JPH09138823A - Progress control method for design and development and its system, control method for designing and developing project and its system - Google Patents

Progress control method for design and development and its system, control method for designing and developing project and its system

Info

Publication number
JPH09138823A
JPH09138823A JP23603296A JP23603296A JPH09138823A JP H09138823 A JPH09138823 A JP H09138823A JP 23603296 A JP23603296 A JP 23603296A JP 23603296 A JP23603296 A JP 23603296A JP H09138823 A JPH09138823 A JP H09138823A
Authority
JP
Japan
Prior art keywords
work
design
development
project
progress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP23603296A
Other languages
Japanese (ja)
Inventor
Hideaki Suzuki
英明 鈴木
Hiroko Nishikawa
博子 西川
Yoshie Matsuzaki
吉衛 松崎
Setsuo Yazawa
節雄 矢沢
Masaki Kurimoto
正樹 栗本
Soichi Oyamada
聡一 小山田
Toshiaki Terunuma
利晃 照沼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP23603296A priority Critical patent/JPH09138823A/en
Publication of JPH09138823A publication Critical patent/JPH09138823A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To correctly and surely grasp and control a progress situation or an operation result including operation a system can not grasp. SOLUTION: Through the use of a designing/developing progress control system constituted by connecting plural operation terminals 32 to a server 31 through a communication network 33, the operation content of design or development executed by a designer or a developer in a designing or developing project is executed from the desired terminal 32 through the use of a desired using tool or a using hardware, and these operation results are stored in the storing device 316 of a server 31 through a communication network 33. The progress situation of at least by the unit of the date or the week corresponding to the operation contents by the unit of the designer or the developer in the project retrieved from these stored operation result is displayed on the display means 326 of the desired operation terminal 32 through the communication network 33.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、設計または開発プ
ロジェクトにおける製品の設計または開発作業におい
て、作業端末上で設計者または開発者が行った設計また
は開発のための作業内容をモニタリングし、システムで
把握されなかった時間帯の作業内容に関する作業実績を
設計者または開発者に入力させることにより正確に進捗
情報を管理できるようにした設計・開発の進捗管理方法
及びそのシステム並びに設計・開発プロジェクトの管理
方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention monitors the contents of work for design or development performed by a designer or a developer on a work terminal in the design or development work of a product in a design or development project. Progress management method and its system for design / development and management of design / development project that enables progress information to be accurately managed by allowing the designer or developer to input the work record related to the work content of the time period that was not grasped Regarding the method.

【0002】[0002]

【従来の技術】例えば、ソフトウェア開発工程の進捗状
況を自動的に管理する従来技術として、特開平4−77
921号公報が知られている。この従来技術には、ソフ
トウェア開発のための進捗計画をその開発作業工程毎に
示す標準計画情報が登録された標準ファイルと、ソフト
ウェアの開発作業がそれぞれ実行される複数の作業端末
と、これら各作業端末によって作業が完了された開発成
果物の開発工期、およびそれら各作業端末によって実行
されている開発作業状況を実績データとして前記各作業
端末から採取する採取手段と、この採取手段によって採
取された実績データと前記標準ファイルに登録されてい
る標準計画情報とを比較し、前記作業端末に対してその
比較結果に応じた作業指示を行う作業指示手段とを具備
し、ソフトウェア開発工程の進捗状況を自動的に管理す
るソフトウェア開発管理システムが記載されている。
2. Description of the Related Art For example, Japanese Patent Laid-Open No. 4-77 discloses a conventional technique for automatically managing the progress of a software development process.
No. 921 is known. In this conventional technology, a standard file in which standard plan information indicating a progress plan for software development for each development work process is registered, a plurality of work terminals for respectively executing software development work, and each work A collection means for collecting from the work terminals the development period of the development products whose work has been completed by the terminals and the development work status being executed by each of the work terminals, and the results collected by the collection means. It is equipped with a work instruction means for comparing the data with the standard plan information registered in the standard file and giving a work instruction to the work terminal according to the comparison result, and automatically monitors the progress status of the software development process. A software development management system that manages dynamically is described.

【0003】[0003]

【発明が解決しようとする課題】通常、設計または開発
プロジェクトにおける製品の設計または開発作業は、様
な種類の製品の設計または開発を担当することになる。
そして各一つ製品の設計または開発作業は、多数の作業
内容を伴った作業群から構成されることになる。また製
品の設計または開発に必要な作業内容としては、作業端
末上で行う作業以外に、机上あるいは実験室などの場所
での思考や実験などの様々な作業が存在することにな
る。このようなプロジェクトにおける製品の設計または
開発作業において、プロジェクト全体で、また個々の製
品全体で、また設計者または開発者個人毎の進捗状況を
正確に、且つ確実に把握して管理できるようにすること
については、上記従来技術において、十分考慮されてい
なかった。
Generally, the product design or development work in a design or development project is responsible for the design or development of various types of products.
Each product design or development work is composed of a work group with many work contents. Further, as work contents necessary for designing or developing a product, in addition to work performed on a work terminal, there are various works such as thinking and experimenting on a desk or a place such as a laboratory. In the product design or development work in such a project, it is possible to accurately and reliably grasp and manage the progress status of the entire project, individual products as a whole, and individual designers or developers. This has not been sufficiently taken into consideration in the above-mentioned related art.

【0004】本発明の目的は、上記課題を解決すべく、
プロジェクトにおける製品の設計または開発作業におい
て、システムが把握できなかった作業を含めて、プロジ
ェクト全体で、また個々の製品全体で、また設計者また
は開発者個人毎に、進捗状況または作業実績を正確に、
且つ確実に把握して管理できるようにした設計・開発の
進捗管理方法及びそのシステムを提供することにある。
また本発明の他の目的は、設計者または開発者が担当し
ている業務全般の作業実績を把握できるようにして設計
者または開発者の負荷や各作業内容に対する生産性等を
把握して管理できるようにした設計・開発の進捗管理方
法及びそのシステムを提供することにある。また本発明
の他の目的は、設計者または開発者が納得できる日程計
画及び割当のもとでの設計・開発プロジェクトの円滑な
進行を可能にした設計・開発プロジェクトの管理方法及
びそのシステムを提供することにある。また本発明の他
の目的は、成果物作成のために必要な作業項目単位で、
進捗状況を把握することによって、問題が発生した際対
策が容易となり、その結果設計・開発プロジェクト全体
において作業計画通りに作業を遂行することができるよ
うにした設計・開発プロジェクトの管理方法及びそのシ
ステムを提供することにある。
[0004] An object of the present invention is to solve the above problems.
Accurately track the progress or work performance of the entire project, individual products, or individual designers or developers, including the tasks that the system could not understand in product design or development work in the project ,
Another object of the present invention is to provide a design / development progress management method and system for surely grasping and managing it.
Another object of the present invention is to manage the work of the designer or developer by grasping the work performance of all the tasks that the designer or developer is in charge of and the productivity for each work content. It is intended to provide a design / development progress management method and its system that are made possible. Another object of the present invention is to provide a designing / development project management method and system capable of smoothly proceeding with a designing / development project under a schedule and allocation that the designer or developer can be satisfied with. To do. Another object of the present invention is to provide a work item unit required for producing a work product,
By grasping the progress status, it becomes easy to take countermeasures when a problem occurs, and as a result, it is possible to carry out the work according to the work plan in the entire design and development project, and its management method and system. To provide.

【0005】[0005]

【課題を解決するための手段】上記目的を達成するため
に、本発明は、サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発の進捗管理システ
ムを使用して、設計または開発プロジェクトにおいて設
計者または開発者が行う設計または開発の作業内容を所
望の使用ツールまたは使用ハードウェアを用いて所望の
作業端末から実行してこれらの作業実績を前記通信ネッ
トワークを介して前記サーバの記憶装置に格納し、これ
ら格納された作業実績から検索される前記プロジェクト
における設計者または開発者単位での作業内容に対応し
た少なくとも日または週単位の進捗状況を前記通信ネッ
トワークを介して所望の作業端末の表示手段に表示する
ことを特徴とする設計・開発の進捗管理方法である。ま
た本発明は、サーバに複数の作業端末を通信ネットワー
クで接続して構成される設計・開発の進捗管理システム
を使用して、設計または開発プロジェクトにおいて設計
者または開発者が行う設計または開発の作業内容を所望
の使用ツールまたは使用ハードウェアを用いて所望の作
業端末から実行してこれらの作業実績を前記通信ネット
ワークを介して前記サーバの記憶装置に格納し、これら
格納された作業実績から検索される前記プロジェクトに
おける設計者または開発者単位での作業内容に対応した
少なくとも日または週単位の進捗状況を前記通信ネット
ワークを介して所望の作業端末の表示手段に表示し、該
作業端末に接続された入力手段を用いて進捗データを入
力して前記通信ネットワークを介して前記サーバの記憶
装置に格納することを特徴とする設計・開発の進捗管理
方法である。
To achieve the above object, the present invention uses a progress management system for design / development, which is configured by connecting a plurality of work terminals to a server through a communication network. Alternatively, a designer or a developer performs a design or development work performed in a development project from a desired work terminal by using a desired tool or hardware to be used, and outputs the work results through the communication network to the server. Stored in the storage device, and the progress status of at least a day or a week corresponding to the work content of the designer or developer in the project retrieved from the stored work records is desired via the communication network. It is a design / development progress management method characterized by displaying on a display means of a work terminal. The present invention also uses a design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network to perform design or development work performed by a designer or a developer in a design or development project. The contents are executed from a desired work terminal using a desired tool or hardware to be used, these work results are stored in the storage device of the server via the communication network, and the stored work results are retrieved. The progress status of at least a day or a week corresponding to the work content of each designer or developer in the project is displayed on the display means of the desired work terminal via the communication network, and the work terminal is connected to the work terminal. Input progress data using the input means and store the progress data in the storage device of the server via the communication network. A progress management method of design and development, characterized the door.

【0006】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発の進
捗管理システムを使用して、設計または開発プロジェク
トにおいて設計者または開発者が行う設計または開発の
作業内容を所望の使用ツールまたは使用ハードウェアを
用いて所望の作業端末から実行してこれらの作業実績を
前記通信ネットワークを介して前記サーバの記憶装置に
格納し、所望の作業端末において管理されている作業内
容における作業終了を入力手段を用いて入力することに
よって、該作業内容における作業開始時刻前までの進捗
度と作業開始時刻から作業終了時刻までの作業時間と該
作業時間において指標となる予測進捗度とを所望の作業
端末の表示手段に表示し、該作業時間における作業の実
施結果に対応した進捗度を所望の作業端末の入力手段を
用いて入力することによって前記通信ネットワークを介
して前記サーバの記憶装置に格納することを特徴とする
設計・開発の進捗管理方法である。また本発明は、サー
バに複数の作業端末を通信ネットワークで接続して構成
される設計・開発の進捗管理システムを使用して、設計
または開発プロジェクトにおいて設計者または開発者が
行う設計または開発の作業内容を所望の使用ツールまた
は使用ハードウェアを用いて所望の作業端末から実行し
てこれらの作業実績を前記通信ネットワークを介して前
記サーバの記憶装置に格納し、これら格納された作業実
績の内、前記プロジェクトにおける設計者または開発者
単位での作業実績を前記通信ネットワークを介して所望
の作業端末の表示手段に表示することを特徴とする設計
・開発の進捗管理方法である。
Further, the present invention uses a design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network, thereby designing or performing a design or development project by a designer or a developer. The development work contents are executed from a desired work terminal using a desired tool or hardware to be used, and these work results are stored in the storage device of the server via the communication network and managed at the desired work terminal. By inputting the work end in the work contents being performed using the input means, the progress degree before the work start time in the work contents, the work time from the work start time to the work end time, and the index in the work time are calculated. The predicted progress degree is displayed on the display means of the desired work terminal, and it corresponds to the execution result of the work during the work time. A tracking method of design and development, characterized in that stored in the storage device of the server via the communication network by inputting using input means desired work terminal Hakadodo. The present invention also uses a design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network to perform design or development work performed by a designer or a developer in a design or development project. The contents are executed from a desired work terminal using a desired tool or hardware to be used, and these work results are stored in the storage device of the server via the communication network, and among the stored work results, A progress management method for design / development, characterized in that the work record of each designer or developer in the project is displayed on a display unit of a desired work terminal via the communication network.

【0007】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発の進
捗管理システムを使用して、設計または開発プロジェク
トにおいて設計者または開発者が行う設計または開発の
作業内容を所望の使用ツールまたは使用ハードウェアを
用いて所望の作業端末から実行してこれらの作業実績を
前記通信ネットワークを介して前記サーバの記憶装置に
格納し、これら格納された作業実績の内、前記プロジェ
クトにおける設計者または開発者単位での少なくとも日
または週単位の作業実績と少なくとも日または週単位で
設計者または開発者が作業を行う予定になっているにも
係らず作業実績が登録されていないこととを前記通信ネ
ットワークを介して所望の作業端末の表示手段に表示
し、実際設計者または開発者が作業を実行していた場合
には、作業端末に接続された入力手段を用いて作業実績
を入力して前記通信ネットワークを介して前記サーバの
記憶装置に格納することを特徴とする設計・開発の進捗
管理方法である。また本発明は、サーバに複数の作業端
末を通信ネットワークで接続して構成される設計・開発
の進捗管理システムを使用して、設計または開発プロジ
ェクトにおいて設計者または開発者が行う設計または開
発の作業内容を所望の使用ツールまたは使用ハードウェ
アを用いて所望の作業端末から実行してこれらの作業実
績を前記通信ネットワークを介して前記サーバの記憶装
置に格納し、これら格納された作業実績の内、前記プロ
ジェクトにおける設計者または開発者単位での少なくと
も日または週単位の作業実績を前記通信ネットワークを
介して所望の作業端末の表示手段に表示し、該表示され
た作業実績に対して設計者または開発者が入力手段を用
いて確認することを特徴とする設計・開発の進捗管理方
法である。
Further, the present invention uses a design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network, and uses a design / development progress management system to perform a design or The work content of development is executed from a desired work terminal using a desired tool or hardware to be used, and these work results are stored in a storage device of the server via the communication network, and the stored work results are stored. Among them, the work record of at least a day or a week in the designer or developer unit in the project and the work record of a designer or a developer is planned to work at least in a day or week. The fact that it is not registered is displayed on the display means of the desired work terminal via the communication network, and the actual designer or When the developer is executing the work, the work record is input using the input means connected to the work terminal and stored in the storage device of the server via the communication network. -It is a method of managing the progress of development. The present invention also uses a design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network to perform design or development work performed by a designer or a developer in a design or development project. The contents are executed from a desired work terminal using a desired tool or hardware to be used, and these work results are stored in the storage device of the server via the communication network, and among the stored work results, A work record of at least a day or a week in the designer or developer unit in the project is displayed on the display means of a desired work terminal via the communication network, and the designer or the developer works on the displayed work record. It is a design / development progress management method in which a person confirms by using an input means.

【0008】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発の進
捗管理システムを使用して、設計または開発プロジェク
トにおいて設計者または開発者が行う設計または開発の
作業内容を所望の使用ツールまたは使用ハードウェアを
用いて所望の作業端末から実行してこれらの作業実績を
前記通信ネットワークを介して前記サーバの記憶装置に
格納し、これら格納された作業実績の内、前記プロジェ
クトにおける設計者または開発者単位での少なくとも日
または週単位の作業実績を前記通信ネットワークを介し
て所望の作業端末の表示手段に表示し、該表示された作
業実績に対して設計者または開発者が確認して正しい場
合にはその旨を入力手段を用いて入力し、間違いがある
場合には入力手段を用いて作業実績に対して修正を加え
て、正しい作業実績を前記通信ネットワークを介して前
記サーバの記憶装置に格納することを特徴とする設計・
開発の進捗管理方法である。
The present invention also uses a design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network, and uses a design or development project to carry out design or The work content of development is executed from a desired work terminal using a desired tool or hardware to be used, and these work results are stored in a storage device of the server via the communication network, and the stored work results are stored. Of the above, the work record of at least a day or a week in the designer or developer unit in the project is displayed on the display means of the desired work terminal via the communication network, and the design is performed with respect to the displayed work record. Person or developer confirms and if it is correct, input that fact using input means, and if there is a mistake, input means With the modification to the working performance by using, design and the correct work record via the communication network and storing, in a storage device of the server
This is a development progress management method.

【0009】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発の進
捗管理システムを使用して、所望の作業端末において、
表示手段に管理すべき作業内容をその管理指標と共に表
示し、該表示手段に表示された作業内容を所望の使用ツ
ールまたは使用ハードウェアを用いて開始した際、作業
内容と作業開始時刻とをモニタリング処理して作業終了
を入力されない限り前記システムをログアウトできない
ように制御することを特徴とする設計・開発の進捗管理
方法である。
Further, the present invention uses a progress management system for design / development configured by connecting a plurality of work terminals to a server through a communication network,
The work content to be managed is displayed together with the management index on the display means, and when the work content displayed on the display means is started using a desired tool or hardware used, the work content and the work start time are monitored. A progress management method for design / development, characterized in that the system is controlled so that the system cannot be logged out unless an end of work is input.

【0010】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発の進
捗管理システムを使用して、設計または開発プロジェク
トにおいて設計者または開発者が行う設計または開発の
作業を所望の使用ツールまたは使用ハードウェアを用い
て所望の作業端末から実行してこれらの作業実績を前記
通信ネットワークを介して前記サーバの記憶装置に格納
し、これら格納された作業実績の内、前記プロジェクト
における設計者または開発者単位での少なくとも日また
は週単位の作業実績と、作業実績を把握できなかった時
間帯に、進捗状況を把握すべき時間帯が存在する場合に
は、進捗報告の要求とを前記通信ネットワークを介して
所望の作業端末の表示手段に表示することを特徴とする
設計・開発の進捗管理方法である。また本発明は、サー
バに複数の作業端末を通信ネットワークで接続して構成
される設計・開発の進捗管理システムを使用して、設計
または開発プロジェクトにおいて設計者または開発者が
行う設計または開発の作業を所望の使用ツールまたは使
用ハードウェアを用いて所望の作業端末から実行してこ
れらの作業実績を前記通信ネットワークを介して前記サ
ーバの記憶装置に格納し、これら格納された作業実績の
内、前記プロジェクトにおける設計者または開発者単位
での少なくとも日または週単位の作業実績と、作業実績
を把握できなかった時間帯に、進捗状況を把握すべき時
間帯が存在する場合には、進捗報告の要求とを前記通信
ネットワークを介して所望の作業端末の表示手段に表示
し、該表示された進捗報告の要求に基づいて前記作業端
末の入力手段を用いて進捗報告を行うことを特徴とする
設計・開発の進捗管理方法である。
Also, the present invention uses a design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network, and uses the design / development progress management system The development work is executed from a desired work terminal using a desired tool or hardware to be used, and these work results are stored in the storage device of the server via the communication network. Of the above, if there is at least a day or weekly work record for each designer or developer in the project and a time slot where the work record could not be grasped, there is a progress Progress of design and development characterized by displaying a report request and a display means of a desired work terminal through the communication network. It is a management method. The present invention also uses a design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network to perform design or development work performed by a designer or a developer in a design or development project. Is executed from a desired work terminal using a desired use tool or use hardware, and these work results are stored in the storage device of the server via the communication network, and among the stored work results, the Request a progress report if there is a time zone where the progress status should be grasped in the time zone when the work achievement could not be grasped at least on a daily or weekly basis in the designer or developer unit in the project. Is displayed on the display means of a desired work terminal via the communication network, and the work is performed based on the displayed progress report request. A tracking method of design and development which is characterized in that a progress report with youngest input means.

【0011】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発の進
捗管理システムを使用して、設計または開発プロジェク
トにおいて設計者または開発者が行う設計または開発の
作業の作業計画を所望の作業端末における入力手段を用
いて入力して前記通信ネットワークを介して前記サーバ
の記憶装置に格納し、前記設計または開発プロジェクト
において設計者または開発者が行う設計または開発の作
業を所望の使用ツールまたは使用ハードウェアを用いて
所望の作業端末から実行してこれらの作業実績を前記通
信ネットワークを介して前記サーバの記憶装置に格納
し、これら格納された作業計画と作業実績とから検索さ
れる前記プロジェクトにおける設計者または開発者単位
での作業内容に対応した少なくとも日または週単位の進
捗状況を前記通信ネットワークを介して所望の作業端末
の表示手段に表示することを特徴とする設計・開発の進
捗管理方法である。また本発明は、サーバに複数の作業
端末を通信ネットワークで接続して構成される設計・開
発の進捗管理システムであって、設計または開発プロジ
ェクトにおいて設計者または開発者が行う設計または開
発の作業内容を所望の使用ツールまたは使用ハードウェ
アを用いて実行する所望の作業端末を設け、該所望の作
業端末において実行された作業実績を前記通信ネットワ
ークを介して格納する記憶装置と該記憶装置に格納され
た作業実績から前記プロジェクトにおける設計者または
開発者単位での作業内容に対応した少なくとも日または
週単位の進捗状況を検索する計算手段とを有するサーバ
を設け、該サーバの計算手段で検索された進捗状況を前
記通信ネットワークを介して表示する表示手段を有する
作業端末を設けたことを特徴とする設計・開発の進捗管
理システムである。
Further, the present invention uses a design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network, and uses a design / development progress management system to perform a design or A design or a design performed by a designer or a developer in the design or development project by inputting a work plan of a development work using an input unit in a desired work terminal and storing the work plan in the storage device of the server via the communication network. The development work is executed from a desired work terminal using a desired tool or hardware to be used, and these work results are stored in the storage device of the server via the communication network. Corresponding to the work contents by the designer or developer in the project retrieved from the work record And a tracking method of design and development, characterized by displaying a progress of at least days or weeks on the display unit of the desired working terminal via the communication network. Further, the present invention is a design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network, and the contents of design or development work performed by a designer or a developer in a design or development project. Is provided with a desired work terminal for executing using the desired tool or hardware used, and a storage device for storing the work record executed by the desired work terminal via the communication network, and a storage device stored in the storage device. A server having a calculating means for searching the progress status of at least a day or a week unit corresponding to the work content of the designer or the developer in the project from the work record is provided, and the progress searched by the calculating means of the server is provided. A work terminal having a display means for displaying a situation via the communication network is provided. · The development progress management system of.

【0012】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発の進
捗管理システムであって、設計または開発プロジェクト
において設計者または開発者が行う設計または開発の作
業内容を所望の使用ツールまたは使用ハードウェアを用
いて実行する所望の作業端末を設け、該所望の作業端末
において実行された作業実績を前記通信ネットワークを
介して格納する記憶装置と該記憶装置に格納された作業
実績から前記プロジェクトにおける設計者または開発者
単位での作業内容に対応した少なくとも日または週単位
の進捗状況を検索または算出する計算手段とを有するサ
ーバを設け、該サーバの計算手段で検索または算出され
た進捗状況を前記通信ネットワークを介して表示する表
示手段と進捗データを入力して前記通信ネットワークを
介して前記サーバの記憶装置に格納する入力手段とを有
する作業端末を設けたことを特徴とする設計・開発の進
捗管理システムである。また本発明は、サーバに複数の
作業端末を通信ネットワークで接続して構成される設計
・開発の進捗管理システムであって、設計または開発プ
ロジェクトにおいて設計者または開発者が行う設計また
は開発の作業内容を所望の使用ツールまたは使用ハード
ウェアを用いて実行し、管理されている作業内容の作業
終了を入力する入力手段を有する所望の作業端末を設
け、該所望の作業端末において実行された作業実績を前
記通信ネットワークを介して格納する記憶装置と該記憶
装置に格納された作業実績から作業内容における作業開
始時刻前までの進捗度と作業開始時刻から作業終了時刻
までの作業時間と該作業時間において指標となる予測進
捗度とを算出する計算手段とを有するサーバを設け、該
サーバの計算手段で算出された作業内容における作業開
始時刻前までの進捗度と作業時間と予測進捗度とを前記
通信ネットワークを介して表示する表示手段と前記作業
時間における作業の実施結果に対応した進捗度を入力す
る入力手段とを有する作業端末を設け、該作業端末の入
力手段を用いて入力された進捗度を前記通信ネットワー
クを介して前記サーバの記憶装置に格納するように構成
したことを特徴とする設計・開発の進捗管理システムで
ある。
The present invention is also a design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network, wherein the design or development is performed by a designer or a developer in a design or development project. Storage device for storing a work record executed by the desired work terminal via the communication network, and a storage device provided with a desired work terminal for executing the work content of 1. using a desired use tool or use hardware A server having a calculating means for searching or calculating the progress status of at least a day or a week corresponding to the work contents of the designer or developer in the project from the work record stored in the server is provided, and the calculating means of the server is provided. Display means for displaying the progress status retrieved or calculated by A progress management system design and development, characterized in that via the communication network by entering provided work terminal having input means for storing in a storage device of the server. Further, the present invention is a design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network, and the contents of design or development work performed by a designer or a developer in a design or development project. Is performed using a desired tool or hardware to be used, and a desired work terminal having an input means for inputting the work end of the work content being managed is provided, and the work record of the work performed at the desired work terminal is displayed. A storage device to be stored via the communication network, the degree of progress from the work record stored in the storage device to the work start time before the work start time, the work time from the work start time to the work end time, and the index in the work time A server having a calculation means for calculating the predicted progress degree is provided, and the work content calculated by the calculation means of the server is added to A display unit for displaying the progress level up to the work start time before, the work time period, and the predicted progress level via the communication network, and the input unit for inputting the progress level corresponding to the work execution result in the work time period. A progress management system for design / development, characterized in that a work terminal is provided, and a progress degree input using an input means of the work terminal is stored in a storage device of the server via the communication network. Is.

【0013】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発の進
捗管理システムであって、設計または開発プロジェクト
において設計者または開発者が行う設計または開発の作
業内容を所望の使用ツールまたは使用ハードウェアを用
いて実行する所望の作業端末を設け、該所望の作業端末
において実行された作業実績を前記通信ネットワークを
介して格納する記憶装置と該記憶装置に格納された作業
実績から前記プロジェクトにおける設計者または開発者
単位での作業実績を算出する計算手段とを有するサーバ
を設け、該サーバの計算手段で算出された作業実績を前
記通信ネットワークを介して表示する表示手段を有する
作業端末を設けたことを特徴とする設計・開発の進捗管
理システムである。また本発明は、サーバに複数の作業
端末を通信ネットワークで接続して構成される設計・開
発の進捗管理システムであって、設計または開発プロジ
ェクトにおいて設計者または開発者が行う設計または開
発の作業内容を所望の使用ツールまたは使用ハードウェ
アを用いて実行する所望の作業端末を設け、該所望の作
業端末において実行された作業実績を前記通信ネットワ
ークを介して格納する記憶装置と該記憶装置に格納され
た作業実績から前記プロジェクトにおける設計者または
開発者単位での作業実績と少なくとも日または週単位で
設計者または開発者が作業を行う予定になっているにも
係らず作業実績が登録されていないこととを算出する計
算手段とを有するサーバを設け、該サーバの計算手段で
算出された作業実績と作業実績が登録されていないこと
とを前記通信ネットワークを介して表示する表示手段と
実際設計者または開発者が作業を実行していた場合に
は、この作業実績を入力する入力手段とを有する作業端
末を設け、該作業端末の入力手段で入力された作業実績
を前記通信ネットワークを介して前記サーバの記憶装置
に格納するように構成したことを特徴とする設計・開発
の進捗管理システムである。
The present invention is also a design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network, wherein the designer or developer performs a design or development in a design or development project. And a storage device for storing a work record executed by the desired work terminal through the communication network, the work terminal being provided with a desired tool or hardware for use. A server having a calculation means for calculating the work result for each designer or developer in the project from the work result stored in the server is provided, and the work result calculated by the calculation means of the server is provided via the communication network. It is a design / development progress management system characterized in that a work terminal having a display means for displaying is provided. Further, the present invention is a design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network, and the contents of design or development work performed by a designer or a developer in a design or development project. Is provided with a desired work terminal for executing using a desired tool or hardware used, and a storage device for storing the work record executed by the desired work terminal via the communication network, and a storage device stored in the storage device. Based on the work record, the work record for each designer or developer in the above project and the work record for at least one day or week are planned to be worked by the designer or developer, but no work record is registered. And a work record calculated by the calculation means of the server is registered. A work terminal having a display means for displaying the fact that the work is not performed and an input means for inputting the work record when the designer or the developer is actually performing the work, A progress management system for design / development, characterized in that the work record input by the input means of the work terminal is stored in the storage device of the server via the communication network.

【0014】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発の進
捗管理システムであって、設計または開発プロジェクト
において設計者または開発者が行う設計または開発の作
業内容を所望の使用ツールまたは使用ハードウェアを用
いて実行する所望の作業端末を設け、該所望の作業端末
において実行された作業実績を前記通信ネットワークを
介して格納する記憶装置と該記憶装置に格納された作業
実績から前記プロジェクトにおける設計者または開発者
単位での少なくとも日または週単位の作業実績を算出す
る計算手段とを有するサーバを設け、該サーバの計算手
段で算出された作業実績を前記通信ネットワークを介し
て読出して表示する表示手段と該表示手段に表示された
作業実績に対して確認情報を入力する入力手段とを有す
る作業端末を設けたことを特徴とする設計・開発の進捗
管理システムである。また本発明は、サーバに複数の作
業端末を通信ネットワークで接続して構成される設計・
開発の進捗管理システムであって、管理すべき作業内容
をその管理指標と共に表示する表示手段を有し、該表示
手段に表示された作業内容を所望の使用ツールまたは使
用ハードウェアを用いて開始した際、作業内容と作業開
始時刻とをモニタリング処理して作業終了を入力されな
い限り前記システムをログアウトできないように制御す
る作業端末を備えたことを特徴とする設計・開発の進捗
管理システムである。
The present invention is also a design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network, wherein the design or development is performed by a designer or a developer in a design or development project. And a storage device for storing a work record executed by the desired work terminal through the communication network, the work terminal being provided with a desired tool or hardware for use. A server having a calculation means for calculating at least daily or weekly work results for each designer or developer in the project from the work results stored in is provided, and the work results calculated by the calculation means of the server are provided. Display means for reading and displaying via the communication network and work records displayed on the display means A progress management system design and development, characterized in that a work terminal having input means for inputting the certification information. Further, the present invention is a design / configuration that is configured by connecting a plurality of work terminals to a server through a communication network.
A development progress management system, having display means for displaying the work content to be managed together with its management index, and the work content displayed on the display means was started using a desired tool or hardware used. In this case, the progress management system for design / development is provided with a work terminal for monitoring the work content and the work start time and controlling so that the system cannot be logged out unless the work end is input.

【0015】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発の進
捗管理システムであって、設計または開発プロジェクト
において設計者または開発者が行う設計または開発の作
業を所望の使用ツールまたは使用ハードウェアを用いて
実行する所望の作業端末を設け、該所望の作業端末にお
いて実行された作業実績を前記通信ネットワークを介し
て格納する記憶装置と該記憶装置に格納された作業実績
から前記プロジェクトにおける設計者または開発者単位
での少なくとも日または週単位の作業実績を算出し、作
業実績を把握できなかった時間帯に、進捗状況を把握す
べき時間帯が存在するか否かを算出して存在する場合に
は、進捗報告の要求を作成する計算手段とを有するサー
バを設け、該サーバの計算手段で算出された作業実績と
作成された進捗報告の要求とを前記通信ネットワークを
介して表示する表示手段と該表示手段に表示された進捗
報告の要求に基づいて進捗報告を行う入力手段とを有す
る作業端末を備えたことを特徴とする設計・開発の進捗
管理システムである。また本発明は、ソフトウェアやハ
ードウェアの利用実績をモニタリングして、管理すべき
作業内容の作業実績を、作業実績格納部に登録すると共
に作業端末の表示手段に表示し、モニタリングしていな
い時間帯における作業実績の登録要求を表示手段に表示
することによって開発者に要求し、開発者が作業端末に
接続された入力手段を用いて作業実績を追加・変更・確
認し、この結果を作業実績格納部に登録することによっ
て、ソフトウェアやハードウェア利用実績以外のシステ
ムがモニタリングできない机上の作業等の作業実績を正
確に把握することを特徴とする設計・開発の進捗管理方
法及びそのシステムである。
The present invention is also a design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network, wherein the designer or developer performs a design or development in a design or development project. A storage device and a storage device for storing a work record executed by the desired work terminal via the communication network by providing a desired work terminal for executing the work of using the desired use tool or use hardware At least daily or weekly work results for each designer or developer in the project are calculated from the stored work results, and there is a time zone in which the progress status should be grasped in the time zone when the work achievement could not be grasped. If there is a server that has a calculation unit that creates a request for a progress report, the server Display means for displaying the work record calculated by the calculation means and the created progress report request via the communication network, and an input means for making a progress report based on the progress report request displayed on the display means. It is a design / development progress management system characterized by comprising a work terminal having Further, the present invention monitors the usage record of software and hardware, registers the work record of the work content to be managed in the work record storage unit, and also displays the work record on the display means of the work terminal during a non-monitoring time period. Display the work record registration request at the display means to the developer, the developer adds / changes / confirms the work record using the input means connected to the work terminal, and stores this result in the work record It is a design and development progress management method and its system characterized by accurately registering work records such as desk work that cannot be monitored by a system other than software and hardware use records by registering in the department.

【0016】また本発明は、管理すべき作業内容を管理
指標とともに作業端末の表示手段に表示し、作業内容を
識別するための識別コードと作業開始時刻とソフトウェ
アやハードウェアの利用実績とをモニタリングして作業
実績格納部に格納することによって、開発中にソフトウ
ェアやハードウェアを利用する開発者が容易に進捗報告
でき、作業を中断させることなく正確に作業実績をモニ
タリングすることを特徴とする設計・開発の進捗管理方
法及びそのシステムである。また本発明は、管理される
べき作業内容を作業端末の表示手段に表示し、作業内容
を識別するための識別コードと作業開始時刻とをモニタ
リングしてこの作業開始時刻が一旦モニタリングされる
と、作業終了を宣言するコードが入力されない限り該シ
ステムをログアウトできないように処理を制御すること
により、開発中にソフトウェアやハードウェアを利用す
る開発者が容易に進捗報告でき、作業を中断することな
く正確、かつ確実に作業実績をモニタリングすることを
特徴とする設計・開発の進捗管理方法及びそのシステム
である。
Further, the present invention displays the work content to be managed together with the management index on the display means of the work terminal, and monitors the identification code for identifying the work content, the work start time, and the usage record of software or hardware. By storing it in the work record storage unit, developers who use software or hardware can easily report the progress during development, and the feature is that the work record can be accurately monitored without interrupting the work.・ Development progress management method and system. Further, the present invention displays the work content to be managed on the display means of the work terminal, monitors the identification code for identifying the work content and the work start time, and once the work start time is monitored, By controlling the process so that the system cannot be logged out unless a code that declares the end of work is input, developers using software or hardware can easily report the progress during development, and the work can be performed accurately without interruption. And a system for managing the progress of design / development, which is characterized by reliably monitoring work performance.

【0017】また本発明は、管理されている作業内容の
作業終了を宣言するコードが入力されると、該作業内容
の作業開始時刻前までの進捗度と作業開始時刻から作業
終了時刻までの作業時間と該作業時間において指標とな
る予測進捗度とを作業端末の表示手段に表示し、該作業
時間における実施結果に対応した進捗度が作業端末の入
力手段で入力されるまで次の処理に移ることができない
よう処理を制御することにより、開発者の自己申告によ
る進捗度を正確に、かつ確実にモニタリングすることを
特徴とする設計・開発の進捗管理方法及びそのシステム
である。また本発明は、前記設計・開発の進捗管理方法
及びそのシステムにおいて、作業実績を把握できなかっ
た時間帯に、進捗状況を把握すべき時間帯が存在する場
合に進捗報告を要求することによって、年休、休日など
の、勤務時間としてモニタリングされるべきではない時
間帯、又は、開発者自身が自己啓発として捉える時間帯
に関する進捗報告を要求せずに、開発者の作業を中断せ
ずに正確な進捗情報をモニタリングすることを特徴とす
る。また本発明は、前記設計・開発の進捗管理方法及び
そのシステムにおいて、モニタリングされた作業実績を
検索して得られる進捗情報を、管理目的に合わせて加工
して作業端末の表示手段に表示することにより、管理目
的にあった進捗状況を表示することを特徴とする。
Further, according to the present invention, when a code for declaring the end of work of the managed work contents is input, the progress of the work contents up to the work start time and the work from the work start time to the work end time. The time and the predicted progress degree serving as an index in the work time are displayed on the display means of the work terminal, and the process proceeds to the next process until the progress degree corresponding to the implementation result in the work time is input by the input means of the work terminal. It is a design and development progress management method and its system characterized by accurately and surely monitoring the progress of a developer's self-declaration by controlling the processing so that it cannot be performed. Further, the present invention, in the design / development progress management method and system thereof, by requesting a progress report when there is a time zone in which the progress status should be grasped in a time zone in which the work record could not be grasped, Accurate without interrupting the work of developers, without requesting progress reports regarding time periods that should not be monitored as work hours, such as yearly holidays and holidays, or those that developers consider themselves as self-development It is characterized by monitoring various progress information. In the present invention, the progress management method and system for designing and developing the progress information obtained by retrieving a monitored work record, processing the progress information according to a management purpose, and displaying the progress information on a display unit of a work terminal. According to, the progress status suitable for the management purpose is displayed.

【0018】また本発明は、前記設計・開発の進捗管理
方法及びそのシステムにおいて、複数または単数の製品
開発を含むプロジェクトにおける開発工程を構成する作
業群を定義する情報、例えば作業群を構成する目的にな
っているもの、つまり製品名、部品名、成果物名など、
または作業群を構成する作業内容の進捗管理指標である
ところのマイルストーン、予定工数、先行関係などを作
業計画部において定めて開発工程の進捗情報を把握した
上で作業計画を構築することを特徴とする。また本発明
は、前記設計・開発の進捗管理方法及びそのシステムに
おいて、管理されるべき作業内容を実施するときに使用
されるべき、または使用することによる利便が得られる
ソフトウェア、ハードウェア、作業実施の前提条件にな
る成果物、及び入手情報等の参照情報を作業端末の表示
手段に表示させ、この表示された内容を入力手段によっ
て編集することによって、進捗情報から進行上優先させ
るべき作業を把握しつつ、即座に開発作業に移ることを
可能にしたことを特徴とする。
The present invention is also directed to the above-mentioned design / development progress management method and system, in which information for defining a work group constituting a development process in a project including development of a plurality of or a single product, for example, constructing a work group. , That is, product name, part name, deliverable name, etc.
Alternatively, the work plan department establishes a work plan after determining the progress information of the development process by defining milestones, planned man-hours, advance relationships, etc., which are progress management indicators of the work contents that make up the work group. And Further, the present invention provides software, hardware, and work execution that should be used when carrying out work contents to be managed, or obtained by using the progress management method and system for design / development. The work to be prioritized in the progress is grasped from the progress information by displaying the deliverables, which are the prerequisites of the above, and the reference information such as the obtained information on the display means of the work terminal and editing the displayed contents by the input means. In addition, it is possible to move to development work immediately.

【0019】ところで、プロジェクトにおける製品の設
計または開発において、製品開発に必要な作業として
は、作業端末上で行う作業以外に、机上あるいは実験室
などでの思考や実験等がある。本発明は、これらの作業
をモニタリングすることによって、設計者または開発者
の負担、設計者または開発者の各作業内容に対する生産
性、設計者または開発者が複数の優先順位の異なる作業
に対して費やした工数などを正確に把握することができ
る。また本発明は、製品開発に必要な作業のみの作業実
績だけではなく、開発者が担当している業務全般の作業
実績を把握することができ、その結果開発者の真の負荷
を把握することができる。またどのような作業を優先的
に行っているかが把握することができる。また本発明
は、作業計画と作業実績とのずれをマクロにプロジェク
ト全体で、またプロジェクトが抱える複数または単数の
製品開発における個々の製品開発全体で把握することが
可能となり、更にミクロに開発者個人に割り当てられた
作業計画がどの程度進行しているか、およびどのような
作業結果(成果物)が作成されたかについても把握する
ことができ、その結果真の進捗状況を把握することが可
能となる。
By the way, in designing or developing a product in a project, work required for product development includes thinking and experimentation on a desk or a laboratory in addition to work performed on a work terminal. By monitoring these tasks, the present invention can reduce the burden on the designer or the developer, the productivity of the designer or the developer for each work content, and the designer or the developer for the tasks with different priorities. It is possible to accurately grasp the number of man-hours spent. Further, according to the present invention, not only the work record of only the work required for product development but also the work record of the entire work that the developer is in charge of can be grasped, and as a result, the true load of the developer can be grasped. You can Also, it is possible to understand what kind of work is being preferentially performed. Further, according to the present invention, it is possible to grasp the deviation between the work plan and the work result as a macro as a whole project, and also as a whole for individual product development in plural or singular product development of the project. It is possible to understand the progress of the work plan assigned to each job and what work result (deliverable) was created, and as a result, it is possible to understand the true progress status. .

【0020】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発プロ
ジェクト管理システムを使用して設計・開発プロジェク
トにおける作業管理を行う設計・開発プロジェクトの管
理方法であって、設計・開発プロジェクトを複数の製品
単位に分け、分けられた製品を複数の設計工程で構成
し、該各設計工程を成果物作成可能な複数の作業項目単
位(作業項目単位は工数が1週間以下で定義される)で
分けて定義し、この定義された作業項目単位で作業の進
捗状況(予定日に対する実績日または進捗度または標準
工数に対する実績工数等で示される。)を所望の作業端
末の表示手段に対して提示することを特徴とする設計・
開発プロジェクトの管理方法である。また本発明は、サ
ーバに複数の作業端末を通信ネットワークで接続して構
成される設計・開発プロジェクト管理システムを使用し
て設計・開発プロジェクトにおける作業管理を行う設計
・開発プロジェクトの管理方法であって、設計・開発プ
ロジェクトにおける製品・設計工程で行うべき作業項目
に関係する作業成果物の一覧を所望の作業端末の表示手
段に表示して提示することを特徴とする設計・開発プロ
ジェクトの管理方法である。また本発明は、サーバに複
数の作業端末を通信ネットワークで接続して構成される
設計・開発プロジェクト管理システムを使用して設計・
開発プロジェクトにおける作業管理を行う設計・開発プ
ロジェクトの管理方法であって、設計・開発プロジェク
トにおける製品・設計工程で行うべき作業項目毎の作業
実績を、ツールまたはハードウエアを使用した時刻また
は時間に基づいて取得することを特徴とする設計・開発
プロジェクトの管理方法である。
Further, the present invention is a method of managing a design / development project, in which work is managed in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. That is, the design / development project is divided into a plurality of product units, the divided products are composed of a plurality of design processes, and each design process is composed of a plurality of work item units (work item units are man-hours). Is defined within 1 week or less), and the progress status of the work (indicated by the actual date or progress rate against the planned date or the actual man-hour against the standard man-hour etc.) is desired for each defined work item. Designed to present to the display means of the work terminal of
This is a management method for development projects. The present invention also provides a design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. In the method of managing a design / development project, a list of work products related to work items to be performed in the product / design process in the design / development project is displayed and presented on the display means of the desired work terminal. is there. The present invention also uses a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network.
A method of managing a design / development project that manages work in a development project. The work record for each work item to be performed in the product / design process in the design / development project is based on the time or time when a tool or hardware is used. It is a method of managing a design / development project that is characterized in that

【0021】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発プロ
ジェクト管理システムを使用して設計・開発プロジェク
トにおける作業管理を行う設計・開発プロジェクトの管
理方法であって、取得されたツールまたはハードウエア
を使用した時刻または時間に対して追加・修正して日単
位で設計・開発リソース毎の作業実績を管理することを
特徴とする設計・開発プロジェクトの管理方法である。
また本発明は、サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、作業計画と作業実績とに基づいて設計・開発リソー
スまたは設計・開発リソースのグループ毎に得られる作
業負荷状況を所望の作業端末の表示手段に提示して設計
・開発プロジェクトにおける作業負荷状況を管理するこ
とを特徴とする設計・開発プロジェクトの管理方法であ
る。また本発明は、サーバに複数の作業端末を通信ネッ
トワークで接続して構成される設計・開発プロジェクト
管理システムを使用して設計・開発プロジェクトにおけ
る作業管理を行う設計・開発プロジェクトの管理方法で
あって、設計・開発プロジェクトにおける日程計画と実
際の作業実績または予測もしくは推定される作業実績と
を比較して遅れが発生した場合または遅れが予測される
場合には警告を所望の作業端末から出力することを特徴
とする設計・開発プロジェクトの管理方法である。また
本発明は、前記設計・開発プロジェクトの管理方法にお
いて、前記比較を設計工程単位または作業項目単位で行
うことを特徴とする。
Further, the present invention is a method for managing a design / development project, in which work is managed in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. The management of the design / development project is characterized by managing the work record of each design / development resource on a daily basis by adding / correcting the time or time when the acquired tool or hardware is used. Is the way.
The present invention also provides a design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. , Manages the workload status in a design / development project by presenting the workload status obtained for each design / development resource or group of design / development resources on the display means of the desired work terminal based on the work plan and work record It is a method of managing a design / development project characterized by: The present invention also provides a design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. , Output a warning from a desired work terminal when a delay occurs or a delay is predicted by comparing a schedule plan in a design / development project with actual work results or predicted or estimated work results. Is a method of managing a design / development project. Further, the present invention is characterized in that, in the design / development project management method, the comparison is performed in design process units or work item units.

【0022】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発プロ
ジェクト管理システムを使用して設計・開発プロジェク
トにおける作業管理を行う設計・開発プロジェクトの管
理方法であって、設計・開発プロジェクトを複数の製品
単位に分け、分けられた製品を複数の設計工程で構成
し、該各設計工程を成果物作成可能な複数の作業項目単
位(作業項目単位は工数が1週間以下で定義される)で
分けて定義し、この定義された作業項目単位で作業の進
捗状況(予定日に対する実績日または進捗度または標準
工数に対する実績工数等で示される。)を所望の作業端
末の表示手段に対して提示することを特徴とする設計・
開発プロジェクトの管理方法である。また本発明は、サ
ーバに複数の作業端末を通信ネットワークで接続して構
成される設計・開発プロジェクト管理システムを使用し
て設計・開発プロジェクトにおける作業管理を行う設計
・開発プロジェクトの管理方法であって、設計・開発プ
ロジェクトにおける製品・設計工程で行うべき作業項目
に関係する作業成果物の一覧を所望の作業端末の表示手
段に表示して提示することを特徴とする設計・開発プロ
ジェクトの管理方法である。また本発明は、サーバに複
数の作業端末を通信ネットワークで接続して構成される
設計・開発プロジェクト管理システムを使用して設計・
開発プロジェクトにおける作業管理を行う設計・開発プ
ロジェクトの管理方法であって、設計・開発プロジェク
トにおける製品・設計工程で行うべき作業項目毎の作業
実績を、ツールまたはハードウエアを使用した時刻また
は時間に基づいて取得することを特徴とする設計・開発
プロジェクトの管理方法である。
Further, the present invention is a method of managing a design / development project, which manages work in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. That is, the design / development project is divided into a plurality of product units, the divided products are composed of a plurality of design processes, and each design process is composed of a plurality of work item units (work item units are man-hours). Is defined within 1 week or less), and the progress status of the work (indicated by the actual date or progress rate against the planned date or the actual man-hour against the standard man-hour, etc.) is desired for each defined work item. Designed to present to the display means of the work terminal of
This is a management method for development projects. The present invention also provides a design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. In the method of managing a design / development project, a list of work products related to work items to be performed in the product / design process in the design / development project is displayed and presented on the display means of the desired work terminal. is there. The present invention also uses a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network.
A method of managing a design / development project that manages work in a development project. The work record for each work item to be performed in the product / design process in the design / development project is based on the time or time when a tool or hardware is used. It is a method of managing a design / development project that is characterized in that

【0023】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発プロ
ジェクト管理システムを使用して設計・開発プロジェク
トにおける作業管理を行う設計・開発プロジェクトの管
理方法であって、取得されたツールまたはハードウエア
を使用した時刻または時間に対して追加・修正して日単
位で設計・開発リソース毎の作業実績を管理することを
特徴とする設計・開発プロジェクトの管理方法である。
また本発明は、サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、作業計画と作業実績とに基づいて設計・開発リソー
スまたは設計・開発リソースのグループ毎に得られる作
業負荷状況を所望の作業端末の表示手段に提示して設計
・開発プロジェクトにおける作業負荷状況を管理するこ
とを特徴とする設計・開発プロジェクトの管理方法であ
る。また本発明は、サーバに複数の作業端末を通信ネッ
トワークで接続して構成される設計・開発プロジェクト
管理システムを使用して設計・開発プロジェクトにおけ
る作業管理を行う設計・開発プロジェクトの管理方法で
あって、設計・開発プロジェクトにおける日程計画と実
際の作業実績または予測もしくは推定される作業実績と
を比較して遅れが発生した場合または遅れが予測される
場合には警告を所望の作業端末から出力することを特徴
とする設計・開発プロジェクトの管理方法である。
Further, the present invention is a method for managing a design / development project, which manages work in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. The management of the design / development project is characterized in that the work record of each design / development resource is managed on a daily basis by adding / correcting the time or time when the acquired tool or hardware is used. Is the way.
The present invention also provides a design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. , Manages the workload status in a design / development project by presenting the workload status obtained for each design / development resource or group of design / development resources on the display means of the desired work terminal based on the work plan and work record It is a method of managing a design / development project characterized by: The present invention also provides a design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. , Output a warning from a desired work terminal when a delay occurs or a delay is predicted by comparing a schedule plan in a design / development project with actual work results or predicted or estimated work results. Is a method of managing a design / development project.

【0024】また本発明は、前記設計・開発プロジェク
トの管理方法において、前記比較を設計工程単位または
作業項目単位で行うことを特徴とする。また本発明は、
サーバに複数の作業端末を通信ネットワークで接続して
構成される設計・開発プロジェクト管理システムを使用
して設計・開発プロジェクトにおける作業管理を行う設
計・開発プロジェクトの管理方法であって、設計・開発
プロジェクトにおける作業の実績状況を日程計画と合わ
せて所望の作業端末の表示手段に対して表示することを
特徴とする設計・開発プロジェクトの管理方法である。
また本発明は、サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、新規設計・開発プロジェクトにおいてリストアップ
された製品・設計工程と、このリストアップされた製品
・設計工程における日程計画または工数情報もしくは作
業量とを所望の作業端末の表示手段に対して提示するこ
とを特徴とする設計・開発プロジェクトの管理方法であ
る。
The present invention is also characterized in that, in the design / development project management method, the comparison is performed in design process units or work item units. The present invention also provides
A design / development project management method for managing work in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. It is a method of managing a design / development project, characterized in that the actual status of the work in is displayed on the display means of a desired work terminal together with the schedule.
The present invention also provides a design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. To present the product / design process listed in the new design / development project and the schedule or man-hour information or work amount in the listed product / design process to the display means of the desired work terminal. Is a method of managing a design / development project.

【0025】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発プロ
ジェクト管理システムを使用して設計・開発プロジェク
トにおける作業管理を行う設計・開発プロジェクトの管
理方法であって、所望の作業端末の表示手段に対して、
日或いは週或いは月或いは半年或いは年の単位で設計・
開発プロジェクトにおける作業負荷状況を提示して設計
・開発プロジェクトの日程計画を作成または変更するこ
とを特徴とする設計・開発プロジェクトの管理方法であ
る。また本発明は、サーバに複数の作業端末を通信ネッ
トワークで接続して構成される設計・開発プロジェクト
管理システムを使用して設計・開発プロジェクトにおけ
る作業管理を行う設計・開発プロジェクトの管理方法で
あって、新規設計・開発プロジェクトに必要な工数情報
またはリソース数情報を算出し、この算出された新規設
計・開発プロジェクトに必要な工数情報またはリソース
数情報と既存の製品・設計プロジェクトに対して割り当
てている工数情報またはリソース数情報とプロジェクト
業務以外の作業量およびその未来の予測値とを日或いは
週或いは月或いは半年或いは年の単位で所望の作業端末
の表示手段に対して提示することを特徴とする設計・開
発プロジェクトの管理方法である。
Further, the present invention is a method for managing a design / development project, which manages work in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. And with respect to the display means of the desired work terminal,
Design by day, week, month, half year or year
It is a method of managing a design / development project, characterized by presenting a work load situation in the development project and creating or changing a schedule of the design / development project. The present invention also provides a design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. Calculates the man-hour information or resource number information required for a new design / development project, and allocates it to the calculated man-hour information or resource number information required for the new design / development project and the existing product / design project. Characterized by presenting man-hour information or resource number information, a work amount other than the project work, and a future predicted value thereof in units of day, week, month, half year or year to the display means of the desired work terminal. This is a management method for design / development projects.

【0026】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発プロ
ジェクト管理システムを使用して設計・開発プロジェク
トにおける作業管理を行う設計・開発プロジェクトの管
理方法であって、新規設計・開発プロジェクトにおける
作業計画を作成する際、該新規設計・開発プロジェクト
における各製品・設計工程で行うべき作業項目に対して
リソースが割り当てられているか否かを所望の作業端末
の表示手段に対して提示することを特徴とする設計・開
発プロジェクトの管理方法である。また本発明は、サー
バに複数の作業端末を通信ネットワークで接続して構成
される設計・開発プロジェクト管理システムを使用して
設計・開発プロジェクトにおける作業管理を行う設計・
開発プロジェクトの管理方法であって、新規設計・開発
プロジェクトにおける作業計画を作成する際、該新規設
計・開発プロジェクトにおける各製品・設計工程で行う
べき作業項目の内、特殊作業項目についてはこの特殊作
業項目を実行するのに適するリソース候補を所望の作業
端末の表示手段に対して提示し、該提示されたリソース
候補からリソースを選定して割り当てることを特徴とす
る設計・開発プロジェクトの管理方法である。また本発
明は、サーバに複数の作業端末を通信ネットワークで接
続して構成される設計・開発プロジェクト管理システム
を使用して設計・開発プロジェクトにおける作業管理を
行う設計・開発プロジェクトの管理方法であって、新規
設計・開発プロジェクトにおける作業計画を作成する
際、該新規設計・開発プロジェクトにおける各製品・設
計工程で行うべき作業項目に対して割り当てるリソース
の能力に応じた予想工数に変更して前記リソースを割り
当てることを特徴とする設計・開発プロジェクトの管理
方法である。
The present invention is also a method of managing a design / development project, which manages work in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. In addition, when creating a work plan for a new design / development project, it is desirable to determine whether or not resources are allocated to work items to be performed in each product / design process in the new design / development project. It is a method of managing a design / development project characterized by presenting it to the display means. In addition, the present invention is a design / work management system that uses a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network.
This is a management method for a development project, and when a work plan for a new design / development project is created, this special work is performed for a special work item among work items to be performed in each product / design process in the new design / development project. A method for managing a design / development project, characterized by presenting a resource candidate suitable for executing an item to a display means of a desired work terminal, and selecting and allocating a resource from the presented resource candidates. . The present invention also provides a design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. When creating a work plan for a new design / development project, change the resource to the expected manpower according to the capacity of the resource to be assigned to the work item to be performed in each product / design process in the new design / development project, and change the resource. It is a design / development project management method characterized by allocation.

【0027】また本発明は、サーバに複数の作業端末を
通信ネットワークで接続して構成される設計・開発プロ
ジェクト管理システムを使用して設計・開発プロジェク
トにおける作業管理を行う設計・開発プロジェクトの管
理方法であって、設計・開発プロジェクトを複数の製品
単位に分け、分けられた製品を複数の設計工程で構成
し、該各設計工程を成果物作成可能な複数の作業項目単
位で分けて定義し、この定義された作業項目単位で作業
を実行する際、前記作業項目毎または設計工程毎に対し
て入力される作業指示事項と該作業指示事項に対して入
力される回答情報とを所望の作業端末の表示手段に提示
して前記作業項目毎または設計工程毎の作業指示を管理
することを特徴とする設計・開発プロジェクトの管理方
法である。また本発明は、サーバに複数の作業端末を通
信ネットワークで接続して構成される設計・開発プロジ
ェクト管理システムを使用して設計・開発プロジェクト
における作業管理を行う設計・開発プロジェクトの管理
方法であって、設計・開発プロジェクトを複数の製品単
位に分け、分けられた製品を複数の設計工程で構成し、
該各設計工程を成果物作成可能な複数の作業項目単位で
分けて定義し、この定義された作業項目または設計工程
の待ち条件を入力して設定し、所定の作業項目または設
計工程を遂行する際、前記入力されて設定された待ち条
件が成立したとき警告を所定の作業端末から出力して待
ち条件を管理することを特徴とする設計・開発プロジェ
クトの管理方法である。また本発明は、サーバに複数の
作業端末を通信ネットワークで接続して構成され、設計
・開発プロジェクトにおける作業管理を行う設計・開発
プロジェクト管理システムであって、設計・開発プロジ
ェクトを複数の製品単位に分け、分けられた製品を複数
の設計工程で構成し、該各設計工程を成果物作成可能な
複数の作業項目単位で分けて定義した情報を格納する格
納手段を前記サーバに備え、前記定義された作業項目単
位で作業の進捗状況を取得する取得手段を所望の作業端
末に備え、前記所得手段で取得された作業項目単位で作
業の進捗状況を提示する表示手段を所望の作業端末に備
えたことを特徴とする設計・開発プロジェクトの管理シ
ステムである。
Further, the present invention is a method of managing a design / development project, in which work is managed in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. That is, the design / development project is divided into a plurality of product units, the divided products are composed of a plurality of design processes, and each design process is defined by dividing it into a plurality of work item units capable of producing deliverables. When performing work in units of the defined work items, desired work terminals include work instruction items input for each work item or design process and reply information input for the work instruction items. The method for managing a design / development project is characterized by presenting the work instructions for each work item or each design process by displaying the work instructions on the display means. The present invention also relates to a design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. , The design / development project is divided into multiple product units, and the divided products are configured in multiple design processes.
Each design process is defined by dividing it into a plurality of work items capable of producing deliverables, waiting conditions for the defined work items or design processes are input and set, and predetermined work items or design processes are executed. At this time, when the input and set waiting condition is satisfied, a warning is output from a predetermined work terminal to manage the waiting condition, which is a design / development project management method. Further, the present invention is a design / development project management system configured to connect a plurality of work terminals to a server via a communication network, and manages work in a design / development project. The server is provided with a storage unit that stores information that is configured by dividing each divided product into a plurality of design processes and dividing each design process into a plurality of work item units capable of creating deliverables. The desired work terminal is equipped with an acquisition means for acquiring the work progress status for each work item, and the desired work terminal is provided with a display means for presenting the work progress status for each work item acquired by the income means. It is a management system for design / development projects.

【0028】以上説明したように、本発明の特徴とする
基本思想は、根底にプロジェクト状況の可視化というア
イデアに基づいている。まず設計開発プロジェクトの業
務を明確化するため、プロジェクトを開発する製品を単
位に分割し、次に製品毎に設計工程をまとめることがで
きるようにした。この製品というグループは設計工程の
グルーピングと考えることもできる。更に、この1つの
設計工程を詳細な作業項目に分割し、この作業項目に基
づいて設計工程及びプロジェクトを記述することにし
た。このため、1つの設計工程を定義するための手段と
ともに、その設計工程を記述するための作業項目を定義
するための手段を設けた。ただし、ここでは「プロジェ
クトは複数の設計工程の集合である」という意味でプロ
ジェクトと設計工程ということばを使用している。すな
わち、1つのプロジェクトを完了するにあたっての、例
えば「○○部仕様書作成」、「××部コーディング」な
どのレベルを、1つの設計工程と呼んでいる。また、以
下ではこのように定義した「設計工程」のことを「ワー
ク」と呼ぶこともあり、または「設計工程」、または製
品と関係づけられていることから「製品・設計工程」と
呼ぶこともある。また、設計工程において作成する設計
ドキュメント、図面、手配書などの作業成果物(ドキュ
メント)と設計工程と関連を保持する手段を設け、また
設計成果物を作成するためのツールとの関連情報を管理
するための格納手段を設け、設計作業自身を効率化する
ことを実現した。
As described above, the basic idea that characterizes the present invention is based on the idea of visualizing the project status. First, in order to clarify the work of the design and development project, the products for which the project is developed are divided into units, and then the design process can be summarized for each product. This product group can be thought of as a grouping in the design process. Further, this one design process is divided into detailed work items, and the design process and the project are described based on these work items. Therefore, a means for defining one design process and a means for defining a work item for describing the design process are provided. However, the terms project and design process are used here to mean "project is a set of multiple design processes". In other words, the level of “specification of XX department”, “coding of XX department”, etc. in completing one project is called one design process. In the following, the "design process" defined in this way is sometimes called "work", or "design process", or "product / design process" because it is associated with the product. There is also. In addition, there is a means to maintain the relationship between the work products (documents) such as design documents, drawings, and order documents created in the design process and the design process, and manage the related information with the tools for creating the design products. By implementing the storage means to do so, we have realized the efficiency of the design work itself.

【0029】また、1つの設計工程を詳細化した上記作
業項目は、その属性として担当者、工数を持っている。
また、このような詳細作業項目は1つの設計工程に比較
すれば、作業工数が小さい、すなわち完成に時間がかか
らない、短期間で行える作業である。したがって、担当
者の違いによる作業の完成に必要な時間のバラツキを少
なくすることができ、プロジェクト計画全体の工数の見
積もり精度を向上させる効果がある。また、担当者の能
力を考慮することによって、この工数の見積りの精度を
更に向上させることができる。この見積りは、プロジェ
クト初期計画時に不可欠であり、特にプロジェクト全体
を見渡した適切な人員の予測として不可欠な機能であ
る。そこで、プロジェクトの全体工数を予測する手段を
設けた。また、このように詳細化した作業項目は、作業
実績として保持可能であり、次回のプロジェクトの実施
時にはその工数などが、大いに参考になる。すなわち、
これらの詳細作業項目の工数の積み上げに基づいて日程
計画の立案を行えば、日程計画が単なるがんばり目標で
なく、工数的裏付けのある達成可能な日程計画とするこ
とができる。
The work item, which is a detailed design process, has a person in charge and man-hours as attributes.
Further, such a detailed work item is a work that can be performed in a short period of time, that is, the work man-hour is small as compared with one design process, that is, it does not take time to complete. Therefore, it is possible to reduce the variation in the time required to complete the work due to the difference in person in charge, and it is possible to improve the accuracy of estimating the man-hours of the entire project plan. In addition, the accuracy of the estimation of the man-hours can be further improved by considering the ability of the person in charge. This estimate is essential during the initial planning of the project, especially as a predictor of appropriate personnel over the entire project. Therefore, we have provided a means to predict the total man-hours of the project. Further, the work items detailed in this way can be retained as work results, and the man-hours, etc., of the next project implementation can be greatly referred to. That is,
If a schedule is drafted based on the accumulation of man-hours of these detailed work items, the schedule can be a achievable schedule with man-hour support, not just a hard-working goal.

【0030】また、このような詳細作業項目による設計
開発業務の記述により、従来大まかな指示のみで進行し
ていた設計業務に対して、やるべき作業を漏れなく確実
に遂行することができる。また、担当者の違いによる設
計成果物の品質をバラツキを無くし、安定した品質の設
計を実現することができる。また、設計工程毎に設計成
果物の完成度を検証することを必ず実施するようにし
て、設計結果の品質の向上を実現する構成とした。ま
た、設計開発プロジェクト進行中において発生する問題
の多くは、潜在化している問題であり、事前に予測が可
能なものも数多くある。そこで、日程計画と実績情報の
比較分析による警告発行のための手段を設け、問題が顕
在化する前に警告として知らせ、早期の対策実施を可能
とした。また、設計開発プロジェクトの管理者は、日程
計画を作成することだけが業務ではない。作成した日程
計画に基づき、工程で発生した問題に有効な対策を施し
て、プロジェクトの円滑な進行を行わなければならない
が、このためには各担当者が実施する設計開発作業の進
捗状況の把握が不可欠である。しかしながら、進捗情報
はプロジェクト管理者が担当者にヒアリングしたり、申
告させたりして調査するのは非常に手間がかかる。そこ
で、本発明では、進捗情報の取得のため、作業項目の遂
行中に使用する作業ツールの使用時間を自動的に取得す
ることにより、進捗情報を取得することとした。また、
ツール未使用の作業に関しては作業項目毎に実績時間を
入力する手段を設け、各担当者が実施した作業の実績情
報を漏れなく採取することを実現した。また、このよう
な自動取得によれば、担当者、管理者双方の手間と工数
を削減することができる。このように本発明によれば、
無理のない日程計画な基づく、設計開発プロジェクトの
円滑な進行と、詳細化された作業項目による具体的な作
業指示により、設計品質の安定化、向上を実現できる。
Further, by describing the design and development work by such detailed work items, it is possible to surely carry out the work to be performed for the design work which has conventionally been carried out only by rough instructions. Further, it is possible to eliminate variations in the quality of the design result due to the difference in the person in charge and to realize a stable quality design. In addition, the quality of the design result is improved by always verifying the degree of completion of the design result for each design process. Many of the problems that occur during the design and development project are latent problems, and there are many that can be predicted in advance. Therefore, a means for issuing a warning by comparative analysis of the schedule and actual information was provided, and a warning was issued before the problem became apparent, enabling early implementation of countermeasures. Also, the manager of a design and development project is not the only task to create a schedule. Based on the created schedule, it is necessary to take effective measures against problems that occur in the process and to carry out the project smoothly.To do this, grasp the progress of the design and development work carried out by each person in charge. Is essential. However, it is very time-consuming for the project manager to inquire about the progress information by inquiring the person in charge or making a declaration. Therefore, in the present invention, in order to acquire the progress information, the progress information is acquired by automatically acquiring the usage time of the work tool used during the execution of the work item. Also,
With regard to work that does not use tools, a means has been provided to enter the actual time for each work item, and it has been possible to collect the actual information of the work performed by each person in charge. In addition, such automatic acquisition can reduce the labor and man-hours of both the person in charge and the administrator. Thus, according to the present invention,
Stabilization and improvement of design quality can be realized by smooth progress of design and development projects based on reasonable schedules and concrete work instructions by detailed work items.

【0031】[0031]

【発明の実施の形態】本発明に係る設計・開発の進捗管
理方法及びそのシステムの実施例について図面を用いて
説明する。図1は、本発明に係る設計・開発の進捗管理
システムの一実施例である機能ブロック構成を示す図で
ある。図2は、本発明に係る設計・開発の進捗管理シス
テムの一実施例であるハード構成を示した図である。本
システムは、複数の作業端末(例えばパソコン、ワーク
ステーション)32を通信ネットワーク33を介して管
理するサーバ(計算機)31に接続して構成している。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a design / development progress management method and system according to the present invention will be described with reference to the drawings. FIG. 1 is a diagram showing a functional block configuration which is an embodiment of a design / development progress management system according to the present invention. FIG. 2 is a diagram showing a hardware configuration which is an embodiment of the design / development progress management system according to the present invention. This system is configured by connecting a plurality of work terminals (for example, personal computers, workstations) 32 to a server (computer) 31 that manages via a communication network 33.

【0032】サーバ(計算機)31は、図2に示すよう
に、CPU311と、CPU311が演算処理するプロ
グラムを記憶し、作業端末32から送られてきたデータ
および外部記憶装置316から読出されたデータ等を一
時記憶するメモリ312と、制御装置313を介して接
続されたキーボード、マウス、ディスク等の入力手段3
17と、制御装置314を介して接続された作業実績、
管理項目および成果物等を記憶格納する外部記憶装置3
16と、制御装置315を介して接続されたディスプレ
イ等の表示手段318と、通信ネットワーク33とのイ
ンターフェースをとる通信インターフェース部319
と、これらを接続するバス310とから構成される。上
記外部記憶装置316は、作業実績、管理項目および成
果物等を記憶格納するもので、図1及び図5に示す作業
実績格納部101および管理項目格納部106、並びに
図5に示す成果物格納部404及び参照情報入力実績登
録部406等が対応する。そして、計画情報の一部や作
業識別情報の一部などの共通管理情報については上記入
力手段317を用いて入力して外部記憶装置316等に
記憶格納することができる。
As shown in FIG. 2, the server (computer) 31 stores a CPU 311 and a program which the CPU 311 performs arithmetic processing, data sent from the work terminal 32, data read from the external storage device 316, and the like. A memory 312 for temporarily storing the data and an input means 3 such as a keyboard, a mouse, and a disk connected via a control device 313.
17, work records connected via the control device 314,
External storage device 3 for storing and storing management items and deliverables
16, a display unit 318 such as a display connected via the control device 315, and a communication interface unit 319 for interfacing with the communication network 33.
And a bus 310 connecting them. The external storage device 316 stores and stores work records, management items, deliverables, and the like. The work record storage unit 101 and the management item storage unit 106 shown in FIGS. 1 and 5 and the deliverable storage shown in FIG. The section 404 and the reference information input result registration section 406 correspond to each other. Then, common management information such as part of the plan information and part of the work identification information can be input using the input means 317 and stored in the external storage device 316 or the like.

【0033】各作業端末(例えばパソコン、ワークステ
ーション)32も、CPU321と、ディスプレイ等の
表示手段326に表示する画像情報(アイコン等も含
む)や入力手段325で入力された進捗データ及び作業
実績データ等を一時記憶するメモリ322と、制御装置
323を介して接続されたキーボード、マウス、ディス
ク等の入力手段325及びバーコード読み取り装置32
8と、制御装置324を介して接続されたディスプレイ
等の表示手段326と、インターフェース330を介し
て接続された実験等を行うためのハードウェア(実験装
置、分析装置、制御装置も含むロボットシステム)32
9と、通信ネットワーク33とのインターフェースをと
る通信インターフェース部327と、これらを接続する
バス320とから構成される。なお、開発者は、各種作
業内容を、システムにログインしない状態で、実験・分
析装置等を利用しての実験・分析作業や思考作業等をす
る場合が有る。即ち、ハードウェア329は、必ずしも
作業端末32に接続されていない場合も有る。
Each work terminal (for example, a personal computer, a work station) 32 also has CPU 321 and image information (including icons and the like) displayed on display means 326 such as a display, and progress data and work record data input by input means 325. A memory 322 for temporarily storing data etc., a keyboard, a mouse, an input means 325 such as a disk, and a barcode reading device 32 connected via a control device 323.
8 and display means 326 such as a display connected via the control device 324, and hardware connected to the interface 330 for performing experiments (robot system including experimental device, analysis device, control device) 32
9, a communication interface unit 327 that interfaces with the communication network 33, and a bus 320 that connects them. Note that the developer may perform an experiment / analysis work or a thinking work by using an experiment / analysis device or the like without logging in to the system for various work contents. That is, the hardware 329 may not necessarily be connected to the work terminal 32.

【0034】次に本発明に係る図1に示す設計・開発の
進捗管理システムの機能ブロックについて説明する。即
ち、作業実績格納部101は、開発者の担当作業(図1
7に利用ツールとして「○○Editor」、「△△C
AE」及び「□□CAD」で示すソフトウェアを利用し
た作業や「□分析装置」で示すハードウェアを利用した
作業)の作業実績(図3に201で示すように、作業対
象であるプロジェクトAAAの製品名HA100の作業
群名HAにおける作業内容(コードha1,ha2・・
・)毎に作業日、進捗度、作業終了日、作業開始時刻、
作業終了時刻、利用ツール、利用ツールの利用開始時刻
及び利用終了時刻等)を格納するもので、ハード構成と
しては図2に示すサーバ(計算機)31における外部記
憶装置316に相当する。作業実績表現部102は、作
業端末32のディスプレイ326上に、例えば図18に
作業日06/22の作業実績欄に示すように、作業実績
格納部101(サーバ31の外部記憶装置316)から
CPU311によって検索された作業実績や作業実績報
告部104から入力または修正された作業実績を作業内
容を識別する情報とともに表示する機能を示し、ハード
構成としては図2に示す主にサーバ(計算機)31にお
けるCPU311および作業端末32のCPU321が
相当する。作業実績報告部104は、図18に作業日0
6/22としての作業実績欄に?で示すようにソフトウ
ェアやハードウェア利用以外のシステムが把握できない
(モニタリングできない)作業内容(例えば図18に本
日の予定作業として「○○部品発注」や「構造解析」等
のように机上作業内容)についての作業実績の入力、既
に図18に作業日06/22としての作業実績欄に示さ
れたソフトウェアやハードウェア利用することによって
システムが把握した(モニタリングできた)作業実績に
対する修正(追加・変更)を作業端末32に設けられた
入力手段325を用いて行って表示手段326に表示す
ると共に最後に確定した作業実績を作業実績格納部10
1(サーバ31の外部記憶装置316)に登録する機能
を示し、ハード構成としては主に図2に示す作業端末3
2の入力手段325、表示手段326及びCPU32
1、並びにサーバ31におけるCPU311が相当す
る。
The functional blocks of the design / development progress management system shown in FIG. 1 according to the present invention will now be described. That is, the work record storage unit 101 stores the work of the developer (see FIG.
7 use tools as "○○ Editor", "△△ C"
AE ”and“ □□ CAD ”work using software and“ □ analyzer ”using hardware) work record (as indicated by 201 in FIG. 3) Work content of product group HA100, work group name HA (code ha1, ha2 ...
・) For each work date, progress, work end date, work start time,
The work end time, the utilization tool, the utilization start time and the utilization end time of the utilization tool, etc. are stored, and the hardware configuration corresponds to the external storage device 316 in the server (computer) 31 shown in FIG. The work record expression unit 102 displays the work record storage unit 101 (the external storage device 316 of the server 31) to the CPU 311 on the display 326 of the work terminal 32, for example, as shown in the work record column of the work date 06/22 in FIG. 2 shows a function of displaying the work record retrieved by the work record and the work record input or corrected from the work record report unit 104 together with the information for identifying the work content. The hardware configuration is mainly shown in the server (computer) 31 shown in FIG. The CPU 311 and the CPU 321 of the work terminal 32 correspond to each other. The work performance report unit 104 displays the work date 0 in FIG.
In the work record column as 6/22? As shown in, the contents of work that cannot be grasped (monitored) by the system other than using software or hardware (for example, contents of desk work such as "Ordering ○○ parts" and "Structural analysis" as scheduled work for today in Fig. 18) Input of the work record, and correction (addition / change) to the work record which the system has grasped (monitored) by using the software and hardware already shown in the work record column as work date 06/22 in FIG. ) Is displayed on the display unit 326 by using the input unit 325 provided in the work terminal 32, and the work record finally determined is stored in the work record storage unit 10.
1 (the external storage device 316 of the server 31), and the hardware configuration is mainly the work terminal 3 shown in FIG.
2 input means 325, display means 326 and CPU 32
1 corresponds to the CPU 311 in the server 31.

【0035】作業内容表現部105は、作業端末32か
ら入力手段325等を用いてシステムにログインした開
発者名を判断して、管理項目格納部106から図16に
示すような開発者が担当しているプロジェクトAAAの
製品名HA100の作業群名HAにおける管理指標(例
えば期限、即ち、ステータス、作業予定日、進捗度、標
準工数)、及び図17に示すように選択された担当作業
内容ha2に関係する情報(作業上利用する利用ツー
ル、書類及び図面等のフォーマット)を作業端末32の
表示手段326に表示する機能を示し、ハード構成とし
ては主に図2に示す作業端末32の入力手段325、表
示手段326及びCPU321、並びにサーバ31にお
けるCPU311が相当する。管理項目格納部106
は、進捗管理の対象となる開発を構成するプロジェクト
AAAの製品名HA100の作業群名HAにおける進捗
開発指標などの定義情報(図16に示す。)を格納する
もので、ハード構成としては主に図2に示すサーバ31
における外部記憶装置316が相当する。作業実績モニ
タリング部107は、開発者「佐藤」が作業端末(例え
ばパソコン、ワークステーション)32の表示手段32
6に表示された図17に示す画面を用いて作業内容ha
2を実行する際、利用ツール(「○○Editor」、
「△△CAE」及び「□□CAD」等のソフトウェア
と、作業端末32に接続された「□分析装置」等のハー
ドウェア329)の利用開始時刻と利用終了時刻、作業
内容を識別するための識別コードha2と作業開始時
刻、作業終了時刻を作業端末32のCPU321によっ
てモニタリングし、このモニタリングされた作業実績
(例えば図3の201で示す。)を作業実績格納部(サ
ーバ31の外部記憶装置316)101に格納する機能
を示し、ハード構成としては主に図2に示す作業端末3
2の入力手段325、表示手段326及びCPU32
1、並びにサーバ31におけるCPU311が相当す
る。進捗度報告部108は、開発者が作業端末32に対
して図17に示す画面を開いて作業開始時刻が一旦モニ
タリングされて実際作業を実行し、作業の終了を宣告し
て作業を終了させる際、図11に示すような作業内容の
進捗度を登録することを要求する画面を表示手段326
に表示させ、入力手段325を用いて進捗度を入力し
て、作業実績格納部101に登録する機能を示し、ハー
ド構成としては主に図2に示す作業端末32の入力手段
325、表示手段326及びCPU321、並びにサー
バ31におけるCPU311が相当する。
The work content expression unit 105 judges the name of the developer who has logged in to the system from the work terminal 32 by using the input means 325 and the like, and the developer as shown in FIG. The management index (for example, the deadline, that is, the status, the scheduled work date, the degree of progress, the standard man-hours) in the work group name HA of the product name HA100 of the existing project AAA, and the assigned work content ha2 selected as shown in FIG. 2 shows a function of displaying related information (utilization tools used for work, formats of documents and drawings, etc.) on the display means 326 of the work terminal 32, and the hardware configuration is mainly the input means 325 of the work terminal 32 shown in FIG. , The display unit 326 and the CPU 321, and the CPU 311 in the server 31. Management item storage unit 106
Stores definition information (shown in FIG. 16) such as a progress development index in the work group name HA of the product name HA 100 of the project AAA that constitutes the development subject to progress management, and is mainly used as a hardware configuration. The server 31 shown in FIG.
The external storage device 316 in FIG. In the work result monitoring unit 107, the developer “Sato” has a display means 32 of a work terminal (eg, personal computer, workstation) 32.
Work content ha using the screen shown in FIG.
When executing 2, use tools ("○○ Editor",
For identifying the use start time and use end time of the software such as “ΔΔCAE” and “□□ CAD” and the hardware 329) such as “□ analyzer” connected to the work terminal 32, and the work content The identification code ha2, the work start time, and the work end time are monitored by the CPU 321 of the work terminal 32, and the monitored work record (for example, 201 in FIG. 3) is stored in the work record storage unit (the external storage device 316 of the server 31). ) 101, and the hardware configuration is mainly the work terminal 3 shown in FIG.
2 input means 325, display means 326 and CPU 32
1 corresponds to the CPU 311 in the server 31. When the developer opens the screen shown in FIG. 17 with respect to the work terminal 32, the work start time is once monitored and the work is actually executed, and the developer declares the end of the work and ends the work. , A screen requesting to register the progress of the work content as shown in FIG.
The function of inputting the degree of progress using the input unit 325 and registering the progress in the work record storage unit 101 is shown. The hardware configuration is mainly the input unit 325 and the display unit 326 of the work terminal 32 shown in FIG. And the CPU 321 and the CPU 311 in the server 31.

【0036】非進捗状況把握時刻設定部109は、年
休、休日などの勤休上、モニタリングされる必要のない
日、また必要勤務時間外の時間帯で自己啓発などの目的
で作業を行う時間帯を、進捗把握を行う必要のない時刻
として設定すべく、作業端末32の入力手段325等を
用いて入力して、管理項目格納部(サーバ31の外部記
憶装置316)106(図4に示す304)に登録する
機能を示し、ハード構成としては主に図2に示す作業端
末32の入力手段325、表示手段326及びCPU3
21、並びにサーバ31におけるCPU311が相当す
る。進捗報告要求時刻検出部110は、システムが進捗
報告を要求するタイミングと時刻を抽出する機能を示
し、ハード構成としては主に図2に示す作業端末32の
CPU321、またはサーバ31におけるCPU311
が相当する。この進捗報告要求時刻検出部110は、サ
ーバ31側のCPU311と作業端末32側のCPU3
21のどちらで行っても良い。進捗報告要求部111
は、作業端末32上で進捗報告を要求する機能を示し、
ハード構成としては主に図2に示す作業端末32のCP
U321、またはサーバ31におけるCPU311が相
当する。
The non-progress status grasping time setting unit 109 is used for work days such as annual holidays and holidays, days that do not need to be monitored, and hours for performing work for the purpose of self-development during times outside the required working hours. In order to set the band as a time at which it is not necessary to grasp the progress, it is input using the input means 325 of the work terminal 32, and the management item storage unit (external storage device 316 of the server 31) 106 (shown in FIG. 4). 304), and the hardware configuration mainly includes the input unit 325, the display unit 326, and the CPU 3 of the work terminal 32 shown in FIG.
21 and the CPU 311 in the server 31. The progress report request time detection unit 110 has a function of extracting the timing and time at which the system requests a progress report. As a hardware configuration, the CPU 321 of the work terminal 32 or the CPU 311 of the server 31 shown in FIG.
Is equivalent. The progress report request time detection unit 110 includes a CPU 311 on the server 31 side and a CPU 3 on the work terminal 32 side.
You can go either 21. Progress report request unit 111
Indicates a function for requesting a progress report on the work terminal 32,
The hardware configuration is mainly the CP of the work terminal 32 shown in FIG.
It corresponds to the U321 or the CPU 311 in the server 31.

【0037】次に、図6を用いて、上記システムを用い
て自動的にモニタリングできない作業実績を把握するた
めの作用について説明する。その前に、作業実績格納部
101と作業実績表現部102について図3を用いて説
明する。即ち作業実績格納部(サーバ31の外部記憶装
置)101には、開発者が例えば図17に示す画面を用
いて作業した作業日、作業の進捗度、作業終了日、作業
開始時刻と作業終了時刻、作業端末32を用いて利用ツ
ール(サーバ31の外部記憶装置316から読出して通
信ネットワーク33を介して作業端末32のメモリ32
2に記憶された「○○Editor」、「△△CAE」
及び「□□CAD」等のソフトウェアと、作業端末32
に接続された「□分析装置」等のハードウェア329)
を用いて行った作業における利用ツールの利用開始時刻
と利用終了時刻等の作業実績が、図3の201のよう
に、作業の対象であるプロジェクトAAA、製品名HA
100、作業群名HAを構成する作業内容コードha
1,ha2,・・・に対応させて格納されている。作業
実績表現部(主としてサーバ31のCPU311、およ
び作業端末32のCPU321、入力手段325、表示
手段326)102は、開発者がマウスやキーボード等
の入力手段325を用いて作業端末32に入力した作業
実績登録のためのコマンドにより、開発者名をキーとし
てCPU321は通信ネットワーク33を介してサーバ
(計算機)31のCPU311に対して作業実績格納部
(外部記憶装置316)101から作業実績を検索し、
この検索された開発者名をキーとする作業実績を通信ネ
ットワーク33を介して作業端末32に送信し、作業端
末32の表示手段326に表示させるものである。
Next, with reference to FIG. 6, the operation for grasping the work record that cannot be automatically monitored using the above system will be described. Before that, the work record storage unit 101 and the work record expression unit 102 will be described with reference to FIG. That is, in the work record storage unit (external storage device of the server 31) 101, for example, the work date on which the developer worked using the screen shown in FIG. , A working tool using the work terminal 32 (read from the external storage device 316 of the server 31 and read through the communication network 33 from the memory 32 of the work terminal 32).
"○○ Editor", "△△ CAE" stored in 2
And software such as "□□ CAD" and the work terminal 32
Hardware such as "□ analyzer" 329 connected to
The work results such as the use start time and the use end time of the usage tool in the work performed by using the project are the project AAA, the product name HA, which is the target of the work, as indicated by 201 in FIG.
100, work content code ha composing work group name HA
1, ha2, ... The work result expression unit (mainly the CPU 311 of the server 31 and the CPU 321, the input means 325, the display means 326) 102 of the work is input to the work terminal 32 by the developer using the input means 325 such as a mouse or a keyboard. With the command for registering the result, the CPU 321 searches the work record from the work record storage unit (external storage device 316) 101 to the CPU 311 of the server (computer) 31 via the communication network 33 using the developer name as a key,
The work record with the searched developer name as a key is transmitted to the work terminal 32 via the communication network 33 and displayed on the display means 326 of the work terminal 32.

【0038】そして図6に示すように、作業実績表現部
(主としてサーバ31のCPU311、および作業端末
32のCPU321、入力手段325、表示手段32
6)102は、作業端末32の入力手段325で入力さ
れた指示に基づいて、その日、開発者名をキーとして、
作業実績報告部(主としてサーバ31のCPU311)
104において作業実績格納部(サーバ31の外部記憶
装置316)101から取り出された作業実績の作業時
間帯から、モニタリングされていない時間帯を検出し、
このモニタリングされていない時間帯を通信ネットワー
ク33を介して作業端末32のCPU321に送信して
作業端末32の表示手段326に、図18に示す如く作
業実績欄(作業日06/22)に?として表示する(6
01)。また、作業実績表現部102は、作業端末32
の入力手段325で入力された指示に基づいて、その
日、開発者名をキーとして、作業実績報告部(主として
サーバ31のCPU311)104において作業実績格
納部(サーバ31の外部記憶装置316)101から取
り出されたモニタリングされた作業実績を検索し、この
モニタリングされた作業実績を通信ネットワーク33を
介して作業端末32のCPU321に送信して作業端末
32の表示手段326に、モニタリングされた作業実績
として作業開始時刻、作業終了時刻、利用ツール(利用
したソフトウェア及びハードウェア)、利用時間(利用
開始時刻と利用終了時刻)などを図18の作業実績欄6
1、参考作業欄63のように表示し(602)、更に、
当日、予定されていた作業内容を、作業実績報告部(主
としてサーバ31のCPU311)104において管理
項目格納部(サーバ31の外部記憶装置316)106
に格納された図4に示す計画情報305の内の個人計画
情報3052から取り出し、この本日の予定作業を、通
信ネットワーク33を介して作業端末32のCPU32
1に送信して作業端末32の表示手段326に、前記の
モニタリングされた作業時間と一緒に図18に示す本日
の予定作業欄62のように表示する(603)。
Then, as shown in FIG. 6, a work record expression section (mainly the CPU 311 of the server 31 and the CPU 321 of the work terminal 32, the input means 325, the display means 32).
6) 102, based on the instruction input by the input means 325 of the work terminal 32, using the developer name as a key on that day
Work performance report section (mainly the CPU 311 of the server 31)
In 104, a non-monitored time period is detected from the work time period of the work result extracted from the work result storage unit (external storage device 316 of the server 31) 101,
This unmonitored time zone is transmitted to the CPU 321 of the work terminal 32 via the communication network 33 and displayed on the display means 326 of the work terminal 32 in the work record column (work date 06/22) as shown in FIG. Display as (6
01). In addition, the work record expression unit 102 uses the work terminal 32.
Based on the instruction input by the input means 325 of the work record reporting unit (mainly the CPU 311 of the server 31) 104 from the work record storage unit (external storage device 316 of the server 31) 101 on that day, using the developer name as a key. The retrieved monitored work record is retrieved, the monitored work record is transmitted to the CPU 321 of the work terminal 32 via the communication network 33, and the display means 326 of the work terminal 32 displays the work record as the monitored work record. The work record column 6 of FIG. 18 includes start time, work end time, use tool (used software and hardware), use time (use start time and use end time), etc.
1. Display like the reference work column 63 (602), and
On the day of the scheduled work, the work item report unit (mainly the CPU 311 of the server 31) 104 stores the scheduled work content in the management item storage unit (external storage device 316 of the server 31) 106.
4 is extracted from the personal plan information 3052 of the plan information 305 shown in FIG. 4 stored in FIG. 4, and this today's scheduled work is performed by the CPU 32 of the work terminal 32 via the communication network 33.
1 and displays it on the display means 326 of the work terminal 32 together with the monitored work time as in the scheduled work field 62 of today shown in FIG. 18 (603).

【0039】これら作業実績とともに、作業実績報告部
(主としてサーバ31のCPU311)104は、通信
ネットワーク33を介して作業端末32の表示手段32
6に対して画面上にメッセージを表示して作業実績の確
認を要求する(604)。そして、この要求に対して、
開発者が、表示手段326に表示された画面上でマウ
ス、キーボードなどの入力手段325を利用して作業実
績欄61において、進捗報告の修正(モニタリングされ
ていない作業実績?については追加し、モニタリングさ
れている作業実績において間違って入力されている箇所
については変更する。)を行った結果を表示手段326
に表示すると共に一時メモリ322上に記憶する(60
5)。開発者によって、表示手段326に表示された画
面上の編集結果を了承するコマンドを、マウス、キーボ
ードなどの入力手段325を用いて発行されると、メモ
リ322に一時記憶された編集結果の作業実績(画面上
に表示されたその日のその時刻までの作業実績)がCP
U321によって通信ネットワーク33を介してサーバ
(計算機)31に送信され、作業実績格納部(サーバ3
1の外部記憶装置316)101に登録される(60
6)。
Along with these work records, the work record reporting unit (mainly the CPU 311 of the server 31) 104 displays the work means 32 on the display means 32 via the communication network 33.
A message is displayed on the screen to request the confirmation of the work record (6). And for this request,
The developer uses the input means 325 such as a mouse and a keyboard on the screen displayed on the display means 326 to correct the progress report in the work performance column 61 (add the work performance not monitored? Display means 326 for the result of performing a change in a portion that is erroneously input in the work record that has been input.
And is stored in the temporary memory 322 (60
5). When the developer issues a command for approving the edited result on the screen displayed on the display unit 326 by using the input unit 325 such as a mouse and a keyboard, the work record of the edited result temporarily stored in the memory 322. (Work record up to that time on the day displayed on the screen) is CP
It is transmitted to the server (computer) 31 via the communication network 33 by the U321 and is stored in the work record storage unit (server 3).
No. 1 external storage device 316) 101 (60)
6).

【0040】しかし、万一、何らかの理由で、開発者
が、表示手段326の画面に表示された作業実績を了承
せずに作業実績登録処理をキャンセルするコマンドを入
力手段325を用いて発行した場合にも、作業実績登録
のためのコマンドを入力手段325を用いて再発行すれ
ば、図6の上記に説明した処理を行い、作業実績を作業
実績格納部(サーバ31の外部記憶装置316)101
に正しく登録することが可能となる。これにより、ソフ
トウェアやハードウェア利用以外のシステムが把握でき
ない(モニタリングされなかった)作業実績について
も、図18に参考作業欄63に示す如く、本システムに
対してログインしないで(接続しないで)開発者自身が
利用したソフトウェア(「○○Editor」、「△△
calcura」、「□CAD」、「○○CAE」
等)、ハードウェアなどの利用実績(作業内容コードh
a1におけるファイル名(ha1−1,ha1−2,h
a1−1,ha1−3)、ファイルオープン時刻、使用
ソフトウェア(「○○Editor」、「△△calc
ura」、「□CAD」、「○○CAE」等)、最終保
存時刻)とともに表示することにより、開発者が前後の
モニタリングされた作業実績欄61に示す作業実績を参
照しながら、モニタリングされなかった作業実績?(作
業開始時刻、作業終了時刻が入っているのは作業計画が
あったことを示す。)において入力手段325を用いて
追加・修正することができ、その結果がCPU321に
よって通信ネットワーク33を介してサーバ(計算機)
31に送信されて作業実績格納部(サーバ31の外部記
憶装置316)101に登録されることによって、本シ
ステムとして正確に全ての作業実績を容易にモニタリン
グすることができる。
However, in the unlikely event that the developer issues a command for canceling the work record registration processing by using the input unit 325 without accepting the work record displayed on the screen of the display unit 326, for some reason. Also, if the command for work record registration is reissued using the input means 325, the process described above with reference to FIG. 6 is performed, and the work record is stored in the work record storage unit (external storage device 316 of the server 31) 101.
It is possible to register correctly in. As a result, even for work results that cannot be grasped (not monitored) by the system other than using software or hardware, as shown in the reference work column 63 in FIG. 18, development is performed without logging in (without connecting) to this system. Software used by the person himself (“○ Editor”, “△△
"calcura", "□ CAD", "○○ CAE"
Etc.), hardware usage record (work content code h
File name in a1 (ha1-1, ha1-2, h
a1-1, ha1-3), file open time, software used ("○○ Editor", "△△ calc"
ura ”,“ □ CAD ”,“ ○ CAE ”, etc.), and the last save time), so that the developer does not monitor while referring to the work record shown in the monitored work record column 61 before and after. Work record? (Including the work start time and work end time indicates that there was a work plan.) The input means 325 can be used for addition / correction, and the result can be read by the CPU 321 via the communication network 33. Server (computer)
By being transmitted to 31 and registered in the work record storage unit (the external storage device 316 of the server 31) 101, all work records can be accurately and easily monitored as the present system.

【0041】次に、図9を用いて、システムが開発者の
作業実績を自動的にモニタリングする方法について説明
する。即ち、作業内容表現部105は、図15に示すよ
うに、作業端末32から入力手段325を用いてシステ
ムにログインして表示手段326の画面における入力域
151に入力された開発者名を作業端末32のCPU3
21が判断し、通信ネットワーク33を介してサーバ3
1に送信してCPU311が管理項目格納部(外部記憶
装置316等)106に格納された開発者の開発対象で
ある製品、又はその製品の一部の設計のための作業群の
管理指標(例えば期限、工数、作業計画上その日に行う
予定になっている作業)を取り出し、この取り出された
作業群の管理指標を通信ネットワーク33を介して作業
端末32のCPU321に送信して表示手段326上に
表示する。そこで、この表示された作業群のマクロな進
捗情報を基に、開発者が作業を開始する作業群を、例え
ばマウスなどの入力手段325を用いて選択すると、作
業内容表現部105は、図16に示す作業群を構成する
作業内容の計画情報(ステータスや作業開始予定日、進
捗度、標準工数)や作業手順などを管理項目格納部(外
部記憶装置316等)106から作業端末32にロード
して表示手段326の画面上に表示する。即ち、作業内
容表現部(主としてサーバ31におけるCPU311)
105は、開発者の開発対象である製品、又はその製品
の一部の設計のための担当作業内容、またその他の業務
の担当作業内容を検索し、図16に示すように検索され
た担当作業内容(プロジェクト名AAA、製品名HA1
00、作業群HAにおける作業内容ha1,ha2,h
a3,ha4,チェック、審査、承認、提出において、
ステータス、作業開始予定日、進捗度、標準工数)を通
信ネットワーク33を介して作業端末32のCPU32
1に送信して表示手段326上に表示する(901)。
そこで、開発者が、作業内容表現部105により作業端
末32の表示手段326上に表示された個々の作業内容
161を、例えばマウスなどの入力手段325を用いて
選択すると、作業実績モニタリング部(主として作業端
末32のCPU321、サーバ31におけるCPU31
1)107は、CPU321において図17に示す作業
を行う画面を作業端末32の表示手段326に表示し
て、作業開始時刻と作業内容を識別するための識別コー
ド(例えばha2)をモニタリングして、通信ネットワ
ーク33を介してCPU311へ送信し、作業実績格納
部(外部記憶装置316)101に格納する(90
2)。また、このタイミングで、作業実績モニタリング
部107は、作業を行うために必要なソフトウェア
(「○○Editor」、「△△CAE」及び「□□C
AD」等)、および作業端末32に接続されたハードウ
ェア(「□分析装置」等)329のソフトウェアと、作
業端末32に接続された「□分析装置」等のハードウェ
ア329に対する利用実績(利用開始時刻、利用終了時
刻等)のモニタリングを開始する。例えば、これら利用
ツールを用いた作業の利用開始時刻および利用終了時刻
をモニタリングする(903)。また、使用ソフトウェ
アを利用してファイルを作成した場合、ファイルの最終
保存時刻等をモニタリングする(904)。このように
モニタリングされた利用ツールを用いた作業の利用開始
時刻および利用終了時刻、並びにファイルの最終保存時
刻等を、作業端末32から通信ネットワーク33を介し
てサーバ31に送信して、図3の201並びに202で
示すように、他のモニタリング情報とともに作業実績格
納部(外部記憶装置316)101に格納する(90
5)。以上説明したように、管理項目格納部106、作
業内容表現部105、作業実績モニタリング部107お
よび作業実績格納部101により、開発中にソフトウェ
アやハードウェアを利用する開発者が、容易に進捗報告
でき、作業を中断することなく、正確に作業実績をモニ
タリングすることができる。
Next, a method for the system to automatically monitor the work record of the developer will be described with reference to FIG. That is, as shown in FIG. 15, the work content expression unit 105 logs in the system from the work terminal 32 by using the input unit 325 and inputs the developer name input in the input area 151 on the screen of the display unit 326 to the work terminal. 32 CPU3
21 makes a decision, and the server 3 through the communication network 33
1 and the CPU 311 stores the product to be developed by the developer stored in the management item storage unit (external storage device 316 or the like) 106, or the management index of the work group for designing a part of the product (for example, The deadline, the number of man-hours, and the work scheduled to be performed on the day according to the work plan) are extracted, and the management index of the extracted work group is transmitted to the CPU 321 of the work terminal 32 via the communication network 33 and displayed on the display unit 326. indicate. Therefore, based on the macro progress information of the displayed work group, when the developer selects the work group to start the work using the input unit 325 such as a mouse, the work content expression unit 105 displays The plan information (status, planned start date of work, progress, standard man-hours) and work procedure of the work contents constituting the work group shown in are loaded from the management item storage unit (external storage device 316, etc.) 106 to the work terminal 32. Are displayed on the screen of the display means 326. That is, the work content expression unit (mainly the CPU 311 in the server 31)
Reference numeral 105 designates a product under development by the developer, or a work content for designing a part of the product, or a work content for other work, and the searched work content as shown in FIG. Contents (project name AAA, product name HA1
00, work contents ha1, ha2, h in the work group HA
a3, ha4, check, examination, approval, submission,
The status, the scheduled work start date, the degree of progress, and the standard man-hours) are stored in the CPU 32 of the work terminal 32 via the communication network 33.
1 and display it on the display means 326 (901).
Therefore, when the developer selects the individual work content 161 displayed on the display unit 326 of the work terminal 32 by the work content expression unit 105 using the input unit 325 such as a mouse, the work result monitoring unit (mainly, CPU 321 of work terminal 32, CPU 31 of server 31
1) 107 causes the CPU 321 to display the screen for performing the work shown in FIG. 17 on the display unit 326 of the work terminal 32, and monitors the work start time and the identification code (for example, ha2) for identifying the work content, It is transmitted to the CPU 311 via the communication network 33 and stored in the work record storage unit (external storage device 316) 101 (90
2). Further, at this timing, the work performance monitoring unit 107 causes the software (“○ Editor”, “ΔΔCAE”, and “□□ C” necessary for performing the work to be performed.
AD) etc.), and software of hardware (“□ analyzer” etc.) 329 connected to the work terminal 32 and hardware 329 connected to the work terminal 32 such as “□ analyzer” (use) Start time, use end time, etc.) will be monitored. For example, the usage start time and usage end time of the work using these usage tools are monitored (903). When the file is created using the software used, the last save time of the file is monitored (904). The use start time and use end time of the work using the use tool monitored in this way, the last save time of the file, and the like are transmitted from the work terminal 32 to the server 31 via the communication network 33, and the operation of FIG. As indicated by 201 and 202, it is stored in the work record storage unit (external storage device 316) 101 together with other monitoring information (90).
5). As described above, the management item storage unit 106, the work content expression unit 105, the work result monitoring unit 107, and the work result storage unit 101 allow a developer who uses software or hardware during development to easily report the progress. , The work performance can be accurately monitored without interrupting the work.

【0042】次に、システムが開発者の作業実績を確実
にモニタリングできる方法を、図10を用いて説明す
る。即ち、図1のブロック構成図にて前述したように、
開発者が作業端末32の表示手段326に表示された図
17に示す画面に基づいて、作業内容ha2を実行して
作業内容の作業開始時刻が一旦モニタリングされると、
作業端末32のCPU321からなる作業実績モニタリ
ング部107は、作業終了を宣言するコードがマウス、
キーボードなどの入力手段325を用いて入力されない
限り、本システムをログアウトできないよう制御する。
例えば、開発者が、作業終了を宣言するコードを入力せ
ずに作業端末32に対してログアウトしようとすると、
作業端末32の表示手段326の画面上に作業終了がな
されていない作業内容があることをメッセージとして表
示し(1001)、その作業内容が属する作業群名、作
業内容名なども合わせて表示する(1002)。開発者
が、表示手段326に表示された作業内容についてマウ
スなどの入力手段325を用い作業終了を意味するコマ
ンドを入力すると、作業端末32のCPU321は作業
終了時刻を求めて、その作業終了時刻を通信ネットワー
ク33を介してサーバ31に送信し、作業実績格納部
(外部記憶装置316)101に登録する(100
3)。ここにおいて、作業端末32からシステムのログ
アウトを意味するコマンドが発行されてサーバ31に送
信されると、本システムが終了する(1004)。以上
説明したように作業実績モニタリング部107により、
作業内容の作業終了時刻が確実にモニタリングでき、開
発者が進捗報告を意識しなくとも作業内容別に作業開始
時刻、終了時刻とともにソフトウェアと、ハードウェア
の利用実績が作業実績格納部101に格納されることに
なる。
Next, a method by which the system can reliably monitor the work record of the developer will be described with reference to FIG. That is, as described above in the block diagram of FIG.
When the developer executes the work content ha2 based on the screen shown in FIG. 17 displayed on the display unit 326 of the work terminal 32 and once the work start time of the work content is monitored,
The work result monitoring unit 107 including the CPU 321 of the work terminal 32 has a code for declaring the end of work as a mouse,
The system is controlled so that it cannot be logged out unless input is performed using the input means 325 such as a keyboard.
For example, if the developer tries to log out to the work terminal 32 without inputting the code that declares the end of work,
On the screen of the display means 326 of the work terminal 32, a message indicating that there is work content that has not been completed is displayed as a message (1001), and the work group name to which the work content belongs, the work content name, etc. are also displayed ( 1002). When the developer inputs a command indicating the end of work by using the input unit 325 such as a mouse for the work content displayed on the display unit 326, the CPU 321 of the work terminal 32 obtains the work end time and sets the work end time. It is transmitted to the server 31 via the communication network 33 and registered in the work record storage unit (external storage device 316) 101 (100
3). Here, when the command indicating the logout of the system is issued from the work terminal 32 and transmitted to the server 31, the present system ends (1004). As described above, the work performance monitoring unit 107
The work end time of the work content can be reliably monitored, and the use record of software and hardware is stored in the work record storage unit 101 together with the work start time and end time for each work content without the developer being aware of the progress report. It will be.

【0043】次に、図11を用いて、作業内容の進捗度
を採取する方法について説明する。即ち、図1のブロッ
ク構成図にて前述したように、作業端末32において、
開発者が、図17を示す画面を用いて例えば作業内容h
a2について作業を実行することによって作業開始時刻
が一旦モニタリングされ、開発者が実行した作業結果
(処理結果)が成果物格納部(サーバ31の外部記憶装
置316)404に格納し、開発者が入力手段325を
用いて作業内容を終了する際、進捗度報告部(作業端末
32のCPU321)108は、入力手段325から作
業内容の作業終了を宣言するコードが入力されると、作
業内容の進捗度を登録することを要求するメッセージ
(40)を表示手段326の画面上に表示する。ここで
登録される進捗度は、作業内容で達成すべき目標に対す
る達成度を表わした数値であり、未着手を0、完成を1
00として開発者が入力手段325を用いて入力できる
ものである。表示手段326の画面上には、進捗度の入
力域の他、作業実績格納部(サーバ31の外部記憶装置
316)101からサーバ31のCPU311が取り出
して通信ネットワーク33を介して送信された作業開始
時刻前までの進捗度(41)と、作業開始時刻から作業
終了時刻までの作業時間(42)と、該作業時間(4
2)において指標となる予測進捗度(43)が進捗度報
告部(主として作業端末32のCPU321)108に
より計算され、作業端末32の表示手段326上に表示
される。進捗度報告部(主として作業端末32のCPU
321)108は、該作業時間における実施結果に対応
した進捗度が入力されるまで他の処理に移ることができ
ないよう制御する。ここで、開発者が100という数字
を画面上の入力域114にキーボードまたはマウス等の
入力手段325を使用して入力して作業の完了を宣言す
ると、進捗度報告部(主として作業端末32のCPU3
21)108は、その作業内容で必ず行わなければなら
ない手順、守るべき設計基準、などのチェック項目を表
示手段326の画面に表示して、開発者にチェックを要
求する。全てチェックされなければ進捗度は、作業端末
32のCPU321からサーバ31に送信されず、登録
されない。即ち、作業端末32において、開発者によっ
て全てチェックされると、入力手段325を用いて入力
されて一時メモリ322に記憶された進捗度は、通信ネ
ットワーク33を介してサーバ(計算機)31に送信さ
れ、作業実績格納部(外部記憶装置316)101に登
録されることになる。以上説明したように進捗度報告部
108により、作業内容の信頼性も確保された上で正確
にかつ確実に進捗度を作業実績格納部101に登録する
ことができる。
Next, with reference to FIG. 11, a method of collecting the progress of the work content will be described. That is, as described above in the block diagram of FIG. 1, in the work terminal 32,
The developer uses the screen shown in FIG.
The work start time is once monitored by executing the work for a2, and the work result (processing result) executed by the developer is stored in the deliverable storage unit (external storage device 316 of the server 31) 404 and input by the developer. When the work content is ended by using the means 325, the progress report unit (CPU 321 of the work terminal 32) 108 receives the code declaring the work end of the work content from the input means 325, and the progress degree of the work content. A message (40) requesting to register is displayed on the screen of the display means 326. The degree of progress registered here is a numerical value indicating the degree of achievement of the goal to be achieved by the work content, and 0 is not started and 1 is completed.
00 can be input by the developer using the input means 325. On the screen of the display means 326, in addition to the progress input area, the CPU 311 of the server 31 takes out from the work record storage unit (external storage device 316 of the server 31) 101 and starts the work transmitted via the communication network 33. Progress (41) before time, work time (42) from work start time to work end time, and work time (4
The predicted progress degree (43) which is an index in 2) is calculated by the progress degree reporting unit (mainly the CPU 321 of the work terminal 32) 108 and displayed on the display means 326 of the work terminal 32. Progress report section (mainly CPU of work terminal 32
321) 108 controls so that another process cannot be performed until the progress degree corresponding to the execution result in the work time is input. Here, when the developer declares the completion of the work by inputting the number 100 into the input area 114 on the screen using the input means 325 such as a keyboard or a mouse, the progress report unit (mainly the CPU 3 of the work terminal 32).
21) 108 displays on the screen of the display means 326 check items such as procedures that must be performed in accordance with the work contents, design criteria to be observed, and requests the developer to check. If all are not checked, the degree of progress is not transmitted from the CPU 321 of the work terminal 32 to the server 31 and is not registered. That is, in the work terminal 32, when all are checked by the developer, the progress level input using the input means 325 and stored in the temporary memory 322 is transmitted to the server (computer) 31 via the communication network 33. Will be registered in the work record storage unit (external storage device 316) 101. As described above, the progress report unit 108 can accurately and reliably register the progress in the work record storage unit 101 while ensuring the reliability of the work content.

【0044】次に、システムが進捗把握の必要のない時
間帯の進捗報告の要求を行わない方法について説明す
る。まず、前述した非進捗状況把握時刻設定部109
は、年休、休日などの勤休上、モニタリングされる必要
のない日、また、開発者自身が必要勤務時間外の時間帯
で自己啓発などの目的で作業を行う場合、開発者が作業
端末32上でこの時刻や日程をマウスやキーボードなど
の入力手段325を用いて入力することにより、作業端
末32からサーバ31に送信されてモニタリングできな
い時刻として管理項目格納部(外部記憶装置316)1
06に登録する。また、開発者が出勤時刻、退勤時刻を
登録するためのコマンドを発行できる領域が常に作業端
末32の表示手段326上に表示されており、これをマ
ウスなどの入力手段325を用いて発行すると、非進捗
状況把握時刻設定部(主として作業端末32におけるC
PU321等)109が起動する。例えば、開発者が自
分固有のバーコードをバーコードリーダ328を用いて
よませるか、または、氏名コード等をキーボード等の入
力手段325から入力すると、非進捗状況把握時刻設定
部(主として作業端末32におけるCPU321等)1
09がその旨をサーバ31へ通信して作業実績格納部
(外部記憶装置316)101に開発者の出勤時間また
は退勤時間を登録する。
Next, a method will be described in which the system does not request a progress report in a time period when it is not necessary to grasp the progress. First, the non-progress status grasping time setting unit 109 described above.
Is a work terminal such as an annual holiday, a holiday, a day that does not need to be monitored, or when the developer himself / herself performs work for the purpose of self-development during times other than the required working hours By inputting this time and date on the monitor 32 using the input means 325 such as a mouse and a keyboard, the management item storage unit (external storage device 316) 1 is transmitted from the work terminal 32 to the server 31 and cannot be monitored.
Register in 06. Further, the area where the developer can issue a command for registering the attendance time and the attendance time is always displayed on the display means 326 of the work terminal 32, and when this is issued using the input means 325 such as a mouse, Non-progress status grasping time setting unit (mainly C in the work terminal 32
PU321 etc.) 109 starts. For example, when the developer reads a barcode unique to himself / herself using the barcode reader 328 or inputs a name code or the like from the input means 325 such as a keyboard, the non-progress status grasping time setting unit (mainly the work terminal 32). CPU 321 etc.) 1
09 communicates to that effect to the server 31 and registers the attendance time or leaving time of the developer in the work record storage unit (external storage device 316) 101.

【0045】次に、進捗報告要求時刻検出部110と進
捗報告要求部111とが、上記で設定された非進捗把握
時刻をもとに進捗要求を行う方法を、図12を用いて説
明する。当システムの進捗報告の要求は、図12と図1
3とに記す処理によって制御される。まず、進捗報告要
求部111が進捗報告要求時刻検出部110を用いて進
捗報告を要求する時間帯を検出する方法について、図1
2を用いて説明する。
Next, a method of the progress report request time detection unit 110 and the progress report request unit 111 making a progress request based on the non-progress grasp time set above will be described with reference to FIG. The request for the progress report of this system is shown in Figure 12 and Figure 1.
It is controlled by the process described as 3. First, a method for the progress report requesting unit 111 to detect a time zone for requesting a progress report using the progress report requesting time detecting unit 110 will be described with reference to FIG.
2 will be described.

【0046】開発者が当システムへの進捗報告処理を行
うためのコマンドを、マウスまたはキーボードなどの入
力手段325を用いて入力した場合、又は開発者が当シ
ステムをログアウトもしくはログインするために発行す
るコマンドを、マウスまたはキーボードなどの入力手段
325を用いてに入力した場合に進捗報告要求部(主と
して作業端末32のCPU321)111が起動する
(121)。このとき進捗報告要求部(主として作業端
末32のCPU321)111が発行したコードを受け
取り、メモリ322上の開発者名を通信ネットワーク3
3を介して進捗報告要求時刻検出部(主としてサーバ3
1のCPU311)110に送る(122)。
When the developer inputs a command for performing a progress report process to this system using the input means 325 such as a mouse or a keyboard, or is issued for the developer to log out or log in to this system. When a command is input using the input means 325 such as a mouse or a keyboard, the progress report request unit (mainly the CPU 321 of the work terminal 32) 111 is activated (121). At this time, the code issued by the progress report request unit (mainly the CPU 321 of the work terminal 32) 111 is received, and the developer name on the memory 322 is set to the communication network 3
The progress report request time detection unit (mainly the server 3
1) to the CPU 311) 110 (122).

【0047】進捗報告要求時刻検出部(主としてサーバ
31のCPU311)110では、CPU311におい
て開発者名を検索キーとして作業実績格納部101のモ
ニタリングフラグがたっていない日付の作業実績の中
で、モニタリングされていない時間帯を検出(123)
する。そして、進捗報告要求時刻検出部(主としてサー
バ31のCPU311)110は、上記検出されたモニ
タリングされていない時間帯と非進捗状況把握時刻設定
部109による設定外の時間帯との共通の時間帯を求め
(124)、この求められた共通の時間帯により進捗報
告要求時刻検出部110が進捗把握が必要で、モニタリ
ングされていない時間帯を検出することができる。この
共通の時間帯において、進捗報告要求部111は、作業
端末32に対して進捗報告を要求する。
In the progress report request time detection unit (mainly the CPU 311 of the server 31) 110, the developer name is used as a search key in the CPU 311 to monitor the work record of the date when the monitoring flag of the work record storage unit 101 is not set. Detect no time zone (123)
I do. Then, the progress report request time detection unit (mainly the CPU 311 of the server 31) 110 sets a common time period between the detected non-monitored time period and the time period not set by the non-progress situation grasp time setting unit 109. In step 124, the progress report request time detection unit 110 needs to grasp the progress based on the obtained common time zone, and the time zone that is not monitored can be detected. During this common time period, the progress report requesting unit 111 requests the work terminal 32 for a progress report.

【0048】次に、モニタリングフラグをたてる方法に
ついて、図13を用いて説明する。即ち、進捗報告要求
時刻検出部(主としてサーバ31のCPU311)11
0は、開発者が作業端末32において退勤時刻を登録す
るコマンドを発行すると、この退勤時刻が通信ネットワ
ーク33を介して送信されて作業実績格納部101に格
納される。このタイミング、または開発者が作業内容の
作業終了を宣言するコードをマウスなどの入力手段32
5を用いて入力(131)したタイミングで、次に説明
する処理を行う。まずサーバ31において、CPU31
1は、モニタリングフラグがたっていない作業日を、作
業実績格納部101から抽出し(132)、その日の出
勤時刻から退勤時刻までの時間帯で、非進捗状況把握時
刻として設定された時間帯以外の時間帯と、モニタリン
グされていない時間帯との照合を行う(133)。照合
した結果、一致する時間帯(進捗報告を要求する必要の
時間帯)がなければ、作業実績格納部101にモニタリ
ングフラグ(=図3の204の進捗実績カラム)をたて
る(124)。
Next, a method of setting the monitoring flag will be described with reference to FIG. That is, the progress report request time detection unit (mainly the CPU 311 of the server 31) 11
When the developer issues a command for registering the leaving time at the work terminal 32, the leaving time 0 is transmitted via the communication network 33 and stored in the work record storage unit 101. At this timing, or a code for the developer to declare the end of work of the work content is input means 32 such as a mouse.
At the timing of inputting (131) using 5, the processing described below is performed. First, in the server 31, the CPU 31
1 is a time period from the work record storage unit 101 that extracts work days for which the monitoring flag is not set (132), and is a time period from the sunrise working time to the working time, other than the time period set as the non-progress status grasping time. The time zone and the time zone not monitored are collated (133). As a result of the collation, if there is no matching time zone (time zone required to request the progress report), a monitoring flag (= progress achievement column of 204 in FIG. 3) is set in the work achievement storage unit 101 (124).

【0049】前記に説明した処理により、進捗報告要求
時刻検出部110の進捗把握が必要な時間帯で、モニタ
リングされていない時間帯を検出すると、進捗報告要求
部111が作業端末32に対して進捗報告を要求すべ
く、作業端末32の表示手段326上に進捗報告を要求
するメッセージを表示する。万一、複数の日付にわたっ
て進捗報告されていない時間帯がある場合には、古い日
付から順番に表示する。進捗報告要求部111は、進捗
報告されるまで作業実績格納部101のモニタリングフ
ラグをたてない。これにより、確実に作業実績をモニタ
リングできる。一方、非進捗状況把握時刻設定部109
は、入力された年休などの勤務時間を設定する情報を、
一旦、管理項目格納部106に格納するが、管理者が作
業端末32またはサーバ31にて承認すると、承認済み
フラグをたてる。作業内容表現部105、作業実績表現
部102および図5の進捗情報表示部402は、承認済
みであるか、そうでないかによって表示内容を制限す
る。例えば、年休を予定していてシステムに登録して
も、進捗情報表示部402がその日を年休として表示し
ないということである。また、承認されていない時間帯
は、進捗状況を把握しなければならない時間帯としてシ
ステムが把握するよう制御されており、進捗報告要求部
111が開発者に進捗報告を要求する。
By the processing described above, when the progress report request time detection unit 110 detects a time period in which it is necessary to grasp the progress and is not monitored, the progress report request unit 111 advances the work terminal 32. In order to request the report, a message requesting the progress report is displayed on the display means 326 of the work terminal 32. If there are times when the progress is not reported for multiple dates, they are displayed in order from the oldest date. The progress report requesting unit 111 does not set the monitoring flag in the work result storage unit 101 until the progress is reported. As a result, the work record can be reliably monitored. On the other hand, the non-progress status grasping time setting unit 109
Is the information that sets the entered working hours such as annual leave,
Once stored in the management item storage unit 106, an approval flag is set when the administrator approves the work terminal 32 or the server 31. The work content expression unit 105, the work result expression unit 102, and the progress information display unit 402 in FIG. 5 limit the display contents depending on whether approval has been made or not. For example, even if a yearly vacation is planned and registered in the system, the progress information display unit 402 does not display that day as the yearly vacation. Further, the system is controlled so that the system recognizes an unapproved time zone as a time zone in which the progress status needs to be grasped, and the progress report requesting unit 111 requests the developer for a progress report.

【0050】図5は、本発明に係わる設計・開発の進捗
管理システムの他の一実施例である機能ブロック構成を
示す図である。101から111までの機能ブロックの
構成は、前述の図1の101〜111と同一機能を有す
るブロックとする。進捗情報検索部401は、CPU3
11において進捗状況把握システムでモニタリングされ
た進捗情報、又は管理指標をもつ管理項目格納部106
の計画データを検索する機能を示し、ハード構成として
主としてサーバ31におけるCPU311が相当する。
進捗情報表示部402は、進捗情報検索部401で検索
した進捗情報を通信ネットワーク33を介して作業端末
32に送信して表示手段326に表示する機能を示し、
ハード構成として主としてサーバ31におけるCPU3
11、並びに作業端末32におけるCPU321及び表
示手段326が相当する。計画部403は、管理者等が
製品の開発工程計画をたてて作業端末32の入力手段3
25またはサーバ31の入力手段317を用いて入力し
て外部記憶装置316に格納する機能である。即ち計画
部403は、例えば、図16に示すプロジェクトAA
A,製品HA100,作業群HAにおける作業内容の進
捗状況や期限や担当作業者の負荷状況等を見ながら、管
理者等が作業の担当者の割り当てや、先行関係がある作
業の開始可能日、期限を矛盾なく設定するなどの機能を
有する。成果物格納部404は、図3に203、図16
に162で示すようなシステムの利用者が作成した成果
物、入手実績等の入手情報を格納するもので、ハード構
成としてサーバ31における外部記憶装置316が相当
する。作業環境設定部405は、開発者が作業内容を実
施するときに使用されるべき、または使用することによ
る利便が得られる利用ツール(ソフトウェアやハードウ
ェア等)、書類及び図面のフォーマット、作業実施の前
提条件になる成果物、入手実績等の参照情報を、管理項
目格納部106(図4に示す作業環境設定情報303)
に登録する機能を示し、ハード構成として作業端末32
の入力手段325またはサーバ31の入力手段317を
用いて入力して、管理項目格納部(サーバ31の外部記
憶装置316)106(図4に示す作業環境設定情報3
03)に登録するものである。参照情報入手実績格納部
406は、作業環境設定部405で設定された参照情報
(図3に203、または図16に162で示す。)が成
果物格納部404に格納されたとき、参照情報入手実績
を作業実績格納部(サーバ31の外部記憶装置316)
406に登録する機能であり、ハード構成として作業端
末32の入力手段325が相当する。
FIG. 5 is a diagram showing a functional block structure which is another embodiment of the design / development progress management system according to the present invention. The configuration of the functional blocks 101 to 111 is a block having the same functions as 101 to 111 in FIG. 1 described above. The progress information search unit 401 is the CPU 3
11, the management item storage unit 106 having the progress information monitored by the progress status grasping system or the management index.
The CPU 311 in the server 31 mainly corresponds to the hardware configuration.
The progress information display unit 402 has a function of transmitting the progress information retrieved by the progress information retrieval unit 401 to the work terminal 32 via the communication network 33 and displaying the progress information on the display unit 326.
CPU 3 mainly in the server 31 as a hardware configuration
11 and the CPU 321 and display means 326 in the work terminal 32. In the planning unit 403, the administrator or the like makes a product development process plan and the input means 3 of the work terminal 32 is used.
25 or the input means 317 of the server 31 to input and store in the external storage device 316. That is, the planning unit 403 uses, for example, the project AA shown in FIG.
A, the product HA 100, the work group HA, while monitoring the progress status and deadline of the work content and the load status of the worker in charge, the manager or the like assigns the person in charge of the work and the start possible date of the work having the preceding relationship, It has functions such as setting deadlines consistently. The deliverable storage unit 404 is shown in FIG.
It stores the obtained information such as the deliverables and the obtained achievements created by the user of the system indicated by 162, and corresponds to the external storage device 316 in the server 31 as a hardware configuration. The work environment setting unit 405 is used by a developer when carrying out work contents, or a useful tool (software, hardware, etc.) that can be obtained by using it, a format of documents and drawings, and work execution. Reference information such as deliverables and acquisition records, which are prerequisites, is stored in the management item storage unit 106 (work environment setting information 303 shown in FIG. 4).
The function of registering with the work terminal 32 is shown as a hardware configuration.
Input means 325 of the server 31 or the input means 317 of the server 31 to input the management item storage unit (external storage device 316 of the server 31) 106 (work environment setting information 3 shown in FIG. 4).
03). The reference information acquisition record storage unit 406 acquires the reference information when the reference information (203 in FIG. 3 or 162 in FIG. 16) set by the work environment setting unit 405 is stored in the deliverable storage unit 404. A work result storage unit (external storage device 316 of the server 31)
This is a function to be registered in 406 and corresponds to the input means 325 of the work terminal 32 as a hardware configuration.

【0051】そして、管理項目格納部106に格納され
た情報としては、図4に示すように、プロジェクト情報
3011と開発製品情報3012と作業群情報3013
と作業内容情報3014とからなる作業識別情報30
1、各作業識別情報についての入手元情報308、各作
業識別情報についての送付先情報307、各作業識別情
報についてのイベント情報306、開発者情報3021
と管理者情報3022とからなるユーザ定義情報30
2、作業識別情報301とユーザ定義情報302とに対
応して設定される作業環境設定情報303、作業識別情
報301とユーザ定義情報302とに対応して設定され
る非進捗状況把握時間帯設定情報304、作業識別情報
301に対応して計画される管理指標3051と個人計
画情報3052とからなる計画情報305によって形成
される。
As the information stored in the management item storage unit 106, as shown in FIG. 4, project information 3011, development product information 3012, and work group information 3013.
And work identification information 3014 including work content information 3014
1. Source information 308 for each work identification information, destination information 307 for each work identification information, event information 306 for each work identification information, developer information 3021
User-defined information 30 composed of the following and administrator information 3022
2. Work environment setting information 303 set corresponding to the work identification information 301 and the user definition information 302, and non-progress status grasping time zone setting information set corresponding to the work identification information 301 and the user definition information 302 304, plan information 305 including management index 3051 and individual plan information 3052 planned corresponding to the work identification information 301.

【0052】まず、進捗情報検索部401と進捗情報表
示部402によって、開発者と管理者が進捗情報を表示
する方法について図7と図8とを用いて説明する。例え
ば、作業端末32にて管理者、又は、開発者がマウスな
どの入力手段325により、図7のように表示手段32
6に表示する801のレベルを設定すると、メモリ32
2上に表示レベルを示すコードが記録される。この表示
レベルは、プロジェクト、製品、機種、成果物、作業内
容、開発者、工程におけるイベントなどである。ここで
設定されたレベルは進捗を表示するときの単位として用
いられる。例えば、”プラント”を選択すると、実施工
数がプラント全体で計算されて表示されるということで
ある。また、図7に示す802は、表示する進捗情報の
期間を設定する入力域である。また、803は、設定さ
れた表示レベルの具体的な要素を選択するための入力域
である。また、804は表示方法を選択するための入力
域である。
First, a method for displaying the progress information by the developer and the administrator using the progress information search unit 401 and the progress information display unit 402 will be described with reference to FIGS. 7 and 8. For example, the administrator or the developer at the work terminal 32 uses the input means 325 such as a mouse to display the display means 32 as shown in FIG.
When the level of 801 displayed in 6 is set, the memory 32
A code indicating the display level is recorded on the display 2. This display level is a project, product, model, deliverable, work content, developer, event in process, or the like. The level set here is used as a unit when displaying the progress. For example, when "plant" is selected, it means that the actual man-hours are calculated and displayed for the entire plant. Reference numeral 802 shown in FIG. 7 is an input area for setting the period of the progress information to be displayed. Also, reference numeral 803 is an input area for selecting a specific element of the set display level. Reference numeral 804 is an input area for selecting a display method.

【0053】これら作業実績や計画情報を表示する表示
方法としては、ガントチャート形式、リスト形式、ネッ
トワーク形式、山積み形式等がある。ガントチャート、
山積み、リスト形式は一般的な表示方法であるが、ネッ
トワーク形式というのは、成果物同士の先行関係など、
作業内容の集合同士の先行関係、期限、を図5に示す管
理項目格納部106から取り出し、図8に示すように表
示するものである。
As a display method for displaying the work record and the plan information, there are a Gantt chart format, a list format, a network format, a piled-up format and the like. Gantt chart,
The pile-up and list formats are common display methods, but the network format is such as the preceding relationship between deliverables.
The preceding relationship between the sets of work contents and the deadline are retrieved from the management item storage unit 106 shown in FIG. 5 and displayed as shown in FIG.

【0054】進捗情報検索部(サーバ31におけるCP
U311)401は、以上の802から804を801
の設定で作業実績格納部(外部記憶装置316)101
から作業実績を、管理項目格納部(外部記憶装置31
6)106から計画情報を検索し、これら検索された作
業実績と計画情報とからなる進捗情報を作業端末32に
送信し、進捗情報表示部(作業端末32におけるCPU
321)402が作業端末の表示手段326上に表示す
る。例えば、開発者または管理者などのユーザが、作業
端末32において、表示レベル801では”成果物”
と、期間を設定する入力域802では現在から”3週
間”と、マウスまたはキーボードなどの入力手段325
を用いて設定したとする。この設定された”成果物”
と”3週間”とが作業端末32から通信ネットワーク3
3を介してサーバ31に送信され、CPU311は、現
在から3週間分の管理項目格納部(外部記憶装置31
6)106に格納された計画情報と作業実績格納部(外
部記憶装置316)101に格納された作業実績とか
ら、現在完了していない作業内容のデータを検索して一
時メモリ312またはディスク316上に一括または分
割してロードし、それをCPU311により作業端末3
2に送信してメモリ322またはディスク上に一括また
は分割してロードされる。ところで、作業端末32の表
示手段326の画面上の要素を選択するための入力域8
03において、はじめは、プロジェクトの欄だけが入力
(マウスなどの入力手段325で選択)可能な領域にな
っている。プロジェクトを”AAA”と選択すると、A
AAプロジェクトのもつ機種がメモリ322またはディ
スクから読みだされて、表示手段326の画面(現在完
了していない作業内容のデータを示す表領域)803上
の機種欄に表示され、機種欄の選択が可能となり、AA
Aプロジェクトに関係するイベントがメモリ322また
はディスクから読みだされて、表示手段326の画面
(現在完了していない作業内容のデータを示す表領域)
803上のイベント欄に表示され、イベントが選択可能
となる。”機種を”haaa”と選択すると、機種ha
aaの製品がメモリ322またはディスクから読みださ
れて、表示手段326の画面803上の製品欄に表示さ
れ、製品欄が選択可能となり、製品を”HA000”と
選択すると、製品HA000の成果物が、メモリ322
またはディスクから読みだされて、表示手段326の画
面803上の成果物欄に表示され、成果物欄が選択可能
となる。成果物欄を”A図”、から”D図”まで選択す
ると、その担当開発者がメモリ322またはディスクか
ら読みだされて、表示手段326の画面803上の開発
者欄に表示され、選択可能となる。選択可能となった欄
についてユーザが何も選択せずに検索を実行すると、進
捗情報表示部402である作業端末32のCPU321
は、図8に示すようにすべての要素を進捗表示する。
Progress information retrieval unit (CP in server 31
U311) 401 801 above 802 to 804
Setting of the work record storage unit (external storage device 316) 101
To the management item storage unit (external storage device 31
6) The plan information is retrieved from 106, the progress information consisting of the retrieved work record and the plan information is transmitted to the work terminal 32, and the progress information display section (CPU in the work terminal 32
321) 402 displays it on the display means 326 of the work terminal. For example, a user such as a developer or an administrator may display “deliverable product” at the display level 801 on the work terminal 32.
In the input area 802 for setting the period, "3 weeks" from the present, and input means 325 such as a mouse or a keyboard.
It is assumed that it is set using. This set "artifact"
And "3 weeks" from the work terminal 32 to the communication network 3
3 is transmitted to the server 31, and the CPU 311 causes the management item storage unit (external storage device 31) for three weeks from now.
6) From the plan information stored in 106 and the work record stored in the work record storage unit (external storage device 316) 101, the data of the work content that is not completed at present is searched and the temporary memory 312 or the disk 316 is searched. To the work terminal 3 by the CPU 311.
2 to be loaded into the memory 322 or the disk in a batch or divided manner. By the way, the input area 8 for selecting an element on the screen of the display means 326 of the work terminal 32.
In 03, initially, only the project field is an area in which input (selection by the input means 325 such as a mouse) is possible. If you select "AAA" for the project, A
The model of the AA project is read from the memory 322 or the disk and displayed in the model column on the screen of the display unit 326 (table area showing the data of the work contents that are not completed at present) 803, and the model column is selected. Enabled, AA
The event related to the A project is read from the memory 322 or the disk, and the screen of the display unit 326 (a table area showing the data of the work contents that have not been completed at present)
It is displayed in the event column on 803, and the event can be selected. If you select "haaa" as the model, the model ha
The product aa is read from the memory 322 or the disk and is displayed in the product column on the screen 803 of the display unit 326. The product column becomes selectable. When the product is selected as “HA000”, the product of the product HA000 is obtained. , Memory 322
Alternatively, it is read from the disc and displayed in the product column on the screen 803 of the display unit 326, and the product column can be selected. If you select "A" from "A" to "D" in the deliverables column, the developer in charge will be read from the memory 322 or the disk, displayed in the developer column on the screen 803 of the display means 326, and selectable. Becomes When the user performs a search without selecting any of the selectable columns, the CPU 321 of the work terminal 32, which is the progress information display unit 402, is displayed.
Displays the progress of all elements as shown in FIG.

【0055】表示方法として”ネットワーク”がユーザ
によって選択された場合について、図8を用いて説明す
る。前記の設定で進捗情報表示部402が進捗を表示す
る場合、例えば、図8の700のように表示する。図中
706は、700の進捗情報を更に詳細に表示するため
の機能をロードするコマンドを発行する入力域である。
当入力域706をマウス等の入力手段325を用いて選
択すると、作業端末32からサーバ31に送信され、管
理項目格納部(外部記憶装置316)106に格納され
ている管理指標(例えば期限、標準工数など)、また作
業実績格納部(外部記憶装置316)101に格納され
ている作業実績(例えば実施した工数、進捗度など)、
また管理指標および作業実績から計算される項目(例え
ば実施した工数、進捗度から計算される残りの必要工数
など)が検索されて、一時メモリ312またはディスク
316上に一括または分割してロードし、それをCPU
311により作業端末32に送信してメモリ322また
はディスク上に一括または分割してロードし、表示手段
326において入力域をもつ文字列として707のよう
に表示される。ユーザは707に表示された項目を、マ
ウスなどの入力手段325を用いて選択でき、この選択
された情報が作業端末32からサーバ31に送信され
て、進捗情報検索部401であるサーバ31のCPU3
11がこの入力に基づき管理項目格納部106、作業実
績格納部101からデータをロードして作業端末32に
送信し、進捗情報表示部402である作業端末32のC
PU321がこの値を使用して管理指標と作業実績など
から計算される項目を随時計算して表示手段326上に
表示する。
A case where "network" is selected by the user as the display method will be described with reference to FIG. When the progress information display unit 402 displays the progress with the above setting, for example, the progress is displayed as 700 in FIG. Reference numeral 706 in the drawing denotes an input area for issuing a command for loading a function for displaying the progress information 700 in more detail.
When the input area 706 is selected by using the input means 325 such as a mouse, the management index (for example, the deadline, the standard, which is transmitted from the work terminal 32 to the server 31 and stored in the management item storage unit (external storage device 316) 106. Number of man-hours), the work record stored in the work record storage unit (external storage device 316) 101 (eg, man-hours carried out, degree of progress, etc.),
Further, items calculated from the management index and the work record (for example, man-hours carried out, remaining man-hours calculated from the degree of progress, etc.) are searched and loaded in the temporary memory 312 or the disk 316 collectively or dividedly, CPU it
It is transmitted to the work terminal 32 by 311 and loaded in the memory 322 or the disk collectively or dividedly, and displayed as a character string 707 having an input area on the display means 326. The user can select the item displayed on 707 by using the input means 325 such as a mouse, and the selected information is transmitted from the work terminal 32 to the server 31 and the CPU 3 of the server 31 which is the progress information search unit 401.
Based on this input, 11 loads the data from the management item storage unit 106 and the work record storage unit 101, transmits the data to the work terminal 32, and C of the work terminal 32, which is the progress information display unit 402.
The PU 321 uses this value to calculate an item calculated from the management index and work record, etc., and displays it on the display unit 326.

【0056】次に、図5に示す計画部403について説
明する。即ち、作業端末32からシステムにログインし
たときに、サーバ31のメモリ312に格納されるログ
イン名から判断して、計画部(主としてサーバ31にお
けるCPU311)403では計画できる機能を作業端
末32に対して制限する。制限される機能としては、管
理者のみの機能として、開発担当者の作業群への割り当
てを行う機能、作業群において他の開発担当者の作業群
(作業が一つだけの群も含む)と先行関係がある等、個
人の予定範囲内で変更不可能な作業群の予定開始日、予
定終了日の変更を行う機能等である。また、開発担当者
と同じ作業群の作業を行う開発者同士、近い先行関係に
ある作業群の開発担当者同士、または管理者が開発者と
いう関係以外の間で、他人の作業群の作業実績を参照す
ることはできないように制限される。
Next, the planning unit 403 shown in FIG. 5 will be described. That is, when the user logs in to the system from the work terminal 32, the planning unit (mainly the CPU 311 in the server 31) 403 determines a function that can be planned by the work terminal 32 based on the login name stored in the memory 312 of the server 31. Restrict. The functions that are limited are the functions of the administrator only, the function of assigning the developer to the work group, the work group of other developers in the work group (including the group having only one work). This is a function to change the scheduled start date and scheduled end date of a work group that cannot be changed within the personal schedule range due to the preceding relationship. In addition, the work record of other work groups other than the developers who work in the same work group as the development staff, the development staff of work groups with a close preceding relationship, or the relationship where the manager is the developer Is restricted so that you cannot see.

【0057】次に、同上の計画部(主としてサーバ31
におけるCPU311)403において、管理者が作業
群に開発担当者を割り当てる場合について図14を用い
て説明する。即ち、作業端末32にログインすると、作
業端末32の表示手段326の画面上に、計画部の割り
当てを行う機能をロードするためのコマンドを発行する
入力域が表示される。このとき、図5に示した進捗情報
表示部(作業端末のCPU321)402がログイン名
を判断してサーバ31のCPU311に送信し、CPU
311がログイン名の人物が管理するプロジェクトの管
理項目を、管理項目格納部(外部記憶装置316)10
6からロードしてメモリ312上に一時記憶し、それを
作業端末32に送信してメモリ322に記憶して表示手
段326の画面上の表示領域141に表示する。また進
捗情報検索部(サーバ31のCPU311)401にお
いて、日程遅れのアラームとなる未着手の作業群、必要
工数が現状計画されている計画工数よりも多くなってい
る作業群などが検索された場合には、その情報を作業端
末32に送信して表示手段326の表示領域142にア
ラームとして表示する。例えば、未着手作業群としてア
ラームを作業端末32の表示手段326上に表示する場
合について説明する。作業端末32からロードされたプ
ロジェクト名をキーとしてサーバ31に送信し、サーバ
31のCPU311は、作業実績格納部101と管理項
目格納部106からプロジェクトの作業実績と計画情報
を取り出し、該作業実績と該計画情報をもとに、実績の
進捗度が0となっている作業群の予定開始日と当日を比
較し、予定開始日が当日を過ぎている場合、その情報を
作業端末32に送信して表示手段326の表示領域14
2にアラームとして143のようなユーザがわかるよう
な目印を表示する。また、さらに例を挙げれば、進捗情
報検索部(サーバ31のCPU311)401におい
て、モニタリングした作業実績の実施工数に対する進捗
度から、残りの進捗度を達成するために必要な工数を計
算し、管理指標である標準工数から作業実績である実施
工数をひいた残りの工数を計算し、この値が必要工数よ
りも少ないと検索された場合、その情報を作業端末32
に送信して表示手段326の表示領域142にアラーム
として表示する。このようにアラーム情報として考えら
れる進捗情報をログイン時に参照した管理者は、図5に
示す主として作業端末のCPU321が行う進捗情報表
示部402の機能を利用して、開発者の負荷情報、更に
詳細な進捗情報を表示しながら、再スケジューリングし
たり、開発担当者をまだ割り当てられていない作業群に
割り当てたるなどの作業を行って、一時メモリ322に
記憶させる。そしてメモリ322に記憶された情報がサ
ーバ31に送信されて、新しくまたは再度定められた計
画情報として、管理項目格納部(外部記憶装置316)
106に格納される。
Next, the above-mentioned planning department (mainly the server 31
A case where the manager assigns the development staff to the work group in the CPU 311) 403 in FIG. That is, when logging in to the work terminal 32, an input area for issuing a command for loading the function of assigning the planning unit is displayed on the screen of the display unit 326 of the work terminal 32. At this time, the progress information display unit (CPU 321 of the work terminal) 402 shown in FIG. 5 determines the login name and sends it to the CPU 311 of the server 31.
The management item storage unit (external storage device 316) 10 stores the management items of the project managed by the person whose login name is 311.
6 is temporarily stored in the memory 312, is transmitted to the work terminal 32, is stored in the memory 322, and is displayed in the display area 141 on the screen of the display unit 326. Further, in the case where the progress information search unit (CPU 311 of the server 31) 401 searches for a work group that has not yet started, which is an alarm for a schedule delay, or a work group whose required man-hours are larger than the planned man-hours currently planned. Information is transmitted to the work terminal 32 and displayed as an alarm in the display area 142 of the display unit 326. For example, a case will be described where an alarm is displayed on the display unit 326 of the work terminal 32 as an unstarted work group. The project name loaded from the work terminal 32 is transmitted to the server 31 as a key, and the CPU 311 of the server 31 retrieves the work record and plan information of the project from the work record storage unit 101 and the management item storage unit 106, and Based on the plan information, the scheduled start date of the work group whose actual progress is 0 is compared with the current day, and if the scheduled start date is past the current date, the information is transmitted to the work terminal 32. Display area 14 of the display means 326
In FIG. 2, a mark such as 143 that the user can understand is displayed as an alarm. Further, as a further example, the progress information search unit (CPU 311 of the server 31) 401 calculates and manages the man-hours required to achieve the remaining progress from the progress of the monitored work record with respect to the actual man-hours. The remaining man-hours are calculated by subtracting the actual man-hours, which is the work record, from the standard man-hours, which is an index.
To be displayed as an alarm in the display area 142 of the display means 326. The administrator who referred to the progress information considered as the alarm information at the time of login in this way uses the function of the progress information display unit 402 mainly performed by the CPU 321 of the work terminal shown in FIG. While the progress information is displayed, work is performed such as rescheduling, assigning a person in charge of development to a work group that has not been assigned, and storing the work in the temporary memory 322. Then, the information stored in the memory 322 is transmitted to the server 31, and the management item storage unit (external storage device 316) serves as new or redefined plan information.
106.

【0058】次に、作業環境設定部405を利用して設
定した作業環境を用いた開発業務に関して説明する。ま
ず、管理者または同等の権限をもつユーザが作業環境を
設定する方法について説明する。即ち、管理者又は同等
の権限をもつユーザがシステムにログインすると、作業
端末のCPU321はそのログイン名をみて、作業環境
設定部405を起動するために必要なコマンドを発行す
るための入力域144(図14)を表示手段326の画
面上に表示する。本入力域144をマウスなどの入力手
段325により選択して作業環境設定部405を起動す
ると、作業環境を設定するために、プロジェクト名、機
種名、製品名、作業群名を入力することができる入力域
が表示された画面が表示手段326に表示される。当画
面において、ユーザが管理者である場合には、作業内容
別に作業手順、作業上の注意事項、作業実施の前提条件
になる成果物、入手情報などの参照すべき情報、作業上
使用すべき書類および図面のフォーマットなどの項目を
入力手段325を用いて各々の入力域に入力して設定す
ることができる。一方、ユーザが開発者自身である場合
には、使用したいと考える参照情報、作業上使用すべき
利用ツール(ソフトウェアおよびハードウェア)などを
入力手段325を用いて各々の入力域に入力して設定す
ることができる。これら作業実施の前提条件になる成果
物、参照情報、書類および図面のフォーマットなどは、
作業端末32がサーバ31の成果物格納部(外部記憶装
置316)404に格納されているものを受信して表示
手段326にメニュー形式で表示し、マウスなどの入力
手段325で選択して入力し、ユーザが、作業端末上で
画面上の内容を確認して登録するためのコマンドを発行
する入力域を選択すると作業環境設定情報(作業実施の
前提条件になる成果物、参照情報、書類および図面のフ
ォーマットなど)303を作業端末32のCPU321
によりサーバ(計算機)31に送信してCPU311に
より管理項目格納部106に格納することができる。ま
た作業上使用すべき利用ツール(ソフトウェアおよびハ
ードウェア)については、管理項目格納部106にあら
かじめ格納してあるシステムにおいて利用可能なツール
で、これについても作業端末32がサーバ31の管理項
目格納部106に格納された利用ツールを受信して表示
手段326にメニュー形式で表示し、マウスなどの入力
手段325で選択して入力し、ユーザが、作業端末上で
画面上の内容を確認して登録するためのコマンドを発行
する入力域を選択すると作業環境設定情報(作業上使用
すべき利用ツールなど)303を作業端末32のCPU
321によりサーバ(計算機)31に送信してCPU3
11により管理項目格納部106に格納することができ
る。
Next, the development work using the work environment set by using the work environment setting unit 405 will be described. First, a method of setting a work environment by an administrator or a user having equivalent authority will be described. That is, when an administrator or a user with equivalent authority logs in to the system, the CPU 321 of the work terminal looks at the login name and issues an input area 144 (for issuing a command necessary to activate the work environment setting unit 405). (FIG. 14) is displayed on the screen of the display means 326. When the main input area 144 is selected by the input means 325 such as a mouse and the work environment setting unit 405 is activated, a project name, a model name, a product name, and a work group name can be input to set the work environment. The screen on which the input area is displayed is displayed on the display unit 326. In this screen, if the user is an administrator, work procedures, work precautions, deliverables that are prerequisites for work execution, information to be referred such as acquisition information, work should be used for each work content. Items such as document and drawing formats can be input and set in the respective input areas using the input means 325. On the other hand, in the case where the user is the developer himself, the reference information he / she wants to use, the utilization tools (software and hardware) to be used in the work, etc. are input and set in the respective input areas using the input means 325. can do. The deliverables, reference information, document and drawing formats that are prerequisites for performing these operations are
The work terminal 32 receives what is stored in the deliverable storage unit (external storage device 316) 404 of the server 31, displays it in a menu format on the display means 326, and selects and inputs it with the input means 325 such as a mouse. , When the user selects the input area to issue the command for checking and registering the contents on the screen on the work terminal, work environment setting information (artifacts that are prerequisites for work execution, reference information, documents and drawings) Format) 303 to the CPU 321 of the work terminal 32
Can be transmitted to the server (computer) 31 and stored in the management item storage unit 106 by the CPU 311. The tools (software and hardware) that should be used for work are tools that can be used in the system and are stored in advance in the management item storage unit 106, and the work terminal 32 also uses the management item storage unit of the server 31. The utilization tool stored in 106 is received, displayed in a menu format on the display means 326, selected by the input means 325 such as a mouse and input, and the user confirms the contents on the screen on the work terminal and registers. When an input area for issuing a command to execute is selected, the work environment setting information (utilization tool to be used for work, etc.) 303 is sent to the CPU of the work terminal 32.
321 to send to the server (computer) 31 and CPU3
It can be stored in the management item storage unit 106 according to item 11.

【0059】また作業環境設定部405は、過去の設定
を取り出すをコマンドをもつ。画面上の該コマンドの入
力域をマウスで選択すると、取り出そうとする過去の設
定を指定するための、プロジェクト名、機種名、製品
名、作業群名などのデータを入力する画面を表示する。
このプロジェクト名、機種名などを入力することによ
り、作業実績格納部101に登録されている過去の情報
を、一時サーバ31のメモリ312又はディスク上にロ
ードし、これを作業端末32に送信してメモリ322又
はディスク上にロードして表示手段326の画面に表示
する。表示された内容は作業端末のマウスまたはキーボ
ードなどの入力手段325をもってして編集可能になっ
ている。管理者がマウスなどの入力手段325を用いて
同画面上の編集内容を確認して登録するためのコマンド
を発行する入力域を選択すると、この選択されたコマン
ド情報がサーバ31に送信され、CPU311によって
新しいプロジェクトの作業環境として管理項目格納部1
06に保存することができる。次に、上記作業環境設定
部405で設定された作業環境がどのように開発者に利
用されるかについての実施例を説明する。即ち、開発者
がシステムにログインするとログイン名を判断して作業
内容表現部105である作業端末32のCPU321
が、サーバ31に対して送信して開発者の担当している
作業群の管理指標(期限などの情報、また計画上その日
行う予定になっているかどうかの情報)を管理項目格納
部106から取り出して、サーバ31から作業端末32
に送信して表示手段326上に表示する。このときサー
バ31は、作業実績格納部101に格納された進捗情報
また日程遅れにつながる前述のアラーム情報があれば、
作業端末32に送信して表示手段326上に表示する。
The work environment setting unit 405 also has a command to retrieve past settings. When the input area of the command on the screen is selected with the mouse, a screen for inputting data such as a project name, a model name, a product name, a work group name for designating past settings to be taken out is displayed.
By inputting this project name, model name, etc., the past information registered in the work record storage unit 101 is loaded onto the memory 312 or disk of the temporary server 31 and transmitted to the work terminal 32. It is loaded onto the memory 322 or the disk and displayed on the screen of the display means 326. The displayed contents can be edited using the input means 325 such as the mouse or keyboard of the work terminal. When the administrator uses the input means 325 such as a mouse to select an input area for issuing a command for confirming and registering the edited contents on the screen, the selected command information is transmitted to the server 31 and the CPU 311 By the management item storage unit 1 as a work environment for a new project
It can be stored in 06. Next, an example of how the developer uses the work environment set by the work environment setting unit 405 will be described. That is, when the developer logs in to the system, the login name is determined, and the CPU 321 of the work terminal 32 that is the work content expression unit 105.
Retrieves from the management item storage unit 106 the management index (information such as a deadline, and information about whether or not it is planned to be performed on that day) of the work group that the developer is in charge of transmitting to the server 31. From the server 31 to the work terminal 32
And display it on the display means 326. At this time, if the server 31 has the progress information stored in the work record storage unit 101 or the above-mentioned alarm information leading to a schedule delay,
The data is transmitted to the work terminal 32 and displayed on the display unit 326.

【0060】そこで、表示された作業群のマクロな進捗
情報をもとに、開発者が作業を開始する作業群をマウス
などの入力手段325を用いて選択すると、作業内容表
現部105である作業端末のCPU321は、作業群を
構成する作業内容の計画情報、作業手順などをサーバ3
1の管理項目格納部(外部記憶装置316)106から
ロードして例えば図16に示すように表示手段326の
画面上に表示する。例えば図16に示すように表示手段
326の画面上に表示された作業内容を以下、作業内容
リストと呼ぶ。該作業内容リストは、作業内容をマウス
などの入力手段325を用いて選択できる入力域(16
1)を有する。その入力域161をマウスなどの入力手
段325で選択すると、作業内容表現部105である作
業端末のCPU321は、作業上使用すべき利用ツール
(ソフトウェアおよびハードウェア)、書類および図面
のフォーマットなどの作業環境設定を、サーバ31の管
理項目格納部(外部記憶装置316)106から取り出
して受信し、表示手段326上に例えば図17に示すよ
うに表示する。
Then, when the developer selects a work group to start the work by using the input means 325 such as a mouse based on the displayed macro progress information of the work group, the work which is the work content expression unit 105. The CPU 321 of the terminal uses the server 3 to store the plan information of the work contents constituting the work group, the work procedure, and the like.
It is loaded from the first management item storage unit (external storage device 316) 106 and displayed on the screen of the display means 326 as shown in FIG. 16, for example. For example, the work content displayed on the screen of the display unit 326 as shown in FIG. 16 is hereinafter referred to as a work content list. The work content list includes an input area (16) where work content can be selected using an input means 325 such as a mouse.
1). When the input area 161 is selected by the input means 325 such as a mouse, the CPU 321 of the work terminal, which is the work content expression unit 105, performs work such as utilization tools (software and hardware) to be used for work, document and drawing formats. The environment setting is extracted from the management item storage unit (external storage device 316) 106 of the server 31 and received, and displayed on the display unit 326 as shown in FIG.

【0061】まず、作業内容別に作業手順および作業上
の注意事項がメッセージとして表示領域171に表示さ
れる。そして利用ツール(個々のソフトウェア「○○E
ditor」「△△CAE」「□□CAD」、ハードウ
ェア「□分析装置」など)の表示領域(172)は、個
々のソフトウェア、ハードウェアの制御ソフトウェア等
が起動するコマンドに対応しており、開発者がこれをマ
ウスなどの入力手段325で選択すると、作業実績モニ
タリング部(作業端末のCPU321およびサーバのC
PU311)107がソフトウェア、他ハードウェアの
制御ソフトウェアを起動して、作業開始時刻を同時にモ
ニタリングする。書類および図面のフォーマットなどの
表示領域(173)も同様である。マウスなどの入力手
段325で選択すると作業端末からサーバへ送信して、
サーバにおいてこれを作成したソフトウェアを起動し、
これが格納されている成果物格納部404からファイル
を取り出して作業端末へ送信して表示手段326の画面
上にロードする。これにより、開発者が目的の作業を逸
速く開始することができるのである。
First, a work procedure and work precautions are displayed as a message in the display area 171 for each work content. And use tools (individual software "○○ E
The display area (172) of "ditor", "△△ CAE", "□□ CAD", hardware "□ analyzer", etc.) corresponds to the commands activated by individual software, hardware control software, etc. When the developer selects this with the input means 325 such as a mouse, the work performance monitoring unit (CPU 321 of the work terminal and C of the server)
The PU 311) 107 activates software and control software for other hardware, and simultaneously monitors the work start time. The same applies to the display area (173) such as the format of documents and drawings. If you select with the input means 325 such as a mouse, it will be sent from the work terminal to the server,
Start the software that created this on the server,
A file is taken out from the deliverable storage unit 404 in which this is stored, transmitted to the work terminal, and loaded on the screen of the display means 326. This allows developers to get the work done quickly.

【0062】また、作業内容表現部105は、開発者が
作業を行った結果(処理結果)を作業端末32からサー
バ31へ送信してサーバの成果物格納部404に保存
し、この保存場所をポインタとして作業実績格納部10
1に格納する。そこで、作業内容表現部105が、その
後図17のように作業環境を開く度に、保存場所のポイ
ンタにより、前に保存した処理結果を174に表示する
ことができる。勿論、処理結果の表示領域174の場合
も前述の書類および図面のフォーマット等と同じよう
に、マウス等の入力手段325により選択することによ
り、これを作成したソフトウェアを起動し、処理結果を
画面上に表示する。また書類、図面およびプログラム等
の成果物が成果物格納部404に格納されると、作業内
容表現部105は、これを参照情報として利用する作業
内容の、作業を開始した開発者の作業端末の表示手段上
に(例えば、図16に162で示すように)、入手実績
を表示する。このように成果物格納部404に書類、図
面およびプログラム等の参照情報が格納されると、参照
情報入手実績登録部406は、作業環境設定部405で
作業内容別に設定した参照情報の入手実績を作業実績格
納部101に登録することを実行する。これにより、作
業環境設定部405により、作業内容に参照情報を設定
している開発者は、作業内容表現部105において参照
情報の入手実績を作業を開始する際に参照することがで
きる。
Further, the work content expression unit 105 transmits the result (processing result) of the work performed by the developer from the work terminal 32 to the server 31, saves it in the deliverable storage unit 404 of the server, and saves this storage location. Work record storage 10 as a pointer
1 is stored. Therefore, each time the work content expression unit 105 subsequently opens the work environment as shown in FIG. 17, the processing result previously saved can be displayed in 174 by the pointer of the save location. Of course, in the case of the processing result display area 174 as well as in the above-mentioned document and drawing formats, by selecting it with the input means 325 such as a mouse, the software that created it is activated and the processing result is displayed on the screen. To display. When the deliverables such as documents, drawings, and programs are stored in the deliverable storage unit 404, the work content expression unit 105 stores the work content of the developer who started the work of the work content using the deliverables as reference information. The acquisition record is displayed on the display means (for example, as indicated by 162 in FIG. 16). When reference information such as documents, drawings and programs is stored in the deliverable storage unit 404 in this way, the reference information acquisition result registration unit 406 acquires the reference information acquisition results set by the work environment setting unit 405 for each work content. Registration in the work record storage unit 101 is executed. As a result, the developer who has set the reference information in the work content by the work environment setting unit 405 can refer to the acquisition record of the reference information in the work content expression unit 105 when starting the work.

【0063】以上説明したように、前記実施例によれ
ば、開発対象である製品又はその製品の一部の設計のた
めに開発者が、作業端末上のソフトウェア及び作業端末
に接続されたハードウェアを用いて行った作業の開始時
刻および終了時刻等の作業実績を作業実績格納部(サー
バ31の外部記憶装置316)101に格納でき、作業
実績登録のためのコマンドが開発者によって作業端末3
2に入力されると、作業実績表現部102は開発者名を
判断してモニタリングされた開発者の作業実績を、作業
内容が識別できる情報(例えば作業内容が関係するプロ
ジェクト名、製品名、部品名、成果物名等の情報)とと
もに作業端末32の表示手段326に表示し、モニタリ
ングされていない時間帯がある場合には、その時間帯
と、当日、計画されていた作業内容を、前記のモニタリ
ングされた作業実績とともに作業端末32の表示手段3
26に表示し、また表示した作業実績の確認を要求する
メッセージを表示して進捗報告の追加・変更または確認
を要求し、確認された結果は、作業実績格納部101に
格納される。万一ここで作業実績を登録せずに作業実績
登録処理を終了した場合にも、再度当作業実績登録部を
起動するコマンドが開発者によって作業端末32に入力
されば、再登録することができる。これにより、システ
ムが把握できないソフトウェアやハードウェア利用以外
の作業実績についても、開発者自身が利用したソフトウ
ェア、ハードウェアなどの利用実績を作業内容別に表示
することにより、開発者が前後の作業をみながら追加・
修正でき、正確に全ての作業実績をモニタリングするこ
とができることになる。
As described above, according to the above-described embodiment, the developer on the work terminal and the hardware connected to the work terminal for designing the product to be developed or a part of the product. A work record such as a start time and an end time of a work performed using the can be stored in the work record storage unit (external storage device 316 of the server 31) 101, and a command for registering the work record can be issued by the developer to the work terminal 3
2 is input, the work result expression unit 102 determines the developer name, and can monitor the work result of the developer by identifying the work content (for example, the project name, the product name, the part to which the work content relates). Name, deliverable name, etc.) on the display means 326 of the work terminal 32, and if there is an unmonitored time zone, the time zone and the planned work content on the day are described above. Display means 3 of the work terminal 32 together with the monitored work record
26, a message requesting confirmation of the displayed work record is displayed to request addition / change or confirmation of the progress report, and the confirmed result is stored in the work record storage unit 101. Even if the work result registration process is terminated without registering the work result here, it can be re-registered if the developer inputs a command for activating the work result registration unit to the work terminal 32 again. . As a result, even for work results other than the use of software and hardware that the system cannot grasp, by displaying the use results of software and hardware used by the developer by work content, the developer can see the work before and after. While adding
It will be possible to correct and accurately monitor all work records.

【0064】また前記実施例によれば、システムにログ
インした開発者のログイン名を判断して、作業内容表現
部105が開発者の担当作業内容を、作業内容が識別で
きる情報(例えば、作業内容が関係するプロジェクト
名、製品名、部品名、成果物名等の情報)とともに作業
端末32の表示手段に表示し、ここで開始する作業内容
が端末上で開発者によって選択されると、作業実績モニ
タリング部107は、作業開始時刻と作業内容を識別す
るための識別コードをモニタリングし、さらにソフトウ
ェア及び作業端末に接続されたハードウェアが開発者に
よって利用されると、この利用開始時刻および利用終了
時刻がモニタリングされ、またソフトウェアを利用した
際にディスク上またはメモリ上に出力される処理結果の
保存時刻もモニタリングし、そして処理結果保存の最終
時刻を、作業開始時刻および作業終了時刻等のモニタリ
ング情報とともに作業実績として作業実績格納部101
に格納することにより、開発中にソフトウェアやハード
ウェアを利用する開発者が容易に進捗報告でき、開発作
業を中断されることがなく、正確に作業実績をモニタリ
ングすることができる。
Further, according to the above-described embodiment, the work content expression unit 105 determines the login name of the developer who has logged in to the system, and the work content representation unit 105 can identify the work content of the developer (for example, work content). Related project names, product names, parts names, deliverable names, etc.) on the display means of the work terminal 32, and when the work content to be started here is selected by the developer on the terminal, the work results The monitoring unit 107 monitors the work start time and the identification code for identifying the work content, and when the software and the hardware connected to the work terminal are used by the developer, the use start time and the use end time. Is monitored, and the save time of the processing result output to the disk or memory when using the software is also monitored. Grayed was, and the processing result the last time of storage, work result storage unit as operation result along with the monitoring information such as work start time and work end time 101
By storing in, the progress can be easily reported by a developer who uses software or hardware during development, and the work performance can be accurately monitored without interruption of the development work.

【0065】また前記実施例によれば、システムにログ
インした開発者のログイン名を判断して、作業内容表現
部105が、開発者の担当作業内容を作業内容が識別で
きる情報(例えば、作業内容が関係するプロジェクト
名、製品名、部品名、成果物名等の情報)とともに作業
端末32の表示手段326に表示し、ここで開始する作
業内容が端末上で開発者によって選択されると、作業実
績モニタリング部107は、作業開始時刻と作業内容を
識別するための識別コードをモニタリングし、さらにソ
フトウェア及び作業端末に接続されたハードウェアが開
発者によって利用されると、この利用開始時刻および利
用終了時刻をモニタリングし、そして作業実績モニタリ
ング部107は、該作業開始時刻を一旦モニタリングす
ると、作業終了を宣言するコードが開発者によって入力
されない限り、開発者が当システムからログアウトでき
ないように制御し、作業実績モニタリング部107は、
作業終了を宣言するコードが開発者によって入力された
ときに、作業終了時刻を作業実績格納部101に格納
し、またソフトウェアを利用した際にディスク上または
メモリ上に出力される処理結果の保存時刻もモニタリン
グし、そして、処理結果保存の最終時刻を、作業開始時
刻、作業終了時刻等のモニタリング情報とともに、作業
実績として作業実績格納部101に格納ことにより、正
確な作業実績が、開発作業が中断されることなく作業内
容別に作業開始時刻、終了時刻とともにソフトウェアと
ハードウェアの利用実績を作業実績格納部101に格納
することができる。
Further, according to the above embodiment, the work content expression unit 105 judges the login name of the developer who has logged in to the system, and the work content expression unit 105 can identify the work content of the developer by the work content (for example, the work content. Associated project name, product name, part name, deliverable name, etc.) on the display means 326 of the work terminal 32, and when the work contents to be started here are selected by the developer on the terminal, the work is started. The performance monitoring unit 107 monitors the work start time and the identification code for identifying the work content, and when the software and the hardware connected to the work terminal are used by the developer, the use start time and the use end time. The work performance monitoring unit 107 monitors the time, and once the work start time is monitored, the work performance monitoring unit 107 declares the work end. As long as the code is not entered by the developer, the developer is controlled so as not to be logged out from this system, the operation result monitoring section 107,
When the code for declaring the end of work is input by the developer, the work end time is stored in the work record storage unit 101, and the storage time of the processing result output on the disk or the memory when the software is used Also, the final time of processing result storage is stored in the work result storage unit 101 as the work result together with the monitoring information such as the work start time and the work end time, so that the accurate work result is interrupted by the development work. It is possible to store the work start time and the end time for each work content together with the usage record of software and hardware in the work record storage unit 101 without being performed.

【0066】また前記実施例によれば、作業終了を宣言
するコードが作業端末上に開発者によって入力された際
に、作業内容の作業開始時刻前までの進捗度と作業開始
時刻から作業終了時刻までの作業時間と該作業時間にお
いて指標となる予測進捗度とを作業端末上に表示し、該
作業時間における実施結果に対応した進捗度が開発者に
よって入力されるまで、次の処理に移ることができない
よう制御する進捗度報告部108により、開発者の自己
申告による進捗度を正確にかつ確実にモニタリングする
ことができる。また前記実施例によれば、非進捗状況把
握時刻設定部109により、年休、休日などの勤休上作
業実績を把握する必要のない日や、勤務時間として必ず
把握される必要のない時間帯を非進捗状況把握時間帯と
して、開発者または管理者が作業端末上から登録し、進
捗報告要求時刻検出部110が作業実績が必ず把握され
なければならない時間帯(作業実績が把握されなかった
時間帯で、かつ非進捗状況把握時間帯ではない部分)を
検出し、そして進捗報告要求部111が、あらかじめ設
定されたコードが開発者によって入力されると開発者に
進捗報告を要求することにより、システムが、真に進捗
が把握されなければならない時間帯の進捗報告のみを要
求するため、開発者の作業をできるだけ中断せずに、正
確に確実に作業実績をモニタリングすることができる。
Further, according to the above-mentioned embodiment, when the code for declaring the work end is input by the developer on the work terminal, the progress of the work contents before the work start time and the work end time from the work start time. Until the work progress is displayed on the work terminal and the progress corresponding to the implementation result in the work time is displayed on the work terminal, and the next progress is displayed. The progress reporting unit 108 that controls such that the developer cannot self-report can accurately and surely monitor the progress of the developer's self-report. Further, according to the above-described embodiment, the non-progress status grasping time setting unit 109 is a day when it is not necessary to grasp the work record of work hours such as annual holidays and holidays, and a time zone which is not necessarily grasped as working hours. Is a non-progress status grasping time zone, which is a time zone in which the developer or administrator registers from the work terminal and the progress report request time detection unit 110 must grasp the work record (the time when the work record is not grasped). Band and not the non-progress status grasping time zone), and the progress report requesting unit 111 requests the developer to report the progress when the preset code is input by the developer. Since the system only requests the progress report during the time when the progress needs to be truly grasped, the work performance is monitored accurately and surely without interrupting the developer's work as much as possible. It can be.

【0067】また前記実施例によれば、ソフトウェアお
よびハードウェアの利用実績をモニタリングし、開発者
の作業を妨げずに、正確かつ確実に作業内容別に作業開
始時刻、終了時刻、進捗度を含む作業実績を把握するこ
とができる。またモニタリング不可能な作業実績につい
ても、真に把握されねばならない時間帯のみを検出し、
開発者に既にモニタリングされた作業実績に追加、変更
を要求して登録させることにより、開発者の作業を妨げ
ることなく作業実績を把握することができる。
Further, according to the above-described embodiment, the usage record of software and hardware is monitored, and the work including the work start time, end time, and progress is accurately and reliably classified by the work content without hindering the work of the developer. You can grasp the achievements. In addition, regarding work performance that cannot be monitored, only the time period that must be truly understood is detected,
By requesting the developer to add or change the already-monitored work record and register the work record, the work record can be grasped without hindering the developer's work.

【0068】また前記実施例によれば、進捗情報検索部
401が、開発者または管理者によって入力された開発
者名、製品名、製品を開発する過程で生成される成果物
名などの管理対象名をキーワードとして、作業実績格納
部101または管理項目格納部106から進捗情報を検
索し、進捗情報表示部402が、検索された進捗情報を
加工して表示することにより、開発者は、開発者の負
荷、開発者の各作業内容に対する生産性、優先順位の異
なる複数のプロジェクトあるいは一つのプロジェクト内
の複数の作業内容に対して費されている工数などの作業
実績だけではない付加情報を把握することができる。
Further, according to the above embodiment, the progress information retrieval unit 401 manages the developer name, the product name, the deliverable name generated in the process of developing the product, which is input by the developer or the administrator. With the name as a keyword, the progress information is retrieved from the work record storage unit 101 or the management item storage unit 106, and the progress information display unit 402 processes and displays the retrieved progress information, so that the developer is the developer. Load, productivity for each work content of the developer, multiple projects with different priorities or man-hours spent for multiple work contents in one project, etc. be able to.

【0069】また前記実施例によれば、計画部403に
おいて、複数または単数の製品開発を含むプロジェクト
の開発工程を構成する作業群を定義する情報(例えば作
業群を構成する目的になっているもの(製品名、部品
名、成果物名など)、または作業群を構成する作業内容
の進捗管理指標(マイルストーン、予定工数、先行関係
など))を決定し、管理項目格納部106に登録するこ
とにより、進捗情報検索部401が管理項目格納部10
6と作業実績格納部101から計画情報と作業実績を取
り出し、進捗情報表示部402がこれを表示することに
より、管理者は進捗が計画通りにいっているかどうかを
確認することができる。また進捗情報検索部401が、
管理項目格納部106と作業実績格納部101から計画
情報および進捗情報を検索し、計画部403で管理者が
行いたい作業(例えば作業割り当て、計画変更など)に
合わせて、開発者の負荷とプロジェクトの進捗状況を考
慮したスケジューリングを行うことができる。
Further, according to the above-mentioned embodiment, the planning unit 403 has information for defining a work group constituting a development process of a project including development of a plurality of or singular products (for example, information for the purpose of constructing the work group). (Product name, part name, deliverable name, etc.) or the progress management index (milestone, planned man-hours, preceding relationship, etc.) of the work content that constitutes the work group is determined and registered in the management item storage unit 106. Accordingly, the progress information search unit 401 causes the management item storage unit 10 to
6 and the work record storage unit 101, the plan information and the work record are taken out, and the progress information display unit 402 displays them, so that the manager can confirm whether the progress is as planned. In addition, the progress information search unit 401
The plan information and the progress information are retrieved from the management item storage unit 106 and the work result storage unit 101, and the load and the project of the developer are matched with the work (for example, work allocation, plan change, etc.) that the administrator wants to perform in the planning unit 403. The scheduling can be performed in consideration of the progress status of.

【0070】また前記実施例によれば、作業環境設定部
405において、開発者が作業内容を実施するときに使
用されるべき、または使用することによる利便が得られ
るソフトウェア、作業実施の前提条件になる成果物、入
手情報等の参照情報を登録することができる。またソフ
トウェアを利用して作成された成果物や入手情報は成果
物格納部404に格納される。参照情報入手実績登録部
406は、作業環境設定部405で設定された参照情報
が成果物格納部404に格納されたとき、参照情報入手
実績を作業実績格納部101に登録する。作業内容表現
部105は、作業環境設定部405により成果物等を参
照情報として設定している開発者の作業端末32に入手
実績を表示する。また作業内容表現部105は作業環境
設定部405が設定したソフトウェア、参照情報、進捗
情報および計画情報等を作業端末上に表示する。これに
より、開発者は正確な進捗情報をモニタリングでき、こ
の進捗情報から進行上優先させるべき作業を把握しつ
つ、即座に開発作業に移ることができる。
Further, according to the above-described embodiment, the work environment setting unit 405 defines the software to be used by the developer when carrying out the work content, or the software which is convenient to use, and the prerequisite for the work execution. It is possible to register reference information such as deliverables and acquisition information. Further, the deliverables created by using the software and the acquisition information are stored in the deliverable storage unit 404. The reference information acquisition record registration unit 406 registers the reference information acquisition record in the work record storage unit 101 when the reference information set by the work environment setting unit 405 is stored in the product storage unit 404. The work content expression unit 105 displays the acquisition record on the work terminal 32 of the developer who has set the deliverable or the like as reference information by the work environment setting unit 405. The work content expression unit 105 also displays the software, reference information, progress information, plan information, etc. set by the work environment setting unit 405 on the work terminal. As a result, the developer can accurately monitor the progress information and can immediately move to the development work while grasping the work to be prioritized in the progress from the progress information.

【0071】更に、本発明に係る設計開発プロジェクト
管理方法及びシステムの実施の形態について図面を用い
て説明する。設計開発プロジェクトは図78に示すよう
に構成されるものとする。各設計工程(作業群)は、各
種作業項目(作業内容)から構成され、成果物が生成さ
れる。各作業項目(作業内容)は、図16および図30
に示すように担当者が決められる。各製品は、各種設計
工程(作業群)から構成される。即ち各製品は、各種設
計工程(作業群)によって出来上がる。各プロジェクト
は、各種製品を担当することになる。図19は、本発明
に係る設計開発プロジェクト管理システムの一実施の形
態である機能ブロック構成を示す図である。図20は、
本発明に係わる設計開発プロジェクト管理システムの一
実施の形態であるデータ格納部の構造を示す図である。
図2は、本発明に係る設計開発プロジェクト管理システ
ムの一実施の形態であるハード構成を示した図である。
本システムは、複数の作業用計算機(作業端末)(例え
ばパソコン、ワークステーション)32を通信ネットワ
ーク33を介して管理するサーバ(計算機)31に接続
して構成している。
Further, embodiments of the design and development project management method and system according to the present invention will be described with reference to the drawings. The design and development project shall be configured as shown in FIG. Each design process (work group) is composed of various work items (work contents), and a product is generated. Each work item (work content) is shown in FIG. 16 and FIG.
The person in charge is decided as shown in. Each product is composed of various design processes (work groups). That is, each product is completed by various design processes (work groups). Each project will be in charge of various products. FIG. 19 is a diagram showing a functional block configuration which is an embodiment of the design and development project management system according to the present invention. 20
It is a figure which shows the structure of the data storage part which is one Embodiment of the design development project management system concerning this invention.
FIG. 2 is a diagram showing a hardware configuration which is an embodiment of the design and development project management system according to the present invention.
This system is configured by connecting a plurality of work computers (work terminals) (for example, personal computers, workstations) 32 to a server (computer) 31 that is managed via a communication network 33.

【0072】サーバ(計算機)31は、図2に示すよう
に、CPU311と、CPU311が演算処理するプロ
グラムを記憶し、作業用計算機(作業端末)32から送
られてきたデータおよび外部記憶装置317から読出さ
れたデータ等を一時記憶するメモリ312と、制御装置
313を介して接続されたキーボード、マウス、ディス
ク等の入力手段316と、制御装置314を介して接続
された作業実績、管理項目および成果物等を記憶格納す
る外部記憶装置317と、制御装置315を介して接続
されたディスプレイ等の表示手段318と、通信ネット
ワーク33とのインターフェースをとる通信インターフ
ェース部319と、これらを接続するバス310とから
構成される。そして、計画情報の一部や作業識別情報の
一部などの共通管理情報については上記入力手段316
を用いて入力して外部記憶装置317等に記憶格納する
ことができる。各作業用計算機(作業端末)(例えばパ
ソコン、ワークステーション)32も、CPU321
と、ディスプレイ等の表示手段326に表示する画像情
報(アイコン等も含む)や入力手段325で入力された
進捗データ及び作業実績データ等を一時記憶するメモリ
322と、制御装置323を介して接続されたキーボー
ド、マウス、ディスク等の入力手段325及びバーコー
ド読み取り装置328と、制御装置324を介して接続
されたディスプレイ等の表示手段326と、インターフ
ェース30を介して接続された実験等を行うためのハー
ドウェア(実験装置、分析装置、制御装置も含むロボッ
トシステム)329と、通信ネットワーク33とのイン
ターフェースをとる通信インターフェース部327と、
外部記憶装置328と、これらを接続するバス320と
から構成される。尚、開発者は、各種作業内容を、シス
テムにログインしない状態で、実験・分析装置等を利用
しての実験・分析作業や思考作業等をする場合が有る。
即ち、ハードウェア329は、必ずしも作業計算機32
に接続されていない場合も有る。
As shown in FIG. 2, the server (computer) 31 stores a CPU 311 and a program which the CPU 311 performs arithmetic processing, and stores data sent from a work computer (work terminal) 32 and an external storage device 317. A memory 312 for temporarily storing the read data and the like, an input means 316 such as a keyboard, a mouse, and a disk connected via a control device 313, and work records, management items, and results connected via a control device 314. An external storage device 317 for storing and storing objects and the like, a display unit 318 such as a display connected via the control device 315, a communication interface unit 319 for interfacing with the communication network 33, and a bus 310 for connecting these. Composed of. Then, for the common management information such as part of the plan information and part of the work identification information, the input means 316 is used.
Can be used to store and store in the external storage device 317 or the like. Each work computer (work terminal) (for example, personal computer, work station) 32 also has a CPU 321.
And a memory 322 for temporarily storing image information (including icons and the like) displayed on a display unit 326 such as a display and progress data and work record data input by the input unit 325, and is connected via a control device 323. Input means 325 such as a keyboard, a mouse, a disk and a bar code reading device 328, a display means 326 such as a display connected through the control device 324, and an experiment connected through the interface 30. Hardware (robot system including experimental device, analysis device, control device) 329, communication interface unit 327 for interfacing with communication network 33,
It is composed of an external storage device 328 and a bus 320 connecting these. Incidentally, the developer may perform various kinds of work contents such as an experiment / analysis work and a thinking work using an experiment / analysis device without logging in to the system.
That is, the hardware 329 is not necessarily the work computer 32.
It may not be connected to.

【0073】なお、作業実績情報格納部221−5は、
図1および図5において作業実績格納部101が対応す
る。日報管理部1934は、図1および図5に示す作業
実績表現部102と作業実績報告部104と進捗度報告
部108と非進捗状況把握時刻設定部109と進捗報告
要求時刻検出部110と進捗報告要求部111とが対応
する。個人認識及び個人情報表示部1929、担当プロ
ジェクト/製品/工程指示部1930、担当作業項目指
示部1931および成果物指示部1932は、図1およ
び図5における作業内容表現部105が対応する。プロ
ジェクト定義情報格納部221−1、製品情報定義格納
部221−2、設計工程定義情報格納部221−3およ
び作業項目定義情報格納部221−4は、図1および図
5における管理項目格納部106が対応する。ツール使
用時間取得部1933は、図1および図5における作業
実績モニタリング部107が対応する。成果物指示部1
932、成果物管理情報格納部223−1および成果物
ファイル格納部223−2は、図5に示す成果物格納部
404が対応する。プロジェクト属性入力部1911、
必要工程生成物1912、成果物定義部1913、日程
計画生成部1914、設計作業量推定部1915、ガン
トチャート表示部1916、日程計画変更部1917、
リソース検索部1920、リソース割当部1921およ
び山崩し実行部1922は、図5に示す作業環境設定部
405が対応する。プロジェクト属性入力部1911、
必要工程生成物1912、日程計画生成部1914、設
計作業量推定部1915、ガントチャート表示部191
6、日程計画変更部1917、リソース検索部192
0、リソース割当部1921および山崩し実行部192
2は、図5に示す計画部403が対応する。警報生成部
1924、進捗度推定部1925、負荷山積み計算部1
926、リソースグループ別負荷山積み計算部192
7、リソース属性別負荷山積み計算部1928およびガ
ントチャート表示部1916は、図5に示す進捗情報検
索部401および進捗情報表示部402が対応する。
The work record information storage unit 221-5 is
1 and 5, the work record storage unit 101 corresponds. The daily report management unit 1934 includes a work performance expression unit 102, a work performance reporting unit 104, a progress level reporting unit 108, a non-progress status grasping time setting unit 109, a progress report request time detecting unit 110, and a progress report shown in FIGS. 1 and 5. It corresponds to the request unit 111. The personal identification and personal information display unit 1929, the project / product / process instruction unit 1930 in charge, the work item instruction unit 1931 in charge, and the product instruction unit 1932 correspond to the work content expression unit 105 in FIGS. 1 and 5. The project definition information storage unit 221-1, the product information definition storage unit 221-2, the design process definition information storage unit 221-3, and the work item definition information storage unit 221-4 are the management item storage unit 106 in FIGS. Corresponds. The tool usage time acquisition unit 1933 corresponds to the work performance monitoring unit 107 in FIGS. 1 and 5. Deliverables instruction section 1
The deliverable storage unit 404 illustrated in FIG. 5 corresponds to the 932, the deliverable management information storage unit 223-1, and the deliverable file storage unit 223-2. Project attribute input section 1911,
Required process product 1912, deliverable definition unit 1913, schedule planning generation unit 1914, design work estimation unit 1915, Gantt chart display unit 1916, schedule planning change unit 1917,
The work environment setting unit 405 illustrated in FIG. 5 corresponds to the resource search unit 1920, the resource allocation unit 1921, and the mountain collapse execution unit 1922. Project attribute input section 1911,
Required process product 1912, schedule planning generation unit 1914, design work amount estimation unit 1915, Gantt chart display unit 191.
6, schedule change unit 1917, resource search unit 192
0, the resource allocation unit 1921, and the mountain collapse execution unit 192
2 corresponds to the planning unit 403 shown in FIG. Warning generation unit 1924, progress estimation unit 1925, load pile calculation unit 1
926, resource group-based load heap calculation unit 192
7, the resource attribute-based load stacking calculation unit 1928 and the Gantt chart display unit 1916 correspond to the progress information search unit 401 and the progress information display unit 402 illustrated in FIG. 5.

【0074】またプロジェクト定義情報格納部221−
1に格納されるプロジェクト定義情報は、図4に示すプ
ロジェクト情報3011が対応する。製品情報定義格納
部221−2に格納される製品定義情報は、図4に示す
開発製品情報3012が対応する。設計工程定義情報格
納部221−3に格納される設計工程定義情報は、図4
に示す作業群情報3013が対応する。作業項目定義情
報格納部221−4に格納される作業項目定義情報およ
び作業成果物定義情報格納部221−8に格納される作
業成果物定義情報は、図4に示す作業内容情報3014
が対応する。リソース属性格納部222−1に格納され
るリソース属性とリソースグループ属性格納部222−
2に格納されるリソースグループ属性とは、図4に示す
ユーザ定義情報302に対応する。図4に示す開発者情
報3021であるか管理者情報3022であるかは、図
75に示すリソース属性格納部222−1に格納される
No.9の「職名」で与えられる。標準設計成果物ツー
ルマスタ格納部226−3に格納される標準設計成果物
ツールマスタ情報、設計工程マスタ格納部226−4に
格納される設計工程マスタ情報および外部入力成果物入
手状況格納部221−7に格納される外部入手成果物入
手状況は、図4に示す作業環境設定情報が対応する。標
準カレンダ格納部224−1に格納される標準カレンダ
情報およびリソースカレンダ格納部224−2に格納さ
れるリソースカレンダは、図4に示す非進捗状況把握時
間帯設定情報304が対応する。イベント格納部221
−11に格納されるイベント情報は、図4に示すイベン
ト情報306が対応する。成果物管理情報格納部223
−1に格納される成果物管理情報は、図4に示す送付先
情報307が対応する。外部入手成果物入手状況格納部
221−7に格納される外部入手成果物入手状況は、図
4に示す入手元情報308が対応する。
The project definition information storage unit 221-
The project definition information stored in 1 corresponds to the project information 3011 shown in FIG. The product definition information stored in the product information definition storage unit 221-2 corresponds to the developed product information 3012 shown in FIG. The design process definition information stored in the design process definition information storage unit 221-3 is as shown in FIG.
The work group information 3013 shown in FIG. The work item definition information stored in the work item definition information storage unit 221-4 and the work product definition information stored in the work product definition information storage unit 221-8 are the work content information 3014 shown in FIG.
Corresponds. Resource attribute and resource group attribute storage unit 222-stored in the resource attribute storage unit 222-1
The resource group attribute stored in 2 corresponds to the user definition information 302 shown in FIG. Whether the developer information 3021 or the administrator information 3022 shown in FIG. 4 is the No. stored in the resource attribute storage unit 222-1 shown in FIG. It is given by "Job title" of 9. Standard design product tool master information stored in the standard design product tool master storage unit 226-3, design process master information stored in the design process master storage unit 226-4, and external input product acquisition status storage unit 221- The externally acquired deliverable acquisition status stored in 7 corresponds to the work environment setting information shown in FIG. The standard calendar information stored in the standard calendar storage unit 224-1 and the resource calendar stored in the resource calendar storage unit 224-2 correspond to the non-progress status grasping time zone setting information 304 shown in FIG. Event storage 221
The event information stored in -11 corresponds to the event information 306 shown in FIG. Deliverable management information storage unit 223
The product management information stored in -1 corresponds to the destination information 307 shown in FIG. The acquisition source information 308 illustrated in FIG. 4 corresponds to the acquisition status of the externally acquired artifacts stored in the externally acquired artifact acquisition status storage unit 221-7.

【0075】次に本発明に係る設計・開発の進捗管理シ
ステムの機能ブロックについて図19を用いて説明す
る。図5にも本発明に係る設計・開発の進捗管理システ
ムの機能ブロックが示されている。図19に示す設計開
発プロジェクト管理システム190は、処理モジュール
群191とデータ格納部193と検索及び更新部192
とこれらを結ぶ通信ネットワーク33から構成される。
機能ブロック1911〜1939は、データ格納部19
3にあるデータを通信ネットワーク33と検索及び更新
部192を介して処理し、またデータ格納部193のデ
ータを変更する場合も検索及び更新部192と通信ネッ
トワーク33を介して行う。ここで、データ格納部19
3は、大容量の外部記憶装置持つサーバ計算機31と市
販のリレーショナルデータベース(以下単にデータベー
スと呼ぶこともある)で構成し、また検索及び更新部1
92は、当該リレーショナルデータベースの検索、更新
機能を利用することによって実現できる。すなわち、処
理モジュール群191は、作業用計算機32上におい
て、当該データ格納部193に対する検索及び更新の命
令を生成し、検索及び更新部192がその命令を解釈し
て検索及び更新を実施する。
Next, the functional blocks of the design / development progress management system according to the present invention will be described with reference to FIG. FIG. 5 also shows the functional blocks of the design / development progress management system according to the present invention. The design and development project management system 190 shown in FIG. 19 includes a processing module group 191, a data storage unit 193, a search and update unit 192.
And a communication network 33 connecting them.
The function blocks 1911 to 1939 include the data storage unit 19
3 is processed via the communication network 33 and the search / update unit 192, and the data in the data storage unit 193 is also changed via the search / update unit 192 and the communication network 33. Here, the data storage unit 19
Reference numeral 3 is composed of a server computer 31 having a large-capacity external storage device and a commercially available relational database (hereinafter may be simply referred to as a database).
92 can be realized by using the search and update functions of the relational database. That is, the processing module group 191 generates a search and update command for the data storage unit 193 on the work computer 32, and the search and update unit 192 interprets the command and executes the search and update.

【0076】次に処理モジュール群191の各機能につ
いて図面を用いて説明する。まず、個人認識及び個人情
報表示部1929(計画部403において計画する計画
情報305の内の個人計画情報が対応する。)について
図21および図22を用いて説明する。図21は個人認
識及び個人情報表示部1929の一実施の形態における
画面例であり、図22は処理の流れを示す図である。ま
ず、当該設計開発プロジェクト管理システムの個人認識
及び個人情報表示部1929(図5においては計画部4
03に含まれる。)は、ユーザのログインIDをリソー
ス属性格納部222−1の登録情報と照合し、ログイン
の許可を判定する。システムは許可されないユーザに対
しては、メッセージとともに強制的にシステムを終了さ
せる(ステップ510)。次に、個人認識及び個人情報
表示部1929は、図21に示すようにユーザがログイ
ンした日付の当月のカレンダをユーザがログインした作
業用計算機32の表示手段326に表示する。このカレ
ンダは、標準カレンダ格納部224−1をベースにして
生成されるが、これとともに上記ユーザIDをキーにし
て、そのユーザ(リソース)個人のカレンダを作成する
ためリソースカレンダ格納部224−2を検索し、更
に、当該ユーザIDを含む会議及び出張の予定を同様に
当該ユーザIDをキーにして会議/出張定義情報格納部
225−1より検索する(ステップ511)。次に、当
該ユーザIDをキーにして、ペンディング事項管理部1
918はペンディング事項格納部121−10からペン
ディング事項の条件判定と、同じく当該ユーザIDをキ
ーにして、待ち条件管理部1923は待ち条件格納部2
21−13から条件待ちの成立の判定を行う(ステップ
512)。次に、システムのプロジェクトデータ格納部
221(管理項目格納部106が対応する。)から、現
在のプロジェクトの状況データを検索し、システムは、
431[(1)プロジェクトAの設計工程Aの図面提出
期限です。]、432[(2)プロジェクトBの設計工
程Aの期限遅延しています。]、433[(3)メール
に新規メッセージが3件到着しています。]、434
[(4)プロジェクトCの作業項目A完了しましたの
で、着手できます。]、435[(5)15:00から
第3会議室にて会議です。]といったメッセージを自動
生成する(ステップ513)。ステップ514ではこれ
らの情報を表示する(図21)。即ち、図21に示すよ
うに、作業用計算機(作業端末)32の表示手段329
に、設計開発リソース毎に1ケ月分の休日と既に決定し
ている出張、会議の予定日と既に決定している設計開発
リソースの有給休暇の予定日とを提示するカレンダと、
システムメッセージ欄に設計開発リソースが担当として
割り当てられている設計工程或いは作業項目の日程進捗
状況に対する警告情報432や、参加すべき会議或いは
出張の日付が近づいたことを知らせる警告情報431、
435等と、個人メモ欄に入力された設計開発リソース
のメモとを提示して設計開発リソースに対する業務指示
ができるようにした。
Next, each function of the processing module group 191 will be described with reference to the drawings. First, the personal recognition and personal information display unit 1929 (corresponding to the personal plan information in the plan information 305 planned by the planning unit 403) will be described with reference to FIGS. 21 and 22. FIG. 21 is an example of a screen in an embodiment of the personal identification and personal information display unit 1929, and FIG. 22 is a diagram showing a flow of processing. First, the personal identification and personal information display unit 1929 (the planning unit 4 in FIG. 5) of the design and development project management system.
Included in 03. ) Collates the login ID of the user with the registration information in the resource attribute storage unit 222-1 and determines the login permission. The system forces the system to terminate with a message for unauthorized users (step 510). Next, the personal identification and personal information display unit 1929 displays the calendar of the current month of the date when the user logged in on the display unit 326 of the work computer 32 where the user logged in, as shown in FIG. This calendar is generated on the basis of the standard calendar storage unit 224-1. Along with this, the resource calendar storage unit 224-2 is used to create a calendar of the user (resource) individual by using the user ID as a key. Further, the schedule of the conference and the business trip including the user ID is also retrieved from the conference / business trip definition information storage unit 225-1 using the user ID as a key (step 511). Next, using the user ID as a key, the pending item management unit 1
918 is a condition determination of the pending matter from the pending matter storage unit 121-10, and similarly, the waiting condition management unit 1923 uses the user ID as a key.
From 21-13, it is determined whether or not the condition waiting is satisfied (step 512). Next, the project data storage unit 221 of the system (corresponding to the management item storage unit 106) is searched for the status data of the current project, and the system
431 [(1) Drawing deadline for design process A of project A. ] 432 [(2) The deadline for design process A of project B has been delayed. ] 433 [(3) Three new messages have arrived in the mail. ] 434
[(4) Work item A for project C has been completed, so you can start working. ] 435 [(5) From 15:00, it is a meeting in the 3rd meeting room. ] Is automatically generated (step 513). In step 514, these pieces of information are displayed (FIG. 21). That is, as shown in FIG. 21, the display means 329 of the work computer (work terminal) 32.
In addition, a calendar that presents the planned business trip and meeting dates that have already been determined to be one month's holiday for each design and development resource and the planned paid vacation dates for the design and development resources that have already been determined,
Warning information 432 for the progress of the schedule of the design process or work item to which the design and development resource is assigned as the person in charge in the system message column, warning information 431 notifying that the date of the meeting or business trip to be attended is approaching,
435 and the like and the memo of the design / development resource entered in the personal memo field are presented so that the work instruction can be given to the design / development resource.

【0077】次に、ここで条件待ちとペンディング事項
管理について説明しておく。設計開発業務の遂行中に
は、さまざまな待ちが発生する。例えば、複数の設計開
発担当者が協調して設計作業を行う場合、すべての作業
を1人で行うということは、まずあり得ない。すなわ
ち、何らかの形で他人の結果なりを参照して自身の設計
作業を遂行するということがある。この場合、他人の設
計作業の完了を待つことになり、その人の設計作業が完
了すれば、直ちに自身の作業を開始できるといった場合
である。そこで、その他人の作業の完了/未完了を上記
設計開発プロジェクト管理システム190によって常時
監視することによって、本機能を実現する。また、この
ような設計開発業務以外の待ちについてをサポートする
のが、条件待ち機能である。これは、全く個人的なもの
であって、設計開発業務と無関係なものでよいと考え
る。
Next, the condition waiting and the pending item management will be described. Various waits occur during the execution of design and development work. For example, when a plurality of persons in charge of design and development collaborate in design work, it is unlikely that all the work will be performed by one person. That is, in some form, the design work of oneself may be performed by referring to the result of another person. In this case, it is necessary to wait for the completion of the design work of another person, and when the design work of the other person is completed, the work of oneself can be immediately started. Therefore, this function is realized by constantly monitoring the completion / non-completion of the work of others by the design / development project management system 190. In addition, the condition wait function supports waiting other than such design and development work. This is completely personal and may be unrelated to the design and development work.

【0078】まず、条件待ち管理部1923(図1及び
図5において非進捗状況把握時刻設定部109が相当す
る。)における条件待ちの管理について図23および図
24を用いて説明する。この条件待ちは、図21に示す
ように、作業端末32の表示手段326において個人メ
モ表示部42に表示されるものである。図23は当該条
件待ち管理部1923において管理する一画面例を示し
た図であり、図24は当該待ち条件格納部221−13
に格納された待ち条件のデータ構造を示す図である。条
件待ち管理において管理する画面は、通番表示欄232
と内容表示欄233と期限表示欄234から構成され
る。作業端末32から新規に待ち条件を入力する場合に
は、新規ボタン231をクリックすると通番表示欄23
2と内容表示欄233と期限表示欄234に新規入力エ
リアが生成され、その欄に直接入力する。そしてこの入
力された新規の待ち条件をデータベースに登録する場合
には、登録ボタン235をクリックすることによって、
当該入力データが待ち条件格納部221−13に格納さ
れる。キャンセルボタン236をクリックすると本画面
は閉じられ、データベースへの登録及び更新は行わな
い。なお、この待ち条件に関する内容や期限の編集は、
ダイレクトにこれらの内容表示欄233と期限表示欄2
34とで修正することができる。上記待ち条件格納部2
21−13における待ち条件のデータ構造は、図24に
示すように、通番表示欄232と内容表示欄233と期
限表示欄234の内容がそれぞれ含まれるカラムと、こ
れに加えて個人を識別するための個人識別キーカラム
と、条件成立の期限日付および当該条件を設定した設定
日とをカラムに持つ。なお、この個人識別キーは1人の
人間を識別するためのキーコードであり、以下の説明で
も頻出する。
First, the management of the condition wait in the condition wait management unit 1923 (which corresponds to the non-progress status grasping time setting unit 109 in FIGS. 1 and 5) will be described with reference to FIGS. 23 and 24. This condition waiting is displayed on the personal memo display unit 42 on the display unit 326 of the work terminal 32, as shown in FIG. FIG. 23 is a diagram showing an example of a screen managed by the condition wait management unit 1923, and FIG. 24 is a wait condition storage unit 221-13.
It is a figure which shows the data structure of the waiting condition stored in. The screen managed in the condition waiting management is the serial number display field 232.
And a content display column 233 and a deadline display column 234. To enter new waiting conditions from the work terminal 32, click the new button 231 to display the serial number display field 23.
2, a new display area is created in the content display column 233, and the deadline display column 234, and a direct input is made in that column. Then, when registering the input new waiting condition in the database, by clicking the register button 235,
The input data is stored in the waiting condition storage unit 221-13. When the cancel button 236 is clicked, this screen is closed and registration and update in the database are not performed. In addition, editing the contents and deadline regarding this waiting condition,
Directly display these contents display field 233 and deadline display field 2
It can be modified with 34 and. The waiting condition storage unit 2
The data structure of the waiting condition in 21-13 is, as shown in FIG. 24, a column including the contents of the serial number display column 232, the content display column 233, and the deadline display column 234, and in addition to this, for identifying an individual. The column has a personal identification key column of, a condition expiration date and a setting date when the condition is set. It should be noted that this personal identification key is a key code for identifying one person, and is frequently used in the following description.

【0079】次に、ペンディング事項管理部1918
(図5において作業環境設定部405が相当する。)に
おけるペンディング事項の管理(監視)について図25
および図26を用いて説明する。図25はペンディング
事項管理部1918の一画面例を示した図であり、図2
6は当該ペンディング事項格納部221−10に格納さ
れたペンディング事項のデータ構造を示す図である。ま
ず、ペンディング事項管理部1918について説明す
る。図25はペンディング事項管理部1918の一画面
例を示す。ペンディング事項管理において管理する画面
は、自分のプロジェクトの名称表示欄81と、製品の名
称表示欄82と、設計工程の表示欄83と、プロジェク
ト名がプロジェクトA、製品名が製品A、設計工程名
(作業群名)が設計工程(作業群)Aにおける通番表示
欄84、作業項目表示欄85、担当者表示欄86および
待ち条件表示欄87とから構成される。作業端末32か
ら新規に待ち条件を入力する場合には、新規ボタン88
−1をクリックすると完了条件設定画面89が表示され
るので、この画面上にて設定する。設定後、システム
は、通番表示欄84と作業項目表示欄85と担当者表示
欄86と待ち条件表示欄87に新規エリアを生成し、待
ち条件をその欄に表示する。データベースに登録する場
合は登録ボタン88−2をクリックすることによって、
当該入力データはペンディング事項格納部221−10
に格納される。キャンセルボタン88−3をクリックす
ると本画面は閉じられ、データベースへの登録及び更新
は行わない。即ち、プロジェクトAの製品Aの設計工程
(作業群)Aにおける作業項目(作業内容)Bは、待ち
条件として、“設計工程B”の完了待ちである。またプ
ロジェクトAの製品Aの設計工程(作業群)Aにおける
作業項目(作業内容)Cは、待ち条件として、“設計工
程C”の“作業項目8”の完了待ちである。このように
作業端末32から、図25に示すように完了条件設定を
入力してペンディング事項格納部221−10に格納す
ることによって、他人の作業の完了/未完了を、上記ペ
ンディング事項管理部1918によって常時監視するこ
とが可能となり、その結果何らかの形で他人の結果なり
を参照して自身の設計作業を遂行するが可能となる。上
記ペンディング事項格納部221−10におけるペンデ
ィング事項のデータ構造は、図26に示すように、プロ
ジェクトコード、製品コード、設計工程コード、作業項
目コードと個人コードと待ち設計工程コードと待ち作業
項目コードとステータスと設定日の内容がそれぞれ含ま
れるカラムと、これに加えて個人を識別するための個人
識別キーカラムと、条件成立の期限日付と当該条件を設
定した設定日をカラムに持つ。尚、この個人識別キーは
1人の人間を識別するためのキーコードである。
Next, the pending item management section 1918
Regarding management (monitoring) of pending items in (corresponding to the work environment setting unit 405 in FIG. 5)
This will be described with reference to FIG. FIG. 25 is a diagram showing an example of a screen of the pending matter management unit 1918.
6 is a diagram showing a data structure of pending items stored in the pending item storage unit 221-10. First, the pending item management unit 1918 will be described. FIG. 25 shows a screen example of the pending item management unit 1918. The screens managed in the pending item management are the project name display field 81, the product name display field 82, the design process display field 83, the project name is project A, the product name is product A, and the design process name. The (work group name) is composed of a serial number display column 84, a work item display column 85, a person in charge display column 86, and a waiting condition display column 87 in the design process (work group) A. When a new waiting condition is input from the work terminal 32, a new button 88
When -1 is clicked, the completion condition setting screen 89 is displayed, and the setting is made on this screen. After setting, the system creates a new area in the serial number display column 84, the work item display column 85, the person-in-charge display column 86, and the waiting condition display column 87, and displays the waiting condition in that column. To register in the database, click the register button 88-2.
The input data is pending item storage unit 221-10.
Is stored in When the cancel button 88-3 is clicked, this screen is closed and the database is not registered or updated. That is, the work item (work content) B in the design process (work group) A of the product A of the project A is waiting for the completion of the "design process B" as a waiting condition. Further, the work item (work content) C in the design process (work group) A of the product A of the project A is waiting for completion of the “work item 8” of the “design process C” as a waiting condition. As described above, the completion condition setting is input from the work terminal 32 and stored in the pending item storage unit 221-10 as shown in FIG. By doing so, it becomes possible to constantly monitor, and as a result, it becomes possible to carry out one's own design work by referring to the results of others in some form or another. As shown in FIG. 26, the data structure of the pending items in the pending item storage unit 221-10 includes a project code, a product code, a design process code, a work item code, an individual code, a waiting design process code, and a waiting work item code. It has columns containing the contents of the status and the set date, an individual identification key column for identifying an individual in addition to this, a deadline date for satisfying the condition, and a set date for setting the condition. The personal identification key is a key code for identifying one person.

【0080】次に、担当プロジェクト/製品/工程指示
部1930、警告生成部1924および担当作業項目指
示部1931(図5においては進捗情報検索部401お
よび進捗情報表示部402が相当する。)において、プ
ロジェクト全体に亘ってのマクロな作業計画とこの作業
計画に対する進捗状況に基づくアラーム(警告)情報、
または各設計工程についてのミクロな作業計画とこの作
業計画に対する進捗状況に基づくアラーム(警告)情
報、または設計担当者毎のミクロな作業計画とこの作業
計画に対する進捗状況に基づくアラーム(警告)情報を
検索して出力することについて、図27〜図31を用い
て説明する。
Next, in the assigned project / product / process instruction section 1930, the warning generation section 1924 and the assigned work item instruction section 1931 (corresponding to the progress information retrieval section 401 and the progress information display section 402 in FIG. 5). Macro work plan for the entire project and alarm information based on the progress status of this work plan,
Or, a micro work plan for each design process and alarm (warning) information based on the progress status for this work plan, or a micro work plan for each person in charge of design and alarm (warning) information based on the progress status for this work plan Searching and outputting will be described with reference to FIGS. 27 to 31.

【0081】図27は担当プロジェクト/製品/工程指
示部1930において検索されたプロジェクト全体に亘
ってのマクロな作業計画とこの作業計画に対する進捗状
況に基づくアラーム(警告)情報を出力する一画面例を
示す図である。システムは、設計担当者または管理者が
作業端末32またはサーバ31からログインするとその
設計担当者または管理者があらかじめ割り当てられてい
る作業項目を含む設計工程をすべてデータベースから検
索し、その設計工程の製品名とプロジェクト名を合わせ
て検索する。その結果表示されるのが図27の画面であ
る。すなわち、画面は担当するプロジェクト名称表示領
域2701と、製品・設計工程名表示領域2702と、
その設計工程の開始予定日表示領域2703と、その設
計工程の開始終了日表示領域2704と、その設計工程
のとりまとめ担当者表示領域2705と、その設計工程
に発生している警告(アラーム)の表示領域2706よ
り構成される。アラームの表示はシンボル表示され、ア
ラームの生成に関しては、警告生成部1924が、作業
実績情報格納部221−5(図1および図5においては
作業実績格納部101が相当する。)にある実績データ
と計画情報との比較により生成する。担当プロジェクト
/製品/工程指示部1930の処理フローを図28に示
した。まず、担当プロジェクト/製品/工程指示部19
30(図5においては進捗情報検索部401が相当す
る。)は、ログインした設計開発担当者のユーザIDを
キーにして当該担当者が担当する作業項目の情報を作業
項目定義情報格納部221−4から検索し(ステップ2
801)、次に当該作業項目を含む設計工程及び製品の
情報を設計工程定義情報格納部221−3及び製品情報
定義格納部221−2より検索し(ステップ280
2)、次に当該作業項目、設計工程、製品を含むプロジ
ェクト情報をプロジェクト定義情報格納部221−1よ
り検索し(ステップ2803)、次に警告生成部(アラ
ーム生成部)1924を起動し(ステップ2804)、
プロジェクトにおける製品・設計工程を構成する各作業
項目に対して警告生成部1924の処理終了後、製品・
設計工程単位で生成されたアラーム情報とともに、図2
7に示すように製品・設計工程単位で表示する(ステッ
プ2805)。なお、各作業項目単位で生成されたアラ
ーム情報(警告情報)については、図16と同様に図3
0に示すように表示される。
FIG. 27 shows an example of a screen for outputting a macro work plan for the entire project searched by the project / product / process instruction section 1930 in charge and alarm (warning) information based on the progress status of this work plan. FIG. When the designer or manager logs in from the work terminal 32 or the server 31, the system searches the database for all design processes including work items to which the designer or manager has been assigned in advance, and then the product of the design process is searched. Search by matching the project name with the project name. As a result, the screen shown in FIG. 27 is displayed. That is, the screen includes a project name display area 2701 in charge, a product / design process name display area 2702,
A scheduled start date display area 2703 of the design process, a start / end date display area 2704 of the design process, a person in charge of coordinating the design process display region 2705, and a warning (alarm) generated in the design process It is composed of a region 2706. The display of the alarm is displayed as a symbol, and regarding the generation of the alarm, the performance data stored in the work performance information storage unit 221-5 (corresponding to the work performance storage unit 101 in FIGS. 1 and 5) by the warning generation unit 1924. It is generated by comparing with the plan information. The processing flow of the project / product / process instruction unit 1930 in charge is shown in FIG. First, the project / product / process instruction section 19 in charge
30 (corresponds to the progress information search unit 401 in FIG. 5) uses the user ID of the logged-in design and development staff as a key to store information on the work items that the staff is in charge of in the work item definition information storage unit 221-. Search from 4 (Step 2
801), and then, the design process and product information including the work item is searched from the design process definition information storage unit 221-3 and the product information definition storage unit 221-2 (step 280).
2) Next, the project information including the work item, the design process, and the product is searched from the project definition information storage unit 221-1 (step 2803), and the warning generation unit (alarm generation unit) 1924 is activated (step S2803). 2804),
After completion of the processing of the warning generation unit 1924 for each work item constituting the product / design process in the project,
Fig. 2 together with the alarm information generated for each design process
As shown in FIG. 7, the product / design process unit is displayed (step 2805). It should be noted that the alarm information (warning information) generated for each work item is similar to FIG.
It is displayed as shown in 0.

【0082】上記警告生成部1924(図5においては
進捗情報検索部401が相当する。)は、図29に示す
処理フローに基づいて各作業項目単位および各製品・設
計工程単位で警告(アラーム)を生成する。まず、警告
生成部1924は、作業計画から得られる開始予定日と
作業実績から得られる開始実績日との比較により未着手
アラームの検出(ステップ2901)をし、次に進捗度
推定部1925が計算した予測進捗度または進捗度報告
部108から得られる予測進捗度と実績進捗度との比較
による進捗遅れアラームの検出(ステップ2902)を
し、次に作業計画から得られる完了予定日と作業実績か
ら得られる完了実績日との比較による完了遅れアラーム
の検出(ステップ2903)をし、リソース属性別負荷
山積み計算部1928における個人をキーにした負荷山
積み計算(負荷状況計算)に基づく過負荷アラームの検
出(ステップ2904)をし、次に、先行後続関係を用
いた先行工程遅れアラームの検出(ステップ2905)
をし、次に、依頼事項格納部221−8を検索して当該
担当者に対する依頼事項の有無アラームの検出(ステッ
プ2906)をし、次に、ペンディング事項格納部22
1−9及び待ち条件格納部221−10を検索してペン
ディング事項、待ち条件の条件成立アラームの検出(ス
テップ2907)をし、次に、外部入手資料入手状況格
納部221−11を検索して外部入手資料の到着お知ら
せアラームの検出(ステップ2908)をして警告情報
(アラーム情報)を返す。即ち、プロジェクト日程計画
上において、各製品・設計工程単位および各作業項目単
位の作業開始予定日と本日の日付を比較して作業実績情
報格納部221−5に格納されている各製品・設計工程
単位および各作業項目単位の作業開始実績日が未確定
で、それぞれの作業開始予定日が過ぎている場合に作業
が未着手であると警告提示する(ステップ2901)。
またプロジェクト日程計画上において、各製品・設計工
程単位および各作業項目単位の作業開始予定日および作
業完了予定日と本日の日付とから計算される計画上の進
捗度と、作業実績情報格納部221−5に格納されてい
る各製品・設計工程単位および各作業項目単位の作業の
実績進捗度とを比較して実績進捗度が計画上の進捗度よ
り小さい場合には、作業が進捗遅れであると警告提示す
る(ステップ2902)。またプロジェクト日程計画上
において、各製品・設計工程単位および各作業項目単位
の作業完了予定日と本日の日付を比較して作業実績情報
格納部221−5に格納されている各製品・設計工程単
位および各作業項目単位の作業完了実績日が未確定で、
それぞれの作業完了予定日が過ぎている場合に作業の完
了遅れであると警告提示する(ステップ2903)。な
お、上記各作業項目単位の開始実績日および完了実績日
は、作業項目単位の作業実績から直接求まる。他方各製
品・設計工程単位の開始実績日は、各製品・設計工程を
構成する作業項目の開始実績日の内の最も最初の日によ
って求め、各製品・設計工程単位の完了実績日は、各製
品・設計工程を構成する全ての作業項目が完了した実績
日によって求めることができる。また各製品・設計工程
の実績進捗度は、各作業項目の実績進捗度を集計するこ
とによって求めることができる。また設計開発リソース
グループ毎の負荷山積み(負荷状況)に対して、山の高
さ(負荷)の上限値と比較し、上記負荷山積みが上記上
限値を越えている場合には、設計開発リソース或いは設
計開発リソースのグループに対する過負荷であると警告
提示する(ステップ2904)。また設計工程間の先行
後続関係を取得して、設計工程の開始条件が該設計工程
の先行工程であって、且つ該先行工程が完了していない
場合には、先行工程の遅れであることの警告を提示し、
該設計工程の先行工程に後続する全ての設計工程及び先
行工程を担当する設計開発リソース或いは設計開発リソ
ースのグループに関係する設計工程の遅延の可能性を警
告として提示する(ステップ2905)。また他の設計
開発リソースの担当する製品・設計工程或いは作業項目
の完了を待ってある製品・設計工程或いは作業項目を遂
行する際、待ち条件が成立したとき警告を発して条件待
ちを管理する(ステップ2907)。
The warning generation unit 1924 (corresponding to the progress information retrieval unit 401 in FIG. 5) warns (alarms) in each work item unit and each product / design process unit based on the processing flow shown in FIG. To generate. First, the warning generation unit 1924 detects an unstarted alarm by comparing the scheduled start date obtained from the work plan with the start actual date obtained from the work record (step 2901), and then calculated by the progress estimation unit 1925. A progress delay alarm is detected (step 2902) by comparing the predicted progress obtained from the predicted progress or the progress reporting unit 108 with the actual progress, and then from the expected completion date and the actual work obtained from the work plan. A completion delay alarm is detected by comparison with the obtained actual completion date (step 2903), and an overload alarm is detected based on the load accumulation calculation (load condition calculation) using the individual resource as the key accumulation calculation unit 1928. (Step 2904), and then detection of preceding process delay alarm using the preceding / successive relationship (Step 2905).
Next, the requested item storage unit 221-8 is searched to detect the presence / absence alarm of the requested item for the person in charge (step 2906), and then the pending item storage unit 22.
1-9 and the waiting condition storage unit 221-10 are searched to detect a pending condition and a condition satisfaction alarm of the waiting condition (step 2907), and then the externally acquired material acquisition status storage unit 221-11 is searched. The arrival notification alarm of the externally obtained material is detected (step 2908) and the warning information (alarm information) is returned. That is, on the project schedule, each product / design process stored in the work record information storage unit 221-5 by comparing the scheduled work start date of each product / design process unit and each work item unit with today's date. When the actual work start date for each unit and each work item is undetermined and the respective scheduled work start dates have passed, a warning is presented that the work has not been started (step 2901).
Further, in the project schedule planning, the planned progress degree calculated from the scheduled work start date and scheduled work completion date of each product / design process unit and each work item unit, and today's date, and the work result information storage unit 221. If the actual progress is smaller than the planned progress by comparing the actual progress of the work of each product / design process unit and each work item unit stored in -5, the work is delayed. Is displayed (step 2902). Further, in the project schedule, each product / design process unit stored in the work result information storage unit 221-5 by comparing the scheduled work completion date of each product / design process unit and each work item unit with today's date. And the actual work completion date for each work item is undetermined,
When each scheduled work completion date has passed, a warning is presented that the completion of the work is delayed (step 2903). The start record date and the completion record date for each work item are directly obtained from the work record for each work item. On the other hand, the start actual date of each product / design process unit is obtained by the earliest start date of the work items that make up each product / design process, and the actual completion date of each product / design process unit is It can be calculated by the actual date when all the work items that make up the product / design process are completed. Further, the actual progress of each product / design process can be obtained by aggregating the actual progress of each work item. Further, the load pile (load status) for each design and development resource group is compared with the upper limit value of the mountain height (load). If the load pile exceeds the upper limit value, the design and development resources or A warning is presented that the group of design and development resources is overloaded (step 2904). Further, if the preceding / succeeding relationship between the design processes is acquired and the starting condition of the design process is the preceding process of the design process, and the preceding process is not completed, it may be a delay of the preceding process. Present a warning,
The possibility of delay of the design process related to all the design processes subsequent to the design process and the design development resource or group of design development resources in charge of the preceding process is presented as a warning (step 2905). Waiting for the completion of the product / design process or work item in charge of other design / development resources When performing a product / design process or work item, a warning is issued when the wait condition is met and the condition wait is managed ( Step 2907).

【0083】図30は上記担当作業項目指示部1931
(図5においては進捗情報検索部401および進捗情報
表示部402が相当する。)において検索された所定の
製品・設計工程における各作業項目毎のミクロな作業計
画とこの作業計画に対する進捗状況に基づくアラーム
(警告)情報を出力する一画面例を示す。即ち、図30
は、図16と同様に、図27に示す“プロジェクトAA
Aの製品A設計工程B”における詳細な進捗状況を示す
ものである。図27において、ユーザが、“プロジェク
トAAAの製品A設計工程B”を選択すると、担当作業
項目指示部1931において検索されて、作業端末32
の表示手段326に図30に示す画面が表示される。シ
ステムは、選択されたプロジェクト名と製品・設計工程
名を3001のように表示し、その作業項目一覧300
2(図16においては161で示す。)を表示する。作
業項目3002の一覧表に、作業項目毎のステータス、
作業開始予定日、作業完了予定日、進捗度、標準工数、
実績工数、担当者、アラーム(警告)を合わせて表示す
る。アラームは上記警告生成部1924が生成した内容
である。なお、警告を作業用計算機(作業端末)32か
ら出力する際、表示手段329で表示する以外に音声を
出力してもよい。しかしながら、警告を出力する際作業
項目毎のステータス、進捗状況、担当者等については表
示手段329に表示させることが必要となる。
FIG. 30 shows the above-mentioned work item instructing section 1931 in charge.
(It corresponds to the progress information search unit 401 and the progress information display unit 402 in FIG. 5.) Based on the micro work plan for each work item in the predetermined product / design process searched and the progress status for this work plan. The example of a screen which outputs alarm (warning) information is shown. That is, FIG.
As shown in FIG. 16, “Project AA” shown in FIG.
27 shows a detailed progress situation in the product A design process B "of A. In FIG. 27, when the user selects" product A design process B of project AAA ", the work item instructing section 1931 searches for the item. , Work terminal 32
The screen shown in FIG. 30 is displayed on the display means 326 of FIG. The system displays the selected project name and product / design process name as 3001, and the work item list 300
2 (indicated by 161 in FIG. 16) is displayed. In the list of work items 3002, the status of each work item,
Scheduled work start date, scheduled work completion date, progress, standard man-hours,
The actual man-hours, the person in charge, and the alarm are displayed together. The alarm is the content generated by the warning generation unit 1924. When the warning is output from the work computer (work terminal) 32, a sound may be output instead of being displayed by the display unit 329. However, when outputting a warning, it is necessary to display the status, progress status, person in charge, etc. for each work item on the display unit 329.

【0084】上記担当作業項目指示部1931(図5に
おいては進捗情報検索部401および進捗情報表示部4
02が相当する。)は、図31に示す処理フローによ
り、“プロジェクトAAAの製品A設計工程B”におけ
る作業項目毎の管理指標(ステータス、作業開始予定
日、作業完了予定日、進捗度、標準工数、実績工数、担
当者)を検索し、警告生成部1924によりアラーム情
報を抽出する。まず、担当作業項目指示部1931は、
プロジェクト情報、製品情報、設計工程情報は既知であ
るので、これらをキーにして作業項目の図30に示すス
テータス、開始予定日、完了予定日、進捗度など全属性
データを検索し(ステップ3101)、次に先に生成し
たアラーム情報のうちこれらの作業項目に関連するもの
だけ抽出し(ステップ3102)して作業端末32の表
示手段326に表示する(ステップ3103)。また、
作業項目一覧3002には、一般的な作業の他、チェッ
ク、審査、承認、配布といった特殊な作業項目を必ず指
定して設定されるようになっている。それは、設計にお
いては、必ずチェック、審査、承認、配布といった特殊
な作業項目が必要であるからである。また書類、図面お
よびプログラム等の成果物が成果物格納部223(40
4)に格納されると、担当作業項目指示部1931(作
業内容表現部105)は、これを参照情報として作業内
容の、作業を開始する設計担当者の作業端末の表示手段
上に(例えば、図16に162で示すのと同様に図31
に3003で示すように)、入手実績を表示する。この
ように成果物格納部223(404)に書類、図面およ
びプログラム等の参照情報が格納されると、参照情報入
手実績登録部406は、作業環境設定部405で作業内
容別に設定した参照情報の入手実績を作業実績情報格納
部221−5(101)に登録することを実行する。こ
れにより、作業環境設定部405によって作業項目に対
応させて参照情報を設定すると、設計担当者は、担当作
業項目指示部1931(作業内容表現部105)におい
て作業端末の表示手段上に表示された参照情報の入手実
績3003(162)を設計作業を開始する際に参照す
ることができる。
The assigned work item instructing section 1931 (in FIG. 5, the progress information searching section 401 and the progress information displaying section 4)
02 corresponds. 31) is a management index (status, scheduled work start date, scheduled work completion date, progress level, standard man-hours, actual man-hours) for each work item in “Product A design process B of project AAA” according to the process flow shown in FIG. The person in charge (person in charge) is searched, and the alarm information is extracted by the warning generation unit 1924. First, the work item instructing section 1931 in charge is
Since the project information, the product information, and the design process information are known, all attribute data such as the status, the scheduled start date, the scheduled completion date, and the progress degree of the work item shown in FIG. 30 are searched using these as keys (step 3101). Then, of the previously generated alarm information, only the alarm information related to these work items is extracted (step 3102) and displayed on the display means 326 of the work terminal 32 (step 3103). Also,
In the work item list 3002, in addition to general work, special work items such as check, examination, approval, and distribution are always specified and set. This is because special work items such as checking, examination, approval, and distribution are necessary in design. In addition, deliverables such as documents, drawings and programs are stored in the deliverable storage unit 223 (40
4), the assigned work item instruction unit 1931 (work content expression unit 105) uses this as reference information on the display means of the work terminal of the designer who starts the work (for example, Similar to that shown at 162 in FIG.
(As indicated by 3003), the acquisition record is displayed. When reference information such as documents, drawings and programs is stored in the deliverable storage unit 223 (404) in this way, the reference information acquisition result registration unit 406 stores the reference information set by the work environment setting unit 405 for each work content. Registration of the acquisition record in the work record information storage unit 221-5 (101) is executed. As a result, when the work environment setting unit 405 sets the reference information in association with the work item, the designer is displayed on the display means of the work terminal in the work item instructing unit 1931 (work content expressing unit 105). The reference information acquisition record 3003 (162) can be referred to when the design work is started.

【0085】次に設計担当者が作業項目(作業内容)を
実行する際、成果物提示部1932(図1および図5に
おいては作業実績モニタリング部107が相当する。)
により作業端末32の表示手段326に表示させる画面
について説明する。図32は、図17と同様に、成果物
提示部1932(作業実績モニタリング部107)で生
成された一画面例を示す図である。設計担当者が所定の
作業項目(作業内容)Bを実行する際、例えば図30に
示す画面において作業項目Bを指定することによって成
果物提示部1932は、図32に示すように、作業ガイ
ダンス表示部3201に作業ガイダンス(図17におい
てはメッセージ171が対応する。)を表示し、成果物
(ドキュメント)の一覧リストを提出成果物表示部32
02(図17においては処理結果・ファイル174が対
応する。)と使用成果物表示部3203(図17におい
ては利用ツール172が対応する。)と参照成果物表示
部3204(図17においてはフォーマット173が対
応する。)とに3分類して表示する。作業ガイダンスは
作業実施に当たっての一般的な注意や留意点である。ま
た、成果物ファイルは上記のように意味に応じて3分類
して見やすくしている。上記成果物提示部1932にお
ける処理フローについて図33を用いて説明する。ま
ず、作業ガイダンスは、作業項目定義情報格納部221
−4に保持されているが、この情報は新たに検索に行か
なくても既に作業項目の全属性データを検索したことに
より得られている。そこで、初めに作業ガイダンス内容
の表示を行う(ステップ3301)。次に関連する成果
物の識別のための成果物識別コード(ドキュメントコー
ド)を取得するため、作業成果物定義情報格納部221
−7を検索して上記識別コードを得る(ステップ330
2)。次に成果物識別コード(ドキュメントコード)を
用いて成果物の実体を管理する成果物管理情報格納部2
23−1に対して、成果物実体の管理情報を取得する
(ステップ3303)。尚、成果物の実体は成果物ファ
イル格納部223−2に保持、格納されており、成果物
管理情報格納部223−1はその格納場所などの管理情
報のみを保持する。次に得られた情報もとにして表示す
る(ステップ3304)。
Next, when the designer executes the work item (work content), the product presentation unit 1932 (corresponding to the work performance monitoring unit 107 in FIGS. 1 and 5).
The screen displayed on the display unit 326 of the work terminal 32 will be described. Similar to FIG. 17, FIG. 32 is a diagram showing an example of a screen generated by the deliverable presentation unit 1932 (work performance monitoring unit 107). When the designer executes a predetermined work item (work content) B, the work item presentation unit 1932 displays the work guidance as shown in FIG. 32 by designating the work item B on the screen shown in FIG. 30, for example. The work guidance (the message 171 corresponds in FIG. 17) is displayed in the section 3201 and a list of deliverables (documents) is submitted.
02 (corresponding to the processing result / file 174 in FIG. 17), the used artifact display unit 3203 (corresponding to the utilization tool 172 in FIG. 17), and the reference artifact display unit 3204 (format 173 in FIG. 17). Are displayed in three categories. The work guidance is general precautions and points to note when performing work. Also, the product files are classified into three according to the meaning as described above to make them easier to see. The processing flow in the deliverable presentation unit 1932 will be described with reference to FIG. First, the work guidance includes the work item definition information storage unit 221.
This information is obtained by searching all the attribute data of the work item without having to newly search. Therefore, the contents of the work guidance are first displayed (step 3301). Next, in order to obtain a product identification code (document code) for identifying a related product, the work product definition information storage unit 221
-7 is searched to obtain the identification code (step 330).
2). Next, the product management information storage unit 2 that manages the substance of the product by using the product identification code (document code)
With respect to 23-1, the management information of the product entity is acquired (step 3303). The actual product is stored and stored in the product file storage unit 223-2, and the product management information storage unit 223-1 holds only the management information such as the storage location. Then, it is displayed based on the obtained information (step 3304).

【0086】また一つの設計工程における設計開発作業
の完成度を確認する方法として、設計工程においてなす
べき作業項目との関連を持つチェック項目(図16およ
び図30に示す作業項目におけるチェックが対応す
る。)と、各項目に対応するチェック時に考慮した検討
内容の入力手段325を用いて入力した検討内容と、各
チェック項目に対するチェックした/していないを指定
する手段325によって入力したチェックリストを表示
手段329に表示し、チェック項目に実施されていない
項目が存在する場合、該設計工程の設計開発作業は完了
したことの認証を不可能とすることにより、作業用計算
機32において設計工程の完了を判定する方法を採用し
ている。このような方法で設計工程での完了を判定する
ことによって、設計工程で作成される成果物の完成度を
向上させることができ、設計品質を安定化することがで
きる。また設計工程の成果物は、図32に示すように、
予め初期計画時に定義されている。しかしながら、作業
担当者自身が、初期計画時には存在しない成果物で、プ
ロジェクト進行中、即ち作業実行中に、初期計画時に予
め指示されている成果物と別に新たに成果物とすべきと
判断した成果物を図32の成果物中に追加定義すること
が可能であることが必要である。本システムは、図32
において提出成果物、使用成果物、参照成果物の各成果
物への新規成果物の追加が容易にできる。即ち、設計工
程において予め定義、指示されている提出成果物と別に
新たに設計工程の成果物を表示手段329の画面上で指
定できる手段を有する。また成果物の完成度を検証する
ための審査や承認といった作業項目が必ず定義され、設
計成果物の完成度を必ずチェックして、設計品質を安定
化することが可能である。
As a method for confirming the degree of completion of design development work in one design process, check items (checks in work items shown in FIGS. 16 and 30 correspond to work items to be performed in the design process. .) And the check contents input by means 325 for inputting the examination contents considered at the time of checking corresponding to each item and means 325 for designating whether or not each check item is checked. When there is an item which is displayed on the means 329 and is not carried out in the check items, it is impossible to certify that the design development work of the design process is completed, so that the work computer 32 completes the design process. The judgment method is adopted. By determining the completion in the design process by such a method, it is possible to improve the degree of completion of the product created in the design process and stabilize the design quality. Also, the deliverables of the design process are as shown in FIG.
It is defined in advance at the time of initial planning. However, the work person himself / herself determined that the product that does not exist at the time of initial planning and should be a new product separately from the product designated in advance at the time of initial planning while the project is in progress, that is, during work execution. It is necessary that an object can be additionally defined in the artifact of FIG. This system is shown in FIG.
In, it is possible to easily add a new product to each product of the submitted product, the use product, and the reference product. That is, there is provided means for newly designating the deliverables of the designing process on the screen of the display means 329 in addition to the deliverable deliverables previously defined and instructed in the designing process. In addition, work items such as examination and approval for verifying the completeness of the deliverable are always defined, and it is possible to always check the completeness of the design deliverable and stabilize the design quality.

【0087】次に図32に示す画面を表示して作業項目
Bについて設計担当者(開発者)が作業を実行し、この
実行された作業実績をツール使用時間取得部1933お
よび日報管理部1934(作業実績モニタリング部10
7が相当する。)を用いて漏れなく取得することについ
て説明する。まず、ツール使用時間取得部1933(作
業実績モニタリング部107)は、ツールの使用時刻ま
たは時間から作業実績を取得する。図34はツール使用
時間取得部1933における処理フローを示した図であ
る。ツール使用時間取得部1933は、設計開発作業担
当者が各作業計算機32上でソフトウェアツールを使用
するときに作業時実績情報を自動的に取得する方式を実
現する。即ち、ツール使用時間取得部1933は、成果
物提示部1932において成果物ファイルが選択されて
使用ツールが起動した時刻または時間を取得し、作業実
績情報格納部221−5(作業実績格納部101)に格
納し、また同時に新規実績データである意味のフラグを
作業実績情報格納部221−5に生成する(ステップ3
401)。次に作業が終了したとき、ツール使用時間取
得部1933は、ファイル格納時刻等を作業実績情報格
納部221−5に格納する(ステップ3402)。この
時使用したツール名称も格納される。このようにして作
業実績情報を自動的に取得する。また図11に示すよう
に予測進捗度を入力することによって作業実績情報を取
得することができる。また作業項目の作業実績情報を取
得するための方法として、上記の如く作業ツールの使用
開始時刻、完了時刻をモニタして自動的に作業実績を取
得する方法と、日報管理部1934を用いて日毎に空白
時間帯の作業実績をユーザに対して入力要求することに
よって取得する方法について説明した。作業項目の作業
実績情報の取得するための他の方法として、予め開始日
付と開始時刻と完了時刻と、完了時刻の経過の検出と同
時に完了となるといった特別な作業項目が存在する。こ
のような作業項目に対しても作業実績は必要であるが、
入力する手間がかかり実用的でない。このため、このよ
うな会議や出張などを表す作業項目に対しては、システ
ムが該作業項目の完了時刻の経過を作業端末32内に備
えられたタイマーから検出すると同時に自動的に完了と
して、その実績情報を自動的に作業実績情報格納部22
1−5に格納することによって実績情報の入力を自動化
することができる。
Next, the screen shown in FIG. 32 is displayed, and the designer (developer) executes the work for the work item B, and the performance record of the executed work is obtained by the tool usage time acquisition unit 1933 and the daily report management unit 1934 ( Work performance monitoring unit 10
7 corresponds. ) Is used to explain the acquisition without omission. First, the tool usage time acquisition unit 1933 (work performance monitoring unit 107) acquires the work performance from the tool use time or time. FIG. 34 is a diagram showing a processing flow in the tool usage time acquisition unit 1933. The tool usage time acquisition unit 1933 realizes a method of automatically acquiring work result information when a person in charge of design and development work uses a software tool on each work computer 32. That is, the tool usage time acquisition unit 1933 acquires the time or time when the product file is selected in the product presentation unit 1932 and the tool is activated, and the work record information storage unit 221-5 (work record storage unit 101). In the work record information storage unit 221-5 (step 3).
401). Next, when the work is completed, the tool usage time acquisition unit 1933 stores the file storage time and the like in the work record information storage unit 221-5 (step 3402). The tool name used at this time is also stored. In this way, the work record information is automatically acquired. Further, as shown in FIG. 11, the work record information can be acquired by inputting the predicted progress degree. Further, as a method for acquiring the work record information of the work item, a method of monitoring the use start time and the completion time of the work tool to automatically acquire the work record as described above, and a method for daily work using the daily report management unit 1934 The method of obtaining the work record in the blank time zone by requesting the user to input was explained. As another method for acquiring the work record information of the work item, there is a special work item such that the start date, the start time, the completion time, and the completion of the completion time are detected at the same time. Work records are necessary for such work items,
It takes time and effort to enter and is not practical. Therefore, for a work item that represents such a meeting or a business trip, the system automatically detects that the completion time of the work item has elapsed from the timer provided in the work terminal 32 and automatically completes the work item. The work performance information storage unit 22 automatically stores the work performance information.
By storing it in 1-5, the input of performance information can be automated.

【0088】図35は日報管理部1934における処理
フローを示した図である。日報管理部1934は、図1
8に61で示すように、まず作業実績情報格納部221
−5に格納されている1日分の作業実績を分析して空白
時間帯、及びフラグのある実績データを抽出し(ステッ
プ3501)、空白の時間帯の実績登録を作業用計算機
32上でユーザに要求する(ステップ3502)。当日
の予定作業を図18に62で示すように、作業用計算機
32に表示する(ステップ3503)。表示した作業実
績が作業実績情報格納部221−5に格納されることを
ユーザに了承するかどうかを確認する(ステップ350
4)。ユーザが作業用計算機32で追加・修正した作業
実績を作業用計算機32上のメモリ322上に保持する
(ステップ3505)。了承を意味するコマンドが作業
用計算機32上でマウスなどの入力手段325を用いて
発行されたタイミングで、作業実績を作業実績情報格納
部221−5に格納する(ステップ3506)。このよ
うにしてツール使用時間取得部1933で取得した実績
情報の修正を行うことができ、正確な実績情報を得るこ
とができる。また、作業用計算機32を使わない設計開
発作業を行った場合には、空白時間帯として日報管理部
1934が抽出するので、漏れのない作業実績を取得す
ることができる。以上により作業用計算機(作業端末)
32から漏れのない作業実績が取得されて通信ネットワ
ーク33を介してサーバ31の外部記憶装置316にお
ける作業実績情報格納部221−5(作業実績格納部1
01)に格納されることになる。
FIG. 35 is a diagram showing a processing flow in the daily report management unit 1934. The daily report management unit 1934 is shown in FIG.
As shown at 8 to 61, first, the work record information storage unit 221
The work record for one day stored in -5 is analyzed to extract the blank time slot and the actual data having a flag (step 3501), and the user registers the actual record of the blank time slot on the work computer 32. (Step 3502). The scheduled work of the day is displayed on the work computer 32 as indicated by 62 in FIG. 18 (step 3503). It is confirmed whether the user acknowledges that the displayed work record is stored in the work record information storage unit 221-5 (step 350).
4). The work record added / corrected by the user on the work computer 32 is held in the memory 322 on the work computer 32 (step 3505). The work record is stored in the work record information storage unit 221-5 at the timing when the command indicating approval is issued on the work computer 32 using the input means 325 such as a mouse (step 3506). In this way, the record information acquired by the tool usage time acquisition unit 1933 can be corrected, and accurate record information can be obtained. In addition, when a design / development work is performed without using the work computer 32, the daily report management unit 1934 extracts it as a blank time period, and thus a complete work record can be acquired. Due to the above, the work computer (work terminal)
A complete work record is acquired from 32, and the work record information storage unit 221-5 (work record storage unit 1) in the external storage device 316 of the server 31 is acquired via the communication network 33.
01) will be stored.

【0089】次に設計担当者(リソース:開発者)別
毎、リソースグループ(例えば課)別毎、リソース属性
(技術レベル)別毎の負荷変動を調査する方法について
説明する。設計担当者(リソース:開発者)別毎の負荷
変動の調査結果については、前述した警告生成部124
における過負荷アラームの検出等に用いることができ
る。また設計担当者(リソース:開発者)別毎、リソー
スグループ(例えば課)別毎、リソース属性(技術レベ
ル)別毎の負荷変動の調査結果は、前述した警告生成部
124においてアラーム情報が生成されないように、日
程計画生成部1914で生成された作業計画を日程計画
変更部1917において変更(修正)する際に用いるこ
とができる。なお、図19における1911、191
2、1914〜1917、1920〜1922、192
6〜1928は、図5の構成においては、計画部403
が対応する。まず設計担当者(リソース:開発者)別毎
の負荷変動を調査する負荷山積み計算部1926につい
て図36および図37を用いて説明する。図36は負荷
山積みを計算部1926において計算された負荷山積み
表示の一画面例を表す図である。図37は負荷山積みを
計算部1926において行う処理のフローチャートであ
る。負荷山積みを計算部1926において計算された設
計担当者別の負荷山積みの計算結果は、作業端末32の
表示手段326またはサーバ31の表示手段318に表
示することができる。設計担当者別の負荷山積みの計算
結果の表示画面は、山積みの対象となるリソースの名称
の表示領域3601と、設計工程とその設計工程に属す
る作業項目の表示領域3602と、山積み計算を行う期
間を表す領域3603と、山積み棒グラフの表示領域3
604と、本日の位置を表すマーク3605と、山積み
棒グラフの表示領域3604をスクロールする横スクロ
ールバー3606と、設計工程とその設計工程に属する
作業項目の表示領域3602及び山積み棒グラフの表示
領域3604をスクロールする縦スクロールバー360
7と、表示単位を日または月または半年または年単位に
切り替えるボタン群3608とから構成される。作業項
目の表示領域3602にある各パターンは山積み棒グラ
フの表示領域3604の棒グラフのパターンと対応して
いる。また、山積み棒グラフの表示領域3604には、
本日の日付を中心にして前後例えば、日単位表示の場合
は1カ月分、月単位表示の場合は半年分、半年単位表示
の場合は5年分、年単位表示の場合は10年分を表示す
る。また横スクロールバー3606は、この山積み棒グ
ラフの表示領域3604の表示範囲を変更する。また縦
スクロールバー3607は縦方向の表示をスクロールす
るもので作業項目の表示領域3602をスクロールする
ためのスクロールバーである。また表示単位を切り替え
るボタン群3608は、表示単位を日または月または半
年または年単位に切り替えるためのもので、各ボタンは
排他的な動作をする。また横軸の表示も日付、月、半
年、年というように変化し、本日マークの位置も日、
月、期、年というように変化する。以上説明したよう
に、設計担当者別の負荷山積みの表示形態を変更するこ
とができる。
Next, a method for investigating the load fluctuation for each design engineer (resource: developer), each resource group (for example, section), and each resource attribute (technical level) will be described. For the result of the investigation of the load fluctuation for each person in charge of design (resource: developer), the warning generation unit 124 described above is used.
Can be used to detect an overload alarm in. In addition, alarm information is not generated in the above-described warning generation unit 124 for the load variation investigation result for each designer (resource: developer), each resource group (for example, section), and each resource attribute (technical level). As described above, the work plan generated by the schedule plan generating unit 1914 can be used when changing (correcting) the schedule plan changing unit 1917. 1911 and 191 in FIG.
2, 1914-1917, 1920-1922, 192
6 to 1928 are the planning unit 403 in the configuration of FIG.
Corresponds. First, the load stacking calculation unit 1926 that investigates the load fluctuation for each designer (resource: developer) will be described with reference to FIGS. 36 and 37. FIG. 36 is a diagram showing a screen example of a load pile display in which the load pile calculation unit 1926 has calculated. FIG. 37 is a flowchart of a process for performing load heaping in the calculation unit 1926. The calculation result of the load heap for each designer in which the load heap is calculated by the calculation unit 1926 can be displayed on the display unit 326 of the work terminal 32 or the display unit 318 of the server 31. The display screen of the calculation result of the load heap for each designer is a display area 3601 for the name of the resource to be heaped, a display area 3602 for the design process and the work items belonging to the design process, and a period for performing the heap calculation. 3603 that represents the number and the display area 3 of the stacked bar graph
604, a mark 3605 indicating the position of today, a horizontal scroll bar 3606 that scrolls the display area 3604 of the stacked bar graph, a display area 3602 of the design process and work items belonging to the design process, and a display area 3604 of the stacked bar graph. Vertical scroll bar 360
7 and a button group 3608 for switching the display unit to day, month, half year or year. Each pattern in the work item display area 3602 corresponds to the bar graph pattern in the stacked bar graph display area 3604. Further, in the display area 3604 of the stacked bar graph,
Before and after today's date, for example, 1 month for daily display, 6 months for monthly display, 5 years for 6 months display, 10 years for 6 year display To do. The horizontal scroll bar 3606 changes the display range of the display area 3604 of this stacked bar graph. A vertical scroll bar 3607 scrolls the vertical display and is a scroll bar for scrolling the work item display area 3602. The button group 3608 for switching the display unit is for switching the display unit to the unit of day, month, half year or year, and each button operates exclusively. The display on the horizontal axis also changes to date, month, half year, year, etc., and the position of today's mark also changes to day,
Changes such as month, period, and year. As described above, it is possible to change the display form of the load pile for each designer.

【0090】上記負荷山積み計算部1926の処理につ
いて図37の処理フローを用いて説明する。まず、ログ
インユーザIDをキーにして、当該ユーザの担当する作
業項目を作業項目定義情報格納部221−4から検索
し、あわせて当該作業項目を含む設計工程を設計工程定
義情報格納部221−3から検索し、製品情報を製品情
報定義格納部221−2から検索し、プロジェクト情報
をプロジェクト定義情報格納部221−1から検索し、
検索結果をメモリ322に一時記憶する(ステップ37
01)。次に、ログインユーザIDをキーにして、作業
項目の実績情報を作業実績情報格納部221−5から検
索し、検索結果をメモリ322に一時記憶する(ステッ
プ3702)。次に本日の日付を計算機のタイマから求
め、表示単位から適切な横軸を決定する(ステップ37
03)。本日以前はメモリ322に一時記憶されている
実績工数を積み上げ、本日より未来はメモリ322に一
時記憶されている作業項目の計画上の工数を積み上げる
(ステップ3704)。次に上記工数山積み計算結果を
ディスプレイ等の表示手段326に表示する(ステップ
3705)。表示単位切替用のボタン群3608によっ
て表示するスケールが変更された場合や、横スクロール
バー3606によるスクロールの場合など、メモリ32
2に一時記憶されていない情報の表示が必要となった場
合には、ステップ3701より再度処理を実行する。
The processing of the load pile calculation unit 1926 will be described with reference to the processing flow of FIG. First, using the login user ID as a key, the work item in charge of the user is searched from the work item definition information storage unit 221-4, and the design process including the work item is also searched for in the design process definition information storage unit 221-3. From the product information definition storage unit 221-2, and project information from the project definition information storage unit 221-1.
The search result is temporarily stored in the memory 322 (step 37).
01). Next, using the login user ID as a key, the work record information of the work item is searched from the work record information storage unit 221-5, and the search result is temporarily stored in the memory 322 (step 3702). Next, today's date is obtained from the timer of the computer, and the appropriate horizontal axis is determined from the display unit (step 37).
03). The actual man-hours temporarily stored in the memory 322 before today are accumulated, and the planned man-hours of the work items temporarily stored in the memory 322 from today are accumulated (step 3704). Next, the manhour stacking calculation result is displayed on the display means 326 such as a display (step 3705). When the scale to be displayed is changed by the display unit switching button group 3608 or when scrolling is performed by the horizontal scroll bar 3606, the memory 32
When it is necessary to display the information that is not temporarily stored in 2, the processing is executed again from step 3701.

【0091】次にリソースグループ(例えば課)別毎の
負荷変動を調査するリソースグループ別負荷山積み計算
部1927について図38を用いて説明する。図38
は、リソースグループ別負荷山積み計算部1927で計
算されたリソースグループ別負荷山積み表示の一画面例
を表す図である。リソースグループ別の負荷山積みの計
算結果の表示画面は、山積みの対象となるリソースグル
ープの名称の表示領域3801と、当該リソースグルー
プの開発しているプロジェクトの一覧の表示領域380
2と、山積み計算を行う期間を表す領域3803と、山
積み棒グラフの表示領域3804と、本日の位置を表す
マーク3805と、山積み棒グラフの表示領域3804
をスクロールする横スクロールバー3806と、設計工
程とその設計工程に属する作業項目の表示領域3802
及び山積み棒グラフの表示領域3804をスクロールす
る縦スクロールバー3807と、表示単位を日または月
または半年または年単位に切り替えるボタン群3808
とから構成される。作業項目の表示領域3802にある
各パターンは山積み棒グラフの表示領域3804の棒グ
ラフのパターンと対応している。また、山積み棒グラフ
の表示領域3804には、本日の日付を中心にして前後
例えば、日単位表示の場合は1カ月分、月単位表示の場
合は半年分、半年単位表示の場合は5年分、年単位表示
の場合は10年分を表示する。また、横スクロールバー
3806は、この山積み棒グラフの表示領域3804の
表示範囲を変更する。また、縦スクロールバー3807
は縦方向の表示をスクロールするもので作業項目の表示
領域3802をスクロールするためのスクロールバーで
ある。また、表示単位を切り替えるボタン群3808
は、表示単位を日または月または半年または年単位に切
り替えるためのもので、各ボタンは排他的な動作をす
る。また、横軸の表示も日付、月、半年、年というよう
に変化し、本日の位置も日、月、期、年というように変
化する。以上説明したように、リソースグループ別の負
荷山積みの表示形態を変更することができる。
Next, the load pile calculation unit 1927 for each resource group for investigating the load fluctuation for each resource group (for example, section) will be described with reference to FIG. Figure 38
FIG. 9 is a diagram showing a screen example of a load pile display for each resource group calculated by a resource group load pile calculation unit 1927. The display screen of the calculation result of the load heap by resource group shows a display area 3801 of the name of the resource group to be heaped and a display area 380 of the list of projects developed by the resource group.
2, a region 3803 that represents a period for which heap calculation is performed, a heap bar graph display region 3804, a mark 3805 that represents today's position, and a heap bar graph display region 3804.
Horizontal scroll bar 3806 for scrolling, and a display area 3802 for a design process and work items belonging to the design process
And a vertical scroll bar 3807 for scrolling the display area 3804 of the stacked bar graph, and a button group 3808 for switching the display unit to day, month, half year or year.
It is composed of Each pattern in the work item display area 3802 corresponds to the bar graph pattern in the stacked bar graph display area 3804. Further, the display area 3804 of the stacked bar graph is centered around today's date, for example, one month for daily display, half a year for monthly display, and five years for half year display. In case of yearly display, 10 years worth is displayed. Also, the horizontal scroll bar 3806 changes the display range of the display area 3804 of this stacked bar graph. Also, the vertical scroll bar 3807
Is a scroll bar for scrolling the vertical display and for scrolling the work item display area 3802. Also, a button group 3808 for switching the display unit
Is for switching the display unit to day, month, half year or year, and each button operates exclusively. Also, the display of the horizontal axis changes such as date, month, half year, and year, and today's position also changes such as day, month, period, and year. As described above, it is possible to change the display form of the load pile for each resource group.

【0092】またこのリソースグループ別負荷山積み計
算部1927の処理については、図37に示す負荷山積
み計算部1926の処理フローの処理ボックス3701
において、そのユーザIDからリソースグループの情報
をリソース属性格納部222−1とリソースグループ属
性格納部222−2から検索し、処理ボックス3702
〜3705において、当該ユーザのリソースグループの
一致するリソースグループの工数負荷を集計および表示
することで本機能を実現する。
Regarding the processing of this load group-by-resource group calculation unit 1927, a processing box 3701 of the processing flow of the load pile calculation unit 1926 shown in FIG.
In the process box 3702, information on the resource group is searched from the resource attribute storage unit 222-1 and the resource group attribute storage unit 222-2 based on the user ID.
In 3705 to 3705, this function is realized by totaling and displaying the man-hour load of the resource group in which the resource group of the user matches.

【0093】次にリソース属性(技術レベル)別毎の負
荷変動を調査するリソース属性別負荷山積み計算部19
28について図39を用いて説明する。図39は、リソ
ース属性としてリソースの技術レベルを属性としてリソ
ース属性別負荷山積み表示の一画面例を表す図である。
負荷山積みの計算結果の表示画面は、山積みの対象とな
るリソース属性の名称の表示領域3901と、当該リソ
ース属性の開発しているプロジェクトの一覧の表示領域
3902と、山積み計算を行う期間を表す領域3903
と、山積み棒グラフの表示領域3904と、本日の位置
を表すマーク3905と、山積み棒グラフの表示領域3
904をスクロールする横スクロールバー3906と、
設計工程とその設計工程に属する作業項目の表示領域3
902及び山積み棒グラフの表示領域3904をスクロ
ールする縦スクロールバー3907と、表示単位を日ま
たは月または半年または年単位に切り替えるボタン群3
908とから構成される。作業項目の表示領域3902
にある各パターンは山積み棒グラフの表示領域3904
の棒グラフのパターンと対応している。また、山積み棒
グラフの表示領域3904には、本日の日付を中心にし
て前後例えば、日単位表示の場合は1カ月分、月単位表
示の場合は半年分、半年単位表示の場合は5年分、年単
位表示の場合は10年分を表示する。また、横スクロー
ルバー3906は、この山積み棒グラフの表示領域39
04の表示範囲を変更する。また、縦スクロールバー3
907は縦方向の表示をスクロールするもので作業項目
の表示領域3902をスクロールするためのスクロール
バーである。また、表示単位を切り替えるボタン群39
08は、表示単位を日または月または半年または年単位
に切り替えるためのもので、各ボタンは排他的な動作を
する。また、横軸の表示も日付、月、半年、年というよ
うに変化し、本日の位置も日、月、期、年というように
変化する。またこのリソース属性別負荷山積み計算部1
928の処理については、図37に示す負荷山積み計算
部1926の処理フローの処理ボックス3701におい
て、そのユーザIDからリソース属性の情報をリソース
属性格納部222−1とリソースグループ属性格納部2
22−2から検索し、処理ボックス3702〜3705
において、当該ユーザのリソース属性の一致するリソー
ス属性の工数負荷を集計および表示することで本機能を
実現する。
Next, the load pile calculation unit 19 for each resource attribute for investigating the load fluctuation for each resource attribute (technical level)
28 will be described with reference to FIG. FIG. 39 is a diagram showing a screen example of a load pile display for each resource attribute having the resource technical level as the resource attribute.
The display screen of the calculation result of the load pile is a display area 3901 of the name of the resource attribute to be piled up, a display area 3902 of a list of projects developed by the resource attribute, and an area showing a period for performing the pile calculation. 3903
Display area 3904 for stacking bar graph, mark 3905 indicating today's position, and display area 3 for stacking bar graph
A horizontal scroll bar 3906 for scrolling 904,
Display area 3 of design process and work items belonging to the design process
902 and a vertical scroll bar 3907 for scrolling the display area 3904 of the stacked bar graph, and a button group 3 for switching the display unit to day, month, half year or year
And 908. Work item display area 3902
Each pattern in is a display area 3904 for a stack bar graph.
Corresponds to the bar graph pattern of. Further, the display area 3904 of the stacked bar graph is centered around today's date, for example, one month for daily display, half a year for monthly display, and five years for half year display In case of yearly display, 10 years worth is displayed. The horizontal scroll bar 3906 is used to display the stack bar graph display area 39.
Change the display range of 04. Also, the vertical scroll bar 3
Reference numeral 907 denotes a scroll bar for scrolling the vertical display, which is a scroll bar for scrolling the work item display area 3902. Also, a button group 39 for switching the display unit
08 is for switching the display unit to a day, a month, a half year, or a year unit, and each button operates exclusively. Also, the display of the horizontal axis changes such as date, month, half year, and year, and today's position also changes such as day, month, period, and year. In addition, the load pile calculation unit 1 for each resource attribute
Regarding the processing of 928, in the processing box 3701 of the processing flow of the load heap calculation unit 1926 shown in FIG. 37, the resource attribute information from the user ID is stored in the resource attribute storage unit 222-1 and the resource group attribute storage unit 2.
22-2, processing box 3702-3705
In, the function is realized by aggregating and displaying the man-hour load of the resource attribute in which the resource attribute of the user matches.

【0094】次に計画部403において作業計画を立案
するための各種データ入力方法について説明する。まず
プロジェクト属性入力部1911によるプロジェクト属
性の入力方法について図40および図41を用いて説明
する。プロジェクト属性入力部1911によるプロジェ
クト属性の入力は、所望の作業端末(作業計算機)32
の入力手段325またはサーバ31の入力手段317を
用いて行なうことができる。当然表示手段326または
318の画面上で入力することもできる。図40はプロ
ジェクト属性入力部1911によるプロジェクト属性を
入力するための一画面例を示す図である。図40に示す
ように、画面はプロジェクト属性入力領域4001と、
製品名の指定選択領域4002と、工程の指定選択領域
4003より構成される。製作すべき製品及び工程は製
品名の指定選択領域4002及び工程の指定選択領域4
003で選択手段4004を用いて選択されると、表示
が反転し選択されたことを示す。再度選択すると、この
反転表示は解除され、非選択状態に戻る。ただし、製品
名の指定選択領域4002及び工程の指定選択領域40
03の初期の状態はすべてが選択された状態となってお
り、ユーザは不要の選択を解除することから始める。当
該プロジェクト属性入力部111の処理フローを図41
を用いて説明する。まずプロジェクトの属性(プロジェ
クト名、略称、完了日、等)を入力する(ステップ41
01)。次に製作する製品名称を製品一覧表である製品
マスタ情報格納部226−1より検索して、表示する
(ステップ4102)。次に実施する設計工程を工程一
覧表である設計工程マスタ格納部226−4より検索し
て、表示する(ステップ4103)。次に製品一覧表示
領域4002の各行に対してマウスなどの入力手段32
5による選択/非選択を判定して、選択されている製品
名を一時記憶用メモリ322に一時記憶する(ステップ
4104)。次に工程一覧表示領域4003の各行に対
してマウスなどの入力手段325による選択/非選択を
判定して、選択されている工程名を一時記憶用メモリ3
22に一時記憶する(ステップ4105)。以上により
入力された新規プロジェクトの属性(プロジェクト名、
略称、完了日、等)に対応させて所望の複数の製品名と
所望の複数の設計工程名とが選択されて一時記憶メモリ
322に格納されることになる。当然一時記憶メモリ3
22には所望の複数の製品名と所望の複数の設計工程名
とが新規プロジェクトの属性に対応して格納されること
になる。
Next, various data input methods for making a work plan in the planning unit 403 will be described. First, a method of inputting a project attribute by the project attribute input unit 1911 will be described with reference to FIGS. 40 and 41. The input of the project attribute by the project attribute input unit 1911 is performed by the desired work terminal (work computer) 32.
Input means 325 or the input means 317 of the server 31. Of course, it is also possible to input on the screen of the display means 326 or 318. FIG. 40 is a diagram showing an example of a screen for inputting project attributes by the project attribute input unit 1911. As shown in FIG. 40, the screen includes a project attribute input area 4001 and
The product name designation selection area 4002 and the process designation selection area 4003. The product and process to be manufactured are designated selection region 4002 of product name and designated selection region 4 of process.
When the selection means 4004 is selected in 003, the display is highlighted to indicate that the selection has been made. When it is selected again, this highlighted display is canceled and the state returns to the non-selected state. However, the product name designation selection area 4002 and the process designation selection area 40
In the initial state of 03, all are selected, and the user starts by canceling unnecessary selections. The processing flow of the project attribute input unit 111 is shown in FIG.
This will be described with reference to FIG. First, enter project attributes (project name, abbreviation, completion date, etc.) (step 41).
01). Next, the product name to be manufactured is retrieved from the product master information storage unit 226-1 which is a product list and displayed (step 4102). The design process master storage unit 226-4, which is a process list, is searched for and displays the design process to be executed next (step 4103). Next, input means 32 such as a mouse is input to each line of the product list display area 4002.
The selection / non-selection according to No. 5 is determined, and the selected product name is temporarily stored in the temporary storage memory 322 (step 4104). Next, selection / non-selection by the input means 325 such as a mouse is judged for each line of the process list display area 4003, and the selected process name is temporarily stored in the memory 3
It is temporarily stored in 22 (step 4105). The new project attributes (project name,
A desired plurality of product names and a desired plurality of design process names are selected according to the abbreviation, completion date, etc.) and stored in the temporary storage memory 322. Naturally, temporary storage memory 3
22 stores a plurality of desired product names and a plurality of desired design process names corresponding to the attributes of the new project.

【0095】次に一時記憶メモリ322に格納された新
規プロジェクトに対応する製品と工程の全組合せから必
要な製品・設計工程を生成する必要工程生成部1912
について図42、図43および図44を用いて説明す
る。図42は必要工程生成部1912において新規プロ
ジェクトに対応する製品と工程の全組合せから必要な製
品・設計工程を生成するための一画面例を示す図であ
る。図43は旧プロジェクトについての過去の実績情報
を参照または再利用して必要工程生成部1912におい
て新規プロジェクトに対応する製品と工程の全組合せか
ら必要な製品・設計工程を生成するために、旧プロジェ
クトについての過去の実績情報を検索し、選択するため
のウィンドウの説明図である。図44は必要工程生成部
1912の処理フローを示す図である。必要工程生成部
1912において新規プロジェクトに対応する製品と工
程の全組合せから必要な製品・設計工程を生成するため
の画面は、図42に示すように、工程名の表示領域42
01と、製品名の表示領域4202と、製品・設計工程
の表示領域4203と、操作用のボタン群4204より
構成される。工程名表示領域4201及び製品名表示領
域4202の表示内容は、プロジェクト属性入力部19
11において選択して一時記憶用メモリ322に格納し
た工程名、製品名である。まず“新規作成”ボタン42
04−1をマウスなどの入力手段325によって選択す
ると、製品・設計工程の表示領域4203には、新規プ
ロジェクトに対応したすべての工程名と製品名の組合せ
を表示することができる。ここで、システム(必要工程
生成部1912)は、製品・設計工程の表示領域420
3のセル4205のような各セルに数値を表示するが、
これは各製品・設計工程の標準的な工数を示す数値であ
り、設計工程マスタ格納部226−4より検索された値
である。これによって、新規プロジェクトにおける製品
毎の標準工数および全体の標準工数を集計することがで
き、これによって作業計画がマクロ的に良好であるか否
かを判断することができる。ここで、例えば新規プロジ
ェクトにおける作業計画が良好でない場合には、製品・
設計工程の表示領域4203において、各セルをマウス
などの入力手段325によって選択すると、セル420
5のように表示が反転し、この製品・設計工程を新規プ
ロジェクトにおいて使用しないことを指定することがで
き、新規プロジェクトから除くことができる。すなわ
ち、新規プロジェクトにおいて、工程と製品のすべての
組合せで生成した製品・設計工程の全体から不要なもの
を削除し、必要なものを残すユーザインターフェースを
提供することができる。
Next, a necessary process generation unit 1912 that generates a necessary product / design process from all combinations of products and processes corresponding to the new project stored in the temporary storage memory 322.
This will be described with reference to FIGS. 42, 43 and 44. FIG. 42 is a diagram showing an example of a screen for generating a necessary product / design process from all combinations of products and processes corresponding to a new project in the necessary process generation unit 1912. 43. In FIG. 43, the old project is generated in order to generate necessary products and design processes from all combinations of products and processes corresponding to the new project in the necessary process generation unit 1912 by referring to or reusing past performance information about the old project. FIG. 8 is an explanatory diagram of a window for searching and selecting past performance information about. FIG. 44 is a diagram showing a processing flow of the necessary process generation unit 1912. As shown in FIG. 42, the screen for generating the necessary product / design process from all combinations of products and processes corresponding to the new project in the necessary process generation unit 1912 is as shown in FIG. 42.
01, a product name display area 4202, a product / design process display area 4203, and an operation button group 4204. The display contents of the process name display area 4201 and the product name display area 4202 are as follows.
11 are process names and product names selected in 11 and stored in the temporary storage memory 322. First, the "New" button 42
When 04-1 is selected by the input means 325 such as a mouse, a combination of all process names and product names corresponding to the new project can be displayed in the product / design process display area 4203. Here, the system (necessary process generation unit 1912) displays the product / design process display area 420.
Display a number in each cell, such as cell 3 of 3
This is a numerical value indicating a standard man-hour of each product / design process, and is a value retrieved from the design process master storage unit 226-4. As a result, the standard man-hours for each product in the new project and the total standard man-hours can be aggregated, and it is possible to judge whether or not the work plan is macroscopically good. Here, for example, if the work plan for a new project is not good,
In the design process display area 4203, when each cell is selected by the input means 325 such as a mouse, the cell 420 is displayed.
The display is reversed as shown in 5, and it can be specified that this product / design process is not used in the new project, and it can be excluded from the new project. That is, in a new project, it is possible to provide a user interface in which unnecessary items are deleted from the entire product / design process generated by all combinations of processes and products and necessary items are left.

【0096】上記新規プロジェクトの作業計画におい
て、新規プロジェクトに近い旧プロジェクトにおける過
去の実績情報を参照または再利用したい場合には、“実
績・・・”ボタン2504−2をマウスなどの入力手段3
25によって選択すると、図43に示すようなウィンド
ウ4300が生成され、各旧プロジェクトについて過去
の実績情報を検索し、参照または再利用することができ
る。旧プロジェクト情報の表示領域4301には、プロ
ジェクト属性入力部1911で入力した新規プロジェク
ト属性に近い旧プロジェクトの実績情報から順に上から
表示される。ここで、近さの尺度はプロジェクト属性の
差によって判断される。所望の旧プロジェクト情報を、
図43の選択手段4302によって選択する。このよう
な選択手段4302は、マウスなどの入力手段325に
よって実現する。選択が完了すると、システム(必要工
程生成部1912)は、当該ウィンドウ4300を閉じ
て、当該プロジェクトの情報を図42の工程名の表示領
域4201と、製品名の表示領域4202と、製品・設
計工程の表示領域4203に表示する。これ以降の表示
領域4203上での動作は新規作成ボタン4204−1
によって製品・設計工程を生成した場合と同様である。
次に新規プロジェクトにおいて生成した製品・設計工程
を格納する場合は、“登録”ボタン4204−3をマウ
スなどの入力手段325によって選択することによっ
て、当該新規プロジェクト情報がデータ格納部193に
格納される。また“キャンセル”ボタン4204−4を
マウスなどの入力手段325によって選択すると、これ
までの操作はすべてキャンセルされ、したがってデータ
格納部193に対するデータの格納も行わないで終了す
る。
In the work plan of the new project, if it is desired to refer to or reuse the past performance information of the old project close to the new project, the "results ..." button 2504-2 is used as an input means 3 such as a mouse.
When selected by 25, a window 4300 as shown in FIG. 43 is generated, and past performance information can be searched for each old project and can be referred to or reused. In the old project information display area 4301, the past project performance information that is closer to the new project attribute input by the project attribute input unit 1911 is displayed in order from the top. Here, the measure of closeness is determined by the difference in project attributes. The desired old project information,
Selection is made by the selection means 4302 of FIG. Such selecting means 4302 is realized by the input means 325 such as a mouse. When the selection is completed, the system (necessary process generation unit 1912) closes the window 4300, and displays the information of the project in the process name display area 4201, the product name display area 4202, and the product / design process in FIG. Is displayed in the display area 4203. The operation on the display area 4203 thereafter is the new creation button 4204-1.
This is the same as when the product / design process is generated by.
Next, when the product / design process generated in the new project is stored, the new project information is stored in the data storage unit 193 by selecting the “register” button 4204-3 with the input means 325 such as a mouse. . Further, when the "Cancel" button 4204-4 is selected by the input means 325 such as a mouse, all the operations so far are cancelled, and therefore the data storage unit 193 ends without storing data.

【0097】次に図44を用いて必要工程生成部191
2の処理のフローについて説明する。まず、プロジェク
ト属性入力部1911で入力した新規プロジェクトの属
性を一時記憶用メモリ322からロードする(ステップ
4401)。次に製品と工程の全組合せを生成し、工数
などの標準情報を設計工程マスタ格納部226−4から
検索する(ステップ4403)。一方過去の実績情報を
利用する場合は、プロジェクト実績情報をプロジェクト
定義情報格納部221−1、製品情報定義格納部221
−2、設計工程定義情報格納部221−3から検索する
(ステップ4402)。次に結果を表示(ステップ44
04)して、登録する場合は“登録”ボタンで、データ
格納部193にデータを格納し、登録しない場合は“キ
ャンセル”ボタンでそのまま終了する(ステップ440
5)。
Next, with reference to FIG. 44, the required process generation unit 191
The flow of the process 2 will be described. First, the attributes of the new project input by the project attribute input unit 1911 are loaded from the temporary storage memory 322 (step 4401). Next, all combinations of products and processes are generated, and standard information such as man-hours is searched from the design process master storage unit 226-4 (step 4403). On the other hand, when the past achievement information is used, the project achievement information is stored in the project definition information storage unit 221-1 and the product information definition storage unit 221.
-2, the design process definition information storage unit 221-3 is searched (step 4402). Then display the results (step 44
04) Then, when registering, the "register" button is used to store the data in the data storage unit 193, and when not registered, the "cancel" button is used to end the process (step 440).
5).

【0098】ここで、本明細書中に述べている用語につ
いて注釈をつけておくと、上記では、製品と工程の全組
合せから必要な製品・設計工程を生成すると説明した。
この場合、本システムの適用対象が設計部門のみであれ
ば、上記“製品”はそのまま開発する“機種”等に対応
し、“工程”は“設計成果物”に対応させることができ
る。また試作試験工程などを考えれば、“製品”は“試
作機”に対応し、“工程”は“試験項目”に対応させる
ことができる。このように製品・設計工程という名称
は、製品と工程がペアとなっていることを表すものであ
るが、更に一般的な呼称を用いることとし、以下の説明
では簡単にワークと呼ぶこともあることを断っておく。
次に日程計画を生成する日程計画生成部1914につい
て図45を用いて説明する。図45は日程計画生成部1
914を説明するための図である。日程計画生成部19
14の目的とするところは、必要工程生成部1912に
おいて生成したすべてのワーク(製品・設計工程)につ
いて、イベントマイルストーン、先行関係に基づいて、
着手可能日を概略求めることである。ここでいうイベン
トはマイルストーンの1つであり、各種のマイルストー
ンのうちポイントとなる重要なマイルストーンである。
これらのイベントはプロジェクト毎にイベント格納部2
21−11に保持、格納される。まず、プロジェクトに
関する情報としてプロジェクトの開始日、プロジェクト
の重要マイルストーンであるイベント日程、また新規に
考慮すべきワーク間の先行後続関係を入力し、そのイベ
ントマイルストーンを考慮して日程表を時間軸上に展開
する。ここで、プロジェクトの完了日等のプロジェクト
属性はプロジェクト属性入力部1911において入力さ
れたデータを使用する。画面は、図45の下方に示すよ
うにプロジェクト完了日までのカレンダとイベントの表
示領域4502と、ワークのバーチャート表示領域45
03と、作業量推定部1915へ遷移するための「作業
量推定・・・」ボタン4504から構成される。ワークは
イベントとの関係が強く、1つのイベントまでに終了し
ていなければならないワークの関連情報も設計工程マス
タ格納部226−4に格納されており、必要工程生成部
1912で生成した必要工程の情報をデータ格納部19
3に格納する際に、イベントデータも作成されているた
め、上記のワークのバーチャート表示領域4503の表
示が可能となる。システムは、まず入力されたイベント
日付に対して、ワークとイベントとの関係を利用し、ま
ずワークの完了日をイベントと一致させ、完了日から標
準工数分だけ前に移動した日付を当該ワークの開始日と
して決定していく。この際、工程間の先行後続関係デー
タを基準に最も後ろのワークから決定していく。また上
記決定後、「作業量推定・・・」ボタン4504をマウス
などの入力手段325により選択することによって、当
該日程計画の作業量を作業量推定部1915に遷移して
評価することができる。
Here, to add a note to the terms described in the present specification, it has been explained above that a necessary product / design process is generated from all combinations of products and processes.
In this case, if the target of application of this system is only the design department, the above "product" can correspond to the "model" to be developed as it is, and the "process" can correspond to the "design product". Considering the prototype test process, etc., the "product" can correspond to the "prototype machine", and the "process" can correspond to the "test item". As described above, the name of product / design process represents that a product and a process are paired, but a more general name is used, and in the following description, it may be simply called a work. I'll decline it.
Next, the schedule plan generation unit 1914 that generates a schedule plan will be described with reference to FIG. FIG. 45 shows the schedule plan generation unit 1
It is a figure for explaining 914. Schedule planning unit 19
The purpose of No. 14 is that all work (product / design process) generated by the necessary process generation unit 1912 is
It is to roughly calculate the possible start date. The event here is one of the milestones, and is an important milestone that is a point among various milestones.
These events are stored in the event storage section 2 for each project.
21-11 is stored and stored. First, enter the project start date as the information about the project, the event schedule that is the important milestone of the project, and the predecessor-successor relationship between the works to be newly considered, and consider the event milestone, Expand to the top. Here, the data input in the project attribute input unit 1911 is used as the project attribute such as the completion date of the project. As shown in the lower part of FIG. 45, the screen displays a calendar and event display area 4502 until the project completion date, and a work bar chart display area 45.
03 and a “work load estimation ...” button 4504 for transiting to the work load estimating unit 1915. The work has a strong relation with the event, and the related information of the work that must be completed by one event is also stored in the design process master storage unit 226-4, and the necessary process generated by the necessary process generation unit 1912 is stored. Information storage unit 19
Since the event data is also created when the data is stored in No. 3, the bar chart display area 4503 of the above work can be displayed. The system first uses the relationship between the work and the event for the entered event date, first matches the completion date of the work with the event, and moves the date moved by the standard man-hours from the completion date to the relevant work date. It will be decided as the start date. At this time, based on the preceding / successive relationship data between the processes, the work at the rearmost is determined. Further, after the above determination, the “work load estimation ...” button 4504 is selected by the input means 325 such as a mouse, so that the work amount of the schedule can be transferred to the work amount estimating unit 1915 and evaluated.

【0099】次に設計作業量を推定するための設計作業
量推定部1915について図46および図47を用いて
説明する。図46および図47は、本システムの設計作
業量推定部1915において設計作業量を推定するため
の一画面例を示した図である。この設計作業量推定部1
915が目的とする機能は、作業計画の達成可能性を評
価することにある。日程計画生成部1914で自動作成
した日程計画は、完成期限を遵守するために立案した日
程計画であり、工数的考慮もされていない。そこで、本
設計作業量推定部1915は工数を山積み表示し、必要
人員数の予測を行うことを狙っている。またここでは新
規プロジェクトの投入による負荷の予測である。このた
めには現状の負荷状況が不可欠である。また設計・開発
業務進行中においては、すべてが設計作業ということは
なく、何らかの非設計業務も定常的に存在する。そこ
で、これらを含めた山積み、負荷の予測が必要である。
画面は期単位(半年単位)で表示され、7年分のカレン
ダの表示領域4604と、新規プロジェクトに対するす
べてのイベント表示領域4605と、工数山積み表示領
域4606、またその設計・開発グループの保有リソー
ス数を示すMAXリソース数ライン4602と、保有リ
ソース数と設計作業量の工数山積みとの比較による過負
荷の警告表示領域4601と、一日当たりのリソースの
作業可能時間の設定欄4603より構成される。工数山
積み表示領域4606には、新規投入プロジェクトの負
荷量と、既存プロジェクトの負荷量と、非設計業務の工
数の予測値に分けて表示する。また、MAXリソース数
ライン4602が示すものは、その設計・開発グループ
のリソースの数であり、異動、転勤等の要因によって変
動する値であるため、設定を変更することが可能であ
り、マウスなどの入力手段325によって図46の46
07に示すように、当該ライン4602を期単位(半年
単位)で動かして、再設定することができる。また、過
負荷の警告表示領域4601は過負荷の度合いにより、
表示色が濃くなるようになっている。また、一日当たり
のリソースの作業可能時間の設定欄4603の値のデフ
ォルトは8時間であるが、この欄内にマウスやキーボー
ドなどの入力手段325を用いて数値を入力することに
よって容易に変更することができる。システムはこの値
を基準にして山積みを計算するので、その場合は山積み
の再計算及び再表示を自動的に行う。また、期単位の山
積み表示は粗いため、更に詳細な山積みを表示させる必
要が生じる。その場合は、図46の4608に示すよう
に、カレンダの表示領域4604をマウスなどの入力手
段325により選択することによって、年間の月単位の
工数山積みも参照することができる。この年間の工数山
積みを表示した一画面例が図47である。次に、年間の
負荷山積みを月単位に表示した図47について説明す
る。画面の構成は図46とほぼ同じであるが、月の表示
欄4701が新たに追加される。また、MAXリソース
ライン4702については、半年ではなく月単位の変更
が可能となる。この画面でも設計作業は、新規投入プロ
ジェクトの負荷量と、既存プロジェクトの負荷量と、非
設計業務の工数の予測値に分けて表示する。
Next, the design work amount estimating unit 1915 for estimating the design work amount will be described with reference to FIGS. 46 and 47. 46 and 47 are diagrams showing one screen example for estimating the design work amount in the design work amount estimating unit 1915 of the present system. This design work amount estimation unit 1
The purpose of the function 915 is to assess the feasibility of the work plan. The schedule plan automatically created by the schedule plan generation unit 1914 is a schedule plan designed to comply with the completion deadline, and is not considered in terms of man-hours. Therefore, the design work amount estimating unit 1915 aims to predict the required number of workers by displaying the man-hours in piles. Also, here is the forecast of the load due to the input of a new project. For this purpose, the current load situation is indispensable. Further, while design / development work is in progress, not all design work is performed, and some non-design work is constantly present. Therefore, it is necessary to predict the heap and load including these.
The screen is displayed on a period basis (semi-annual basis), and a calendar display area 4604 for 7 years, an event display area 4605 for all new projects, an accumulated man-hour display area 4606, and the number of resources owned by the design / development group A MAX resource number line 4602, an overload warning display area 4601 by comparing the number of owned resources and the number of man-hours of design work, and a setting field 4603 of a resource workable time per day. In the man-hour accumulated display area 4606, the load amount of a newly input project, the load amount of an existing project, and the estimated man-hours of non-design work are displayed separately. Further, the MAX resource number line 4602 indicates the number of resources of the design / development group, which is a value that fluctuates due to factors such as transfer and transfer, so that it is possible to change the setting, such as a mouse. 46 by the input means 325 of FIG.
As shown in 07, the line 4602 can be reset by moving in a period unit (semi-annual unit). In addition, the overload warning display area 4601 is
The display color is darker. Further, the default value of the workable time setting field 4603 of the resource per day is 8 hours, but it can be easily changed by inputting a numerical value in this field using the input means 325 such as a mouse or a keyboard. be able to. Since the system calculates the heap based on this value, the heap is automatically recalculated and redisplayed in that case. Further, since the display of piles in units of periods is rough, it is necessary to display more detailed piles. In that case, as shown by 4608 in FIG. 46, by selecting the display area 4604 of the calendar by the input means 325 such as a mouse, it is also possible to refer to the pile of man-hours on a monthly basis in a year. FIG. 47 shows an example of a screen displaying a pile of man-hours for this year. Next, a description will be given of FIG. 47 in which the annual load pile is displayed on a monthly basis. The screen configuration is almost the same as in FIG. 46, but a month display field 4701 is newly added. Also, the MAX resource line 4702 can be changed in units of months instead of half a year. Also on this screen, the design work is divided into the load amount of the newly input project, the load amount of the existing project, and the estimated value of the man-hours of the non-design work and displayed.

【0100】また更にこのように山積みされた作業の種
類毎の工数を参照する方法について図48を用いて説明
する。図46及び図47の工数山積みはプロジェクト全
体の工数山積みであって、作業の内容にも触れていな
い。しかしながら、設計開発作業にはさまざまな作業が
あり、一様に負荷工数のみで、必要工数の算出を行うこ
とに意味はない。そこで、作業の種類別に工数を考慮
し、必要人員数を求める。全プロジェクト作業の山積み
表示4801は、指定された月毎のプロジェクト全工数
の山積み結果であり、新規プロジェクトと、既存プロジ
ェクトと、非設計作業の3種類に分けて表示する。ま
た、新規プロジェクト(製品別)表示4802は、指定
された月毎の新規プロジェクトに関して製品別に必要と
する工数の山積みである。また、全プロジェクトの作業
種類別表示4803は、難易度の高い作業と、通常の作
業と、例えば作図などの特殊作業に分けて表示する。ま
た、作業の難易度毎の工数を表示する機能4804も有
している。このように作業を分割した表示を行うこと
で、プロジェクトマネージャは必要人員数を把握するこ
とが可能となり、必要なら外注するなどの判断を行うこ
とができる。
Furthermore, a method for referring to the man-hours for each type of work thus piled up will be described with reference to FIG. The man-hours pile of FIG. 46 and FIG. 47 is the man-hour pile of the whole project, and the content of the work is not touched. However, there are various kinds of design and development work, and it is meaningless to uniformly calculate the required man-hours only by the load man-hours. Therefore, the man-hours are considered for each type of work, and the required number of workers is obtained. The piled-up display 4801 of all project work is a piled-up result of the total number of man-hours of the designated month, and is displayed separately for three types of new project, existing project, and non-designed work. Further, the new project (by product) display 4802 is a pile of man-hours required for each product regarding a specified monthly new project. Further, the work type-based display 4803 for all projects is displayed by dividing it into highly difficult work, normal work, and special work such as drawing. It also has a function 4804 for displaying the number of man-hours for each work difficulty level. By displaying the work in a divided manner in this way, the project manager can grasp the required number of personnel, and can make a decision such as outsourcing if necessary.

【0101】上記のように、設計作業量推定部1915
の機能によれば、日程計画の必要リソース量と、過負荷
な状況を把握することができる。しかしながら、ここで
の日程計画は単純な工数の積み上げ結果であって意味の
ある計画ではない。また、ここでは単に必要人員数を把
握したに留まり、担当者の割当も行われていない。次に
担当者の割当を行うためのリソース割当部1921につ
いて図49を用いて説明する。図49は、当該プロジェ
クトの設計工程の一覧を示す画面例である。システムは
プロジェクトに属する製品・設計工程の一覧をユーザに
提示し、各製品・設計工程(ワークと呼ぶ)及びワーク
の作業項目に対する割当を促す。画面の構成として設計
工程一覧表示部4901(1921)は、必要工程生成
部1912と同じで、工程名の表示領域4903と製品
・設計工程の表示領域4904とを持つ。相異点は製品
・設計工程の表示領域4904のセル4902に工数で
はなくて色分けがなされることである。この色分けは、
当該製品・設計工程にリソースの割当がなされたか否か
を識別するために付されるものである。製品・設計工程
の表示領域4904のセル4902がマウスなどの入力
手段325によって選択されると、システムはそのワー
ク完成の責任者として妥当なリソースをリソース属性格
納部222−1より検索し、ユーザに提示する。検索及
び提示方式については図50を用いて説明する。図50
はリソース検索部1920の画面例を示す図であるが、
リソース検索部1920は要求されたレベルのリソース
をリソース属性格納部222−1より検索し、ユーザに
提示する手段であり、図50(a)に示すようにプロジ
ェクト管理者の候補検索機能5001と、図50(b)
に示すようにワーク完成の責任者候補の検索機能500
2と、図50(c)に示すように特殊な作業項目であっ
て特定のリソースのみが実施できる作業項目に対して適
任のリソース割当を行いたい場合の候補者の検索機能5
003より構成される。上記のリソース検索部1920
を使用して検索され、割当が済んだリソース割当情報は
プロジェクトデータ格納部221に格納される。
As described above, the design work amount estimating unit 1915
With the function of, it is possible to grasp the amount of resources required for scheduling and the overload situation. However, the schedule here is a simple result of the accumulation of man-hours and is not a meaningful plan. Moreover, here, the number of required personnel is merely grasped, and the person in charge is not assigned. Next, the resource allocation unit 1921 for allocating a person in charge will be described with reference to FIG. FIG. 49 is an example of a screen showing a list of design processes of the project. The system presents the user with a list of products / design processes belonging to the project, and prompts allocation of each product / design process (referred to as a work) and work items to work items. As a screen configuration, the design process list display unit 4901 (1921) has the same process name display region 4903 and product / design process display region 4904 as the required process generation unit 1912. The difference is that the cells 4902 in the display area 4904 of the product / design process are color-coded instead of man-hours. This color coding
It is added to identify whether or not resources have been allocated to the product / design process. When the cell 4902 of the product / design process display area 4904 is selected by the input means 325 such as a mouse, the system searches the resource attribute storage unit 222-1 for a resource appropriate as the person in charge of completion of the work, and informs the user. Present. The search and presentation method will be described with reference to FIG. Figure 50
Is a diagram showing an example of a screen of the resource search unit 1920.
The resource search unit 1920 is a means for searching the resource of the requested level from the resource attribute storage unit 222-1 and presenting it to the user. As shown in FIG. 50A, the candidate search function 5001 for the project manager, FIG. 50 (b)
As shown in Fig. 5, a search function 500 for candidate candidates for work completion
2 and a candidate search function 5 in the case of assigning appropriate resources to a work item that is a special work item and can be performed only by a specific resource as shown in FIG.
003. The above resource search unit 1920
The resource allocation information that has been searched for and allocated is stored in the project data storage unit 221.

【0102】割当てに際して、本システムは割当てられ
た担当者の能力を考慮している。一般的に人間の能力を
定量化することは困難であるが、本発明の場合、これを
能力係数という値で代表して表現する。この能力係数は
リソース属性格納部222−1内に保持されているデー
タで、リソース全員が持つ係数である。リソース能力を
考慮した割当てとは、この係数を使用することを意味す
る。リソース能力係数は、作業を割当てる場合にその標
準工数をリソース毎に調整するために使用する。能力係
数はベテランなどの能力の高い人に対しては、1.1,
1.2,1.3,・・・と増加していき、新人などの経
験の少ない人に対しては、0.9,0.8,0.7とい
うように減少していく。平均は、1.0である。能力を
考慮したリソースの実施する工数は「10時間」とな
る。また能力係数1.5のベテランリソースをこの作業
項目に割当てるたとすると、計画上このリソースの実施
する工数は「10/1.5=6.7時間」となる。また
能力係数0.7の新人リソースをこの作業項目に割当て
たとすると、計画上このリソースの実施する工数は、
「10/0.7=14.3時間」となる。これらの工数
の負荷山積みを算出する場合にも上記リソース毎の能力
係数によって修正された工数が使用される。
In the assignment, the system considers the ability of the assigned personnel. Generally, it is difficult to quantify human ability, but in the case of the present invention, this is represented by a value called an ability coefficient. This capability coefficient is data held in the resource attribute storage unit 222-1 and is a coefficient possessed by all resources. Allocation considering resource capacity means using this coefficient. The resource capacity coefficient is used to adjust the standard man-hour for each resource when allocating the work. The ability coefficient is 1.1, for veterans and other highly capable people.
It will increase to 1.2, 1.3, ..., And will decrease to 0.9, 0.8, 0.7 for people with little experience such as newcomers. The average is 1.0. The number of man-hours that resources take into consideration in terms of capacity is “10 hours”. If a veteran resource with a capacity factor of 1.5 is assigned to this work item, the number of man-hours executed by this resource is “10 / 1.5 = 6.7 hours” in the plan. If a new resource with a capacity factor of 0.7 is assigned to this work item, the number of man-hours to be executed by this resource is planned.
It becomes "10 / 0.7 = 14.3 hours". Also when calculating the load pile of these man-hours, the man-hours corrected by the capacity coefficient for each resource are used.

【0103】次にガントチャート表示部1916につい
て図51を用いて説明する。ガントチャート表示部19
16は定義されたプロジェクトの計画情報及び実績情報
をプロジェクトデータ格納部221から検索して表示す
る機能を提供する。図51はその表示画面例5101で
ある。画面5101は、期間表示部5102と、当該表
示期間内のイベント表示部5103とを持ち、プロジェ
クト/製品/ワーク/作業項目表示部5104と、ガント
チャートを表示部5106より構成される。表示切替ボ
タン群5108がマウスなどの入力手段325によって
選択された場合には、システムは表示単位を“月単位”
や“週単位”や“日単位”に変更してガントチャートを
表示する。また、ガントチャート上には“本日”を示す
本日ライン5109を表示する。プロジェクト/製品/
ワーク/作業項目表示部5104には全プロジェクトが
表示される。ここで、この表示部5104上においてプ
ロジェクト名がマウスなどの入力手段325を用いてダ
ブルクリックされると、システムは当該プロジェクトに
含まれる製品一覧を段付けして、当該プロジェクトの製
品毎のガントチャートを表示する。もし、段付けされた
状態で製品毎のガントチャートが表示されている場合に
は、システムは製品一覧表示を解除して、プロジェクト
名だけの表示にする。同様に製品一覧が表示されている
場合に、製品がマウスなどの入力手段325を用いてダ
ブルクリックされると、製品に関するワークの一覧を段
付けして、当該プロジェクトの当該製品のワーク毎のガ
ントチャートを表示する。ワーク一覧でワークがマウス
などの入力手段325を用いてダブルクリックされる
と、作業項目の一覧を段付けして、当該プロジェクトの
当該製品の当該ワークの作業項目毎のガントチャートを
表示する。システムは、製品やワークがマウスなどが入
力手段325を用いてダブルクリックされると、その段
付け表示を解除する。図51中の表示例5105はワー
クまでのガントチャートを表示している例である。また
本システムは、各計画のガントチャートとともに実績情
報を使用したプロジェクト、製品、ワーク、作業項目毎
の進捗を表示する。図51において、バー表示例511
0はこの例であり、白枠は計画を表す。これに対して、
斜線部はその計画に対する実績を表す。また、図51に
示したガントチャートは表示だけでなく、この上で計画
の変更を行う機能を持つ。すなわち、ガントチャート上
のバーがマウスなどの入力手段325によって選択さ
れ、移動された場合には対応する日程計画も変更され
る。この変更のための計算を行うのが日程計画変更部1
917である。そこで次に、日程計画変更部1917に
ついて図52および図53を用いて説明する。
Next, the Gantt chart display portion 1916 will be described with reference to FIG. Gantt chart display section 19
Reference numeral 16 provides a function of retrieving and displaying defined project plan information and actual result information from the project data storage unit 221. FIG. 51 shows an example 5101 of the display screen. The screen 5101 has a period display unit 5102 and an event display unit 5103 within the display period, and includes a project / product / work / work item display unit 5104 and a Gantt chart display unit 5106. When the display switching button group 5108 is selected by the input means 325 such as a mouse, the system sets the display unit to "monthly".
Or change to "weekly" or "daily" to display the Gantt chart. Further, a today line 5109 indicating “today” is displayed on the Gantt chart. Project / Product /
All projects are displayed in the work / work item display portion 5104. Here, when the project name is double-clicked on the display unit 5104 using the input means 325 such as a mouse, the system displays a list of products included in the project, and a Gantt chart for each product of the project. Is displayed. If the Gantt chart for each product is displayed in the stepped state, the system cancels the product list display and displays only the project name. Similarly, when the product list is displayed and the product is double-clicked by using the input means 325 such as a mouse, a list of works related to the product is displayed and the Gantt for each work of the product of the project is displayed. Display the chart. When a work is double-clicked in the work list using the input means 325 such as a mouse, the work item list is stepped and a Gantt chart for each work item of the work of the product of the project is displayed. When the mouse or the like of the product or the work is double-clicked using the input means 325, the system releases the step display. A display example 5105 in FIG. 51 is an example in which a Gantt chart up to the work is displayed. In addition, this system displays the progress for each project, product, work and work item using the actual information together with the Gantt chart of each plan. In FIG. 51, a bar display example 511
0 is an example of this, and the white frame represents the plan. On the contrary,
The shaded area shows the actual results for the plan. Further, the Gantt chart shown in FIG. 51 has not only the display but also the function of changing the plan on this. That is, when the bar on the Gantt chart is selected by the input means 325 such as a mouse and moved, the corresponding schedule is also changed. It is the schedule change unit 1 that performs the calculation for this change.
917. Therefore, next, the schedule plan changing unit 1917 will be described with reference to FIGS. 52 and 53.

【0104】図52は、ガントチャート上において日程
を変更する際の日程バーの連動移動の模式図であり、図
53は、日程計画変更部1917の処理フローを示す図
である。
FIG. 52 is a schematic diagram of interlocking movement of the schedule bar when changing the schedule on the Gantt chart, and FIG. 53 is a diagram showing a processing flow of the schedule plan changing unit 1917.

【0105】まず、図52を使用して日程を変更する場
合の連動移動の動作についてワークの日程を変更する場
合を例に説明する。図52の上部の図52のガントチャ
ート(a)は変更前の図52のガントチャートである。
図52のガントチャート(a)中でハッチングした日程
バー5201、5202、5203はAプロジェクトの
製品Aを開発するためのワーク群である。また、これら
のワーク1、ワーク2、ワーク3の間には「直前のワー
クが完了しない限り開始できない」という拘束条件であ
る先行後続関係が定義されているものとする。他方、日
程バー5204及び5205は同じ、Aプロジェクトの
製品Bを開発するためのワークであり、ワーク4とワー
ク5の間には同様の拘束条件である先行後続関係が定義
されているものとする。製品Aのワークと製品Bのワー
クの間には先行後続関係は存在しないものとする。また
これらの各ワークには実際の作業内容となる作業項目が
定義されている。図52のガントチャート(a)におい
て、製品Aのワーク1(日程バー5201)の開始日程
を2カ月後方に移動した場合の結果が図52のガントチ
ャート(b)である。図52のガントチャート(b)に
示すように後続するワーク2及びワーク3の開始日程が
後方に連動して2カ月分移動する。結果が日程バー52
11、5212、5213である。製品Bのワーク4及
びワーク5に関してはワーク間の先行後続関係が存在し
ないので、日程バー5214及び5215のように変化
しない。逆にこの図52のガントチャート(b)の状態
から、日程バー5211の開始日程を2カ月分前に移動
すれば、日程バー5212及び5213も連動して移動
し、図52のガントチャート(a)の状態に戻すことが
できる。ただし、移動にあたっては他のプロジェクトの
関係も考慮するすることが不可欠である。
First, with reference to FIG. 52, the operation of interlocking movement in the case of changing the schedule will be described by taking the case of changing the schedule of the work as an example. The Gantt chart (a) of FIG. 52 at the upper part of FIG. 52 is the Gantt chart of FIG. 52 before the change.
The hatched date bars 5201, 5202, and 5203 in the Gantt chart (a) of FIG. 52 are work groups for developing the product A of the A project. Further, it is assumed that a predecessor-successor relationship, which is a constraint condition that "it cannot be started unless the immediately preceding work is completed", is defined among these works 1, 2 and 3. On the other hand, it is assumed that the schedule bars 5204 and 5205 are the same work for developing the product B of the A project, and that the work 4 and the work 5 have the same precedent / successive relationship which is the same constraint condition. . It is assumed that there is no predecessor succession relationship between the work of product A and the work of product B. In addition, work items that are the actual work contents are defined for each of these works. In the Gantt chart (a) of FIG. 52, the result when the start date of the work 1 (schedule bar 5201) of the product A is moved backward by 2 months is the Gantt chart (b) of FIG. As shown in the Gantt chart (b) of FIG. 52, the start dates of the works 2 and 3 that follow are moved backward by two months. Result is schedule bar 52
11, 5212 and 5213. As for the work 4 and the work 5 of the product B, since there is no predecessor succession relationship between the works, there is no change like the schedule bars 5214 and 5215. Conversely, if the start date of the date bar 5211 is moved two months before from the state of the Gantt chart (b) of FIG. 52, the date bars 5212 and 5213 are also moved in tandem, and the Gantt chart (a of FIG. 52 is changed. ) Can be returned to the state. However, it is essential to consider the relationship of other projects when moving.

【0106】次に上記の連動移動の処理について図53
を用いて説明する。選択されたバーの日程データを一時
格納メモリ322より取得する。ただし、一時格納メモ
リ322に対象データが存在しない場合はサーバ31の
データ格納部193(外部記憶装置316)から取得す
る(ステップ5301)。リソース情報の取得と一時格
納メモリ322への格納を行なう(ステップ530
2)。移動対象ワークとこれを先行ワークとする後続ワ
ークすべてに移動量を加算する(ステップ5303)。
移動量は、マウスなどの入力手段325により画面上で
示された位置の画面上での座標値を読み込み、その座標
値から移動量を計算する。同一リソースの他の担当業務
を移動しない範囲で、すべてのワークを移動する(ステ
ップ5304)。制約チェックを行う(ステップ530
5)。ここでの制約とは、この移動に伴うマイルストー
ンに対する影響、リソースの制約である。リソースの制
約とはこの移動対象のワーク群の中の担当者が他のプロ
ジェクトの作業を担当していることが十分あるので、1
つのプロジェクトの日程を単純に変更すると他のプロジ
ェクトの日程に影響を及ぼし、最悪の場合他のプロジェ
クトの日程を破壊してしまうことがあり得るからであ
る。最後に結果を一時格納メモリ322に格納する(ス
テップ5306)。このモジュールを抜けた後で、ガン
トチャート表示部1916は変更後の日程データを再表
示する。
Next, the processing of the interlocking movement described above will be described with reference to FIG.
This will be described with reference to FIG. The schedule data of the selected bar is acquired from the temporary storage memory 322. However, if the target data does not exist in the temporary storage memory 322, the target data is acquired from the data storage unit 193 (external storage device 316) of the server 31 (step 5301). The resource information is acquired and stored in the temporary storage memory 322 (step 530).
2). The movement amount is added to the movement target work and all succeeding works having this as a preceding work (step 5303).
As the movement amount, the coordinate value on the screen at the position indicated on the screen is read by the input means 325 such as a mouse, and the movement amount is calculated from the coordinate value. All works are moved to the extent that other tasks in charge of the same resource are not moved (step 5304). Check constraints (step 530)
5). The restrictions here are the effects on milestones and the restrictions on resources associated with this movement. The resource constraint means that the person in charge of the work group to be moved is in charge of the work of another project, so 1
This is because simply changing the schedule of one project may affect the schedule of another project, and in the worst case, may destroy the schedule of another project. Finally, the result is stored in the temporary storage memory 322 (step 5306). After exiting this module, the Gantt chart display unit 1916 redisplays the changed schedule data.

【0107】次に、山崩し実行部1922について図5
4および図55を用いて説明する。図54は、山崩し実
行前と山崩し実行後の工数山積みの一画面例を示す図で
ある。工数山積み(a)は、山崩しを行う前の工数山積
みグラフであって、山積み部5401は96年の6月に
最大人員数を超過している。このような場合、この96
年の6月のため、6月以降の作業の進度に遅延を起こす
ことは自明である。したがって、これを例えば工数山積
み(b)の山積み部5402のように平均的に平準化す
る必要がある。このような処理を行うのが山崩し部19
22である。
Next, referring to FIG.
4 and FIG. 55. FIG. 54 is a diagram showing an example of a screen for stacking man-hours before and after the execution of the landslide. The man-hour heap (a) is a man-hour heap graph before the landslide, and the heap section 5401 exceeded the maximum number of personnel in June 1996. In such a case, this 96
Since it is June of the year, it is obvious that there will be a delay in the progress of work after June. Therefore, for example, it is necessary to average the piles like the pile portion 5402 of the pile of man-hours (b). This kind of processing is performed by the mountain collapse unit 19.
22.

【0108】次に、この山崩し実行部1922の処理に
ついて図55を用いて説明する。図55は山崩し実行部
の処理フローを示す図である。まず、得られた工数山積
み(負荷状態)に対して、山が最大人員数を越えている
期間(過負荷である期間)を抽出する(ステップ550
1)。次に、この期間のワーク、工数、マイルストーン
を一時記憶メモリ322にコピーする(ステップ550
2)。次に、テップ5502で求めたワークと先行関係
のあるワークのマイルストーンを求め、一時記憶メモリ
322にコピーする(ステップ5503)。次に、期間
内の全作業量(工数の総和)と期間内の日数とから1日
当たりの平均工数を計算する(ステップ5504)。次
に、平均工数が最大人員数以上の場合または収束しない
場合は最大人員数を修正する(ステップ5505)。次
に、ステップ5502で求めたワークのうち工数の大き
い方からワークを選定し、マイルストーン、先行後続関
係から日程を移動できる期間を検索する(ステップ55
06)。次に、すべてのワークについてステップ550
6を実行する(ステップ5507)。次に、全体の山が
最大人員数以下になるまでステップ5505〜ステップ
5507の繰返し実行する(ステップ5508)。次
に、結果を格納する(ステップ5509)。
Next, the processing of the mountain collapse executing unit 1922 will be described with reference to FIG. FIG. 55 is a diagram showing a processing flow of the landslide executing unit. First, for the obtained man-hour stacking (load state), the period in which the mountain exceeds the maximum number of workers (the period when it is overloaded) is extracted (step 550).
1). Next, the work, man-hours, and milestones of this period are copied to the temporary storage memory 322 (step 550).
2). Next, the milestone of the work having a preceding relationship with the work found in step 5502 is found and copied to the temporary storage memory 322 (step 5503). Next, the average man-hour per day is calculated from the total work amount (sum of man-hours) in the period and the number of days in the period (step 5504). Next, if the average man-hour is greater than or equal to the maximum number of personnel or does not converge, the maximum number of personnel is corrected (step 5505). Next, of the works obtained in step 5502, the one having the largest man-hour is selected, and the period during which the schedule can be moved is searched based on the milestone and the preceding succession relationship (step 55).
06). Next, step 550 for all workpieces.
6 is executed (step 5507). Next, steps 5505 to 5507 are repeatedly executed until the total number of mountains becomes equal to or less than the maximum number of people (step 5508). Next, the result is stored (step 5509).

【0109】次に、依頼事項管理部1919について説
明する。図56は、依頼事項管理部1919の処理フロ
ーを説明するための図である。依頼事項とは主に設計開
発担当者からプロジェクトの管理者に対する依頼であ
る。一例を挙げると、設計ドキュメント類の承認作業が
これに相当する。設計担当者が作成したドキュメント
は、設計品質を保証するためにも作成後チェックする必
要があるが、担当者ではなく例えばプロジェクトの管理
者などの上位の人間が誤りのないことを確認して完成と
なる。このような作業を審査作業、承認作業と呼び、一
般に審査者が審査作業を遂行し、承認者が承認作業を遂
行する。すなわち、設計ドキュメント類は担当者が作成
した後で、審査者、承認者の二重のチェックを受けるこ
とになる。また、この実現のためには“審査”及び“承
認”という作業項目を設けることで実現できる。このよ
うな作業項目(作業内容)の一例は図16および図30
において既に説明した。処理を説明すると、まずシステ
ムが、依頼手続きが選択されたことを検出する(ステッ
プ5601)と、依頼内容を取得し、一時格納メモリ3
22に格納する(ステップ5602)。次に、当該依頼
手続きを含むプロジェクト、製品、ワークを一時格納メ
モリ322から取得する(ステップ5603)。次に、
依頼内容とプロジェクト、製品、設計工程を一時格納メ
モリ322より取得し、依頼事項管理部221−9に格
納する(ステップ5604)。このようにして、格納さ
れた依頼内容は、被依頼者すなわち審査であれば審査
者、承認であれば承認者を宛先として依頼するものであ
る。被依頼者すなわち審査者或いは承認者に対しては、
警告生成部1924の処理フローを説明した図29にお
けるステップ2906が、当該担当者に対する依頼事項
の有無アラームの検出を行い、これらの依頼事項を知ら
せる。
Next, the request item management unit 1919 will be described. FIG. 56 is a diagram for explaining the processing flow of the requested item management unit 1919. Request items are mainly requests from design and development personnel to project managers. For example, the approval work of design documents corresponds to this. The document created by the designer must be checked after creation to guarantee the design quality, but not the person in charge, for example, the project manager or other senior person must confirm that there is no error and complete the document. Becomes Such work is called examination work and approval work. Generally, the examiner performs the examination work, and the approver performs the approval work. In other words, design documents will be double checked by the examiner and approver after being created by the person in charge. In order to realize this, work items such as "examination" and "approval" can be provided. Examples of such work items (work contents) are shown in FIGS.
Already explained in. To explain the process, first, when the system detects that a request procedure has been selected (step 5601), the request content is acquired and the temporary storage memory 3 is acquired.
22 (step 5602). Next, the project, product, and work including the request procedure are acquired from the temporary storage memory 322 (step 5603). next,
The request content, the project, the product, and the design process are acquired from the temporary storage memory 322 and stored in the request item management unit 221-9 (step 5604). In this way, the stored request contents are requested to the requestee, that is, the examiner in the case of examination and the approver in the case of approval. For the requestee, that is, the examiner or approver,
Step 2906 in FIG. 29, which describes the processing flow of the warning generation unit 1924, detects the presence / absence of a request item alarm for the person in charge and notifies these request items.

【0110】次に進捗度推定部1925について図57
を用いて説明する。図57は、進捗度推定部1925の
処理フローについて説明した図である。まず、個人をキ
ーにして、関係するプロジェクト、製品、設計工程、作
業項目情報をプロジェクトデータ格納部221より検索
し、一時格納メモリ322に格納する(ステップ570
1)。次に、作業実績情報格納部221−5から一時格
納メモリ322にある作業項目をキーにしてその進捗情
報をすべて検索し、一時格納メモリ322に格納する
(ステップ5702)。次に、本日の日付を取得する
(ステップ5703)。次に、各設計工程の開始日と本
日の日付を比較して計画上の進捗度を計算し、一時格納
メモリ322に格納する(ステップ5704)。次に、
実績情報から各設計工程の実進捗度を計算し、一時格納
メモリ322に格納する(ステップ5705)。遅延が
ある場合には、システムは、図29に示すステップ29
02と同様に、これらの計画上の進捗度と実進捗度は一
時格納メモリ322を介して警告生成部1924が検出
し、進捗遅れアラームを生成してユーザに知らせる。
Next, the progress estimation section 1925 will be described with reference to FIG.
This will be described with reference to FIG. FIG. 57 is a diagram illustrating the processing flow of the progress estimation unit 1925. First, using the individual as a key, the related project, product, design process, and work item information are retrieved from the project data storage unit 221 and stored in the temporary storage memory 322 (step 570).
1). Next, all the progress information is retrieved from the work record information storage unit 221-5 using the work item in the temporary storage memory 322 as a key and stored in the temporary storage memory 322 (step 5702). Next, today's date is acquired (step 5703). Next, the start date of each design process is compared with today's date to calculate the planned progress and store it in the temporary storage memory 322 (step 5704). next,
The actual progress of each design process is calculated from the record information and stored in the temporary storage memory 322 (step 5705). If there is a delay, the system proceeds to step 29 shown in FIG.
Similarly to 02, the progress and actual progress in the plan are detected by the warning generation unit 1924 via the temporary storage memory 322, and a progress delay alarm is generated to notify the user.

【0111】次に、作業指示管理部1935について図
58を用いて説明する。作業指示とは担当者が設計作業
を行うに際しての留意点、注意すべき点といった作業内
容、作業のやり方に対する管理者の指示である。従来、
作業指示は口頭やちょっとしたメモ書き等で行われてい
たため、作業指示が徹底せずに設計ミスが生じることも
しばしば発生した。本発明ではこのような作業指示を管
理し、作業品質を向上させることを目的としている。た
だし、作業指示が管理者からの一方的なものであって
は、指示が十分実行されているかどうかわからない。し
たがって、本発明では管理者からの作業指示に対する担
当者側の回答と合わせて管理することにした。このよう
にすることで、指示事項を漏れなく実施させることが徹
底でき、設計品質の向上を実現できる。また、プロジェ
クトの作業指示事項は実績として、すべて蓄積されてい
る。このため、将来類似のプロジェクトが起こったとき
にも作業指示事項は参照でき、将来のプロジェクト計画
時に十分役立つ。図58は、作業指示事項管理部193
5を説明するための一画面例を示す図である。作業指示
事項管理部1935の画面は、まず指示事項の管理のた
めの整理番号表示欄5801と、管理者の作業指示事項
入力及び表示欄5802と、当該指示を管理者が入力し
た指示日表示欄5803と、管理者の指示事項に対する
回答入力及び表示欄5804と、当該回答を担当者が入
力した回答日表示欄5805と、担当者表示欄5806
と、担当者の回答内容を判断し、回答の合否を判定し入
力する管理者判定入力及び表示欄5807とから構成さ
れる。指示日表示欄5803、回答日表示欄5805、
担当者表示欄5806ににシステムが自動的に値を設定
する。また、1つの項目について続けて指示内容を確認
する場合は、図58の整理番号表示欄5801にある”
1”と”1−1”のように整理番号に子番を生成して管
理する。また、作業指示事項は、設計工程(ワーク)と
直接関連を持つ構造になっている。システムは作業指示
事項データの要求をユーザから受けたときには、プロジ
ェクトデータ格納部221からプロジェクト、製品、設
計工程(ワーク)をキーにして必要なデータを検索して
表示する。このように、指示事項管理部135を用いれ
ば、設計業務に関するやりとりも実績として管理でき
る。
Next, the work instruction management unit 1935 will be described with reference to FIG. The work instruction is a manager's instruction regarding work contents such as points to be noted and points to be noted when a person in charge performs design work, and a work method. Conventionally,
Since work instructions were given orally or by writing a small note, design mistakes often occurred without thorough work instructions. The present invention aims to manage such work instructions and improve work quality. However, if the work order is one-sided from the administrator, it is not known whether the work order is sufficiently executed. Therefore, in the present invention, it is decided to manage the work instruction together with the reply from the person in charge in response to the work instruction from the manager. By doing so, it is possible to thoroughly implement the instructions without fail, and it is possible to improve the design quality. All work instructions for the project have been accumulated as actual results. Therefore, the work instructions can be referred to when a similar project occurs in the future, which is sufficiently useful when planning a future project. FIG. 58 shows the work instruction item management unit 193.
It is a figure which shows an example of 1 screen for demonstrating 5. On the screen of the work instruction item management unit 1935, first, a reference number display field 5801 for managing the instruction items, a work instruction item input and display field 5802 of the administrator, and an instruction date display field in which the administrator inputs the instruction. 5803, an answer input and display field 5804 for the administrator's instructions, an answer date display field 5805 in which the person in charge has entered the answer, and a person display field 5806.
And an administrator judgment input and display field 5807 for judging the answer contents of the person in charge and judging whether the answer is acceptable or not. Instruction date display column 5803, answer date display column 5805,
The system automatically sets a value in the person-in-charge display field 5806. Further, when the instruction content is continuously confirmed for one item, it is displayed in the reference number display field 5801 in FIG.
Sub-numbers are generated and managed as reference numbers such as 1 ”and“ 1-1. ”Work instruction items are directly related to the design process (work). When a request for item data is received from a user, necessary data is searched and displayed from the project data storage unit 221 using the project, product, and design process (work) as keys. If used, exchanges related to design work can be managed as results.

【0112】本発明では、上記説明のように作業指示事
項を管理して、その履歴も実績として保持管理する。次
に、この実績情報を使用して作業の難易度を評価する難
易度評価部1936について図59を用いて次に説明す
る。図59は、難易度評価部1936の処理フローを説
明する図である。プロジェクトデータ格納部221でワ
ークをキーにして、プロジェクト、製品、作業項目、作
業指示を検索する(ステップ5901)。次に、作業指
示の個数をワーク毎に計数する(ステップ5902)。
次に、作業項目の予定工数と実績工数と上記作業指示個
数とから難易度を計算する(ステップ5903)。次
に、計算結果を表示する(ステップ5904)。表示の
方式としては、ワークを難易度順にソートして並べた表
などを考えることができる。
In the present invention, the work instruction items are managed as described above, and the history thereof is also retained and managed as a record. Next, the difficulty level evaluation unit 1936 that evaluates the difficulty level of work using this record information will be described next with reference to FIG. FIG. 59 is a diagram illustrating a processing flow of the difficulty level evaluation unit 1936. The project, the product, the work item, and the work instruction are searched using the work as a key in the project data storage unit 221 (step 5901). Next, the number of work instructions is counted for each work (step 5902).
Next, the difficulty level is calculated from the planned man-hours of the work item, the actual man-hours, and the above-mentioned number of work instructions (step 5903). Next, the calculation result is displayed (step 5904). As a display method, a table in which works are sorted and arranged in order of difficulty can be considered.

【0113】次に、作業分析部1937について図60
および図61を用いて説明する。作業分析部1937
は、完了したプロジェクト実績データを分析し、将来の
計画の見直しのためのデータを提供する機能である。図
60の山積みグラフ6010及び山積みグラフ6020
は全設計業務内容を設計業務と非設計業務に分類して作
業時間の合計を表示する機能である。表示の単位は週
別、月別、期別、年別といった単位が選択できる。表示
単位はマウスなどの入力手段325を用いて画面上で選
択、変更できる。システムは、選択、変更された表示単
位に基づいて再表示する。設計開発業務と非設計開発業
務の区別は、プロジェクト単位で行う。設計業務/非設
計業務を区別し、定義するための手段が業務定義部60
30である。非設計開発業務表示領域6031と設計開
発業務表示領域6032にそれぞれ区別して表示し、移
動ボタン6033が選択されたときに、相互に移動す
る。図61は作業分析部1937の別の画面例を示す図
であり、システムは作業項目別統計表示部6110と、
実績の詳細表示部6120と、作業項目毎の工数の分布
を示す度数分布6130を表示することができる。ま
ず、システムは、作業項目別統計表示部6110は実績
情報格納部221−5を検索して、作業項目毎にその工
数の平均値、標準偏差、また最悪値を表示する。ここ
で、作業項目別統計表示部6110の行が選択された場
合、システムはその作業項目の詳細情報を実績情報格納
部221−5から検索し、実績の詳細表示部6120を
表示する。実績の詳細表示部6120は、1つの作業項
目について、項目名表示領域6121に示すように、担
当者、実績工数、当該作業項目を含むプロジェクト名、
製品名、時期の項目により構成される。これらの表示
は、「ソート」ボタン6122により切り替えることが
できる。すなわち、図61では実績工数をキーとしてそ
の順に表示しているが、「ソート」ボタン6122によ
り、担当者、実績工数、当該作業項目を含むプロジェク
ト名、製品名、時期のいずれをキーとした順序で表示す
るかを指定するダイアログウインドウにより変更でき
る。また、単純に項目名表示領域6121の上をマウス
などの入力手段325で選択することによっても変更で
きる。また、「度数分布・・・」ボタン6123がマウス
などの入力手段325によって選択されると、度数分布
6130を表示する。また、「閉じる」ボタン6124
がマウスなどの入力手段325によって選択されると、
当該実績の詳細表示部6120ウインドウを閉じて、作
業項目別統計表示部6110の表示に戻る。このように
して、過去の実績情報を生かし、より精度の高い作業の
工数を自動的に求めることが可能となる。
Next, the work analysis unit 1937 is shown in FIG.
And it demonstrates using FIG. Work analysis unit 1937
Is a function that analyzes completed project performance data and provides data for reviewing future plans. Stacked graph 6010 and stacked graph 6020 of FIG.
Is a function that classifies all design work contents into design work and non-design work and displays the total work time. The unit of display can be selected by week, month, period, or year. The display unit can be selected and changed on the screen using the input means 325 such as a mouse. The system redisplays based on the selected and changed display unit. The distinction between design and development work and non-design and development work is done on a project basis. A means for distinguishing and defining design work / non-design work is work definition unit 60.
30. The non-design / development work display area 6031 and the design / development work display area 6032 are separately displayed, and when the move button 6033 is selected, they are moved to each other. FIG. 61 is a diagram showing another example of the screen of the work analysis unit 1937, and the system includes a work item-based statistical display unit 6110,
It is possible to display a detailed result display unit 6120 and a frequency distribution 6130 showing the distribution of man-hours for each work item. First, in the system, the work item-based statistical display unit 6110 searches the performance information storage unit 221-5 and displays the average value, standard deviation, and worst value of the man-hours for each work item. Here, when the row of the work item-specific statistic display unit 6110 is selected, the system retrieves the detailed information of the work item from the record information storage unit 221-5 and displays the record detail display unit 6120. As shown in the item name display area 6121, the detailed result display unit 6120 for the work record shows the person in charge, the actual man-hours, the project name including the work item,
It is composed of items such as product name and time. These displays can be switched by the “sort” button 6122. That is, in FIG. 61, the actual man-hours are displayed in that order, but by the “sort” button 6122, the order in which any of the person in charge, the actual man-hours, the project name including the work item, the product name, and the time is used as a key. It can be changed by the dialog window that specifies whether to display. Further, it can be changed by simply selecting the item name display area 6121 with the input means 325 such as a mouse. When the “frequency distribution ...” Button 6123 is selected by the input means 325 such as a mouse, the frequency distribution 6130 is displayed. Also, a “close” button 6124
Is selected by the input means 325 such as a mouse,
The detailed display section 6120 of the actual result is closed and the display returns to the display of the work item-based statistical display section 6110. In this way, it is possible to automatically obtain the man-hours of the work with higher accuracy by utilizing the past record information.

【0114】次に、リソースカレンダ管理部1938と
標準カレンダ管理部1939について図62および図6
3を用いて説明する。図62は、リソースカレンダ管理
部1938が対象とするリソースカレンダ格納部224
−1の構造を示す図である。このデータ構造は、設計開
発担当者や管理者などリソース毎に標準的なカレンダの
上の個人の休日予定、出勤予定のカレンダを管理する構
造である。個人コードを主キーとして、その日付、コメ
ントとともに当該日の属性をコードで保持する構造であ
る。図63は、標準カレンダ管理部1939が対象とす
る標準カレンダ格納部224−2の構造を示す図であ
る。このデータ構造は、個人ではなく、全員に対しての
カレンダである。例えば、工場や事務所によっては、土
曜、日曜、祝日等の他にも特別に休日を設けることがあ
る。そのような強雨実のリストを管理するのが、当該標
準カレンダ格納部224−2である。次に、図20に示
すデータ格納部193(外部記憶装置317)の各格納
部の構造について説明する。
Next, the resource calendar management unit 1938 and the standard calendar management unit 1939 will be described with reference to FIGS.
3 will be described. FIG. 62 shows a resource calendar storage unit 224 targeted by the resource calendar management unit 1938.
It is a figure which shows the structure of -1. This data structure is a structure for managing personal holiday schedules and attendance calendars on a standard calendar for each resource such as a person in charge of design and development and a manager. This is a structure in which the personal code is used as a primary key, and the date and comments as well as the attributes of the day are held by the code. FIG. 63 is a diagram showing the structure of the standard calendar storage unit 224-2 targeted by the standard calendar management unit 1939. This data structure is a calendar for everyone, not for individuals. For example, some factories and offices may have special holidays in addition to Saturdays, Sundays, and holidays. The standard calendar storage unit 224-2 manages such a list of heavy rain. Next, the structure of each storage unit of the data storage unit 193 (external storage device 317) shown in FIG. 20 will be described.

【0115】まず、プロジェクト定義情報格納部221
−1の構造について図64を用いて説明する。当該デー
タ構造は、“プロジェクトコード”、“プロジェクト名
称”、“プロジェクト略称”、“プロジェクト種別”、
“プロジェクト開始日”、“プロジェクト完了日”、
“管理者個人コード”といったカラムから構成される。
このデータはリレーショナルデータベース上では、“プ
ロジェクトコード”のみでユニークレコードを識別でき
る。“管理者個人コード”は、リソース属性格納部22
2−1の“個人コード”と関連付けられており、必要に
応じてその定義内容が参照できる。次に、製品情報定義
格納部221−2の構造について図65を用いて説明す
る。当該データ構造は、“プロジェクトコード”、“製
品コード”、“製品略称”、“製品名称”、“製品用
途”、“モデル名”、といったカラムから構成される。
このデータはリレーショナルデータベース上では、“プ
ロジェクトコード”、“製品コード”の組合せでユニー
クレコードを識別できる。“プロジェクトコード”は、
プロジェクト定義情報格納部221−1の“プロジェク
トコード”と関連付けられており、必要に応じてその定
義内容が参照できる。次に、設計工程定義情報格納部2
21−3の構造について図66を用いて説明する。当該
データ構造は、“プロジェクトコード”、“製品コー
ド”、“設計工程コード”、“設計工程名称”、“責任
担当者コード”、“予定開始日”、“予定完了日”、
“実績開始日”、“実績完了日”、“難易度係数”、
“管理者個人コード”、“工程種別コード”、“イベン
トコード”、“会議・出張コード”、“ステータス”、
“補足メッセージといったカラムから構成される。この
データはリレーショナルデータベース上では、“プロジ
ェクトコード”、“製品コード”、“設計工程コード”
の組合せでユニークレコードを識別できる。“プロジェ
クトコード”は、プロジェクト定義情報格納部221−
1の“プロジェクトコード”と関連付けられており、ま
た、“製品コード”は、製品情報定義格納部221−2
の“製品コード”と関連付けられており、また、“責任
担当者コード”及び“管理者個人コード”はリソース属
性格納部222−1の“個人コード”と関連付けられて
おり、必要に応じてその定義内容が参照できる。
First, the project definition information storage section 221
The structure of -1 will be described with reference to FIG. The data structure is "project code", "project name", "project abbreviation", "project type",
"Project Start Date", "Project Completion Date",
It consists of columns such as "Administrator personal code".
In this data, a unique record can be identified only by the "project code" in the relational database. The “administrator personal code” is the resource attribute storage unit 22.
It is associated with the “personal code” 2-1 and the definition content can be referred to as necessary. Next, the structure of the product information definition storage unit 221-2 will be described with reference to FIG. The data structure is composed of columns such as "project code", "product code", "product abbreviation", "product name", "product use", and "model name".
In this relational data, a unique record can be identified by a combination of "project code" and "product code" on the relational database. The “project code” is
It is associated with the “project code” of the project definition information storage unit 221-1 and the definition content can be referred to as necessary. Next, the design process definition information storage unit 2
The structure 21-3 will be described with reference to FIG. 66. The data structure is “project code”, “product code”, “design process code”, “design process name”, “responsible person code”, “planned start date”, “planned completion date”,
"Actual start date", "Actual completion date", "Difficulty factor",
"Administrator personal code", "Process type code", "Event code", "Meeting / Business trip code", "Status",
"It consists of columns such as supplementary messages. This data is" project code "," product code "," design process code "in the relational database.
Unique record can be identified by the combination of. The “project code” is the project definition information storage unit 221-
1 is associated with the “project code”, and the “product code” is the product information definition storage unit 221-2.
"Product code" of the resource attribute storage unit 222-1 and the "responsible person code" and the "personal code of the administrator" are associated with the "personal code" of the resource attribute storage unit 222-1. You can refer to the definition contents.

【0116】次に、作業項目定義情報格納部221−4
の構造について図67を用いて説明する。当該データ構
造は、“プロジェクトコード”、“製品コード”、“設
計工程コード”、“作業項目コード”、“作業項目名
称”、“作業項目担当者コード”、“予定工数”、“予
定開始日”、“予定完了日”、“実績工数”、“実績開
始日”、“実績完了日”、“ステータス”、“ガイダン
ス”、“会議・出張コード”、“作業種別”、“進捗
度”、“表示順序”といったカラムから構成される。こ
のデータはリレーショナルデータベース上では、“プロ
ジェクトコード”、“製品コード”、“設計工程コー
ド”、“作業項目コード”、“作業項目名称”の組合せ
でユニークレコードを識別できる。“プロジェクトコー
ド”は、プロジェクト定義情報格納部221−1の“プ
ロジェクトコード”と関連付けられており、また、“製
品コード”は、製品情報定義格納部221−2の“製品
コード”と関連付けられており、また、“設計工程コー
ド”は、設計工程定義情報格納部221−3の“設計工
程コード”と関連付けられており、また、“作業項目担
当者コード”はリソース属性格納部222−1の“個人
コード”と関連付けられており、必要に応じてその定義
内容が参照できる。システムは“ステータス”とし
て、”新規”、未着手”、着手中”、“完了”を値と
り、“会議・出張コードは”、本システムと別システム
で管理されるコードと関連を持つ。“ガイダンスは”作
業を行う上での一般的なガイダンスである。当該プロジ
ェクトの作業項目固有のガイダンスは作業指示事項とし
て取り扱う。
Next, the work item definition information storage section 221-4
The structure of will be described with reference to FIG. The data structure is “project code”, “product code”, “design process code”, “work item code”, “work item name”, “work item person code”, “planned man-hours”, “planned start date”. ”,“ Scheduled completion date ”,“ Actual man-hours ”,“ Actual start date ”,“ Actual completion date ”,“ Status ”,“ Guidance ”,“ Meeting / Traveling code ”,“ Work type ”,“ Progress ”, It consists of columns such as "display order". On the relational database, this data can identify a unique record by a combination of "project code", "product code", "design process code", "work item code", and "work item name". The “project code” is associated with the “project code” in the project definition information storage unit 221-1, and the “product code” is associated with the “product code” in the product information definition storage unit 221-2. Further, the “design process code” is associated with the “design process code” in the design process definition information storage unit 221-3, and the “work item person code” is stored in the resource attribute storage unit 222-1. It is associated with the "individual code", and its definition content can be referred to as necessary. The system takes "new", "not yet started", "starting", and "complete" as the "status", and is associated with the "meeting / business trip code", which is managed by this system and another system. “Guidance” is the general guidance for doing work. Guidance specific to the work item of the project is treated as work instructions.

【0117】次に、作業実績情報格納部221−5の構
造について図68を用いて説明する。当該データ構造
は、“プロジェクトコード”、“製品コード”、“設計
工程コード”、“作業項目コード”、“作業実施日
付”、“作業開始時刻”、“作業終了時刻”、“作業実
施者個人コード”、“作業時間”、“進捗度”、“確認
フラグ”、といったカラムから構成される。このデータ
はリレーショナルデータベース上では、“プロジェクト
コード”、“製品コード”、“設計工程コード”、“作
業項目コード”、“作業実施日付”、“作業開始時
刻”、“作業実施者個人コード”の組合せでユニークレ
コードを識別できる。“プロジェクトコード”は、プロ
ジェクト定義情報格納部221−1の“プロジェクトコ
ード”と関連付けられており、また、“製品コード”
は、製品情報定義格納部221−2の“製品コード”と
関連付けられており、また、“設計工程コード”は、設
計工程定義情報格納部221−3の“設計工程コード”
と関連付けられており、また、“作業項目コード”は、
作業項目定義情報格納部221−4の“作業項目コー
ド”と関連付けられており、“作業実施者個人コード”
はリソース属性格納部222−1の“個人コード”と関
連付けられており、必要に応じてその定義内容が参照で
きる。“確認フラグ”は、自動取得された実績情報の確
認、修正を実施したかどうかを検出するためのフラグで
ある。
Next, the structure of the work record information storage section 221-5 will be described with reference to FIG. The data structure is “project code”, “product code”, “design process code”, “work item code”, “work execution date”, “work start time”, “work end time”, “worker individual”. It is composed of columns such as "code", "work time", "progress" and "confirmation flag". In the relational database, this data includes "project code", "product code", "design process code", "work item code", "work execution date", "work start time", and "worker individual code". The unique record can be identified by the combination. The “project code” is associated with the “project code” in the project definition information storage unit 221-1, and also the “product code”.
Is associated with the "product code" of the product information definition storage unit 221-2, and the "design process code" is the "design process code" of the design process definition information storage unit 221-3.
And the "work item code" is
It is associated with the “work item code” in the work item definition information storage section 221-4 and is the “worker individual code”.
Is associated with the "individual code" of the resource attribute storage unit 222-1 and its definition content can be referred to as necessary. The “confirmation flag” is a flag for detecting whether or not the automatically acquired record information has been confirmed and corrected.

【0118】次に、工程間先行後続関係定義情報格納部
221−6の構造について図69を用いて説明する。当
該データ構造は、“プロジェクトコード”、“製品コー
ド”、“設計工程コード”、“先行プロジェクトコー
ド”、“先行製品コード”、“先行設計工程コード”、
といったカラムから構成される。このデータはリレーシ
ョナルデータベース上では、すべてのカラムである“プ
ロジェクトコード”、“製品コード”、“設計工程コー
ド”、“先行プロジェクトコード”、“先行製品コー
ド”、“先行設計工程コード”の組合せでユニークレコ
ードを識別できる。“プロジェクトコード”及び“先行
プロジェクトコード”は、プロジェクト定義情報格納部
221−1の“プロジェクトコード”と関連付けられて
おり、また、“製品コード”及び“先行製品コード”
は、製品情報定義格納部221−2の“製品コード”と
関連付けられており、また、“設計工程コード”及び
“先行設計工程コード”は、設計工程定義情報格納部2
21−3の“設計工程コード”と関連付けられており、
必要に応じてその定義内容が参照できる。
Next, the structure of the inter-process preceding / successive relationship definition information storage unit 221-6 will be described with reference to FIG. The data structure is “project code”, “product code”, “design process code”, “preceding project code”, “preceding product code”, “preceding design process code”,
It is composed of columns such as. In the relational database, this data is a combination of all columns "project code", "product code", "design process code", "preceding project code", "preceding product code", "preceding design process code". Unique records can be identified. The “project code” and the “preceding project code” are associated with the “project code” in the project definition information storage unit 221-1, and the “product code” and the “preceding product code” are also associated with each other.
Is associated with the “product code” of the product information definition storage unit 221-2, and the “design process code” and the “preceding design process code” are the design process definition information storage unit 2
21-3 is associated with the “design process code”,
The definition contents can be referred to as needed.

【0119】次に、外部入手成果物入手状況格納部22
1−7の構造について図70を用いて説明する。当該デ
ータ構造は、“プロジェクトコード”、“製品コー
ド”、“設計工程コード”、“ドキュメントコード(成
果物コード)”、“成果物名称”、“必要入手日”とい
ったカラムから構成される。このデータはリレーショナ
ルデータベース上では、“プロジェクトコード”、“製
品コード”、“設計工程コード”、“ドキュメントコー
ド(成果物コード)”、の組合せでユニークレコードを
識別できる。“プロジェクトコード”は、プロジェクト
定義情報格納部221−1の“プロジェクトコード”と
関連付けられており、また、“製品コード”は、製品情
報定義格納部221−2の“製品コード”と関連付けら
れており、また、“設計工程コード”は、設計工程定義
情報格納部221−3の“設計工程コード”と関連付け
られており、必要に応じてその定義内容を参照できる。
次に、作業成果物定義情報格納部221−8の構造につ
いて図71を用いて説明する。当該データ構造は、“プ
ロジェクトコード”、“製品コード”、“設計工程コー
ド”、“作業項目コード”、“ドキュメントコード(成
果物コード)”、“成果物区分”、“成果物登録者氏名
番”、“成果物登録日付”、“成果物登録時刻”、“コ
メント”といったカラムから構成される。このデータは
リレーショナルデータベース上では、“プロジェクトコ
ード”、“製品コード”、“設計工程コード”、“作業
項目コード”、“ドキュメントコード”の組合せでユニ
ークレコードを識別できる。“プロジェクトコード”
は、プロジェクト定義情報格納部221−1の“プロジ
ェクトコード”と関連付けられており、また、“製品コ
ード”は、製品情報定義格納部221−2の“製品コー
ド”と関連付けられており、また、“設計工程コード”
は、設計工程定義情報格納部221−3の“設計工程コ
ード”と関連付けられており、必要に応じてその定義内
容を参照できる。
Next, the externally acquired deliverable acquisition status storage unit 22
The structure 1-7 will be described with reference to FIG. The data structure is composed of columns such as “project code”, “product code”, “design process code”, “document code (delivery product code)”, “delivery product name”, and “necessary acquisition date”. In this data, a unique record can be identified on the relational database by a combination of "project code", "product code", "design process code", and "document code (product code)". The "project code" is associated with the "project code" in the project definition information storage unit 221-1, and the "product code" is associated with the "product code" in the product information definition storage unit 221-2. Further, the “design process code” is associated with the “design process code” of the design process definition information storage unit 221-3, and the definition content can be referred to as necessary.
Next, the structure of the work product definition information storage unit 221-8 will be described with reference to FIG. The data structure is “project code”, “product code”, “design process code”, “work item code”, “document code (delivery product code)”, “delivery product classification”, “delivery product registrant name number”. It is composed of columns such as "," deliverable registration date "," delivery product registration time "and" comment ". On the relational database, this data can identify a unique record by a combination of "project code", "product code", "design process code", "work item code", and "document code". "Project Code"
Is associated with the “project code” in the project definition information storage unit 221-1, the “product code” is associated with the “product code” in the product information definition storage unit 221-2, and "Design process code"
Is associated with the “design process code” of the design process definition information storage unit 221-3, and the definition content can be referred to as necessary.

【0120】次に、依頼事項格納部221−9の構造に
ついて図72を用いて説明する。当該データ構造は、
“プロジェクトコード”、“製品コード”、“設計工程
コード”、“作業項目コード”、“要求元個人コー
ド”、“依頼先個人コード”、“ステータス”、“依頼
種別コード”、“コメント”といったカラムから構成さ
れる。このデータはリレーショナルデータベース上で
は、“プロジェクトコード”、“製品コード”、“設計
工程コード”、“作業項目コード”、“要求元個人コー
ド”、“依頼先個人コード”の組合せでユニークレコー
ドを識別できる。“プロジェクトコード”は、プロジェ
クト定義情報格納部221−1の“プロジェクトコー
ド”と関連付けられており、また、“製品コード”は、
製品情報定義格納部221−2の“製品コード”と関連
付けられており、また、“設計工程コード”は、設計工
程定義情報格納部221−3の“設計工程コード”と関
連付けられており、また、“作業項目コード”は、作業
項目定義情報格納部221−4の“作業項目コード”と
関連付けられており、また、要求元個人コード”及び
“依頼先個人コード”は、リソース属性格納部222−
1の“個人コード”と関連付けられており、必要に応じ
てその定義内容が参照できる。次に、イベント格納部2
21−11の構造について図73を用いて説明する。当
該データ構造は、“プロジェクトコード”、“イベント
コード”、“イベント名称”、“イベントのマイルスト
ーン”といったカラムから構成される。このデータはリ
レーショナルデータベース上では、“プロジェクトコー
ド”、“イベントコード”の組合せでユニークレコード
を識別できる。“プロジェクトコード”は、プロジェク
ト定義情報格納部221−1の“プロジェクトコード”
と関連付けられており、必要に応じてその定義内容が参
照できる。
Next, the structure of the requested item storage section 221-9 will be described with reference to FIG. The data structure is
"Project code", "Product code", "Design process code", "Work item code", "Requester personal code", "Requestee personal code", "Status", "Request type code", "Comment" Composed of columns. In the relational database, this data identifies a unique record by the combination of "project code", "product code", "design process code", "work item code", "requester personal code", and "requestee personal code". it can. The “project code” is associated with the “project code” in the project definition information storage unit 221-1, and the “product code” is
The product information definition storage unit 221-2 is associated with the "product code", the "design process code" is associated with the design process definition information storage unit 221-3, the "design process code", and , "Work item code" is associated with the "work item code" of the work item definition information storage unit 221-4, and the requester personal code "requestee personal code" is the resource attribute storage unit 222. −
It is associated with No. 1 "personal code", and the definition content can be referred to as necessary. Next, the event storage 2
The structure 21-11 will be described with reference to FIG. 73. The data structure is composed of columns such as “project code”, “event code”, “event name”, and “milestone of event”. In this relational data, a unique record can be identified by a combination of "project code" and "event code" on the relational database. The "project code" is the "project code" of the project definition information storage unit 221-1.
It is associated with, and the definition content can be referred to when necessary.

【0121】次に、作業指示格納部221−12の構造
について図74を用いて説明する。当該データ構造は、
“プロジェクトコード”、“製品コード”、“設計工程
コード”、“作業項目コード”、“整理番号”、“指示
者個人コード”、“指示事項”、“指示日付”、“回
答”、“回答者個人コード”、“回答日付”、“判
定”、“判定日”、“フラグ”、といったカラムから構
成される。このデータはリレーショナルデータベース上
では、“プロジェクトコード”、“製品コード”、“設
計工程コード”、“作業項目コード”、“整理番号”の
組合せでユニークレコードを識別できる。“プロジェク
トコード”は、プロジェクト定義情報格納部221−1
の“プロジェクトコード”と関連付けられており、ま
た、“製品コード”は、製品情報定義格納部221−2
の“製品コード”と関連付けられており、また、“設計
工程コード”は、設計工程定義情報格納部221−3の
“設計工程コード”と関連付けられており、また、“作
業項目コード”は、作業項目定義情報格納部221−4
の“作業項目コード”と関連付けられており、“指示者
個人コード”及び“回答者個人コード”は、リソース属
性格納部222−1の“個人コード”と関連付けられて
おり、必要に応じてその定義内容が参照できる。
Next, the structure of the work instruction storage unit 221-12 will be described with reference to FIG. The data structure is
"Project code", "Product code", "Design process code", "Work item code", "Reference number", "Instructor personal code", "Instructions", "Instruction date", "Reply", "Reply" It is composed of columns such as "personal code of individual", "response date", "judgment", "judgment date", "flag". In this data, a unique record can be identified on the relational database by a combination of "project code", "product code", "design process code", "work item code", and "reference number". The “project code” is the project definition information storage unit 221-1.
Associated with the “project code” of the product information definition storage unit 221-2.
"Product Code", the "Design Process Code" is associated with the "Design Process Code" in the Design Process Definition Information Storage 221-3, and the "Work Item Code" is Work item definition information storage section 221-4
The “worker code” of “No.”, the “instructor personal code” and the “responder personal code” are associated with the “personal code” of the resource attribute storage unit 222-1, and the You can refer to the definition contents.

【0122】次に、リソース属性格納部222−1の構
造について図75を用いて説明する。リソース属性格納
部222−1は、“個人定義部”と“個人権限定義部”
の2つの部分から構成される。“個人定義部”のデータ
構造は、“個人コード”、“部課コード”、“個人I
D”、“個人パスワード”、“漢字氏名”、“カタカナ
氏名”、“利用者コード”、“メールアドレス”、“職
名”、“入社日”、“人名ニックネーム”、“配属
日”、“能力クラス”といったカラムから構成される。
このデータはリレーショナルデータベース上では、“個
人コード”のみでユニークレコードを識別できる。“職
名”は、そのリソースのランクを示すもので、値として
は“一般”、“主任”、“技師”、“課長”をとる。
“利用者コード”は、当該システム利用を利用するユー
ザであるか否かの区別のためのフラグである。また、
“個人権限定義部”のデータ構造は、“個人コード”、
“プロジェクトコード”、“権限レベル”といったカラ
ムから構成される。このデータはリレーショナルデータ
ベース上では、“個人コード”、“プロジェクトコー
ド”の組合せでユニークレコードを識別できる。ここで
の、プロジェクトコードは、権限を与えるプロジェクト
のコードを意味し、リソースに対して“参照権限”、
“更新権限”、“権限無し”の権限が権限レベルとして
与えられる。“個人コード”は、上記“個人定義部”の
“個人コード”と関連付けられており、“プロジェクト
コード”は、また、プロジェクト定義情報格納部221
−1の“プロジェクトコード”と関連付けられており、
必要に応じてその定義内容が参照できる。
Next, the structure of the resource attribute storage unit 222-1 will be described with reference to FIG. The resource attribute storage unit 222-1 has a "personal definition unit" and a "personal authority definition unit".
It consists of two parts. The data structure of the "personal definition part" is "personal code", "department code", "personal I".
D ”,“ Personal Password ”,“ Kanji Name ”,“ Katakana Name ”,“ User Code ”,“ Email Address ”,“ Job Title ”,“ Company Date ”,“ Person Name Nickname ”,“ Affiliation Date ”,“ Ability ” It consists of columns such as "class".
In this data, a unique record can be identified only by the "personal code" in the relational database. The “job title” indicates the rank of the resource, and the values are “general”, “chief”, “engineer”, and “section manager”.
The "user code" is a flag for distinguishing whether or not the user uses the system. Also,
The data structure of "personal authority definition part" is "personal code",
It consists of columns such as "project code" and "privilege level". In this relational data, a unique record can be identified by a combination of "personal code" and "project code" on a relational database. Here, the project code means the code of the project to which the authority is given, and "reference authority" to the resource,
The authority of "update authority" and "no authority" is given as the authority level. The "individual code" is associated with the "individual code" in the "individual definition section", and the "project code" is also defined in the project definition information storage section 221.
-1 associated with the "project code",
The definition contents can be referred to as needed.

【0123】次に、リソースグループ属性格納部222
−2の構造について図76を用いて説明する。当該デー
タ構造は、“部課定義部”と“部課権限定義部”の2つ
の部分から構成される。“部課定義部”のデータ構造
は、“部課コード”、“部名称”、“課名称”、“部課
名称”といったカラムから構成される。このデータはリ
レーショナルデータベース上では、“部課コード”のみ
でユニークレコードを識別できる。また、“部課権限定
義部”のデータ構造は、“部課コード”、“プロジェク
トコード”、“権限レベル”といったカラムから構成さ
れる。このデータはリレーショナルデータベース上で
は、“部課コード”、“プロジェクトコード”の組合せ
でユニークレコードを識別できる。ここでの、プロジェ
クトコードは、権限を与えるプロジェクトのコードを意
味し、リソースグループに対して“参照権限”、“更新
権限”、“権限無し”の権限が権限レベルとして与えら
れる。“部課コード”は、上記“部課定義部”の“部課
コード”と関連付けられており、また、“プロジェクト
コード”は、プロジェクト定義情報格納部221−1の
“プロジェクトコード”と関連付けられており、必要に
応じてその定義内容が参照できる。次に、成果物管理情
報格納部223−1の構造について図77を用いて説明
する。当該データ構造は、“ドキュメントコード”、
“ドキュメント名称”、“作成フェーズ”、“ドキュメ
ント補足名称”、“作成部署”、“作成元ドキュメント
番号”、“作成元管理番号”、“入手日”、“キーワー
ド1”、“キーワード2”、“保管先1(紙の場合の保
管先)”、“保管先2(電子データの場合の保管
先)”、“担当者個人コードコメント”といったカラム
から構成される。このデータはリレーショナルデータベ
ース上では、“ドキュメントコード”のみでユニークレ
コードを識別できる。当該データは設計ドキュメント定
義構造であり、“ドキュメントコード”を使用して、必
要に応じてその定義内容が参照される。
Next, the resource group attribute storage unit 222
The structure -2 will be described with reference to FIG. The data structure is composed of two parts, a “department and section definition section” and a “department and section authority definition section”. The data structure of the “department section definition part” is composed of columns such as “department section code”, “department name”, “section name”, and “department name”. In this relational database, a unique record can be identified only by the "department code". The data structure of the “department / section authority definition part” is composed of columns such as “department / section code”, “project code”, and “authority level”. In this relational data, a unique record can be identified on the relational database by a combination of "department code" and "project code". Here, the project code means the code of the project to which the authority is given, and the authority of "reference authority", "update authority", and "no authority" is given to the resource group. The “department code” is associated with the “department code” of the “department definition unit”, and the “project code” is associated with the “project code” of the project definition information storage unit 221-1. The definition contents can be referred to as needed. Next, the structure of the deliverables management information storage unit 223-1 will be described with reference to FIG. The data structure is "Document code",
“Document name”, “Creation phase”, “Document supplement name”, “Creation department”, “Creation source document number”, “Creation source management number”, “Date of acquisition”, “Keyword 1”, “Keyword 2”, It is composed of columns such as "storage destination 1 (storage destination in case of paper)", "storage destination 2 (storage destination in case of electronic data)", and "personal code comment of person in charge". In this relational database, a unique record can be identified only by the "document code". The data is a design document definition structure, and the definition content is referred to as necessary using a “document code”.

【0124】[0124]

【発明の効果】本発明によれば、製品開発に携わる開発
者が行う作業(全てまたは開発に直接関係する作業の
み)について、ソフトウェアおよびハードウェアを利用
する作業、利用しない作業に係わらず、正確な進捗把握
ができるので、開発者の実際の負荷状況、開発者の各作
業内容に対する生産性、複数の優先順位の異なるプロジ
ェクト、プロジェクトを構成する作業内容への作業時間
の投下状況(開発対象又は開発工程を構成する幾つかの
作業群の進捗などの進捗情報)が把握可能となる効果を
奏する。また本発明によれば、製品開発に携わる開発者
が行う作業(全てまたは開発に直接関係する作業のみ)
について、ソフトウェアおよびハードウェアを利用する
作業、利用しない作業に係わらず、進捗状況の正確なモ
ニタリング結果が保存できるので、過去の同程度の作業
内容に対する実施工数を用いて使用工数と進捗度から簡
単な計算処理を行うだけで、進行状況の安全度を定量的
に知ることができる効果を奏する。また本発明によれ
ば、製品開発に携わる開発者が行う作業(全てまたは開
発に直接関係する作業のみ)について、ソフトウェアお
よびハードウェアを利用する作業の進捗状況をモニタリ
ングでき、利用しない作業についても追加・変更という
形で容易に進捗報告できるので、開発者の作業を妨害す
ることなく、正確で、且つ確実なモニタリングが実現す
ることができる効果を奏する。
According to the present invention, work performed by a developer involved in product development (all or only work directly related to development) is performed accurately regardless of work using software and hardware and work not using software. Since the progress can be grasped, the actual load situation of the developer, the productivity of the developer for each work content, the projects with different priorities, and the status of the work time spent on the work content that constitutes the project (development target or This has the effect of making it possible to grasp progress information) such as the progress of several work groups that make up the development process. Further, according to the present invention, the work performed by the developer involved in the product development (all or only the work directly related to the development)
Regarding, regarding the work that uses software and hardware, regardless of the work that is not used, accurate monitoring results of the progress status can be saved, so it is easy to use the man-hours and the degree of progress by using the man-hours for the same work contents in the past. The effect of being able to quantitatively know the degree of safety of the progress is achieved by simply performing various calculation processes. Further, according to the present invention, with respect to the work performed by the developer involved in product development (all or only the work directly related to the development), the progress of the work using the software and the hardware can be monitored, and the work not used is also added. -Since the progress can be easily reported in the form of changes, there is an effect that accurate and reliable monitoring can be realized without disturbing the work of the developer.

【0125】本発明によれば、ソフトウェアおよびハー
ドウェアを利用した作業に関しては、自動的にモニタリ
ングされる。更にこの結果と当日行う予定になっていた
作業名が表示され、それ以外の作業についても選択的に
登録でき、モニタリングされなかった前の時間帯と後ろ
の時間帯の情報をみることができるため、思考したり迷
ったりする時間を要さない。即ち本発明によれば、自動
的にモニタリングすることができるため、例えば1日あ
たりの作業数を約10作業とし、作業端末に連結可能な
ソフトウェアおよびハードウェアを利用した作業が1作
業あたり1つ、それ以外の作業が1作業あたり1つある
として概算すると1ヵ月(約20日)あたり次のように
説明する時間で済ませることができる。ところで、作業
端末上に表示される作業群から作業を選択するのに1作
業あたり2秒程度であり、従って10作業として20秒
程度となる。また作業の終了を宣言するコードを作業端
末上に投入するのは1秒程度で済むため、10作業で1
0秒程度である。モニタリングされない作業の登録に関
しては、モニタリングされなかった時間帯にモニタリン
グされた作業実績を参照しながら入力して1作業あたり
10秒としても10作業で100秒程度である。従っ
て、合計130秒であるから1ヵ月(約20日)あたり
43分余り/1名、開発者が50名いるとすると約1.
5日余りで済ませることができる。
According to the present invention, work using software and hardware is automatically monitored. In addition, this result and the name of the work scheduled to be performed on the day are displayed, and other work can be selectively registered, and the information of the time zone before and after that which was not monitored can be seen. It doesn't take time to think or get lost. That is, according to the present invention, since the number of works can be automatically monitored, for example, the number of works per day is set to about 10, and one work using software and hardware connectable to the work terminal is provided for each work. Assuming that there is one other task per task, it can be completed in the following time per month (about 20 days). By the way, it takes about 2 seconds per work to select a work from the work group displayed on the work terminal, and therefore 10 works take about 20 seconds. In addition, it takes about 1 second to put the code that declares the end of the work on the work terminal.
It is about 0 seconds. Regarding the registration of unmonitored work, 10 work is about 100 seconds even if 10 work is input with reference to the work record monitored in the non-monitored time zone. Therefore, since the total time is 130 seconds, there are about 43 minutes per month (about 20 days) / 1 person, and if there are 50 developers, about 1.
It can be done in about 5 days.

【0126】また本発明によれば、設計開発プロジェク
トを作業項目と呼ぶ詳細な作業単位で記述するため、従
来のようなマクロな作業指示ではなく、ミクロな作業指
示を実現する。したがって、設計開発担当者に任されて
いたために、担当者の力量に左右されていた設計品質を
担当者によらずに安定化させることができる。また、設
計開発プロジェクトの日程計画の立案においては、この
ような詳細作業項目の工数を使用することで、工数的な
根拠を持った日程計画となり、従来のように単なる目標
ではなく、達成可能な日程計画となる。また、詳細な作
業項目によって設計業務を記述することによって、各担
当者のやるべきこと、やらなければならないことが明確
になり、設計時での検討作業の漏れがなくなる。このた
め、設計品質は向上し、安定化する。また本発明によれ
ば、精確な日程計画に基づき各設計開発担当者は、シス
テムからの指示に従って設計業務を遂行でき、またその
作業の実績情報を自動的に収集する。自動的に取得でき
ない部分に対しては、日報と呼ぶ簡易的な実績情報入力
の手段により、漏れなく実績を収集できる仕組みとし
た。このため、従来のようにプロジェクトの管理者が各
担当者に対して進捗状況をヒアリングしたり、フォロー
アップ会議などが不要となり、各担当者の負担を軽くす
る。また、管理者にとっても収集した進捗情報の整理分
析にかかる多大な工数を削減することが可能となる。す
なわち、管理者及び担当者双方にとって、フォローアッ
プのだけのための時間が、なくなるというメリットがあ
る。
Further, according to the present invention, since the design and development project is described in detailed work units called work items, micro work instructions are realized instead of the conventional macro work instructions. Therefore, since it is left to the person in charge of design and development, it is possible to stabilize the design quality that was influenced by the ability of the person in charge of design, regardless of the person in charge. Also, in planning a schedule for a design and development project, by using the man-hours of such detailed work items, it becomes a schedule that has a man-hourly basis, and is not a mere goal as in the past, but can be achieved. Scheduled. Further, by describing the design work by detailed work items, it becomes clear what each person in charge should do and what must be done, and the examination work at the time of design will not be overlooked. Therefore, the design quality is improved and stabilized. Further, according to the present invention, each person in charge of design and development can carry out the design work in accordance with the instruction from the system based on the accurate schedule, and automatically collects the performance information of the work. For parts that cannot be automatically acquired, a simple means of inputting results information called a daily report was used to collect results without omission. For this reason, the project manager does not need to hear the progress status from each person in charge and follow-up meetings are required as in the past, and the burden on each person in charge is lightened. In addition, it is possible for the administrator to reduce a great number of man-hours required for organizing and analyzing the collected progress information. That is, there is an advantage that both the manager and the person in charge have no time for just follow-up.

【0127】また本発明によれば工程の進捗情報が客観
的な手法により取得できるため、その作業実績の信頼性
は高い。したがって、この実績情報を基にして、プロジ
ェクト進行時の遅延などの問題点を事前に警告すること
ができるようになり、問題発生前の早期の対策実行が可
能となる。また、このような対策も詳細な日程計画と精
確な進捗情報と基づく対策であるため、工数的に根拠の
ある有効な対策である。また本発明によれば、新規にプ
ロジェクトを計画する場合にも、既に完了したプロジェ
クトの詳細な情報が実績として利用でき、このために予
測される問題や、必要な工数等の情報を有効に利用する
ことができる。
Further, according to the present invention, since the progress information of the process can be obtained by an objective method, the reliability of the work record is high. Therefore, based on this performance information, it becomes possible to give advance warning of problems such as delays in the progress of the project, and it is possible to take early countermeasures before problems occur. In addition, since such measures are also measures based on detailed schedule plans and accurate progress information, they are effective measures that are grounded in man-hours. Further, according to the present invention, even when a new project is planned, the detailed information of the already completed project can be used as the actual result, and the information such as the problem predicted for this and the required man-hours can be effectively used. can do.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明に係る設計・開発の進捗管理システム
の一実施例である機能ブロック構成を示す図である。
FIG. 1 is a diagram showing a functional block configuration which is an embodiment of a design / development progress management system according to the present invention.

【図2】 本発明に係る設計・開発の進捗管理システム
の一実施例であるハード構成を示した図である。
FIG. 2 is a diagram showing a hardware configuration of an embodiment of a design / development progress management system according to the present invention.

【図3】 本発明に係る作業実績格納部に格納されたデ
ータ構成を示す説明図である。
FIG. 3 is an explanatory diagram showing a data structure stored in a work record storage unit according to the present invention.

【図4】 本発明に係る管理項目格納部に格納されたデ
ータ構成を示す説明図である。
FIG. 4 is an explanatory diagram showing a data structure stored in a management item storage unit according to the present invention.

【図5】 本発明に係る設計・開発の進捗管理システム
の他の一実施例である機能ブロック構成を示す図であ
る。
FIG. 5 is a diagram showing a functional block configuration which is another embodiment of the design / development progress management system according to the present invention.

【図6】 本発明に係る設計・開発の進捗管理システム
において、システムが把握できない作業実績の把握手順
を示したフローチャートである。
FIG. 6 is a flowchart showing a procedure of grasping a work record that the system cannot grasp in the design / development progress management system according to the present invention.

【図7】 本発明に係る設計・開発の進捗管理システム
において、進捗情報の検索方法を説明するための画面例
を示す図である。
FIG. 7 is a diagram showing an example of a screen for explaining a progress information search method in the design / development progress management system according to the present invention.

【図8】 本発明に係る設計・開発の進捗管理システム
において、進捗情報の表示方法を説明するための画面例
を示す図である。
FIG. 8 is a diagram showing an example of a screen for explaining a method of displaying progress information in the design / development progress management system according to the present invention.

【図9】 本発明に係る設計・開発の進捗管理システム
において、システムのモニタリング手順を示したフロー
チャートである。
FIG. 9 is a flowchart showing a system monitoring procedure in the design / development progress management system according to the present invention.

【図10】 本発明に係る設計・開発の進捗管理システ
ムにおいて、システムのモニタリング手順を示したフロ
ーチャートである。
FIG. 10 is a flowchart showing a system monitoring procedure in the design / development progress management system according to the present invention.

【図11】 本発明に係る設計・開発の進捗管理システ
ムにおいて、進捗度の獲得手順を説明するための画面例
を示す図である。
FIG. 11 is a diagram showing an example of a screen for explaining a procedure of acquiring a progress degree in the design / development progress management system according to the present invention.

【図12】 本発明に係る設計・開発の進捗管理システ
ムにおいて、進捗報告を要求する時間帯の検出処理手順
を示したフローチャートである。
FIG. 12 is a flowchart showing a detection processing procedure of a time zone for requesting a progress report in the design / development progress management system according to the present invention.

【図13】 本発明に係る設計・開発の進捗管理システ
ムにおいて、進捗報告有無の把握手順を示したフローチ
ャートである。
FIG. 13 is a flowchart showing a procedure for grasping the presence / absence of a progress report in the design / development progress management system according to the present invention.

【図14】 本発明に係る設計・開発の進捗管理システ
ムにおいて、作業環境を設定するための画面の例を示す
図である。
FIG. 14 is a diagram showing an example of a screen for setting a work environment in the design / development progress management system according to the present invention.

【図15】 本発明に係る設計・開発の進捗管理システ
ムにおいて、開発者が開発対象の作業群の管理指標から
作業群を選択するための画面の例を示した図である。
FIG. 15 is a diagram showing an example of a screen for a developer to select a work group from the management indices of the work group to be developed in the design / development progress management system according to the present invention.

【図16】 本発明に係る設計・開発の進捗管理システ
ムにおいて、プロジェクトを構成する作業の集合である
作業群の作業計画、作業実績、参照情報などを表示し、
作業選択を支援する画面の例を示す図である。
FIG. 16 is a diagram showing a progress management system for design / development according to the present invention, which displays a work plan, a work record, reference information, etc. of a work group which is a set of works constituting a project,
It is a figure which shows the example of the screen which supports work selection.

【図17】 本発明に係る設計・開発の進捗管理システ
ムにおいて、設計・開発作業を開始するための画面の例
を示す図である。
FIG. 17 is a diagram showing an example of a screen for starting design / development work in the design / development progress management system according to the present invention.

【図18】 本発明に係る作業実績報告部によって作業
端末上に表示される画面の例を示す図である。
FIG. 18 is a diagram showing an example of a screen displayed on the work terminal by the work record reporting unit according to the present invention.

【図19】 本発明に係る設計・開発プロジェクトの管
理システムの一実施の形態である機能ブロック構成を示
す図である。
FIG. 19 is a diagram showing a functional block configuration which is an embodiment of a design / development project management system according to the present invention.

【図20】 本発明に係る設計・開発プロジェクトの管
理システムのデータ格納部の構造の一実施の形態を示す
図である。
FIG. 20 is a diagram showing an embodiment of a structure of a data storage unit of a management system for a design / development project according to the present invention.

【図21】 本発明に係る設計・開発プロジェクトの管
理システムの個人認識及び個人情報表示部の一実施の形
態における画面例である。
FIG. 21 is an example of a screen in an embodiment of an individual recognition and personal information display section of the design / development project management system according to the present invention.

【図22】 本発明に係る設計・開発プロジェクトの管
理システムの個人認識及び個人情報表示部の一実施の形
態における処理の流れを示す図である。
FIG. 22 is a diagram showing a flow of processing in an embodiment of an individual recognition and personal information display unit of the design / development project management system according to the present invention.

【図23】 本発明に係る設計・開発プロジェクトの管
理システムの条件待ち管理部の一実施の形態における画
面例を示す図である。
FIG. 23 is a diagram showing an example of a screen in the embodiment of the condition waiting management unit of the management system of the design / development project according to the present invention.

【図24】 本発明に係る設計・開発プロジェクトの管
理システムの条件待ち格納部の構造の一実施の形態を示
す図である。
FIG. 24 is a diagram showing an embodiment of the structure of a condition waiting storage unit of the design / development project management system according to the present invention.

【図25】 本発明に係る設計・開発プロジェクトの管
理システムのペンディング事項管理部の一画面例を示し
た図である。
FIG. 25 is a diagram showing an example of a screen of a pending matter management unit of the design / development project management system according to the present invention.

【図26】 本発明に係る設計・開発プロジェクトの管
理システムのペンディング事項格納部のデータ構造の一
実施の形態を示す図である。
FIG. 26 is a diagram showing an embodiment of a data structure of a pending item storage unit of the design / development project management system according to the present invention.

【図27】 本発明に係る管理システムの担当プロジェ
クト/製品/工程指示部の一画面例を示す図である。
FIG. 27 is a diagram showing an example of a screen of a project / product / process instruction unit in charge of the management system according to the present invention.

【図28】 本発明に係る管理システムの担当プロジェ
クト/製品/工程指示部の処理フローの一実施の形態を
示す図である。
FIG. 28 is a diagram showing an embodiment of a processing flow of a project / product / process instruction unit in charge of the management system according to the present invention.

【図29】 本発明に係る管理システムの警告生成部の
処理フローの一実施の形態を説明するための図である。
FIG. 29 is a diagram for explaining an embodiment of a processing flow of a warning generation unit of the management system according to the present invention.

【図30】 本発明に係る管理システムの担当作業項目
指示部の一画面例を示す。
FIG. 30 shows an example of a screen of a work item instructing section in charge of the management system according to the present invention.

【図31】 本発明に係る管理システムの担当作業項目
指示部の処理フローの一実施の形態を示す図である。
FIG. 31 is a diagram showing an embodiment of a processing flow of a work item instructing section in charge of the management system according to the present invention.

【図32】 本発明に係る管理システムの成果物提示部
の一画面例を示す図である。
FIG. 32 is a diagram showing an example of a screen of the deliverable product presentation unit of the management system according to the present invention.

【図33】 本発明に係る管理システムの成果物提示部
の処理フローの一実施の形態について示した図である。
FIG. 33 is a diagram showing an embodiment of a processing flow of a deliverable presentation unit of the management system according to the present invention.

【図34】 本発明に係る管理システムのツール使用時
間取得部における処理フローの一実施の形態を示した図
である。
FIG. 34 is a diagram showing an embodiment of a processing flow in a tool usage time acquisition unit of the management system according to the present invention.

【図35】 本発明に係る管理システムの日報管理部に
おける処理フローの一実施の形態を示した図である。
FIG. 35 is a diagram showing an embodiment of a processing flow in a daily report management unit of the management system according to the present invention.

【図36】 本発明に係る管理システムの負荷山積み表
示の一画面例を表す図である。
FIG. 36 is a diagram showing a screen example of a load pile display of the management system according to the present invention.

【図37】 本発明に係る管理システムの負荷山積み計
算部の処理フローの一実施の形態を説明するための図で
ある。
FIG. 37 is a diagram for explaining an embodiment of a processing flow of a load pileup calculation unit of the management system according to the present invention.

【図38】 本発明に係る管理システムのリソースグル
ープ別負荷山積み表示の一画面例を示す図である。
[Fig. 38] Fig. 38 is a diagram showing a screen example of a load pile display for each resource group of the management system according to the present invention.

【図39】 本発明に係る管理システムのリソース属性
別負荷山積み表示の一画面例を示す図である。
FIG. 39 is a diagram showing a screen example of a load pile display for each resource attribute of the management system according to the present invention.

【図40】 本発明に係る管理システムのプロジェクト
属性入力部の一画面例を示す図である。
FIG. 40 is a diagram showing an example of a screen of a project attribute input section of the management system according to the present invention.

【図41】 本発明に係る管理システムのプロジェクト
属性入力部の処理フローの一実施の形態を示す図であ
る。
FIG. 41 is a diagram showing an embodiment of a processing flow of a project attribute input unit of the management system according to the present invention.

【図42】 本発明に係る管理システムの必要工程生成
部の一画面例を示す図である。
FIG. 42 is a diagram showing an example of a screen of a necessary process generation unit of the management system according to the present invention.

【図43】 本発明に係る管理システムのプロジェクト
実績を選択するためのウィンドウの説明図である。
FIG. 43 is an explanatory diagram of a window for selecting a project record of the management system according to the present invention.

【図44】 本発明に係る管理システムの必要工程生成
部の処理フローの一実施の形態を示す図である。
FIG. 44 is a diagram showing an embodiment of a processing flow of a necessary process generation unit of the management system according to the present invention.

【図45】 本発明に係る管理システムの日程計画生成
部を説明するための図である。
[Fig. 45] Fig. 45 is a diagram for explaining a schedule plan generation unit of the management system according to the present invention.

【図46】 本発明に係る管理システムの設計作業量推
定部の一画面例を示した図である。
FIG. 46 is a diagram showing an example of a screen of a design work amount estimation unit of the management system according to the present invention.

【図47】 本発明に係る管理システムの設計作業量推
定部の一画面例を示した図である。
FIG. 47 is a diagram showing an example of a screen of a design work amount estimation unit of the management system according to the present invention.

【図48】 本発明に係る管理システムの設計作業量推
定部の一画面例を示す図である。
FIG. 48 is a diagram showing an example of a screen of a design work amount estimation unit of the management system according to the present invention.

【図49】 本発明に係る管理システムのプロジェクト
の設計工程の一覧を提示する一画面例を示す図である。
FIG. 49 is a diagram showing an example of a screen for presenting a list of project design steps of the management system according to the present invention.

【図50】 本発明に係る管理システムのリソース検索
部の一画面例を示す図である
FIG. 50 is a diagram showing an example of a screen of the resource search unit of the management system according to the present invention.

【図51】 本発明に係る管理システムのガントチャー
ト表示部の一画面例を示す図である。
FIG. 51 is a diagram showing an example of a screen of the Gantt chart display unit of the management system according to the present invention.

【図52】 本発明に係る管理システムのガントチャー
ト上において日程バーの連動移動のを説明するための図
である。
FIG. 52 is a diagram for explaining interlocking movement of the date bar on the Gantt chart of the management system according to the present invention.

【図53】 本発明に係る管理システムの日程計画変更
部の処理フローの一実施の形態を示す図である。
FIG. 53 is a diagram showing an embodiment of a processing flow of a schedule plan changing unit of the management system according to the present invention.

【図54】 本発明に係る管理システムの山崩し実行前
と山崩し実行後の工数山積みの一画面例を示す図であ
る。
[Fig. 54] Fig. 54 is a diagram showing an example of a screen for stacking man-hours before and after execution of a landslide in the management system according to the present invention.

【図55】 本発明に係る管理システムの山崩し実行部
の処理フローの一実施の形態を示す図である。
FIG. 55 is a diagram showing an embodiment of a processing flow of a landslide executing unit of the management system according to the present invention.

【図56】 本発明に係る管理システムの依頼事項管理
部の処理フローの一実施の形態を説明するための図であ
る。
FIG. 56 is a diagram illustrating an embodiment of a processing flow of a requested item management unit of the management system according to the present invention.

【図57】 本発明に係る管理システムの進捗度推定部
の処理フローの一実施の形態を説明するための図であ
る。
FIG. 57 is a diagram for explaining an embodiment of a processing flow of a progress degree estimating unit of the management system according to the present invention.

【図58】 本発明に係る管理システムの作業指示事項
管理部を説明するための一画面例を示す図である。
FIG. 58 is a diagram showing an example of a screen for explaining a work instruction item management unit of the management system according to the present invention.

【図59】 本発明に係る管理システムの難易度評価部
の処理フローの一実施の形態を説明する図である。
FIG. 59 is a diagram illustrating an embodiment of a processing flow of the difficulty level evaluation unit of the management system according to the present invention.

【図60】 本発明に係る管理システムの作業分析部の
一画面例を示す図である。
FIG. 60 is a diagram showing an example of a screen of a work analysis section of the management system according to the present invention.

【図61】 本発明に係る管理システムの作業分析部の
別の画面例を示す図である。
FIG. 61 is a diagram showing another screen example of the work analysis unit of the management system according to the present invention.

【図62】 本発明に係る管理システムのリソースカレ
ンダ格納部の構造の一実施の形態を示す図である。
FIG. 62 is a diagram showing an embodiment of a structure of a resource calendar storage unit of the management system according to the present invention.

【図63】 本発明に係る管理システムの標準カレンダ
格納部の構造の一実施の形態を示す図である。
FIG. 63 is a diagram showing one embodiment of a structure of a standard calendar storage unit of the management system according to the present invention.

【図64】 本発明に係る管理システムのプロジェクト
定義情報格納部の構造の一実施の形態を説明するための
図である。
FIG. 64 is a diagram for explaining an embodiment of a structure of a project definition information storage unit of the management system according to the present invention.

【図65】 本発明に係る管理システムの製品情報定義
格納部の構造の一実施の形態を説明するための図であ
る。
FIG. 65 is a diagram for explaining an embodiment of the structure of a product information definition storage unit of the management system according to the present invention.

【図66】 本発明に係る管理システムの設計工程定義
情報格納部の構造の一実施の形態を説明するための図で
ある。
FIG. 66 is a diagram for explaining an embodiment of the structure of the design process definition information storage unit of the management system according to the present invention.

【図67】 本発明に係る管理システムの作業項目定義
情報格納部の構造の一実施の形態を説明するための図で
ある。
FIG. 67 is a diagram for explaining one embodiment of the structure of the work item definition information storage unit of the management system according to the present invention.

【図68】 本発明に係る管理システムの作業実績情報
格納部の構造の一実施の形態を説明するための図であ
る。
FIG. 68 is a diagram for explaining an embodiment of the structure of the work record information storage section of the management system according to the present invention.

【図69】 本発明に係る管理システムの工程間先行後
続関係定義情報格納部の構造の一実施の形態を説明する
ための図である。
FIG. 69 is a diagram for explaining an embodiment of the structure of an inter-process preceding / successive relationship definition information storage unit of the management system according to the present invention.

【図70】 本発明に係る管理システムの外部入手成果
物入手状況格納部の構造の一実施の形態を説明するため
の図である。
[Fig. 70] Fig. 70 is a diagram for describing an embodiment of the structure of an externally acquired deliverable acquisition status storage unit of the management system according to the present invention.

【図71】 本発明に係る管理システムの作業成果物定
義情報格納部の構造の一実施の形態を説明するための図
である。
FIG. 71 is a diagram for explaining an embodiment of the structure of the work product definition information storage unit of the management system according to the present invention.

【図72】 本発明に係る管理システムの依頼事項格納
部の構造の一実施の形態を説明するための図である。
FIG. 72 is a diagram for explaining an embodiment of the structure of a requested item storage unit of the management system according to the present invention.

【図73】 本発明に係る管理システムのイベント格納
部の構造の一実施の形態を説明するための図である。
FIG. 73 is a diagram for explaining an embodiment of a structure of an event storage unit of the management system according to the present invention.

【図74】 本発明に係る管理システムの作業指示格納
部の構造の一実施の形態を説明するための図である。
FIG. 74 is a diagram for explaining one embodiment of the structure of the work instruction storage unit of the management system according to the present invention.

【図75】 本発明に係る管理システムのリソース属性
格納部の構造の一実施の形態を説明するための図であ
る。
FIG. 75 is a diagram for explaining an embodiment of the structure of a resource attribute storage unit of the management system according to the present invention.

【図76】 本発明に係る管理システムのリソースグル
ープ属性格納部の構造の一実施の形態を説明するための
図である。
FIG. 76 is a diagram illustrating an embodiment of a structure of a resource group attribute storage unit of the management system according to the present invention.

【図77】 本発明に係る管理システムの成果物管理情
報格納部の構造の一実施の形態を説明するための図であ
る。
FIG. 77 is a diagram for explaining an embodiment of the structure of the deliverables management information storage unit of the management system according to the present invention.

【図78】 本発明に係る定義された設計開発プロジェ
クトと、製品と、設計工程(作業群)と、作業項目(作
業内容)との関係を示した図である。
FIG. 78 is a diagram showing a relationship among a defined design development project, a product, a design process (work group), and a work item (work content) according to the present invention.

【符号の説明】[Explanation of symbols]

31…サーバ(計算機)、32…作業端末(クライアン
ト、作業用計算機)、33…通信ネットワーク、310
…バス、311…CPU、312…メモリ、313、3
14、315…制御装置、316…外部記憶装置、31
7…入力手段、318…表示手段、320…バス、32
1…CPU、322…メモリ、323、324…制御装
置、325…入力手段(キーボード、マウス等)、32
6…表示手段、328…バーコード読み取り装置、32
9…ハードウェア、101…作業実績格納部、102…
作業実績表現部、104…作業実績報告部、105…作
業内容表現部、106…管理項目格納部、107…作業
実績モニタリング部、108…進捗度報告部、109…
非進捗状況把握時刻設定部、110…進捗報告要求時刻
検出部、111…進捗報告要求部、401…進捗情報検
索部、402…進捗情報表示部、403…計画部、40
4…成果物格納部、405…作業環境設定部、406…
参照情報入手実績格納部、190…設計開発プロジェク
トの管理システム、193…データ格納部、191…処
理モジュール群、192…検索及び更新部、1911…
プロジェクト属性入力部、1912…必要工程生成部、
1913…成果物定義部、1914…日程計画生成部、
1915…設計作業量推定部、1916…ガントチャー
ト表示部、1917…日程計画変更部、1918…ペン
ディング事項管理部、1919…依頼事項管理部、19
20…リソース検索部、1921…リソース割当部、1
922…山崩し実行部、1923…待ち条件管理部、1
924…警告生成部、1925…進捗度推定部、192
6…負荷山積み計算部、1927…リソースグループ別
負荷山積み計算部、1928…リソース属性別負荷山積
み計算部、1929…個人認識及び個人情報表示部、1
930…担当プロジェクト/製品/工程指示部、193
1…担当作業項目指示部、1932…成果物指示部、1
933…ツール使用時間取得部、1934…日報管理
部、1935…作業指示管理部、1936…難易度評価
部、1937…作業分析部、1938…リソースカレン
ダ管理部、1939…標準カレンダ管理部、221−1
…プロジェクト定義情報格納部、221−2…製品情報
定義格納部、221−3…設計工程定義情報格納部、2
21−4…作業項目定義情報格納部、221−5…作業
実績情報格納部、221−8…作業成果物定義情報格納
部、223−1…成果物管理情報格納部、223−2…
成果物ファイル格納部
31 ... Server (computer), 32 ... Work terminal (client, work computer), 33 ... Communication network, 310
... bus, 311, ... CPU, 312 ... memory, 313, 3
14, 315 ... Control device, 316 ... External storage device, 31
7 ... Input means, 318 ... Display means, 320 ... Bus, 32
1 ... CPU, 322 ... Memory, 323, 324 ... Control device, 325 ... Input means (keyboard, mouse, etc.), 32
6 ... Display means, 328 ... Bar code reader, 32
9 ... Hardware, 101 ... Work record storage unit, 102 ...
Work record expression part, 104 ... Work record report part, 105 ... Work content expression part, 106 ... Management item storage part, 107 ... Work record monitoring part, 108 ... Progress report part, 109 ...
Non-progress status grasp time setting unit, 110 ... Progress report request time detection unit, 111 ... Progress report request unit, 401 ... Progress information search unit, 402 ... Progress information display unit, 403 ... Planning unit, 40
4 ... deliverable storage unit, 405 ... work environment setting unit, 406 ...
Reference information acquisition record storage unit, 190 ... Design and development project management system, 193 ... Data storage unit, 191 ... Processing module group, 192 ... Search and update unit, 1911 ...
Project attribute input section, 1912 ... Necessary process generation section,
1913 ... deliverable definition section, 1914 ... schedule planning generation section,
1915 ... Design work estimation section, 1916 ... Gantt chart display section, 1917 ... Schedule change section, 1918 ... Pending item management section, 1919 ... Request item management section, 19
20 ... resource search unit, 1921 ... resource allocation unit, 1
922 ... Yamabushiri execution section, 1923 ... Wait condition management section, 1
924 ... Warning generation unit, 1925 ... Progress degree estimation unit, 192
6 ... Load pile calculation unit, 1927 ... Resource group load pile calculation unit, 1928 ... Resource attribute load pile calculation unit, 1929 ... Individual recognition and personal information display unit, 1
930 ... Responsible project / product / process instruction section, 193
1 ... Work item instructor in charge, 1932 ... Product instructor, 1
933 ... Tool usage time acquisition unit, 1934 ... Daily report management unit, 1935 ... Work instruction management unit, 1936 ... Difficulty level evaluation unit, 1937 ... Work analysis unit, 1938 ... Resource calendar management unit, 1939 ... Standard calendar management unit, 221- 1
... Project definition information storage section 221-2 ... Product information definition storage section, 221-3 ... Design process definition information storage section, 2
21-4 ... Work item definition information storage unit, 221-5 ... Work record information storage unit, 221-8 ... Work product definition information storage unit, 223-1 ... Product management information storage unit, 223-2 ...
Artifact file storage

───────────────────────────────────────────────────── フロントページの続き (72)発明者 矢沢 節雄 茨城県土浦市神立町603番地株式会社日立 製作所土浦工場内 (72)発明者 栗本 正樹 茨城県土浦市神立町603番地株式会社日立 製作所土浦工場内 (72)発明者 小山田 聡一 茨城県土浦市神立町603番地株式会社日立 製作所土浦工場内 (72)発明者 照沼 利晃 茨城県土浦市神立町603番地株式会社日立 製作所土浦工場内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Setsuo Yazawa 603 Kazutachi-cho, Tsuchiura-shi, Ibaraki Hitachi, Ltd. Tsuchiura factory (72) Masaki Kurimoto 603 Kintate-cho, Tsuchiura-shi, Ibaraki Hitachi, Ltd. Tsuchiura factory (72) Inventor Souichi Koyamada 603 Kuchitachi-cho, Tsuchiura-shi, Ibaraki Hitachi Co., Ltd. Tsuchiura Plant (72) Inventor Toriaki Terunuma 603, Kintachi-cho, Tsuchiura-shi, Ibaraki Hitachi Ltd. Tsuchiura Plant

Claims (36)

【特許請求の範囲】[Claims] 【請求項1】サーバに複数の作業端末を通信ネットワー
クで接続して構成される設計・開発の進捗管理システム
を使用して、設計または開発プロジェクトにおいて設計
者または開発者が行う設計または開発の作業内容を所望
の使用ツールまたは使用ハードウェアを用いて所望の作
業端末から実行してこれらの作業実績を前記通信ネット
ワークを介して前記サーバの記憶装置に格納し、これら
格納された作業実績から検索される前記プロジェクトに
おける設計者または開発者単位での作業内容に対応した
少なくとも日または週または月単位の進捗状況を前記通
信ネットワークを介して所望の作業端末の表示手段に表
示することを特徴とする設計・開発の進捗管理方法。
1. A design or development work performed by a designer or a developer in a design or development project using a design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network. The contents are executed from a desired work terminal using a desired tool or hardware to be used, these work results are stored in the storage device of the server via the communication network, and the stored work results are retrieved. A design characterized by displaying the progress status of at least a day, a week, or a month corresponding to the work content in the designer or developer unit in the project through the communication network on a display means of a desired work terminal. -Development progress management method.
【請求項2】サーバに複数の作業端末を通信ネットワー
クで接続して構成される設計・開発の進捗管理システム
を使用して、設計または開発プロジェクトにおいて設計
者または開発者が行う設計または開発の作業内容を所望
の使用ツールまたは使用ハードウェアを用いて所望の作
業端末から実行してこれらの作業実績を前記通信ネット
ワークを介して前記サーバの記憶装置に格納し、これら
格納された作業実績から検索される前記プロジェクトに
おける設計者または開発者単位での作業内容に対応した
少なくとも日または週または月単位の進捗状況を前記通
信ネットワークを介して所望の作業端末の表示手段に表
示し、該作業端末に接続された入力手段を用いて進捗デ
ータを入力して前記通信ネットワークを介して前記サー
バの記憶装置に格納することを特徴とする設計・開発の
進捗管理方法。
2. A design or development work performed by a designer or a developer in a design or development project using a design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network. The contents are executed from a desired work terminal using a desired tool or hardware to be used, these work results are stored in the storage device of the server via the communication network, and the stored work results are retrieved. The progress status of at least a day, a week or a month corresponding to the work content of each designer or developer in the project is displayed on the display means of a desired work terminal via the communication network and connected to the work terminal. The progress data is input using the input means and stored in the storage device of the server via the communication network. Progress management method of design and development which is characterized in that.
【請求項3】サーバに複数の作業端末を通信ネットワー
クで接続して構成される設計・開発の進捗管理システム
を使用して、設計または開発プロジェクトにおいて設計
者または開発者が行う設計または開発の作業内容を所望
の使用ツールまたは使用ハードウェアを用いて所望の作
業端末から実行してこれらの作業実績を前記通信ネット
ワークを介して前記サーバの記憶装置に格納し、所望の
作業端末において管理されている作業内容における作業
終了を入力手段を用いて入力することによって、該作業
内容における作業開始時刻前までの進捗度と作業開始時
刻から作業終了時刻までの作業時間と該作業時間におい
て指標となる予測進捗度とを所望の作業端末の表示手段
に表示し、該作業時間における作業の実施結果に対応し
た進捗度を所望の作業端末の入力手段を用いて入力する
ことによって前記通信ネットワークを介して前記サーバ
の記憶装置に格納することを特徴とする設計・開発の進
捗管理方法。
3. A design or development work performed by a designer or a developer in a design or development project using a design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network. The contents are executed from a desired work terminal using a desired tool or hardware to be used, and these work records are stored in the storage device of the server via the communication network and managed by the desired work terminal. By inputting the work end in the work content using the input means, the progress degree before the work start time in the work content, the work time from the work start time to the work end time, and the predicted progress as an index in the work time The degree of progress is displayed on the display means of the desired work terminal, and the progress degree corresponding to the execution result of the work in the working time is displayed as desired. Tracking method of design and development, characterized in that stored in the storage device of the server via the communication network by inputting using input means work terminal.
【請求項4】サーバに複数の作業端末を通信ネットワー
クで接続して構成される設計・開発の進捗管理システム
を使用して、設計または開発プロジェクトにおいて設計
者または開発者が行う設計または開発の作業内容を所望
の使用ツールまたは使用ハードウェアを用いて所望の作
業端末から実行してこれらの作業実績を前記通信ネット
ワークを介して前記サーバの記憶装置に格納し、これら
格納された作業実績の内、前記プロジェクトにおける設
計者または開発者単位での作業実績を前記通信ネットワ
ークを介して所望の作業端末の表示手段に表示すること
を特徴とする設計・開発の進捗管理方法。
4. A design or development work performed by a designer or a developer in a design or development project using a design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network. The content is executed from a desired work terminal using a desired tool or hardware to be used, and these work records are stored in the storage device of the server via the communication network, and among these stored work records, A progress management method for design / development, characterized in that the work record of each designer or developer in the project is displayed on a display unit of a desired work terminal via the communication network.
【請求項5】サーバに複数の作業端末を通信ネットワー
クで接続して構成される設計・開発の進捗管理システム
を使用して、設計または開発プロジェクトにおいて設計
者または開発者が行う設計または開発の作業内容を所望
の使用ツールまたは使用ハードウェアを用いて所望の作
業端末から実行してこれらの作業実績を前記通信ネット
ワークを介して前記サーバの記憶装置に格納し、これら
格納された作業実績の内、前記プロジェクトにおける設
計者または開発者単位での少なくとも日または週または
月単位の作業実績と少なくとも日または週または月単位
で設計者または開発者が作業を行う予定になっているに
も係らず作業実績が登録されていないこととを前記通信
ネットワークを介して所望の作業端末の表示手段に表示
し、実際設計者または開発者が作業を実行していた場合
には、作業端末に接続された入力手段を用いて作業実績
を入力して前記通信ネットワークを介して前記サーバの
記憶装置に格納することを特徴とする設計・開発の進捗
管理方法。
5. A design or development work performed by a designer or a developer in a design or development project using a design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network. The content is executed from a desired work terminal using a desired tool or hardware to be used, and these work records are stored in the storage device of the server via the communication network, and among these stored work records, At least daily, weekly, or monthly work results in the designer or developer unit of the project and at least the designer's or developer's work results at least in days, weeks, or months Is displayed on the display means of the desired work terminal via the communication network, and the actual designer Is characterized in that, when a developer is executing a work, the work record is input using an input means connected to a work terminal and stored in a storage device of the server via the communication network. Design / development progress management method.
【請求項6】サーバに複数の作業端末を通信ネットワー
クで接続して構成される設計・開発の進捗管理システム
を使用して、設計または開発プロジェクトにおいて設計
者または開発者が行う設計または開発の作業内容を所望
の使用ツールまたは使用ハードウェアを用いて所望の作
業端末から実行してこれらの作業実績を前記通信ネット
ワークを介して前記サーバの記憶装置に格納し、これら
格納された作業実績の内、前記プロジェクトにおける設
計者または開発者単位での少なくとも日または週または
月単位の作業実績を前記通信ネットワークを介して所望
の作業端末の表示手段に表示し、該表示された作業実績
に対して設計者または開発者が入力手段を用いて確認す
ることを特徴とする設計・開発の進捗管理方法。
6. A design or development work performed by a designer or a developer in a design or development project using a design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network. The contents are executed from a desired work terminal using a desired tool or hardware to be used, and these work results are stored in the storage device of the server via the communication network, and among the stored work results, A work record of at least a day, a week, or a month in the designer or developer unit in the project is displayed on the display means of a desired work terminal via the communication network, and the designer with respect to the displayed work record. Alternatively, a design / development progress management method characterized in that the developer confirms using input means.
【請求項7】サーバに複数の作業端末を通信ネットワー
クで接続して構成される設計・開発の進捗管理システム
を使用して、設計または開発プロジェクトにおいて設計
者または開発者が行う設計または開発の作業内容を所望
の使用ツールまたは使用ハードウェアを用いて所望の作
業端末から実行してこれらの作業実績を前記通信ネット
ワークを介して前記サーバの記憶装置に格納し、これら
格納された作業実績の内、前記プロジェクトにおける設
計者または開発者単位での少なくとも日または週または
月単位の作業実績を前記通信ネットワークを介して所望
の作業端末の表示手段に表示し、該表示された作業実績
に対して設計者または開発者が確認して正しい場合には
その旨を入力手段を用いて入力し、間違いがある場合に
は入力手段を用いて作業実績に対して修正を加えて、正
しい作業実績を前記通信ネットワークを介して前記サー
バの記憶装置に格納することを特徴とする設計・開発の
進捗管理方法。
7. A design or development work performed by a designer or a developer in a design or development project using a design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network. The content is executed from a desired work terminal using a desired tool or hardware to be used, and these work records are stored in the storage device of the server via the communication network, and among these stored work records, A work record of at least a day, a week, or a month in the designer or developer unit in the project is displayed on the display means of a desired work terminal via the communication network, and the designer with respect to the displayed work record. Alternatively, if the developer confirms and is correct, use the input means to input the fact, and if there is a mistake, use the input means. With the modification to the working performance, tracking method of design and development of a correct work record via the communication network and storing, in a storage device of the server.
【請求項8】サーバに複数の作業端末を通信ネットワー
クで接続して構成される設計・開発の進捗管理システム
を使用して、所望の作業端末において、表示手段に管理
すべき作業内容をその管理指標と共に表示し、該表示手
段に表示された作業内容を所望の使用ツールまたは使用
ハードウェアを用いて開始した際、作業内容と作業開始
時刻とをモニタリング処理して作業終了を入力されない
限り前記システムをログアウトできないように制御する
ことを特徴とする設計・開発の進捗管理方法。
8. A design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network, and managing the work content to be managed on a display means at a desired work terminal. The system is displayed together with the index, and when the work content displayed on the display means is started using a desired tool or hardware used, the system is monitored unless the work content and the work start time are monitored and the work end is input. A progress management method for design / development, which is characterized by controlling not to log out.
【請求項9】サーバに複数の作業端末を通信ネットワー
クで接続して構成される設計・開発の進捗管理システム
を使用して、設計または開発プロジェクトにおいて設計
者または開発者が行う設計または開発の作業を所望の使
用ツールまたは使用ハードウェアを用いて所望の作業端
末から実行してこれらの作業実績を前記通信ネットワー
クを介して前記サーバの記憶装置に格納し、これら格納
された作業実績の内、前記プロジェクトにおける設計者
または開発者単位での少なくとも日または週または月単
位の作業実績と、作業実績を把握できなかった時間帯
に、進捗状況を把握すべき時間帯が存在する場合には、
進捗報告の要求とを前記通信ネットワークを介して所望
の作業端末の表示手段に表示することを特徴とする設計
・開発の進捗管理方法。
9. A design or development work performed by a designer or a developer in a design or development project using a design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network. Is executed from a desired work terminal using a desired use tool or use hardware, and these work results are stored in the storage device of the server via the communication network. Among these stored work results, the If there is at least one day, week, or month work record in the designer or developer unit in the project and a time frame when the work record could not be grasped, if there is a time zone in which the progress status should be grasped,
A progress management method for design / development, comprising displaying a progress report request and a display means of a desired work terminal via the communication network.
【請求項10】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発の進捗管理システ
ムを使用して、設計または開発プロジェクトにおいて設
計者または開発者が行う設計または開発の作業を所望の
使用ツールまたは使用ハードウェアを用いて所望の作業
端末から実行してこれらの作業実績を前記通信ネットワ
ークを介して前記サーバの記憶装置に格納し、これら格
納された作業実績の内、前記プロジェクトにおける設計
者または開発者単位での少なくとも日または週または月
単位の作業実績と、作業実績を把握できなかった時間帯
に、進捗状況を把握すべき時間帯が存在する場合には、
進捗報告の要求とを前記通信ネットワークを介して所望
の作業端末の表示手段に表示し、該表示された進捗報告
の要求に基づいて前記作業端末の入力手段を用いて進捗
報告を行うことを特徴とする設計・開発の進捗管理方
法。
10. A design or development work performed by a designer or a developer in a design or development project using a design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network. Is executed from a desired work terminal using a desired use tool or use hardware, and these work results are stored in the storage device of the server via the communication network. Among these stored work results, the If there is at least one day, week, or month work record in the designer or developer unit in the project and a time frame when the work record could not be grasped, if there is a time zone in which the progress status should be grasped,
A progress report request is displayed on the display means of a desired work terminal via the communication network, and a progress report is made using the input means of the work terminal based on the displayed progress report request. Design and development progress management method.
【請求項11】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発の進捗管理システ
ムを使用して、設計または開発プロジェクトにおいて設
計者または開発者が行う設計または開発の作業の作業計
画を所望の作業端末における入力手段を用いて入力して
前記通信ネットワークを介して前記サーバの記憶装置に
格納し、前記設計または開発プロジェクトにおいて設計
者または開発者が行う設計または開発の作業を所望の使
用ツールまたは使用ハードウェアを用いて所望の作業端
末から実行してこれらの作業実績を前記通信ネットワー
クを介して前記サーバの記憶装置に格納し、これら格納
された作業計画と作業実績とから検索される前記プロジ
ェクトにおける設計者または開発者単位での作業内容に
対応した少なくとも日または週または月単位の進捗状況
を前記通信ネットワークを介して所望の作業端末の表示
手段に表示することを特徴とする設計・開発の進捗管理
方法。
11. A design or development work performed by a designer or a developer in a design or development project using a design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network. Of the work plan is input using an input means in a desired work terminal, stored in the storage device of the server via the communication network, and the design or development work performed by the designer or developer in the design or development project. Is executed from a desired work terminal using a desired tool or hardware to be used, and these work results are stored in the storage device of the server via the communication network. At least corresponding to the work contents of each designer or developer in the project searched from Tracking method of design and development, which comprises displaying the progress of the day or week or month on a display unit of a desired work terminal via the communication network.
【請求項12】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発の進捗管理システ
ムであって、 設計または開発プロジェクトにおいて設計者または開発
者が行う設計または開発の作業内容を所望の使用ツール
または使用ハードウェアを用いて実行する所望の作業端
末を設け、 該所望の作業端末において実行された作業実績を前記通
信ネットワークを介して格納する記憶装置と該記憶装置
に格納された作業実績から前記プロジェクトにおける設
計者または開発者単位での作業内容に対応した少なくと
も日または週または月単位の進捗状況を検索する計算手
段とを有するサーバを設け、 該サーバの計算手段で検索された進捗状況を前記通信ネ
ットワークを介して表示する表示手段を有する作業端末
を設けたことを特徴とする設計・開発の進捗管理システ
ム。
12. A design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network, wherein the design or development work performed by a designer or a developer in a design or development project. Is provided with a desired work terminal that executes the desired work tool or hardware, and a storage device that stores the work record executed by the desired work terminal via the communication network, and a storage device that is stored in the storage device. A server having a calculating means for searching the progress status of at least a day, a week, or a month corresponding to the work contents of the designer or developer in the project from the work record is provided, and is searched by the calculating means of the server. It is characterized in that a work terminal having a display means for displaying the progress status obtained through the communication network is provided. Progress management system of design and development to.
【請求項13】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発の進捗管理システ
ムであって、 設計または開発プロジェクトにおいて設計者または開発
者が行う設計または開発の作業内容を所望の使用ツール
または使用ハードウェアを用いて実行する所望の作業端
末を設け、 該所望の作業端末において実行された作業実績を前記通
信ネットワークを介して格納する記憶装置と該記憶装置
に格納された作業実績から前記プロジェクトにおける設
計者または開発者単位での作業内容に対応した少なくと
も日または週または月単位の進捗状況を検索または算出
する計算手段とを有するサーバを設け、 該サーバの計算手段で検索または算出された進捗状況を
前記通信ネットワークを介して表示する表示手段と進捗
データを入力して前記通信ネットワークを介して前記サ
ーバの記憶装置に格納する入力手段とを有する作業端末
を設けたことを特徴とする設計・開発の進捗管理システ
ム。
13. A design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network, wherein the contents of design or development work performed by a designer or a developer in a design or development project. Is provided with a desired work terminal for executing using a desired tool or hardware used, and a storage device for storing the work record executed by the desired work terminal via the communication network, and a storage device stored in the storage device. A server having a calculating means for searching or calculating at least daily, weekly, or monthly progress corresponding to the work contents of each designer or developer in the project based on the work record is provided. Display means and progress data for displaying the retrieved or calculated progress status via the communication network Tracking system design and development, characterized in that a work terminal having input means for storing input to the storage device of the server via the communication network.
【請求項14】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発の進捗管理システ
ムであって、 設計または開発プロジェクトにおいて設計者または開発
者が行う設計または開発の作業内容を所望の使用ツール
または使用ハードウェアを用いて実行し、管理されてい
る作業内容の作業終了を入力する入力手段を有する所望
の作業端末を設け、 該所望の作業端末において実行された作業実績を前記通
信ネットワークを介して格納する記憶装置と該記憶装置
に格納された作業実績から作業内容における作業開始時
刻前までの進捗度と作業開始時刻から作業終了時刻まで
の作業時間と該作業時間において指標となる予測進捗度
とを算出する計算手段とを有するサーバを設け、 該サーバの計算手段で算出された作業内容における作業
開始時刻前までの進捗度と作業時間と予測進捗度とを前
記通信ネットワークを介して表示する表示手段と前記作
業時間における作業の実施結果に対応した進捗度を入力
する入力手段とを有する作業端末を設け、該作業端末の
入力手段を用いて入力された進捗度を前記通信ネットワ
ークを介して前記サーバの記憶装置に格納するように構
成したことを特徴とする設計・開発の進捗管理システ
ム。
14. A design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network, wherein the contents of design or development work performed by a designer or a developer in a design or development project. Is performed using a desired tool or hardware to be used, and a desired work terminal having an input means for inputting the end of work of the work content being managed is provided, and the work record of the work performed at the desired work terminal is provided. A storage device to be stored via the communication network, the degree of progress from the work record stored in the storage device to the work start time before the work content, the work time from the work start time to the work end time, and an index in the work time A server having a calculation means for calculating the estimated progress degree is provided, and the work content calculated by the calculation means of the server is added. A display unit for displaying the progress level up to the work start time, the work time and the predicted progress level via the communication network, and the input unit for inputting the progress level corresponding to the execution result of the work in the work time. A progress management system for design / development, characterized in that a work terminal is provided, and a progress degree input using an input means of the work terminal is stored in a storage device of the server via the communication network. .
【請求項15】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発の進捗管理システ
ムであって、 設計または開発プロジェクトにおいて設計者または開発
者が行う設計または開発の作業内容を所望の使用ツール
または使用ハードウェアを用いて実行する所望の作業端
末を設け、 該所望の作業端末において実行された作業実績を前記通
信ネットワークを介して格納する記憶装置と該記憶装置
に格納された作業実績から前記プロジェクトにおける設
計者または開発者単位での作業実績を算出する計算手段
とを有するサーバを設け、 該サーバの計算手段で算出された作業実績を前記通信ネ
ットワークを介して表示する表示手段を有する作業端末
を設けたことを特徴とする設計・開発の進捗管理システ
ム。
15. A design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network, wherein the contents of design or development work performed by a designer or a developer in a design or development project. Is provided with a desired work terminal for executing using a desired tool or hardware used, and a storage device for storing the work record executed by the desired work terminal via the communication network, and a storage device stored in the storage device. A display having a server having a calculation means for calculating the work result for each designer or developer in the project from the work result obtained, and displaying the work result calculated by the calculation means of the server via the communication network A design / development progress management system characterized in that a work terminal having means is provided.
【請求項16】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発の進捗管理システ
ムであって、 設計または開発プロジェクトにおいて設計者または開発
者が行う設計または開発の作業内容を所望の使用ツール
または使用ハードウェアを用いて実行する所望の作業端
末を設け、 該所望の作業端末において実行された作業実績を前記通
信ネットワークを介して格納する記憶装置と該記憶装置
に格納された作業実績から前記プロジェクトにおける設
計者または開発者単位での作業実績と少なくとも日また
は週または月単位で設計者または開発者が作業を行う予
定になっているにも係らず作業実績が登録されていない
こととを算出する計算手段とを有するサーバを設け、 該サーバの計算手段で算出された作業実績と作業実績が
登録されていないこととを前記通信ネットワークを介し
て表示する表示手段と実際設計者または開発者が作業を
実行していた場合には、この作業実績を入力する入力手
段とを有する作業端末を設け、該作業端末の入力手段で
入力された作業実績を前記通信ネットワークを介して前
記サーバの記憶装置に格納するように構成したことを特
徴とする設計・開発の進捗管理システム。
16. A design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network, wherein the design or development work performed by a designer or a developer in a design or development project. Is provided with a desired work terminal for executing using a desired tool or hardware used, and a storage device for storing the work record executed by the desired work terminal via the communication network, and a storage device stored in the storage device. Based on the work performance, the work performance is registered in the above-mentioned project by the designer or developer and the work performance is registered even though the designer or developer is scheduled to work at least on a daily, weekly or monthly basis. A server having a calculation means for calculating the absence and presence is provided, and the work record and the work calculated by the calculation means of the server A work terminal having a display means for displaying that the achievement is not registered via the communication network and an input means for inputting the work record when the designer or the developer is actually performing the work. And a work record input by the input means of the work terminal is stored in the storage device of the server via the communication network.
【請求項17】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発の進捗管理システ
ムであって、 設計または開発プロジェクトにおいて設計者または開発
者が行う設計または開発の作業内容を所望の使用ツール
または使用ハードウェアを用いて実行する所望の作業端
末を設け、 該所望の作業端末において実行された作業実績を前記通
信ネットワークを介して格納する記憶装置と該記憶装置
に格納された作業実績から前記プロジェクトにおける設
計者または開発者単位での少なくとも日または週または
月単位の作業実績を算出する計算手段とを有するサーバ
を設け、 該サーバの計算手段で算出された作業実績を前記通信ネ
ットワークを介して読出して表示する表示手段と該表示
手段に表示された作業実績に対して確認情報を入力する
入力手段とを有する作業端末を設けたことを特徴とする
設計・開発の進捗管理システム。
17. A design / development progress management system configured by connecting a plurality of work terminals to a server through a communication network, wherein the contents of design or development work performed by a designer or a developer in a design or development project. Is provided with a desired work terminal that executes the desired work tool or hardware, and a storage device that stores the work record executed by the desired work terminal via the communication network, and a storage device that is stored in the storage device. A server having a calculation means for calculating at least daily, weekly, or monthly work results for each designer or developer in the project from the work results is provided, and the work results calculated by the calculation means of the server are described above. The display means for reading out and displaying via the communication network and the work record displayed on the display means are confirmed. Tracking system design and development, characterized in that a work terminal having input means for inputting information.
【請求項18】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発の進捗管理システ
ムであって、 管理すべき作業内容をその管理指標と共に表示する表示
手段を有し、該表示手段に表示された作業内容を所望の
使用ツールまたは使用ハードウェアを用いて開始した
際、作業内容と作業開始時刻とをモニタリング処理して
作業終了を入力されない限り前記システムをログアウト
できないように制御する作業端末を備えたことを特徴と
する設計・開発の進捗管理システム。
18. A progress management system for design / development, comprising a plurality of work terminals connected to a server via a communication network, comprising display means for displaying work contents to be managed together with management indicators thereof. When the work content displayed on the display means is started using a desired tool or hardware to be used, the work content and work start time are monitored so that the system cannot be logged out unless the work end is input. A progress management system for design and development, which is equipped with a control work terminal.
【請求項19】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発の進捗管理システ
ムであって、 設計または開発プロジェクトにおいて設計者または開発
者が行う設計または開発の作業を所望の使用ツールまた
は使用ハードウェアを用いて実行する所望の作業端末を
設け、 該所望の作業端末において実行された作業実績を前記通
信ネットワークを介して格納する記憶装置と該記憶装置
に格納された作業実績から前記プロジェクトにおける設
計者または開発者単位での少なくとも日または週または
月単位の作業実績を算出し、作業実績を把握できなかっ
た時間帯に、進捗状況を把握すべき時間帯が存在するか
否かを算出して存在する場合には、進捗報告の要求を作
成する計算手段とを有するサーバを設け、 該サーバの計算手段で算出された作業実績と作成された
進捗報告の要求とを前記通信ネットワークを介して表示
する表示手段と該表示手段に表示された進捗報告の要求
に基づいて進捗報告を行う入力手段とを有する作業端末
を備えたことを特徴とする設計・開発の進捗管理システ
ム。
19. A design / development progress management system configured by connecting a plurality of work terminals to a server via a communication network, the design / development work being performed by a designer or a developer in a design or development project. A storage device that is provided with a desired work terminal that is executed by using a desired tool or hardware that is used, and stores the work record of the work performed by the desired work terminal via the communication network, and the storage device that is stored in the storage device. At least the day, week, or month work results for each designer or developer in the project are calculated from the work results, and there is a time zone in which the progress status should be known in the time zone when the work results could not be grasped. If there is a server that has a calculation means for creating a request for a progress report when it is calculated and exists, the server is provided. Display means for displaying, through the communication network, the work record calculated by the calculation means and the created progress report request; and an input means for making a progress report based on the progress report request displayed on the display means. A design / development progress management system characterized by having a work terminal having
【請求項20】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、設計・開発プロジェクトを複数の製品単位に分け、
分けられた製品を複数の設計工程で構成し、該各設計工
程を成果物作成可能な複数の作業項目単位で分けて定義
し、この定義された作業項目単位で作業の進捗状況を所
望の作業端末の表示手段に対して提示することを特徴と
する設計・開発プロジェクトの管理方法。
20. A design / development project management method for managing work in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. , Design / development projects are divided into multiple product units,
Divided products are composed of a plurality of design processes, each design process is defined by being divided into a plurality of work item units capable of producing deliverables, and the progress status of the work is calculated by the defined work item unit as desired work. A design / development project management method characterized by presenting to a display means of a terminal.
【請求項21】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、設計・開発プロジェクトにおける製品・設計工程で
行うべき作業項目に関係する作業成果物の一覧を所望の
作業端末の表示手段に表示して提示することを特徴とす
る設計・開発プロジェクトの管理方法。
21. A design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. A method for managing a design / development project, characterized in that a list of work products related to work items to be performed in a product / design process in a design / development project is displayed and presented on a display means of a desired work terminal.
【請求項22】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、設計・開発プロジェクトにおける製品・設計工程で
行うべき作業項目毎の作業実績を、ツールまたはハード
ウエアを使用した時刻または時間に基づいて取得するこ
とを特徴とする設計・開発プロジェクトの管理方法。
22. A design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. , A method for managing a design / development project, characterized in that the work record for each work item to be performed in the product / design process in the design / development project is acquired based on the time or time when the tool or the hardware is used.
【請求項23】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、取得されたツールまたはハードウエアを使用した時
刻または時間に対して追加・修正して日単位で設計・開
発リソース毎の作業実績を管理することを特徴とする設
計・開発プロジェクトの管理方法。
23. A design / development project management method for managing work in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. A method for managing a design / development project, characterized in that the work record of each design / development resource is managed on a daily basis by adding / correcting the time or time when the acquired tool or hardware is used.
【請求項24】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、作業計画と作業実績とに基づいて設計・開発リソー
スまたは設計・開発リソースのグループ毎に得られる作
業負荷状況を所望の作業端末の表示手段に提示して設計
・開発プロジェクトにおける作業負荷状況を管理するこ
とを特徴とする設計・開発プロジェクトの管理方法。
24. A design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. , Manages the workload status in a design / development project by presenting the workload status obtained for each design / development resource or each group of design / development resources on the display means of the desired work terminal based on the work plan and work performance A method of managing a design / development project characterized by:
【請求項25】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、設計・開発プロジェクトにおける日程計画と実際の
作業実績または予測もしくは推定される作業実績とを比
較して遅れが発生した場合または遅れが予測される場合
には警告を所望の作業端末から出力することを特徴とす
る設計・開発プロジェクトの管理方法。
25. A design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. , Output a warning from a desired work terminal when a delay occurs or a delay is predicted by comparing a schedule plan in a design / development project with actual work results or predicted or estimated work results. Management method of design and development project characterized by.
【請求項26】前記比較を設計工程単位または作業項目
単位で行うことを特徴とする請求項25記載の設計・開
発プロジェクトの管理方法。
26. The design / development project management method according to claim 25, wherein the comparison is performed in design process units or work item units.
【請求項27】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、設計・開発プロジェクトにおける作業の実績状況を
日程計画と合わせて所望の作業端末の表示手段に対して
表示することを特徴とする設計・開発プロジェクトの管
理方法。
27. A design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. A method for managing a design / development project, characterized in that the actual status of work in the design / development project is displayed on a display means of a desired work terminal together with a schedule.
【請求項28】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、新規設計・開発プロジェクトにおいてリストアップ
された製品・設計工程と、このリストアップされた製品
・設計工程における日程計画または工数情報もしくは作
業量とを所望の作業端末の表示手段に対して提示するこ
とを特徴とする設計・開発プロジェクトの管理方法。
28. A design / development project management method for managing work in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. The product / design process listed in the new design / development project and the schedule or man-hour information or the work amount in the product / design process listed are presented to the display means of the desired work terminal. Management method of design and development project characterized by.
【請求項29】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、所望の作業端末の表示手段に対して、日或いは週或
いは月或いは半年或いは年の単位で設計・開発プロジェ
クトにおける作業負荷状況を提示して設計・開発プロジ
ェクトの日程計画を作成または変更することを特徴とす
る設計・開発プロジェクトの管理方法。
29. A design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. , To create or change the schedule of a design / development project by presenting the work load status in the design / development project on a daily, weekly, monthly, semi-annual or yearly basis to the display means of the desired work terminal. How to manage characteristic design and development projects.
【請求項30】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、新規設計・開発プロジェクトに必要な工数情報また
はリソース数情報を算出し、この算出された新規設計・
開発プロジェクトに必要な工数情報またはリソース数情
報と既存の製品・設計プロジェクトに対して割り当てて
いる工数情報またはリソース数情報とプロジェクト業務
以外の作業量およびその未来の予測値とを日或いは週或
いは月或いは半年或いは年の単位で所望の作業端末の表
示手段に対して提示することを特徴とする設計・開発プ
ロジェクトの管理方法。
30. A design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. Calculate the man-hour information or resource number information required for a new design / development project, and calculate the calculated new design /
The man-hour information or resource number information necessary for the development project, the man-hour information or resource number information allocated to the existing product / design project, the work amount other than the project work, and the future predicted value are set to day, week, or month. Alternatively, a design / development project management method characterized by presenting to a display means of a desired work terminal on a half-yearly or yearly basis.
【請求項31】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、新規設計・開発プロジェクトにおける作業計画を作
成する際、該新規設計・開発プロジェクトにおける各製
品・設計工程で行うべき作業項目に対してリソースが割
り当てられているか否かを所望の作業端末の表示手段に
対して提示することを特徴とする設計・開発プロジェク
トの管理方法。
31. A design / development project management method for managing work in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. When a work plan for a new design / development project is created, it is possible to display whether or not resources are allocated to work items to be performed in each product / design process in the new design / development project, on a desired work terminal display means. A method of managing a design / development project characterized by being presented to
【請求項32】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、新規設計・開発プロジェクトにおける作業計画を作
成する際、該新規設計・開発プロジェクトにおける各製
品・設計工程で行うべき作業項目の内、特殊作業項目に
ついてはこの特殊作業項目を実行するのに適するリソー
ス候補を所望の作業端末の表示手段に対して提示し、該
提示されたリソース候補からリソースを選定して割り当
てることを特徴とする設計・開発プロジェクトの管理方
法。
32. A design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. , When creating a work plan for a new design / development project, of the work items to be performed in each product / design process in the new design / development project, the special work item is a resource suitable for executing this special work item. A method of managing a design / development project, characterized by presenting a candidate to a display unit of a desired work terminal and selecting and allocating a resource from the presented resource candidates.
【請求項33】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、新規設計・開発プロジェクトにおける作業計画を作
成する際、該新規設計・開発プロジェクトにおける各製
品・設計工程で行うべき作業項目に対して割り当てるリ
ソースの能力に応じた予想工数に変更して前記リソース
を割り当てることを特徴とする設計・開発プロジェクト
の管理方法。
33. A design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. , When creating a work plan for a new design / development project, change the resource to the expected man-hours according to the ability of resources to be assigned to work items to be performed in each product / design process in the new design / development project Design and development project management method characterized by allocation.
【請求項34】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、設計・開発プロジェクトを複数の製品単位に分け、
分けられた製品を複数の設計工程で構成し、該各設計工
程を成果物作成可能な複数の作業項目単位で分けて定義
し、この定義された作業項目単位で作業を実行する際、
前記作業項目毎または設計工程毎に対して入力される作
業指示事項と該作業指示事項に対して入力される回答情
報とを所望の作業端末の表示手段に提示して前記作業項
目毎または設計工程毎の作業指示を管理することを特徴
とする設計・開発プロジェクトの管理方法。
34. A design / development project management method for managing work in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. , Design / development projects are divided into multiple product units,
When the divided products are composed of a plurality of design processes, each design process is defined by being divided into a plurality of work item units capable of producing deliverables, and the work is executed in the defined work item units,
The work instruction items input for each work item or each design process and the reply information input for the work instruction items are presented on the display means of the desired work terminal to display each work item or each design process. A method of managing a design / development project, characterized by managing work instructions for each.
【請求項35】サーバに複数の作業端末を通信ネットワ
ークで接続して構成される設計・開発プロジェクト管理
システムを使用して設計・開発プロジェクトにおける作
業管理を行う設計・開発プロジェクトの管理方法であっ
て、設計・開発プロジェクトを複数の製品単位に分け、
分けられた製品を複数の設計工程で構成し、該各設計工
程を成果物作成可能な複数の作業項目単位で分けて定義
し、この定義された作業項目または設計工程の待ち条件
を入力して設定し、所定の作業項目または設計工程を遂
行する際、前記入力されて設定された待ち条件が成立し
たとき警告を所定の作業端末から出力して待ち条件を管
理することを特徴とする設計・開発プロジェクトの管理
方法。
35. A design / development project management method for performing work management in a design / development project using a design / development project management system configured by connecting a plurality of work terminals to a server via a communication network. , Design / development projects are divided into multiple product units,
Divided products are composed of multiple design processes, each design process is defined separately for each work item that can create deliverables, and the defined work items or waiting conditions for the design process are input. When setting and performing a predetermined work item or design process, a warning is output from a predetermined work terminal when the inputted and set waiting condition is satisfied, and the waiting condition is managed. How to manage development projects.
【請求項36】サーバに複数の作業端末を通信ネットワ
ークで接続して構成され、設計・開発プロジェクトにお
ける作業管理を行う設計・開発プロジェクト管理システ
ムであって、設計・開発プロジェクトを複数の製品単位
に分け、分けられた製品を複数の設計工程で構成し、該
各設計工程を成果物作成可能な複数の作業項目単位で分
けて定義した情報を格納する格納手段を前記サーバに備
え、前記定義された作業項目単位で作業の進捗状況を取
得する取得手段を所望の作業端末に備え、前記所得手段
で取得された作業項目単位で作業の進捗状況を提示する
表示手段を所望の作業端末に備えたことを特徴とする設
計・開発プロジェクトの管理システム。
36. A design / development project management system configured to connect a plurality of work terminals to a server via a communication network, and performing work management in a design / development project, wherein the design / development project is divided into a plurality of product units. The server is provided with a storage unit that stores information that is configured by dividing each divided product into a plurality of design processes and dividing each design process into a plurality of work item units capable of creating deliverables. The desired work terminal is equipped with an acquisition means for acquiring the work progress status for each work item, and the desired work terminal is provided with a display means for presenting the work progress status for each work item acquired by the income means. Management system for design / development projects.
JP23603296A 1995-09-11 1996-09-06 Progress control method for design and development and its system, control method for designing and developing project and its system Pending JPH09138823A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23603296A JPH09138823A (en) 1995-09-11 1996-09-06 Progress control method for design and development and its system, control method for designing and developing project and its system

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP7-232947 1995-09-11
JP23294795 1995-09-11
JP23603296A JPH09138823A (en) 1995-09-11 1996-09-06 Progress control method for design and development and its system, control method for designing and developing project and its system

Publications (1)

Publication Number Publication Date
JPH09138823A true JPH09138823A (en) 1997-05-27

Family

ID=26530754

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23603296A Pending JPH09138823A (en) 1995-09-11 1996-09-06 Progress control method for design and development and its system, control method for designing and developing project and its system

Country Status (1)

Country Link
JP (1) JPH09138823A (en)

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10254759A (en) * 1997-03-12 1998-09-25 Toshiba Corp Concurrent engineering supporting device and its method
JPH11259575A (en) * 1998-03-13 1999-09-24 Toshiba Corp Product constitution and process management system and method
EP1005037A4 (en) * 1998-06-19 2001-03-21 Dainippon Ink & Chemicals Optical disk and method of manufacturing optical disk
JP2001184401A (en) * 1999-12-24 2001-07-06 Nec Corp Method and device for grasping operation state, and recording medium
JP2002213080A (en) * 2001-01-16 2002-07-31 Pc Network Plaza:Kk Work management method for construction work
JP2002236788A (en) * 2001-02-09 2002-08-23 Kawasaki Steel Corp Project progress management device for computer aided design
JP2003006398A (en) * 2001-06-19 2003-01-10 Nec Corp Project management supporting method, system and program
JP2003091588A (en) * 2001-09-19 2003-03-28 Hitachi Software Eng Co Ltd Method and system for supporting medical examination business
JP2004078037A (en) * 2002-08-21 2004-03-11 Cad Center:Kk Progress managing method and progress managing program for three-dimensional city model generation, recording medium with recorded progress managing program, and progress management server
US7039480B2 (en) 2004-03-25 2006-05-02 Toshiba Solutions Corporation Planning operation management support system, and planning operation management support program
JP2006172328A (en) * 2004-12-20 2006-06-29 Token Corp Business management system and business management program
JP2007058703A (en) * 2005-08-26 2007-03-08 Matsushita Electric Ind Co Ltd Project management system
JP2008134840A (en) * 2006-11-28 2008-06-12 Zuken Inc Information processing unit, and method therefor
JP2011090459A (en) * 2009-10-21 2011-05-06 Prime Japan Co Ltd Account settlement business promotion system
JP2011090607A (en) * 2009-10-26 2011-05-06 Prime Japan Co Ltd Account settlement business support system
JP2011090608A (en) * 2009-10-26 2011-05-06 Prime Japan Co Ltd Account settlement business support system
US8223369B2 (en) 2008-06-13 2012-07-17 Fuji Xerox Co., Ltd. Information processing apparatus, information processing system and computer readable medium
JP2013097742A (en) * 2011-11-04 2013-05-20 Higashi Nihon Medicom Kk Progress confirmation system of work procedure
JP2014142861A (en) * 2013-01-25 2014-08-07 Hitachi Ltd Work item management system and work item management file
CN104112174A (en) * 2013-04-17 2014-10-22 中广核工程有限公司 Project regulating and controlling method and system of nuclear power plant
WO2018047256A1 (en) * 2016-09-07 2018-03-15 三菱電機株式会社 Information processing device, information processing method and information processing program
KR20180102066A (en) * 2015-11-11 2018-09-14 에플란 소프트웨어 앤드 서비스 게엠베하 운트 코. 카가. Method and corresponding device for developing an assembly having at least one mechatronic component
JP2019061619A (en) * 2017-09-28 2019-04-18 株式会社オービック Balance management device, balance management method, and balance management program
JP2019159540A (en) * 2018-03-09 2019-09-19 富士ゼロックス株式会社 Information processing apparatus and information processing program
JP2020046811A (en) * 2018-09-18 2020-03-26 株式会社Ihi Processing plan indication device
JP2020181574A (en) * 2019-04-24 2020-11-05 株式会社エイチ・ピィ・ピィ・ティ Information processor, method for processing information, and program
CN112204589A (en) * 2018-06-12 2021-01-08 神钢建机株式会社 Construction management system and construction management method
JP2021068321A (en) * 2019-10-25 2021-04-30 菱洋エレクトロ株式会社 Information processing system, information processing method, and information processing program
JP2022015852A (en) * 2020-07-10 2022-01-21 株式会社日立Ictビジネスサービス Information processing system and information processing method
JP7255030B1 (en) * 2022-03-08 2023-04-10 日揮グローバル株式会社 Management device, management method, management program, and recording medium

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10254759A (en) * 1997-03-12 1998-09-25 Toshiba Corp Concurrent engineering supporting device and its method
JPH11259575A (en) * 1998-03-13 1999-09-24 Toshiba Corp Product constitution and process management system and method
EP1005037A4 (en) * 1998-06-19 2001-03-21 Dainippon Ink & Chemicals Optical disk and method of manufacturing optical disk
JP2001184401A (en) * 1999-12-24 2001-07-06 Nec Corp Method and device for grasping operation state, and recording medium
JP2002213080A (en) * 2001-01-16 2002-07-31 Pc Network Plaza:Kk Work management method for construction work
JP2002236788A (en) * 2001-02-09 2002-08-23 Kawasaki Steel Corp Project progress management device for computer aided design
JP2003006398A (en) * 2001-06-19 2003-01-10 Nec Corp Project management supporting method, system and program
JP2003091588A (en) * 2001-09-19 2003-03-28 Hitachi Software Eng Co Ltd Method and system for supporting medical examination business
JP2004078037A (en) * 2002-08-21 2004-03-11 Cad Center:Kk Progress managing method and progress managing program for three-dimensional city model generation, recording medium with recorded progress managing program, and progress management server
US7039480B2 (en) 2004-03-25 2006-05-02 Toshiba Solutions Corporation Planning operation management support system, and planning operation management support program
JP2006172328A (en) * 2004-12-20 2006-06-29 Token Corp Business management system and business management program
JP2007058703A (en) * 2005-08-26 2007-03-08 Matsushita Electric Ind Co Ltd Project management system
JP2008134840A (en) * 2006-11-28 2008-06-12 Zuken Inc Information processing unit, and method therefor
US8223369B2 (en) 2008-06-13 2012-07-17 Fuji Xerox Co., Ltd. Information processing apparatus, information processing system and computer readable medium
JP2011090459A (en) * 2009-10-21 2011-05-06 Prime Japan Co Ltd Account settlement business promotion system
JP2011090608A (en) * 2009-10-26 2011-05-06 Prime Japan Co Ltd Account settlement business support system
JP2011090607A (en) * 2009-10-26 2011-05-06 Prime Japan Co Ltd Account settlement business support system
JP2013097742A (en) * 2011-11-04 2013-05-20 Higashi Nihon Medicom Kk Progress confirmation system of work procedure
JP2014142861A (en) * 2013-01-25 2014-08-07 Hitachi Ltd Work item management system and work item management file
CN104112174A (en) * 2013-04-17 2014-10-22 中广核工程有限公司 Project regulating and controlling method and system of nuclear power plant
US10810328B2 (en) 2015-11-11 2020-10-20 EPLAN Software & Service GmbH & Co. KG Method for developing an assembly which has at least one mechatronic component, and a corresponding arrangement
KR20180102066A (en) * 2015-11-11 2018-09-14 에플란 소프트웨어 앤드 서비스 게엠베하 운트 코. 카가. Method and corresponding device for developing an assembly having at least one mechatronic component
JP2019502194A (en) * 2015-11-11 2019-01-24 イープラン ソフトウエア ウント サービス ゲーエムベーハー ウント コー. カーゲー Method for developing an assembly having at least one mechatronic component and apparatus corresponding thereto
WO2018047256A1 (en) * 2016-09-07 2018-03-15 三菱電機株式会社 Information processing device, information processing method and information processing program
JPWO2018047256A1 (en) * 2016-09-07 2018-09-06 三菱電機株式会社 Information processing apparatus, information processing method, and information processing program
JP2019061619A (en) * 2017-09-28 2019-04-18 株式会社オービック Balance management device, balance management method, and balance management program
JP2019159540A (en) * 2018-03-09 2019-09-19 富士ゼロックス株式会社 Information processing apparatus and information processing program
CN112204589A (en) * 2018-06-12 2021-01-08 神钢建机株式会社 Construction management system and construction management method
JP2020046811A (en) * 2018-09-18 2020-03-26 株式会社Ihi Processing plan indication device
JP2020181574A (en) * 2019-04-24 2020-11-05 株式会社エイチ・ピィ・ピィ・ティ Information processor, method for processing information, and program
JP2021068321A (en) * 2019-10-25 2021-04-30 菱洋エレクトロ株式会社 Information processing system, information processing method, and information processing program
JP2022015852A (en) * 2020-07-10 2022-01-21 株式会社日立Ictビジネスサービス Information processing system and information processing method
JP7255030B1 (en) * 2022-03-08 2023-04-10 日揮グローバル株式会社 Management device, management method, management program, and recording medium
WO2023170785A1 (en) * 2022-03-08 2023-09-14 日揮グローバル株式会社 Management device, management method, management program, and recording medium

Similar Documents

Publication Publication Date Title
JPH09138823A (en) Progress control method for design and development and its system, control method for designing and developing project and its system
US7062449B1 (en) Method and apparatus for planning and monitoring multiple tasks based on user defined criteria and predictive ability and for automatically detecting task related work
Bauer Shop floor control systems: from design to implementation
US7212986B1 (en) Method and apparatus for planning and monitoring multiple tasks based on user defined criteria and predictive ability
US5381332A (en) Project management system with automated schedule and cost integration
US5848394A (en) Method and system for producing a work breakdown structure for a project
Yates Construction decision support system for delay analysis
US7930201B1 (en) EDP portal cross-process integrated view
JP3832824B2 (en) Workflow server and workflow engine
US20060031840A1 (en) Real time monitoring manufacturing scheduling and control
Soibelman et al. Design review checking system with corporate lessons learned
JP7297817B2 (en) man hour system
US20020178036A1 (en) Project management method and project management system
JPH09259181A (en) Work flow managing system
US20090125368A1 (en) System and Method for Scheduling Work Orders
KR101845417B1 (en) Task management system and method for intellectual property right
US20020103620A1 (en) Apparatus management method, apparatus management system, and apparatus management program product
JPH03268098A (en) Building maintenance control system
US20030105657A1 (en) Personal resource management tool
US20030023597A1 (en) Methods and systems for automated project management
US20050182698A1 (en) Report generation and distribution system and method for a time and attendance recording system
Davis et al. A functional approach to designing architectures for CIM
JP2000039904A (en) Project management system
JP2006235872A (en) Project management apparatus
CN111666511A (en) Multi-level transaction display method, device and system

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20031224

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040223

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20040323