JP2002236788A - Project progress management device for computer aided design - Google Patents

Project progress management device for computer aided design

Info

Publication number
JP2002236788A
JP2002236788A JP2001034135A JP2001034135A JP2002236788A JP 2002236788 A JP2002236788 A JP 2002236788A JP 2001034135 A JP2001034135 A JP 2001034135A JP 2001034135 A JP2001034135 A JP 2001034135A JP 2002236788 A JP2002236788 A JP 2002236788A
Authority
JP
Japan
Prior art keywords
progress
milestone
project
work
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001034135A
Other languages
Japanese (ja)
Inventor
Takeo Kondo
武夫 近藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Steel Corp filed Critical Kawasaki Steel Corp
Priority to JP2001034135A priority Critical patent/JP2002236788A/en
Publication of JP2002236788A publication Critical patent/JP2002236788A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily realize checking of the omission of operation, confirming of operation contents and grasping of an operation progress situation. SOLUTION: Necessary operation and a schedule are set for every milestone in advance, and a document directory for the execution and operation finish of a command on a CAD sorted for every milestone is prepared. Then, check list after necessary operation, the next operation list and warning by a mail concerning the milestone passing over a schedule are performed automatically and the progress information of a project on the Web is updated automatically.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、コンピュータ支援
設計(CAD)用プロジェクト進捗管理装置に係り、特
に、大規模集積回路(LSI)設計用のCAD装置に用
いるのに好適な、作業もれのチェックや、以降の作業内
容の確認、及び、作業進捗状況の把握を容易に実現する
ことが可能な、CAD用プロジェクト進捗管理装置に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a computer aided design (CAD) project progress management apparatus, and more particularly to a work leakage suitable for use in a CAD apparatus for designing a large-scale integrated circuit (LSI). The present invention relates to a CAD project progress management device capable of easily realizing checks, confirmation of work contents thereafter, and grasp of work progress status.

【0002】[0002]

【従来の技術】回路設計、あるいは、半導体ベンダでの
チップ化の作業工程では、CAD装置上での回路設計だ
けでなく、仕様書や取扱説明書等の各種ドキュメントの
作成や、関連部署あるいは外部会社とのスケジュールの
調整等、様々な工程を、決められた期間で誤り無く実施
する必要がある。
2. Description of the Related Art In the process of circuit design or chip formation by a semiconductor vendor, not only circuit design on a CAD device, but also creation of various documents such as specifications and instruction manuals, related departments or external departments. Various processes, such as schedule adjustment with the company, need to be performed without errors in a fixed period.

【0003】従って従来は、通常、作業手順書と予定に
従って、作業の進捗管理と、作業もれがないかをチェッ
クリスト等で手作業で確認していた。
Therefore, conventionally, according to the work procedure manual and the schedule, the progress management of the work and whether there is any work omission have been manually checked by a checklist or the like.

【0004】[0004]

【発明が解決しようとする課題】しかしながら従来の方
法では、一人の担当者が複数の案件業務を担当していた
場合や、作業手順自体が相当多い場合には、多忙による
記入もれ等が生じて、作業もれ、あるいは、関連する作
業指示のもれ等により、計画に遅延等が生ずるという問
題点を有していた。
However, according to the conventional method, when one person is in charge of a plurality of project tasks or when the work procedure itself is considerably large, missing entries due to busyness may occur. Therefore, there is a problem that a plan is delayed due to work leakage or leakage of related work instructions.

【0005】本発明は、前記従来の問題点を解消するべ
くなされたもので、担当者が入力作業を行わなくても、
作業もれのチェックや、以降の作業内容の確認、及び、
作業進捗状況の把握を容易に実現可能とすることを課題
とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned conventional problems.
Check for work leaks, check the contents of subsequent work, and
An object of the present invention is to make it possible to easily grasp the work progress.

【0006】[0006]

【課題を解決するための手段】本発明は、コンピュータ
支援設計用のプロジェクト進捗管理装置であって、プロ
ジェクト情報のテンプレートを生成するプロジェクト情
報テンプレート生成装置と、マイルストーン毎に、作業
項目、作成ドキュメント、予定(開始と終了日)と実績
(開始と終了日)及び進捗メール送付アドレスを設定す
るマイルストーン設定・変更装置と、マイルストーン情
報が付加されたコンピュータ支援設計用コマンドが実
行、あるいは、ドキュメントディレクトリ内の終了ディ
レクトリ内のドキュメントが更新される毎に、前記マイ
ルストーン設定・変更装置の実績欄を更新し、同時に進
捗情報報告装置の更新を促す進捗情報更新装置と、該進
捗情報更新装置が更新されるか、又は、指定された期間
内において、最近終了したマイルストーンの終了作業に
関する作業チェックリストと、次のマイルストーンの作
業リスト及び予定を越えているマイルストーンの作業に
関する定期的な警告を、指定されたアドレスへ電子メー
ルで送信する進捗情報報告装置とを備え、作業もれと作
業前の事前確認及び全体の進捗管理を自動的に監視する
ようにして、前記課題を解決したものである。
SUMMARY OF THE INVENTION The present invention relates to a project progress management device for computer-aided design, comprising: a project information template generation device for generating a template of project information; A milestone setting / change device that sets the schedule (start and end dates), results (start and end dates), and the progress mailing address, and executes a computer-aided design command to which milestone information is added, or documents Each time a document in the end directory in the directory is updated, the progress column of the milestone setting / change device is updated, and at the same time, a progress information updating device for prompting the update of the progress information reporting device; Renewed or recently completed within a specified time period A progress information reporting device that sends an e-mail to the specified address with a work checklist for the completed work of the milestone, a work list for the next milestone, and a periodic warning about the work for the milestone that is beyond schedule The above-mentioned problem is solved by automatically monitoring work leakage, advance confirmation before work, and overall progress management.

【0007】又、前記プロジェクト情報が、プロジェク
トコード、設計ディレクトリとコンピュータ支援設計用
テンプレートファイル、ドキュメントディレクトリとド
キュメントのテンプレート、更に、進捗情報をインター
ネットのウェブ上に掲載する際には、ウェブ表示言語用
ディレクトリとウェブ表示言語のテンプレートファイル
を含むようにしたものである。
When the project information includes a project code, a design directory and a template file for computer-aided design, a document directory and a template for the document, and further, when the progress information is posted on the Internet web, the It includes a directory and template files for the web display language.

【0008】又、前記進捗情報報告装置が、インターネ
ットのウェブ上に掲載された進捗情報を更新するように
して、遠隔地からも容易に監視できるようにしたもので
ある。
Further, the progress information reporting device updates the progress information posted on the Internet web, so that it can be easily monitored from a remote place.

【0009】[0009]

【発明の実施の形態】以下図面を参照して、本発明の実
施形態を詳細に説明する。
Embodiments of the present invention will be described below in detail with reference to the drawings.

【0010】本実施形態は、図1に示す如く、例えばL
SI用のCAD装置10に関して、例えばプロジェクト
コード24、設計ディレクトリ26とCAD用テンプレ
ートファイル、ドキュメントディレクトリ28とドキュ
メントのテンプレート及びウェブ表示言語(例えばHT
ML)用のHTMLディレクトリ30とHTMLのテン
プレートファイル等のプロジェクト情報のテンプレート
22を作成するプロジェクト情報テンプレート生成装置
20と、例えば全ての回路のRTL記述が完了したRT
L完了、仮配線長での検証を行うファーストサインオ
フ、実配線長での検証を行うセカンドサインオフ、仮配
線又は実配線での客先データ受領であるデータリリース
等のマイルストーン毎に、作業項目、作成ドキュメン
ト、予定(開始と終了日)と実績(開始と終了日)及び
進捗メール送付アドレスを設定するマイルストーン設定
・変更装置40と、マイルストーン情報が付加されたL
SI設計用CADコマンドが実行、あるいは、ドキュメ
ントディレクトリ28内の終了ディレクトリ内のドキュ
メントが更新される毎に、前記マイルストーン設定・変
更装置40の実績欄を更新し、同時に、後出進捗情報報
告装置44の更新を促す進捗情報更新装置42と、該進
捗情報更新装置42が更新されるか、又は、指定された
期間内において、最近終了したマイルストーンの終了作
業に関する作業チェックリストと、次のマイルストーン
の作業リスト及び予定を越えているマイルストーンの作
業に関する定期的な警告を、指定されたアドレスへ電子
メールで送出し、同時に、ウェブ上の進捗情報を更新す
る進捗情報報告装置44とを備えている。
In this embodiment, as shown in FIG.
Regarding the CAD device 10 for SI, for example, the project code 24, the design directory 26 and the CAD template file, the document directory 28 and the document template and the web display language (for example, HT
A project information template generating device 20 for creating a project information template 22 such as an HTML directory 30 for HTML (ML) and an HTML template file, and an RT in which RTL descriptions of all circuits are completed, for example.
Work is performed for each milestone, such as completion of L, first sign-off for verification with provisional wiring length, second sign-off for verification with actual wiring length, and data release, which is reception of customer data by provisional or actual wiring. A milestone setting / change device 40 for setting items, created documents, schedules (start and end dates) and results (start and end dates), and a progress mailing address, and L to which milestone information is added
Every time the SI design CAD command is executed or the document in the end directory in the document directory 28 is updated, the result column of the milestone setting / change device 40 is updated. 44, a progress information updating device 42 for prompting the updating of the progress information 44, a work checklist relating to the completion work of the recently completed milestone in which the progress information updating device 42 is updated or within a designated period, A progress information reporting device 44 for sending an e-mail of a work list of stones and a regular warning regarding work of milestones exceeding schedule to a designated address, and simultaneously updating progress information on the web; ing.

【0011】以下、本実施形態の作用を説明する。Hereinafter, the operation of the present embodiment will be described.

【0012】まず、新規プロジェクトが発生すると、プ
ロジェクト情報テンプレート生成装置20は、プロジェ
クトに関して、進捗管理を行うためのスケジュール表と
して、図2に示すようなテンプレートを自動的に生成す
る。
First, when a new project is generated, the project information template generating device 20 automatically generates a template as shown in FIG. 2 as a schedule table for managing the progress of the project.

【0013】更に、プロジェクト毎に、マイルストーン
設定・変更装置40で、マイルストーンと、その作業項
目を設定する。マイルストーンの例を図3に示す。ここ
では、当該マイルストーンがファーストサインオフ、直
前のマイルストーンがデータリリース、次のマイルスト
ーンがセカンドサインオフの例を示しており、作業項目
を示すACTIONでは、使用ツールがTOOLの項
に、使用ドキュメントがDOCの項に記載されている。
更に、送付メールアドレスを示すMAILでは、進捗管
理のための責任者(manager)にメールを送ると共に、
その写しを設計担当者(taro)にも送るようにしてい
る。
Further, a milestone and its work items are set by the milestone setting / changing device 40 for each project. FIG. 3 shows an example of a milestone. In this example, the milestone is the first sign-off, the immediately preceding milestone is the data release, and the next milestone is the second sign-off. Documents are listed in the DOC section.
In addition, MAIL indicating the sending mail address sends an e-mail to the manager for progress management (manager),
A copy is also sent to the designer (taro).

【0014】この状態で、CAD装置10上でコマンド
が実行されるか、あるいは、ドキュメントディレクトリ
28の作成済みディレクトリ(上記例では図2の6行目
のDOCS/CLOSEにある完成済みドキュメント)
が更新されると、進捗情報更新装置42は、前記マイル
ストーン設定・変更装置40を呼び出し、図4に示す如
く、実績(開始日、実行中、終了日)を更新する。図4
において、日付を示すDATEの始めには予定日が入っ
ており、予定日に続く括弧内に実績日が自動的に入る。
In this state, a command is executed on the CAD device 10, or a directory created in the document directory 28 (completed document in DOCS / CLOSE on the sixth line in FIG. 2 in the above example).
Is updated, the progress information update device 42 calls the milestone setting / change device 40, and updates the results (start date, execution, end date) as shown in FIG. FIG.
In, the scheduled date is entered at the beginning of DATE indicating the date, and the actual date is automatically entered in parentheses following the scheduled date.

【0015】進捗情報報告装置44は、次の各場合に応
じて、指定されたアドレスへ、以下に示す内容で電子メ
ールを送付する。又、全ての変更について、インターネ
ット上のWWWディレクトリのHTMLで記述された進
捗情報を更新する。
The progress information reporting device 44 sends an e-mail to the designated address according to the following cases, with the following contents. In addition, for all changes, the progress information described in HTML in the WWW directory on the Internet is updated.

【0016】即ち、(1)マイルストーン設定・変更装
置40の内容が更新された場合には、更新がマイルスト
ーンの完了である場合は、完了したマイルストーンの作
業完了チェックリストと次のマイルストーンの作業リス
トを送付する。
(1) When the content of the milestone setting / change device 40 is updated, when the update is the completion of the milestone, the work completion checklist of the completed milestone and the next milestone Send a work list.

【0017】又、(2)予定を一定期間経過したマイル
ストーンがある場合には、予定したマイルストーンが予
定を越えた旨、メールを送出して、遅れを警告する。
[0017] (2) If there is a milestone for which the schedule has passed for a predetermined period, a mail is sent to the effect that the planned milestone has exceeded the schedule, and a delay is warned.

【0018】なお、前記実施形態においては、本発明
が、LSI設計用のCAD装置に適用されていたが、本
発明の適用対象はこれに限定されず、一般のCAD装置
にも同様に適用可能である。
In the above embodiment, the present invention is applied to a CAD device for LSI design. However, the application of the present invention is not limited to this, and the present invention is similarly applicable to a general CAD device. It is.

【0019】[0019]

【発明の効果】本発明によれば、作業者の入力に頼るこ
となく、CADで必要な多くの工程を自動的に管理し、
作業もれを軽減し、且つ、進捗管理を自動的に実施する
ことで、管理工数を削減することが可能となる。
According to the present invention, many processes required in CAD are automatically managed without relying on input from an operator,
It is possible to reduce management man-hours by reducing work leakage and automatically performing progress management.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係るLSI設計用のCAD装置のプロ
ジェクト進捗管理装置の構成を示すブロック図
FIG. 1 is a block diagram showing a configuration of a project progress management device of a CAD device for LSI design according to the present invention.

【図2】前記実施形態におけるプロジェクト情報テンプ
レートの例を示す線図
FIG. 2 is a diagram showing an example of a project information template in the embodiment.

【図3】同じくマイルストーンの例を示す線図FIG. 3 is a diagram showing an example of a milestone.

【図4】同じくマイルストーンの更新例を示す線図FIG. 4 is a diagram showing an example of updating milestones.

【符号の説明】[Explanation of symbols]

10…コンピュータ支援設計(CAD)装置 20…プロジェクト情報テンプレート生成装置 22…プロジェクトテンプレート 24…プロジェクトコード 26…設計ディレクトリ 28…ドキュメントディレクトリ 30…HTMLディレクトリ 40…マイルストーン設計・変更装置 42…進捗情報更新装置 44…進捗情報報告装置 DESCRIPTION OF SYMBOLS 10 ... Computer-aided design (CAD) apparatus 20 ... Project information template generation apparatus 22 ... Project template 24 ... Project code 26 ... Design directory 28 ... Document directory 30 ... HTML directory 40 ... Milestone design / change apparatus 42 ... Progress information update apparatus 44… Progress information reporting device

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】コンピュータ支援設計用のプロジェクト進
捗管理装置であって、 プロジェクト情報のテンプレートを生成するプロジェク
ト情報テンプレート生成装置と、 マイルストーン毎に、作業項目、作成ドキュメント、予
定(開始と終了日)と実績(開始と終了日)及び進捗メ
ール送付アドレスを設定するマイルストーン設定・変更
装置と、 マイルストーン情報が付加されたコンピュータ支援設計
用コマンドが実行、あるいは、ドキュメントディレクト
リ内の終了ディレクトリ内のドキュメントが更新される
毎に、前記マイルストーン設定・変更装置の実績欄を更
新し、同時に進捗情報報告装置の更新を促す進捗情報更
新装置と、 該進捗情報更新装置が更新されるか、又は、指定された
期間内において、最近終了したマイルストーンの終了作
業に関する作業チェックリストと、次のマイルストーン
の作業リスト及び予定を越えているマイルストーンの作
業に関する定期的な警告を、指定されたアドレスへ電子
メールで送信する進捗情報報告装置とを備え、 作業もれと作業前の事前確認及び全体の進捗管理を自動
的に監視することを特徴とするコンピュータ支援設計用
プロジェクト進捗管理装置。
1. A project progress management device for computer-aided design, comprising: a project information template generation device for generating a project information template; a work item, a created document, and a schedule (start and end dates) for each milestone. A milestone setting / change device that sets the actual and actual (start and end dates) and the progress mail sending address, and executes the computer-aided design command with the added milestone information, or the document in the end directory in the document directory Each time is updated, a progress information update device that updates the performance column of the milestone setting / change device and simultaneously prompts an update of the progress information report device; and that the progress information update device is updated or designated. The end of the most recently completed milestone within the A work checklist for completed work, and a progress information reporting device that sends an e-mail to the designated address with a work list for the next milestone and a periodic warning about work for milestones that are beyond schedule. A project progress management device for computer-aided design, which automatically monitors work leakage, advance confirmation before work, and overall progress management.
【請求項2】前記プロジェクト情報が、プロジェクトコ
ード、設計ディレクトリとコンピュータ支援設計用テン
プレートファイル、ドキュメントディレクトリとドキュ
メントのテンプレート、更に、進捗情報をインターネッ
トのウェブ上に掲載する際には、ウェブ表示言語用ディ
レクトリとウェブ表示言語のテンプレートファイルを含
むことを特徴とする請求項1に記載のコンピュータ支援
設計用プロジェクト進捗管理装置。
2. The method according to claim 1, wherein the project information includes a project code, a design directory and a template file for computer-aided design, a document directory and a template for the document, and a progress display information on a web display language when the progress information is posted on the Internet. The apparatus of claim 1, further comprising a directory and a template file in a web display language.
【請求項3】前記進捗情報報告装置が、インターネット
のウェブ上に掲載された進捗情報を更新するようにされ
ていることを特徴とする請求項1又は2に記載のコンピ
ュータ支援設計用プロジェクト進捗管理装置。
3. The computer-aided design project progress management according to claim 1, wherein the progress information reporting device updates the progress information posted on the Internet web. apparatus.
JP2001034135A 2001-02-09 2001-02-09 Project progress management device for computer aided design Pending JP2002236788A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001034135A JP2002236788A (en) 2001-02-09 2001-02-09 Project progress management device for computer aided design

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001034135A JP2002236788A (en) 2001-02-09 2001-02-09 Project progress management device for computer aided design

Publications (1)

Publication Number Publication Date
JP2002236788A true JP2002236788A (en) 2002-08-23

Family

ID=18897793

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001034135A Pending JP2002236788A (en) 2001-02-09 2001-02-09 Project progress management device for computer aided design

Country Status (1)

Country Link
JP (1) JP2002236788A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005128742A (en) * 2003-10-23 2005-05-19 Nippon Digital Kenkyusho:Kk Electronic income tax data generating and confirming method, electronic income tax operation processing apparatus, and program
US8028294B2 (en) 2004-08-31 2011-09-27 International Business Machines Corporation Progress management for projects
KR101153018B1 (en) * 2004-06-15 2012-06-04 마이크로소프트 코포레이션 Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data
JP2012238069A (en) * 2011-05-10 2012-12-06 Mitsubishi Electric Corp Progress management device, progress management system, progress management method and progress management program
CN111192003A (en) * 2019-12-05 2020-05-22 北京直真科技股份有限公司 Method for evaluating and calculating actual progress of special line project of passenger collector

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09101987A (en) * 1995-10-09 1997-04-15 Hitachi Ltd Project progress managing device
JPH09138823A (en) * 1995-09-11 1997-05-27 Hitachi Ltd Progress control method for design and development and its system, control method for designing and developing project and its system
JPH09138818A (en) * 1995-11-15 1997-05-27 Sekisui Chem Co Ltd Drawing management system
JPH09160950A (en) * 1995-12-07 1997-06-20 Sekisui Chem Co Ltd Method for supporting design
JPH1083415A (en) * 1996-09-06 1998-03-31 Computer Tekunika:Kk Design progress management device
JPH10177568A (en) * 1996-12-17 1998-06-30 Hitachi Ltd Document management system and storing medium for managing document
JPH10240797A (en) * 1997-02-25 1998-09-11 Hitachi Ltd System and method for assisting process control
JPH1139397A (en) * 1997-07-24 1999-02-12 Hitachi Ltd Method for managing inspection schedule
JP2000003378A (en) * 1998-06-16 2000-01-07 Hitachi Ltd Progress situation grasping system for logic circuit design
JP2000242490A (en) * 1999-02-19 2000-09-08 Pfu Ltd Software development managing device, information presenting device, and program recording medium

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09138823A (en) * 1995-09-11 1997-05-27 Hitachi Ltd Progress control method for design and development and its system, control method for designing and developing project and its system
JPH09101987A (en) * 1995-10-09 1997-04-15 Hitachi Ltd Project progress managing device
JPH09138818A (en) * 1995-11-15 1997-05-27 Sekisui Chem Co Ltd Drawing management system
JPH09160950A (en) * 1995-12-07 1997-06-20 Sekisui Chem Co Ltd Method for supporting design
JPH1083415A (en) * 1996-09-06 1998-03-31 Computer Tekunika:Kk Design progress management device
JPH10177568A (en) * 1996-12-17 1998-06-30 Hitachi Ltd Document management system and storing medium for managing document
JPH10240797A (en) * 1997-02-25 1998-09-11 Hitachi Ltd System and method for assisting process control
JPH1139397A (en) * 1997-07-24 1999-02-12 Hitachi Ltd Method for managing inspection schedule
JP2000003378A (en) * 1998-06-16 2000-01-07 Hitachi Ltd Progress situation grasping system for logic circuit design
JP2000242490A (en) * 1999-02-19 2000-09-08 Pfu Ltd Software development managing device, information presenting device, and program recording medium

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005128742A (en) * 2003-10-23 2005-05-19 Nippon Digital Kenkyusho:Kk Electronic income tax data generating and confirming method, electronic income tax operation processing apparatus, and program
JP4601937B2 (en) * 2003-10-23 2010-12-22 株式会社日本デジタル研究所 Electronic reporting data creation confirmation method, electronic reporting business processing device, and program
KR101153018B1 (en) * 2004-06-15 2012-06-04 마이크로소프트 코포레이션 Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data
US8028294B2 (en) 2004-08-31 2011-09-27 International Business Machines Corporation Progress management for projects
JP2012238069A (en) * 2011-05-10 2012-12-06 Mitsubishi Electric Corp Progress management device, progress management system, progress management method and progress management program
CN111192003A (en) * 2019-12-05 2020-05-22 北京直真科技股份有限公司 Method for evaluating and calculating actual progress of special line project of passenger collector
CN111192003B (en) * 2019-12-05 2023-07-18 北京直真科技股份有限公司 Actual progress evaluation calculation method for special line project of passenger collection

Similar Documents

Publication Publication Date Title
US6984198B2 (en) Experiment management system, method and medium
US7606628B2 (en) Design and manufacturing management system, method, and program
JP4399127B2 (en) Document management method and apparatus, processing program therefor, and storage medium storing the same
KR20090025271A (en) Customizable parameter user interface
JP5451086B2 (en) Workflow management apparatus, method, and program
JP2008257316A (en) Information processing system and information processing program
WO2008150613A1 (en) Methods and systems for managing electronic work instructions for manufacture of product
JPH06332712A (en) Data processing system having object
JP2002236788A (en) Project progress management device for computer aided design
JP6054008B1 (en) Data management apparatus, data management method, and data management program
JP2006285473A (en) Manufacturing process management system
US20060106660A1 (en) Route input system
JP4527937B2 (en) Development management method, development management system, development management program, and recording medium recording the program
JP2007213508A (en) Production planning system and method of manufacturing semiconductor device
JP2024004548A (en) Board design system and board design method
JP4466575B2 (en) Design support system, design support method, and design support program
JP2001312412A (en) System and method for job scheduling
JP2006268226A (en) Management system, and its management method
JP4751755B2 (en) Design change management system
JP2010140396A (en) File compatibility confirming system, file compatibility confirming method and program
JP2002297849A (en) Schedule preparation support device and schedule preparation support system
JPH08137923A (en) Design data managing system for cad system
JP4658185B2 (en) Development management system, development management program, and recording medium recording the development management program
JP2002092209A (en) Maintenance and inspection information management system
JPH06309390A (en) Update history managing method for design data

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20080207

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080207

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20080207

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20080207

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080418

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100614

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100622

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100819

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110510

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20110913