63 is connected to the telescopic boom 61.
Is suspended by extension and raising operations. FIG.
Shows this state. In this state, one end of the intermediate divided jib 69 forming the intermediate jib section is pin-connected to the front end of the base divided jib 63 on the back side. When the rear surface of the intermediate split jib 69 and the rear surface of the base split jib 63 are connected by pins, the intermediate split jib 69 is suspended by the extension and raising operations of the telescopic boom 61, and the intermediate split jib is divided into the abdominal surface of the base split jib 63. The abdominal surface of the jib 69 is pinned. The intermediate division jib 69 is prepared in the number of stages according to the work content, and when all the intermediate division jib 69 are connected by repeating the above-described suspension, the top jib is placed at the tip of the most advanced intermediate division jib 69. As shown in FIG. 12, the top divided jib 70 forming a section is pin-connected to the back and the abdominal surface of the suspended middle divided jib 69. One end of the tension rod P extended from the first mast 64 is fixed to the tip of the top split jib 70, and a sheave for hanging a sub-rope is supported. FIG. 12 shows a state before the base division jib 63, the intermediate division jib 69, and the top division jib 70 are sequentially connected to form a luffing jib. In this state, the tension rope fixed to the second mast 65 is shown. The second mast 65 is pulled by the tow 67.
Then, the first mast 64 is caused via the tension rod 66, and the tension rod P fixed to the tip of the first mast 64 and the top split jib 70 is pulled. As shown by the dashed line, it is shaken to raise the luffing jib.
【0005】[0005]
【発明が解決しようとする課題】ところで、上述した立
組方式によるラフィングジブの組み立てに際しては、吊
り下げた状態で連結される分割ジブの背面をピン結合し
た後、伸縮ブーム61の伸長および起仰操作を繰り返し
て分割ジブの腹面同士を連結する手順が必要となる。こ
のため、吊り下げられた分割ジブの背面および腹面同士
の連結位置の位置合わせを行うことになるが、吊り下げ
られた分割ジブは、図11に示すように、先に連結され
ている背面を支点として揺動することができるので、吊
り下げされた時点での重心位置の変化によって一直線状
にはならず、腹面の連結位置同士の位置合わせが困難に
なる。そこで、分割ジブの腹面同士の連結位置を位置合
わせするためには、作業者によって腹面の連結位置が一
致するように分割ジブを揺動させる操作が必要とされ
る。しかし、このような操作は伸縮ブーム61の下方に
入り込んでの作業であるので、万一、ジブサポート62
あるいは分割ジブ同士の連結が不備な場合には落下事故
が発生する危険がある。また、分割ジブの連結が繰り返
される毎にその作業が必要となることから、組み立て作
業性が悪くなる。By the way, when assembling the luffing jib by the above-described vertical assembly method, the back of the divided jib to be connected in a suspended state is pin-connected, and then the extension and retraction operation of the telescopic boom 61 is performed. Is required to connect the abdominal surfaces of the divided jib. For this reason, alignment of the connection position between the back surface and the abdominal surface of the suspended divided jib is performed. As illustrated in FIG. 11, the suspended divided jib has the rear surface connected earlier. Since it can swing as a fulcrum, it does not form a straight line due to a change in the position of the center of gravity at the time of suspension, making it difficult to align the connecting positions of the abdominal surfaces. Therefore, in order to align the connection positions of the abdominal surfaces of the divided jib, an operation is required by an operator to swing the divided jib so that the connected positions of the abdominal surfaces coincide. However, since such an operation is a work that enters under the telescopic boom 61, the jib support 62
Alternatively, if the connection between the divided jibs is insufficient, there is a risk that a fall accident may occur. Further, since the work is required every time the connection of the divided jib is repeated, the assembling workability is deteriorated.
【0006】特に、地上において複数段の中間分割ジブ
69に対してトップ分割ジブ70を連結した状態で吊り
下げる場合には、地上で組み立てられている分割ジブの
長さが長くなることからして、背面を支点とした揺動量
も大きくなる。このため、背面が連結されている分割ジ
ブの重量も大きくなることも原因して腹面の連結位置を
一致させるための操作力も多大となり、作業性はさらに
悪化する。Particularly, when the top divided jib 70 is hung on the ground with the middle divided jib 69 connected to the plurality of intermediate divided jib 69, the length of the divided jib assembled on the ground increases. In addition, the amount of swing with the back as a fulcrum also increases. For this reason, since the weight of the divided jib to which the back surface is connected also becomes large, the operation force for matching the connection position of the abdominal surface becomes large, and the workability is further deteriorated.
【0007】一方、トップジブセクションをなすトップ
分割ジブ70は、その先端に第1マスト64の先端から
延長されたテンションロッドPの一端がピン結合により
係脱可能に取り付けられており、テンションロッドPが
牽引されることでラフィングジブを任意の起伏角度に維
持することができるようになっている。しかし、テンシ
ョンロッドPは、第1マスト64からトップ分割ジブ7
0に至る長さが予め決められているので、伸縮ブームに
対するラフィングジブの長さによっては、立起こす際に
次のような問題があった。図13は、上記問題点を説明
するための図であり、同図において、トップ分割ジブ7
0に装備されているテンションロッド(以下、便宜上、
トップジブテンションロッドP1という)は、他の分割
ジブ(この場合は、中間分割ジブ69)に装備されてい
るテンションロッド(以下、便宜上、中間ジブテンショ
ンロッドP2という)と同様に、その長さが予め決めら
れている。このため、トップジブテンションロッドP1
と中間ジブテンションロッドP2とが連結されると、ト
ップ分割ジブ70が背面を支点として腹面同士を当接さ
せる方向に回転しようとしても、その回転が阻まれてし
まう。つまり、図13において、トップ分割ジブ70の
先端にピン結合されているトップジブテンションロッド
P1が一点鎖線で示すように自由端を持上げられて中間
ジブテンションロッドP2の先端に連結されると、トッ
プ分割ジブ70の背面が各テンションロッドP1、P2
によって動きを拘束されてしまう。このため、中間分割
ジブ69が吊り上げられた際、中間分割ジブ69と連結
されている背面を支点としてトップ分割ジブ70が下方
に回転しようとした場合、トップ分割ジブ70の先端が
トップジブテンションロッドP1によって引き上げられ
るのと同じ現象が生じる。これにより、トップ分割ジブ
70は下方への回転が阻まれてしまい、中間分割ジブ6
9の腹面に向け移動することができない。そこで、トッ
プ分割ジブ70を回転させる際には、トップ分割ジブ7
0とトップジブテンションロッドP1との連結を解除
し、トップ分割ジブ70の回転を許容し、その腹面が中
間分割ジブ69の腹面に当接した段階で再度トップジブ
テンションロッドP1とトップ分割ジブP1との連結を
やり直すことが実際の作業で行われている。On the other hand, the top split jib 70 forming the top jib section has one end of a tension rod P extended from the tip of the first mast 64 detachably attached to the tip thereof by a pin connection. By pulling, the luffing jib can be maintained at an arbitrary undulation angle. However, the tension rod P is moved from the first mast 64 to the top split jib 7.
Since the length to reach 0 is predetermined, there are the following problems when standing up depending on the length of the luffing jib with respect to the telescopic boom. FIG. 13 is a diagram for explaining the above problem. In FIG.
0 tension rod (hereinafter, for convenience,
The top jib tension rod P1) has a length similar to that of a tension rod (hereinafter, for convenience, referred to as an intermediate jib tension rod P2) mounted on another divided jib (in this case, the intermediate divided jib 69). It is predetermined. For this reason, the top jib tension rod P1
When the upper jib 70 is connected to the intermediate jib tension rod P2, even if the top split jib 70 tries to rotate in a direction in which the abdominal surfaces come into contact with the back surface as a fulcrum, the rotation is hindered. That is, in FIG. 13, when the top jib tension rod P1 pin-connected to the tip of the top split jib 70 is lifted at the free end as shown by the dashed line and connected to the tip of the intermediate jib tension rod P2, The back surface of the split jib 70 has the tension rods P1, P2.
The movement is restricted by the. For this reason, when the middle split jib 69 is lifted and the top split jib 70 tries to rotate downward with the back surface connected to the middle split jib 69 as a fulcrum, the top split jib 70 has a top jib tension rod. The same phenomenon occurs that is pulled up by P1. As a result, the top divided jib 70 is prevented from rotating downward, and the intermediate divided jib 6 is prevented from rotating.
9 cannot move toward the abdomen. Therefore, when rotating the top split jib 70, the top split jib 7
0, the connection between the top jib tension rod P1 and the top jib tension rod P1 is released, the rotation of the top division jib 70 is allowed, and the top jib tension rod P1 and the top division jib P1 are re-entered when the abdominal surface of the jib 70 contacts the abdominal surface of the intermediate division jib 69. Redoing the connection with is done in actual work.
【0008】トップ分割ジブ70とトップジブテンショ
ンロッドP1との連結解除および再連結作業は、例え
ば、図13および図14に示すように、トップ分割ジブ
70の長さ、換言すれば、吊り下げられている分割ジブ
に対して連結されようとする対象の分割ジブが短く、し
かも、ラフィングジブの長さが伸縮ブーム61よりも短
い場合には、第1マスト64から延長されるテンション
ロッドPが略垂直に垂れ下がり、さらにはテンションロ
ッドPの先端近傍にトップ分割ジブ70の先端が位置す
るので比較的容易に連結作業が行える。しかし、図15
に示すように、例えば、ラフィングジブが伸縮ブーム6
1よりも長く、地上で横臥された状態でラフィングジブ
の一部が組み立てられるような場合(本実施例の説明に
用いる図7に示されているような場合)には、一旦トッ
プ分割ジブ70とトップジブテンションロッドP1との
連結を解除してしまうと、テンションロッドP全体が垂
れ下がろうとするのでテンションロッドPの先端側に位
置するトップジブテンションロッドP1はトップ分割ジ
ブ70から遠ざかってしまう。このため、再度トップ分
割ジブ70に対してトップジブテンションロッドP1を
連結しようとした場合には、テンションロッドPを引っ
張りながらトップジブテンションロッドP1をトップ分
割ジブ70の連結位置に位置合わせすることになる。し
かし、このような作業はテンションロッドPの張力の影
響も受けやすくなるので、位置合わせに要する労力が多
大になりきわめて困難な作業を強いられることになる。As shown in FIGS. 13 and 14, for example, as shown in FIGS. 13 and 14, the work of disconnecting and reconnecting the top divided jib 70 and the top jib tension rod P1 is carried out by suspending the top divided jib 70 from the length. If the split jib to be connected to the split jib is short and the length of the luffing jib is shorter than the telescopic boom 61, the tension rod P extended from the first mast 64 is substantially vertical. Since the tip of the top split jib 70 is located near the tip of the tension rod P, the connecting operation can be performed relatively easily. However, FIG.
For example, as shown in FIG.
If the luffing jib is longer than 1 and a part of the luffing jib can be assembled while lying on the ground (as shown in FIG. 7 used in the description of this embodiment), the top split jib 70 is If the connection with the top jib tension rod P1 is released, the entirety of the tension rod P tends to hang down, so that the top jib tension rod P1 located at the tip end side of the tension rod P moves away from the top split jib 70. Therefore, when the top jib tension rod P1 is to be connected to the top split jib 70 again, the top jib tension rod P1 is aligned with the connection position of the top split jib 70 while pulling the tension rod P. Become. However, such an operation is easily affected by the tension of the tension rod P, so that the labor required for the positioning is increased and an extremely difficult operation is forced.
【0009】本発明の目的は、上記従来のラフィングジ
ブ付きクレーンの組み立てにおける問題に鑑み、分割ジ
ブの連結位置同士の位置合わせが容易に行えるラフィン
グジブの組み立て方法を提供することにある。SUMMARY OF THE INVENTION An object of the present invention is to provide a method of assembling a luffing jib in which the positions of the connecting positions of the divided jib can be easily adjusted in view of the above-described problems in assembling the conventional crane with a luffing jib.
【0010】本発明の別の目的は、伸縮ブームよりも長
いラフィングジブを組み立てる際に作業性を改善できる
組み立て方法を提供することにある。Another object of the present invention is to provide an assembling method capable of improving workability when assembling a luffing jib longer than a telescopic boom.
【0011】[0011]
【課題を解決するための手段】この目的を達成するた
め、請求項1記載の発明は、伸縮ブームを伸長および起
仰させながら分割されているジブを順次ブーム先端から
吊り下げた状態で連結してベースジブセクションと中間
ジブセクションあるいはトップジブセクションを順次連
結してなるラフィングジブを組み立てる方法であって、
伸縮ブームの先端に対して着脱可能に取り付けられるジ
ブベース部材と、このじジブベース部材に基端が支持さ
れて起伏可能なベースジブセクションと、基端が上記ベ
ースジブセクションの起伏支持位置近傍にて支持され、
揺動端に同一軸上で支持するローラを備えた第1および
第2マストと、これら第1、第2マストの各揺動端を連
結する連結部材とを備えた基部アッセンブリーと、上記
中間ジブセクションを構成する分割ジブの対向端部にお
いて、背面側に位置して上記分割ジブを鉛直面内で屈曲
可能に支持する背面側連結手段および背面側連結手段を
支点として揺動することで接合し、分割ジブ同士が一直
線状態となったときに腹面側を連結可能な腹面側連結手
段と、上記第1マストと上記トップジブセクションの先
端とに連結されるテンション手段と、上記第2マストの
先端に連結されてその先端部を上記伸縮ブーム側に向け
牽引する牽引手段とを備え、上記伸縮ブームの先端に対
し、上記ジブベースを介して上記基部アッセンブリーの
ベースジブセクションを取り付け、上記第2マストの先
端部に上記牽引手段を連結する第1の工程と、上記第1
マストの先端部と上記基部アッセンブリーのベースジブ
セクションの先端部寄りの位置とに所定長さのワイヤー
ロープを連結し、上記第1、第2マストの立て起こし動
作に連動して上記ベースジブセクションを構成する分割
ジブを吊り下げた状態から前方に振出す第2の工程と、
上記伸縮ブームの伸長および起仰操作により上記吊り下
げた状態のベースジブセクションの先端に対して上記背
面側連結手段を介して上記中間ジブセクションをなす分
割ジブの端部の背面を連結するとともに腹面連結手段を
介して分割ジブの腹面を連結し、吊り下げられた分割ジ
ブ群と地上に横臥されている残りの分割ジブ群との間で
上記吊り下げられている分割ジブの端部の背面と地上に
横臥されている分割ジブの端部の背面とを背面側連結手
段を介して連結する第3の工程と、上記背面側連結手段
を介して背面同士が互いに連結されている分割ジブを上
記伸縮ブームの伸長および起仰操作により吊り下げ、こ
の状態で上記牽引手段の作動による上記第1、第2マス
トの立て起こし動作に連動させて上記ベースジブセクシ
ョンを前方に振出して分割ジブ同士を一直線状にする第
4の工程と、上記第4の工程後、上記分割ジブの端部の
腹面同士を上記腹面側連結手段により連結する第5の工
程と備え、上記第1乃至第5の工程を繰り返して作業内
容に応じた段数の分割ジブを連結して上記中間ジブセク
ションを構成し、上記第1マストの先端と上記中間ジブ
セクションの先端に連結されるトップジブセクションを
なす分割ジブの先端との間に上記テンション部材を連結
してなることを特徴としている。In order to achieve this object, according to the first aspect of the present invention, the divided jib is connected while being suspended from the end of the boom while extending and raising the telescopic boom. A method of assembling a luffing jib by sequentially connecting a base jib section and an intermediate jib section or a top jib section,
A jib base member detachably attached to the distal end of the telescopic boom, a base jib section whose base end is supported by the jib base member and which can be raised and lowered, and a base end supported near the up and down support position of the base jib section And
A base assembly including first and second masts having rollers supported on the same axis at a swinging end, and a connecting member connecting the swinging ends of the first and second masts; At the opposing end of the divided jib constituting the section, the joint is formed by swinging with the back side connecting means and the back side connecting means, which are located on the back side and support the divided jib so that it can bend in the vertical plane, as a fulcrum. An abdominal surface connecting means capable of connecting the abdominal surface when the divided jibs are in a straight line; a tension means connected to the first mast and the tip of the top jib section; and a tip of the second mast And a pulling means for pulling a distal end of the retractable boom toward the telescopic boom side, and a base jib section of the base assembly with respect to a distal end of the telescopic boom via the jib base. The attachment down, a first step of connecting the traction means to the distal end of the second mast, said first
A wire rope of a predetermined length is connected to the tip of the mast and a position near the tip of the base jib section of the base assembly, and the base jib section is linked with the upright operation of the first and second masts. A second step of swinging the constituting jib forward from the suspended state,
The extension and extension operations of the telescopic boom connect the back of the end of the divided jib that forms the intermediate jib section to the tip of the suspended base jib section via the back side connection means, and By connecting the abdominal surface of the divided jib through the connecting means, the back of the end of the suspended divided jib between the suspended divided jib group and the remaining divided jib group lying on the ground and A third step of connecting the back side of the end of the divided jib lying on the ground via a back side connecting means, and the split jib whose back sides are connected to each other via the back side connecting means; The telescopic boom is suspended by extension and raising operations, and in this state, the base jib section is swung forward in conjunction with the raising and lowering operations of the first and second masts by the operation of the traction means. And a fifth step of connecting the abdominal surfaces of the ends of the divided jib with each other by the abdominal surface-side connecting means after the fourth step. By repeating the fifth to fifth steps, the intermediate jib section is formed by connecting the divided jib of the number of stages according to the work content, and the top jib section connected to the end of the first mast and the end of the intermediate jib section is formed. It is characterized in that the tension member is connected to the tip of the divided jib to be formed.
【0012】請求項2記載の発明は、請求項1記載のラ
フィングジブの組み立て方法において、上記第3の工程
では、地上に横臥されている分割ジブ群は、最先端に位
置する分割ジブに至るまで上記背面側連結手段および腹
面側連結手段により背面および腹面がそれぞれ連結され
ていることを特徴としている。According to a second aspect of the present invention, in the method of assembling the luffing jib according to the first aspect, in the third step, the divided jib group lying on the ground reaches the divided jib located at the forefront. The back surface and the abdomen are connected by the back side connection means and the abdomen side connection means, respectively.
【0013】請求項3記載の発明は、請求項1または2
記載のラフィングジブの組み立て方法において、上記第
1マストと上記トップジブセクションの先端とに連結さ
れるテンション手段は、トップジブセクション側に位置
する端部が枢支されるとともに上記中間ジブセクション
側から延長されたテンション部材と連結される部分が伸
縮可能とされていることを特徴としている。[0013] The invention according to claim 3 is the invention according to claim 1 or 2.
In the method for assembling a luffing jib as described above, the tension means connected to the first mast and the tip of the top jib section has an end located on the top jib section side and extends from the intermediate jib section side. It is characterized in that a portion connected to the tension member is made expandable and contractible.
【0014】[0014]
【作用】請求項1記載の発明では、第2の工程におい
て、第1マストの先端部と基部アッセンブリーのベース
ジブセクションの先端部寄りの位置とに所定長さのワイ
ヤーロープを連結し、ベースジブセクションを構成する
分割ジブを吊り下げた状態から第1、第2マストの立て
起こし動作に連動して前方に振出すようにしているの
で、背面側が支点となることで重心位置の変化により腹
面側が離れようとしても、強制的にワイヤーロープによ
り引動されることで一直線状にされて腹面同士の位置合
わせが行いやすくされる。According to the first aspect of the present invention, in the second step, a wire rope having a predetermined length is connected to the distal end of the first mast and a position near the distal end of the base jib section of the base assembly, and Since the divided jib that constitutes the section is swinging forward from the suspended state of the first and second masts from the suspended state, the rear side becomes the fulcrum. Even if the user tries to separate the abdominal surfaces, the abdominal surfaces are easily aligned by being forcibly pulled by the wire rope.
【0015】請求項2記載の発明では、地上に横臥され
ている分割ジブ群が背面および腹面同士を連結されてい
るので、伸縮ブームの伸長および起仰操作が少ない回数
で済む。しかも、この場合においても、吊り下げられた
分割ジブと地上に横臥されている分割ジブとが背面を連
結されて吊り上げられる時にはワイヤーロープの引動に
よって強制的に引き上げられて一直線状に姿勢が整えら
れる。According to the second aspect of the present invention, since the divided jib groups lying on the ground have their back and abdominal surfaces connected to each other, the number of extension and raising operations of the telescopic boom can be reduced. Moreover, even in this case, when the suspended divided jib and the divided jib lying on the ground are connected to each other on the back surface and lifted, the wire rope is forcibly pulled up and the posture is adjusted in a straight line. .
【0016】請求項3記載の発明では、吊り下げられて
いる分割ジブに対して背面が支点となって揺動する際
に、テンション手段が伸縮可能であるので、テンション
手段の長さに拘束されることなく揺動することができ
る。このため、トップジブセクションとテンション手段
との連結解除を要しないようにすることができる。According to the third aspect of the present invention, the tension means can be extended and contracted when swinging with the back surface as a fulcrum with respect to the suspended divided jib, so that the jib is restricted by the length of the tension means. It can swing without having to. Therefore, it is not necessary to release the connection between the top jib section and the tension means.
【0017】[0017]
【実施例】以下、図示実施例により本発明の詳細を説明
する。図1は、本発明による組み立て方法が適用される
ラフィングジブの全体構成の要部を、立組方式により組
み立てられて立て起こしされる前の状態で示す図であ
る。同図においてラフィングジブ1は、台車2と、台車
2上に水平旋回自在に搭載されている旋回台3と、旋回
台3上で鉛直面内で起伏可能に装備されている伸縮ブー
ム4と、ブーム先端に装備されてジブベースをなすラフ
ィングジブ取り付け基台9を基端として連続して先端に
向け連結されているベースジブセクション5、中間ジブ
セクション6およびトップジブセクション7と、これら
各ジブセクション5、6、7を任意の起伏角度で支持す
る支持装置8とを基本構成として備えている。上記した
各ジブセクションは、単位長さの分割ジブが用いられ、
そのうち、ベースジブセクション5をなす分割ジブは、
伸縮ブーム4の先端に装備されているラフィングジブ取
り付け基台9に対してピン結合されて揺動自在に支持さ
れており、中間ジブセクション6をなす分割ジブは、作
業内容に応じた段数が用意されてその端部同士がピン結
合され、さらにトップジブセクション7は、中間ジブセ
クション6の先端に位置する分割ジブに対してピン結合
されている。BRIEF DESCRIPTION OF THE DRAWINGS FIG. FIG. 1 is a diagram showing a main part of an entire configuration of a roughing jib to which an assembling method according to the present invention is applied, in a state before being assembled and raised by a vertical assembly method. In FIG. 1, a luffing jib 1 includes a bogie 2, a swivel 3 mounted on the bogie 2 so as to be horizontally rotatable, a telescopic boom 4 mounted on the swivel 3 so as to be able to undulate in a vertical plane, and a boom. A base jib section 5, an intermediate jib section 6, and a top jib section 7, which are continuously connected to the tip with a luffing jib mounting base 9 provided at the tip and forming a jib base, and these jib sections 5, 6 , 7 at an arbitrary undulation angle. For each of the above jib sections, a divided jib of unit length is used,
Among them, the divided jib that forms the base jib section 5
It is pin-coupled to a luffing jib mounting base 9 provided at the end of the telescopic boom 4 and is swingably supported. The divided jib forming the intermediate jib section 6 has a number of steps corresponding to the work content. The top jib section 7 is further pin-connected to a divided jib located at the tip of the intermediate jib section 6.
【0018】支持装置8は、ベースジブセクション5の
起伏支持位置近傍に揺動支点が設けられている第1、第
2マスト8a、8bを備えている。これら第1、第2マ
スト8a、8bは、その先端間に連結された連結部材で
ある屈曲可能なテンションロッド11によって連動可能
に設けられている。これらベースジブセクション5、ラ
フィングジブ取り付け基台9、支持装置8に有する第
1、第2マスト8a、8bおよび連結部材であるテンシ
ョンロッド11は、ラフィングジブ1における基部アッ
センブリーとして構成される。The support device 8 includes first and second masts 8a and 8b provided with swing fulcrums in the vicinity of the undulating support position of the base jib section 5. These first and second masts 8a and 8b are provided so as to be interlocked by a bendable tension rod 11 which is a connecting member connected between the distal ends thereof. The base jib section 5, the luffing jib mounting base 9, the first and second masts 8a and 8b of the support device 8, and the tension rod 11 as a connecting member are configured as a base assembly in the luffing jib 1.
【0019】第1マスト8aの先端とトップジブセクシ
ョン7の先端との間には、ワイヤとロッドとを組合わせ
たテンションロッド12が配置されて先端同士が連結さ
れ、また、第2マスト8bの先端には旋回台3に装備さ
れているウィンチから繰り出されたテンションロープ付
きのテンションロッド13が結合されている。さらに、
第1マスト8aの先端とベースジブセクション5の先端
寄りの位置との間には、所定長さのワイヤーロープから
なる控えロープ10が連結されている。Between the tip of the first mast 8a and the tip of the top jib section 7, a tension rod 12 in which a wire and a rod are combined is arranged so that the tips are connected to each other. A tension rod 13 with a tension rope that is extended from a winch mounted on the swivel 3 is connected to the tip. further,
Between the tip of the first mast 8a and a position near the tip of the base jib section 5, a stay rope 10 made of a wire rope of a predetermined length is connected.
【0020】ベースジブセクション5に連結される中間
ジブセクション6をなす分割ジブは、図2に示す構成を
備えている。図2において、分割ジブ(便宜上、符号5
0とする)は、4隅にてジブセクションの長手方向に沿
って延長された枠パイプ51と、枠パイプ51の延長方
向前後端部で各枠パイプ51を支持するように上下左右
に張り渡されている支持パイプ52と、各枠パイプ51
間にてラチス構造をなす補強パイプ53とで構成されて
いる。枠パイプ51の延長方向端部の一方には、各枠パ
イプ51に固定されている座板54を介して一対のラグ
片を備えたエンド部55が設けられ、また、枠パイプ5
1の延長方向端部の他方には、上記と同様な座板54を
介してエンド部55内に嵌合可能な片部からなる受け部
56が設けられている。エンド部55は、ラグ片を貫通
する挿通孔55Aが形成され、その挿通孔55Aには、
後述する連結手段の一例である係合手段9が係脱可能に
対向して設けられている。The divided jib forming the intermediate jib section 6 connected to the base jib section 5 has the structure shown in FIG. In FIG. 2, a divided jib (reference numeral 5 for convenience)
0) means that the frame pipes 51 extend along the longitudinal direction of the jib section at the four corners, and extend vertically and horizontally so as to support each frame pipe 51 at the front and rear ends of the frame pipe 51 in the extension direction. Support pipe 52 and each frame pipe 51
The reinforcing pipe 53 has a lattice structure in between. One end of the frame pipe 51 in the extending direction is provided with an end portion 55 having a pair of lug pieces via a seat plate 54 fixed to each frame pipe 51.
The other end of the extension direction 1 is provided with a receiving portion 56 formed of a piece that can be fitted into the end portion 55 via the same seat plate 54 as described above. The end portion 55 is formed with an insertion hole 55A penetrating the lug piece, and the insertion hole 55A has
An engaging means 9 which is an example of a connecting means described later is provided so as to be detachably opposed to each other.
【0021】連結手段の一例をなす係合手段9は、エン
ド部55の位置に合せて支持パイプ52に対し、図1に
おいて分割ジブ50の上面側に相当する背面側および分
割ジブ50の下面側に相当する腹面側にそれぞれ配置さ
れて支持され、背面側連結手段および腹面側連結手段を
構成している。係合手段9は、エンド部55に固定され
ている油圧シリンダ9Aの駆動制御によってエンド部5
5との係脱制御が行われるようになっており、そのため
の構成は図3に示されている。図3において、係合手段
9は、油圧シリンダ9A内で往復動可能なピストン9B
と、軸方向一端にピストン9Bが一体化されるとともに
エンド部55の挿通孔55Aに対して係脱可能な係合ピ
ン9Cを軸方向他端に備えたプランジャ9Dと、油圧シ
リンダ9Aと係合ピン9Cとの間に配置されて係合ピン
9Cを常に油圧シリンダ9Aから突出させる習性を付与
するコイルスプリング9Eとを備えている。本実施例で
は、プランジャ9Dの往動ストロークとして、係合ピン
9Cがエンド部55のラグ片間を貫通して挿通孔55A
から突出し、その外表面が外部に露呈するストロークと
されている。油圧シリンダ9Aには、ピストン9Bをは
さんでピストン9Bを往復動させるための油路9F、9
Gが連通させてあり、この油路9F、9Gのうち、油路
9Fはピストン9Bの往動油路とされ、油路9Gはピス
トン9Bの復動油路とされている。また、係合ピン9C
は容易に識別できる色の着色が施されている。The engaging means 9, which is an example of the connecting means, is provided on the support pipe 52 at the rear side corresponding to the upper surface side of the divided jib 50 and the lower surface side of the divided jib 50 in FIG. Are respectively arranged and supported on the abdominal surface side, and constitute the back side connecting means and the abdominal surface connecting means. The engagement means 9 is driven by the hydraulic cylinder 9 </ b> A fixed to the end 55 to control the end 5.
5 is controlled, and the configuration for that is shown in FIG. In FIG. 3, an engagement means 9 includes a piston 9B which can reciprocate in a hydraulic cylinder 9A.
A piston 9B is integrated with one end in the axial direction, and a plunger 9D having an engagement pin 9C at the other end in the axial direction, which is engageable with and disengageable from the insertion hole 55A of the end portion 55, is engaged with the hydraulic cylinder 9A. A coil spring 9E is provided between the pin 9C and the coil spring 9E to give a habit of always protruding the engagement pin 9C from the hydraulic cylinder 9A. In the present embodiment, as the forward stroke of the plunger 9D, the engaging pin 9C passes through the space between the lug pieces of the end portion 55 and the insertion hole 55A.
, And the outer surface thereof is a stroke exposed to the outside. Oil passages 9F, 9 for reciprocating the piston 9B with the piston 9B interposed therebetween are provided in the hydraulic cylinder 9A.
G is connected, and among these oil passages 9F and 9G, the oil passage 9F is a forward movement oil passage of the piston 9B, and the oil passage 9G is a backward movement oil passage of the piston 9B. Also, the engagement pin 9C
Are colored so that they can be easily identified.
【0022】上記油路9F、9Gに対しては、分割ジブ
50内に配置されている配管によってオイルの供給が行
われるようになっている。図2において、上記した配管
の構成を説明すると次の通りである。油圧シリンダ9A
に対する配管は、分割ジブ50の背面側と腹面側にそれ
ぞれ配置されている油圧シリンダ9Aを独立して作動さ
せるための送油経路が選択できるようになっているとと
もに、背面側および腹面側では、左右に配置されている
油圧シリンダ9Aにおいてピストン9Bの往動油路(油
路9Fに相当)同士、および復動油路(油路9Gに相
当)同士がそれぞれ並列されて左右の油圧シリンダ9A
内でピストン9Bが同じ向きの動作を行えるようにされ
ている。このため、分割ジブ50内には、油路9Fおよ
び油路9Gへの送油を行うための一対の基幹油路14、
15が枠パイプ51の一つに沿って延長されており、そ
の端部の一方、つまり、油圧シリンダ9A側に位置する
端部がジョイント部材16に接続可能とされ、端部の他
方には接続部材17が取り付けられている。なお、図2
においては、配管が分割ジブ50よりもはみ出して示さ
れているが、これは、配管経路を明確にするためであ
り、現実には、各配管は分割ジブ50内にて纏められて
いることはいうまでもない。The oil is supplied to the oil passages 9F and 9G by piping arranged in the divided jib 50. In FIG. 2, the configuration of the above-mentioned piping is described as follows. Hydraulic cylinder 9A
In addition to the piping for, the oil supply path for independently operating the hydraulic cylinders 9A disposed on the rear side and the ventral side of the divided jib 50 can be selected, and on the rear side and the ventral side, In the left and right hydraulic cylinders 9A, the forward oil passages (corresponding to the oil passages 9F) and the backward oil passages (corresponding to the oil passages 9G) of the piston 9B are arranged in parallel with each other, and the left and right hydraulic cylinders 9A are arranged.
Inside, the piston 9B can perform the operation in the same direction. For this reason, in the divided jib 50, a pair of main oil passages 14 for feeding oil to the oil passages 9F and 9G,
15 is extended along one of the frame pipes 51, and one of its ends, that is, the end located on the hydraulic cylinder 9A side is connectable to the joint member 16, and the other end is connected to the other end. A member 17 is attached. Note that FIG.
In, the pipes are shown to protrude from the divided jib 50, but this is for the purpose of clarifying the piping path, and in reality, it is not possible that the pipes are grouped in the divided jib 50. Needless to say.
【0023】ジョイント部材16は、分割ジブ50の背
面側および腹面側に位置する油圧シリンダ9Aへの送油
経路をそれぞれ備え、いずれかの送油経路が選択されて
基幹油路14、15と接続される接続部(図示されず)
が設けられている。ジョイント部材16に対する基幹油
路14、15の接続は、その詳細を示さないが、基幹油
路14、15の端部の一方およびジョイント部材16に
設けられているカップラ同士を係合させることで行わ
れ、カップラ同士は互いに係脱可能な構造を備え、離脱
した際には内部のシール構造によってオイルが漏れない
ようになっている。このような構造は、基幹油路14、
15の端部の他方に取り付けられている接続部材17に
も適用されており、その接続部材17がカップラの一方
を構成している。接続部材17は、ラフィングジブ1の
組み立て時に分割ジブ50同士の連結位置とは別に、地
上で準備される給油装置(図示されず)から延長される
送油パイプに連通できるようになっている。The joint member 16 has oil supply paths to the hydraulic cylinders 9A located on the back side and the abdominal side of the split jib 50, and one of the oil supply paths is selected and connected to the main oil paths 14 and 15. Connection (not shown)
Is provided. The connection of the main oil passages 14 and 15 to the joint member 16 is not shown in detail, but is performed by engaging one of the ends of the main oil passages 14 and 15 and the couplers provided on the joint member 16 with each other. The couplers have a structure capable of being disengaged from each other, and when the couplers are disengaged, oil does not leak due to an internal seal structure. Such a structure is used for the main oil passage 14,
The same applies to the connection member 17 attached to the other end of the end 15, and the connection member 17 forms one of the couplers. The connecting member 17 can communicate with an oil feed pipe extending from an oil supply device (not shown) prepared on the ground, separately from a connection position of the divided jib 50 when the luffing jib 1 is assembled.
【0024】なお、複数段の分割ジブ50を地上組み立
てした後、その分割ジブ群を纏めて吊り下げるような場
合には、必要に応じて基幹油路14、15をジョイント
部材16から外し、地上組み立てされる分割ジブ同士の
基幹油路14、15を接続部材17を介して繋ぐことで
連結作業の対象となる分割ジブ50の油圧シリンダ9A
への圧油の供給を行うようにすることも可能である。When a plurality of divided jib 50 are assembled on the ground and the divided jib groups are suspended together, the main oil passages 14 and 15 are removed from the joint member 16 as necessary, and The hydraulic cylinder 9A of the divided jib 50 to be connected by connecting the main oil passages 14, 15 of the divided jib to be assembled via the connecting member 17
It is also possible to supply pressure oil to the pump.
【0025】以上のような構成を備えたラフィングジブ
1は、次の手順により組み立てられる。 (1)第1の工程 この工程では、伸縮ブーム4の先端に対して基部アッセ
ンブリーのベースジブセクション5を連結する一方、基
部アッセンブリーの第2マスト8bの先端に対し、旋回
台3に装備されているウィンチから繰り出されたテンシ
ョンロープ付きのテンションロッド13を結合する。図
4は、第1の工程を説明するために伸縮ブーム4の先端
の状態を示す図であり、同図において、ベースジブセク
ション5の基端に伸縮ブーム4の先端が位置決めされ、
その先端に連結されているラフィングジブ取り付け基台
9を介してベースジブセクション5が連結される。第2
マスト8bの先端には、ウィンチから繰り出されたテン
ションロッド13の端部が結合される。The luffing jib 1 having the above configuration is assembled by the following procedure. (1) First Step In this step, while the base jib section 5 of the base assembly is connected to the tip of the telescopic boom 4, the turntable 3 is attached to the tip of the second mast 8 b of the base assembly. The tension rod 13 with the tension rope pulled out from the winch is connected. FIG. 4 is a view showing the state of the distal end of the telescopic boom 4 for explaining the first step. In FIG. 4, the distal end of the telescopic boom 4 is positioned at the base end of the base jib section 5,
The base jib section 5 is connected via a luffing jib mounting base 9 connected to its tip. Second
The end of the tension rod 13 extended from the winch is connected to the tip of the mast 8b.
【0026】(2)第2の工程 この工程では、第1マスト8aの先端と基部アッセンブ
リーのベースジブセクション5の先端寄りの位置との間
に控えロープ10を連結し、第1、第2マスト8a、8
bの立て起こし動作に連動して上記ベースジブセクショ
ン5を構成する分割ジブを吊り下げた状態から前方に振
出す。図5は、第2の工程を説明するための図であり、
同図において、ベースジブセクション5の先端寄りの位
置上部には、第1マスト8aの先端から延長された控え
ロープ10が連結される。この状態において、伸縮ブー
ム4の伸長および起仰操作を介して第1、第2マスト8
a、8bが立て起こされると、控えロープ10が展張す
ることによりベースジブセクション5が持上げられる。
このため、基端を支点として垂れ下がろうとするベース
ジブセクション5の先端部は、控えロープ10により持
上げられるので前方に振出される。なお、図5におい
て、符号Sは、吊荷用のサブロープを示している。(2) Second Step In this step, the stay rope 10 is connected between the front end of the first mast 8a and the position near the front end of the base jib section 5 of the base assembly, and the first and second masts are connected. 8a, 8
In conjunction with the raising operation of b, the divided jib constituting the base jib section 5 is swung forward from the suspended state. FIG. 5 is a diagram for explaining the second step.
In the figure, a stay rope 10 extending from the tip of the first mast 8a is connected to an upper position near the tip of the base jib section 5. In this state, the first and second masts 8 are extended through extension and raising operations of the telescopic boom 4.
When a and 8b are raised, the base jib section 5 is lifted by the extension of the stay rope 10.
For this reason, the distal end portion of the base jib section 5 that is about to hang down from the base end as a fulcrum is lifted up by the stay rope 10 and thus swayed forward. In addition, in FIG. 5, the code | symbol S has shown the sub rope for suspended loads.
【0027】(3)第3の工程 この工程では、伸縮ブーム4の伸長および起仰操作によ
り吊り下げられるベースジブセクション5の先端に対
し、背面側連結手段をなす係合手段9を介して中間ジブ
セクション6の分割ジブの背面を連結するとともに腹面
側連結手段をなす係合手段9によって中間ジブセクショ
ン6の分割ジブの腹面を連結する。この際、吊り下げら
れている分割ジブ群と地上に横臥されている残りの分割
ジブ群とは、吊り下げられている分割ジブの端部の背面
と地上に横臥されている分割ジブの端部の背面とが背面
側連結手段をなす係合手段9を介して連結される。図5
は、第2の工程から第3の工程に移行する状態を示して
おり、同図において、ベースジブセクション5の先端に
連結された中間ジブセクション6をなす分割ジブは、地
上に横臥されている残りの分割ジブ(便宜上、図5にお
いて符号50’で示すジブ)を連結されることにより作
業内容に応じた段数の分割ジブを備えた中間ジブセクシ
ョン6を構成する。このため、地上では、中間ジブセク
ション6を構成するための残りの分割ジブ50’が配置
されており、地上側の分割ジブ50’の基端に対し、吊
り下げられて中間ジブセクション6の一部をなす分割ジ
ブの先端が位置合わせされて分割ジブの背面同士が係合
手段9によって連結される。(3) Third Step In this step, the front end of the base jib section 5 suspended by the extension and extension operations of the telescopic boom 4 is interposed via the engaging means 9 serving as the back side connecting means. The rear surfaces of the divided jib of the jib section 6 are connected, and the abdominal surfaces of the divided jib of the intermediate jib section 6 are connected by engaging means 9 serving as abdominal surface connecting means. At this time, the suspended divided jib group and the remaining divided jib group lying on the ground are the back of the end of the suspended divided jib and the end of the divided jib lying on the ground. Are connected to each other via an engagement means 9 serving as a back side connection means. FIG.
Shows a state in which the process shifts from the second step to the third step. In the same figure, the divided jib forming the intermediate jib section 6 connected to the tip of the base jib section 5 is lying on the ground. By connecting the remaining divided jib (for convenience, a jib indicated by reference numeral 50 'in FIG. 5), an intermediate jib section 6 having a divided jib of the number of stages according to the work content is constituted. For this reason, on the ground, the remaining divided jib 50 'for constituting the intermediate jib section 6 is arranged, and is suspended from the base end of the divided jib 50' on the ground side so that one of the intermediate jib sections 6 is suspended. The front ends of the divided jib are aligned with each other, and the rear surfaces of the divided jib are connected by the engagement means 9.
【0028】(4)第4の工程 この工程では、背面側同士が連結された分割ジブを伸縮
ブーム4の伸長および起仰操作によって持上げることで
吊り下げ、この状態で第1、第2マスト8a、8bの立
て起こし動作に連動させてベースジブセクション5を前
方に振出し、ベースジブセクション5に連結されている
分割ジブ同士を一直線状にする。図6は、この工程を説
明するための図であり、同図(A)において、地上から
持上げられた分割ジブ(便宜上、符号50’で示す)
は、ベースジブセクション5の前方振り出しに連動して
垂下し吊り下げられる。この場合の第1、第2マスト8
a、8bの立て起こしは、第2マスト8bの先端に結合
されているテンションロープ13をウィンチにより巻上
げることで行われる。ベースジブセクション5は、伸縮
ブーム4の伸長および起仰操作そして第1、第2マスト
8a、8bの立て起こしに連動して前方に振出される
が、その際、控えロープ10によって、図中、時計方向
に向けて引き上げられるので、ベースジブセクション5
に連結されている中間ジブセクション6の一部をなす分
割ジブも同様な方向に移動する。このため、中間ジブセ
クション6の残りの部分である地上に横臥されている分
割ジブ50’は、背面側を支点とした場合に重心位置の
変化により傾いていても、その上位に位置する分割ジブ
が分割ジブ50’の傾きに整合する。その結果、図6
(B)に示すように、地上に横臥した状態から吊り上げ
られる分割ジブ50’がその上位に位置する分割ジブと
一直線状に並べられる。これにより、地上から持ち上げ
られた分割ジブ50’の腹面がその上位に位置する分割
ジブの腹面に対向し、腹面に有するエンド部55(図2
参照)と受け部56(図2参照)とが嵌合した状態が得
られる。(4) Fourth Step In this step, the divided jib whose back sides are connected to each other is suspended by lifting the telescopic boom 4 by extending and raising the telescopic boom 4, and in this state, the first and second masts are suspended. The base jib section 5 is swung forward in conjunction with the upright movements of 8a and 8b, and the divided jib connected to the base jib section 5 are made straight. FIG. 6 is a view for explaining this step. In FIG. 6A, a divided jib lifted from the ground (for convenience, indicated by reference numeral 50 ').
Is suspended in conjunction with the forward swing of the base jib section 5. First and second masts 8 in this case
The erecting of a and 8b is performed by winding up the tension rope 13 connected to the tip of the second mast 8b with a winch. The base jib section 5 is swung forward in conjunction with the extension and raising operations of the telescopic boom 4 and the erecting of the first and second masts 8a, 8b. As it is raised clockwise, the base jib section 5
The divided jib forming a part of the intermediate jib section 6 connected to the second jib moves in the same direction. For this reason, the divided jib 50 ′ lying on the ground, which is the remaining part of the intermediate jib section 6, is positioned higher than the divided jib even if the divided jib 50 ′ is inclined due to a change in the position of the center of gravity when the back side is the fulcrum. Match the inclination of the split jib 50 '. As a result, FIG.
As shown in (B), the divided jib 50 'that is lifted from a state of lying on the ground is aligned with the divided jib positioned above it. As a result, the abdominal surface of the divided jib 50 ′ lifted from the ground faces the abdominal surface of the upper divided jib, and the end portion 55 (FIG.
(See FIG. 2) and the receiving portion 56 (see FIG. 2).
【0029】(5)第5の工程 この工程では、第4の工程により腹面同士が当接した分
割ジブ同士が腹面側連結手段をなす係合手段9により連
結される。なお、このように背面側および腹面側での係
合手段9の動作は、前述した配管経路が選択されること
による油圧シリンダ9Aの動作制御によって得られる。(5) Fifth Step In this step, the divided jibs whose abdominal surfaces have come into contact with each other in the fourth step are connected to each other by the engaging means 9 serving as the abdominal surface connecting means. The operation of the engagement means 9 on the back side and the abdomen side is obtained by controlling the operation of the hydraulic cylinder 9A by selecting the above-described piping path.
【0030】以上の工程は、中間ジブセクション6に連
結される分割ジブの数に応じて繰り返され、中間ジブセ
クション6の先端には、トップジブセクション7をなす
分割ジブが連結され、さらにトップジブセクション7の
先端と第1マスト8aとの間にテンションロッド12が
連結される。なお、ベースジブセクション5、中間ジブ
セクション6およびトップジブセクション7の各分割ジ
ブの背面および腹面同士を連結する手段としては、上記
した係合手段に代えて、人手によるピン結合を用いるこ
とも可能である。The above steps are repeated according to the number of divided jib connected to the intermediate jib section 6. The divided jib forming the top jib section 7 is connected to the tip of the intermediate jib section 6, and the top jib is further connected. The tension rod 12 is connected between the tip of the section 7 and the first mast 8a. As means for connecting the rear and abdominal surfaces of the divided jib of the base jib section 5, the intermediate jib section 6, and the top jib section 7, a manual pin connection may be used instead of the above-described engagement means. It is.
【0031】トップジブセクション7の先端と第1マス
ト8aとの間で連結されるテンションロッド12は、ベ
ースジブセクション5を除く各ジブセクションをなす分
割ジブ毎に分割して装備されて連結できるようになって
おり、連結されて構成されたテンションロッド12は、
トップジブセクション7の先端に向け延長されている。The tension rod 12 connected between the top end of the top jib section 7 and the first mast 8a can be separately mounted for each divided jib that forms each jib section except the base jib section 5, and can be connected. , The tension rod 12 configured to be connected,
It is extended toward the tip of the top jib section 7.
【0032】一方、上記第2の工程において、地上に横
臥されている分割ジブ群としては、上記したような単一
の分割ジブだけでなく、地上で複数段の分割ジブ同士を
連結して中間ジブセクション6の一部とトップジブセク
ション7とを構成するものもある。図7は、このような
分割ジブ群の例を示しており、この例では、ラフィング
ジブ1の長さが伸縮ブーム4よりも長くなっている。こ
の場合には、地上にて横臥されている分割ジブ群は、背
面および腹面が各連結手段をなす係合手段9によって連
結を完了している。図7において、吊り下げられている
分割ジブ郡に対して地上の分割ジブ郡を連結する場合に
は、先に説明した場合と同様に、まず、地上に横臥され
ている分割ジブ群の基端の背面と吊り下げれている分割
ジブ群の先端の背面とが連結される。この後、伸縮ブー
ム4の伸長および起仰操作が行われることにより、地上
側の分割ジブ群が持上げられて一直線状とされ、腹面同
士が接合された時点で腹面側の連結手段をなす係合手段
9を介して腹面が連結される。On the other hand, in the second step, the divided jib group lying on the ground includes not only the single divided jib as described above but also a plurality of divided jib on the ground to connect the divided jib. Some may form part of the jib section 6 and the top jib section 7. FIG. 7 shows an example of such a divided jib group. In this example, the length of the luffing jib 1 is longer than that of the telescopic boom 4. In this case, the connection of the divided jib group lying on the ground has been completed by the engagement means 9 whose back and abdomen form respective connection means. In FIG. 7, when connecting the divided jib group on the ground to the suspended jib group suspended, first, as in the case described above, first, the base end of the divided jib group lying on the ground Is connected to the rear surface of the tip of the suspended divided jib group. Thereafter, the extension and raising operations of the telescopic boom 4 are performed, so that the divided jib group on the ground side is lifted to be straight, and when the abdominal surfaces are joined to each other, the engagement forming the connecting means on the abdominal surface is performed. The abdominal surface is connected via means 9.
【0033】図7に示した分割ジブ群同士を連結する場
合も、先に述べた例と同様に、ベースジブセクション5
に連結されて吊り下げられている中間ジブセクション6
の分割ジブ群が前方に振出される際には控えロープ10
によってベースジブセクション5が引き上げられる。こ
のため、地上に横蛾された分割ジブ群は、伸縮ブーム4
の伸長および起仰操作によりその基端側が持上げられる
と、既に吊り下げられている分割ジブ群が控えロープ1
0によって強制的に図中、時計方向に引き上げられるの
で、連結される端部同士の開き角度の差が急激に小さく
されて一直線状に姿勢を整えられ、腹面同士が対向しや
すくされる。When the divided jib groups shown in FIG. 7 are connected to each other, similarly to the above-described example, the base jib section 5 is connected.
Intermediate jib section 6 connected to and suspended from
When the divided jib group is swung forward,
The base jib section 5 is pulled up. For this reason, the divided jib group that is mothed on the ground is
When the base end side is lifted by the extension and raising operations of the rope, the divided jib group already suspended
Since 0 is forcibly raised in the clockwise direction in the figure, the difference in the opening angle between the connected ends is sharply reduced, the posture is adjusted in a straight line, and the abdominal surfaces are easily opposed to each other.
【0034】ところで、第1マスト8aから延長される
テンションロッド12は、中間ジブセクション6をなす
ベースジブセクションを除いたジブセクションの分割ジ
ブ毎に装備されているロッド部材を繋合わせてトップジ
ブセクション7に至り、その一端がトップジブセクショ
ン7にて連結されるようになっている。本実施例では、
トップジブセクション7に装備されているテンションロ
ッドが伸縮可能な構成とされている。図8および図9
は、上記テンションロッド(便宜上、符号12’で示
す)とトップジブセクション7をなす分割ジブ(便宜
上、符号50Aで示す)との関係を示す図であり、同図
において、テンションロッド12’は、分割ジブ50A
の背面において分割ジブ50Aの幅方向で一対に設けら
れている。なお、図8、図9において、図2および図3
に示した部材と同じ構成のものは同符号により示してあ
る。テンションロッド12’は、図10に示すように、
長手方向一端が分割ジブ50Aに枢支されるブラケット
12Bを備えたプレート部材12Aと、プレート部材1
2Aを内部に挿嵌可能であって、プレート部材12Aを
摺動可能に支持するホルダー部材12Cとを備えてい
る。The tension rod 12 extending from the first mast 8a is connected to a rod member provided for each divided jib of the jib section excluding the base jib section forming the intermediate jib section 6 by connecting the top jib section. 7, one end of which is connected by a top jib section 7. In this embodiment,
The tension rod provided in the top jib section 7 is configured to be extendable and retractable. 8 and 9
Is a diagram showing the relationship between the tension rod (shown by reference numeral 12 'for convenience) and the divided jib (shown by reference numeral 50A) forming the top jib section 7. In the drawing, the tension rod 12' Split jib 50A
Are provided in a pair in the width direction of the divided jib 50A. 8 and 9, FIGS. 2 and 3
The members having the same configuration as those shown in FIG. The tension rod 12 'is, as shown in FIG.
A plate member 12A having a bracket 12B pivotally supported at one longitudinal end by the split jib 50A;
2A, and a holder member 12C that slidably supports the plate member 12A.
【0035】図10においてプレート部材12Aは、長
手方向においてブラケット12Bの近傍にピン挿通孔1
2Dおよび長孔12Eが長手方向に沿って形成され、さ
らにブラケット12Bには、テンションロッド12’を
収縮させる際に収縮を補助する補助ロープを掛け回すた
めのシーブ12Kが回転自在に支持されている。ホルダ
ー部材12Cは、内部に挿嵌されたプレート部材12A
を摺動可能に支持するスライド部12C1を備え、その
スライド部12C1には、プレート部材12Aに形成さ
れているピン挿通孔12Dおよびこのピン挿通孔12D
から長孔12Eの長手方向一端までの間隔(L)を以て
開口されたピン挿通孔12Fおよび12Gが設けられて
いる。ホルダー部材12Cには、長手方向においてスラ
イド部12C1の設置位置と反対側の端部にロッド部材
12Hの一端が固定されており、そのロッド部材12H
の先端には、隣り合う分割ジブから延長されるテンショ
ンロッド12との連結用ブラケット12Jが設けられて
いる。In FIG. 10, the plate member 12A has a pin insertion hole 1 near the bracket 12B in the longitudinal direction.
2D and a long hole 12E are formed along the longitudinal direction, and a sheave 12K for hanging an auxiliary rope for assisting contraction when contracting the tension rod 12 ′ is rotatably supported on the bracket 12B. . The holder member 12C includes a plate member 12A inserted therein.
Is provided with a slide portion 12C1 slidably supporting the pin insertion hole 12D formed in the plate member 12A and the slide portion 12C1.
And pin insertion holes 12F and 12G that are open at an interval (L) from the first hole 12E to one end in the longitudinal direction of the long hole 12E. One end of a rod member 12H is fixed to the holder member 12C at an end opposite to the installation position of the slide portion 12C1 in the longitudinal direction.
Is provided with a connection bracket 12J for connecting to a tension rod 12 extending from an adjacent divided jib.
【0036】テンションロッド12’は、プレート部材
12Aのブラケット12Bを介して分割ジブ50Aに枢
支される。ホルダー部材12Cは、スライド部12C1
にプレート部材12Aが挿嵌され、プレート部材12A
側の長孔12Eに対向するピン挿通孔12Gにピンを挿
通されることでプレート部材12Aを抜け止めするよう
になっている。ホルダー部材12Cに有するピン挿通孔
のうち、上記したピン挿通孔12Gに対しては常時ピン
が挿通されているが、いま一つのピン挿通孔12Fに対
しては挿通状態が選択される。つまり、ピン挿通孔12
Fにピンを挿通しない場合には、プレート部材12Aが
長孔12Eおよびこれに嵌合しているピンをガイド部と
してホルダー部材12C内で、矢印Mで示すように、摺
動することができる。これに対してピン挿通孔12Fに
ピンを挿通すると、プレート部材12Aの摺動動作を行
えないようにすることができる。つまり、ピン挿通孔1
2Fにピンを挿通できるのは、ピン挿通孔12Fの位置
がプレート部材12A側のピン挿通孔12Dの位置と一
致したときであるので、この状態でピンが挿通される
と、プレート部材12Aの摺動が規制される。後者の場
合には、テンションロッド12’が収縮した状態に相当
し、全長が最も短くされてプレート部材12Aとホルダ
ー部材12Cとが一体化される。プレート部材12Aの
ピン挿通孔12Dとホルダー部材12C側のピン挿通孔
12Fとに挿通されているピンが抜かれると、プレート
部材12Aの摺動量に応じてテンションロッド12’の
長さが長くなる。The tension rod 12 'is pivotally supported on the split jib 50A via the bracket 12B of the plate member 12A. The holder member 12C includes a sliding portion 12C1.
The plate member 12A is inserted into the
By inserting a pin into the pin insertion hole 12G facing the long hole 12E on the side, the plate member 12A is prevented from coming off. Of the pin insertion holes of the holder member 12C, the pins are always inserted into the above-described pin insertion holes 12G, but the insertion state is selected for another pin insertion hole 12F. That is, the pin insertion hole 12
When the pin is not inserted through F, the plate member 12A can slide as shown by an arrow M in the holder member 12C using the elongated hole 12E and the pin fitted therein as a guide portion. On the other hand, when the pin is inserted into the pin insertion hole 12F, the sliding operation of the plate member 12A can be prevented. That is, the pin insertion hole 1
Since the pin can be inserted into the 2F when the position of the pin insertion hole 12F coincides with the position of the pin insertion hole 12D on the plate member 12A side, when the pin is inserted in this state, the sliding of the plate member 12A is performed. Movement is regulated. In the latter case, the tension rod 12 'is in a contracted state, the total length is minimized, and the plate member 12A and the holder member 12C are integrated. When a pin inserted in the pin insertion hole 12D of the plate member 12A and the pin insertion hole 12F of the holder member 12C is pulled out, the length of the tension rod 12 'increases in accordance with the sliding amount of the plate member 12A.
【0037】このような構成を備えたテンションロッド
12’は、分割ジブ50Aの背面側を連結されるまでの
間、収縮した状態に維持される。つまり、ホルダー部材
12Cのピン挿通孔12Fに対してピンが挿通されてプ
レート部材12Aの摺動が規制される。これにより、不
用意にプレート部材12Aが伸長しないようにして連結
される分割ジブとの干渉が防がれる。一方、背面が連結
された後に、トップジブセクション7の吊り下げにより
トップジブセクション7の腹面を連結する際には、その
連結作業の前に、プレート部材12Aのピン挿通孔12
Dに対向しているピン挿通孔12Fからピンが抜き取ら
れる。ピン挿通孔12Fからピンが抜き取られると、プ
レート部材12Aは、長孔12Eおよびこれに挿通され
ているピンによって案内される長さに応じた摺動量が得
られることになる。このため、トップジブセクション7
が背面を支点にして回転しようとする際には、背面にテ
ンションロッド12’が連結されたままであっても、ト
ップジブセクション7の先端の回転に応じてテンション
ロッド12’のプレート部材12Aがホルダー部材12
C内から引出される格好となり、トップジブセクション
7の回転は阻まれずに腹面がその上位に位置する分割ジ
ブに対向するまで回転することができる。このような構
成によれば、テンションロッド同士の連結位置からトッ
プジブセクション7の先端までのテンションロッドの長
さが規定されている場合と違って、トップジブセクショ
ン7に有するテンションロッド12’が伸長して長さが
変化するので、トップジブセクション7の回転が阻害さ
れない。これによって、トップジブセクション7を他の
ジブセクションに対して一直線状に姿勢を整え易くな
り、容易に腹面同士を対向せることができる。腹面同士
が当接した時点で腹面連結手段をなす係合手段9により
腹面同士の連結が終了すると、トップジブセクション7
のテンションロッド12は、ホルダー部材12Cを収縮
させてピン挿通孔12Fにピンを挿通することでプレー
ト部材12Aと一体化される。The tension rod 12 'having such a configuration is maintained in a contracted state until the rear side of the split jib 50A is connected. That is, the pins are inserted into the pin insertion holes 12F of the holder member 12C, and the sliding of the plate member 12A is regulated. This prevents interference with the divided jib that is connected so that the plate member 12A is not carelessly extended. On the other hand, when connecting the abdominal surface of the top jib section 7 by suspending the top jib section 7 after the rear surface is connected, the pin insertion holes 12 of the plate member 12A are required before the connection work.
The pin is pulled out from the pin insertion hole 12F facing D. When the pin is pulled out from the pin insertion hole 12F, the sliding amount of the plate member 12A according to the length guided by the long hole 12E and the pin inserted therein is obtained. Therefore, the top jib section 7
When trying to rotate around the back surface as a fulcrum, the plate member 12A of the tension rod 12 'is held by the holder in accordance with the rotation of the tip of the top jib section 7 even if the tension rod 12' is still connected to the back surface. Member 12
The top jib section 7 can be rotated without being hindered until the abdominal surface faces the upper divided jib without being hindered. According to such a configuration, unlike the case where the length of the tension rod from the connection position of the tension rods to the tip of the top jib section 7 is defined, the tension rod 12 ′ of the top jib section 7 extends. Therefore, the rotation of the top jib section 7 is not hindered. Thereby, it becomes easy to adjust the posture of the top jib section 7 in a straight line with respect to the other jib sections, and the abdominal surfaces can be easily opposed to each other. When the connecting of the abdominal surfaces is completed by the engaging means 9 constituting the abdominal surface connecting means when the abdominal surfaces contact each other, the top jib section 7
The tension rod 12 is integrated with the plate member 12A by contracting the holder member 12C and inserting a pin into the pin insertion hole 12F.
【0038】以上のようなテンションロッド12’の構
成によれば、トップジブセクション7に対してテンショ
ンロッド12’に有するプレート部材12’Aが常に連
結された状態にあるので、トップジブセクション7の腹
面を当接させる際に、一々、テンションロッドをトップ
ジブセクション7から外す必要がない。これにより、ラ
フィングジブの長さに関係なく、テンションロッドとト
ップジブセクションとの再連結作業が省けるので組み立
て時の作業性が改善できる。According to the structure of the tension rod 12 'as described above, the plate member 12'A of the tension rod 12' is always connected to the top jib section 7. It is not necessary to remove the tension rod from the top jib section 7 each time the abdominal surfaces are brought into contact. Thus, regardless of the length of the luffing jib, the work of reconnecting the tension rod and the top jib section can be omitted, so that the workability during assembly can be improved.
【0039】[0039]
【発明の効果】以上説明したように、請求項1記載の発
明によれば、第2の工程において、第1マストの先端部
と基部アッセンブリーのベースジブセクションの先端部
寄りの位置とに所定長さのワイヤーロープを連結し、ベ
ースジブセクションを構成する分割ジブを吊り下げた状
態から第1、第2マストの立て起こし動作に連動して前
方に振出すようにしているので、背面側が支点となるこ
とで重心位置の変化により腹面側が離れようとしても、
強制的にワイヤーロープにより引動されることで一直線
状にされて腹面同士の位置合わせが行いやすくされる。
これにより、従来行われていた作業員による位置合わせ
作業が不要となり、そのための労力の低減を含めて組み
立ての際の作業性を向上させることが可能になる。As described above, according to the first aspect of the present invention, in the second step, the predetermined length is set between the front end of the first mast and the position near the front end of the base jib section of the base assembly. The wire ropes are connected to each other, and the divided jib that constitutes the base jib section is swung forward in interlocking with the first and second masts in the suspended state, so that the back side is the fulcrum. By changing the position of the center of gravity,
By being forcibly pulled by the wire rope, the abdominal surfaces can be easily aligned so that the abdominal surfaces can be easily aligned.
This eliminates the need for the positioning work conventionally performed by the operator, and improves the workability during assembly, including the reduction of labor required for the work.
【0040】請求項2記載の発明によれば、地上に横臥
されている分割ジブ群が背面および腹面同士を連結され
ているので、伸縮ブームの伸長および起仰操作が少ない
回数で済む。しかも、この場合においても、吊り下げら
れた分割ジブと地上に横臥されている分割ジブとが背面
を連結されて吊り上げられる時にはワイヤーロープの引
動によって強制的に引き上げられて一直線状に姿勢が整
えられるので、連結対象となる分割ジブ群の規模にかか
わらず、腹面同士の連結の際の作業の手間を省いて作業
性を向上させることが可能になる。According to the second aspect of the present invention, since the divided jib groups lying on the ground have their back and abdominal surfaces connected to each other, the extension and extension operations of the telescopic boom can be performed in a small number of times. Moreover, even in this case, when the suspended divided jib and the divided jib lying on the ground are connected to each other on the back surface and lifted, the wire rope is forcibly pulled up and the posture is adjusted in a straight line. Therefore, irrespective of the size of the divided jib group to be connected, it is possible to improve the workability by saving the labor for connecting the abdominal surfaces.
【0041】請求項3記載の発明によれば、吊り下げら
れている分割ジブに対して背面が支点となって揺動する
際に、テンション手段が伸縮可能であるので、テンショ
ン手段の長さに拘束されることなく揺動することができ
る。このため、トップジブセクションとテンション手段
との連結解除を要しないようにすることができる。これ
により、テンション手段の連結解除および再連結の作業
が不要になるので、組み立ての際の作業性を改善するこ
とが可能になる。According to the third aspect of the present invention, the tension means can extend and contract when swinging with the back surface as a fulcrum with respect to the suspended divided jib. It can swing without being restrained. Therefore, it is not necessary to release the connection between the top jib section and the tension means. Thus, the work of disconnecting and reconnecting the tension means is not required, so that the workability at the time of assembly can be improved.
【図1】請求項1乃至3記載の発明による組み立て方法
が適用されるラフィングジブの要部構成を示す図であ
る。FIG. 1 is a diagram showing a main configuration of a luffing jib to which an assembling method according to the first to third aspects of the present invention is applied.
【図2】図1に示したラフィングジブに用いられる分割
ジブの構成を説明するための斜視図である。FIG. 2 is a perspective view for describing a configuration of a divided jib used for the roughing jib shown in FIG.
【図3】図2に示した分割ジブに用いられる係合手段の
構成を説明するための断面図である。FIG. 3 is a cross-sectional view for explaining a configuration of an engagement means used for the split jib shown in FIG.
【図4】図1に示したラフィングジブの組み立て方法に
おける第1の工程を説明するための図である。FIG. 4 is a view for explaining a first step in the method of assembling the luffing jib shown in FIG. 1;
【図5】図1に示したラフィングジブの組み立て方法に
おける第2、第3の工程を説明するための図である。FIG. 5 is a view for explaining second and third steps in the method of assembling the luffing jib shown in FIG. 1;
【図6】図1に示したラフィングジブの組み立て方法に
おける第4の工程を説明するための図であり、(A)は
伸縮ブームの伸長、起仰途中の状態、(B)は同ブーム
の伸長、起仰後の状態をそれぞれ示している。6A and 6B are views for explaining a fourth step in the method of assembling the luffing jib shown in FIG. 1, wherein FIG. 6A is a state where the telescopic boom is being extended and is being raised, and FIG. 6B is a state where the boom is being extended. , And the state after raising.
【図7】図1に示したラフィングジブの組み立て方法に
おいて、伸縮ブームよりもラフィングジブの長さが長い
場合を対象として第4の工程を説明するための図であ
る。FIG. 7 is a view for explaining a fourth step in a case where the length of the luffing jib is longer than the length of the telescopic boom in the method of assembling the luffing jib shown in FIG. 1;
【図8】トップジブセクションに用いられるテンション
ロッドの構成を説明するためのトップジブセクションの
平面図である。FIG. 8 is a plan view of the top jib section for explaining a configuration of a tension rod used for the top jib section.
【図9】図8に示したテンションロッドの構成を説明す
るためのトップジブセクションの側面図である。FIG. 9 is a side view of a top jib section for explaining a configuration of the tension rod shown in FIG. 8;
【図10】図8に示したテンションロッドの構成を示す
斜視図である。FIG. 10 is a perspective view showing a configuration of a tension rod shown in FIG. 8;
【図11】ラフィングジブの組み立て方法の一例を説明
するための図である。FIG. 11 is a diagram for explaining an example of a method of assembling a luffing jib.
【図12】図11に示した組み立て方法によるラフィン
グジブの立て起こし前の状態を示す図である。FIG. 12 is a diagram showing a state before raising the luffing jib by the assembling method shown in FIG. 11;
【図13】トップジブセクションに用いられるテンショ
ンロッドの牽引構造を説明するための図である。FIG. 13 is a diagram for explaining a tension rod pulling structure used for the top jib section.
【図14】図13に示したテンションロッドが組み付け
られているトップジブセクションを備えたラフィングジ
ブの立て起こし前の状態を示す図である。FIG. 14 is a view showing a state before a raising jib provided with a top jib section to which the tension rod shown in FIG. 13 is attached is raised.
【図15】伸縮ブームよりも長いラフィングジブの立て
起こし前の状態を示す図である。FIG. 15 is a diagram showing a state before raising the luffing jib longer than the telescopic boom.
1 ラフィングジブ 2 台車 3 旋回台 4 伸縮ブーム 5 ベースジブセクション 6 中間ジブセクション 7 トップジブセクション 8 支持装置 8a 支持装置の一構成部材である第1マスト 8b 支持装置の他の構成部材である第2マス
ト 9 背面、腹面に用いられる連結手段をなす
係合手段 10 第1マストとベースジブセクションとの
間に位置する控えロープ 11 第1、第2マストの連結部材であるテン
ションロッド 12 第1マストとトップジブセクションとの
間に位置するテンションロッド 12’ トップジブセクションに装備されている
テンションロッド 12’A プレート部材 12’C ホルダー部材 13 牽引手段をなすテンションロープDESCRIPTION OF REFERENCE NUMERALS 1 luffing jib 2 carriage 3 revolving base 4 telescopic boom 5 base jib section 6 intermediate jib section 7 top jib section 8 support device 8a first mast which is a component of support device 8b second mast which is another component of support device Reference Signs List 9 engaging means serving as connecting means used for the back and abdominal surfaces 10 staying rope located between first mast and base jib section 11 tension rod serving as connecting member for first and second masts 12 first mast and top Tension rod located between jib section 12 'Tension rod provided in top jib section 12'A Plate member 12'C Holder member 13 Tension rope serving as traction means
Claims (3)
分割されているジブを順次ブーム先端から吊り下げた状
態で連結してベースジブセクションと中間ジブセクショ
ンあるいはトップジブセクションを順次連結してなるラ
フィングジブを組み立てる方法であって、 伸縮ブームの先端に対して着脱可能に取り付けられるジ
ブベース部材と、このジブベース部材に基端が支持され
て起伏可能なベースジブセクションと、基端が上記ベー
スジブセクションの起伏支持位置近傍にて支持され、揺
動端に同一軸上で支持するローラを備えた第1および第
2マストと、これら第1、第2マストの各揺動端を連結
する連結部材とを備えた基部アッセンブリーと、 上記中間ジブセクションを構成する分割ジブの対向端部
において、背面側に位置して上記分割ジブを鉛直面内で
屈曲可能に支持する背面側連結手段および背面側連結手
段を支点として揺動することで接合し、分割ジブ同士が
一直線状態となったときに腹面側を連結可能な腹面側連
結手段と、 上記第1マストと上記トップジブセクションの先端とに
連結されるテンション手段と、 上記第2マストの先端に連結されてその先端部を上記伸
縮ブーム側に向け牽引する牽引手段とを備え、 上記伸縮ブームの先端に対し、上記ジブベースを介して
上記基部アッセンブリーのベースジブセクションを取り
付け、上記第2マストの先端部に上記牽引手段を連結す
る第1の工程と、 上記第1マストの先端部と上記基部アッセンブリーのベ
ースジブセクションの先端部寄りの位置とに所定長さの
ワイヤーロープを連結し、上記第1、第2マストの立て
起こし動作に連動して上記ベースジブセクションを構成
する分割ジブを吊り下げた状態から前方に振出す第2の
工程と、 上記伸縮ブームの伸長および起仰操作により上記吊り下
げた状態のベースジブセクションの先端に対して上記背
面側連結手段を介して上記中間ジブセクションをなす分
割ジブの端部の背面を連結するとともに腹面連結手段を
介して分割ジブの腹面を連結し、吊り下げられた分割ジ
ブ群と地上に横臥されている残りの分割ジブ群との間で
上記吊り下げられている分割ジブの端部の背面と地上に
横臥されている分割ジブの端部の背面とを背面側連結手
段を介して連結する第3の工程と、上記背面側連結手段
を介して背面同士が互いに連結されている分割ジブを上
記伸縮ブームの伸長および起仰操作により吊り下げ、こ
の状態で上記牽引手段の作動による上記第1、第2マス
トの立て起こし動作に連動させて上記ベースジブセクシ
ョンを前方に振出して分割ジブ同士を一直線状にする第
4の工程と、 上記第4の工程後、上記分割ジブの端部の腹面同士を上
記腹面側連結手段により連結する第5の工程と備え、 上記第1乃至第5の工程を繰り返して作業内容に応じた
段数の分割ジブを連結して上記中間ジブセクションを構
成し、上記第1マストの先端と上記中間ジブセクション
の先端に連結されるトップジブセクションをなす分割ジ
ブの先端との間に上記テンション部材を連結してなるラ
フィングジブの組み立て方法。1. A luffing jib in which a divided jib is connected while being suspended from the end of the boom while extending and raising the telescopic boom, and a base jib section and an intermediate jib section or a top jib section are connected in order. A jib base member removably attached to the distal end of the telescopic boom, a base jib section whose base end is supported by the jib base member and can be raised and lowered, and a base end of which is raised and lowered by the base jib section. First and second masts which are supported near the support position and which have rollers supported on the same axis at the swinging ends, and a connecting member which connects the swinging ends of the first and second masts. Base assembly, and at the opposite end of the divided jib that constitutes the intermediate jib section, And the back side connecting means for supporting the wings in a vertical plane so as to be able to bend in the vertical plane. Connecting means; tension means connected to the first mast and the tip of the top jib section; and traction means connected to the tip of the second mast and pulling the tip toward the telescopic boom. A first step of attaching a base jib section of the base assembly to the distal end of the telescopic boom via the jib base, and connecting the traction means to a distal end of the second mast; A wire rope of a predetermined length is connected to the distal end and a position near the distal end of the base jib section of the base assembly, and the first and second masts are erected. A second step of swinging the divided jib constituting the base jib section forward from the hung state in conjunction with the operation, and the base jib section in the hung state by extending and raising the telescopic boom. The rear end of the divided jib which forms the intermediate jib section is connected to the front end of the divided jib via the back side connecting means, and the abdominal surface of the divided jib is connected via the abdominal surface connecting means. A back side connecting means for connecting the back of the end of the divided jib suspended between the group and the remaining divided jib group lying on the ground to the back of the end of the divided jib lying on the ground. And a third step in which the backs are connected to each other via the back-side connecting means, and the divided jib whose backs are connected to each other is suspended by extending and raising the telescopic boom. A fourth step of swinging the base jib section forward to link the divided jib with each other by interlocking with the raising operation of the first and second masts by the operation of the traction means, and after the fourth step, A fifth step of connecting the abdominal surfaces of the ends of the divided jib with each other by the abdominal surface side connecting means, and repeating the first to fifth steps to connect the divided jib of a number of stages according to the work content, and A method of assembling a roughing jib, comprising an intermediate jib section, wherein the tension member is connected between a distal end of the first mast and a distal end of a split jib that forms a top jib section connected to the distal end of the intermediate jib section.
て方法において、 上記第3の工程では、地上に横臥されている分割ジブ群
は、最先端に位置する分割ジブに至るまで上記背面側連
結手段および腹面側連結手段により背面および腹面がそ
れぞれ連結されていることを特徴とするラフィングジブ
の組み立て方法。2. The method of assembling a luffing jib according to claim 1, wherein in the third step, the divided jib group lying on the ground reaches the rear-side connecting means until the divided jib located at the forefront is reached. A method for assembling a luffing jib, wherein the back surface and the abdomen surface are respectively connected by abdominal surface connection means.
の組み立て方法において、 上記第1マストと上記トップジブセクションの先端とに
連結されるテンション手段は、トップジブセクション側
に位置する端部が枢支されるとともに上記中間ジブセク
ション側から延長されたテンション部材と連結される部
分が伸縮可能とされていることを特徴とするラフィング
ジブの組み立て方法。3. The method of assembling a luffing jib according to claim 1, wherein the tension means connected to the first mast and a tip of the top jib section has an end located on the side of the top jib section pivotally. A method for assembling a luffing jib, wherein a portion connected to a tension member extended from the intermediate jib section is extendable.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP13125297A JPH10316366A (en) | 1997-05-21 | 1997-05-21 | Luffing jib assembling method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP13125297A JPH10316366A (en) | 1997-05-21 | 1997-05-21 | Luffing jib assembling method |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH10316366A true JPH10316366A (en) | 1998-12-02 |
Family
ID=15053572
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP13125297A Pending JPH10316366A (en) | 1997-05-21 | 1997-05-21 | Luffing jib assembling method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH10316366A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2055665A1 (en) * | 2007-10-29 | 2009-05-06 | Liebherr-Werk Ehingen GmbH | Method for erecting a crane boom |
JP2009107843A (en) * | 2007-10-29 | 2009-05-21 | Liebherr Werk Ehingen Gmbh | Raising method of crane boom |
JP2012116607A (en) * | 2010-11-30 | 2012-06-21 | Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd | Mobile crane, and method of assembling the same |
JP2014065573A (en) * | 2012-09-26 | 2014-04-17 | Kobelco Cranes Co Ltd | Lower gib |
EP3466861A1 (en) * | 2017-10-06 | 2019-04-10 | Sumitomo Heavy Industries Construction Cranes Co., Ltd. | Crane and method of assembling jib |
JP2019108201A (en) * | 2017-12-18 | 2019-07-04 | コベルコ建機株式会社 | Vertically assembling method of crane |
WO2019180167A1 (en) * | 2018-03-22 | 2019-09-26 | Liebherr-Werk Ehingen Gmbh | Mobile crane with two-part jib, and method for aligning the boom system of such a mobile crane |
DE102019131914A1 (en) * | 2019-11-26 | 2021-05-27 | Liebherr-Werk Ehingen Gmbh | Crane with luffing jib extension and method for assembling a luffing jib |
-
1997
- 1997-05-21 JP JP13125297A patent/JPH10316366A/en active Pending
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2055665A1 (en) * | 2007-10-29 | 2009-05-06 | Liebherr-Werk Ehingen GmbH | Method for erecting a crane boom |
JP2009107843A (en) * | 2007-10-29 | 2009-05-21 | Liebherr Werk Ehingen Gmbh | Raising method of crane boom |
US9371215B2 (en) | 2007-10-29 | 2016-06-21 | Liebherr-Werk Ehingen Gmbh | Method for erecting a crane boom |
JP2012116607A (en) * | 2010-11-30 | 2012-06-21 | Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd | Mobile crane, and method of assembling the same |
JP2014065573A (en) * | 2012-09-26 | 2014-04-17 | Kobelco Cranes Co Ltd | Lower gib |
EP3466861A1 (en) * | 2017-10-06 | 2019-04-10 | Sumitomo Heavy Industries Construction Cranes Co., Ltd. | Crane and method of assembling jib |
JP2019108201A (en) * | 2017-12-18 | 2019-07-04 | コベルコ建機株式会社 | Vertically assembling method of crane |
WO2019180167A1 (en) * | 2018-03-22 | 2019-09-26 | Liebherr-Werk Ehingen Gmbh | Mobile crane with two-part jib, and method for aligning the boom system of such a mobile crane |
CN112262098A (en) * | 2018-03-22 | 2021-01-22 | 利勃海尔工厂埃英根有限公司 | Mobile crane with two-part secondary boom and method for erecting a secondary boom system of such a mobile crane |
DE102018106753B4 (en) | 2018-03-22 | 2021-11-11 | Liebherr-Werk Ehingen Gmbh | Mobile crane with a two-part luffing jib and a method for erecting the boom system of such a mobile crane |
CN112262098B (en) * | 2018-03-22 | 2023-01-03 | 利勃海尔工厂埃英根有限公司 | Mobile crane with two-part secondary boom and method for erecting a secondary boom system of such a mobile crane |
US11597636B2 (en) | 2018-03-22 | 2023-03-07 | Liebherr-Werk Ehingen Gmbh | Mobile crane with two-part jib, and method for aligning the boom system of such a mobile crane |
DE102019131914A1 (en) * | 2019-11-26 | 2021-05-27 | Liebherr-Werk Ehingen Gmbh | Crane with luffing jib extension and method for assembling a luffing jib |
DE102019131914B4 (en) | 2019-11-26 | 2023-08-03 | Liebherr-Werk Ehingen Gmbh | Crane with luffing boom extension |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8839966B2 (en) | Folding jib main strut and transportable reeved strut caps | |
US8127949B2 (en) | Crane backstay spreader | |
JP4215807B2 (en) | Multi-position wire rope guide | |
US7878346B1 (en) | Adaptable boom extension for a mobile crane having a telescoping boom | |
US10099905B2 (en) | Crane | |
EP3805144A1 (en) | Crane | |
JPH10316366A (en) | Luffing jib assembling method | |
JP6645222B2 (en) | How to attach a crane jib | |
JP4835209B2 (en) | Crane winch removal method and upper swing body | |
JP6638434B2 (en) | Crane boom mounting method | |
CN109083146B (en) | Method for vertically setting upright post and inclined strut of pile driver | |
JP4422845B2 (en) | Counterweight mounting method and frame support means | |
US4050586A (en) | Apparatus for raising & lowering a mast and boom on a mobile crane | |
JP3566418B2 (en) | Mobile crane with luffing jib | |
JP2824032B2 (en) | Boom head attachment / detachment device | |
CN111704043B (en) | Telescopic boom structure, operation boom and engineering machinery | |
JP2003054876A (en) | Device and method for attaching and detaching side frame | |
JP2022033000A (en) | Telescopic boom high-speed assembly head and method for assembling the same | |
JP6969281B2 (en) | Crane and crane disassembly method | |
JP3950332B2 (en) | How to use the counterweight attachment / detachment device | |
WO2024018913A1 (en) | Crane and crane assembly method | |
JP2020164278A (en) | Rope wiring method and guide sheave device for work machine | |
CN220537377U (en) | Abdominal auxiliary arm stepless amplitude changing device, crane arm assembly and crane | |
JP3917236B2 (en) | Roughing jib crane | |
JP6493581B2 (en) | crane |