JP4527937B2 - Development management method, development management system, development management program, and recording medium recording the program - Google Patents
Development management method, development management system, development management program, and recording medium recording the program Download PDFInfo
- Publication number
- JP4527937B2 JP4527937B2 JP2002350607A JP2002350607A JP4527937B2 JP 4527937 B2 JP4527937 B2 JP 4527937B2 JP 2002350607 A JP2002350607 A JP 2002350607A JP 2002350607 A JP2002350607 A JP 2002350607A JP 4527937 B2 JP4527937 B2 JP 4527937B2
- Authority
- JP
- Japan
- Prior art keywords
- design change
- design
- development
- phase
- change
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000011161 development Methods 0.000 title claims description 120
- 238000007726 management method Methods 0.000 title description 8
- 230000008859 change Effects 0.000 claims description 356
- 238000013461 design Methods 0.000 claims description 259
- 238000012356 Product development Methods 0.000 claims description 8
- 238000010586 diagram Methods 0.000 description 27
- 238000004519 manufacturing process Methods 0.000 description 20
- 238000000034 method Methods 0.000 description 5
- 238000012545 processing Methods 0.000 description 5
- 238000004891 communication Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 230000007704 transition Effects 0.000 description 4
- 125000002066 L-histidyl group Chemical group [H]N1C([H])=NC(C([H])([H])[C@](C(=O)[*])([H])N([H])[H])=C1[H] 0.000 description 3
- 230000006872 improvement Effects 0.000 description 3
- 239000000470 constituent Substances 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 238000012552 review Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000007639 printing Methods 0.000 description 1
- HOWHQWFXSLOJEF-MGZLOUMQSA-N systemin Chemical compound NCCCC[C@H](N)C(=O)N[C@@H](CCSC)C(=O)N[C@@H](CCC(N)=O)C(=O)N[C@@H]([C@@H](C)O)C(=O)N[C@@H](CC(O)=O)C(=O)OC(=O)[C@@H]1CCCN1C(=O)[C@H]1N(C(=O)[C@H](CC(O)=O)NC(=O)[C@H](CCCN=C(N)N)NC(=O)[C@H](CCCCN)NC(=O)[C@H](CO)NC(=O)[C@H]2N(CCC2)C(=O)[C@H]2N(CCC2)C(=O)[C@H](CCCCN)NC(=O)[C@H](CO)NC(=O)[C@H](CCC(N)=O)NC(=O)[C@@H](NC(=O)[C@H](C)N)C(C)C)CCC1 HOWHQWFXSLOJEF-MGZLOUMQSA-N 0.000 description 1
- 108010050014 systemin Proteins 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、製造業における各種製品の開発業務を管理する方法及びシステム、並び開発業務を管理するためのプログラム等に関し、主としてコンピュータを用いた業務管理技術の分野に属する。
【0002】
【従来の技術】
製造業における各種商製品の開発は、その企画から始まり、設計方針や設計仕様の決定、概略設計、詳細設計、1次試作、量産試作等の各過程を経由し、その後、量産に移行することになるが、開発が終了し、量産へ移行した後、当該製品のライフサイクルが終了するまでには、製造現場や市場等において各種の不具合や改良点が見出される場合が少なくない。この場合、仕様や設計の見直しが行われ、これに伴って改めて設計作業、試作作業等が行われることになるが、このような開発終了後における設計等の見直しは著しいコストの上昇を招き、ひいては当該企業の競争力向上の妨げとなる。
【0003】
このような実情に対し、設計開発の段階で、できるだけ完成度の高い製品開発を目指し、量産後の設計変更を極力抑制しようとする試みが行われており、例えば特許文献1には、下記のようなコンピュータを用いた設計支援システムが開示されている。
【0004】
つまり、この支援システムは、設計仕様に基づき、予め設計の評価担当者が抽出した設計に対する要望事項や、過去の製品開発において設計変更を要した不具合の事例及びその解決策等を設計に反映させる要件事項情報として電子ファイル化してサーバに登録すると共に、具体的な設計業務に際しては、設計仕様に応じて対応する要件事項情報を上記サーバから抽出して設計者に提示し、設計者がこの要件事項情報を参照して詳細設計を行うようになっている。
【0005】
【特許文献1】
特開2002−197122号公報
【発明が解決しようとする課題】
上記公報に開示されたシステムでは、設計時に、その設計に対する要望事項や、過去の不具合及びこれに対する設計変更の事例が反映されるから、最終図面の出図時における完成度が向上することが期待できる。
【0006】
しかし、そのためには、評価担当者が設計仕様に対して要望事項を遺漏なく指摘する必要があり、担当者が未熟でその指摘が不十分であると、出図後或いは量産後の設計変更を招くことになる。また、過去の設計変更の事例が多数存在することを前提とするので、これが不十分な場合、設計図面の完成度の向上が期待できず、出図後或いは量産後に設計の見直しが必要となる。
【0007】
そこで、本発明は設計変更に関する定量的な管理を導入することにより、熟練した評価担当者がいなくても、或いは同種製品の多数の設計変更の事例がなくても、完成度の高い開発を実現可能とすることを課題とする。
【0008】
【課題を解決するための手段】
上記課題を解決するため、本発明は次のように構成したことを特徴とする。
【0009】
まず、本願の請求項1に記載の発明は、製品開発業務の完成度を管理する開発管理システムに関するものであって、予め開発対象製品のライフサイクル中に発生が予想される設計変更の件数に基づいて開発期間中の設計変更の目標件数と設計変更指摘の目標件数とをフェーズごとにそれぞれ設定する設計変更目標件数設定手段及び設計変更指摘目標件数設定手段と、上記製品の開発期間中に発生した設計変更をフェーズごとに記録する設計変更記録手段と、上記製品の開発期間中に発生した設計変更指摘をフェーズごとに記録する設計変更指摘記録手段と、上記設計変更記録手段に記録されている設計変更のフェーズごとの実件数と上記設計変更目標件数設定手段で設定された設計変更のフェーズごとの目標件数との差、及び、上記設計変更指摘記録手段に記録されている設計変更指摘のフェーズごとの実件数と上記設計変更指摘目標件数設定手段で設定された設計変更指摘のフェーズごとの目標件数との差を表示する開発完成度表示手段と、フェーズを次に進行させるフェーズ進行手段とを有することを特徴とする。
【0010】
つまり、このシステムは、製品の企画から開発、量産への移行を経て市場に投入され、その後、市場から撤退するまでのライフサイクル中に、例えばその製品の分野に応じて或いは新規開発か改良開発か等の開発態様に応じて、ほぼ一定件数の設計変更が発生するという知見に基づくものであり、全ライフサイクル期間中に発生が予想される件数の設計変更をできるだけ開発期間中に前倒しして実行させることにより、開発の完成度を向上させようとするものである。
【0011】
これを図27を用いて説明すると、従来は、破線で示すように、企画から量産移行(開発終了)を経てライフサイクル終了までの各期間に分散して設計変更の必要性が発生していたのであるが、これらの設計変更のうちには、開発段階で予想可能であったものが少なくない。そこで、全ライフサイクル期間を通じて発生するほぼ一定件数と考えられる設計変更の件数に基づいて、開発期間中に実行する目標件数を設定し、その目標件数と開発期間中の設計変更の実件数とを比較するようにしたのである。これにより、図27に実線で示すように、設計変更を開発期間中に前倒しして実行して、製品の開発終了時点での完成度を向上させることが可能となる。
【0012】
ここで、設計変更とは、設計図面を修正する狭義の設計変更だけでなく、商品企画、設計方針、設計仕様の変更等も含む概念をいう。
【0013】
その場合に、請求項1に記載の発明によれば、目標件数と実件数との差の表示は、設計変更の指摘件数と、その指摘に基づいて行われる設計変更自体の両方について行われることになる。したがって、例えば設計変更件数が不足する場合に、実際に行われた設計変更自体の不足として捉えたり、指摘件数の不足として捉えたり、或いはその両方の不足として捉えたりすることが可能となり、開発業務の完成度の管理の態様として、最適なものを選択することが可能となる。
【0014】
また、目標件数を開発期間中の各フェーズごとに設定し、そのフェーズごとに設計変更指摘及び設計変更の目標件数と実件数との差を表示するので、その差に基づき、完成度が十分であると判断したときに、フェーズ進行手段により当該フェーズを終了して、次のフェーズに進行することが可能となり、これにより、所定数の設計変更の指摘或いは設計変更がなされたかどうかがきめ細かく管理されることになり、開発終了時点での完成度が一層向上することになる。
【0015】
また、請求項2に記載の発明は、上記請求項1に記載のシステムにおいて、設計変更目標件数設定手段は、開発対象製品の構成要素ごとに設計変更の目標件数を設定し、設計変更指摘目標件数設定手段は、構成要素ごとに設計変更指摘の目標件数を設定し、設計変更記録手段は、構成要素ごとに設計変更を記録し、設計変更指摘記録手段は、構成要素ごとに設計変更指摘を記録し、かつ、開発完成度表示手段は、上記設計変更目標件数設定手段で設定された設計変更の構成要素及びフェーズごとの目標件数と上記設計変更記録手段に記録されている設計変更の構成要素及びフェーズごとの実件数との差、並びに、上記設計変更指摘目標件数設定手段で設定された設計変更指摘の構成要素及びフェーズごとの目標件数と上記設計変更指摘記録手段に記録されている設計変更指摘の構成要素及びフェーズごとの実件数との差を表示することを特徴とする。
【0016】
この発明によれば、全ライフサイクル期間を通じて発生するほぼ一定件数と考えられる設計変更が開発段階に前倒しすることが可能となると共に、開発期間の各フェーズごとに、及び開発対象製品の各構成要素ごとに、所定数の設計変更指摘や設計変更がなされたかどうかがきめ細かく表示されることになり、したがって、開発終了時点での完成度がさらに向上し、量産への移行後の設計変更の件数が一層低減されることになる。
【0017】
また、請求項3に記載の発明は、上記請求項1又は請求項2に記載のシステムにおいて、開発期間中に発生した各設計変更について、その指摘、実行指示、完了の各段階を記録する設計変更進捗記録手段と、該設計変更進捗記録手段に記録されている情報に基づいて各設計変更の作業進捗状況を表示する設計変更進捗表示手段とが備えられていることを特徴とする。
【0018】
この発明によれば、特定の設計変更が現在どのような状況にあるのか、具体的には、設計変更の必要性が指摘されただけで、その実行についての指示が未だ下されていない、或いは設計変更の指示が下されたが、その変更自体が未だ完了していない、或いは指摘された設計変更が完了した、といった進捗状況が表示されることになり、開発業務遂行の効率が向上することになる。
【0019】
そして、請求項4に記載の発明は、上記請求項1から請求項3のいずれかに記載のシステムにおいて、設計変更記録手段は、各設計変更の内容を発生したフェーズ及び対象となる構成要素と共に記録可能とされていると共に、該設計変更記録手段に記録されている情報に基づき、各フェーズにおける各構成要素の設計変更を検索する設計変更検索手段が備えられていることを特徴とする。
【0020】
この発明によれば、設計変更記録手段により設計変更の内容が発生したフェーズ或いは対象構成要素を特定して記録され、その内容がフェーズごとに、或いは対象構成要素ごとに検索されることになる。したがって、今回の設計変更を以後の同種製品の開発時に参考として利用する場合の利便性が向上することになる。
【0029】
さらに、請求項5に記載の発明は、製品開発業務の完成度を管理する開発管理用のプログラムに関するものであって、コンピュータを、予め開発対象製品のライフサイクル中に発生が予想される設計変更の件数に基づいて開発期間中の設計変更の目標件数と設計変更指摘の目標件数とをフェーズごとにそれぞれ設定する設計変更目標件数設定手段及び設計変更指摘目標件数設定手段、上記製品の開発期間中に発生した設計変更をフェーズごとに記録する設計変更記録手段、上記製品の開発期間中に発生した設計変更指摘をフェーズごとに記録する設計変更指摘記録手段、上記設計変更記録手段に記録されている設計変更のフェーズごとの実件数と上記設計変更目標件数設定手段で設定された設計変更のフェーズごとの目標件数との差、及び、上記設計変更指摘記録手段に記録されている設計変更指摘のフェーズごとの実件数と上記設計変更指摘目標件数設定手段で設定された設計変更指摘のフェーズごとの目標件数との差を表示する開発完成度表示手段、並びに、フェーズを次に進行させるフェーズ進行手段として機能させることを特徴とする。
【0030】
また、請求項6に記載の発明は、上記請求項5に記載のプログラムにおいて、コンピュータを設計変更目標件数設定手段として機能させるときは、開発対象製品の構成要素ごとに設計変更の目標件数を設定するように機能させ、設計変更指摘目標件数設定手段として機能させるときは、構成要素ごとに設計変更指摘の目標件数を設定するように機能させ、設計変更記録手段として機能させるときは、構成要素ごとに設計変更を記録するように機能させ、設計変更指摘記録手段として機能させるときは、構成要素ごとに設計変更指摘を記録するように機能させ、かつ、開発完成度表示手段として機能させるときは、上記設計変更目標件数設定手段で設定された設計変更の構成要素及びフェーズごとの目標件数と上記設計変更記録手段に記録されている設計変更の構成要素及びフェーズごとの実件数との差、並びに、上記設計変更指摘目標件数設定手段で設定された設計変更指摘の構成要素及びフェーズごとの目標件数と上記設計変更指摘記録手段に記録されている設計変更指摘の構成要素及びフェーズごとの実件数との差を表示するように機能させることを特徴とする。
【0031】
また、請求項7に記載の発明は、上記請求項5又は請求項6に記載のプログラムにおいて、コンピュータを、開発期間中に発生した各設計変更について、その指摘、実行指示、実行の各段階を記録する設計変更進捗記録手段、及び上記設計変更進捗記録手段に記録されている情報に基づいて各設計変更の作業進捗状況を表示する設計変更進捗表示手段として機能させることを特徴とする。
【0032】
そして、請求項8に記載の発明は、上記請求項5から請求項7のいずれかに記載のプログラムにおいて、コンピュータを設計変更記録手段として機能させるときは、各設計変更の内容を発生したフェーズ及び対象となる構成要素と共に記録するように機能させると共に、該コンピュータを、上記設計変更記録手段によって記録されている情報に基づき、各フェーズにおける各構成要素の設計変更を検索する設計変更検索手段として機能させることを特徴とする。
【0036】
上記請求項5から請求項8に記載の発明に係るプログラムは、上記請求項1から請求項4に記載のシステムにそれぞれ対応するもので、当該プログラムをコンピュータに適用して実行することにより、対応するシステムについての上記作用と同様の作用が得られる。
【0037】
さらに、請求項9に記載の発明は、上記請求項5から請求項8のいずれかに記載のプログラムを記録したコンピュータ読み取り可能な開発管理用プログラムの記録媒体に関し、この記録媒体をコンピュータに適用して、記録されているプログラムを実行させることにより、上記請求項1から請求項4に記載のシステムのうちの対応するシステムについての上記作用と同様の作用が得られる。
【0038】
【発明の実施の形態】
以下、本発明の実施の形態に係る開発管理システムについて説明する。なお、このシステムの動作は本発明に係る開発管理方法の実施の形態を構成し、また、このシステムを機能させるプログラムは本発明に係る開発管理用プログラムの実施の形態を構成する。
【0039】
図1は、このシステムの中心となるサーバコンピュータ(以下、「サーバ」という)10の構成を示すもので、このサーバ10は、中央処理装置11と、各種条件の設定やシステムの制御等に用いられる入力装置12と、プログラムやデータを記録する記録装置13と、入力画面や計算結果等を表示する表示装置14と、各種書類を発行する印刷装置15と、他のコンピュータとの通信を制御する通信制御装置16とを有し、該通信制御装置16により、インターネットやイントラネット等のネットワークシステム20を介して例えば当該開発プロジェクトの管理者や設計者等のクライアントコンピュータ(以下、「クライアント」という)21…21に接続されている。
【0040】
上記記録装置13は、図2に示すように、プログラム記録部13aとデータ記録部13bとを有し、プログラム記録部13aには、当該システムの作動に必要なプログラムが記録されており、また、データ記録部13bには、この実施の形態では、プロジェクトテーブル、機種構成要素テーブル、開発フェーズテーブル、変更目標数テーブル、変更指摘テーブル、変更指示テーブル、及び変更通知テーブルが記録されるようになっている。
【0041】
上記プロジェクトテーブルは、当該システムが管理するプロジェクトの一覧を記録するもので、図3に示すように、各プロジェクトごとに、コードと、名称と、開発対象製品の機種コードとを記録するようになっている。
【0042】
また、機種構成要素テーブルは、プロジェクトごとに開発対象製品の機種のユニット及び部位で示される構成要素のディレクトリ構造を記録するもので、図4に示すように、プロジェクトコードをキーとし、当該機種の各構成要素について、ユニットか部位かの階層と、名称と、要素コードと、下位要素(部位)である場合の上位要素(ユニット)の要素コードとを記録するようになっている。
【0043】
また、開発フェーズテーブルは、プロジェクトごとに開発期間中のフェーズを管理するもので、図5に示すように、プロジェクトコードをキーとし、各プロジェクトごとに設定されたフェーズと、各フェーズを終了させるイベントの実施予定日と、そのイベントの実際の実施日とを記録するようになっている。
【0044】
また、変更目標数テーブルは、当該プロジェクトの各フェーズ、各構成要素ごとに設計変更(企画変更や仕様変更等を含む)の目標件数を記録するもので、図6に示すように、プロジェクトコードをキーとし、フェーズ、構成コード、及び変更目標件数を記録するようになっている。
【0045】
また、変更指摘テーブルは、開発期間中の各フェーズにおいて設計変更の指摘があったときにその内容等を記録するもので、図7に示すように、変更指摘の発生時に自動的に付与される変更指摘コードをキーとして、当該プロジェクトのコード、指摘があったフェーズ及び日付、指摘者の所属部署及び氏名、指摘対象構成要素の要素コード、指摘目的、指摘内容、指摘理由、及び指摘個所を示す画像データのサーバ10の記録装置13における格納先のパス、並びに当該指摘に対して変更実行の指示が下され或いは指摘が却下されたときに「1」となる完了フラグの値が記録されるようになっている。
【0046】
また、変更指示テーブルは、指摘された設計変更に対してその実行の指示があったときにその指示内容等を記録するもので、図8に示すように、変更指示の発生時に自動的に付与される変更指示コードをキーとして、その指示の元となった変更指摘のコード、当該プロジェクトのコード、指示があったフェーズ及び日付、指示者の所属部署及び氏名、指示対象構成要素の要素コード、指示目的、指示内容、指示理由、並びに当該指示に基づく設計変更が完了したときに「1」となる完了フラグの値が記録されるようになっている。
【0047】
さらに、変更通知テーブルは、変更指示があった設計変更を完了し、その内容が関係部署に通知されたとき(具体的には設計変更通知書が作成されたとき)にその内容等を記録するもので、図9に示すように、変更通知の実行時に自動的に付与される変更通知コードをキーとして、その通知の元となった変更指示のコード、当該プロジェクトのコード、通知が行われたフェーズ及び日付、通知者の所属部署及び氏名、通知対象構成要素の要素コード、通知目的、通知内容、及び通知理由が記録されるようになっている。
【0048】
次に、サーバ10の記録装置13におけるプログラム記録部13aに記録されているプログラムによる当該システムの動作を説明する。
【0049】
まず、新規開発プロジェクトの立ち上げに際し、例えばプロジェクト管理者等(以下、「管理者等」という)が自らのクライアント21からサーバ10にアクセスすれば、該サーバ10の通信制御装置16からネットワーク20を介して上記クライアント21にWeb画面信号が送信され、その表示装置に図10に示す新規プロジェクト登録画面W1が表示される。そこで、管理者等は、この画面W1上で新規に立ち上げるプロジェクトの名称、コード、及び、該プロジェクトの開発対象製品の機種コードを入力する。
【0050】
また、管理者等は、次にクラインアント21の表示装置に表示される図11に示す機種構成登録画面W2上で、今回のプロジェクトの開発対象機種の構成要素を入力する。即ち、既に画面W1上で入力した機種コードの元に、今回の製品を構成するユニットの名称と、各ユニットに属する部位の名称とをディレクトリ構造を形成しながら入力する。
【0051】
また、管理者等は、次にクラインアント21の表示装置に表示される図12に示す開発フェーズ登録画面W3上で、今回のプロジェクトで設定される開発過程のフェーズを指定し、各フェーズごとにその終了イベントの実施予定日を入力する。
【0052】
さらに、管理者等は、次にクラインアント21の表示装置に表示される図13に示す変更目標数登録画面W4上で、上記のようにして設定した開発対象機種の構成要素ごと、及び開発フェーズごとに、設計変更の目標件数を設定する。その場合、この目標件数は、当該プロジェクトの対象製品に応じて、或いは新規開発か改良開発かなどの開発の態様に応じて設定される。また、この目標件数は実際に変更を実行する件数の目標値であり、例えばその1.5倍が変更指摘の目標件数とされる。
【0053】
以上のようにして、クライアント21の表示装置に順次表示される画面W1〜W4上で、管理者等によって入力されたプロジェクトに関するデータ、開発対象機種の構成要素に関するデータ、開発フェーズに関するデータ、及び変更目標件数に関するデータは、いずれもネットワーク20を経由してサーバ10に送信され、該サーバ10における記録装置13のデータ記録部13bに設けられている図3のプロジェクトテーブル、図4の機種構成要素テーブル、図5の開発フェーズテーブル、及び図6の変更目標数テーブルにそれぞれ記録される。これにより、新規プロジェクトの立ち上げ時の設定が終了する。
【0054】
次に、プロジェクト立ち上げ後の開発過程における設計変更時の当該システムの動作を説明する。
【0055】
今、例えば設計仕様作成フェーズにおいて、ある部位に関する設計変更(仕様変更)の必要性が生じたものとする。この場合、設計者もしくは設計総括責任者等(以下、「設計者等」という)が変更指摘者となり、変更指摘のために自らのクライアント21からサーバ10にアクセスすることになる。
【0056】
そして、サーバ10から送信されるWeb画面上で、プロジェクトの指定等、所定の入力操作を行えば、図14に示す機種構成要素画面W5が表示され、この画面W5に、図4の機種構成要素テーブルから読み出した当該プロジェクトの開発対象機種の各構成要素がディレクトリ構造で表示される。そこで、設計者等は、今回、変更指摘を行う構成要素のユニット名又は部位名を指定する。また、今回の操作が変更指摘のための操作であることを別途指定する。
【0057】
なお、上記機種構成要素画面W5の上部には、矢印aで示すように、現時点のフェーズが表示されるようになっている。
【0058】
この画面W5上で指定した構成要素が例えば(ユニット)ディスプレイの(部位)処理回路であったものとすると、図15に示す次の変更指摘作成画面W6に、そのユニット名及び部位名が表示される。そして、この画面W6上で、設計者等は、変更指摘の日付、自らの所属部署、氏名、設計変更の目的、内容及び理由を入力する。また、変更個所等を示す画像データが存在する場合には、サーバ10の記録装置13におけるその格納先のパスを入力する。
【0059】
これらのデータは、図7の変更指摘テーブルに記録される。その場合に、変更指摘コードが自動的に付与されて記録され、変更指摘日としてその日の日付が自動的に記録され、変更指摘者としての設計者等の所属や氏名が、使用されたクライアント21を識別することにより予め登録されている名簿から読み出されて自動的に記録され、また、完了フラグの値が、当該変更はいまだ実行の指示がなされておらず、かつ却下もされていないので、「0」と記録される。
【0060】
このようにして、設計者等により、いずれかのフェーズにおいて、いずれかの構成要素について変更の指摘がなされると、上記変更指摘テーブルに新たなレコードとして順次その内容等が追加記録されて行く。
【0061】
一方、指摘された変更を実行するか否かを決定する管理者等は、定期的に或いは適宜時期にどのような変更指摘がなされているかを確認する。
【0062】
つまり、自らのクライアント21からサーバ10にアクセスし、前述の機種構成要素画面W5で確認しようとする機種の構成要素を指定する等、所定の操作を行うことにより、図16に示すように、指定した構成要素、例えば(ユニット)ディスプレイの(部位)処理回路についての設計変更状況が表示された変更状況画面W7を表示する。
【0063】
この変更状況画面W7には、設計者等からの変更指摘があった項目の一覧、変更指摘に対して変更指示が行われた項目の一覧、及び変更指示に対して変更の完了を示す変更通知が行われた項目の一覧が、対応する項目を横に並べて、それぞれ日付と担当者の氏名とで表示されている。そこで、管理者等は、変更指摘項目のうち、変更指示が行われていないいずれかの項目を選択する。
【0064】
これにより、図17に示す変更指示画面W8が表示され、この画面W8に、当該変更指摘項目について図7の変更指摘テーブルに記録されている内容、即ち、例えば(ユニット)ディスプレイ−(部位)処理回路について、設計者等が図15の変更指摘画面W6上で入力した変更目的、変更内容、変更理由等が表示される。また、上記変更指摘テーブルに記録されているパスに従って、サーバ10の記録装置13における所定の格納場所から画像データが読み出され、該変更指示画面8に画像として表示される。
【0065】
そこで、管理者等は、この画面W8に表示された内容や画像を確認し、指摘された変更を実行するか否かを判断する。そして、変更の実行を指示するときは変更指示ボタンbをクリックする。これにより、画面W8上の変更指摘に関するデータは変更指示に関するデータとして、図8の変更指示テーブルに記録されることになる。
【0066】
その場合に、変更指示コードが自動的に付与されて記録され、変更指示日としてその日の日付が自動的に記録され、変更指示者としての管理者等の所属や氏名が、使用されたクライアントを識別することにより予め登録されている名簿から読み出されて自動的に記録され、完了フラグの値が、当該指示に対してはいまだ変更が実行されていないから、「0」と記録される。また、このとき、図7の変更指摘テーブルの当該変更指摘項目のレコードの完了フラグの欄に、変更指示があったことを示す「1」が記録される。
【0067】
なお、管理者等が、指摘された変更を却下するときは画面W8の変更却下ボタンcをクリックすることになる。この場合は、図8の変更指示テーブルには新たなレコードは作成されないが、図7の変更指摘テーブルの完了フラグの欄には「1」が記録される。
【0068】
次に、変更指摘を行った設計者等は、自らが行った変更指摘に対して管理者等の変更指示があったか否かを確認する。
【0069】
つまり、再びサーバ10にアクセスし、変更対象の構成要素を指定するなどの所定の操作を行えば、図16に示す前述の変更状況画面W7が表示される。この画面W7には、前述のように、変更指摘項目の一覧が表示されるが、変更指摘に対して変更指示が行われたときは、その変更指摘に対応させて変更指示の欄に指示の日付と指示者の氏名とが表示され、当該変更指摘に対して、変更指示があったことが示される。そして、この画面W7の当該変更指摘に対応する変更指示項目を選択すれば、次に図18に示す変更通知画面W9が表示され、この画面W9に、図8の変更指示テーブルから読み出された変更指示の内容や、パスによって指定された格納場所から読み出された画像等が表示される。なお、変更指摘が却下されたときは、上記変更状況画面W7にその旨が表示される。
【0070】
変更指示があった場合において、その内容や画像等が上記変更通知画面W9に表示されれば、設計者等は、その内容等が自ら指摘した変更指摘の内容等に対応するものであることを確認する。そして、その確認を行えば、自ら指摘し或いは管理者等に指示された変更内容通りに例えば仕様書を修正し或いは図面に訂正を加えるなどの所要の変更を行った上で、この変更通知画面W9の変更通知実行ボタンdをクリックする。
【0071】
このとき、図19に示す変更通知作成画面W10が表示され、この画面W10に、上記変更通知画面W9と同様に、図8の変更指示テーブルから読み出された変更指示の内容が表示される。この画面W10は表示内容の編集が可能な画面であり、設計者等はその表示内容を確認した上で必要な編集を行い、或いはそのままの状態で完了ボタンeをクリックする。
【0072】
これにより、図20に示すように、変更通知画面W10の表示内容が記入された変更通知書が自動的に作成されると共に、その画面W10の内容が図9の変更通知テーブルに記録される。その場合に、変更通知コードが自動的に付与されて記録され、変更通知日としてその日の日付が自動的に記録され、変更通知者としての設計者等の所属や氏名が、使用されたクライアントを識別することにより予め登録されている名簿から読み出されて自動的に記録される。また、このとき、図8の変更指示テーブルの当該変更指示項目のレコードの完了フラグの欄に、変更通知があったことを示す「1」が記録される。
【0073】
そして、上記設計変更通知書がファイルされ、或いは当該変更を反映するための作業が必要な部署に配布され、その設計変更が完了する。
【0074】
以上のようにして、各開発フェーズにおいて、設計変更の指摘、その指摘に対する設計変更実行の指示、その指示に対して設計変更を実行した旨の通知の各作業が当該開発対象機種のユニットや部位等の各構成要素ごとに行われ、図7〜図9に示す変更指摘テーブル、変更指示テーブル及び変更通知テーブルにそれぞれ記録されることになる。そして、これらの変更指摘ないし変更通知の実行件数が、各フェーズ、各構成要素ごとに、当該プロジェクトの立ち上げ時に設定された目標件数と比較され、当該フェーズにおける当該構成要素についての開発完成度が表示される。
【0075】
つまり、現時点が例えば設計仕様作成フェーズにあるものとし、(ユニット)ディスプレイの(部位)処理回路について完成度を表示するものとして説明すると、図14の機種構成要素画面W5上で上記構成要素を指示すれば、まず、図21に示す変更指摘実績画面W11に、予め設定された当該構成要素の変更指摘の目標件数と、現時点までの変更指摘の実件数と、その差とが、表及びグラフで表示される。その場合に、目標件数は、図6の変更目標数テーブルから読み出された当該フェーズ、当該構成要素についての目標数の例えば1.5倍とされ、また、実件数は、図7の変更指摘テーブルに記録されているレコード件数がフェーズごと及び構成要素ごとにカウントされて表示される。
【0076】
また、図22の変更通知実績画面W12には、予め設定された当該構成要素の変更通知の目標件数と、現時点までの変更通知の実件数と、その差とが、上記変更指摘実績画面W11と同様に、表及びグラフで表示される。その場合に、目標件数は、図6の変更目標数テーブルから読み出された当該フェーズ、当該構成要素についての目標数であり、また、実件数は、図9の変更通知テーブルに記録されているレコード件数がフェーズごと及び構成要素ごとにカウントされて表示される。
【0077】
ここで、画面W11、W12の表における「72/75/−3」等の表示は、目標件数「75」に対する実件数「72」と、その差「−3」とを示す。
【0078】
管理者等は、この実績画面W11、W12を参照し、当該フェーズにおける各構成要素についての変更指摘件数や変更通知件数の目標件数に対する差を読み取り、その差が大きいときは、いまだ変更の余地が多く、開発が十分に完成していないものと判断して、設計者等に対して設計の更なる見直しを要請するなどの処置を執る。これに対して、変更指摘件数や変更通知件数の目標件数に対する差が十分小さく、或いは目標件数以上となっている場合には、その構成要素についての当該フェーズでの開発は十分に完成したものと判断する。
【0079】
そして、全ての構成要素についての完成度が十分であると判断すれば、当該フェーズは終了したものとして、所定のフェーズ終了イベントを実行した上で、次のフェーズに進行する。このフェーズの進行は、図23に示すフェーズ進行画面W13のフェーズ進行ボタンfをクリックすることにより行われる。
【0080】
このように、当該システムによれば、開発対象機種の各構成要素ごとに完成度を判断しながら開発フェーズを進めることになるので、開発期間の全フェーズを終了し、量産に移行するときには、当該製品全体として、すでに高い完成度が達成されていることになる。したがって、量産移行後における設計変更の件数が著しく低減されることになる。
【0081】
なお、図16の変更状況画面W7には、上記実績画面W11、W12と同様の完成度を示すグラフと共に、前述のように、その時点のフェーズにおいて、各変更項目ごとに、その指摘の日付、その指摘に対する変更指示の日付、及びその指示に対する変更通知の日付が横に並べて表示される。したがって、この画面W7を参照することにより、各項目についての指摘から変更指示を経て変更通知に至る設計変更作業の進捗状況が表示されることになり、その遅速に応じた対応が可能となる。また、各フェーズの終了時に、その時点の日付と、図5の開発フェーズテーブルに記録されている終了イベントの実施予定日とを比較することによっても、開発作業の進捗に遅速が判断される。
【0082】
さらに、上記変更指摘テーブル、変更指示テーブル、及び変更通知テーブルには、各変更項目について、対象となる構成要素のコード及び実行されたフェーズと共に、変更指摘、変更指示又は変更通知の目的、内容、理由がそれぞれ記録され、次回以降の開発業務の参考として利用されるようになっている。
【0083】
つまり、図24に示す検索画面W14上で、変更指摘、変更指示、及び変更通知の中から1つ以上の検索対象を指定すると共に、属性として、機種、ユニット、部位、フェーズのいずれかを必要に応じて指定すれば、指定した検索対象に対応するテーブルから、指定した属性を備えた変更項目のレコードが検索され、次の図25に示す検索結果画面W15に一覧表示される。
【0084】
例えば、検索対象として変更通知を指定し、属性として機種を指定すれば、画面W15に、その機種についての全変更通知項目が一覧表示されることになり、また、図例のように、属性として機種とユニットとフェーズとを指定すれば、その機種及びユニットについての指定したフェーズでの変更通知項目が一覧表示されることになる。
【0085】
そして、画面W15に表示された項目のいずれかを選択すれば、その項目が例えば変更通知項目であれば、次に図26に示す変更通知詳細画面W16が表示され、当該変更通知の内容等が詳細に表示される。また、変更指摘項目を選択し、或いは変更指示項目を選択したときには、画面W16と同様の変更指摘詳細画面又は変更指示詳細画面が表示される。
【0086】
したがって、その後の当該プロジェクト又は他のプロジェクトにおける開発業務にこれらの設計変更情報を利用して、その開発業務の効率の向上を図ることが可能となる。その場合に、検索項目の属性として機種、ユニット又は部位で示される構成要素、及び開発フェーズ等を指定することができるから、例えば、特定部位での過去の変更例、或いは特定フェーズでの過去の変更例というように属性を絞って検索することができ、必要とする設計変更情報を効率よく入手することが可能なる。
【0087】
【発明の効果】
以上のように、本発明によれば、各種の製造業における製品開発業務において、開発の完成度が定量的に管理されて、開発対象製品のライフサイクル中に発生が予想される設計変更を開発期間中に前倒しして実行することが可能となる。これにより開発から量産への移行後における設計変更の件数が低減されることになって、当該製品のコストが低減され、ひいては当該企業の競争力が向上することが期待できる。
【図面の簡単な説明】
【図1】 本発明の実施の形態に係るシステムの全体構成を示すブロック図である。
【図2】 同システムの記録装置に記録されているテーブルの説明図である。
【図3】 プロジェクトテーブルの説明図である。
【図4】 機種構成要素テーブルの説明図である。
【図5】 開発フェーズテーブルの説明図である。
【図6】 変更目標数テーブルの説明図である。
【図7】 変更指摘テーブルの説明図である。
【図8】 変更指示テーブルの説明図である。
【図9】 変更通知テーブルの説明図である。
【図10】 新規プロジェクト登録画面の説明図である。
【図11】 機種構成要素登録画面の説明図である。
【図12】 開発フェーズ登録画面の説明図である。
【図13】 変更目標件数登録画面の説明図である。
【図14】 機種構成要素画面の説明図である。
【図15】 変更指摘作成画面の説明図である。
【図16】 変更状況画面の説明図である。
【図17】 変更指示画面の説明図である。
【図18】 変更通知画面の説明図である。
【図19】 変更通知作成画面の説明図である。
【図20】 設計変更通知書の説明図である。
【図21】 変更指摘実績画面の説明図である。
【図22】 変更通知実績画面の説明図である。
【図23】 フェーズ進行画面の説明図である。
【図24】 検索画面の説明図である。
【図25】 検索結果画面の説明図である。
【図26】 変更通知詳細画面の説明図である。
【図27】 本発明の効果の説明図である。
【符号の説明】
10 サーバコンピュータ
20 ネットワーク
21 クライアントコンピュータ[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method and system for managing the development work of various products in the manufacturing industry, a program for managing the development work, and the like, and mainly belongs to the field of work management technology using a computer.
[0002]
[Prior art]
The development of various commercial products in the manufacturing industry begins with the planning, goes through each process of design policy and design specification decision, rough design, detailed design, primary trial production, mass production trial production, etc., and then shifts to mass production However, after the development is completed and the production is shifted to mass production, various defects and improvements are often found at the manufacturing site and the market until the life cycle of the product is completed. In this case, the specifications and design are reviewed, and design work, prototype work, etc. will be performed again with this, but such review of the design etc. after the completion of development causes a significant increase in cost, As a result, the company's competitiveness is hindered.
[0003]
For such a situation, at the stage of design development, an attempt has been made to suppress the design change after mass production as much as possible with the aim of developing a product with as high a completeness as possible. A design support system using such a computer is disclosed.
[0004]
In other words, based on the design specifications, this support system reflects the design requirements extracted in advance by the design evaluator, the cases of problems that require design changes in the past product development, and solutions to them. In addition to creating electronic files as requirement information and registering them in the server, for specific design work, the requirement information corresponding to the design specifications is extracted from the server and presented to the designer. Detailed design is done by referring to the item information.
[0005]
[Patent Document 1]
JP 2002-197122 A
[Problems to be solved by the invention]
In the system disclosed in the above publication, since the requirements for the design, past defects, and examples of design changes to the design are reflected at the time of designing, it is expected that the degree of completion at the time of final drawing will be improved. it can.
[0006]
However, in order to do so, it is necessary for the evaluator to point out the requested items to the design specification without omission, and if the person in charge is immature and the indication is insufficient, the design change after drawing or after mass production is required. Will be invited. In addition, since it is assumed that there are many examples of design changes in the past, if this is insufficient, improvement in the completeness of the design drawings cannot be expected, and the design must be reviewed after drawing or after mass production. .
[0007]
Therefore, by introducing quantitative management related to design changes, the present invention realizes development with a high degree of perfection even if there is no skilled evaluator or there are many cases of design changes of similar products. The challenge is to make it possible.
[0008]
[Means for Solving the Problems]
In order to solve the above problems, the present invention is configured as follows.
[0009]
First, the invention according to
[0010]
That is, thissystemIn the life cycle from product planning to development and transition to mass production and then withdrawing from the market, development such as new development or improvement development depending on the product field This is based on the knowledge that an almost constant number of design changes will occur depending on the mode, and the number of design changes that are expected to occur during the entire life cycle period will be executed as early as possible during the development period. , Trying to improve the degree of completion of development.
[0011]
This will be described with reference to FIG. 27. Conventionally, as shown by a broken line, there has been a need for design changes distributed over each period from planning to mass production transition (end of development) to the end of the life cycle. However, many of these design changes were predictable at the development stage. Therefore, based on the number of design changes that are considered to be almost constant throughout the entire life cycle period, the target number to be executed during the development period is set, and the target number and the actual number of design changes during the development period are determined. I tried to compare them. This changes the design as shown by the solid line in FIG.TheExecute ahead of schedule during developmentdo it,Completeness at the end of product developmentTheImprovementIt becomes possible to make it.
[0012]
Here, the design change means not only a narrow design change for correcting the design drawing but also a concept including a product plan, a design policy, a design specification change and the like.
[0013]
In that case, according to the invention described in
[0014]
In addition, the target number is set for each phase during the development period, and the difference between the design change indication and the target number of the design change and the actual number is displayed for each phase. When it is judged that there is, it becomes possible to end the phase by the phase progress means and proceed to the next phase, and thereby, it is finely managed whether or not a predetermined number of design changes have been pointed out or design changes have been made. As a result, the degree of completion at the end of development will be further improved.
[0015]
The invention according to
[0016]
According to the present invention, design changes that are considered to be a substantially constant number that occur throughout the entire life cycle period can be brought forward to the development stage, and each component of the development target product for each phase of the development period Each time, a specific number of design change indications and whether or not a design change has been made will be displayed in detail, so the completeness at the end of development will be further improved, and the number of design changes after the transition to mass production will be reduced. It will be further reduced.
[0017]
The invention according to
[0018]
According to the present invention, the current state of the specific design change, specifically, the necessity of the design change is pointed out, and the execution instruction has not been given yet, or A design change instruction has been given, but the change itself has not yet been completed, or the progress status that the indicated design change has been completed will be displayed, improving the efficiency of execution of development work. become.
[0019]
The invention according to claim 4 is the invention according to any one of
[0020]
According to this invention, the design change recordBy meansThe phase or target component in which the contents of the design change have occurred is specified and recorded, and the content is retrieved for each phase or for each target component. Therefore, convenience is improved when the design change this time is used as a reference when developing the same type of product thereafter.
[0029]
further,Claim 5The invention described in 1 relates to a program for development management that manages the degree of completion of product development work, and the computer is preliminarily based on the number of design changes that are expected to occur during the life cycle of the development target product. Design change target number setting means and design change indication target number setting means for setting the target number of design changes during the development period and the target number of design change indications for each phase, design changes that occurred during the development period of the above products Design change recording means for recording design change indication means for each phase, design change indication means for recording design change indications generated during the product development period for each phase, and for each phase of design change recorded in the design change recording means Difference between the actual number of cases and the target number for each phase of the design change set by the design change target number setting means and the design change indication Development completeness display means for displaying the difference between the actual number of design change indications recorded in the recording means for each phase and the target number of design change indication targets set for the design change indication target number setting means. And it is made to function as a phase advance means to advance a phase next.
[0030]
Also,Claim 6The invention described in the aboveClaim 5In the program described in, when the computer functions as a design change target number setting means, it functions to set the target number of design changes for each component of the development target product and functions as a design change indication target number setting means. Function to set the target number of design change indications for each component, and when functioning as a design change recording means, function to record design changes for each component, and record design change indications. When functioning as a means, function to record design change indications for each component, and when functioning as a development completion indication means, the design change configuration set by the design change target number setting means Target number of elements and phases, and design change components and phases recorded in the design change recording means The difference from the number of cases, the design change indication component set by the design change indication target number setting means, the target number of each phase and the design change indication component recorded in the design change indication recording means, and It is made to function so that the difference with the actual number for every phase may be displayed.
[0031]
Also,Claim 7The invention described in the aboveClaim 5 or claim 6In the program described in 1., the computer is recorded in the design change progress recording means for recording each design change that occurred during the development period, the indication instruction, the execution instruction, and each stage of the execution, and the design change progress recording means. It is made to function as a design change progress display means for displaying the work progress status of each design change based on the stored information.
[0032]
AndClaim 8The invention described in the aboveClaims 5 to 7In the program described in any one of the above, when the computer functions as a design change recording unit, the computer is caused to function so as to record the contents of each design change together with the phase in which the design has occurred and the target component. Based on the information recorded by the design change recording means, it is made to function as a design change search means for searching for a design change of each component in each phase.
[0036]
the aboveClaims 5 to 8The program according to the invention described in
[0037]
further,Claim 9The invention described in the aboveClaims 5 to 8A recording medium for a computer-readable development management program in which the program according to any one of the above is recorded, and the recorded program is executed by applying the recording medium to a computer. Item 4systemCorresponding out ofsystemThe same operation as the above-described operation can be obtained.
[0038]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, a development management system according to an embodiment of the present invention will be described. The operation of this system constitutes an embodiment of the development management method according to the present invention, and the program for causing this system to function constitutes the embodiment of the development management program according to the present invention.
[0039]
FIG. 1 shows a configuration of a server computer (hereinafter referred to as “server”) 10 which is the center of the system. The
[0040]
As shown in FIG. 2, the
[0041]
The project table records a list of projects managed by the system. As shown in FIG. 3, a code, a name, and a model code of a development target product are recorded for each project. ing.
[0042]
The model component table records the directory structure of the component indicated by the unit and part of the model of the development target product for each project. As shown in FIG. For each component, the hierarchy of unit or part, name, element code, and element code of the upper element (unit) when it is a lower element (part) are recorded.
[0043]
The development phase table manages the phases during the development period for each project. As shown in FIG. 5, the project code is used as a key, the phase set for each project, and the event for ending each phase. Is scheduled to be recorded, and the actual implementation date of the event is recorded.
[0044]
The change target number table records the target number of design changes (including plan changes and specification changes) for each phase and each component of the project. As shown in FIG. As a key, the phase, configuration code, and target number of changes are recorded.
[0045]
The change indication table records the contents of design change indications in each phase during the development period, and is automatically assigned when a change indication occurs as shown in FIG. Using the change indication code as a key, the project code, the phase and date of the indication, the department and name of the issuer, the element code of the component to be pointed out, the purpose of the indication, the content of the indication, the reason for the indication, and the location of the indication The storage destination path in the
[0046]
The change instruction table records the contents of the instruction when the specified design change is instructed to be executed, and is automatically given when the change instruction is generated as shown in FIG. Using the change instruction code as a key, the change indication code that is the source of the instruction, the code of the project, the phase and date when the instruction was given, the department and name of the instructor, the element code of the instruction target component, The instruction purpose, instruction content, instruction reason, and the value of the completion flag that becomes “1” when the design change based on the instruction is completed are recorded.
[0047]
Furthermore, the change notification table records the contents etc. when the design change for which the change instruction is given is completed and the contents are notified to the related department (specifically, when the design change notice is created). As shown in FIG. 9, the change instruction code that is the source of the notification, the code of the project, and the notification were made using the change notification code automatically given when the change notification was executed as a key. The phase and date, the department and name of the notifier, the element code of the component to be notified, the purpose of notification, the content of notification, and the reason for notification are recorded.
[0048]
Next, the operation of the system by the program recorded in the
[0049]
First, when a new development project is launched, for example, if a project manager or the like (hereinafter referred to as “manager or the like”) accesses the
[0050]
Further, the administrator or the like inputs the components of the development target model of the current project on the model configuration registration screen W2 shown in FIG. 11 displayed on the display device of the
[0051]
Further, the administrator or the like designates the phase of the development process set in the current project on the development phase registration screen W3 shown in FIG. 12 displayed on the display device of the
[0052]
Further, the administrator or the like, on the change target number registration screen W4 shown in FIG. 13 displayed on the display device of the
[0053]
As described above, on the screens W1 to W4 sequentially displayed on the display device of the
[0054]
Next, the operation of the system at the time of design change in the development process after project startup will be described.
[0055]
Now, for example, in the design specification creation phase, it is assumed that there is a need for design change (specification change) for a certain part. In this case, a designer or a general manager of design (hereinafter referred to as “designer etc.”) becomes a change indicator and accesses the
[0056]
Then, if a predetermined input operation such as project designation is performed on the Web screen transmitted from the
[0057]
Note that the current phase is displayed at the top of the model component screen W5 as shown by the arrow a.
[0058]
If the component designated on this screen W5 is, for example, a (part) processing circuit of a (unit) display, the unit name and part name are displayed on the next change indication creation screen W6 shown in FIG. The Then, on this screen W6, the designer or the like inputs the date of change indication, his / her department, name, design change purpose, content and reason. In addition, when there is image data indicating a change location or the like, the storage destination path in the
[0059]
These data are recorded in the change indication table of FIG. In that case, the change indication code is automatically assigned and recorded, and the date of the date is automatically recorded as the change indication date, and the affiliation and name of the designer as the change indication person are used. Is automatically read and recorded from the name list registered in advance, and the value of the completion flag is not yet instructed to execute the change and has not been rejected. , “0” is recorded.
[0060]
In this way, when a designer or the like points out a change in any component in any phase, the contents and the like are sequentially recorded as new records in the change indication table.
[0061]
On the other hand, an administrator or the like who decides whether or not to execute the indicated change confirms what kind of change is pointed out periodically or at an appropriate time.
[0062]
That is, by accessing the
[0063]
The change status screen W7 includes a list of items that have been pointed out by designers, a list of items for which change instructions have been issued for change points, and a change notification that indicates the completion of changes to the change instructions. The list of items for which the item has been performed is displayed with the corresponding items arranged side by side, with the date and the name of the person in charge. Therefore, the administrator or the like selects one of the change indication items for which no change instruction is given.
[0064]
Thereby, the change instruction screen W8 shown in FIG. 17 is displayed, and the contents recorded in the change indication table of FIG. 7 for the change indication item on this screen W8, for example, (unit) display- (part) processing For the circuit, the change purpose, change content, change reason, etc., which the designer etc. input on the change indication screen W6 of FIG. 15 are displayed. Further, the image data is read from a predetermined storage location in the
[0065]
Therefore, the administrator or the like confirms the contents and images displayed on the screen W8 and determines whether or not to execute the indicated change. When instructing execution of the change, the change instruction button b is clicked. Thereby, the data related to change indication on the screen W8 is recorded in the change instruction table of FIG. 8 as data related to the change instruction.
[0066]
In that case, the change instruction code is automatically assigned and recorded, the date of the change is automatically recorded as the change instruction date, and the affiliation and name of the administrator as the change instruction By identifying, it is read out from the pre-registered name list and automatically recorded, and the value of the completion flag is recorded as “0” because no change has been executed yet for the instruction. At this time, “1” indicating that there is a change instruction is recorded in the field of the completion flag of the record of the change indication item in the change indication table of FIG.
[0067]
Note that when the administrator or the like rejects the indicated change, the administrator clicks the change rejection button c on the screen W8. In this case, a new record is not created in the change instruction table of FIG. 8, but “1” is recorded in the completion flag column of the change indication table of FIG.
[0068]
Next, the designer who made the change indication confirms whether or not there has been a change instruction from the manager or the like for the change indication made by himself / herself.
[0069]
That is, when the
[0070]
When there is a change instruction, if the contents, images, etc. are displayed on the change notification screen W9, the designers should confirm that the contents etc. correspond to the contents of the change indication pointed out by themselves. Check. And if the confirmation is made, this change notification screen will be displayed after making necessary changes such as correcting the specifications or correcting the drawings in accordance with the changes pointed out by the manager or the like. Click the change notification execution button d in W9.
[0071]
At this time, a change notification creation screen W10 shown in FIG. 19 is displayed, and the contents of the change instruction read from the change instruction table of FIG. 8 are displayed on this screen W10, as with the change notification screen W9. This screen W10 is a screen in which the display content can be edited. The designer or the like confirms the display content and performs necessary edits or clicks the completion button e as it is.
[0072]
As a result, as shown in FIG. 20, a change notification form in which the display content of the change notification screen W10 is entered is automatically created, and the content of the screen W10 is recorded in the change notification table of FIG. In that case, the change notification code is automatically assigned and recorded, the date of the change is automatically recorded as the date of change notification, and the affiliation and name of the designer etc. as the change notification By identifying, it is read from a pre-registered name list and automatically recorded. At this time, “1” indicating that there is a change notification is recorded in the completion flag column of the record of the change instruction item in the change instruction table of FIG.
[0073]
Then, the design change notice is filed or distributed to a department that needs work for reflecting the change, and the design change is completed.
[0074]
As described above, in each development phase, the design change indication, the instruction to execute the design change in response to the indication, and the notification that the design change has been executed in response to the indication are performed by the unit or part of the development target model. Etc., and are recorded in the change indication table, change instruction table, and change notification table shown in FIGS. Then, the number of executions of these change indications or change notifications is compared with the target number set at the start of the project for each phase and each component, and the development completeness of the component in that phase is confirmed. Is displayed.
[0075]
In other words, for example, assuming that the current time is in the design specification creation phase and that the (part) processing circuit of the (unit) display is displayed as the degree of completion, the above components are indicated on the model component screen W5 of FIG. First, on the change indication result screen W11 shown in FIG. 21, the preset target number of change indications of the component, the actual number of change indications up to the present time, and the difference between them are shown in a table and a graph. Is displayed. In this case, the target number is set to, for example, 1.5 times the target number for the phase and the component read from the change target number table in FIG. 6, and the actual number is the change indication in FIG. The number of records recorded in the table is counted and displayed for each phase and each component.
[0076]
Further, in the change notification result screen W12 of FIG. 22, the target number of change notifications of the constituent elements set in advance, the actual number of change notifications up to the present time, and the difference between them are the above-described change indication result screen W11. Similarly, it is displayed in a table and a graph. In this case, the target number is the target number for the phase and the component read from the change target number table in FIG. 6, and the actual number is recorded in the change notification table in FIG. The number of records is counted and displayed for each phase and each component.
[0077]
Here, the display such as “72/75 / −3” in the tables of the screens W11 and W12 indicates the actual number “72” with respect to the target number “75” and the difference “−3”.
[0078]
Administrators, etc., read the results screens W11 and W12 and read the difference in the number of change indications and the number of change notifications for each component in the relevant phase. If the difference is large, there is still room for change. In many cases, it is judged that the development has not been completed sufficiently, and the designer is requested to further review the design. On the other hand, if the difference between the number of change indications and change notifications with respect to the target number is sufficiently small, or more than the target number, the development of that component in the relevant phase is considered to be sufficiently completed. to decide.
[0079]
If it is determined that the completeness of all the constituent elements is sufficient, it is determined that the phase has been completed, and a predetermined phase end event is executed. Then, the process proceeds to the next phase. The progress of this phase is performed by clicking the phase progress button f on the phase progress screen W13 shown in FIG.
[0080]
In this way, according to the system, since the development phase is advanced while judging the degree of completion for each component of the development target model, when all phases of the development period are finished and the production phase is shifted to mass production, As a whole, a high degree of perfection has already been achieved. Therefore, the number of design changes after the shift to mass production is significantly reduced.
[0081]
In addition, in the change status screen W7 of FIG. 16, together with the graph showing the degree of completion similar to the performance screens W11 and W12, as described above, in the phase at that time, the date of indication for each change item, The date of the change instruction for the indication and the date of the change notification for the instruction are displayed side by side. Therefore, by referring to this screen W7, the progress of design change work from indication to change notification through change instruction is displayed, and it is possible to respond to the delay. Further, at the end of each phase, the delay in the progress of the development work is also determined by comparing the date at that time with the scheduled date of the end event recorded in the development phase table of FIG.
[0082]
Further, in the change indication table, change instruction table, and change notification table, for each change item, together with the code of the target component and the executed phase, the purpose, content of change indication, change instruction or change notification, Each reason is recorded and used as a reference for future development work.
[0083]
That is, on the search screen W14 shown in FIG. 24, one or more search targets are specified from change indication, change instruction, and change notification, and any of model, unit, part, and phase is required as an attribute. If so, the record of the change item having the specified attribute is searched from the table corresponding to the specified search target, and displayed in a list on the search result screen W15 shown in FIG.
[0084]
For example, if a change notification is specified as a search target and a model is specified as an attribute, a list of all change notification items for that model will be displayed on the screen W15. If the model, unit, and phase are specified, the change notification items in the specified phase for the model and unit are displayed in a list.
[0085]
Then, if any of the items displayed on the screen W15 is selected, for example, if the item is a change notification item, then the change notification detail screen W16 shown in FIG. 26 is displayed. Displayed in detail. When a change indication item is selected or a change instruction item is selected, a change indication detail screen or a change instruction detail screen similar to the screen W16 is displayed.
[0086]
Therefore, it is possible to improve the efficiency of the development work by using the design change information for the development work in the subsequent project or other projects. In that case, since it is possible to specify the model, unit, or component indicated by the part and the development phase, etc. as the search item attributes, for example, past changes in the specific part, or past in the specific phase Search can be performed by narrowing down the attributes as in the modification example, and the necessary design change information can be obtained efficiently.
[0087]
【The invention's effect】
As described above, according to the present invention, in product development work in various manufacturing industries, the degree of development completion is quantitatively managed, and the design change that is expected to occur during the life cycle of the development target productTheExecute ahead of schedule during developmentWill be able to. As a result, the number of design changes after the transition from development to mass production is reduced, the cost of the product is reduced, and the competitiveness of the company is improved.Can expect.
[Brief description of the drawings]
FIG. 1 is a block diagram showing an overall configuration of a system according to an embodiment of the present invention.
FIG. 2 is an explanatory diagram of a table recorded in the recording apparatus of the system.
FIG. 3 is an explanatory diagram of a project table.
FIG. 4 is an explanatory diagram of a model component table.
FIG. 5 is an explanatory diagram of a development phase table.
FIG. 6 is an explanatory diagram of a change target number table.
FIG. 7 is an explanatory diagram of a change indication table.
FIG. 8 is an explanatory diagram of a change instruction table.
FIG. 9 is an explanatory diagram of a change notification table.
FIG. 10 is an explanatory diagram of a new project registration screen.
FIG. 11 is an explanatory diagram of a model component registration screen.
FIG. 12 is an explanatory diagram of a development phase registration screen.
FIG. 13 is an explanatory diagram of a change target number registration screen.
FIG. 14 is an explanatory diagram of a model component screen.
FIG. 15 is an explanatory diagram of a change indication creation screen.
FIG. 16 is an explanatory diagram of a change status screen.
FIG. 17 is an explanatory diagram of a change instruction screen.
FIG. 18 is an explanatory diagram of a change notification screen.
FIG. 19 is an explanatory diagram of a change notification creation screen.
FIG. 20 is an explanatory diagram of a design change notification.
FIG. 21 is an explanatory diagram of a change indication result screen.
FIG. 22 is an explanatory diagram of a change notification result screen.
FIG. 23 is an explanatory diagram of a phase progress screen.
FIG. 24 is an explanatory diagram of a search screen.
FIG. 25 is an explanatory diagram of a search result screen.
FIG. 26 is an explanatory diagram of a change notification details screen.
FIG. 27 is an explanatory diagram of the effect of the present invention.
[Explanation of symbols]
10 Server computer
20 network
21 Client computer
Claims (9)
予め開発対象製品のライフサイクル中に発生が予想される設計変更の件数に基づいて開発期間中の設計変更の目標件数と設計変更指摘の目標件数とをフェーズごとにそれぞれ設定する設計変更目標件数設定手段及び設計変更指摘目標件数設定手段と、
上記製品の開発期間中に発生した設計変更をフェーズごとに記録する設計変更記録手段と、
上記製品の開発期間中に発生した設計変更指摘をフェーズごとに記録する設計変更指摘記録手段と、
上記設計変更記録手段に記録されている設計変更のフェーズごとの実件数と上記設計変更目標件数設定手段で設定された設計変更のフェーズごとの目標件数との差、及び、上記設計変更指摘記録手段に記録されている設計変更指摘のフェーズごとの実件数と上記設計変更指摘目標件数設定手段で設定された設計変更指摘のフェーズごとの目標件数との差を表示する開発完成度表示手段と、
フェーズを次に進行させるフェーズ進行手段とを有することを特徴とする開発管理システム。A development management system that manages the completeness of product development work,
Design change target number setting that sets the target number of design changes during the development period and the target number of design change indications for each phase based on the number of design changes expected to occur during the life cycle of the development target product in advance. Means and design change indication target number setting means ,
Design change recording means for recording design changes that occurred during the development period of the above products for each phase;
Design change indication recording means for recording design change indications generated during the development period of the above products for each phase;
The difference between the actual number of design change phases recorded in the design change recording means and the target number of design change phases set in the design change target number setting means , and the design change indication recording means Development completeness display means for displaying the difference between the actual number of design change indications recorded in the phase and the target number of design change indications set by the design change indication target number setting means ,
A development management system comprising phase advance means for proceeding to the next phase.
設計変更指摘目標件数設定手段は、構成要素ごとに設計変更指摘の目標件数を設定し、
設計変更記録手段は、構成要素ごとに設計変更を記録し、
設計変更指摘記録手段は、構成要素ごとに設計変更指摘を記録し、かつ、
開発完成度表示手段は、上記設計変更目標件数設定手段で設定された設計変更の構成要素及びフェーズごとの目標件数と上記設計変更記録手段に記録されている設計変更の構成要素及びフェーズごとの実件数との差、並びに、上記設計変更指摘目標件数設定手段で設定された設計変更指摘の構成要素及びフェーズごとの目標件数と上記設計変更指摘記録手段に記録されている設計変更指摘の構成要素及びフェーズごとの実件数との差を表示することを特徴とする請求項1に記載の開発管理システム。The design change target number setting means sets the target number of design changes for each component of the development target product,
The design change indication target number setting means sets the target number of design change indications for each component,
The design change recording means records the design change for each component,
The design change indication recording means records the design change indication for each component, and
The development completion degree display means includes the number of design change components and the target number for each phase set by the design change target number setting means and the design change component and the phase change recorded in the design change recording means. The difference from the number of cases, the design change indication component set by the design change indication target number setting means , the target number of each phase and the design change indication component recorded in the design change indication recording means, and The development management system according to claim 1, wherein a difference from the actual number for each phase is displayed.
該設計変更進捗記録手段に記録されている情報に基づいて各設計変更の作業進捗状況を表示する設計変更進捗表示手段とが備えられていることを特徴とする請求項1又は請求項2に記載の開発管理システム。Design change progress recording means for recording each stage of design change that occurred during the development period, indication, execution instruction, and completion,
The design change progress display means for displaying the work progress status of each design change based on the information recorded in the design change progress recording means is provided. Development management system .
該設計変更記録手段に記録されている情報に基づき、各フェーズにおける各構成要素の設計変更を検索する設計変更検索手段が備えられていることを特徴とする請求項1から請求項3のいずれかに記載の開発管理システム。Design change recording means may be capable recorded with components to be phase and the target generated the contents of each design change,
4. The design change search means for searching for a design change of each component in each phase based on information recorded in the design change recording means . Development management system as described in
コンピュータを、予め開発対象製品のライフサイクル中に発生が予想される設計変更の件数に基づいて開発期間中の設計変更の目標件数と設計変更指摘の目標件数とをフェーズごとにそれぞれ設定する設計変更目標件数設定手段及び設計変更指摘目標件数設定手段、
上記製品の開発期間中に発生した設計変更をフェーズごとに記録する設計変更記録手段、
上記製品の開発期間中に発生した設計変更指摘をフェーズごとに記録する設計変更指摘記録手段、
上記設計変更記録手段に記録されている設計変更のフェーズごとの実件数と上記設計変更目標件数設定手段で設定された設計変更のフェーズごとの目標件数との差、及び、上記設計変更指摘記録手段に記録されている設計変更指摘のフェーズごとの実件数と上記設計変更指摘目標件数設定手段で設定された設計変更指摘のフェーズごとの目標件数との差を表示する開発完成度表示手段、並びに、
フェーズを次に進行させるフェーズ進行手段として機能させることを特徴とする開発管理用プログラム。A development management program that manages the completeness of product development work,
Design changes that set the target number of design changes during the development period and the target number of design change indications for each phase based on the number of design changes expected to occur during the life cycle of the development target product in advance. Target number setting means and design change indication target number setting means,
Design change recording means for recording design changes occurring during the development period of the above products for each phase ;
Design change indication recording means for recording design change indications occurring during the development period of the above products for each phase ,
The difference between the actual number of design change phases recorded in the design change recording means and the target number of design change phases set in the design change target number setting means, and the design change indication recording means Development completion level display means for displaying the difference between the actual number of design change indications recorded in the phase and the target number of design change indication target phases set by the design change indication target number setting means , and
A development management program that functions as a phase progression means for proceeding to the next phase.
設計変更指摘目標件数設定手段として機能させるときは、構成要素ごとに設計変更指摘の目標件数を設定するように機能させ、
設計変更記録手段として機能させるときは、構成要素ごとに設計変更を記録するように機能させ、
設計変更指摘記録手段として機能させるときは、構成要素ごとに設計変更指摘を記録するように機能させ、かつ、
開発完成度表示手段として機能させるときは、上記設計変更目標件数設定手段で設定された設計変更の構成要素及びフェーズごとの目標件数と上記設計変更記録手段に記録されている設計変更の構成要素及びフェーズごとの実件数との差、並びに、上記設計変更指摘目標件数設定手段で設定された設計変更指摘の構成要素及びフェーズごとの目標件数と上記設計変更指摘記録手段に記録されている設計変更指摘の構成要素及びフェーズごとの実件数との差を表示するように機能させることを特徴とする請求項5に記載の開発管理用プログラム。 When making a computer function as a design change target number setting means , make it function to set the target number of design changes for each component of the development target product,
When to function as a design change indicated target number setting means, to function so as to set a target number of design changes indicated for each component,
When to function as a design change recording means, to function to record the design change for each component,
When to function as a design change indicated recording means is operative to record a design change indicated for each component, and,
When functioning as a development completion degree display means , the design change components set by the design change target number setting means, the target number of each phase and the design change components recorded in the design change recording means, and Difference from the actual number of each phase, design change indication component set by the above design change indication target number setting means, target number of each phase and design change indication recorded in the above design change indication recording means 6. The development management program according to claim 5, wherein the development management program is made to function so as to display a difference between the component number and the actual number of each phase.
該設計変更進捗記録手段に記録されている情報に基づいて各設計変更の作業進捗状況を表示する設計変更進捗表示手段として機能させることを特徴とする請求項5又は請求項6に記載の開発管理用プログラム。Design change progress recording means for recording the indication, execution instruction, and each stage of execution of each design change that occurred during the development period of the computer , and
7. The development management according to claim 5 or 6, wherein the development management is caused to function as a design change progress display means for displaying a work progress status of each design change based on information recorded in the design change progress recording means. Program .
該コンピュータを、上記設計変更記録手段に記録されている情報に基づき、各フェーズにおける各構成要素の設計変更を検索する設計変更検索手段として機能させることを特徴とする請求項5から請求項7のいずれかに記載の開発管理用プログラム。 When made to function as a design change recording means computers, as well to function to record with components to be phase and the target generated the contents of each design change,
8. The computer according to claim 5, wherein said computer is caused to function as design change search means for searching for a design change of each component in each phase based on information recorded in said design change recording means. development management program according to any one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002350607A JP4527937B2 (en) | 2002-12-03 | 2002-12-03 | Development management method, development management system, development management program, and recording medium recording the program |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002350607A JP4527937B2 (en) | 2002-12-03 | 2002-12-03 | Development management method, development management system, development management program, and recording medium recording the program |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2008321213A Division JP4658185B2 (en) | 2008-12-17 | 2008-12-17 | Development management system, development management program, and recording medium recording the development management program |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2004185251A JP2004185251A (en) | 2004-07-02 |
JP4527937B2 true JP4527937B2 (en) | 2010-08-18 |
Family
ID=32752767
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002350607A Expired - Fee Related JP4527937B2 (en) | 2002-12-03 | 2002-12-03 | Development management method, development management system, development management program, and recording medium recording the program |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4527937B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010009151A (en) * | 2008-06-24 | 2010-01-14 | Incs Inc | Device, system, method and program for supporting design, and computer-readable recording medium |
JP7230330B2 (en) * | 2018-03-09 | 2023-03-01 | 富士フイルムビジネスイノベーション株式会社 | Information processing device and information processing program |
US11651319B2 (en) * | 2019-08-20 | 2023-05-16 | University Of Kentucky Research Foundation | Innovative manufacturing methods for next-generation products, processes, and systems |
-
2002
- 2002-12-03 JP JP2002350607A patent/JP4527937B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2004185251A (en) | 2004-07-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8132092B2 (en) | Automated management of internet and/or web site content | |
JPH10334077A (en) | Action execution managing device, and recording medium readable by computer in which program to function computers action execution managing device is recorded | |
JP2007048009A (en) | Operation support system, its database server, preparation management device and program | |
JP2003248746A (en) | Electronic document processing system, electronic document processing program, computer readable recording medium recording program thereof and electronic document processing method | |
JP5352225B2 (en) | Data reuse method, data reuse system, data reuse device, and data reuse program | |
JP4527937B2 (en) | Development management method, development management system, development management program, and recording medium recording the program | |
JP2004252951A (en) | Introductory operation support system for integrated business software | |
JP6626327B2 (en) | Gantt chart generation program, Gantt chart generation device, and Gantt chart generation method | |
CN116308132A (en) | Automatic office method and system based on workflow engine | |
JP4658185B2 (en) | Development management system, development management program, and recording medium recording the development management program | |
JP2006146506A (en) | Web site updating system, web site updating method and web site updating program | |
JP2003331095A (en) | Workflow (application approval operation) by management of db | |
JP2004102923A (en) | System and method for taking over work flow | |
JP2004178150A (en) | Integrated production management method and system by production process management chart | |
US20060004688A1 (en) | Systems and methods for integrating various processes | |
JP2003256630A (en) | Data flow management system | |
JP4624870B2 (en) | Demo creation system | |
JP7437046B2 (en) | Year history production method, program, year history production device, and year history production system | |
JP2020027322A (en) | Business process management support system, management support method and management support program | |
JP2006134103A (en) | Project management support device, project management support program and project management support method | |
JP2012018588A (en) | Job control system | |
JP6197351B2 (en) | Display program, display method, and display device | |
JP2006252237A (en) | Technical information management system and program | |
JP2003281205A (en) | Related document setting device and related document setting program | |
JP2004302522A (en) | Menu screen control method by shortcut button and computer program |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20051130 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080729 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080805 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20081006 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20081118 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20081216 |
|
A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20090123 |
|
A912 | Re-examination (zenchi) completed and case transferred to appeal board |
Free format text: JAPANESE INTERMEDIATE CODE: A912 Effective date: 20090319 |
|
RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20090907 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20100604 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130611 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 4527937 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130611 Year of fee payment: 3 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130611 Year of fee payment: 3 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |