JP2824032B2 - Boom head attachment / detachment device - Google Patents

Boom head attachment / detachment device

Info

Publication number
JP2824032B2
JP2824032B2 JP24051395A JP24051395A JP2824032B2 JP 2824032 B2 JP2824032 B2 JP 2824032B2 JP 24051395 A JP24051395 A JP 24051395A JP 24051395 A JP24051395 A JP 24051395A JP 2824032 B2 JP2824032 B2 JP 2824032B2
Authority
JP
Japan
Prior art keywords
boom
boom head
sheave
head
tip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP24051395A
Other languages
Japanese (ja)
Other versions
JPH0958976A (en
Inventor
章弘 名倉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo SHI Construction Machinery Co Ltd
Original Assignee
Sumitomo SHI Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo SHI Construction Machinery Co Ltd filed Critical Sumitomo SHI Construction Machinery Co Ltd
Priority to JP24051395A priority Critical patent/JP2824032B2/en
Publication of JPH0958976A publication Critical patent/JPH0958976A/en
Application granted granted Critical
Publication of JP2824032B2 publication Critical patent/JP2824032B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、クレーン等のブームの
先端部にブームヘッドを脱着するブームヘッド脱着装置
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a boom head attaching / detaching apparatus for attaching / detaching a boom head to / from a tip of a boom such as a crane.

【0002】[0002]

【従来の技術】従来、例えば図9に示すオールテレーン
クレーンの上部旋回体1には、起伏自在にボックスブー
ム2が設けられている。このボックスブーム2の先端部
にはブームヘッド3が取り付けられている。このブーム
ヘッド3には、主巻き上げロープ4が巻回されるブーム
ポイント・アイドラ・シーブ5およびブームポイント・
メイン・シーブ6が枢着している。このブームヘッド3
には種々の作業用アタッチメントが取り付けられる。例
えば、実開平5−46879号公報に示されるジブ脱着
装置により、ラフィングジブが作業用アタッチメントと
してブームヘッド3に取り付けられる。同公報では、ブ
ームヘッド先端部から吊り下げられたワイヤロープによ
ってラフィングジブのジブフートが吊り上げられ、架台
上にジブフートが載置された後、ブームヘッドの先端部
にラフィングジブのジブフートが取り付けられる。
2. Description of the Related Art Conventionally, for example, a box boom 2 is provided on an upper revolving structure 1 of an all terrain crane shown in FIG. A boom head 3 is attached to the tip of the box boom 2. The boom head 3 has a boom point idler sheave 5 around which the main hoisting rope 4 is wound and a boom point
Main sheave 6 is pivoted. This boom head 3
Various work attachments are attached to the. For example, the luffing jib is attached to the boom head 3 as a work attachment by a jib attaching / detaching device disclosed in Japanese Utility Model Laid-Open No. 5-46879. In this publication, a jib foot of a luffing jib is lifted by a wire rope suspended from a tip of a boom head, and the jib foot is placed on a gantry. Then, a jib foot of a luffing jib is attached to the tip of the boom head.

【0003】[0003]

【発明が解決しようとする課題】上記従来の構造をした
クレーンにおいては、ブームヘッド3は補助クレーンを
用いてブーム2の先端部に取り付けられており、ブーム
ヘッド自体の脱着装置は従来存在していなかった。この
ため、従来、クレーンの組み立て作業性は良くなく、し
かも、組み立て時に作業スペースが広く必要とされた。
In the crane having the above-mentioned conventional structure, the boom head 3 is attached to the tip of the boom 2 by using an auxiliary crane, and there is conventionally a device for attaching and detaching the boom head itself. Did not. For this reason, conventionally, the workability of assembling the crane was not good, and a wide work space was required at the time of assembling.

【0004】また、大型クレーンの場合にはブームヘッ
ド3も大きい。従って、従来、構内走行時にこのブーム
ヘッド3がキャリア運転室7の前方視界を妨げるという
問題もあった。
In the case of a large crane, the boom head 3 is also large. Therefore, conventionally, there has been a problem that the boom head 3 obstructs the front view of the carrier cab 7 during traveling on the premises.

【0005】また、ブームヘッドへの作業用アタッチメ
ントの脱着は、従来、アタッチメントの重心が吊り上げ
下げされることによって行われていた。しかし、作業用
アタッチメントの重心はアタッチメントの種類によって
それぞれ異なる。このため、ブームヘッドへのアタッチ
メントの脱着は、従来、上記公報に例示されるように、
各アタッチメントに固有の自力脱着装置によって行われ
ている。従って、ブームヘッドに装着するアタッチメン
トの種類によってその都度そのアタッチメントに適した
脱着装置を準備する必要があり、作業効率は良くなかっ
た。
[0005] In addition, attachment and detachment of the work attachment to and from the boom head has conventionally been performed by suspending and lifting the center of gravity of the attachment. However, the center of gravity of the work attachment differs depending on the type of the attachment. For this reason, attachment / detachment of the attachment to / from the boom head is conventionally performed as exemplified in the above-mentioned publication.
It is performed by a self-removing device unique to each attachment. Therefore, it is necessary to prepare a detachable device suitable for each attachment depending on the type of attachment attached to the boom head, and the work efficiency is not good.

【0006】[0006]

【課題を解決するための手段】本発明はこのような課題
を解決するためになされたもので、ブーム先端部に対向
するブームヘッド部分に設けられた係止部と、ブームお
よびブームヘッド間につながれるロープと、このロープ
が掛けられてブームヘッドが吊り下げられる、ブーム先
端部に取り付けられた第1のシーブと、この第1のシー
ブに掛けられたロープの掛け回し方向を変える第2のシ
ーブと、ブームに一端が固定された第1のシリンダと、
この第1のシリンダの他端に枢支され、第2のシーブで
方向が変えられたロープが掛け回される第3のシーブ
と、第1のシーブの下方に端部が移動する第2のシリン
ダと、この第2のシリンダの上記端部に設けられた、ブ
ームヘッドの係止部に係合する係合部とを備え、ブーム
ヘッド脱着装置を構成した。
SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned problems, and comprises a locking portion provided at a boom head portion facing a boom tip portion, and a boom and a boom head. A first sheave attached to a boom tip where the rope is hung and the boom head is suspended, and a second sheave that changes the direction in which the rope is hung on the first sheave. A sheave, a first cylinder having one end fixed to the boom,
A third sheave pivotally supported by the other end of the first cylinder and having a rope diverted by the second sheave wrapped around the second sheave, and a second end moving below the first sheave. A boom head attachment / detachment device is provided including a cylinder and an engaging portion provided at the end of the second cylinder and engaging with a locking portion of the boom head.

【0007】[0007]

【作用】第1のシリンダを伸ばすことによって第2およ
び第3のシーブ間の距離は長くなり、ブームおよびブー
ムヘッド間につながれたロープは、これらシーブ間に張
る長さが長くなる。従って、第1のシーブおよびブーム
ヘッド間に張るロープ長さは相対的に短くなり、ブーム
ヘッドは第1のシーブを介して吊り上げられる。この
際、第2のシリンダを伸ばし、この第2のシリンダに設
けられた係合部をブーム先端部から突出させておく。第
1のシリンダをさらに伸ばすことにより、ブームヘッド
はさらに吊り上げられてブーム先端部に近付き、第2の
シリンダに設けられた係合部にブームヘッドの係止部が
当接する。この状態で第2のシリンダを縮ませることに
より、第2のシリンダに設けられた係合部はブームヘッ
ドの係止部と係合し、ブームヘッドはブーム先端側に引
き寄せられる。この状態で第1のシリンダをさらに伸ば
すことにより、ブームヘッドはこの係合部を中心に回動
し、ブームヘッドはブーム先端部に対向して配置され
る。この際、第2のシリンダを伸縮させることにより、
ブームヘッドを吊り上げる際の重心のずれが吸収され
る。さらに、第1および第2のシリンダの各シリンダ長
が調節されることにより、ブームヘッドはブーム先端部
に装着される。
By extending the first cylinder, the distance between the second and third sheaves is increased, and the length of the rope connected between the boom and the boom head is increased between these sheaves. Therefore, the length of the rope stretched between the first sheave and the boom head is relatively short, and the boom head is lifted via the first sheave. At this time, the second cylinder is extended, and the engaging portion provided on the second cylinder is projected from the boom tip. By further extending the first cylinder, the boom head is further lifted and approaches the boom tip, and the locking portion of the boom head comes into contact with the engaging portion provided on the second cylinder. By contracting the second cylinder in this state, the engaging portion provided on the second cylinder is engaged with the locking portion of the boom head, and the boom head is drawn toward the boom tip. By further extending the first cylinder in this state, the boom head rotates about this engaging portion, and the boom head is arranged to face the boom tip. At this time, by expanding and contracting the second cylinder,
The displacement of the center of gravity when lifting the boom head is absorbed. Further, the boom head is mounted on the boom tip by adjusting the length of each of the first and second cylinders.

【0008】また、構内走行時に第2のシリンダを伸ば
すことにより、ブームヘッドは係合部を介して押し上げ
られる。
Further, by extending the second cylinder during traveling on the premises, the boom head is pushed up through the engaging portion.

【0009】また、第1および第2のシリンダの伸縮に
より、ブームヘッドは、その重心位置にかかわらず、第
2のシリンダとの係合部を中心に回動してブーム先端部
に脱着される。このため、ブームヘッドに取り付けられ
るアタッチメントもその重心位置にかかわらず、ブーム
ヘッドと共にブーム先端部に脱着される。
Also, due to the expansion and contraction of the first and second cylinders, the boom head rotates around the engagement portion with the second cylinder and is detached from the boom tip regardless of the position of the center of gravity. . Therefore, the attachment attached to the boom head is also attached to and detached from the boom tip together with the boom head regardless of the position of the center of gravity.

【0010】[0010]

【実施例】次に、本発明によるブームヘッド脱着装置を
オールテレーンクレーンに適用した一実施例について説
明する。
Next, an embodiment in which the boom head attaching / detaching apparatus according to the present invention is applied to an all terrain crane will be described.

【0011】本実施例によるブームヘッド脱着装置の概
略構造は、図1の側面図を参照して以下のように説明さ
れる。
The schematic structure of the boom head attaching / detaching apparatus according to the present embodiment will be described as follows with reference to the side view of FIG.

【0012】オールテレーンクレーンのボックスブーム
先端部のブーム基部11とブームヘッド12との間に
は、一対のワイヤロープ13がつながれている。つま
り、各ワイヤロープ13の一端13aはピン14によっ
てブームヘッド12の両側部に接続されており、各ワイ
ヤロープ13の他端13bはブーム基部11の先端上部
にピン15によって接続されている。
A pair of wire ropes 13 is connected between the boom base 11 and the boom head 12 at the box boom tip of the all terrain crane. That is, one end 13 a of each wire rope 13 is connected to both sides of the boom head 12 by the pin 14, and the other end 13 b of each wire rope 13 is connected to the upper end of the boom base 11 by the pin 15.

【0013】また、ブーム基部11の先端部にはブラケ
ット16が設けられている。このブラケット16間には
ブームヘッド12が収納される。各ブラケット16に
は、円筒状のピン17を軸として第1のシーブ18が取
り付けられている。この第1のシーブ18にはワイヤロ
ープ13が掛けられ、ブームヘッド12が吊り下げられ
る。また、ワイヤロープ端13bが接続されたピン15
の下部のブーム基部11には、第2のシーブ19がピン
20によって取り付けられている。この第2のシーブ1
9は、第1のシーブ18に掛けられたワイヤロープ13
の掛け回し方向を変えている。また、第2のシーブ19
を枢支するピン20により、第1の油圧シリンダ21の
チューブ端が固定されている。この第1の油圧シリンダ
21の他端には第3のシーブ22が枢支されており、第
2のシーブ19で方向が変えられたワイヤロープ13が
掛け回されている。この第3のシーブ22は、第1の油
圧シリンダ21の伸縮により、図の左右方向に移動す
る。これら第1,第2,第3のシーブ18,19,22
および第1の油圧シリンダ21はボックスブーム中心の
左右にそれぞれ対になって設けられており、第2,第3
のシーブ19,22および第1の油圧シリンダ21はボ
ックスブーム内に設けられている。
A bracket 16 is provided at the tip of the boom base 11. The boom head 12 is housed between the brackets 16. A first sheave 18 is attached to each bracket 16 around a cylindrical pin 17. The wire rope 13 is hung on the first sheave 18, and the boom head 12 is suspended. Also, the pin 15 to which the wire rope end 13b is connected is connected.
A second sheave 19 is attached to the lower boom base 11 by a pin 20. This second sheave 1
9 is a wire rope 13 hung on the first sheave 18.
Is changing the direction in which it is wound. Also, the second sheave 19
The tube end of the first hydraulic cylinder 21 is fixed by a pin 20 pivotally supporting the first hydraulic cylinder 21. A third sheave 22 is pivotally supported at the other end of the first hydraulic cylinder 21, and a wire rope 13 whose direction is changed by a second sheave 19 is looped around the third sheave 22. The third sheave 22 moves in the left and right direction in the figure due to the expansion and contraction of the first hydraulic cylinder 21. These first, second and third sheaves 18, 19, 22
The first and second hydraulic cylinders 21 are provided in pairs on the left and right sides of the center of the box boom, respectively.
The sheaves 19 and 22 and the first hydraulic cylinder 21 are provided in a box boom.

【0014】ボックスブーム中心下部のブーム基部11
には1本の第2の油圧シリンダ23が設けられており、
この第2の油圧シリンダ23のロッド側チューブ端がピ
ン24によってブーム基部11に取り付けられている。
この第2の油圧シリンダ23のロッド端にはフック部材
25が設けられており、このフック部材25の先端部に
は凹状の係合部25aが形成されている。第2の油圧シ
リンダ23のロッドが伸びることにより、ロッド端のフ
ック部材25は第1のシーブ18の下方に移動する。
The boom base 11 below the center of the box boom
Is provided with one second hydraulic cylinder 23,
The rod-side tube end of the second hydraulic cylinder 23 is attached to the boom base 11 by a pin 24.
A hook member 25 is provided at the rod end of the second hydraulic cylinder 23, and a concave engaging portion 25 a is formed at the tip of the hook member 25. The extension of the rod of the second hydraulic cylinder 23 causes the hook member 25 at the rod end to move below the first sheave 18.

【0015】一方、ブームヘッド12の一側面には一対
のブラケット26が設けられており、このブラケット2
6間にはピン27がわたされている。このピン27は係
止部を構成しており、第2の油圧シリンダ23に取り付
けられたフック部材25の係合部25aに係合する。ピ
ン27が設けられたブームヘッド12の側面は、ブーム
ヘッド装着時にブーム基部11の先端部に対向する側面
である。この側面には位置決めストッパ28が設けられ
ており、この位置決めストッパ28を用いて後述のよう
にブームヘッド12の取り付け位置が案内される。ま
た、ブームヘッド12の側面にはピン挿入穴29が設け
られており、後述のようにこのピン挿入穴29と第1の
シーブ18を枢支する円筒状ピン17とにピンが挿入さ
れ、ブームヘッド12がブーム基部11に取り付けられ
る。
On the other hand, a pair of brackets 26 are provided on one side surface of the boom head 12.
A pin 27 extends between the six. The pin 27 forms a locking portion, and is engaged with the engaging portion 25 a of the hook member 25 attached to the second hydraulic cylinder 23. The side surface of the boom head 12 provided with the pin 27 is a side surface facing the tip of the boom base 11 when the boom head is mounted. A positioning stopper 28 is provided on this side surface, and the mounting position of the boom head 12 is guided using the positioning stopper 28 as described later. Further, a pin insertion hole 29 is provided on a side surface of the boom head 12, and a pin is inserted into the pin insertion hole 29 and the cylindrical pin 17 pivotally supporting the first sheave 18, as described later. The head 12 is attached to the boom base 11.

【0016】なお、シーブ30は、主巻き上げロープが
巻回されるブームポイント・メイン・シーブである。ブ
ームポイント・アイドラ・シーブは、ブーム基部11の
側の第1のシーブ18に並設されているが、図示されて
いない。また、ジブ受部33には、作業用アタッチメン
トであるラフィングジブが後述のように取り付けられ
る。
The sheave 30 is a boom point main sheave around which the main hoisting rope is wound. The boom point idler sheave is juxtaposed to the first sheave 18 on the side of the boom base 11, but is not shown. A luffing jib, which is a work attachment, is attached to the jib receiving portion 33 as described later.

【0017】このような構造において、本実施例による
ブームヘッド脱着装置を用いたブームヘッドの装着操作
について、図1から図5の側面図を参照して以下に説明
する。
The operation of mounting the boom head using the boom head attachment / detachment device according to the present embodiment in such a structure will be described below with reference to the side views of FIGS.

【0018】まず、第1の油圧シリンダ21を縮めた状
態でワイヤロープ13が引き出され、地上にあるブーム
ヘッド12にワイヤロープ13の一端13aが取り付け
られる(図1参照)。次に、第1の油圧シリンダ21に
送油され、そのロッドが伸ばされる(図2参照)。第1
の油圧シリンダ21を伸ばすことによって第2および第
3のシーブ19,22間の距離は長くなり、ブーム基部
11およびブームヘッド12間につながれたワイヤロー
プ13は、これらシーブ19,22間に張る長さが長く
なる。従って、第1のシーブ18およびブームヘッド1
2間に張るロープ長さは相対的に短くなり、ブームヘッ
ド12は第1のシーブ18を介して吊り上げられる。こ
の際、第2の油圧シリンダ23にも送油されて第2の油
圧シリンダ23のロッドも伸ばされ、ロッド端のフック
部材25の係合部25aがブーム基部11の先端部から
突出させられる。
First, the wire rope 13 is pulled out with the first hydraulic cylinder 21 contracted, and one end 13a of the wire rope 13 is attached to the boom head 12 on the ground (see FIG. 1). Next, oil is supplied to the first hydraulic cylinder 21 and its rod is extended (see FIG. 2). First
When the hydraulic cylinder 21 is extended, the distance between the second and third sheaves 19 and 22 is increased, and the wire rope 13 connected between the boom base 11 and the boom head 12 has a length extending between the sheaves 19 and 22. Becomes longer. Therefore, the first sheave 18 and the boom head 1
The length of the rope stretched between the two becomes relatively short, and the boom head 12 is lifted via the first sheave 18. At this time, the oil is also supplied to the second hydraulic cylinder 23, and the rod of the second hydraulic cylinder 23 is also extended, so that the engaging portion 25a of the hook member 25 at the rod end is projected from the tip of the boom base 11.

【0019】第1の油圧シリンダ21のロッドがさらに
伸ばされることにより、ブームヘッド12はさらに吊り
上げられてブーム基部11の先端部に近付き、ブームヘ
ッド12のピン27がフック部材25に当接する(図3
参照)。この状態で第2の油圧シリンダ23のロッドを
縮ませることにより、第2の油圧シリンダ23のロッド
端に設けられた係合部25aは図の右方へ移動し、ブー
ムヘッド12のピン27と係合する(図4参照)。従っ
て、第2の油圧シリンダ12のロッドをさらに縮ませる
ことにより、ブームヘッド12はブーム基部11の先端
部に引き寄せられる。この状態で第1の油圧シリンダ2
1がさらに伸ばされることにより、ブームヘッド12は
ピン14を吊点として上方に引っ張られ、ピン27を中
心に回動する。この際、第2の油圧シリンダ23を伸縮
させてフック部材25を左右に動かすことにより、ブー
ムヘッド12を吊り上げる際の重心のずれが吸収され、
また、ブームヘッド12の回動中心が調整される。この
回動操作により、ブームヘッド12のピン27が設けら
れた一側面は、ブーム基部11の先端部に対向配置され
る。
When the rod of the first hydraulic cylinder 21 is further extended, the boom head 12 is further lifted and approaches the tip of the boom base 11, and the pin 27 of the boom head 12 comes into contact with the hook member 25 (FIG. 2). 3
reference). In this state, when the rod of the second hydraulic cylinder 23 is contracted, the engaging portion 25a provided at the rod end of the second hydraulic cylinder 23 moves rightward in the drawing, and the pin 27 of the boom head 12 Engage (see FIG. 4). Therefore, by further contracting the rod of the second hydraulic cylinder 12, the boom head 12 is drawn to the tip of the boom base 11. In this state, the first hydraulic cylinder 2
By further extending 1, the boom head 12 is pulled upward with the pin 14 as a hanging point, and rotates around the pin 27. At this time, by moving the hook member 25 right and left by expanding and contracting the second hydraulic cylinder 23, the displacement of the center of gravity when lifting the boom head 12 is absorbed,
Further, the center of rotation of the boom head 12 is adjusted. As a result of this rotation operation, one side surface of the boom head 12 on which the pin 27 is provided is arranged to face the tip of the boom base 11.

【0020】さらに、第1および第2の各油圧シリンダ
21,23が交互に操作されて各シリンダ長が調節され
ることにより、ブームヘッド12はブーム基部11のブ
ラケット16間に引き込まれる。この際、ブームヘッド
12の位置決めストッパ28がブーム基部11の先端部
下部に当接して、ブームヘッド12のブーム基部11へ
の取り付け位置が案内される。この位置案内によってブ
ームヘッド12のピン挿入穴29と第1のシーブ18を
枢支する円筒状ピン17の軸穴とが一致され、これら各
穴にピン31が挿入される(図5参照)。このピン31
の挿入によってブームヘッド12の上端がブラケット1
6に固定され、ブームヘッド12のブーム基部11への
装着が完了する。
Further, the first and second hydraulic cylinders 21 and 23 are alternately operated to adjust the lengths of the respective cylinders, whereby the boom head 12 is retracted between the brackets 16 of the boom base 11. At this time, the positioning stopper 28 of the boom head 12 abuts on the lower part of the tip of the boom base 11, and the mounting position of the boom head 12 to the boom base 11 is guided. By this position guide, the pin insertion hole 29 of the boom head 12 and the shaft hole of the cylindrical pin 17 pivotally supporting the first sheave 18 are aligned, and the pin 31 is inserted into each of these holes (see FIG. 5). This pin 31
The upper end of the boom head 12 is
6 and the attachment of the boom head 12 to the boom base 11 is completed.

【0021】一方、本実施例によるブームヘッド脱着装
置を用いたブームヘッドの取り外し操作は、上述した装
着操作の逆の手順によって行われる。
On the other hand, the operation of removing the boom head using the boom head attaching / detaching apparatus according to the present embodiment is performed in the reverse order of the above-described mounting operation.

【0022】このような本実施例によるブームヘッド脱
着装置によれば、ブームヘッド12は、従来のように補
助クレーンを用いることなく、自力でブームの先端部に
脱着される。このため、省力化が図れ、オールテレーン
クレーンの組み立て作業性は向上する。しかも、クレー
ンの組み立て時に作業スペースを広く必要とすることも
ない。
According to the boom head attachment / detachment device according to the present embodiment, the boom head 12 is detachably attached to the tip of the boom by itself without using an auxiliary crane as in the conventional art. For this reason, labor can be saved, and the assembling workability of the all terrain crane is improved. Moreover, there is no need for a large work space when assembling the crane.

【0023】また、大型クレーンの場合にはブームヘッ
ドが大きく、構内走行時にブームヘッドがキャリア運転
室の前方視界を妨げていたが、本実施例のブームヘッド
脱着装置によればこのような問題も解消される。つま
り、構内走行時に、図6に示すように、第2の油圧シリ
ンダ23を伸ばすことにより、ブームヘッド12はこの
第2の油圧シリンダ23との係合部を介して押し上げら
れ、チルト・アップする。なお、同図において、図1か
ら図5と同一または相当する部分には同一符号を付して
その説明は省略する。また、同図に示すブームヘッド1
2は図1から図5に示すものと形状が異なり、また、ブ
ームヘッド12にはシングルトップ34が新たに設けら
れているが、ブームヘッド脱着装置の本質的構造は図1
から図5に示されるものと相違するものではない。
In the case of a large crane, the boom head is large, and the boom head obstructs the field of view in front of the carrier cab during traveling on the premises. Will be resolved. In other words, as shown in FIG. 6, during traveling on the premises, by extending the second hydraulic cylinder 23, the boom head 12 is pushed up through the engaging portion with the second hydraulic cylinder 23, and tilts up. . In this figure, the same or corresponding parts as those in FIGS. 1 to 5 are denoted by the same reference numerals, and description thereof will be omitted. Also, the boom head 1 shown in FIG.
2 has a different shape from that shown in FIGS. 1 to 5, and a single top 34 is newly provided in the boom head 12, but the essential structure of the boom head attaching / detaching device is as shown in FIG.
5 is not different from that shown in FIG.

【0024】上記のように構内走行時にブームヘッド1
2がチルトアップされることにより、キャリア運転室3
5の前方視界からブームヘッド12は消え去る。すなわ
ち、大型のオールテレーンクレーンの場合においても、
前方視界を容易に確保することが可能になり、安全性を
向上させることができる。
As described above, the boom head 1 is used during traveling on the premises.
2 is tilted up so that the carrier cab 3
The boom head 12 disappears from the front view 5. That is, even in the case of a large all terrain crane,
It is possible to easily secure a forward view, and it is possible to improve safety.

【0025】また、第1および第2のシリンダ21,2
3の伸縮により、ブームヘッド12は、その重心位置に
かかわらず、第2の油圧シリンダ23との係合部である
ピン27を中心に回動し、ブーム基部11の先端部に脱
着される。このため、ブームヘッド12に取り付けられ
る作業用アタッチメントもその重心位置にかかわらず、
ブームヘッド12と共にブーム基部11の先端部に脱着
される。例えば、この作業用アタッチメントがラフィン
グジブである場合には、アタッチメントの装着は図7に
示すように行われる。
The first and second cylinders 21 and
Due to the expansion and contraction of 3, the boom head 12 rotates about the pin 27 which is an engagement portion with the second hydraulic cylinder 23 regardless of the position of the center of gravity, and is attached to and detached from the tip of the boom base 11. For this reason, the work attachment attached to the boom head 12 also does not depend on the position of the center of gravity.
It is attached to and detached from the tip of the boom base 11 together with the boom head 12. For example, when the work attachment is a luffing jib, the attachment is attached as shown in FIG.

【0026】クレーンが作業現場に到着すると、構内走
行時にチルトアップされていたブームヘッド12は、同
図(a)に示す作業位置にセットされ、シングルトップ
34は折り畳まれる。そして、アウトリガ36の下に敷
板37が設置された後、上部旋回体の後端部にカウンタ
ウエイト38が取り付けられる。また、作業用アタッチ
メントであるラフィングジブ39がクレーン前方の地上
で組み立てられる。この際、中継ぎジブ39aと39b
との組み立てに際しては、上側ピン40だけが挿入さ
れ、下側ピンは挿入されない。次に、ブームが最も縮め
られて水平に倒された状態で、前述の第1のシーブ18
に挿入されていたピン31が抜かれ、第1の油圧シリン
ダ21が縮められることにより、ブームヘッド12はブ
ーム基部11の先端部から外されて降ろされる。次に、
ブームヘッド12のジブ受部33に、ラフィングジブ3
9のジブフート39cがフートピンによって接続され
る。その後、第1の油圧シリンダ21が伸ばされること
により、ブームヘッド12はラフィングジブボトムごと
同図(b)に示すように吊り上げられる。引き続いて第
1および第2の各油圧シリンダ21,23が前述のよう
に操作されることにより、ラフィングジブボトムが取り
付けられたブームヘッド12は、同図(c)に示すよう
にブーム基部11の先端部に装着される。この際、中継
ぎジブ39aは上側ピン40を中心にして図示のように
上方に回動する。
When the crane arrives at the work site, the boom head 12 that has been tilted up during traveling on the premises is set to the work position shown in FIG. 1A, and the single top 34 is folded. Then, after the floor plate 37 is installed under the outrigger 36, a counterweight 38 is attached to the rear end of the upper swing body. A luffing jib 39 as a work attachment is assembled on the ground in front of the crane. At this time, the relay jib 39a and 39b
When assembling, only the upper pin 40 is inserted and the lower pin is not inserted. Next, in a state where the boom is contracted most and is horizontally tilted, the first sheave 18 described above is used.
The boom head 12 is removed from the tip of the boom base 11 and lowered by the first hydraulic cylinder 21 being contracted by removing the pin 31 inserted into the boom head 11. next,
The luffing jib 3 is attached to the jib receiving portion 33 of the boom head 12.
Nine jib feet 39c are connected by foot pins. Thereafter, when the first hydraulic cylinder 21 is extended, the boom head 12 is lifted together with the roughing jib bottom as shown in FIG. Subsequently, by operating the first and second hydraulic cylinders 21 and 23 as described above, the boom head 12 with the luffing jib bottom attached thereto is moved to the tip of the boom base 11 as shown in FIG. Attached to the unit. At this time, the relay jib 39a rotates upward about the upper pin 40 as shown.

【0027】次に、ラフィングジブ起伏ワイヤロープお
よび主巻き上げワイヤロープのワイヤリングが行われ
る。その後、ラフィングジブ39が持ち上げられ、中継
ぎジブ39a,39b間に、ジブ下側のコネクトピン4
1が挿入される。この結果、ブームヘッド12にラフィ
ングジブ39が図8に示すようにセットされる。
Next, the luffing jib undulating wire rope and the main winding wire rope are wired. Thereafter, the luffing jib 39 is lifted and the connecting pin 4 on the lower side of the jib is inserted between the joint jib 39a and 39b.
1 is inserted. As a result, the luffing jib 39 is set on the boom head 12 as shown in FIG.

【0028】このように本実施例によれば、作業用アタ
ッチメントであるラフィングジブ39は、その重心位置
にかかわらず、ブームヘッド12と共にブーム基部11
の先端部に脱着される。すなわち、種々のアタッチメン
トは、地上でブームヘッド12に取り付けることが可能
となり、その後、アタッチメントはブームヘッド12と
共にブーム基部11に自力脱着される。従って、従来、
アタッチメントの種類に応じてその都度準備する必要が
あった固有の自力脱着装置は不要になり、作業用アタッ
チメントのブームヘッド12への脱着は汎用的に行え
る。この結果、クレーンの組立性の向上が図れ、作業効
率は良くなる。
As described above, according to the present embodiment, the luffing jib 39, which is a work attachment, is attached to the boom base 12 and the boom base 11 regardless of the position of the center of gravity.
Detachable to the tip of That is, various attachments can be attached to the boom head 12 on the ground, and then the attachments are detached to the boom base 11 together with the boom head 12. Therefore, conventionally,
A unique self-removing device that had to be prepared each time according to the type of attachment is not required, and the attachment and detachment of the work attachment to and from the boom head 12 can be performed in a general-purpose manner. As a result, the assemblability of the crane can be improved, and the working efficiency can be improved.

【0029】なお、上述の説明では作業用アタッチメン
トをラフィングジブとしたが、チルトジブやアディショ
ナルジブといった、メインブーム先端に脱着を必要とす
る他の作業用アタッチメントも同様に自力脱着すること
が可能である。
In the above description, the work attachment is a luffing jib, but other work attachments that require attachment / detachment at the tip of the main boom, such as a tilt jib and an additional jib, can also be detached by themselves.

【0030】また、上記実施例では本発明によるブーム
ヘッド脱着装置をオールテレーンクレーンに適用した場
合について説明したが、他の建設機械にも同様に適用す
ることが可能であり、この場合においても上記実施例と
同様な効果が奏される。
In the above embodiment, the case where the boom head attaching / detaching apparatus according to the present invention is applied to an all terrain crane has been described. However, the present invention can be applied to other construction machines in the same manner. The same effect as the example is achieved.

【0031】[0031]

【発明の効果】以上説明したように本発明によれば、ブ
ームヘッドは補助クレーンを用いることなく自力でブー
ムの先端部に脱着される。このため、省力化が図れ、建
設機械の組み立て作業性は向上する。しかも、組み立て
時に作業スペースを広く必要とすることもない。
As described above, according to the present invention, the boom head is detachably attached to the end of the boom by itself without using an auxiliary crane. For this reason, labor can be saved, and the workability of assembling the construction machine is improved. Moreover, there is no need for a large work space at the time of assembly.

【0032】また、構内走行時に第2のシリンダを伸ば
すことにより、ブームヘッドは係合部を介して押し上げ
られる。従って、構内走行時にキャリア運転室の前方視
界を確保することができ、安全性が向上する。
When the second cylinder is extended during traveling on the premises, the boom head is pushed up through the engaging portion. Therefore, a front view of the carrier cab can be secured during traveling on the premises, and safety is improved.

【0033】また、第1および第2のシリンダの伸縮に
より、ブームヘッドは、その重心位置にかかわらず、第
2のシリンダとの係合部を中心に回動してブーム先端部
に脱着される。このため、ブームヘッドに取り付けられ
るアタッチメントもその重心位置にかかわらず、ブーム
ヘッドと共にブーム先端部に脱着される。従って、アタ
ッチメントをブームヘッドに地上で取り付けた後、ブー
ムヘッドと共にアタッチメントをブーム先端部に自力脱
着することが可能になる。よって、アタッチメントのブ
ームヘッドへの脱着は汎用的に行え、組立性の向上が図
れる。
Also, due to the expansion and contraction of the first and second cylinders, the boom head rotates about the engagement portion with the second cylinder and is detached from the boom tip regardless of the position of the center of gravity. . Therefore, the attachment attached to the boom head is also attached to and detached from the boom tip together with the boom head regardless of the position of the center of gravity. Therefore, after attaching the attachment to the boom head on the ground, the attachment together with the boom head can be detached and attached to the boom tip by itself. Therefore, attachment and detachment of the attachment to and from the boom head can be performed in a general-purpose manner, and assemblability can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例によるブームヘッド脱着装置
を用いたブームヘッド装着操作の第1の過程を示す側面
図である。
FIG. 1 is a side view showing a first step of a boom head mounting operation using a boom head attaching / detaching device according to an embodiment of the present invention.

【図2】本実施例によるブームヘッド脱着装置を用いた
ブームヘッド装着操作の第2の過程を示す側面図であ
る。
FIG. 2 is a side view showing a second step of the boom head mounting operation using the boom head attaching / detaching device according to the embodiment.

【図3】本実施例によるブームヘッド脱着装置を用いた
ブームヘッド装着操作の第3の過程を示す側面図であ
る。
FIG. 3 is a side view showing a third step of the boom head mounting operation using the boom head attaching / detaching device according to the embodiment.

【図4】本実施例によるブームヘッド脱着装置を用いた
ブームヘッド装着操作の第4の過程を示す側面図であ
る。
FIG. 4 is a side view showing a fourth step of the boom head mounting operation using the boom head attaching / detaching device according to the present embodiment.

【図5】本実施例によるブームヘッド脱着装置を用いて
ブームヘッドがブーム先端部に装着された状態を示す側
面図である。
FIG. 5 is a side view showing a state in which the boom head is mounted on the boom tip using the boom head attaching / detaching device according to the present embodiment.

【図6】本実施例によるブームヘッド脱着装置が装備さ
れたオールテレーンクレーンの構内走行時の側面図であ
る。
FIG. 6 is a side view of the all-terrain crane equipped with the boom head attaching / detaching device according to the present embodiment when traveling inside a premises.

【図7】本実施例によるブームヘッド脱着装置を用いた
作業用アタッチメントの自力装着操作を示す側面図であ
る。
FIG. 7 is a side view showing a self-attachment operation of the work attachment using the boom head attaching / detaching device according to the embodiment.

【図8】本実施例によるブームヘッド脱着装置を用いて
作業用アタッチメントが自力装着された状態を示す側面
図である。
FIG. 8 is a side view showing a state in which the work attachment is mounted by itself using the boom head attaching / detaching device according to the present embodiment.

【図9】従来のオールテレーンクレーンの側面図であ
る。
FIG. 9 is a side view of a conventional all terrain crane.

【符号の説明】[Explanation of symbols]

11…ブーム基部 12…ブームヘッド 13…ワイヤロープ 14,15,20,24,31…ピン 16,26…ブラケット 17…円筒状ピン 18…第1のシーブ 19…第2のシーブ 21…第1の油圧シリンダ 22…第3のシーブ 23…第2の油圧シリンダ 25…フック部材 25a…係合部 27…ピン(係止部) 28…位置決め用ストッパ 29…ピン挿入穴 30…ブームポイント・メイン・シーブ DESCRIPTION OF SYMBOLS 11 ... Boom base 12 ... Boom head 13 ... Wire rope 14, 15, 20, 24, 31 ... Pin 16, 26 ... Bracket 17 ... Cylindrical pin 18 ... First sheave 19 ... Second sheave 21 ... First Hydraulic cylinder 22 ... Third sheave 23 ... Second hydraulic cylinder 25 ... Hook member 25 a ... Engagement part 27 ... Pin (locking part) 28 ... Positioning stopper 29 ... Pin insertion hole 30 ... Boom point main sheave

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 ブーム先端部に対向するブームヘッド部
分に設けられた係止部と、前記ブームおよびブームヘッ
ド間につながれるロープと、このロープが掛けられて前
記ブームヘッドが吊り下げられる前記ブームの先端部に
取り付けられた第1のシーブと、この第1のシーブに掛
けられた前記ロープの掛け回し方向を変える前記ブーム
に取り付けられた第2のシーブと、前記ブームに一端が
固定された第1のシリンダと、この第1のシリンダの他
端に枢支され前記第2のシーブで方向が変えられた前記
ロープが掛け回される第3のシーブと、前記第1のシー
ブの下方に端部が移動する前記ブームに取り付けられた
第2のシリンダと、この第2のシリンダの前記端部に設
けられたブームヘッドの前記係止部に係合する係合部と
を備えて構成されたブームヘッド脱着装置。
1. A boom provided on a boom head portion facing a boom tip, a rope connected between the boom and the boom head, and the boom on which the rope is hung and the boom head is suspended. A first sheave attached to the tip of the first sheave, a second sheave attached to the boom that changes the direction in which the rope is hung on the first sheave, and one end fixed to the boom. A first cylinder, a third sheave pivotally supported by the other end of the first cylinder and around which the rope whose direction is changed by the second sheave is looped, and a third sheave below the first sheave; A second cylinder attached to the boom having an end moving, and an engaging portion engaging with the engaging portion of a boom head provided at the end of the second cylinder. Was Boom head attachment / detachment device.
JP24051395A 1995-08-28 1995-08-28 Boom head attachment / detachment device Expired - Lifetime JP2824032B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24051395A JP2824032B2 (en) 1995-08-28 1995-08-28 Boom head attachment / detachment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24051395A JP2824032B2 (en) 1995-08-28 1995-08-28 Boom head attachment / detachment device

Publications (2)

Publication Number Publication Date
JPH0958976A JPH0958976A (en) 1997-03-04
JP2824032B2 true JP2824032B2 (en) 1998-11-11

Family

ID=17060644

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24051395A Expired - Lifetime JP2824032B2 (en) 1995-08-28 1995-08-28 Boom head attachment / detachment device

Country Status (1)

Country Link
JP (1) JP2824032B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7341157B2 (en) * 2004-11-29 2008-03-11 Slobogean Methody W Enclosed-reeving, live-line boom
JP4857880B2 (en) * 2006-04-13 2012-01-18 コベルコクレーン株式会社 Mobile crane boom mounting method and boom mounting tool
DE102009010452A1 (en) * 2009-02-26 2010-09-02 Terex-Demag Gmbh Method and device for mounting and dismounting an attachment on the main boom of a mobile crane
JP5377728B1 (en) * 2012-08-27 2013-12-25 Ihi建機株式会社 Crane front attachment assembly method and apparatus
JP6366227B2 (en) * 2013-06-03 2018-08-01 株式会社タダノ Jib attachment / detachment mechanism
JP6261066B2 (en) * 2013-08-02 2018-01-17 成幸利根株式会社 Multi-axis excavator

Also Published As

Publication number Publication date
JPH0958976A (en) 1997-03-04

Similar Documents

Publication Publication Date Title
JP2883860B2 (en) Crane jib overhang and storage device and its overhang and storage method
JP2824032B2 (en) Boom head attachment / detachment device
JP4835209B2 (en) Crane winch removal method and upper swing body
JP4415643B2 (en) crane
JP2796950B2 (en) Counterweight desorption device
JP4422845B2 (en) Counterweight mounting method and frame support means
JP2726239B2 (en) Assembling method of rear post supporting cable in jib crane
JP6638434B2 (en) Crane boom mounting method
JPH10316366A (en) Luffing jib assembling method
JPH08333776A (en) Counter weight fitting/removing device
JP4499227B2 (en) Tower crane
JP2002255478A (en) Luffing jib crane and method of assembling it
JP3754496B2 (en) Hook block steady rest device
JP7326898B2 (en) construction machinery
JP3917236B2 (en) Roughing jib crane
JP4263301B2 (en) Crawler crane assembly method
JP3889521B2 (en) Pile driver and its work floor mounting method
JP2019199310A (en) Specification changing method of crane and specification-changeable crane
JP2001310895A (en) Counter weight detaching/attaching device for crawler crane
WO2024018913A1 (en) Crane and crane assembly method
JPH06294129A (en) Suspension rope guide device for excavation machine
JPH07109091A (en) Jib unit of tower crane
JP2542385Y2 (en) Counterweight attachment / detachment equipment for construction work machines
JPH10120371A (en) Bridle moving device
JPS592193Y2 (en) hydraulic excavator work equipment