JP2011090607A - Account settlement business support system - Google Patents

Account settlement business support system Download PDF

Info

Publication number
JP2011090607A
JP2011090607A JP2009245231A JP2009245231A JP2011090607A JP 2011090607 A JP2011090607 A JP 2011090607A JP 2009245231 A JP2009245231 A JP 2009245231A JP 2009245231 A JP2009245231 A JP 2009245231A JP 2011090607 A JP2011090607 A JP 2011090607A
Authority
JP
Japan
Prior art keywords
work
item
procedure
work item
date
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009245231A
Other languages
Japanese (ja)
Inventor
Makoto Kikukawa
真 菊川
Kazunori Yoshimura
和則 芳村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PRIME JAPAN CO Ltd
Original Assignee
PRIME JAPAN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PRIME JAPAN CO Ltd filed Critical PRIME JAPAN CO Ltd
Priority to JP2009245231A priority Critical patent/JP2011090607A/en
Publication of JP2011090607A publication Critical patent/JP2011090607A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an account settlement business support system which can support a processing work of a procedure in the account settlement business, and quickly and accurately process the procedure in the account settlement business following a plan. <P>SOLUTION: In an account settlement business promotion system 10A, a computer 11 for management and computers 12, 13 for business execute: a main procedure output means for outputting procedure names of a plurality of main procedures in various kinds to be processed within a procedure period of the account settlement business; a work item output means for outputting work items necessary for processing a procedure name of each main procedure in the ordered state in the order of processing, relative to each procedure name of each main procedure; a work content output means for outputting the work content of each work item relative to each work item; a work person-in-charge output means for outputting data of a person-in-charge in charge of a work item relative to each work item; and a work progression data output means for outputting work progression data of a work item relative to each work item. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、コンピュータとデータベースとから形成されたネットワークを利用して企業または官庁の決算における決算業務を促進する決算業務支援システムに関する。   The present invention relates to a settlement operation support system that promotes a settlement operation in a settlement of a company or a government office using a network formed from a computer and a database.

連結対象の企業が所有する情報処理装置から当該企業の財務会計情報を取得する財務会計情報手段と、ネットワークを介して企業間に伝達される取引情報を格納する外部のデータベースへ検索要求を発行して連結対象の企業の取引情報であって連結科目に該当する取引情報を取得する取引情報手段と、連結対象の企業が所有する情報処理装置から当該企業の取引情報以外の情報であって連結科目に該当する取引外情報を取得する取引外情報手段と、複数企業に亘る連結決算の要求を受信したときに、連結対象企業の財務会計情報の同一連結科目の金額を加算の対象とし、取得した取引情報の連結科目に該当する取引金額を減算の対象とするとともに、取得した取引外情報の連結科目に該当する金額を減算の対象とし、財務会計情報の各連結科目について上記の加減算を行った結果をまとめて連結決算書を作成する連結決算書作成手段とを有する電子連結サーバ装置がある(特許文献1参照)。   Issue a search request to the financial accounting information means that obtains the financial accounting information of the company from the information processing device owned by the company to be consolidated, and the external database that stores the transaction information transmitted between the companies via the network Transaction information means for acquiring the transaction information corresponding to the consolidated item, and information other than the transaction information of the company from the information processing device owned by the consolidated company, and the consolidated item Acquired the amount of the same consolidated item in the financial accounting information of the consolidated company when the non-transactional information means that obtains the non-transactional information that falls under and the request for consolidated settlement of accounts across multiple companies was received. The transaction amount corresponding to the consolidated item of transaction information is subject to subtraction, and the amount corresponding to the consolidated item of acquired non-transaction information is subject to subtraction, and each consolidated department of financial accounting information For there is an electronic connection server device and a connecting Financial Statements creating means for creating a consolidated financial statements summarizes the results of addition and subtraction of the (see Patent Document 1).

特開11−39409号公報JP 11-39409 A

前記特許公報1に開示の電子連結サーバ装置は、企業間で交わされる取引情報と各企業個別の財務会計情報と取引外情報とから連結決算処理を行うから、連結決算書作成のための作業数を削減することができる。しかし、この電子連結サーバ装置は、決算業務を担当する担当者に対してその業務における手続の処理作業を支援するものではなく、担当者に対してその業務における手続を計画的に進めさせるものではない。担当者がこのサーバ装置によって実行される各手段に従ってとしても、決算業務の手続処理中にその担当者の処理作業を支援することはできず、手続を当初の計画に沿って迅速かつ正確に処理させることができない。また、この電子連結サーバ装置は、決算業務を担当する担当者がその業務における手続を遅延したとしても、その手続の遅延を把握することができず、手続の遅延に対する注意を喚起することができない。   Since the electronically linked server device disclosed in the above-mentioned patent publication 1 performs consolidated settlement processing from transaction information exchanged between companies, individual company's individual financial accounting information and non-transaction information, the number of operations for creating consolidated statement of accounts Can be reduced. However, this electronically linked server device does not support the person in charge of the account settlement business, but does not allow the person in charge to proceed with the procedure in the systematic manner. Absent. Even if the person in charge follows each means executed by this server device, he cannot support the person in charge during the settlement process, and the procedure is processed quickly and accurately according to the original plan. I can't let you. In addition, even if the person in charge of the settlement business delays the procedure in the business, this electronically linked server device cannot grasp the delay in the procedure and cannot call attention to the delay in the procedure. .

本発明の目的は、決算業務を担当する担当者に対し、その業務における手続の処理作業を支援することができ、担当者が決算業務の手続を計画に沿って迅速かつ正確に処理することができる決算業務支援システムを提供することにある。本発明の他の目的は、決算業務における手続が遅延している場合、それを把握することができ、手続の遅延に対する注意を喚起することができる決算業務支援システムを提供することにある。   An object of the present invention is to support a person in charge of a settlement operation, and to support the processing process of the procedure in that business, and the person in charge can quickly and accurately process the procedure of the settlement operation according to a plan. The purpose is to provide an account settlement business support system. It is another object of the present invention to provide an account settlement operation support system that can grasp a procedure in an account settlement operation when it is delayed and can call attention to the delay in the procedure.

前記課題を解決するための本発明の前提は、決算における決算業務を監視する管理者が使用する少なくとも1つの管理用コンピュータと、決算業務を担当する複数の担当者が使用する複数の業務用コンピュータと、それらコンピュータに決算業務に関する各種情報を提供するデータベースとから所定のネットワークを形成し、ネットワークを利用して決算業務を支援する決算業務支援システムである。   The premise of the present invention for solving the above-mentioned problems is that at least one management computer used by an administrator who monitors settlement work in settlement, and a plurality of business computers used by a plurality of persons in charge of settlement work And a database for providing various information related to the settlement work on the computer, and forming a predetermined network and using the network to support the settlement work.

前記前提における本発明の特徴は、管理用コンピュータが、決算業務の手続期間に処理を要する各種複数の主要手続をデータベースに格納する主要手続格納手段と、主要手続の処理に必要な少なくとも1つの作業項目をその処理順に順番付けた状態で各主要手続毎に区分して前記データベースに格納する作業項目格納手段と、作業項目の作業内容を各作業項目毎に区分してデータベースに格納する作業内容格納手段と、それら作業項目の担当者データを各作業項目毎に区分してデータベースに格納する作業担当者格納手段とを実行し、管理用コンピュータと業務用コンピュータとが、主要手続を出力する主要手続出力手段と、作業項目をその処理順に順番付けた状態で各主要手続毎に出力する作業項目出力手段と、作業項目の作業内容を各作業項目毎に出力する作業内容出力手段と、作業項目を担当する担当者データを各作業項目毎に出力する作業担当者出力手段とを実行することにある。   The feature of the present invention based on the above premise is that the management computer stores in the database a plurality of various main procedures that need to be processed in the procedure period of the settlement work, and at least one operation necessary for the processing of the main procedures Work item storage means for storing the items in the database by sorting them into each main procedure in the state in which the items are arranged in the processing order, and storing the work contents for storing the work contents of the work items in the database by sorting the work items by each work item Main procedure in which the management computer and the business computer output the main procedure, and the person-in-charge storing means for classifying the person-in-charge data of those work items into each database and storing them in the database. Output means, work item output means for outputting work items in order of their processing order for each main procedure, and work contents of work items for each work procedure A work output means for outputting for each item, there personnel data in charge of work items to be executed and worker output means for outputting for each work item.

本発明の一例としては、管理用コンピュータが、それら作業項目の作業完了予定期日を各作業項目毎に区分してデータベースに格納する作業完了予定期日格納手段を実行し、管理用コンピュータと業務用コンピュータとが、作業項目の作業開始期日を各作業項目毎に区分してデータベースに格納する作業開始期日格納手段と、作業項目の作業完了期日を各作業項目毎に区分してデータベースに格納する作業完了期日格納手段と、作業項目の作業進捗データを各作業項目毎に区分してデータベースに格納する作業進捗データ格納手段と、作業項目の作業進捗データを各作業項目毎に出力する作業進捗データ出力手段とを実行する。   As an example of the present invention, the management computer executes a scheduled work completion date storage unit that stores the scheduled work completion dates of these work items for each work item and stores them in a database. The management computer and the business computer The work start date storage means for storing the work start date of the work item for each work item and storing it in the database, and the work completion for storing the work completion date of the work item for each work item and storing it in the database Due date storage means, work progress data storage means for sorting work progress data of work items for each work item and storing them in a database, and work progress data output means for outputting work progress data of work items for each work item And execute.

本発明の他の一例としては、管理用コンピュータが、主要手続を処理する際に必要な資料データを各主要手続毎に区分してデータベースに格納する資料データ格納手段を実行し、管理用コンピュータと業務用コンピュータとが、主要手続の処理に必要な資料データを各主要手続毎に出力する資料データ出力手段を実行する。   As another example of the present invention, the management computer executes material data storage means for classifying the material data necessary for processing the main procedure for each main procedure and storing the data in a database. The business computer executes material data output means for outputting material data necessary for processing the main procedure for each main procedure.

本発明の他の一例としては、管理用コンピュータが、作業項目を処理する際に必要な作業注意事項が存在する場合、その作業注意事項を各作業項目毎に区分してデータベースに格納する作業注意事項格納手段を実行し、管理用コンピュータと業務用コンピュータとが、作業項目を処理する際の作業注意事項の確認有無を判断する確認有無判断手段と、作業項目を処理する際に必要な作業注意事項を各作業項目毎に出力する作業注意事項出力手段と、確認有無判断手段によって判断した作業注意事項の確認有無情報を該注意事項毎に出力する確認有無情報出力手段とを実行する。   As another example of the present invention, when there are work precautions necessary when the management computer processes work items, the work precautions are stored in a database by dividing the work precautions into each work item. Executes the item storage means, and the management computer and the business computer determine whether or not to confirm the work precautions when processing the work item. A work precaution output unit that outputs items for each work item and a confirmation presence / absence information output unit that outputs confirmation information on the work precautions determined by the confirmation presence determination unit for each precaution are executed.

本発明の他の一例としては、管理用コンピュータが、主要手続によって作成される成果物を各主要手続毎に区分してデータベースに格納する成果物格納手段と、主要手続によって計上される仕訳タイプを各主要手続毎に区分してデータベースに格納する仕訳タイプ格納手段とを実行し、管理用コンピュータと業務用コンピュータとが、主要手続によって作成される成果物を各主要手続毎に出力する成果物出力手段と、主要手続によって計上される仕訳タイプを各主要手続毎に出力する仕訳タイプ出力手段とを実行する。   As another example of the present invention, the management computer divides the product created by the main procedure for each main procedure and stores it in the database, and the journal type recorded by the main procedure. The journal type storage means that stores each type of main procedure and stores it in the database, and the management computer and the business computer output the product created by the main procedure for each main procedure. And journal type output means for outputting the journal type recorded by the main procedure for each main procedure.

本発明の他の一例としては、管理用コンピュータと業務用コンピュータとが、各作業項目に対応しつつそれら作業項目の処理に必要な場合にのみ記載される作業伝達事項を各作業項目毎に区分してデータベースに格納する作業伝達事項格納手段と、それら作業項目に作業伝達事項が存在するか否かを確認可能な伝達事項有無情報を各作業項目毎に出力する伝達事項有無情報出力手段と、作業伝達事項を各作業項目毎に出力する作業伝達事項出力手段とを実行する。   As another example of the present invention, the work transmission items described only when the management computer and the business computer correspond to each work item and are necessary for processing the work items are classified for each work item. Work transmission item storage means for storing in the database, and transmission item presence / absence information output means for outputting transmission item presence / absence information for each work item that can be confirmed whether or not there is a work transmission item in those work items, A work transmission item output means for outputting a work transmission item for each work item is executed.

本発明の他の一例としては、管理用コンピュータと業務用コンピュータとが、作業伝達事項のランク付けされた重要度を各作業伝達事項毎に区分してデータベースに格納する作業伝達事項重要度格納手段と、作業伝達事項の重要度を各作業伝達事項毎に出力する作業伝達事項重要度出力手段とを実行する。   As another example of the present invention, the management computer and the business computer classify the importance of ranked work transmission items for each work transmission item and store them in a database. And a work transmission item importance output means for outputting the importance of the work transmission item for each work transmission item.

本発明の他の一例として、伝達事項には、それら作業項目の処理に必要な注意事項、それら作業項目の処理に必要な質問事項、質問事項に対する回答事項、それら作業項目の処理に必要な要望事項、それら伝達事項の記入者、それら伝達事項の記入日が含まれ、管理用コンピュータと業務用コンピュータとが、質問事項に対する回答事項を作業伝達事項毎に区分してデータベースに格納する回答事項格納手段と、質問事項に対して所定の回答が存在するか否かを確認可能な回答有無情報を各作業伝達事項毎に出力する回答有無情報出力手段と、回答事項を各作業伝達事項毎に出力する回答事項出力手段とを実行する。   As another example of the present invention, communication items include notes necessary for processing these work items, questions necessary for processing these work items, answers to the questions, and requests required for processing these work items. Answer items are stored in the database by the management computer and business computer classifying the answer items to the question items for each work item. A means for outputting information on the presence / absence of a reply for each work transmission item, and a means for outputting the presence / absence information for each work transmission item. The response item output means is executed.

本発明の他の一例として、作業進捗データ出力手段では、作業項目の作業完了予定期日を参照しつつ、その作業項目の作業完了期日が作業完了予定期日までに入力された場合、その作業項目の完了メッセージを出力し、その作業項目の作業開始期日が作業完了予定期日を越えても入力されない場合、その作業項目の遅延メッセージを出力する。   As another example of the present invention, the work progress data output means refers to the work completion scheduled date of the work item, and if the work completion date of the work item is input by the scheduled work completion date, A completion message is output, and when the work start date of the work item exceeds the scheduled work completion date, a delay message for the work item is output.

本発明の他の一例として、進捗状況出力手段では、作業項目の作業完了予定期日と作業注意事項の確認有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日までに入力され、かつ、その作業項目の作業注意事項の確認有りが作業完了予定期日までに確認された場合、その作業項目の完了メッセージを出力し、その作業項目の作業開始期日が作業完了予定期日を越えても入力されず、または、その作業項目の作業注意事項の確認有りが作業完了予定期日を越えても確認されない場合、その作業項目の遅延メッセージを出力する。   As another example of the present invention, the progress output means inputs the work completion date of the work item by the work completion due date while referring to the scheduled work completion date of the work item and the information on whether or not to confirm the work notes. If the confirmation of work precautions for the work item is confirmed by the scheduled work completion date, a completion message for the work item is output and the work start date for the work item exceeds the scheduled work completion date. However, if the confirmation of the work precautions for the work item is not confirmed even after the scheduled work completion date is exceeded, a delay message for the work item is output.

本発明の他の一例として、進捗状況出力手段では、作業項目の作業完了予定期日と作業注意事項の確認有無情報と回答有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日までに入力され、かつ、その作業項目の作業注意事項の確認有りが作業完了予定期日までに確認され、かつ、その作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日までに確認された場合、その作業項目の完了メッセージを出力し、その作業項目の作業開始期日が作業完了予定期日を越えても入力されず、または、その作業項目の作業注意事項の確認有りが作業完了予定期日を越えても確認されず、または、その作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日を越えても確認されない場合、その作業項目の遅延メッセージを出力する。   As another example of the present invention, the progress status output means refers to the scheduled work completion date of the work item, the work presence / absence confirmation information and the reply presence / absence information, and the work completion date of the work item is the work completion schedule. Confirmed by the due date and confirmation of the work precautions for the work item is confirmed by the scheduled work completion date, and answers to the questions for the work item are confirmed by the scheduled work completion date If the work item is completed, a completion message for the work item is output, and even if the work start date of the work item exceeds the scheduled work completion date, it will not be entered, or the work precautions for that work item will be confirmed and the work will be completed If it is not confirmed even if the due date is exceeded, or if the answer to the question for the work item is not confirmed even if the due date is exceeded, the work item will be delayed. And it outputs the message.

本発明の他の一例として、作業進捗データ出力手段では、自己が担当する作業項目を遅延している担当者に対してその作業項目の遅延メッセージを出力しつつ、作業項目を遅延している担当者の後に後続の作業項目を担当する担当者のうちの少なくとも直近の担当者に対し、作業項目を遅延している担当者のその作業項目の遅延メッセージを出力する。   As another example of the present invention, in the work progress data output means, the person in charge of delaying the work item while outputting a delay message of the work item to the person in charge of delaying the work item in charge of the work progress data output means A delay message for the work item of the person who is delaying the work item is output to at least the person in charge of the work item following the work person.

本発明の他の一例として、作業進捗データ出力手段では、作業項目の完了予定期日を参照しつつ、その作業項目の作業完了期日が作業完了予定期日を越えて入力された場合、その作業項目の遅延完了メッセージを出力する。   As another example of the present invention, when the work progress data output means refers to the scheduled completion date of the work item and the work completion date of the work item is input beyond the scheduled work completion date, Output delayed completion message.

本発明の他の一例として、作業進捗データ出力手段では、作業項目の作業完了予定期日と作業注意事項の確認有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日を越えて入力され、または、その作業項目の作業注意事項の確認有りが作業完了予定期日を越えて確認された場合、その作業項目の遅延完了メッセージを出力する。   As another example of the present invention, in the work progress data output means, the work completion date of the work item exceeds the scheduled work completion date while referring to the scheduled work completion date of the work item and the information on whether or not to confirm the work precautions. If the confirmation of work precautions for the work item is confirmed beyond the scheduled work completion date, a delayed completion message for the work item is output.

本発明の他の一例として、作業進捗データ出力手段では、作業項目の作業完了予定期日と作業注意事項の確認有無情報と回答有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日を越えて入力され、または、その作業項目の作業注意事項の確認有りが作業完了予定期日を越えて確認され、または、その作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日を越えて確認された場合、その作業項目の遅延完了メッセージを出力する。   As another example of the present invention, in the work progress data output means, the work completion date of the work item is the work completion while referring to the scheduled work completion date of the work item, the work presence / absence confirmation information and the reply presence / absence information. Input beyond the due date or confirmation of work precautions for the work item is confirmed beyond the work completion due date, or answer to the question for the work item is answered and the work completion due date If it is confirmed that it exceeds the limit, a delayed completion message for the work item is output.

本発明の他の一例として、作業進捗データ出力手段では、作業項目の作業完了予定期日を参照しつつ、その作業項目の作業開始期日が作業完了予定期日までに入力されない場合、その作業項目の作業未着手メッセージを出力し、その作業項目の作業開始期日が作業完了予定期日までに入力された場合、その作業項目の作業中メッセージを出力し、その作業項目の作業開始期日が作業完了予定期日までに入力され、かつ、その作業項目の作業完了期日が作業完了予定期日を越えても入力されない場合、その作業項目の遅延作業中メッセージを出力する。   As another example of the present invention, when the work progress data output means refers to the work completion scheduled date of the work item and the work start date of the work item is not input by the scheduled work completion date, the work of the work item If an unstarted message is output and the work start date of the work item is entered by the scheduled work completion date, an in-progress message for the work item is output, and the work start date of the work item is until the scheduled work completion date If the work completion date of the work item exceeds the scheduled work completion date, the delayed work in progress message for the work item is output.

本発明の他の一例として、作業進捗データ出力手段では、自己が担当する作業項目を未着手または遅延作業中の担当者に対してその作業項目の未着手メッセージまたは遅延作業中メッセージを出力しつつ、作業項目を未着手または遅延作業中の担当者の後に後続の作業項目を担当する担当者のうちの少なくとも直近の担当者に対し、作業項目を未着手または遅延作業中の担当者のその作業項目の未着手メッセージまたは遅延作業中メッセージを出力する。   As another example of the present invention, the work progress data output means outputs a work item not yet started message or a delayed work in progress message to a person in charge of the work item that he / she is in charge of or who has not started the work. , The work of the person who has not started the work item or has been late, and the person who has not started the work item or is late Outputs the item's unstarted message or delayed work message.

本発明の他の一例として、作業進捗データ出力手段では、自己が担当する作業項目を作業中の担当者に対してその作業項目の作業中メッセージを出力しつつ、作業項目を作業中の担当者の後に後続の主要手続を担当する担当者のうちの少なくとも直近の担当者に対し、作業項目を作業中の担当者のその作業項目の作業中メッセージを出力する。   As another example of the present invention, the work progress data output means outputs a work-in-progress message for the work item to the person who is working on the work item that he is in charge of, while the work item is in charge of the work item. After that, the in-work message of the work item of the person in charge of the work item is output to at least the person in charge of the subsequent main procedure.

請求項1に対応:本発明にかかる決算業務支援システムによれば、管理用コンピュータと業務用コンピュータとがネットワークを形成しつつ、決算業務の手続期間に処理を要する各種複数の主要手続を出力し、主要手続の処理に必要な少なくとも1つの作業項目をその処理順に番号付けて出力するとともに、作業項目の作業内容を各作業項目毎に出力し、さらに、作業項目を担当する担当者データを各主要手続毎に出力するから、主要手続の内容やそれの処理に要する作業項目の順序および内容の明確化を図ることができることはもちろん、各担当者が自己の処理すべき主要手続の内容や作業項目の順序および内容を事前に把握することができ、各担当者に対して主要手続や作業項目の処理作業を支援することができる。この決算業務支援システムは、主要手続や作業項目の処理に対する計画を事前に立てることができ、計画に従って主要手続や作業項目を処理することで、主要手続や作業項目の処理を計画に沿って迅速かつ正確に処理することができる。   Corresponding to Claim 1: According to the settlement business support system according to the present invention, the management computer and the business computer form a network and output a plurality of main procedures that require processing during the settlement business procedure period. , Output at least one work item necessary for the processing of the main procedure in the order of the processing, output the work content of the work item for each work item, and further, each person's data in charge of the work item Since it is output for each main procedure, it is possible to clarify the contents of the main procedures and the order and contents of the work items required to process them. The order and contents of the items can be grasped in advance, and each person in charge can be supported in the main procedure and work item processing work. This settlement business support system can plan in advance for the processing of main procedures and work items, and by processing the main procedures and work items according to the plan, the processing of the main procedures and work items can be performed quickly according to the plan. And can be processed accurately.

請求項2に対応:作業項目の作業進捗データを各作業項目毎に出力する決算業務支援システムは、担当者が自ら担当する作業項目の現在の進捗状況を各作業項目毎に把握することができ、それに基づいて、担当者自らが作業項目の処理の促進に努めることができ、主要手続や作業項目の処理を計画どおりに進めることができる。この決算業務支援システムは、管理者が各担当者の作業項目の現在の進捗状況を各作業項目毎に把握することができ、それに基づいて、管理者が担当者に作業項目の処理上の助言を与えることやその担当者の作業項目の処理の迅速化を促すことができ、各担当者の作業項目の処理に対する注意を喚起することで、各担当者毎に作業項目の処理の促進を図ることができる。   Corresponding to Claim 2: The settlement work support system that outputs work progress data of work items for each work item, the person in charge can grasp the current progress status of the work item for each work item. Based on this, the person in charge can make efforts to promote the processing of work items, and the main procedures and processing of work items can be proceeded as planned. In this settlement work support system, the administrator can grasp the current progress status of the work item of each person in charge for each work item, and based on that, the administrator provides advice on the work item processing to the person in charge. Accelerating the processing of work items by the person in charge and promoting the processing of work items for each person in charge by calling attention to the work item processing of each person in charge be able to.

請求項3に対応:主要手続の処理に必要な資料データを各主要手続毎に出力する決算業務支援システムは、主要手続を処理する際に必要な資料の明確化を図ることができることはもちろん、各担当者が自己の処理すべき主要手続に必要な資料を事前に把握することができ、事前に資料を明示することで各担当者の主要手続の処理を支援することができる。   Corresponding to claim 3: The settlement work support system that outputs the material data necessary for the processing of the main procedure for each main procedure can clarify the materials necessary for processing the main procedure. Each person in charge can grasp in advance the materials necessary for the main procedure to be processed by himself / herself, and the person in charge can support the processing of the main procedures by specifying the material in advance.

請求項4に対応:作業項目を処理する際に必要な作業注意事項を各作業項目毎に出力し、作業注意事項の確認有無情報を作業注意事項毎に出力する決算業務支援システムは、作業項目を処理する際に必要な作業注意事項がある場合、その作業注意事項を出力するから、各担当者がそれら作業注意事項を把握しつつ、作業注意事項にしたがって作業項目の処理を遂行することができ、作業注意事項を明示にすることで各担当者の作業項目の処理を支援することができる。この決算業務支援システムは、作業注意事項の確認有無情報によって管理者や担当者が作業項目を処理する際に作業注意事項を確認したか否かを知ることができ、作業注意事項の確認を義務づけることで、担当者に作業項目の正確かつ迅速な処理を遂行させることができる。   Corresponding to Claim 4: The settlement work support system that outputs the work notes necessary for processing the work items for each work item and outputs the confirmation information on the work notes for each work note. If there are work precautions necessary for processing the work, the work precautions are output, so that each person in charge can grasp the work precautions and execute the work item processing according to the work precautions. It is possible to support the processing of the work items of each person in charge by clarifying the work precautions. This settlement work support system is able to know whether or not the administrator or the person in charge confirmed the work notes when processing the work items based on the information on whether or not the work notes are confirmed, and obligates the confirmation of the work notes. This allows the person in charge to perform accurate and quick processing of work items.

請求項5に対応:主要手続によって作成される成果物を各主要手続毎に出力し、主要手続によって計上される仕訳タイプを各主要手続毎に出力する決算業務支援システムは、主要手続によって作成される成果物や主要手続によって計上される仕訳タイプの明確化を図ることができることはもちろん、各担当者が自己の処理すべき主要手続によって作成される成果物や主要手続によって計上される仕訳タイプを事前に把握することができ、事前に成果物や仕訳タイプを明示することで各担当者の主要手続の処理を支援することができる。   Corresponding to Claim 5: A settlement business support system that outputs a product created by a main procedure for each main procedure and outputs a journal type recorded by the main procedure for each main procedure is created by the main procedure. In addition to clarifying the types of journals recorded by the deliverables and main procedures, each person in charge defines the deliverables created by the main procedures to be processed by the person in charge and the journal types recorded by the main procedures. It is possible to grasp in advance, and by specifying the deliverables and journal types in advance, it is possible to support the processing of the main procedures of each person in charge.

請求項6に対応:作業項目に作業伝達事項が存在するか否かを確認可能な伝達事項有無情報を各作業項目毎に出力し、作業伝達事項を各作業項目毎に出力する決算業務支援システムは、各担当者が伝達事項有無情報によって作業項目に伝達事項があるか否かを把握することができるとともに、作業項目の処理に必要な伝達事項がある場合、その伝達事項を出力するから、各担当者がそれら伝達事項を把握しつつ、伝達事項を参照して作業項目の処理を遂行することができ、伝達事項を明示にすることで各担当者の作業項目の処理を支援することができる。   Corresponding to Claim 6: Settlement work support system that outputs information on presence / absence of communication items capable of confirming whether or not there is a work transmission item in each work item, and outputs the work transmission item for each work item Since each person in charge can grasp whether there is a transmission item in the work item based on the transmission item presence / absence information, and when there is a transmission item necessary for processing the work item, the transmission item is output. Each person in charge can grasp the items to be communicated and can process the work items by referring to the items to be communicated. By clarifying the items to be communicated, each person in charge can support the processing of the work items. it can.

請求項7に対応:作業伝達事項の重要度を各作業伝達事項毎に出力する決算業務支援システムは、作業伝達事項のランク付けされた重要度が各作業伝達事項毎に出力されるから、重要度に応じて伝達事項を参照しつつ、その伝達事項を参考に作業項目の処理を遂行することができ、作業伝達事項の重要度を明示にすることで各担当者の作業項目の処理を支援することができる。   Corresponding to Claim 7: The settlement work support system that outputs the importance of work transfer items for each work transfer item is important because the ranked importance of work transfer items is output for each work transfer item. Work items can be processed with reference to the items to be communicated according to the degree, and support for each person's work item processing by clarifying the importance of the items to be communicated. can do.

請求項8に対応:伝達事項に作業項目の処理に必要な注意事項、作業項目の処理に必要な質問事項、質問事項に対する回答事項、作業項目の処理に必要な要望事項が含まれ、質問事項に対して所定の回答が存在するか否かを確認可能な回答有無情報と回答事項とを各作業伝達事項毎に出力する決算業務支援システムは、各担当者が作業項目に対する注意事項や質問事項、回答事項、要望事項を把握することができ、注意事項や質問事項、回答事項、要望事項を参照しつつ、それらを参考に作業項目を処理することができ、注意事項や質問事項、回答事項、要望事項を明示にすることで各担当者の作業項目の処理を支援することができる。この決算業務支援システムは、回答有無情報によって管理者や担当者が質問事項に対して回答したか否かを知ることができ、また、回答事項の出力によって管理者や担当者がその内容を知ることができ、質問事項に対する回答を義務づけることや回答内容の周知を図ることで、担当者に作業項目の正確かつ迅速な処理を遂行させることができる。   Corresponding to Claim 8: Communication items include precautions necessary for processing work items, questions necessary for processing work items, answers to questions, and requirements necessary for processing work items. An account settlement support system that outputs information on whether or not there is a predetermined answer to each work transfer item for each work transfer item. , Answers and requests can be grasped, work items can be processed with reference to the notes, questions, answers and requests, and the notes, questions and answers can be processed. By clarifying the desired items, it is possible to support the processing of the work items of each person in charge. This settlement operation support system can know whether or not the administrator or the person in charge has answered the question based on the answer presence information, and the administrator or person in charge knows the contents by outputting the answer It is possible to make the person in charge perform accurate and prompt processing of work items by obliging to answer questions and making the contents of the answers known.

請求項9に対応:作業項目の作業完了期日が作業完了予定期日までに入力された場合、その作業項目の完了メッセージを出力し、作業項目の作業開始期日が作業完了予定期日を越えても入力されない場合、その作業項目の遅延メッセージを出力する決算業務支援システムは、各作業項目の完了メッセージを確認することで、管理者がそれら作業項目の進捗状況を正確に把握することができ、各作業項目の進み具合を確認しつつ、担当者に対して作業項目の処理の迅速化を促すことで、作業項目の処理の促進を図ることができ、あわせて主要手続の処理の促進を図ることができる。この決算業務支援システムは、作業項目の作業開始期日が作業完了予定期日を越えても入力されない場合、その作業項目の遅延メッセージを出力するから、各作業項目の遅延メッセージに基づいて、管理者や担当者が作業項目の遅延の原因を追及しつつその対応策を案出し、その対応策によって次回の決算業務における作業項目を計画通りに進めることができ、作業項目の正確かつ迅速な処理を支援することができる。また、管理者や担当者がそれら作業項目の遅延を作業項目毎に把握することができ、管理者が担当者の作業項目に対する処理の遅延を指摘し、担当者に作業項目の処理の迅速化を促すことで、作業項目の処理に対する注意を喚起することができ、担当者に対して作業項目の処理の促進を図ることができる。   Corresponds to Claim 9: When the work completion date of a work item is entered by the scheduled work completion date, a completion message for the work item is output and entered even if the work start date of the work item exceeds the planned work completion date If not, the settlement work support system that outputs a delay message for the work item confirms the completion message for each work item, so that the administrator can accurately grasp the progress of those work items. By confirming the progress of the items and prompting the person in charge to expedite the processing of the work items, the processing of the work items can be promoted, and the processing of the main procedures can also be promoted. it can. Since this settlement work support system outputs a delayed message for a work item when the work start date of the work item exceeds the scheduled work completion date, it outputs a delayed message for that work item. The person in charge devised a countermeasure while pursuing the cause of the delay of the work item, and the countermeasure enables the work item in the next settlement operation to proceed as planned, supporting accurate and quick processing of the work item. can do. In addition, the administrator and the person in charge can grasp the delay of these work items for each work item, the administrator points out the process delay for the person in charge of the work item, and speeds up the work item processing to the person in charge. , It is possible to call attention to the processing of the work item and to promote the processing of the work item to the person in charge.

請求項10に対応:作業項目の作業完了期日が作業完了予定期日までに入力され、かつ、その作業項目の作業注意事項の確認有りが作業完了予定期日までに確認された場合、その作業項目の完了メッセージを出力し、その作業項目の作業開始期日が作業完了予定期日を越えても入力されず、または、その作業項目の作業注意事項の確認有りが作業完了予定期日を越えても確認されない場合、その作業項目の遅延メッセージを出力する決算業務支援システムは、作業項目の作業注意事項の確認有りが確認されない限り、その作業項目の処理が完了しないから、作業項目を処理する際にその作業項目の作業注意事項の確認を義務づけることができ、作業注意事項の確認を実施させることで担当者に作業項目の正確かつ迅速な処理を遂行させることができる。決算業務支援システムは、各作業項目の完了メッセージを確認することで、管理者がそれら作業項目の進捗状況を正確に把握することができ、各作業項目の進み具合を確認しつつ、担当者に対して作業項目の処理の迅速化を促すことで、作業項目の処理の促進を図ることができ、あわせて主要手続の処理の促進を図ることができる。この決算業務支援システムは、作業項目の作業開始期日が作業完了予定期日を越えても入力されず、または、その作業項目の作業注意事項の確認有りが作業完了予定期日を越えても確認されない場合、その作業項目の遅延メッセージを出力するから、各作業項目の遅延メッセージに基づいて、管理者や担当者が作業項目の遅延の原因を追及しつつその対応策を案出し、その対応策によって次回の決算業務における作業項目を計画通りに進めることができ、作業項目の正確かつ迅速な処理を支援することができる。また、管理者や担当者がそれら作業項目の遅延を作業項目毎に把握することができ、管理者が担当者の作業項目に対する処理の遅延を指摘し、担当者に作業項目の処理の迅速化を促すことで、作業項目の処理に対する注意を喚起することができ、担当者に対して作業項目の処理の促進を図ることができる。   Corresponding to Claim 10: When the work completion date of a work item is input by the scheduled work completion date and the confirmation of the work precautions for the work item is confirmed by the scheduled work completion date, When a completion message is output and the work start date of the work item exceeds the scheduled work completion date, it will not be entered, or confirmation of work precautions for that work item will not be confirmed even after the scheduled work completion date The settlement work support system that outputs a delay message for the work item does not complete the processing of the work item unless it is confirmed that the work precautions for the work item have been confirmed. It is possible to require confirmation of work precautions, and to make the person in charge perform accurate and quick processing of work items by checking work precautions. It can be. By confirming the completion message of each work item, the settlement work support system allows the administrator to accurately grasp the progress of each work item, and confirms the progress of each work item while On the other hand, by accelerating the processing of the work item, the processing of the work item can be promoted, and at the same time, the processing of the main procedure can be promoted. In this settlement work support system, if the work start date of the work item exceeds the scheduled work completion date, it will not be entered, or if confirmation of the work precautions for that work item exceeds the scheduled work completion date, it will not be confirmed , The delay message of the work item is output, and based on the delay message of each work item, the administrator or the person in charge devises the countermeasure while pursuing the cause of the delay of the work item, and the countermeasure The work items in the settlement work can be advanced as planned, and accurate and quick processing of the work items can be supported. In addition, the administrator and the person in charge can grasp the delay of these work items for each work item, the administrator points out the process delay for the person in charge of the work item, and speeds up the work item processing to the person in charge. , It is possible to call attention to the processing of the work item and to promote the processing of the work item to the person in charge.

請求項11に対応:作業項目の作業完了期日が作業完了予定期日までに入力され、かつ、作業項目の作業注意事項の確認有りが作業完了予定期日までに確認され、かつ、作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日までに確認された場合、その作業項目の完了メッセージを出力し、作業項目の作業開始期日が作業完了予定期日を越えても入力されず、または、作業項目の作業注意事項の確認有りが作業完了予定期日を越えても確認されず、または、作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日を越えても確認されない場合、その作業項目の遅延メッセージを出力する決算業務支援システムは、作業項目の作業注意事項の確認有りが確認されない限り、かつ、作業項目の質問事項に対する回答事項の回答有りが確認されない限り、その作業項目の処理が完了しないから、作業項目を処理する際の作業注意事項の確認や質問事項に対する回答を義務づけることができ、作業注意事項の確認を実施させるとともに質問事項して回答させることで担当者に作業項目の正確かつ迅速な処理を遂行させることができる。決算業務支援システムは、各作業項目の完了メッセージを確認することで、管理者がそれら作業項目の進捗状況を正確に把握することができ、各作業項目の進み具合を確認しつつ、担当者に対して作業項目の処理の迅速化を促すことで、作業項目の処理の促進を図ることができ、あわせて主要手続の処理の促進を図ることができる。この決算業務支援システムは、作業項目の作業開始期日が作業完了予定期日を越えても入力されず、または、作業項目の作業注意事項の確認有りが作業完了予定期日を越えても確認されず、または、作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日を越えても確認されない場合、その作業項目の遅延メッセージを出力するから、各作業項目の遅延メッセージに基づいて、管理者や担当者が作業項目の遅延の原因を追及しつつその対応策を案出し、その対応策によって次回の決算業務における作業項目を計画通りに進めることができ、作業項目の正確かつ迅速な処理を支援することができる。また、管理者や担当者がそれら作業項目の遅延を作業項目毎に把握することができ、管理者が担当者の作業項目に対する処理の遅延を指摘し、担当者に作業項目の処理の迅速化を促すことで、作業項目の処理に対する注意を喚起することができ、担当者に対して作業項目の処理の促進を図ることができる。   Corresponding to Claim 11: The work completion date of the work item is entered by the scheduled work completion date, and the confirmation of the work precautions of the work item is confirmed by the scheduled work completion date, and the question of the work item If it is confirmed that there is a response to the answer to the work completion date, the completion message for the work item is output, and if the work start date of the work item exceeds the work completion due date, it will not be entered, or the work If the item's work precautions are not confirmed even if the scheduled work completion date is exceeded, or if the answer to the work item's questions is not confirmed even if the scheduled work completion date is exceeded, the work item The settlement work support system that outputs the delayed message of the answer to the question of the work item will not answer unless the confirmation of the work precaution of the work item is confirmed. The processing of the work item will not be completed unless it is confirmed that there is an answer, so it is possible to check the work precautions when processing the work item and to answer the questions, and to confirm the work precautions It is possible to cause the person in charge to perform accurate and quick processing of work items by answering questions. By confirming the completion message of each work item, the settlement work support system allows the administrator to accurately grasp the progress of each work item, and confirms the progress of each work item while On the other hand, by accelerating the processing of the work item, the processing of the work item can be promoted, and at the same time, the processing of the main procedure can be promoted. This settlement work support system will not be entered even if the work start date of the work item exceeds the scheduled work completion date, or the confirmation of work precautions for the work item will not be confirmed even if it exceeds the scheduled work completion date. Or, if the answer to the work item question is not confirmed even after the scheduled work completion date is exceeded, a delayed message for that work item is output. The person in charge devised a countermeasure while pursuing the cause of the delay of the work item, and the countermeasure enables the work item in the next settlement operation to proceed as planned, supporting accurate and quick processing of the work item. can do. In addition, the administrator and the person in charge can grasp the delay of these work items for each work item, the administrator points out the process delay for the person in charge of the work item, and speeds up the work item processing to the person in charge. , It is possible to call attention to the processing of the work item and to promote the processing of the work item to the person in charge.

請求項12に対応:自己が担当する作業項目を遅延している担当者に対してその作業項目の遅延メッセージを出力しつつ、作業項目を遅延している担当者の後に後続の作業項目を担当する担当者のうちの少なくとも直近の担当者に対し、作業項目を遅延している担当者のその作業項目の遅延メッセージを出力する決算業務支援システムは、作業項目を遅延している担当者のみならず、作業項目を遅延している担当者の後に後続の作業項目を担当する担当者にその作業項目の遅延メッセージを出力するから、後続の作業項目を担当する担当者が前の作業項目を担当する担当者に作業項目に対する処理の遅延を指摘し、前の担当者に対して作業項目の処理の迅速化を促すことで、前の担当者の作業項目の遅延による後続の作業項目の遅延を防ぐことができる。   Corresponding to Claim 12: Outputs a work item delay message to a person who is delaying the work item that he is responsible for, and is responsible for the subsequent work item after the person who is delaying the work item The account settlement support system that outputs the delayed message of the work item of the person who is delaying the work item to at least the most recent person in charge Instead, a delay message for the work item is output to the person in charge of the subsequent work item after the person in charge of the work item, so the person in charge of the subsequent work item is responsible for the previous work item. The delay of the work item of the previous person in charge by delaying the work item of the previous person can be prevented by Prevent Can.

請求項13に対応:作業項目の作業完了期日が作業完了予定期日を越えて入力された場合、その作業項目の遅延完了メッセージを出力する決算業務支援システムは、各作業項目の遅延完了メッセージに基づいて、管理者や担当者が作業項目の遅延完了の原因を追及しつつその対応策を案出し、その対応策によって次回の決算業務における作業項目を計画通りに進めることができ、作業項目の正確かつ迅速な処理を支援することができる。   Corresponding to Claim 13: When the work completion date of the work item is input beyond the scheduled work completion date, the settlement work support system that outputs the delayed completion message of the work item is based on the delayed completion message of each work item. Therefore, the manager and the person in charge can devise a countermeasure while pursuing the cause of delay completion of the work item, and the countermeasure can proceed the work item in the next settlement work as planned. In addition, a quick process can be supported.

請求項14に対応:作業項目の作業完了期日が作業完了予定期日を越えて入力され、または、作業項目の作業注意事項の確認有りが作業完了予定期日を越えて確認された場合、その作業項目の遅延完了メッセージを出力する決算業務支援システムは、各作業項目の遅延完了メッセージに基づいて、管理者や担当者が作業項目の遅延完了の原因を追及しつつその対応策を案出し、その対応策によって次回の決算業務における作業項目を計画通りに進めることができ、作業項目の正確かつ迅速な処理を支援することができる。   Corresponding to Claim 14: When the work completion date of the work item is input beyond the scheduled work completion date, or the confirmation of the work precautions of the work item is confirmed beyond the scheduled work completion date, the work item The account settlement business support system that outputs the delayed completion message of the manager, based on the delayed completion message of each work item, the manager and the person in charge devise the countermeasure while pursuing the cause of the delayed completion of the work item, and the response By this measure, work items in the next settlement work can be advanced as planned, and accurate and quick processing of work items can be supported.

請求項15に対応:作業項目の作業完了期日が作業完了予定期日を越えて入力され、または、作業項目の作業注意事項の確認有りが作業完了予定期日を越えて確認され、または、作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日を越えて確認された場合、その作業項目の遅延完了メッセージを出力する決算業務支援システムは、各作業項目の遅延完了メッセージに基づいて、管理者や担当者が作業項目の遅延完了の原因を追及しつつその対応策を案出し、その対応策によって次回の決算業務における作業項目を計画通りに進めることができ、作業項目の正確かつ迅速な処理を支援することができる。   Corresponding to Claim 15: The work completion date of the work item is input beyond the scheduled work completion date, or the confirmation of the work precautions of the work item is confirmed beyond the scheduled work completion date, or the work item When it is confirmed that there is an answer to a question that exceeds the due date for completion of the work, the settlement work support system that outputs a delayed completion message for that work item is based on the delayed completion message for each work item. And the person in charge can devise a countermeasure while pursuing the cause of the delayed completion of the work item, and the countermeasure can proceed the work item in the next settlement work as planned, so that the work item can be processed accurately and promptly. Can help.

請求項16に対応:作業項目の作業開始期日が作業完了予定期日までに入力されない場合、その作業項目の作業未着手メッセージを出力し、作業項目の作業開始期日が作業完了予定期日までに入力された場合、その作業項目の作業中メッセージを出力し、作業項目の作業開始期日が作業完了予定期日までに入力され、かつ、作業項目の作業完了期日が作業完了予定期日を越えても入力されない場合、その作業項目の遅延作業中メッセージを出力する決算業務支援システムは、作業項目の未着手メッセージや遅延作業中メッセージに基づいて、管理者や担当者が作業項目の未着手や遅延作業の原因を追及しつつその対応策を案出し、その対応策によって次回の決算業務における作業項目を計画通りに進めることができ、作業項目の正確かつ迅速な処理を支援することができる。この決算業務支援システムは、管理者や担当者がそれら作業項目の未着手や遅延作業を作業項目毎に把握することができ、管理者が担当者の作業項目の処理の未着手や作業項目に対する処理の遅延を指摘し、担当者に作業項目の処理の迅速化を促すことで、作業項目の処理に対する注意を喚起することができ、担当者に対して作業項目の処理の促進を図ることができる。   Corresponding to Claim 16: If the work start date of a work item is not entered by the scheduled work completion date, a work not yet started message is output for the work item, and the work start date of the work item is entered by the scheduled work completion date If a work item message is output, the work start date of the work item is entered by the planned work completion date, and the work item work completion date exceeds the planned work completion date, it will not be entered. The settlement work support system that outputs a delayed work-in-progress message for the work item allows the administrator or person in charge to determine the cause of the work item not started or delayed work based on the unstarted message or delayed work-in-progress message of the work item. We devise countermeasures while pursuing, and the countermeasures can advance the work items in the next settlement work as planned. It is possible to support the process. This settlement work support system allows managers and staff to grasp the start of work items and delayed work for each work item. By pointing out the processing delay and prompting the person in charge to expedite the processing of the work item, it is possible to call attention to the processing of the work item, and to promote the processing of the work item to the person in charge. it can.

請求項17に対応:自己が担当する作業項目を未着手または遅延作業中の担当者に対してその作業項目の未着手メッセージまたは遅延作業中メッセージを出力しつつ、作業項目を未着手または遅延作業中の担当者の後に後続の作業項目を担当する担当者のうちの少なくとも直近の担当者に対し、作業項目を未着手または遅延作業中の担当者のその作業項目の未着手メッセージまたは遅延作業中メッセージを出力する決算業務支援システムは、作業項目の未着手や遅延作業中の担当者のみならず、作業項目を未着手や遅延作業中の担当者の後に後続の作業項目を担当する担当者にその作業項目の未着手メッセージや遅延作業中メッセージを出力するから、後続の作業項目を担当する担当者が前の作業項目を担当する担当者に作業項目に対する処理の未着手や遅延作業中を指摘し、前の担当者に対して作業項目の処理の迅速化を促すことで、前の担当者の作業項目の未着手や遅延作業中による後続の作業項目の遅延を防ぐことができる。   Corresponding to Claim 17: A work item not started or delayed work is output to a person in charge of the work item that he / she is in charge of, or a work in progress or delayed work is being output to the person in charge of the work item. At least the person in charge of the subsequent work item after the person in charge of the person who has not started or delayed the work item for the person in charge of the work item not yet started or delayed The settlement work support system that outputs messages is not only for those who have not yet started work or delayed work, but also for those who are in charge of subsequent work items after those who have not started work or are late. Since the unstarted message or delayed work in progress message is output for the work item, the person in charge of the subsequent work item handles the action for the work item to the person in charge of the previous work item. Point out that the work item has not been started or is delayed, and prompt the previous person in charge to expedite the processing of the work item. Delay can be prevented.

請求項18に対応:自己が担当する作業項目を作業中の担当者に対してその作業項目の作業中メッセージを出力しつつ、作業項目を作業中の担当者の後に後続の作業項目を担当する担当者のうちの少なくとも直近の担当者に対し、作業項目を作業中の担当者のその作業項目の作業中メッセージを出力する決算業務支援システムは、作業項目の作業中の担当者のみならず、作業項目を作業中の担当者の後に後続の作業項目を担当する担当者にその作業項目の作業中メッセージを出力するから、後続の作業項目を担当する担当者が前の作業項目を担当する担当者の作業項目の処理の進捗データを把握することで、後続の作業項目の担当者が作業項目の処理の準備をすることができ、その結果、作業項目の処理の促進を図ることができる。   Corresponding to Claim 18: While the work item of the work item is output to the person in charge of the work item that he is in charge of, the subsequent work item is assigned after the person in charge of the work item. The settlement work support system that outputs a work-in-progress message for the person in charge of the work item to the person in charge of the work item to at least the person in charge of the work item is not limited to the person in charge of the work item. Since the in-progress message for the work item is output to the person in charge of the subsequent work item after the person in charge of the work item, the person in charge of the subsequent work item is responsible for the previous work item. By grasping the progress data of the work item processing, the person in charge of the subsequent work item can prepare for the work item processing, and as a result, the work item processing can be promoted.

決算業務促進システムの一例を示す概略構成図。The schematic block diagram which shows an example of an account settlement business promotion system. 決算業務促進システムの他の一例を示す概略構成図。The schematic block diagram which shows another example of an account settlement business promotion system. 決算業務促進システムの認証画面の一例を示す図。The figure which shows an example of the authentication screen of an account settlement business promotion system. 初期画面の一例を示す図。The figure which shows an example of an initial screen. データ入力選択画面の一例を示す図。The figure which shows an example of a data input selection screen. 担当者データ入力画面の一例を示す図。The figure which shows an example of a person in charge data input screen. 資料データ入力画面の一例を示す図。The figure which shows an example of a document data input screen. 資料リスト出力画面の一例を示す図。The figure which shows an example of a document list output screen. 休日データ入力画面の一例を示す図。The figure which shows an example of a holiday data input screen. 主要手続リスト出力画面の一例を示す図。The figure which shows an example of a main procedure list output screen. 主要手続入力画面の一例を示す図。The figure which shows an example of a main procedure input screen. 主要手続更新画面の一例を示す図。The figure which shows an example of a main procedure update screen. 作業リスト出力画面の一例を示す図。The figure which shows an example of a work list output screen. 作業入力画面の一例を示す図。The figure which shows an example of a work input screen. 作業更新画面の一例を示す図。The figure which shows an example of a work update screen. 部署データ入力画面の一例を示す図。The figure which shows an example of a department data input screen. 解説図表リスト出力画面の一例を示す図。The figure which shows an example of an explanatory chart list output screen. 解説図表リストにおいて指定された解説図表の一例を示す図。The figure which shows an example of the explanatory chart designated in the explanatory chart list. 決算手続詳細リスト出力画面の一例を示す図。The figure which shows an example of a settlement procedure detailed list output screen. 決算手続マニュアル表示画面の一例を示す図。The figure which shows an example of a settlement procedure manual display screen. 決算手続マニュアル表示画面の他の一例を示す図。The figure which shows another example of a settlement procedure manual display screen. 決算手続マニュアル表示画面の他の一例を示す図。The figure which shows another example of a settlement procedure manual display screen. 決算手続マニュアル表示画面の他の一例を示す図。The figure which shows another example of a settlement procedure manual display screen. 作業管理選択画面の一例を示す図。The figure which shows an example of a work management selection screen. 手続一覧表の一例を示す図。The figure which shows an example of a procedure list. 作業一覧表の一例を示す図。The figure which shows an example of a work list. 手続一覧表の他の一例を示す図。The figure which shows another example of a procedure list. 手続一覧表の他の一例を示す図。The figure which shows another example of a procedure list. 作業一覧表の他の一例を示す図。The figure which shows another example of a work list. 作業一覧表の他の一例を示す図。The figure which shows another example of a work list. チェックリスト出力画面の一例を示す図。The figure which shows an example of a check list output screen. チェックリスト出力画面の他の一例を示す図。The figure which shows another example of a check list output screen. チェックリスト出力画面の他の一例を示す図。The figure which shows another example of a check list output screen. 伝達事項一覧表出力画面の一例を示す図。The figure which shows an example of a transmission matter list output screen. リスク作業チェックリスト表示画面の一例を示す図。The figure which shows an example of a risk work checklist display screen. リスク作業チェックリスト表示画面の他の一例を示す図。The figure which shows another example of a risk work check list display screen. リスク作業チェックリスト表示画面の他の一例を示す図。The figure which shows another example of a risk work check list display screen. リスク作業チェックリスト表示画面の他の一例を示す図。The figure which shows another example of a risk work check list display screen. 新旧対照表表示画面の一例を示す図。The figure which shows an example of the new and old contrast table display screen.

決算業務促進システムの一例を示す概略構成図である図1や決算業務支援システムの他の一例を示す概略構成図である図2等の添付の図面を参照し、本発明にかかる決算業務支援システムの詳細を説明すると、以下のとおりである。この決算業務支援システム10A,10Bは、管理用コンピュータ11と複数の業務用コンピュータ12〜16とデータベース17とから形成され、企業会計または官庁会計の決算における決算業務の適正な進行を促進する。   With reference to the attached drawings such as FIG. 1 which is a schematic configuration diagram showing an example of the settlement business promotion system and FIG. 2 which is a schematic configuration diagram showing another example of the settlement business support system, the settlement business support system according to the present invention The details will be described as follows. The settlement business support systems 10A and 10B are formed of a management computer 11, a plurality of business computers 12 to 16, and a database 17, and promote the proper progress of settlement business in corporate accounting or government accounting.

図1のシステム10Aでは、それらコンピュータ11〜13とデータベース17とによってローカルエリアネットワーク(有線LANまたは無線LAN)が構築されている。図2のシステム10Bでは、それらコンピュータ11〜16やデータベース17がセグメント単位の複数のローカルエリアネットワークを構築し、それらネットワークがインターネット18を介して互いに接続される。ネットワークには、それらコンピュータ11〜16やデータベース17の他に、ハブ19とサーバ20とが設置されている。   In the system 10 </ b> A of FIG. 1, a local area network (wired LAN or wireless LAN) is constructed by the computers 11 to 13 and the database 17. In the system 10 </ b> B of FIG. 2, the computers 11 to 16 and the database 17 construct a plurality of local area networks in segment units, and these networks are connected to each other via the Internet 18. In addition to the computers 11 to 16 and the database 17, a hub 19 and a server 20 are installed in the network.

管理用コンピュータ11は、決算における決算業務を監視する管理者が管理、使用し、業務用コンピュータ12〜16は、管理用コンピュータ11の管理下に置かれ、決算業務を担当する複数の担当者が管理、使用する。データベース17には、各種複数のファイルやアドレスが作られている。データベース17は、それらファイルやアドレスに決算業務に関する各種データを格納し、それらコンピュータ11〜16にそれらデータを提供する。データベース17は、各コンピュータ11〜16からのデータ転送指令に基づいて各種データをコンピュータ11〜16に転送し、コンピュータ11〜16からのデータ格納指令に基づいて各種データを格納する。   The management computer 11 is managed and used by a manager who monitors the settlement business in the settlement, and the business computers 12 to 16 are placed under the management of the management computer 11, and a plurality of persons in charge of the settlement business are used. Manage and use. In the database 17, a plurality of various files and addresses are created. The database 17 stores various data related to settlement work in these files and addresses, and provides these data to the computers 11-16. The database 17 transfers various data to the computers 11 to 16 based on data transfer commands from the computers 11 to 16, and stores various data based on data storage commands from the computers 11 to 16.

サーバ20は、ホスト名とそのホスト名に割り当てるIPアドレスとの対応付けを設定するDNSサーバ機能、ホームページを公開するために必要なWebサーバ機能、他のコンピュータや他のサーバからの要求を受け付けて各種情報を読み書きする機能を提供するデータベースサーバ機能、電子メールの送受信用のメールサーバ機能、作成された文章や画像等のデータをすべて保存してそれらのデータを検索可能にするドキュメントサーバ機能等を有する。   The server 20 accepts a request from a DNS server function for setting a correspondence between a host name and an IP address assigned to the host name, a Web server function necessary for publishing a home page, and other computers and other servers. A database server function that provides functions for reading and writing various information, a mail server function for sending and receiving e-mails, a document server function that saves all data such as texts and images created, and makes it possible to search for such data Have.

ローカルエリアネットワークは、企業の1つの社屋内や官庁の1つの庁舎内に構築される場合、または、各所に建設された企業の複数の社屋どうしの間や各所に建設された官庁の複数の庁舎どうしの間に構築される場合がある。なお、図1では、ネットワークにおいて1つの管理用コンピュータ11と2つの業務用コンピュータ12,13とを図示しているが、コンピュータの個数に特に限定はなく、2つ以上の管理用コンピュータと3つ以上の業務用コンピュータとからネットワークが構築されていてもよい。また、図2では、2つのネットワークを図示しているが、ネットワークの数に特に限定はなく、3つ以上のネットワークがインターネット18を介して接続される態様であってもよい。   A local area network is built in one company's office or in one government office, or between office buildings built in various places, or in several government office buildings built in various places. May be built between. 1 shows one management computer 11 and two business computers 12 and 13 in the network, the number of computers is not particularly limited, and there are two or more management computers and three computers. A network may be constructed from the above business computers. In FIG. 2, two networks are illustrated, but the number of networks is not particularly limited, and three or more networks may be connected via the Internet 18.

管理用コンピュータ11およびそれら業務用コンピュータ12〜16は、中央処理部(CPUまたはMPU)とメモリ(記憶部)とを有し、大容量ハードディスクを内蔵している。それらコンピュータ11〜16やデータベース17は、インターフェイス(有線または無線)を介してハブ19に接続されている。図1,2ではデータベース17がそれらコンピュータ11〜16とは別に設置されているが、管理用コンピュータ11のハードディスクにデータベース17が設定される場合もある。   The management computer 11 and the business computers 12 to 16 have a central processing unit (CPU or MPU) and a memory (storage unit), and incorporate a large-capacity hard disk. The computers 11 to 16 and the database 17 are connected to the hub 19 via an interface (wired or wireless). 1 and 2, the database 17 is installed separately from the computers 11 to 16. However, the database 17 may be set on the hard disk of the management computer 11.

管理用コンピュータ11や業務用コンピュータ12〜16には、プライベートIPアドレスやMACアドレスが設定されており、それらアドレス情報に基づいて各コンピュータ11〜16を個別に特定することができる。管理用コンピュータ11や業務用コンピュータ12〜16には、通信ポートが内蔵され、キーボード21やマウス22等の入力装置、ディスプレイ23,24やプリンタ(図示せず)等の出力装置がインターフェイスを介して接続されている。管理用コンピュータ11や業務用コンピュータ12〜16は、サーバ20を介してインターネット18に接続可能であり、ネットワーク間において決算業務に関する各種データを送受信可能である。ネットワーク内では、管理用コンピュータ11や業務用コンピュータ12〜16どうしで決算業務に関する各種データを送受信可能である。   Private IP addresses and MAC addresses are set in the management computer 11 and the business computers 12 to 16, and the computers 11 to 16 can be individually specified based on the address information. The management computer 11 and the business computers 12 to 16 have built-in communication ports, and input devices such as a keyboard 21 and a mouse 22 and output devices such as displays 23 and 24 and a printer (not shown) are connected via an interface. It is connected. The management computer 11 and the business computers 12 to 16 can be connected to the Internet 18 via the server 20 and can transmit and receive various data related to settlement work between networks. In the network, various data related to the settlement work can be transmitted and received between the management computer 11 and the business computers 12 to 16.

管理用コンピュータ11や業務用コンピュータ12〜16のメモリには、決算業務促進アプリケーションが格納されている。決算業務促進アプリケーションは、それを記憶したCD−ROM等の光ディスク(記憶媒体)からコンピュータ11〜16のメモリにインストールされる。なお、記憶媒体には、光ディスクの他に半導体メモリや磁気ディスクを使用することもできる。管理用コンピュータ11や業務用コンピュータ12〜16の中央処理部は、オペレーティングシステムによる制御に基づいて、メモリに格納された決算業務促進アプリケーションを起動し、そのアプリケーションに従って以下の各手段を実行する。   A settlement business promotion application is stored in the memory of the management computer 11 or the business computers 12 to 16. The settlement work promotion application is installed in the memories of the computers 11 to 16 from an optical disc (storage medium) such as a CD-ROM storing the settlement work promotion application. In addition to the optical disk, a semiconductor memory or a magnetic disk can be used as the storage medium. The central processing units of the management computer 11 and the business computers 12 to 16 start the settlement business promotion application stored in the memory based on the control by the operating system, and execute the following means according to the application.

管理用コンピュータ11の中央処理部は、決算業務の手続期間に処理を要する各種複数の主要手続(主要手続の手続名)に所定の主要手続識別子を設定し、それら主要手続をデータベース17の主要手続ファイルに格納する主要手続格納手段を実行する。それら主要手続は、主要手続識別子によって特定される。コンピュータ11の中央処理部は、それら主要手続を担当する担当者データを各主要手続毎(各主要手続の手続名毎)に区分した状態(主要手続を特定する主要手続識別子と担当者データを特定する担当者ID番号(担当者識別子)とを関連付けた状態)でデータベース17の主要手続ファイルに格納する手続担当者格納手段を実行する。それら担当者データは、担当者ID番号によって特定される。担当者識別子には、担当者ID番号の他に、担当者の暗証番号やその他の識別符号を利用することもできる。   The central processing unit of the management computer 11 sets predetermined main procedure identifiers in a plurality of main procedures (procedure names of main procedures) that need to be processed during the procedure period of the settlement work, and these main procedures are stored in the main procedure of the database 17. The main procedure storage means for storing in the file is executed. These main procedures are specified by the main procedure identifier. The central processing unit of the computer 11 divides the person-in-charge data in charge of these main procedures into each main procedure (for each procedure name of each main procedure) (identifies the main procedure identifier and person-in-charge data specifying the main procedure) The person in charge of the procedure is stored in the main procedure file of the database 17 in a state in which the person in charge ID number (person in charge identifier) is associated). The person-in-charge data is specified by the person-in-charge ID number. As the person-in-charge identifier, a personal identification number of the person in charge and other identification codes can be used in addition to the person-in-charge ID number.

コンピュータ11の中央処理部は、それら主要手続の手続完了予定期日を各主要手続毎(各主要手続の手続名毎)に区分した状態(主要手続を特定する主要手続識別子に関連付けた状態)でデータベース17の主要手続ファイルに格納する手続完了予定期日格納手段を実行する。コンピュータ11の中央処理部は、主要手続の処理に要する主要手続見込時間を各主要手続毎(各主要手続の手続名毎)に区分した状態(主要手続識別子に関連付けた状態)でデータベース17の主要手続ファイルに格納する手続処理見込時間格納手段を実行する。   The central processing unit of the computer 11 divides the scheduled procedure completion date of these main procedures into each main procedure (for each procedure name of each main procedure) (in a state associated with the main procedure identifier specifying the main procedure). The procedure completion scheduled date storage means stored in the 17 main procedure files is executed. The central processing unit of the computer 11 determines the main procedure expected time required for processing the main procedure for each main procedure (for each procedure name of each main procedure) (state associated with the main procedure identifier). The procedure processing expected time storage means stored in the procedure file is executed.

コンピュータ11〜16の中央処理部は、主要手続の処理の手続開始期日を各主要手続毎(各主要手続の手続名毎)に区分した状態(主要手続識別子に関連付けた状態)でデータベース17の主要手続ファイルに格納する手続開始期日格納手段を実行し、主要手続の処理の手続完了期日を各主要手続毎(各主要手続の手続名毎)に区分した状態(主要手続識別子に関連付けた状態)でデータベース17の主要手続ファイルに格納する手続完了期日格納手段を実行する。コンピュータ11〜16の中央処理部は、それら主要手続の手続進捗データを各主要手続毎(各主要手続の手続名毎)に区分した状態(主要手続識別子に関連付けた状態)でデータベース17の主要手続ファイルに格納する手続進捗データ格納手段を実行する。   The central processing unit of the computers 11 to 16 stores the main process of the database 17 in a state (state associated with the main procedure identifier) in which the procedure start date of processing of the main procedure is divided for each main procedure (for each procedure name of each main procedure). The procedure start date storage means stored in the procedure file is executed, and the procedure completion date of processing of the main procedure is divided into each main procedure (for each procedure name of each main procedure) (state associated with the main procedure identifier) The procedure completion date storage means stored in the main procedure file of the database 17 is executed. The central processing unit of the computers 11 to 16 divides the procedure progress data of these main procedures for each main procedure (for each procedure name of each main procedure) (in the state associated with the main procedure identifier), and the main procedures in the database 17 Procedure progress data storage means for storing in a file is executed.

コンピュータ11の中央処理部は、主要手続を処理する際に必要な資料データを各主要手続毎(各主要手続の手続名毎)に区分した状態(主要手続識別子に関連付けた状態)でデータベース17の主要手続ファイルに格納する資料データ格納手段を実行し、主要手続によって作成される成果物を各主要手続毎(各主要手続の手続名毎)に区分した状態(主要手続識別子に関連付けた状態)でデータベース17の主要手続ファイルに格納する成果物格納手段を実行する。   The central processing unit of the computer 11 stores the data in the database 17 in a state (state associated with the main procedure identifier) in which the data necessary for processing the main procedure is classified for each main procedure (for each procedure name of each main procedure). Executes the material data storage means stored in the main procedure file, and categorizes the deliverables created by the main procedure for each main procedure (for each procedure name of each main procedure) (state associated with the main procedure identifier) The product storage means for storing the main procedure file in the database 17 is executed.

コンピュータ11の中央処理部は、主要手続によって計上される仕訳タイプを各主要手続毎(各主要手続の手続名毎)に区分した状態(主要手続識別子に関連付けた状態)でデータベース17の主要手続ファイルに格納する仕訳タイプ格納手段を実行する。コンピュータ11〜16の中央処理部は、主要手続の処理に要した手続処理実測時間を計測し、その手続処理実測時間を各主要手続毎(各主要手続の手続名毎)に区分した状態(主要手続識別子に関連付けた状態)でデータベース17の主要手続ファイルに格納する手続処理実測時間格納手段を実行する。   The central processing unit of the computer 11 stores the main procedure file of the database 17 in a state (state associated with the main procedure identifier) in which the journal type recorded by the main procedure is classified for each main procedure (for each procedure name of each main procedure). Execute journal type storage means for storing in. The central processing unit of the computers 11 to 16 measures the procedure processing actual measurement time required for processing the main procedure, and divides the procedure processing actual measurement time for each main procedure (for each procedure name of each main procedure). The procedure processing actual measurement time storage means for storing in the main procedure file of the database 17 is executed in a state associated with the procedure identifier.

コンピュータ11の中央処理部は、各種複数の主要手続の処理に必要な少なくとも1つの作業項目をその処理順に番号(順番)付けた状態で各主要手続毎(各主要手続の手続名毎)に区分(各主要手続を特定する主要手続識別子に関連付けるとともに、各作業項目を特定する作業項目識別子に関連付けた状態)してデータベース17の各作業項目ファイルに格納する作業項目格納手段を実行する。それら作業項目は、主要手続識別子と作業項目識別子とによって特定される。   The central processing unit of the computer 11 classifies each main procedure (each procedure name of each main procedure) with at least one work item necessary for the processing of a plurality of main procedures numbered (ordered) in the processing order. The work item storage means for storing each work item in the work item file in the database 17 is executed (in a state in which each main procedure is associated with the main procedure identifier for specifying each work procedure and associated with the work item identifier for specifying each work item). These work items are specified by the main procedure identifier and the work item identifier.

コンピュータ11の中央処理部は、それら作業項目の作業内容を各作業項目毎に区分した状態(主要手続識別子と作業項目識別子とに関連付けた状態)でデータベース17の各作業項目ファイルに格納する作業内容格納手段を実行する。コンピュータ11の中央処理部は、それら作業項目を担当する担当者データを各作業項目毎に区分した状態(主要手続識別子と作業項目識別子と各担当者データを特定する担当者ID番号(担当者識別子)とを関連付けた状態)でデータベース17の各作業項目ファイルに格納する作業担当者格納手段を実行する。   The central processing unit of the computer 11 stores the work contents of these work items in each work item file of the database 17 in a state in which the work contents are classified for each work item (a state associated with the main procedure identifier and the work item identifier). Execute storage means. The central processing unit of the computer 11 divides the person-in-charge data in charge of those work items into each work item (main procedure identifier, work item identifier, person-in-charge ID number for identifying each person-in-charge data (person-in-charge identifier) ) Is associated with each other), the person-in-charge storage means for storing the work item files in the database 17 is executed.

コンピュータ11の中央処理部は、作業項目の作業完了予定期日を各作業項目毎に区分した状態(主要手続識別子と作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルに格納する作業完了予定期日格納手段を実行する。コンピュータ11の中央処理部は、作業項目の処理に要する作業処理見込時間を各作業項目毎に区分した状態(主要手続識別子と作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルに格納する作業処理見込時間格納手段を実行する。   The central processing unit of the computer 11 completes the work to be stored in the work item file of the database 17 in a state in which the work completion scheduled due date of the work item is classified for each work item (a state associated with the main procedure identifier and the work item identifier). The scheduled date storage means is executed. The central processing unit of the computer 11 stores the work processing expected time required for the processing of the work item in the work item file of the database 17 in a state in which each work item is divided (a state associated with the main procedure identifier and the work item identifier). The work processing expected time storage means is executed.

コンピュータ11〜16の中央処理部は、作業項目の処理の作業開始期日を各作業項目毎に区分した状態(主要手続識別子と作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルに格納する作業開始期日格納手段を実行し、作業項目の処理の作業完了期日を各作業項目毎に区分した状態(主要手続識別子と作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルに格納する作業完了期日格納手段を実行する。コンピュータ11〜16の中央処理部は、それら作業項目の作業進捗データを各作業項目毎に区分した状態(主要手続識別子と作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルに格納する作業進捗データ格納手段を実行する。   The central processing unit of the computers 11 to 16 stores the work start date of the work item processing in the work item file of the database 17 in a state in which the work start date is divided for each work item (a state associated with the main procedure identifier and the work item identifier). The work start date storage means is executed, and the work completion date of the work item processing is stored in the work item file of the database 17 in a state in which each work item is classified (a state associated with the main procedure identifier and the work item identifier). The work completion date storage means is executed. The central processing unit of the computers 11 to 16 stores the work progress data of these work items in the work item file of the database 17 in a state of being divided for each work item (a state associated with the main procedure identifier and the work item identifier). The work progress data storage means is executed.

コンピュータ11の中央処理部は、作業項目を処理する際に必要な作業注意事項が存在する場合、その作業注意事項を各作業項目毎に区分した状態(主要手続識別子と作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルの作業注意事項アドレスに格納する作業注意事項格納手段を実行する。コンピュータ11〜16の中央処理部は、作業注意事項の確認の有無を判断する確認有無判断手段を実行し、確認有り情報または確認無し情報を各作業項目毎に区分した状態(主要手続識別子と作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルの作業注意事項アドレスに格納する確認有無情報格納手段を実行する。   The central processing unit of the computer 11 categorizes the work notes for each work item when the work notes necessary for processing the work item exist (associated with the main procedure identifier and the work item identifier). In the state, the work precaution storage means for storing the work precaution address in the work item file of the database 17 is executed. The central processing unit of the computers 11 to 16 executes a confirmation presence / absence judging means for judging whether or not work precautions are confirmed, and states that information with confirmation or information without confirmation is classified for each work item (main procedure identifier and work In the state associated with the item identifier), the confirmation presence / absence information storage means for storing the work item address of the work item file in the database 17 is executed.

コンピュータ11〜16の中央処理部は、それら作業項目に対応しつつ作業項目の処理に必要な場合にのみ記載される各種複数の作業伝達事項を各作業項目毎に区分した状態(主要手続識別子と作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルの作業伝達事項アドレスに格納する作業伝達事項格納手段を実行する。コンピュータ11〜16の中央処理部は、作業伝達事項のランク付けされた重要度を各作業伝達事項毎に区分した状態(主要手続識別子と作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルの作業伝達事項アドレスに格納する作業伝達事項重要度格納手段を実行する。   The central processing unit of the computers 11 to 16 divides each work item into a plurality of various work items to be described only when necessary for processing the work item while corresponding to the work items (main procedure identifier and In the state associated with the work item identifier), the work transmission item storage means for storing in the work transmission item address of the work item file of the database 17 is executed. The central processing units of the computers 11 to 16 work items in the database 17 in a state where the ranked importance of the work transfer items is classified for each work transfer item (a state associated with the main procedure identifier and the work item identifier). The work transmission item importance storage means for storing the work transmission item address of the file is executed.

作業伝達事項には、それら作業項目の処理に必要な注意事項、それら作業項目の処理に必要な質問事項、それら作業項目の処理に必要な要望事項、それら伝達事項の記入者、それら伝達事項の記入日が含まれ、質問事項に対する回答事項、それら回答事項の回答者、それら回答事項の回答日が含まれる。伝達事項が質問事項である場合、その伝達事項を質問事項と判断するためのアドレス情報(質問事項識別子)が設定される。   The work communication items include precautions necessary for the processing of these work items, questions necessary for the processing of these work items, requests necessary for the processing of these work items, who filled in those communication items, The date of entry is included, the answers to the questions, the respondents of those answers, and the answers of those answers. When the transmission item is a question item, address information (question item identifier) for determining the transmission item as the question item is set.

コンピュータ11〜16の中央処理部は、質問事項に対する回答事項を各作業項目毎に区分した状態(主要手続識別子と作業項目識別子と質問事項のアドレス情報とに関連付けた状態)でデータベース17の作業項目ファイルの作業伝達事項アドレスに格納する回答事項格納手段を実行し、質問事項に対する回答事項の有無を判断する回答事項有無判断手段を実行する。コンピュータ11〜16の中央処理部は、作業項目の処理に要した作業処理実測時間を計測し、その作業処理実測時間を各作業項目毎に区分した状態(主要手続識別子と作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルに格納する作業処理実測時間格納手段を実行する。   The central processing units of the computers 11 to 16 work items in the database 17 in a state in which the answer items to the question items are classified for each work item (a state associated with the main procedure identifier, the work item identifier, and the question address information). An answer matter storage means for storing in the work transmission matter address of the file is executed, and an answer matter presence / absence judging means for judging whether or not there is an answer matter for the question matter is executed. The central processing unit of the computers 11 to 16 measures the actual work processing time required for processing the work item, and categorizes the work processing actual time for each work item (associated with the main procedure identifier and the work item identifier). The work processing actual time storage means for storing in the work item file of the database 17 is executed.

コンピュータ11の中央処理部は、それら作業項目を処理する際にリスクがある場合、そのリスクを各作業項目毎に区分した状態で(主要手続識別子とリスクを伴う作業項目を特定する作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルのリスクアドレスに格納するリスク格納手段を実行し、それら作業項目に適用すべきアサーションがある場合、そのアサーションを各作業項目毎に区分した状態で(主要手続識別子とリスクを伴う作業項目の作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルのリスクアドレスに格納するアサーション格納手段を実行する。   When there is a risk when processing these work items, the central processing unit of the computer 11 classifies the risk for each work item (the main procedure identifier and the work item identifier that identifies the work item with the risk) If there is an assertion that should be applied to these work items, the risk storage means for storing them in the risk address of the work item file in the database 17 is executed, and the assertion is classified for each work item ( Assertion storage means for storing in the risk address of the work item file of the database 17 in a state associated with the main procedure identifier and the work item identifier of the work item with risk).

コンピュータ11の中央処理部は、リスクを伴う作業項目のリスク作業内容を各作業項目毎に区分した状態(主要手続識別子とリスクを伴う作業項目の作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルのリスクアドレスに格納するリスク作業内容格納手段を実行し、リスクを伴う作業項目の完了予定期日を各作業項目毎に区分した状態(主要手続識別子とリスクを伴う作業項目の作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルのリスクアドレスに格納するリスク作業完了予定期日格納手段を実行する。コンピュータ11の中央処理部は、リスクを伴う作業項目の処理に要する作業処理見込時間を各作業項目毎に区分した状態(主要手続識別子と作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルのリスクアドレスに格納するリスク作業処理見込時間格納手段を実行する。   The central processing unit of the computer 11 stores the risk work content of the work item with risk in a state in which the risk work content is classified for each work item (state associated with the main procedure identifier and the work item identifier of the work item with risk). The risk work content storage means stored in the risk address of the work item file is executed, and the scheduled completion date of the work item with risk is classified for each work item (the main procedure identifier and the work item identifier of the work item with risk) The risk work completion scheduled date storage means for storing in the risk address of the work item file in the database 17 is executed. The central processing unit of the computer 11 operates the work items in the database 17 in a state in which the work processing expected time required for processing the work items with risks is classified for each work item (a state associated with the main procedure identifier and the work item identifier). The risk work processing expected time storage means for storing in the risk address of the file is executed.

コンピュータ11〜16の中央処理部は、リスクを伴う作業項目の処理の作業開始期日を各作業項目毎に区分した状態(主要手続識別子と作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルのリスクアドレスに格納するリスク作業開始期日格納手段を実行し、リスクを伴う作業項目の処理の作業完了期日を各作業項目毎に区分した状態(主要手続識別子と作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルのリスクアドレスに格納するリスク作業完了期日格納手段を実行する。コンピュータ11〜16の中央処理部は、リスクを伴う作業項目のリスク作業進捗データを各作業項目毎に区分した状態(主要手続識別子とリスクを伴う作業項目の作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルのリスクアドレスに格納するリスク作業進捗データ格納手段を実行する。   The central processing units of the computers 11 to 16 work items in the database 17 in a state in which work start dates for processing work items involving risks are classified for each work item (a state associated with the main procedure identifier and the work item identifier). Executes the risk work start date storage means stored in the risk address of the file and divides the work completion date of the work item processing with risk into each work item (state associated with the main procedure identifier and work item identifier) The risk work completion date storage means for storing the risk item in the risk address of the work item file in the database 17 is executed. The central processing unit of the computers 11 to 16 divides the risk work progress data of the work item with risk into each work item (state associated with the main procedure identifier and the work item identifier of the work item with risk). The risk work progress data storage means stored in the risk address of the work item file in the database 17 is executed.

コンピュータ11の中央処理部は、リスクを伴う作業項目に対してそのリスクをコントロールする管理作業項目を各作業項目毎に関連付けた状態(主要手続識別子とリスクを伴う作業項目の作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルのリスクアドレスに格納するリスク管理作業項目格納手段を実行し、管理作業項目の管理作業内容を各作業項目毎に区分した状態(主要手続識別子とリスクを伴う作業項目の作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルのリスクアドレスに格納するリスク管理作業内容格納手段を実行する。   The central processing unit of the computer 11 associates, for each work item, a management work item that controls the risk with respect to the work item with risk (associated with the work item identifier of the main procedure identifier and the work item with risk). The risk management work item storage means for storing the risk management work item storage means stored in the risk address of the work item file of the database 17 in a state (in which the management work item management work content is classified for each work item (with main procedure identifier and risk) The risk management work content storage means for storing in the risk address of the work item file in the database 17 is executed in a state associated with the work item identifier of the work item.

コンピュータ11の中央処理部は、リスクを伴う作業項目を処理する際に必要なリスク作業注意事項が存在する場合、そのリスク作業注意事項を各作業項目毎に区分した状態(主要手続識別子とリスクを伴う作業項目の作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルの作業注意事項アドレスに格納するリスク作業注意事項格納手段を実行する。コンピュータ11〜16の中央処理部は、リスク作業注意事項の確認の有無を判断する確認有無判断手段を実行し、リスク作業注意事項の確認有り情報または確認無し情報を各作業項目毎に区分した状態(主要手続識別子とリスクを伴う作業項目の作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルの作業注意事項アドレスに格納する確認有無情報格納手段を実行する。   When there are risk work instructions necessary for processing risky work items, the central processing unit of the computer 11 categorizes the risk work notes for each work item (main procedure identifier and risk). The risk work precaution storage means for storing in the work precaution address of the work item file of the database 17 is executed in a state associated with the work item identifier of the accompanying work item). The central processing unit of the computers 11 to 16 executes a confirmation presence / absence judging means for judging whether or not the risk work precautions are confirmed, and categorizes the information with or without confirmation of the risk work precautions for each work item. The confirmation presence / absence information storage means for storing in the work precaution address of the work item file of the database 17 is executed in a state (associated with the main procedure identifier and the work item identifier of the work item with risk).

コンピュータ11〜16の中央処理部は、リスクを伴う各作業項目に対応しつつそれら作業項目の処理に必要な場合にのみ記載される各種複数のリスク作業伝達事項を各作業項目毎に区分した状態(主要手続識別子とリスクを伴う作業項目の作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルの作業伝達事項アドレスに格納するリスク作業伝達事項格納手段を実行する。コンピュータ11〜16の中央処理部は、リスク作業伝達事項のランク付けされた重要度を各リスク作業伝達事項毎に区分した状態(主要手続識別子とリスクを伴う作業項目の作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルの作業伝達事項アドレスに格納するリスク作業伝達事項重要度格納手段を実行する。   The central processing unit of the computers 11 to 16 divides a plurality of various risk work items to be described for each work item, corresponding to each work item accompanied by a risk, only when necessary for processing the work item. The risk work transmission item storage means for storing in the work transmission item address of the work item file of the database 17 is executed in a state (associated with the main procedure identifier and the work item identifier of the work item with risk). The central processing unit of the computers 11 to 16 classifies the ranked importance of the risk work transmission items for each risk work transmission item (related to the main procedure identifier and the work item identifier of the work item with risk). The risk work transmission item importance storage means for storing the work item in the work item file of the database 17 in the state) is executed.

リスク作業伝達事項には、リスクを伴う作業項目の処理に必要な注意事項、リスクを伴う作業項目の処理に必要な質問事項、リスクを伴う作業項目の処理に必要な要望事項、それら伝達事項の記入者、それら伝達事項の記入日が含まれ、質問事項に対する回答事項、それら回答事項の回答者、それら回答事項の回答日が含まれる。リスク作業伝達事項が質問事項である場合、リスク作業伝達事項を質問事項と判断するためのアドレス情報(識別子)が設定される。   Risk work communication items include precautions necessary for processing risky work items, questions necessary for processing risky work items, requests required for processing risky work items, This includes the date of entry of the respondents and their communication items, the answers to the questions, the respondents of those responses, and the dates of response of those responses. When the risk work transmission item is a question item, address information (identifier) for determining the risk work transmission item as the question item is set.

コンピュータ11〜16の中央処理部は、リスクを伴う作業項目の質問事項に対する回答事項を各作業項目毎に区分した状態(主要手続識別子とリスクを伴う作業項目の作業項目識別子と質問事項のアドレス情報とに関連付けた状態)でデータベース17の作業項目ファイルの作業伝達事項アドレスに格納するリスク作業回答事項格納手段を実行し、質問事項に対する回答事項の有無を判断するリスク作業回答事項有無判断手段を実行する。コンピュータ11〜16の中央処理部は、リスクを伴う作業項目の処理に要した作業処理実測時間を計測し、そのリスク作業処理実測時間を各作業項目毎に区分した状態(主要手続識別子とリスクを伴う作業項目の作業項目識別子とに関連付けた状態)でデータベース17の作業項目ファイルのリスクアドレスに格納するリスク作業処理実測時間格納手段を実行する。   The central processing unit of the computers 11 to 16 divides the answer items to the work item questions with risks into each work item (the main procedure identifier, the work item identifier of the work item with risk, and the address information of the question items) The risk work answer item storage means for storing the work item address stored in the work item file of the database 17 is executed and the risk work answer item presence / absence judging means for judging whether or not there is an answer item for the question item is executed. To do. The central processing unit of the computers 11 to 16 measures the actual work processing time required for processing the risky work item, and divides the risk work processing actual time for each work item (main procedure identifier and risk). In the state associated with the work item identifier of the accompanying work item), the risk work processing actually measured time storage means for storing the risk item in the work item file of the database 17 is executed.

管理用コンピュータ11および業務用コンピュータ12〜16の中央処理部は、主要手続識別子に基づいて、決算業務の手続期間に処理を要する各種複数の主要手続(主要手続の手続名)をデータベース17から受け取り、その主要手続をディスプレイ23,24やプリンタ等の出力装置を介して出力する主要手続出力手段を実行し、主要手続識別子と担当者ID番号(担当者識別子)とに基づいて、それら主要手続を担当する担当者データをデータベース17から受け取り、担当者データを各主要手続毎に出力装置を介して出力する手続担当者出力手段を実行する。   Based on the main procedure identifier, the central processing unit of the management computer 11 and the business computers 12 to 16 receives from the database 17 various main procedures (procedure names of main procedures) that need to be processed during the procedure period of the settlement work. The main procedure output means for outputting the main procedure via an output device such as the display 23 or 24 or a printer is executed, and the main procedure is determined based on the main procedure identifier and the person-in-charge ID number (person-in-charge identifier). The person-in-charge data for the person in charge is received from the database 17, and the person-in-charge for the person in charge of the procedure for outputting the person-in-charge data for each main procedure through the output device is executed.

コンピュータ11〜16の中央処理部は、主要手続識別子に基づいて、それら主要手続の完了予定期日をデータベース17から受け取り、完了予定期日を各主要手続毎に出力装置を介して出力する手続完了予定期日出力手段を実行し、主要手続識別子に基づいて、主要手続の処理に要する処理見込時間をデータベース17から受け取り、処理見込時間を各主要手続毎に出力装置を介して出力する手続処理見込時間出力手段を実行する。   Based on the main procedure identifier, the central processing unit of the computers 11 to 16 receives the scheduled completion date of these main procedures from the database 17 and outputs the scheduled completion date for each main procedure via the output device. Procedure processing expected time output means for executing the output means, receiving the expected processing time required for processing of the main procedure from the database 17 based on the main procedure identifier, and outputting the expected processing time for each main procedure via the output device. Execute.

コンピュータ11〜16の中央処理部は、主要手続識別子に基づいて、主要手続の処理に必要な資料データをデータベース17から受け取り、その資料データを各主要手続毎に出力装置を介して出力する資料データ出力手段を実行し、主要手続識別子に基づいて、主要手続によって作成される成果物をデータベース17から受け取り、その成果物を各主要手続毎に出力装置を介して出力する成果物出力手段を実行する。さらに、主要手続識別子に基づいて、主要手続によって計上される仕訳タイプをデータベース17から受け取り、その仕訳タイプを各主要手続毎に出力装置を介して出力する仕訳タイプ出力手段を実行する。   The central processing unit of the computers 11 to 16 receives material data necessary for processing of the main procedure from the database 17 based on the main procedure identifier, and outputs the material data via the output device for each main procedure. The output unit is executed, and based on the main procedure identifier, the product created by the main procedure is received from the database 17, and the product output unit is configured to output the product via the output device for each main procedure. . Furthermore, based on the main procedure identifier, a journal type output unit that receives a journal type recorded by the main procedure from the database 17 and outputs the journal type for each main procedure via an output device is executed.

コンピュータ11〜16の中央処理部は、主要手続識別子に基づいて、それら主要手続の手続進捗データをデータベース17から受け取り、手続進捗データを各主要手続毎に出力装置を介して出力する手続進捗データ出力手段を実行し、主要手続識別子に基づいて、主要手続の処理に要した処理実測時間をデータベース17から受け取り、処理実測時間を各主要手続毎に出力装置を介して出力する手続処理実測時間出力手段を実行する。なお、業務用コンピュータ12〜16には、担当者識別子によって特定される担当者データに対応する主要手続のみが出力され、担当者識別子によって特定される担当者データに対応する主要手続のみの手続進捗データが出力される。   The central processing unit of the computers 11 to 16 receives procedure progress data of the main procedures from the database 17 based on the main procedure identifier, and outputs the procedure progress data via the output device for each main procedure. The procedure processing actual time output means for executing the means, receiving the actual processing time required for processing the main procedure from the database 17 based on the main procedure identifier, and outputting the actual processing time for each main procedure via the output device. Execute. Note that only the main procedure corresponding to the person-in-charge data specified by the person-in-charge identifier is output to the business computers 12 to 16, and the procedure progress of only the main procedure corresponding to the person-in-charge data specified by the person-in-charge identifier. Data is output.

手続進捗データ出力手段では、主要手続の手続完了予定期日を参照しつつ、その主要手続の手続開始期日が手続完了予定期日を越えても入力されない場合、その主要手続に遅延情報を設定するとともに、その主要手続の遅延メッセージを出力する。手続進捗データ出力手段では、自己が担当する主要手続を遅延している担当者に対してその主要手続の遅延メッセージを出力するのみならず、主要手続を遅延している担当者の後に後続の主要手続を担当する直近の担当者に対し、主要手続を遅延している担当者のその主要手続の遅延メッセージを出力する。   The procedure progress data output means refers to the scheduled procedure completion date of the main procedure, and when the procedure start date of the main procedure exceeds the scheduled procedure completion date, the delay information is set for the main procedure, Output a delay message for the main procedure. In the procedure progress data output means, not only the delay message of the main procedure is output to the person who is delaying the main procedure that he is responsible for, but also the main For the person in charge who is in charge of the procedure, a delay message of the person in charge of the main procedure is output.

手続進捗データ出力手段では、主要手続の手続完了予定期日を参照しつつ、その主要手続の手続完了期日が手続完了予定期日までに入力された場合、その主要手続に完了情報を設定するとともに、その主要手続の完了メッセージを出力する。手続進捗データ出力手段では、主要手続の手続完了予定期日を参照しつつ、その主要手続の手続完了期日が完了予定期日を越えて入力された場合、その主要手続に遅延完了情報を設定するとともに、その主要手続の遅延完了メッセージを出力する。   In the procedure progress data output means, if the procedure completion date of the main procedure is entered by the scheduled procedure completion date while referring to the scheduled procedure completion date of the main procedure, the completion information is set for the main procedure, and Output completion message of main procedure. In the procedure progress data output means, if the procedure completion date of the main procedure is entered beyond the scheduled completion date while referring to the procedure completion schedule date of the main procedure, delay completion information is set for the main procedure, Output a delayed completion message for the main procedure.

手続進捗データ出力手段では、主要手続の手続完了予定期日を参照しつつ、その主要手続の手続開始期日が手続完了予定期日までに入力されない場合、その主要手続に未着手情報を設定するとともに、その主要手続の未着手メッセージを出力する。手続進捗データ出力手段では、主要手続の手続完了予定期日を参照しつつ、その主要手続の手続開始期日が手続完了予定期日までに入力された場合、その主要手続に作業中情報を設定するとともに、その主要手続の作業中メッセージを出力する。さらに、主要手続の手続完了予定期日を参照しつつ、その主要手続の手続開始期日が完了予定期日までに入力され、かつ、その主要手続の手続完了期日が完了予定期日を越えても入力されない場合、その主要手続に遅延作業中を設定するとともに、その主要手続の遅延作業中メッセージを出力する。   The procedure progress data output means refers to the scheduled procedure completion date of the main procedure, and if the procedure start date of the main procedure is not entered by the scheduled procedure completion date, information on not yet started is set for the main procedure, and Outputs a message not yet started for the main procedure. In the procedure progress data output means, if the procedure start date of the main procedure is entered by the scheduled procedure completion date with reference to the scheduled procedure completion date of the main procedure, the work progress information is set in the main procedure, Print a message in progress for the main procedure. In addition, referring to the scheduled completion date of the main procedure, the procedure start date of the main procedure is entered by the scheduled completion date, and is not entered even if the procedure completion date of the main procedure exceeds the scheduled completion date In addition, a delay work in progress is set for the main procedure, and a delay work in progress message for the main procedure is output.

手続進捗データ出力手段では、自己が担当する主要手続を未着手または遅延作業中の担当者に対してその主要手続の未着手メッセージまたは遅延作業中メッセージを出力するのみならず、主要手続を未着手または遅延作業中の担当者の後に後続の主要手続を担当する担当者のうちの少なくとも直近の担当者に対し、主要手続を未着手または遅延作業中の担当者のその主要手続の未着手メッセージまたは遅延作業中メッセージを出力する。手続進捗データ出力手段では、自己が担当する主要手続を作業中の担当者に対してその主要手続の作業中メッセージを出力するのみならず、主要手続を作業中の担当者の後に後続の主要手続を担当する直近の担当者に対し、主要手続を作業中の担当者のその主要手続の作業中メッセージを出力する。   In the procedure progress data output means, not only the main procedure for which the person is in charge but the person who has not yet started or is in delayed work will not be able to output an unstarted or delayed message for the main procedure, but the main procedure has not been started yet. Or at least the person in charge of the subsequent main procedure after the person in charge of the delayed work, or the person in charge of the main procedure of the person in charge of the delayed work Output a delayed work message. The procedure progress data output means not only outputs an in-progress message for the main procedure to the person in charge of the main procedure that he is in charge of, but also the subsequent main procedure after the person in charge of the main procedure. To the person in charge of the main procedure, a message indicating that the main procedure is in progress is output to the person in charge of the main procedure.

コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子とに基づいて、それら主要手続の処理に必要な作業項目をデータベース17から受け取り、その作業項目を処理順に番号(順番)付けた状態で各主要手続毎に出力装置を介して出力する作業項目出力手段を実行し、コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子とに基づいて、それら作業項目の作業内容をデータベース17から受け取り、その作業内容を各作業項目毎に出力装置を介して出力する作業内容出力手段を実行する。コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子と担当者ID番号とに基づいて、作業項目を担当する担当者データをデータベース17から受け取り、担当者データを各作業項目毎に出力装置を介して出力する作業担当者出力手段を実行する。   Based on the main procedure identifier and the work item identifier, the central processing unit of the computers 11 to 16 receives the work items necessary for the processing of these main procedures from the database 17 and numbers the work items in the order of processing. The work item output means for outputting each main procedure through the output device in the state is executed, and the central processing unit of the computers 11 to 16 executes the work contents of these work items based on the main procedure identifier and the work item identifier. Is received from the database 17, and the work content output means for outputting the work content for each work item via the output device is executed. Based on the main procedure identifier, work item identifier, and person-in-charge ID number, the central processing unit of the computers 11-16 receives person-in-charge data in charge of work items from the database 17, and assigns person-in-charge data for each work item. A worker output means for outputting via the output device is executed.

コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子とに基づいて、作業項目を処理する際に必要な作業注意事項をデータベース17から受け取り、その作業注意事項を各作業項目毎に出力装置を介して出力する作業注意事項出力手段を実行し、主要手続識別子と作業項目識別子とに基づいて、作業注意事項の確認有無を判断する確認有無情報をデータベース17から受け取り、その確認有無情報を各作業確認事項毎に出力装置を介して出力する確認有無情報出力手段を実行する。   Based on the main procedure identifier and the work item identifier, the central processing unit of the computers 11 to 16 receives work precautions necessary for processing the work item from the database 17 and receives the work precautions for each work item. The work instruction output means for outputting via the output device is executed, and the confirmation presence / absence information for judging whether or not the work instruction is confirmed is received from the database 17 based on the main procedure identifier and the work item identifier. The confirmation presence / absence information output means is output for each work confirmation item via the output device.

コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子とに基づいて、それら作業項目に作業伝達事項が存在するか否かを確認可能な伝達事項有無情報をデータベース17から受け取り、その伝達事項有無情報を各作業項目毎に出力装置を介して出力する伝達事項有無情報出力手段を実行し、主要手続識別子と作業項目識別子とに基づいて、それら作業項目の処理に必要な場合にのみ記載される作業伝達事項をデータベース17から受け取り、その作業伝達事項を各作業項目毎に出力装置を介して出力する作業伝達事項出力手段を実行する。   Based on the main procedure identifier and the work item identifier, the central processing unit of the computers 11 to 16 receives from the database 17 transmission item presence / absence information that can confirm whether or not there is a work transmission item in the work item. Executes the transmission item presence / absence information output means for outputting the transmission item presence / absence information for each work item via the output device, and only when necessary for processing the work item based on the main procedure identifier and the work item identifier. The work transfer item output means for receiving the work transfer items to be described from the database 17 and outputting the work transfer items for each work item via the output device is executed.

コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子とに基づいて、作業伝達事項のランク付けされた作業伝達事項重要度をデータベース17から受け取り、その作業伝達事項重要度を各伝達事項毎に出力装置を介して出力する作業伝達事項重要度出力手段を実行し、主要手続識別子と作業項目識別子とに基づいて、質問事項に対して所定の回答が存在するか否かを確認可能な回答有無情報をデータベース17から受け取り、その回答有無情報を各作業伝達事項毎に出力装置を介して出力する回答有無情報出力手段を実行する。さらに、主要手続識別子と作業項目識別子とに基づいて、質問事項に対する回答事項をデータベース17から受け取り、その回答事項を各伝達事項毎に出力装置を介して出力する回答事項出力手段を実行する。   Based on the main procedure identifier and the work item identifier, the central processing unit of the computers 11 to 16 receives the work transfer item importance degree ranked in the work transfer item from the database 17, and transmits the work transfer item importance degree to each of them. Execution of work transmission item importance output means that outputs via the output device for each item, based on the main procedure identifier and work item identifier, it can be confirmed whether there is a predetermined answer to the question Answer presence / absence information is received from the database 17, and answer presence / absence information output means for outputting the answer presence / absence information for each work transfer item via the output device is executed. In addition, based on the main procedure identifier and the work item identifier, an answer item output unit that receives an answer item for the question item from the database 17 and outputs the answer item for each transmission item via the output device is executed.

コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子とに基づいて、作業項目の作業完了予定期日をデータベース17から受け取り、作業項目の作業完了予定期日を各作業項目毎に出力装置を介して出力する作業完了予定期日出力手段を実行し、主要手続識別子と作業項目識別子とに基づいて、作業項目の処理に要する作業処理見込時間をデータベース17から受け取り、作業項目の作業処理見込時間を各作業項目毎に出力装置を介して出力する作業処理見込時間出力手段を実行する。   The central processing unit of the computers 11 to 16 receives the scheduled work completion date of the work item from the database 17 based on the main procedure identifier and the work item identifier, and outputs the estimated work completion date of the work item for each work item. The work completion schedule due date output means is output, and based on the main procedure identifier and the work item identifier, the work processing expected time required for processing the work item is received from the database 17, and the work processing expected time of the work item is received. Is output for each work item via the output device.

コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子とに基づいて、作業項目の作業進捗データをデータベース17から受け取り、作業項目の作業進捗データを各作業項目毎に出力装置を介して出力する作業進捗データ出力手段を実行し、主要手続識別子と作業項目識別子とに基づいて、作業項目の処理に要した作業処理実測時間をデータベース17から受け取り、作業項目の作業処理実測時間を各作業項目毎に出力装置を介して出力する作業処理実測時間出力手段を実行する。なお、業務用コンピュータ12〜16には、ID番号によって特定される担当者データに対応する作業項目のみが出力され、ID番号によって特定される担当者データに対応する作業項目のみの作業進捗データが出力される。   Based on the main procedure identifier and the work item identifier, the central processing unit of the computers 11 to 16 receives the work progress data of the work item from the database 17 and receives the work progress data of the work item for each work item via the output device. The work progress data output means for outputting the work item is executed, and based on the main procedure identifier and the work item identifier, the actual work process time required for processing the work item is received from the database 17 and The work processing actual time output means for outputting via the output device for each work item is executed. Note that only the work item corresponding to the person-in-charge data specified by the ID number is output to the business computers 12 to 16, and the work progress data of only the work item corresponding to the person-in-charge data specified by the ID number is output. Is output.

作業進捗データ出力手段では、作業項目の作業完了予定期日を参照しつつ、その作業項目の作業開始期日が作業完了予定期日を越えても入力されない場合、その作業項目に遅延情報を設定するとともに、その作業項目の遅延メッセージを出力する。また、作業項目を処理する際に必要な作業注意事項が存在する場合は、作業項目の作業完了予定期日と確認有無情報とを参照しつつ、その作業項目の作業開始期日が作業完了予定期日を越えても入力されず、または、その作業項目の注意事項の確認有りが作業完了予定期日を越えても確認されない場合、その作業項目に遅延情報を設定するとともに、その作業項目の遅延メッセージを出力する。   In the work progress data output means, if the work start date of the work item is not entered even if it exceeds the scheduled work completion date while referring to the work completion scheduled date of the work item, delay information is set for the work item, Output a delayed message for the work item. In addition, when there are work precautions necessary when processing a work item, the work start date of the work item indicates the scheduled work completion date while referring to the work completion scheduled date and confirmation information. If it is not entered even if it exceeds the limit, or if the confirmation of the precautions for the work item is not confirmed even if the scheduled work completion date is exceeded, delay information is set for the work item and a delay message for the work item is output. To do.

作業進捗データ出力手段では、作業項目を処理する際に必要な作業注意事項が存在するとともに、作業伝達事項が質問事項である場合、作業項目の作業完了予定期日と確認有無情報と回答有無情報とを参照しつつ、その作業項目の作業開始期日が作業完了予定期日を越えても入力されず、または、その作業項目の作業注意事項の確認有りが作業完了予定期日を越えても確認されず、または、その作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日を越えても確認されない場合、その作業項目に遅延情報を設定するとともに、その作業項目の遅延メッセージを出力する。作業進捗データ出力手段では、自己が担当する作業項目を遅延している担当者に対してその作業項目の遅延メッセージを出力するのみならず、作業項目を遅延している担当者の後に後続の作業項目を担当する直近の担当者に対し、作業項目を遅延している担当者のその作業項目の遅延メッセージを出力する。   In the work progress data output means, when there are work precautions necessary for processing work items, and when the work communication items are questions, the work completion scheduled due date of the work item, confirmation presence information, answer presence information, Is not entered even if the work start date of the work item exceeds the scheduled work completion date, or confirmation of work precautions for that work item exceeds the scheduled work completion date, Alternatively, when it is not confirmed that there is an answer to the question for the work item even after the scheduled work completion date, delay information is set for the work item and a delay message for the work item is output. In the work progress data output means, not only the delay message of the work item is output to the person who is delaying the work item that he / she is responsible for, but also the subsequent work after the person who is delaying the work item For the person in charge who is in charge of the item, a delay message for the work item of the person in charge of the work item is output.

作業進捗データ出力手段では、作業項目の完了予定期日を参照しつつ、その作業項目の作業完了期日が作業完了予定期日までに入力された場合、その作業項目に完了情報を設定するとともに、その作業項目の完了メッセージを出力する。作業項目を処理する際に必要な作業注意事項が存在する場合は、作業項目の作業完了予定期日と確認有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日までに入力され、かつ、その作業項目の作業注意事項の確認有りが作業完了予定期日までに確認された場合、その作業項目に完了情報を設定するとともに、その作業項目の完了メッセージを出力する。   In the work progress data output means, when the work completion date of the work item is entered by the work completion due date while referring to the work item's scheduled completion date, the completion information is set in the work item and the work Output item completion message. If there are work precautions necessary when processing a work item, enter the work completion due date of the work item by the work completion due date while referring to the work completion due date and confirmation information. When it is confirmed that the work precautions for the work item have been confirmed by the scheduled work completion date, completion information is set for the work item and a completion message for the work item is output.

作業進捗データ出力手段では、作業項目を処理する際に必要な作業注意事項が存在するとともに、作業伝達事項が質問事項である場合、作業項目の作業完了予定期日と確認有無情報と回答有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日までに入力され、かつ、その作業項目の作業注意事項の確認有りが作業完了予定期日までに確認され、かつ、その作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日までに確認された場合、その作業項目に完了情報を設定するとともに、その作業項目の完了メッセージを出力する。   In the work progress data output means, when there are work precautions necessary for processing work items, and when the work communication items are questions, the work completion scheduled due date of the work item, confirmation presence information, answer presence information, , The work completion date of the work item is entered by the scheduled work completion date, and the work precautions for the work item are confirmed by the planned work completion date, and the work item When it is confirmed that there is an answer to the question item by the scheduled work completion date, completion information is set for the work item and a completion message for the work item is output.

作業進捗データ出力手段では、作業項目の完了予定期日を参照しつつ、その作業項目の作業完了期日が作業完了予定期日を越えて入力された場合、その作業項目に遅延完了情報を設定するとともに、その作業項目の遅延完了メッセージを出力する。作業項目を処理する際に必要な作業注意事項が存在する場合は、作業項目の作業完了予定期日と確認有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日を越えて入力され、または、その作業項目の作業注意事項の確認有りが作業完了予定期日を越えて確認された場合、その作業項目に遅延完了情報を設定するとともに、その作業項目の遅延完了メッセージを出力する。   In the work progress data output means, when the work completion date of the work item is input beyond the scheduled work completion date while referring to the work item scheduled completion date, delay completion information is set to the work item, Output a delayed completion message for the work item. If there are work precautions necessary when processing a work item, the work completion date of the work item exceeds the scheduled work completion date while referring to the work completion planned due date and the confirmation information. If input or confirmation of work precautions for the work item is confirmed beyond the scheduled work completion date, delay completion information is set for the work item and a delayed completion message for the work item is output. .

作業進捗データ出力手段では、作業項目を処理する際に必要な作業注意事項が存在するとともに、作業伝達事項が質問事項である場合、作業項目の作業完了予定期日と確認有無情報と回答有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日を越えて入力され、または、その作業項目の作業注意事項の確認有りが作業完了予定期日を越えて確認され、または、その作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日を越えて確認された場合、その作業項目に遅延完了情報を設定するとともに、その作業項目の遅延完了メッセージを出力する。作業進捗データ出力手段では、作業項目のうちの完了情報または遅延完了情報が設定された作業項目の番号とその作業項目の次の作業項目の番号とのいずれか一方を出力する。   In the work progress data output means, when there are work precautions necessary for processing work items and the work communication items are questions, the work completion scheduled due date of the work item, confirmation presence information, answer presence information, The work completion date of the work item is entered beyond the scheduled work completion date, or the confirmation of work precautions for the work item is confirmed beyond the scheduled work completion date, or the work When it is confirmed that there is an answer to the question of the item beyond the scheduled date for completion of work, delay completion information is set for the work item and a delay completion message for the work item is output. The work progress data output means outputs either the number of the work item for which completion information or delay completion information is set, and the number of the work item next to the work item.

作業進捗データ出力手段では、作業項目の作業完了予定期日を参照しつつ、その作業項目の作業開始期日が作業完了予定期日までに入力されない場合、その作業項目に未着手情報を設定するとともに、その作業項目の作業未着手メッセージを出力する。作業進捗データ出力手段では、自己が担当する作業項目を未着手の担当者に対してその作業項目の未着手メッセージを出力するのみならず、作業項目を未着手の担当者の後に後続の作業項目を担当する直近の担当者に対し、作業項目を未着手の担当者のその作業項目の未着手メッセージを出力する。   When the work progress data output means refers to the work completion scheduled date of the work item and the work start date of the work item is not input by the work completion scheduled date, the work item data is set to the unfinished information for the work item. Output a work not yet started message for the work item. In the work progress data output means, not only the work item for which the self is in charge but the person who has not yet started the work item's unstarted message is output, and the work item that has not been started yet follows the work item The person who has not yet started the work item is output a message indicating that the work item has not been started.

作業進捗データ出力手段では、作業項目の作業完了予定期日を参照しつつ、その作業項目の作業開始期日が作業完了予定期日までに入力された場合、その作業項目に作業中情報を設定するとともに、その作業項目の作業中メッセージを出力する。作業進捗データ出力手段では、作業項目の作業完了予定期日を参照しつつ、その作業項目の作業開始期日が作業完了予定期日までに入力され、かつ、その作業項目の作業完了期日が作業完了予定期日を越えても入力されない場合、その作業項目に遅延作業中情報を設定するとともに、その作業項目の遅延作業中メッセージを出力する。作業進捗データ出力手段では、自己が担当する作業項目を作業中または遅延作業中の担当者に対してその作業項目の作業中メッセージまたは遅延作業中メッセージを出力するのみならず、作業項目を作業中または遅延作業中の担当者の後に後続の作業項目を担当する直近の担当者に対し、作業項目を作業中または遅延作業中の担当者のその作業項目の作業中メッセージまたは遅延作業中メッセージを出力する。   In the work progress data output means, when the work start date of the work item is entered by the work completion scheduled date while referring to the work completion scheduled date of the work item, the work in progress information is set in the work item, Outputs a working message for the work item. In the work progress data output means, referring to the scheduled work completion date of the work item, the work start date of the work item is input by the scheduled work completion date, and the work completion date of the work item is the scheduled work completion date. If the information is not input even if it exceeds, the delayed work in progress information is set for the work item and a delayed work in progress message for the work item is output. The work progress data output means not only outputs the in-work message or delayed work message of the work item to the person in charge of the work item that he / she is in charge of or is in the process of delay work, but is also working on the work item Or the work in progress or delayed work message of the work item of the person who is working on the work item or the work in delay is output to the person in charge of the subsequent work item after the person in charge of the work in delay To do.

管理用コンピュータ11および業務用コンピュータ12〜16の中央処理部は、作業項目を処理する際にリスクがある場合、主要手続識別子と作業項目識別子とに基づいて、そのリスクをデータベース17から受け取り、そのリスクを各作業項目毎に出力装置を介して出力するリスク出力手段を実行し、作業項目に適用すべきアサーションがある場合、主要手続識別子と作業項目識別子とに基づいて、そのアサーションをデータベース17から受け取り、そのアサーションを各作業項目毎に出力装置を介して出力するアサーション出力手段を実行する。コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子とに基づいて、リスクを伴う作業項目のリスク作業内容をデータベース17から受け取り、そのリスク作業内容を各作業項目毎に出力装置を介して出力するリスク作業内容出力手段を実行する。   When there is a risk in processing the work item, the central processing unit of the management computer 11 and the business computers 12 to 16 receives the risk from the database 17 based on the main procedure identifier and the work item identifier, If there is an assertion to be applied to the work item by executing the risk output means for outputting the risk for each work item via the output device, the assertion is retrieved from the database 17 based on the main procedure identifier and the work item identifier. An assertion output unit that receives the assertion and outputs the assertion via the output device for each work item is executed. Based on the main procedure identifier and the work item identifier, the central processing unit of the computers 11 to 16 receives the risk work content of the work item involving the risk from the database 17 and outputs the risk work content for each work item. The risk work content output means to output via is executed.

コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子とに基づいて、リスクを伴う作業項目に対してそのリスクをコントロールするリスク管理作業項目をデータベース17から受け取り、そのリスク管理作業項目を各作業項目毎に出力装置を介して出力するリスク管理作業項目出力手段を実行する。さらに、主要手続識別子と作業項目識別子とに基づいて、リスク管理作業項目のリスク管理作業内容をデータベース17から受け取り、そのリスク管理作業内容を各作業項目毎に出力装置を介して出力するリスク管理作業内容出力手段を実行する。   Based on the main procedure identifier and the work item identifier, the central processing unit of the computers 11 to 16 receives a risk management work item for controlling the risk of the work item with risk from the database 17, and the risk management work item. The risk management work item output means is output for each work item via the output device. Further, based on the main procedure identifier and the work item identifier, the risk management work content of the risk management work item is received from the database 17 and the risk management work content is output for each work item via the output device. Execute content output means.

コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子とに基づいて、リスクを伴う作業項目を処理する際に必要なリスク作業注意事項をデータベース17から受け取り、そのリスク作業注意事項を各作業項目毎に出力装置を介して出力するリスク作業注意事項出力手段を実行し、主要手続識別子と作業項目識別子とに基づいて、リスク作業注意事項の確認有無を判断する確認有無情報をデータベース17から受け取り、その確認有無情報を各作業確認事項毎に出力装置を介して出力する確認有無情報出力手段を実行する。   Based on the main procedure identifier and the work item identifier, the central processing unit of the computers 11 to 16 receives risk work precautions necessary for processing work items with risks from the database 17 and receives the risk work precautions. A risk work precautions output means for outputting each work item via the output device is executed, and confirmation presence / absence information for judging whether or not the risk work precautions are confirmed is determined based on the main procedure identifier and the work item identifier. The confirmation presence / absence information output means for outputting the confirmation presence / absence information for each work confirmation item via the output device is executed.

コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子とに基づいて、リスクを伴う作業項目にリスク作業伝達事項が存在するか否かを確認可能なリスク作業伝達事項有無情報をデータベース17から受け取り、そのリスク作業伝達事項有無情報を各作業項目毎に出力装置を介して出力するリスク作業伝達事項有無情報出力手段を実行し、主要手続識別子と作業項目識別子とに基づいて、リスクを伴う作業項目の処理に必要な場合にのみ記載される各種複数のリスク作業伝達事項をデータベース17から受け取り、そのリスク作業伝達事項を各作業項目毎に出力装置を介して出力するリスク作業伝達事項出力手段を実行する。   The central processing unit of the computers 11 to 16 stores risk work transfer item presence / absence information that can confirm whether or not there is a risk work transfer item in the work item with risk based on the main procedure identifier and the work item identifier. The risk work transmission item presence / absence information output means for receiving the risk work transmission item presence / absence information from each of the work items via the output device is executed, and the risk is determined based on the main procedure identifier and the work item identifier. A risk work communication item output that receives from the database 17 a plurality of various risk work communication items that are described only when necessary for the processing of the accompanying work items, and outputs the risk work communication items for each work item via an output device. Execute means.

コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子とに基づいて、リスク作業伝達事項重要度をデータベース17から受け取り、そのリスク作業伝達事項重要度を各伝達事項毎に出力装置を介して出力するリスク作業伝達事項重要度出力手段を実行し、主要手続識別子と作業項目識別子とに基づいて、質問事項に対して所定の回答が存在するか否かを確認可能な回答有無情報をデータベース17から受け取り、その回答有無情報を各伝達事項毎に出力装置を介して出力するリスク作業回答有無情報出力手段を実行する。さらに、主要手続識別子と作業項目識別子とに基づいて、質問事項に対する回答事項をデータベース17から受け取り、その回答事項を各伝達事項毎に出力装置を介して出力するリスク作業回答事項出力手段を実行する。   The central processing unit of the computers 11 to 16 receives the risk work transmission item importance from the database 17 based on the main procedure identifier and the work item identifier, and outputs the risk work transmission item importance for each transmission item. The risk work communication item importance level output means is output through the system, and based on the main procedure identifier and the work item identifier, whether or not there is a predetermined answer to the question is confirmed. A risk work answer presence / absence information output unit that receives the answer presence / absence information from the database 17 and outputs the answer presence / absence information for each transmission item via the output device is executed. Further, based on the main procedure identifier and the work item identifier, a risk work answer item output means for receiving an answer item for the question item from the database 17 and outputting the answer item for each communication item via the output device is executed. .

コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子とに基づいて、リスクを伴う作業項目のリスク作業完了予定期日をデータベース17から受け取り、そのリスク作業完了予定期日を各作業項目毎に出力装置を介して出力するリスク作業完了予定期日出力手段を実行し、主要手続識別子と作業項目識別子とに基づいて、リスクを伴う作業項目の処理に要するリスク作業処理見込時間をデータベース17から受け取り、そのリスク作業処理見込時間を各作業項目毎に出力装置を介して出力するリスク作業処理見込時間出力手段を実行する。   Based on the main procedure identifier and the work item identifier, the central processing unit of the computers 11 to 16 receives the risk work completion scheduled date of the risky work item from the database 17, and the risk work completion scheduled date for each work item. The risk work completion scheduled due date output means for outputting via the output device is executed, and based on the main procedure identifier and work item identifier, the risk work processing expected time required for processing the work item with risk is received from the database 17 The risk work process expected time output means for outputting the risk work process expected time for each work item via the output device is executed.

コンピュータ11〜16の中央処理部は、主要手続識別子と作業項目識別子とに基づいて、リスクを伴う作業項目のリスク作業進捗データをデータベース17から受け取り、そのリスク作業進捗データを各作業項目毎に出力装置を介して出力するリスク作業進捗データ出力手段を実行し、主要手続識別子と作業項目識別子とに基づいて、リスクを伴う作業項目の処理に要したリスク作業処理実測時間をデータベース17から受け取り、そのリスク作業処理実測時間を各作業項目毎に出力装置を介して出力するリスク作業処理実測時間出力手段を実行する。なお、業務用コンピュータ12〜16には、ID番号によって特定される担当者データに対応するリスクを伴う作業項目のみが出力され、ID番号によって特定される担当者データに対応する作業項目のみのリスク作業進捗データが出力される。   Based on the main procedure identifier and the work item identifier, the central processing unit of the computers 11 to 16 receives the risk work progress data of the work item with risk from the database 17 and outputs the risk work progress data for each work item. The risk work progress data output means for outputting via the device is executed, and based on the main procedure identifier and the work item identifier, the risk work process actual measurement time required for processing the work item with risk is received from the database 17, A risk work process actual measurement time output means for outputting the risk work process actual measurement time for each work item via the output device is executed. The work computers 12 to 16 output only work items with risk corresponding to the person-in-charge data specified by the ID number, and risks only work items corresponding to the person-in-charge data specified by the ID number. Work progress data is output.

リスク作業進捗データ出力手段では、リスクを伴う作業項目の作業完了予定期日を参照しつつ、その作業項目の作業開始期日が作業完了予定期日を越えても入力されない場合、リスクを伴う作業項目に遅延情報を設定するとともに、その作業項目の遅延メッセージを出力する。また、リスクを伴う作業項目を処理する際に必要なリスク作業注意事項が存在する場合は、リスクを伴う作業項目の作業完了予定期日と確認有無情報とを参照しつつ、その作業項目の作業開始期日が作業完了予定期日を越えても入力されず、または、その作業項目のリスク作業注意事項の確認有りが作業完了予定期日を越えても確認されない場合、リスクを伴う作業項目に遅延情報を設定するとともに、その作業項目の遅延メッセージを出力する。   The risk work progress data output means refers to the work completion schedule date of the work item with risk, and if the work start date of the work item exceeds the scheduled work completion date, the work item with risk is delayed. Information is set and a delay message for the work item is output. Also, if there are risk work precautions necessary when processing work items that involve risk, start work on the work item while referring to the scheduled work completion date and confirmation information of the work item that involves risk. If the due date exceeds the scheduled work completion date, it will not be entered, or if confirmation of risk work precautions for that work item has not been confirmed even after the scheduled work completion date, delay information will be set for the work item with risk In addition, a delay message for the work item is output.

リスク作業進捗データ出力手段では、リスクを伴う作業項目を処理する際に必要なリスク作業注意事項が存在するとともに、リスク作業伝達事項が質問事項である場合、リスクを伴う作業項目の作業完了予定期日と確認有無情報と回答有無情報とを参照しつつ、その作業項目の作業開始期日が作業完了予定期日を越えても入力されず、または、その作業項目のリスク作業注意事項の確認有りが作業完了予定期日を越えても確認されず、または、その作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日を越えても確認されない場合、リスクを伴う作業項目に遅延情報を設定するとともに、その作業項目の遅延メッセージを出力する。作業進捗データ出力手段では、自己が担当するリスクを伴う作業項目を遅延している担当者に対してその作業項目の遅延メッセージを出力するのみならず、作業項目を遅延している担当者の後に後続の作業項目を担当する直近の担当者に対し、リスクを伴う作業項目を遅延している担当者のその作業項目の遅延メッセージを出力する。   In the risk work progress data output means, if there are risk work precautions necessary when processing work items with risks, and the risk work communication items are questions, the work completion schedule date for work items with risks Referring to the confirmation presence / absence information and the response presence / absence information, if the work start date of the work item exceeds the scheduled work completion date, it will not be entered, or the risk work precautions for that work item will be confirmed and the work completed If it is not confirmed even if it exceeds the scheduled date, or if there is an answer to the question for the work item that is not confirmed even if it exceeds the planned completion date, delay information is set for the work item with risk, Output a delayed message for the work item. In the work progress data output means, not only the delay message of the work item is output to the person who is delaying the work item with the risk that he / she is responsible for, but also after the person who is delaying the work item A delay message of the work item of the person who has delayed the work item with the risk is output to the latest person in charge of the subsequent work item.

リスク作業進捗データ出力手段では、リスクを伴う作業項目の完了予定期日を参照しつつ、その作業項目の作業完了期日が作業完了予定期日までに入力された場合、リスクを伴う作業項目に完了情報を設定するとともに、その作業項目の完了メッセージを出力する。リスクを伴う作業項目を処理する際に必要なリスク作業注意事項が存在する場合は、作業項目の作業完了予定期日と確認有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日までに入力され、かつ、その作業項目のリスク作業注意事項の確認有りが作業完了予定期日までに確認された場合、リスクを伴う作業項目に完了情報を設定するとともに、その作業項目の完了メッセージを出力する。   In the risk work progress data output means, if the work completion date of the work item is entered by the work completion due date while referring to the scheduled completion date of the work item with risk, the completion information is added to the work item with risk. Set and output a completion message for the work item. If there are risk work precautions necessary when processing work items that involve risks, the work completion date of the work item is scheduled to be completed while referring to the scheduled work completion date and confirmation information. If it is entered by the due date and the confirmation of risk work precautions for the work item is confirmed by the scheduled work completion date, completion information is set for the work item with risk and a completion message for the work item Is output.

リスク作業進捗データ出力手段では、リスクを伴う作業項目を処理する際に必要なリスク作業注意事項が存在するとともに、リスク作業伝達事項が質問事項である場合、作業項目の作業完了予定期日と確認有無情報と回答有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日までに入力され、かつ、その作業項目のリスク作業注意事項の確認有りが作業完了予定期日までに確認され、かつ、その作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日までに確認された場合、リスクを伴う作業項目に完了情報を設定するとともに、その作業項目の完了メッセージを出力する。   In the risk work progress data output means, if there are risk work precautions necessary when processing work items with risks, and if the risk work communication items are questions, the work completion scheduled date and confirmation of work items The work completion date of the work item is entered by the scheduled work completion date while referring to the information and the answer presence / absence information, and the risk work precautions for the work item are confirmed by the scheduled work completion date. When it is confirmed that there is an answer to the question for the work item by the scheduled work completion date, completion information is set for the work item with risk and a completion message for the work item is output.

リスク作業進捗データ出力手段では、リスクを伴う作業項目の作業完了予定期日を参照しつつ、その作業項目の作業完了期日が作業完了予定期日を越えて入力された場合、リスクを伴う作業項目に遅延完了情報を設定するとともに、その作業項目の遅延完了メッセージを出力する。リスクを伴う作業項目を処理する際に必要なリスク作業注意事項が存在する場合は、作業項目の作業完了予定期日と確認有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日を越えて入力され、または、その作業項目のリスク作業注意事項の確認有りが作業完了予定期日を越えて確認された場合、リスクを伴う作業項目に遅延完了情報を設定するとともに、その作業項目の遅延完了メッセージを出力する。   In the risk work progress data output means, if the work completion date of the work item is entered beyond the scheduled work completion date while referring to the work completion schedule date of the work item with risk, the work item with risk is delayed. Set completion information and output a delayed completion message for the work item. If there are risk work precautions necessary when processing work items that involve risks, the work completion date of the work item is scheduled to be completed while referring to the scheduled work completion date and confirmation information. If it is input beyond the due date, or if the confirmation of risk work precautions for the work item is confirmed beyond the scheduled work completion date, delayed completion information is set for the work item with risk, and the work item The delayed completion message is output.

リスク作業進捗データ出力手段では、リスクを伴う作業項目を処理する際に必要なリスク作業注意事項が存在するとともに、リスク作業伝達事項が質問事項である場合、作業項目の作業完了予定期日と確認有無情報と回答有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日を越えて入力され、または、その作業項目のリスク作業注意事項の確認有りが作業完了予定期日を越えて確認され、または、その作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日を越えて確認された場合、リスクを伴う作業項目に遅延完了情報を設定するとともに、その作業項目の遅延完了メッセージを出力する。作業進捗データ出力手段では、リスクを伴う作業項目のうちの完了情報または遅延完了情報が設定された作業項目の番号とその作業項目の次の作業項目の番号とのいずれか一方を出力する。   In the risk work progress data output means, if there are risk work precautions necessary when processing work items with risks, and if the risk work communication items are questions, the work completion scheduled date and confirmation of work items The work completion date of the work item is entered beyond the scheduled work completion date while referring to the information and the answer presence / absence information, or the risk work precautions for the work item are confirmed to exceed the scheduled work completion date If it is confirmed or the answer to the question for the work item is answered beyond the scheduled completion date, delay completion information is set for the risky work item and the work item is delayed. Output a message. The work progress data output means outputs either the number of the work item for which completion information or delay completion information is set among the work items with risk and the number of the work item next to the work item.

リスク作業進捗データ出力手段では、リスクを伴う作業項目の作業完了予定期日を参照しつつ、その作業項目の作業開始期日が作業完了予定期日までに入力されない場合、リスクを伴う作業項目に未着手情報を設定するとともに、その作業項目の作業未着手メッセージを出力する。作業進捗データ出力手段では、自己が担当するリスクを伴う作業項目を未着手の担当者に対してその作業項目の未着手メッセージを出力するのみならず、作業項目を未着手の担当者の後に後続の作業項目を担当する直近の担当者に対し、リスクを伴う作業項目を未着手の担当者のその作業項目の未着手メッセージを出力する。   The risk work progress data output means refers to the work completion schedule date of the work item with risk, and if the work start date of the work item is not entered by the scheduled work completion date, the work item with risk is not started And a work not yet started message for the work item is output. In the work progress data output means, not only the work item with the risk that it is in charge of, but also the person who has not yet started the work item's unstarted message, the work item is followed by the person who has not yet started. For the latest person in charge of the work item, the person in charge of the person who has not yet started the work item with the risk outputs a message indicating that the work item has not been started.

リスク作業進捗データ出力手段では、リスクを伴う作業項目の作業完了予定期日を参照しつつ、その作業項目の作業開始期日が作業完了予定期日までに入力された場合、リスクを伴う作業項目に作業中情報を設定するとともに、その作業項目の作業中メッセージを出力する。作業進捗データ出力手段では、リスクを伴う作業項目の作業完了予定期日を参照しつつ、その作業項目の作業開始期日が作業完了予定期日までに入力され、かつ、その作業項目の作業完了期日が作業完了予定期日を越えても入力されない場合、リスクを伴う作業項目に遅延作業中情報を設定するとともに、その作業項目の遅延作業中メッセージを出力する。作業進捗データ出力手段では、自己が担当するリスクを伴う作業項目を作業中または遅延作業中の担当者に対してその作業項目の作業中メッセージまたは遅延作業中メッセージを出力するのみならず、作業項目を作業中または遅延作業中の担当者の後に後続の作業項目を担当する直近の担当者に対し、リスクを伴う作業項目を作業中または遅延作業中の担当者のその作業項目の作業中メッセージまたは遅延作業中メッセージを出力する。   In the risk work progress data output means, if the work start date of the work item is entered by the work completion due date while referring to the work completion due date of the work item with risk, the work item with risk is being worked on. Information is set and a work message for the work item is output. The work progress data output means refers to the scheduled work completion date of the work item with risk, and the work start date of the work item is input by the scheduled work completion date, and the work completion date of the work item is the work completion date. If the input is not made even after the scheduled completion date, delayed work in progress information is set for the work item with risk, and a delayed work in progress message for the work item is output. The work progress data output means not only outputs work in progress messages or delayed work in progress messages to persons in charge of work items with risk that they are in charge of, but is also working items To the immediate contact who is responsible for the subsequent work item after the person who is working or delaying work, the work item with that work item for the person who is working or delaying work Output a delayed work message.

図3は、ディスプレイ23,24に表示された決算業務促進システム10A,10Bの認証画面の一例を示す図であり、図4は、初期画面の一例を示す図である。図5は、データ入力選択画面の一例を示す図である。なお、それら図や後記する各図の表示エリアや入力エリアでは具体的な文字や数字、記号の図示を部分的に省略する。管理用コンピュータ11および業務用コンピュータ12〜16を起動させると、コンピュータ11〜16に接続されたディスプレイ23,24に決算業務促進アプリケーションを示すアイコン(図示せず)が表示される。そのアイコンを押すと、それらコンピュータ11〜16に接続されたディスプレイ23,24に決算業務促進システム10A,10Bの認証画面が表示される。   FIG. 3 is a diagram illustrating an example of an authentication screen of the settlement business promotion systems 10A and 10B displayed on the displays 23 and 24, and FIG. 4 is a diagram illustrating an example of an initial screen. FIG. 5 is a diagram illustrating an example of the data input selection screen. It should be noted that specific letters, numbers, and symbols are partially omitted in the display areas and input areas of these figures and each figure described later. When the management computer 11 and the business computers 12 to 16 are activated, icons (not shown) indicating the settlement business promotion application are displayed on the displays 23 and 24 connected to the computers 11 to 16. When the icon is pressed, the authentication screen of the settlement business promotion systems 10A, 10B is displayed on the displays 23, 24 connected to the computers 11-16.

なお、図2に示すように、ネットワークどうしがインターネット18を介して接続される場合、業務用コンピュータ12〜16がインターネット18に接続した後、サーバ20を介して管理用コンピュータ11にアクセスする。管理用コンピュータ11にアクセスすると、決算業務促進アプリケーションを示すアイコンが管理コンピュータ11から業務用コンピュータ12〜16に転送され、そのアイコンを押すと、システム10Bの認証画面が業務用コンピュータ12〜16のディスプレイ24に表示される。   As shown in FIG. 2, when the networks are connected via the Internet 18, the business computers 12 to 16 access the management computer 11 via the server 20 after connecting to the Internet 18. When the management computer 11 is accessed, an icon indicating the settlement business promotion application is transferred from the management computer 11 to the business computers 12-16, and when the icon is pressed, the authentication screen of the system 10B is displayed on the display of the business computers 12-16. 24.

認証画面には、図3に示すように、ユーザ名の入力エリア3.1、パスワードの入力エリア3.2、ログインボタン3.3が表示される。管理者または業務担当者は、キーボード21を利用してそれら入力エリア3.1,3.2にユーザ名およびパスワードを入力した後、ログインボタン3.3を押す。コンピュータ11〜16は、入力されたユーザ名およびパスワードをメモリに格納されたそれらと比較し、ユーザ名およびパスワードの正誤を判断する。ユーザ名およびパスワードが正しくパスワード認証の結果が可である場合、コンピュータ11〜16は、決算業務促進システム10A,10Bの使用を許可し、図4に示す初期画面をディスプレイ23,24に表示する。管理用コンピュータ11の初期画面には、作業管理ボタン4.1、データ入力ボタン4.2、ログアウトボタン4.3が表示される。業務用コンピュータ12〜16の初期画面には、作業管理ボタン4.1、ログアウトボタン4.3のみが表示され、データ入力ボタン4.2は表示されない。なお、ユーザ名やパスワードが誤っていてパスワード認証の結果が不可である場合、コンピュータ11〜16は、システム10A,10Bの使用を禁止し、使用不可メッセージをディスプレイ23,24に表示する(図示せず)。ログアウトボタン4.3を押すと、このシステム10A,10Bからログアウトすることができる。   As shown in FIG. 3, a user name input area 3.1, a password input area 3.2, and a login button 3.3 are displayed on the authentication screen. The administrator or the person in charge of business uses the keyboard 21 to input the user name and password in the input areas 3.1 and 3.2, and then presses the login button 3.3. The computers 11 to 16 compare the input user name and password with those stored in the memory, and determine whether the user name and password are correct. If the user name and password are correct and the result of password authentication is acceptable, the computers 11 to 16 permit the use of the settlement business promotion systems 10A and 10B, and display the initial screen shown in FIG. On the initial screen of the management computer 11, a work management button 4.1, a data input button 4.2, and a logout button 4.3 are displayed. Only the work management button 4.1 and the logout button 4.3 are displayed on the initial screen of the business computers 12 to 16, and the data input button 4.2 is not displayed. If the user name or password is incorrect and the password authentication result is not possible, the computers 11 to 16 prohibit the use of the systems 10A and 10B and display an unusable message on the displays 23 and 24 (not shown). ) When the logout button 4.3 is pressed, the system 10A, 10B can be logged out.

各種データをデータベース17に格納する場合は、初期画面のデータ入力ボタン4.2を押す。各種データの入力作業は、管理用コンピュータ11のみで行うことができる。データ入力ボタン4.2を押すと、図5のデータ入力選択画面がディスプレイ23に表示される。データ入力選択画面には、担当者データボタン5.1、資料データボタン5.2、休日データボタン5.3、主要手続ボタン5.4、作業データボタン5.5、部署データボタン5.6、解説図表ボタン5.7、決算手続詳細ボタン5.8が表示されるとともに、戻るボタン5.9、ログアウトボタン5.10が表示される。戻るボタン5.9を押すと、初期画面に戻る。   In order to store various data in the database 17, the data input button 4.2 on the initial screen is pushed. Various data input operations can be performed only by the management computer 11. When the data input button 4.2 is pressed, the data input selection screen shown in FIG. The data input selection screen includes a person-in-charge data button 5.1, a material data button 5.2, a holiday data button 5.3, a main procedure button 5.4, a work data button 5.5, a department data button 5.6, An explanatory chart button 5.7 and a settlement procedure details button 5.8 are displayed, and a return button 5.9 and a logout button 5.10 are displayed. Press the back button 5.9 to return to the initial screen.

図6は、担当者データ入力画面の一例を示す図である。図6では、担当者データ入力画面に重ねてパスワード更新画面が表示されている。担当者データを入力するには、図5のデータ入力選択画面の担当者データボタン5.1を押す。担当者データボタン5.1を押すと、図6の担当者データ入力画面がディスプレイ23に表示される。担当者データ入力画面には、図6に示すように、担当者ID番号入力エリア6.1、担当者名入力エリア6.2、パスワード入力エリア6.3、パスワードの変更ボタン6.4が表示されるとともに、実行ボタン6.5、クリアボタン6.6、削除ボタン6.7、キャンセルボタン6.8が表示される。担当者ID番号入力エリア6.1に担当者ID番号(担当者識別子)を入力し(ID番号が自動的に生成され、生成されたID番号がID番号入力エリア6.1に表示される場合を含む)、担当者名入力エリア6.2に担当者名を入力し、パスワード入力エリア6.3にパスワードを入力した後、実行ボタン6.5を押すと、図示はしていないが、担当者データ確認画面が表示される。   FIG. 6 is a diagram illustrating an example of a person-in-charge data input screen. In FIG. 6, a password update screen is displayed over the person-in-charge data input screen. In order to input person-in-charge data, the person-in-charge data button 5.1 on the data input selection screen of FIG. 5 is pressed. When the person-in-charge data button 5.1 is pressed, the person-in-charge data input screen shown in FIG. In the person-in-charge data input screen, as shown in FIG. 6, a person-in-charge ID number input area 6.1, a person-in-charge name input area 6.2, a password input area 6.3, and a password change button 6.4 are displayed. In addition, an execution button 6.5, a clear button 6.6, a delete button 6.7, and a cancel button 6.8 are displayed. When a person-in-charge ID number (person-in-charge identifier) is entered in the person-in-charge ID number input area 6.1 (when an ID number is automatically generated and the generated ID number is displayed in the ID number input area 6.1) After entering the name of the person in charge in the person in charge name input area 6.2 and entering the password in the password input area 6.3 and pressing the execute button 6.5, the person in charge is not shown. Person data confirmation screen is displayed.

担当者データ確認画面には、ID番号が表示された担当者ID番号入力エリア、担当者名が表示された担当者名入力エリア、パスワードの再入力エリア、YESボタン、NOボタンが表示される。NOボタンを押すと、担当者データ(ID番号、担当者名、パスワード)の格納は行われず、図6の担当者データ入力画面に戻る。担当者データ確認画面において、パスワードの再入力エリアにパスワードを再入力し、YESボタンを押すと、担当者データがデータベースに転送され、担当者名(格納日時を含む)とパスワードとが担当者ID番号に関連付けられた状態でデータベース17の担当者データファイルに格納される(担当者データ格納手段)。クリアボタン6.6を押すと、入力エリアに入力された担当者データが消去され、データの入力を初めからやり直す。キャンセルボタン6.8を押すと、図5のデータ入力選択画面に戻る。   In the person-in-charge data confirmation screen, a person-in-charge ID number input area in which the ID number is displayed, a person-in-charge name input area in which the person-in-charge name is displayed, a password re-input area, a YES button, and a NO button are displayed. When the NO button is pressed, the person-in-charge data (ID number, person-in-charge name, password) is not stored, and the screen returns to the person-in-charge data input screen of FIG. On the person-in-charge data confirmation screen, re-enter the password in the password re-entry area, and press the YES button. The person-in-charge data is transferred to the database, and the person-in-charge ID (including the storage date and time) and password are in charge. It is stored in the person-in-charge data file of the database 17 in a state associated with the number (person-in-charge data storage means). When the clear button 6.6 is pressed, the person-in-charge data input in the input area is deleted, and data input is started again from the beginning. When the cancel button 6.8 is pressed, the screen returns to the data input selection screen of FIG.

図6の担当者データ入力画面において、パスワードを変更するには、担当者名入力エリア6.2のプルダウンリストからパスワードを変更する担当者名を選択した後、パスワードの変更ボタン6.4を押す。変更ボタンを押すと、図6に示すように、パスワード更新画面が表示され、新しいパスワード入力エリア6.9、確認用パスワード入力エリア6.10、更新ボタン6.11、中止ボタン6.12が表示される。新しいパスワード入力エリア6.9に新たなパスワードを入力し、確認用パスワード入力エリア6.10にそのパスワードを入力した後、更新ボタン6.11を押すと、その担当者のパスワードが新たなそれに更新される(更新日時を含む)。中止ボタン6.12を押すと、パスワード変更画面が消去される。なお、パスワードの変更は、管理用コンピュータではなく、業務用コンピュータから行う。図6の担当者データ入力画面において、担当者データを削除するには、担当者名入力エリア6.1のプルダウンリストから削除する担当者データを指定し、削除ボタン6.7を押す。削除ボタン6.7を押すと、指定した担当者データがデータベース17の担当者データファイルから削除される。   To change the password on the person-in-charge data input screen of FIG. 6, after selecting the person in charge name whose password is to be changed from the pull-down list in the person-in-charge name input area 6.2, press the password change button 6.4. . When the change button is pressed, a password update screen is displayed as shown in FIG. 6, and a new password input area 6.9, a confirmation password input area 6.10, an update button 6.11, and a cancel button 6.12 are displayed. Is done. Enter a new password in the new password input area 6.9, enter the password in the confirmation password input area 6.10, and press the update button 6.11, the password of the person in charge is updated to the new one. (Including update date and time) When the cancel button 6.12. Is pressed, the password change screen is deleted. The password is changed not from the management computer but from the business computer. In order to delete the person-in-charge data on the person-in-charge data input screen of FIG. 6, the person-in-charge data to be deleted is designated from the pull-down list in the person-in-charge name input area 6.1, and the delete button 6.7 is pressed. When the delete button 6.7 is pressed, the designated person-in-charge data is deleted from the person-in-charge data file in the database 17.

図7は、資料データ入力画面の一例を示す図であり、図8は、資料リスト出力画面の一例を示す図である。資料データを入力するには、図5のデータ入力選択画面の資料データボタン5.2を押す。資料データボタン5.2を押すと、図7の資料データ入力画面がディスプレイ23に表示される。資料データ入力画面には、図7に示すように、資料ID番号表示エリア7.1、資料名入力エリア7.2、主管部署入力エリア7.3、成果物確認エリア7.4、スプレッドシート確認エリア7.5、資料媒体入力エリア7.7が表示されるとともに、実行ボタン7.7、クリアボタン7.8、キャンセルボタン7.9、資料リストボタン7.10が表示される。なお、資料データに設定される資料ID番号(資料識別子)は、自動的に生成される。   FIG. 7 is a diagram illustrating an example of a material data input screen, and FIG. 8 is a diagram illustrating an example of a material list output screen. In order to input the document data, the document data button 5.2 on the data input selection screen in FIG. 5 is pressed. When the document data button 5.2 is pressed, the document data input screen shown in FIG. On the document data input screen, as shown in FIG. 7, a document ID number display area 7.1, a document name input area 7.2, a supervising department input area 7.3, a product confirmation area 7.4, and a spreadsheet confirmation An area 7.5 and a material medium input area 7.7 are displayed, and an execution button 7.7, a clear button 7.8, a cancel button 7.9, and a material list button 7.10 are displayed. Note that the material ID number (material identifier) set in the material data is automatically generated.

資料名入力エリア7.2に資料名を入力し、主管部署入力エリア7.3に主管部署を入力し(主管部署は、主管部署入力エリア7.3に表示されるプルダウンリストから指定することもできる)、成果物確認エリア7.4のプルダウンリストにおいてその資料が成果物か否かを選択し、さらに、スプレッドシート確認エリア7.5のプルダウンリストにおいてその資料がスプレッドシートか否かを選択し、資料媒体入力エリア7.6のプルダウンリストにおいてその資料が紙かデータかを選択した後、実行ボタン7.7を押すと、その資料データ(資料名、主管部署、成果物○,×、スプレッドシート○,×、資料媒体)に資料ID番号(資料識別子)が自動的に設定され、図示はしていないが、資料データ確認画面が表示される。   Enter the material name in the material name input area 7.2, and enter the main department in the main department input area 7.3 (the main department can be specified from the pull-down list displayed in the main department input area 7.3). In the pull-down list in the product confirmation area 7.4, select whether or not the material is a product. In the pull-down list in the spreadsheet confirmation area 7.5, select whether or not the material is a spreadsheet. After selecting whether the material is paper or data in the pull-down list of the material medium input area 7.6, pressing the execute button 7.7 will cause the material data (material name, main department, deliverable ○, ×, spread) A material ID number (material identifier) is automatically set on the sheet (◯, ×, material medium), and although not shown, a material data confirmation screen is displayed.

資料データ確認画面には、資料ID番号が表示された資料ID番号表示エリア、資料名が表示された資料名入力エリア、主管部署が表示された主管部署入力エリア、成果物○,×が表示された成果物確認エリア、スプレッドシート○,×が表示されたスプレッドシート確認エリア、その資料が紙かデータかを表示した資料媒体入力エリアの他に、YESボタン、NOボタンが表示される。NOボタンを押すと、資料データの格納は行われず、図7の資料データ入力画面に戻る。資料データ確認画面において、YESボタンを押すと、資料データ(格納日時を含む)と資料ID番号とがデータベース17に転送され、資料データが資料ID番号に関連付けられた状態でデータベース17の資料データファイルに格納される(資料データ格納手段)。クリアボタン7.8を押すと、入力エリアに入力された資料データが消去され、データの入力を初めからやり直す。キャンセルボタン7.9を押すと、図5のデータ入力選択画面に戻る。   On the document data confirmation screen, the document ID number display area displaying the document ID number, the document name input area displaying the document name, the supervising department input area displaying the supervising department, and the deliverables ○ and X are displayed. In addition to the product confirmation area, the spreadsheet confirmation area where the spreadsheet ○, × is displayed, and the material medium input area where the material is paper or data, a YES button and a NO button are displayed. When the NO button is pressed, the material data is not stored and the screen returns to the material data input screen of FIG. When the YES button is pressed on the document data confirmation screen, the document data (including the storage date and time) and the document ID number are transferred to the database 17, and the document data file of the database 17 is stored in the state where the document data is associated with the document ID number. (Material data storage means). When the clear button 7.8 is pressed, the material data input to the input area is deleted, and data input is started again from the beginning. When the cancel button 7.9 is pressed, the screen returns to the data input selection screen of FIG.

図7の資料データ入力画面において、資料リストボタン7.10を押すと、コンピュータ11が資料リストの送信をデータベース17に要求する。データベース17は、資料リストの送信指令に従って、資料データファイルに既に格納されている資料データの一覧をコンピュータ11に転送する。資料データを受け取ったコンピュータ11は、図8に示すように、資料リスト出力画面をディスプレイ23に表示する。資料リスト出力画面では、資料ID番号表示エリア8.1に資料ID番号、資料名表示エリア8.2に資料名、主管部署表示エリア8.3に主管部署、成果物表示エリア8.4に成果物○,×、スプレッドシート表示エリア8.5にスプレッドシート○,×、資料媒体表示エリア8.6に紙またはデータが表示されるとともに、閉じるボタン8.7、削除ボタン8.8が表示される。閉じるボタン8.7を押すと、図5のデータ入力選択画面に戻る。図8の資料リスト出力画面において、資料データを削除するには、資料名表示エリア8.2に表示された資料名のうちの削除する資料名を反転させて指定した後、削除ボタン8.8を押す。削除ボタン8.8を押すと、指定した資料データがデータベース17の資料データファイルから削除される。   When the material list button 7.10 is pressed on the material data input screen of FIG. 7, the computer 11 requests the database 17 to transmit the material list. The database 17 transfers a list of material data already stored in the material data file to the computer 11 in accordance with a material list transmission command. Receiving the document data, the computer 11 displays a document list output screen on the display 23 as shown in FIG. In the material list output screen, the material ID number is displayed in the material ID number display area 8.1, the material name is displayed in the material name display area 8.2, the department in charge is displayed in the supervising department display area 8.3, and the result is displayed in the product display area 8.4. The object ○, ×, the spreadsheet ○, × is displayed in the spreadsheet display area 8.5, paper or data is displayed in the document medium display area 8.6, and the close button 8.7 and the delete button 8.8 are displayed. The When the close button 8.7 is pressed, the screen returns to the data input selection screen of FIG. In order to delete the document data on the document list output screen of FIG. 8, after specifying the document name to be deleted among the document names displayed in the document name display area 8.2, the delete button 8.8 is selected. Press. When the delete button 8.8 is pressed, the designated material data is deleted from the material data file in the database 17.

資料名には、売掛金勘定明細、未収入金勘定明細、貸倒引当金限度計算資料、有価証券明細、子会社決算書、残高明細表、固定資産台帳、長期前払費用管理表、合計残高試算表等がある。主管部署には、経理部、総務部、営業部、技術部、企画部等がある。なお、資料名はそれらに限定されず、決算に必要なあらゆる資料が含まれ、主管部署はそれらに限定されず、あらゆる部署が含まれる。   Material names include accounts receivable account details, accounts receivable account details, allowance for loan loss allowances, securities details, subsidiary financial statements, balance sheet, fixed asset ledger, long-term prepaid expense management table, total balance trial calculation table, etc. is there. The departments in charge include the accounting department, general affairs department, sales department, engineering department, and planning department. The name of the material is not limited to them, and includes all materials necessary for the settlement of accounts.

図9は、休日データ入力画面の一例を示す図である。なお、データベース17の休日データファイルには、年ごとの法定の休日データが既に格納されている。会社の設立記念日等の新たな休日データを入力するには、図5のデータ入力選択画面の休日データボタン5.3を押す。休日データボタン5.3を押すと、図9の休日データ入力画面がディスプレイ23に表示される。休日データ入力画面には、図9に示すように、年のプルダウンボタン、休日(年月日)入力エリア9.1、休日名入力エリア9.2が表示されるとともに、実行ボタン9.3、クリアボタン9.4、削除ボタン9.5、キャンセルボタン9.6、戻るボタン9.7が表示される。   FIG. 9 is a diagram illustrating an example of a holiday data input screen. The holiday data file of the database 17 already stores legal holiday data for each year. In order to input new holiday data such as the company establishment anniversary, the holiday data button 5.3 on the data input selection screen of FIG. 5 is pressed. When the holiday data button 5.3 is pressed, the holiday data input screen shown in FIG. On the holiday data input screen, as shown in FIG. 9, a year pull-down button, a holiday (year / month / day) input area 9.1, a holiday name input area 9.2 are displayed, and an execution button 9.3, A clear button 9.4, a delete button 9.5, a cancel button 9.6, and a return button 9.7 are displayed.

休日(年月日)入力エリア9.1に休日の年月日を入力し、休日名入力エリア9.2にその休日名を入力した後、実行ボタン9.3を押す。実行ボタン9.3を押すと、入力された休日(年月日)と休日名とがデータベース17に転送され、休日(年月日)と休日名(格納日時を含む)とが時系列に並んだ状態(暦に従って整理された状態)でデータベース17の休日データファイルに格納される(休日データ格納手段)。年のプルダウンボタンを押してプルダウンリストから所定の年を指定し、実行ボタン9.3を押すと、図示はしていないが、データベース17の休日データファイルに格納されているその年の法定の休日データがコンピュータ11に転送され、その休日データが休日名入力エリア9.2に表示される。図9の休日データ入力画面において、休日データを削除するには、休日名入力エリア9.2に表示された休日のうちの削除する休日を反転させて指定した後、削除ボタン9.5を押す。削除ボタン9.5を押すと、指定した休日データがデータベース17の休日データファイルから削除される。   Enter the date of holiday in the holiday (year / month / day) input area 9.1, enter the holiday name in the holiday name input area 9.2, and then press the execution button 9.3. When the execution button 9.3 is pressed, the input holiday (year / month / day) and holiday name are transferred to the database 17, and the holiday (year / month / day) and holiday name (including the storage date / time) are arranged in time series. It is stored in the holiday data file of the database 17 in a state (arranged according to the calendar) (holiday data storage means). When the year pull-down button is pressed to specify a predetermined year from the pull-down list and the execution button 9.3 is pressed, the legal holiday data for that year stored in the holiday data file of the database 17 is not shown. Is transferred to the computer 11 and the holiday data is displayed in the holiday name input area 9.2. In order to delete holiday data on the holiday data input screen of FIG. 9, after designating the holiday to be deleted among the holidays displayed in the holiday name input area 9.2, press the delete button 9.5. . When the delete button 9.5 is pressed, the designated holiday data is deleted from the holiday data file in the database 17.

図10は、主要手続リスト出力画面の一例を示す図であり、図11は、主要手続入力画面の一例を示す図である。図12は、主要手続更新画面の一例を示す図である。主要手続の一覧を表示するには、図5のデータ入力選択画面の主要手続ボタン5.4を押す。主要手続ボタン5.4を押すと、図10の主要手続リスト出力画面がディスプレイ23に表示される。主要手続リスト出力画面には、図10に示すように、番号表示エリア10.1、主要手続表示エリア10.2、入力ボタン10.3、更新ボタン10.4、削除ボタン10.5、戻るボタン10.6が表示される。   FIG. 10 is a diagram illustrating an example of a main procedure list output screen, and FIG. 11 is a diagram illustrating an example of a main procedure input screen. FIG. 12 is a diagram illustrating an example of a main procedure update screen. In order to display a list of main procedures, the main procedure button 5.4 on the data input selection screen of FIG. 5 is pressed. When the main procedure button 5.4 is pressed, the main procedure list output screen shown in FIG. On the main procedure list output screen, as shown in FIG. 10, a number display area 10.1, a main procedure display area 10.2, an input button 10.3, an update button 10.4, a delete button 10.5, and a return button 10.6 is displayed.

主要手続の各データが既にデータベース17の主要手続ファイルに格納されている場合、図示はしていないが、主要手続の番号が番号表示エリア10.1に表示され、その番号の主要手続が主要手続表示エリア10.2に表示される。図10の主要手続リスト出力画面において、主要手続データを削除するには、主要手続リストの主要手続表示エリア10.2に表示された主要手続のうちの削除する主要手続を反転させて指定した後、削除ボタン10.5を押す。削除ボタン10.5を押すと、指定した主要手続データがデータベース17の主要手続ファイルから削除される。戻るボタン10.6を押すと、図5のデータ入力選択画面に戻る。   When each data of the main procedure is already stored in the main procedure file of the database 17, the number of the main procedure is displayed in the number display area 10.1, although not shown, and the main procedure of the number is the main procedure. It is displayed in the display area 10.2. In order to delete the main procedure data on the main procedure list output screen of FIG. 10, after specifying the main procedure to be deleted out of the main procedures displayed in the main procedure display area 10.2 of the main procedure list. The delete button 10.5 is pressed. When the delete button 10.5 is pressed, the designated main procedure data is deleted from the main procedure file in the database 17. When the return button 10.6 is pressed, the screen returns to the data input selection screen of FIG.

主要手続データを入力するには、図10の主要手続リスト出力画面の入力ボタン10.3を押す。入力ボタン10.3を押すと、図11の主要手続入力画面がディスプレイ23に表示される。主要手続入力画面には、主要手続リスト11.1とともに、番号入力エリア11.2、主要手続入力エリア11.3、実行ボタン11.4、クリアボタン11.5、キャンセルボタン11.6が表示される。番号入力エリア11.2に主要手続を特定する番号を入力し(番号入力エリア11.2のプルダウンリストから番号を指定することもできる)、主要手続入力エリア11.3に主要手続を入力した後(主要手続入力エリア11.3のプルダウンリストから所定の主要手続を指定することもできる)、実行ボタン11.4を押すと、図示はしていないが、主要手続入力確認画面が表示される。図11の主要手続入力画面において、クリアボタン11.5を押すと、入力エリアに入力された主要手続データ(番号、主要手続)が消去され、データの入力を初めからやり直す。キャンセルボタン11.6を押すと、主要手続データの格納は行われず、図10の主要手続リスト出力画面に戻る。   To input main procedure data, the input button 10.3 on the main procedure list output screen of FIG. 10 is pressed. When the input button 10.3 is pressed, the main procedure input screen shown in FIG. On the main procedure input screen, a number input area 11.2, a main procedure input area 11.3, an execution button 11.4, a clear button 11.5, and a cancel button 11.6 are displayed together with the main procedure list 11.1. The After entering a number that identifies the main procedure in the number entry area 11.2 (you can also specify a number from the pull-down list in the number entry area 11.2) and entering the main procedure in the main procedure entry area 11.3 (A predetermined main procedure can also be designated from the pull-down list of the main procedure input area 11.3) When the execute button 11.4 is pressed, a main procedure input confirmation screen is displayed, although not shown. When the clear button 11.5 is pressed on the main procedure input screen of FIG. 11, the main procedure data (number, main procedure) input in the input area is deleted, and data input is started again from the beginning. When the cancel button 11.6 is pressed, main procedure data is not stored, and the screen returns to the main procedure list output screen of FIG.

主要手続入力確認画面には、番号が表示された番号入力エリア、主要手続が表示された主要手続入力エリア、YESボタン、NOボタンが表示される。NOボタンを押すと、主要手続データ(番号、主要手続)の格納は行われず、図10の主要手続リスト出力画面に戻る。主要手続入力確認画面において、YESボタンを押すと、主要手続データがデータベース17に転送され、主要手続データ(格納日時を含む)がデータベース17の主要手続データファイルに格納される(主要手続データ格納手段)。なお、各主要手続はそれらに設定された各番号に関連付けられて格納される。   On the main procedure input confirmation screen, a number input area displaying a number, a main procedure input area displaying a main procedure, a YES button, and a NO button are displayed. When the NO button is pressed, main procedure data (number and main procedure) is not stored, and the screen returns to the main procedure list output screen of FIG. When the YES button is pressed on the main procedure input confirmation screen, the main procedure data is transferred to the database 17 and the main procedure data (including the storage date and time) is stored in the main procedure data file of the database 17 (main procedure data storage means) ). Each main procedure is stored in association with each number set for them.

主要手続データを更新するには、図10の主要手続リスト出力画面の更新ボタン10.4を押す。更新ボタン10.4を押すと、図12の主要手続更新画面がディスプレイ23に表示される。主要手続更新画面には、主要手続リスト12.1とともに、番号更新エリア12.2、主要手続更新エリア12.3、実行ボタン12.4、クリアボタン12.5、キャンセルボタン12.6が表示される。番号更新エリア12.2に主要手続を特定する番号を入力し(番号更新エリア12.2のプルダウンリストから番号を指定することもできる)、主要手続更新エリア12.3に新たな主要手続を入力した後(主要手続更新エリア12.3のプルダウンリストから所定の主要手続を指定することもできる)、実行ボタン12.4を押すと、図示はしていないが、主要手続更新確認画面が表示される。図12の主要手続更新画面において、クリアボタン12.5を押すと、更新エリア12.2,12.3に入力された主要手続データ(番号、主要手続)が消去され、データの入力を初めからやり直す。キャンセルボタン12.6を押すと、主要手続データの格納は行われず、図10の主要手続リスト出力画面に戻る。   To update the main procedure data, the update button 10.4 on the main procedure list output screen of FIG. 10 is pressed. When the update button 10.4 is pressed, the main procedure update screen shown in FIG. On the main procedure update screen, a main procedure list 12.1, a number update area 12.2, a main procedure update area 12.3, an execute button 12.4, a clear button 12.5, and a cancel button 12.6 are displayed. The Enter a number that identifies the main procedure in the number update area 12.2 (you can also specify a number from the pull-down list in the number update area 12.2) and enter a new main procedure in the main procedure update area 12.3 After that (the specified main procedure can be specified from the pull-down list of the main procedure update area 12.3), when the execute button 12.4 is pressed, the main procedure update confirmation screen is displayed although not shown. The When the clear button 12.5 is pressed on the main procedure update screen of FIG. 12, the main procedure data (number, main procedure) input in the update areas 12.2, 12.3 is erased, and data input is started from the beginning. Try again. When the cancel button 12.6 is pressed, main procedure data is not stored and the screen returns to the main procedure list output screen of FIG.

主要手続更新確認画面には、番号が表示された番号更新エリア、新たな主要手続が表示された主要手続更新エリア、YESボタン、NOボタンが表示される。NOボタンを押すと、主要手続データ(番号、主要手続)の更新は行われず、図10の主要手続リスト出力画面に戻る。主要手続更新確認画面において、YESボタンを押すと、新たな主要手続データがデータベース17に転送され、その主要手続データ(更新日時を含む)がデータベース17の主要手続データファイルに格納され、主要手続データが更新される(主要手続データ更新手段)。なお、更新後の各主要手続はそれらに設定された各番号に関連付けられて格納される。   On the main procedure update confirmation screen, a number update area displaying a number, a main procedure update area displaying a new main procedure, a YES button, and a NO button are displayed. If the NO button is pressed, the main procedure data (number, main procedure) is not updated, and the screen returns to the main procedure list output screen of FIG. When the YES button is pressed on the main procedure update confirmation screen, the new main procedure data is transferred to the database 17 and the main procedure data (including the update date and time) is stored in the main procedure data file of the database 17. Is updated (main procedure data update means). The updated main procedures are stored in association with the numbers set for them.

主要手続には、現金、預金、売掛金、棚卸資産・貯蔵品、前渡金、前払費用、未収入金、立替金、仮払金、有形・無形固定資産、投資有価証券、敷金、保証金、買掛金、借入金、未払金、未払費用、前受金、預り金、仮受金、企業の概況、事業の状況等がある。なお、主要手続はそれらに限定されず、決算に必要なあらゆる主要手続が含まれる。   Major procedures include cash, deposits, accounts receivable, inventories and supplies, advance payments, prepaid expenses, accounts receivable, advances, temporary deposits, tangible and intangible fixed assets, investment securities, security deposits, guarantees, accounts payable, borrowings, accounts payable , Accrued expenses, advance deposits, deposits, provisional deposits, company overview, business conditions, etc. The main procedures are not limited to these, and include all the main procedures necessary for settlement.

図13は、作業リスト出力画面の一例を示す図であり、図14は、作業入力画面の一例を示す図である。図15は、作業更新画面の一例を示す図である。なお図13の作業リストの作業項目は、標準の作業を示す。作業の一覧を表示するには、図5のデータ入力選択画面の作業項目データボタン5.5を押す。作業項目データボタン5.5を押すと、図13の作業リスト出力画面がディスプレイ23に表示される。作業リスト出力画面には、図13に示すように、作業区分表示エリア13.1、作業項目表示エリア13.2、作業種類表示エリア13.3、作業説明表示エリア13.4、入力ボタン13.5、更新ボタン13.6、削除ボタン13.7、戻るボタン13.8が表示される。   FIG. 13 is a diagram illustrating an example of a work list output screen, and FIG. 14 is a diagram illustrating an example of a work input screen. FIG. 15 is a diagram illustrating an example of a work update screen. The work items in the work list in FIG. 13 indicate standard work. To display the work list, the work item data button 5.5 on the data input selection screen in FIG. 5 is pressed. When the work item data button 5.5 is pressed, a work list output screen shown in FIG. 13 is displayed on the display 23. On the work list output screen, as shown in FIG. 13, a work category display area 13.1, a work item display area 13.2, a work type display area 13.3, a work explanation display area 13.4, an input button 13. 5. An update button 13.6, a delete button 13.7, and a return button 13.8 are displayed.

主要手続の処理に必要な作業に関する各データが既にデータベース17の作業データファイルに格納されている場合、作業の区分が作業区分表示エリア13.1に表示され、作業項目が作業項目表示エリア13.2に表示され、図示はしていないが、作業種類が作業種類表示エリア13.3に表示されるとともに、作業説明が作業説明表示エリア13.4に表示される。図13の作業リスト出力画面において、作業データを削除するには、作業リストの各エリア13.1〜13.4に表示された作業のうちの削除する作業を反転させて指定した後、削除ボタン13.7を押す。削除ボタン13.7を押すと、指定した作業データがデータベース17の作業データファイルから削除される。戻るボタン13.8を押すと、図5のデータ入力選択画面に戻る。   When the data related to the work necessary for the main procedure is already stored in the work data file of the database 17, the work classification is displayed in the work classification display area 13.1, and the work item is displayed in the work item display area 13. Although not shown, the work type is displayed in the work type display area 13.3 and the work description is displayed in the work description display area 13.4. In order to delete the work data on the work list output screen of FIG. 13, after specifying the work to be deleted among the work displayed in the areas 13.1 to 13.4 of the work list, the delete button is displayed. Press 13.7. When the delete button 13.7 is pressed, the designated work data is deleted from the work data file in the database 17. When the return button 13.8 is pressed, the screen returns to the data input selection screen of FIG.

作業に関する各データを入力するには、図13の作業リスト出力画面の入力ボタン13.5を押す。入力ボタン13.5を押すと、図14の作業入力画面がディスプレイ23に表示される。作業入力画面には、作業リスト14.1とともに、作業区分入力エリア14.2、作業項目入力エリア14.3、作業種類入力エリア14.4、作業説明入力エリア14.5、実行ボタン14.6、クリアボタン14.7、キャンセルボタン14.8が表示される。   In order to input each data related to the work, the input button 13.5 on the work list output screen of FIG. 13 is pressed. When the input button 13.5 is pressed, the work input screen shown in FIG. 14 is displayed on the display 23. The work input screen includes a work list 14.1, a work category input area 14.2, a work item input area 14.3, a work type input area 14.4, a work description input area 14.5, and an execution button 14.6. A clear button 14.7 and a cancel button 14.8 are displayed.

作業区分入力エリア14.2に作業の区分を入力し(作業区分入力エリア14.2のプルダウンリストから区分を指定することもできる)、作業項目入力エリア14.3に作業項目を入力し(作業項目入力エリア14.3のプルダウンリストから所定の作業項目を指定することもできる)、作業種類入力エリア14.4に作業種類を入力するとともに(作業種類入力エリア14.4のプルダウンリストから所定の作業種類を指定することもできる)、作業説明入力エリア14.5に作業説明を入力した後、実行ボタン14.6を押すと、図示はしていないが、作業入力確認画面が表示される。   A work category is input in the work category input area 14.2 (a category can also be specified from the pull-down list of the work category input area 14.2), and a work item is entered in the work item input area 14.3 (work A predetermined work item can be specified from the pull-down list in the item input area 14.3), and a work type is input into the work type input area 14.4 (a predetermined value is selected from the pull-down list in the work type input area 14.4). If the execution button 14.6 is pressed after inputting the work description in the work description input area 14.5, a work input confirmation screen is displayed although not shown.

作業入力確認画面には、番号が表示された作業区分入力エリア、作業項目が表示された作業項目入力エリア、作業種類が表示された作業種類入力エリア、作業説明が表示された作業説明入力エリアの他に、YESボタン、NOボタンが表示される。NOボタンを押すと、それらデータの格納は行われず、図13の作業リスト出力画面に戻る。   The work input confirmation screen includes a work category input area that displays numbers, a work item input area that displays work items, a work type input area that displays work types, and a work description input area that displays work descriptions. In addition, a YES button and a NO button are displayed. If the NO button is pressed, the data is not stored and the screen returns to the work list output screen of FIG.

作業入力確認画面において、YESボタンを押すと、作業に関する各データがデータベース17に転送され、それらデータ(格納日時を含む)が作業項目の作業区分に関連付けられた状態でデータベース17の作業データファイルに格納される(作業項目データ格納手段)。図14の作業入力画面において、クリアボタン14.7を押すと、各入力エリア14.2〜14.5に入力された作業データが消去され、データの入力を初めからやり直す。キャンセルボタン14.8を押すと、図13の作業リスト出力画面に戻る。   When the YES button is pressed on the work input confirmation screen, each data relating to the work is transferred to the database 17 and the data (including the storage date and time) is associated with the work classification of the work item in the work data file of the database 17. Stored (work item data storage means). When the clear button 14.7 is pressed on the work input screen shown in FIG. 14, the work data input to the input areas 14.2 to 14.5 is deleted, and the data input is started again from the beginning. When the cancel button 14.8 is pressed, the screen returns to the work list output screen of FIG.

作業に関する各データを更新するには、図13の作業リスト出力画面の更新ボタン13.6を押す。更新ボタン13.6を押すと、図15の作業更新画面がディスプレイに表示される。作業更新画面には、作業リスト15.1とともに、作業区分更新エリア15.2、作業項目更新エリア15.3、作業種類更新エリア15.4、作業説明更新エリア15.5、実行ボタン15.6、クリアボタン15.7、キャンセルボタン15.8が表示される。   In order to update each data relating to the work, an update button 13.6 on the work list output screen of FIG. 13 is pushed. When the update button 13.6 is pressed, the work update screen in FIG. 15 is displayed on the display. The work update screen includes a work list 15.1, work category update area 15.2, work item update area 15.3, work type update area 15.4, work description update area 15.5, execution button 15.6. A clear button 15.7 and a cancel button 15.8 are displayed.

作業区分更新エリア15.2に作業の区分を入力し(作業区分更新エリア15.2のプルダウンリストから区分を指定することもできる)、作業項目更新エリア15.3に作業項目を入力し(作業項目更新エリア15.3のプルダウンリストから所定の作業項目を指定することもできる)、作業種類更新エリア15.4に作業種類を入力するとともに(作業種類更新エリア15.4のプルダウンリストから所定の作業種類を指定することもできる)、作業説明更新エリア15.5に作業説明を入力した後、実行ボタン15.6を押すと、図示はしていないが、作業更新確認画面が表示される。   Enter the work category in the work category update area 15.2 (you can also specify the category from the pull-down list in the work category update area 15.2), and enter the work item in the work item update area 15.3 (work A predetermined work item can also be specified from the pull-down list in the item update area 15.3), and a work type is input to the work type update area 15.4 (a predetermined value is selected from the pull-down list in the work type update area 15.4). If the execution button 15.6 is pressed after inputting the work description in the work description update area 15.5, a work update confirmation screen is displayed (not shown).

作業更新確認画面には、番号が表示された作業区分更新エリア、作業項目が表示された作業項目更新エリア、作業種類が表示された作業種類更新エリア、作業説明が表示された作業説明更新エリアの他に、YESボタン、NOボタンが表示される。NOボタンを押すと、それらデータの更新は行われず、図13の作業リスト出力画面に戻る。   The work update confirmation screen includes a work category update area with a number, a work item update area with a work item, a work type update area with a work type, and a work description update area with a work description. In addition, a YES button and a NO button are displayed. When the NO button is pressed, the data is not updated and the screen returns to the work list output screen of FIG.

作業更新確認画面において、YESボタンを押すと、作業に関する各データがデータベース17に転送され、それらデータ(更新日時を含む)が作業区分に関連付けられた状態でデータベース17の作業データファイルに格納され、作業データが更新される(作業項目データ更新手段)。図15の作業更新画面において、クリアボタン15.7を押すと、各入力エリア15.2〜15.5に入力された作業データが消去され、データの入力を初めからやり直す。キャンセルボタン15.8を押すと、図13の作業リスト出力画面に戻る。   When the YES button is pressed on the work update confirmation screen, each data relating to the work is transferred to the database 17, and the data (including the update date and time) is stored in the work data file of the database 17 in a state associated with the work classification. The work data is updated (work item data updating means). When the clear button 15.7 is pressed on the work update screen of FIG. 15, the work data input to the input areas 15.2 to 15.5 is deleted, and the data input is started again from the beginning. When the cancel button 15.8 is pressed, the screen returns to the work list output screen of FIG.

作業項目には、(A)提出依頼、(B)資料入手、(C)要件確認、(D)作成、(E)照合、(F)確認、(G)起票、(H)記帳、(I)検証、(J)承認、(K)資料保管、(L)準備等があり、作業種類には、実施、再鑑、承認等がある。なお、作業項目はそれらに限定されず、主要手続の処理に必要なあらゆる作業項目が含まれる。作業種類はそれらに限定されず、作業項目の処理に必要なあらゆる作業種類が含まれる。   Work items include (A) submission request, (B) material acquisition, (C) requirement confirmation, (D) creation, (E) verification, (F) confirmation, (G) drafting, (H) bookkeeping, ( I) Verification, (J) Approval, (K) Material storage, (L) Preparation, etc. Work types include implementation, reexamination, approval, etc. The work items are not limited to these, and include all work items necessary for processing the main procedure. The work types are not limited to these, and include all work types necessary for processing work items.

作業項目の提出依頼における説明の一例としては、「他の部署または他の会社等に対し、手元にない情報の提出を依頼すること」があり、作業項目の資料入手における説明の一例としては、「他の部署または他の会社等から必要な情報を入手すること」がある。作業項目の要件確認における説明の一例としては、「入手した情報が正当な手続を経て作成されたものか、また、要件を充足しているかを確かめること」があり、作業項目の作成における説明の一例としては、「情報を利用し易くするために様式を加工・調整すること」がある。作業項目の照合における説明の一例としては、「ある情報を整合する他の情報と比較すること」があり、作業項目の確認における説明の一例としては、「作業の結果が意図したとおりであることを担当者が確かめること」がある。   As an example of the explanation in the work item submission request, there is "requesting other departments or other companies to submit information that is not at hand", and as an example of explanation in the work item document acquisition, “Obtaining necessary information from other departments or companies”. An example of the explanation in the work item requirement confirmation is “to confirm whether the obtained information has been created through legitimate procedures and whether the requirement is satisfied”. As an example, there is “processing / adjusting styles to make information easy to use”. An example of the explanation in the collation of work items is “compare certain information with other matching information”, and an example of explanation in the confirmation of work items is “the result of the work is as intended. The person in charge confirms.

作業項目の起票における説明の一例としては、「仕訳を作成し、その仕訳が適正であることを担当者が確かめること」があり、作業項目の記帳における説明の一例としては、「仕訳を会計帳簿に登録し、記帳が適正であることを担当者が確かめること」がある。作業項目の検証における説明の一例としては、「検証者が、担当者がした作業の結果を、担当者が実施したのと同水準で確かめること」があり、作業項目の承認における説明の一例としては、「権限者が担当者および検証者の作業内容と作業結果とを適正と認めること」がある。作業項目の資料保管における説明の一例としては、「作業で使用した資料を所定のファイル・場所に収納・保管すること」があり、作業項目の準備における説明の一例としては、「作業に必要な情報を手元に置くこと」がある。   An example of work item drafting is “Create a journal and confirm that the journal is appropriate”. An example of the work item bookkeeping is “Account accounting. The person in charge may register in the book and make sure that the book is correct. " As an example of the explanation in the verification of the work item, there is “the verifier confirms the result of the work performed by the person in charge at the same level as the person in charge performed”. “The authorized person recognizes the work contents and work results of the person in charge and the verifier as appropriate”. An example of the explanation of the work item document storage is “store and store the materials used in the work in a predetermined file / location”, and an example of the explanation of the work item preparation is “necessary for work”. “Keeping information at hand”.

図16は、部署データ入力画面の一例を示す図である。部署データを入力するには、図5のデータ入力選択画面の部署データボタン5.6を押す。部署データボタン5.6を押すと、図16の部署データ入力画面がディスプレイ23に表示される。部署データ入力画面には、図16に示すように、部署ID番号(部署識別子)表示エリア16.1、部署名表示エリア16.2、部署ID番号入力エリア16.3、部署入力エリア16.4、実行ボタン16.5、クリアボタン16.6、削除ボタン16.7、キャンセルボタン16.8が表示される。なお、部署ID番号は、自動的に生成される。部署データが既にデータベース17の部署データファイルに格納されている場合、図示はしていないが、部署ID番号が部署ID番号表示エリア16.1に表示され、部署名が部署名表示エリア16.2に表示される。   FIG. 16 is a diagram illustrating an example of a department data input screen. To input department data, the department data button 5.6 on the data input selection screen in FIG. 5 is pressed. When the department data button 5.6 is pressed, the department data input screen shown in FIG. In the department data entry screen, as shown in FIG. 16, department ID number (department identifier) display area 16.1, department display area 16.2, department ID number input area 16.3, department input area 16.4 , An execution button 16.5, a clear button 16.6, a delete button 16.7, and a cancel button 16.8 are displayed. The department ID number is automatically generated. When the department data is already stored in the department data file of the database 17, although not shown, the department ID number is displayed in the department ID number display area 16.1 and the department name is the department display area 16.2. Is displayed.

部署入力エリア16.4に部署名を入力した後(部署名は、部署入力エリア16.4に表示されるプルダウンリストから指定することもできる)、実行ボタン16.5を押すと、その部署名のデータに部署ID番号(部署識別子)が自動的に設定され、図示はしていないが、部署確認画面が表示される。部署確認画面には、部署ID番号が表示された部署ID番号表示エリア、部署名が表示された部署入力エリアの他に、YESボタン、NOボタンが表示される。NOボタンを押すと、部署データの格納は行われず、図16の部署データ入力画面に戻る。   After inputting the department name in the department input area 16.4 (the department name can be specified from the pull-down list displayed in the department input area 16.4), when the execution button 16.5 is pressed, the department name is entered. A department ID number (department identifier) is automatically set in the data of, and although not shown, a department confirmation screen is displayed. On the department confirmation screen, in addition to the department ID number display area where the department ID number is displayed and the department input area where the department name is displayed, a YES button and a NO button are displayed. When the NO button is pressed, the department data is not stored and the screen returns to the department data input screen of FIG.

部署確認画面において、YESボタンを押すと、部署データとそれに設定された部署ID番号とがデータベース17に転送され、部署データ(格納日時を含む)が部署ID番号に関連付けられた状態でデータベース17の部署データファイルに格納される(部署データ格納手段)。クリアボタン16.6を押すと、各入力エリア16.3,16.4に入力された部署データが消去され、データの入力を初めからやり直す。キャンセルボタン16.8を押すと、図5のデータ入力選択画面に戻る。図16の部署データ入力画面において、部署データを削除するには、部署リストの部署名表示エリア16.2に表示された部署のうちの削除する部署を反転させて指定した後、削除ボタン16.7を押す。削除ボタン16.7を押すと、指定した部署データがデータベース17の部署データファイルから削除される。   When the YES button is pressed on the department confirmation screen, the department data and the department ID number set in the department data are transferred to the database 17, and the department data (including the storage date and time) is associated with the department ID number in the database 17. Stored in the department data file (department data storage means). When the clear button 16.6 is pressed, the department data input to the input areas 16.3 and 16.4 is erased, and the data input is restarted from the beginning. When the cancel button 16.8 is pressed, the screen returns to the data input selection screen of FIG. In order to delete the department data on the department data input screen of FIG. 16, after specifying the department to be deleted among the departments displayed in the department display area 16.2 of the department list, the delete button 16. Press 7. When the delete button 16.7 is pressed, the designated department data is deleted from the department data file in the database 17.

図17は、解説図表リスト出力画面の一例を示す図であり、図18は、解説図表リストにおいて指定された解説図表の一例を示す図である。解説図表データを入力するには、図5のデータ入力選択画面の解説図表ボタン5.7を押す。解説図表ボタン5.7を押すと、図17の解説図表リスト出力画面がディスプレイ23に表示される。解説図表リスト出力画面には、図17に示すように、解説図表表示エリア17.1、解説図表ID番号(解説図表識別子)表示エリア17.2、作成ボタン17.3、表示ボタン17.4、キャンセルボタン17.5、削除ボタン17.6が表示される。複数の解説図表が既にデータベース17の解説図表ファイルに格納されている場合、解説図表リスト出力画面にそれら解説図表が表示される。キャンセルボタン17.5を押すと、図5のデータ入力選択画面に戻る。   FIG. 17 is a diagram showing an example of the explanatory chart list output screen, and FIG. 18 is a diagram showing an example of the explanatory chart specified in the explanatory chart list. In order to input the explanatory chart data, the explanatory chart button 5.7 on the data input selection screen of FIG. 5 is pushed. When the explanatory chart button 5.7 is pressed, the explanatory chart list output screen of FIG. 17 is displayed on the display 23. In the explanatory chart list output screen, as shown in FIG. 17, an explanatory chart display area 17.1, an explanatory chart ID number (explanatory chart identifier) display area 17.2, a creation button 17.3, a display button 17.4, A cancel button 17.5 and a delete button 17.6 are displayed. If a plurality of explanatory charts are already stored in the explanatory chart file of the database 17, the explanatory charts are displayed on the explanatory chart list output screen. When a cancel button 17.5 is pressed, the screen returns to the data input selection screen in FIG.

解説図表を作成するには、図17の解説図表リスト出力画面の作成ボタン17.3を押す。作成ボタン17.3を押すと、図示はしていないが、解説図表作成画面がディスプレイ23に表示される。解説図表作成画面には、解説図表作成エリア、入力ボタン、キャンセルボタンが表示される。キャンセルボタンを押すと、図5のデータ入力選択画面に戻る。解説図表作成エリアにおいて解説図表を作成し、入力ボタンを押すと、作成した解説図表データに解説図表ID番号が自動的に設定され、図示はしていないが、解説図表入力確認画面が表示される。解説図表入力確認画面には、解説図表が表示された解説図表作成エリアの他に、YESボタン、NOボタンが表示される。NOボタンを押すと、解説図表データの格納は行われず、図17の解説図表リスト出力画面に戻る。   To create the explanatory chart, the creation button 17.3 on the explanatory chart list output screen of FIG. 17 is pressed. When the creation button 17.3 is pressed, an explanatory chart creation screen is displayed on the display 23 (not shown). On the explanation chart creation screen, an explanation chart creation area, an input button, and a cancel button are displayed. When the cancel button is pressed, the screen returns to the data input selection screen of FIG. When you create an explanatory chart in the explanatory chart creation area and press the Enter button, the explanatory chart ID number is automatically set to the created explanatory chart data, and although not shown, the explanatory chart input confirmation screen is displayed. . On the comment chart input confirmation screen, a YES button and a NO button are displayed in addition to the comment chart creation area where the comment chart is displayed. When the NO button is pressed, the explanatory chart data is not stored and the screen returns to the explanatory chart list output screen of FIG.

解説図表入力確認画面において、YESボタンを押すと、解説図表データとそれに設定されたID番号とがデータベース17に転送され、解説図表データ(格納日時を含む)がID番号に関連付けられた状態でデータベース17の解説図表ファイルに格納される(解説図表格納手段)。図17の解説図表リスト出力画面において、そこに表示された解説図表のうちのいずれかを反転させて指定し、表示ボタン17.4を押すと、図18に示すように、指定した解説図表がディスプレイ23に表示される。
また、図17の解説図表リスト出力画面において、解説図表データを削除するには、解説図表リストの解説図表表示エリア17.1に表示された解説図表のうちの削除する解説図表を反転させて指定した後、削除ボタン17.6を押す。削除ボタン17.6を押すと、指定した解説図表データがデータベース17の解説図表ファイルから削除される。
When the YES button is pressed on the explanatory chart input confirmation screen, the explanatory chart data and the ID number set thereto are transferred to the database 17, and the explanatory chart data (including the storage date and time) is associated with the ID number in the database. 17 explanatory chart files (explanatory chart storage means). On the explanatory chart list output screen of FIG. 17, when any of the explanatory charts displayed there is reversed and designated and the display button 17.4 is pressed, the designated explanatory chart is displayed as shown in FIG. It is displayed on the display 23.
In addition, in the comment chart list output screen of FIG. 17, in order to delete comment chart data, the comment chart to be deleted is specified by inverting the comment chart displayed in the comment chart display area 17.1 of the comment chart list. After that, press the delete button 17.6. When the delete button 17.6 is pressed, the specified explanatory chart data is deleted from the explanatory chart file of the database 17.

図19は、決算手続詳細リスト出力画面の一例を示す図であり、図20は、作業概要を入力する決算手続マニュアル表示画面の一例を示す図である。決算手続詳細リストを表示するには、主要手続を入力し、作業項目を入力した後、図5のデータ入力選択画面の決算手続詳細ボタン5.8を押す。決算手続詳細ボタン5.8を押すと、図19の決算手続詳細リスト出力画面がディスプレイ23に表示される。   FIG. 19 is a diagram illustrating an example of a settlement procedure detail list output screen, and FIG. 20 is a diagram illustrating an example of a settlement procedure manual display screen for inputting a work summary. In order to display the settlement procedure detail list, after inputting the main procedure and entering the work item, the settlement procedure detail button 5.8 on the data input selection screen of FIG. 5 is pushed. When the settlement procedure detail button 5.8 is pressed, the settlement procedure detail list output screen shown in FIG.

決算手続詳細リスト出力画面には、図19に示すように、番号表示エリア19.1、主要手続表示エリア19.2、手続名表示エリア19.3、開示書類表示エリア19.4、実行ボタン19.5、キャンセルボタン19.6が表示される。主要手続の手続名に関する作業概要の詳細データが既にデータベース17の主要手続ファイルや作業項目ファイルに格納されている場合、図示はしていないが、各主要手続の手続名を特定する番号(連番)が番号表示エリア19.1に表示され、その連番の主要手続が主要手続表示エリア19.2に表示されるとともに、手続名が手続名表示エリア19.3に表示され、開示書類表示エリア19.4に開示書類が表示される。なお、開示書類には、有価証券報告書、四半期報告書、決算短信、計算書類等がある。キャンセルボタン19.6を押すと、図5のデータ入力選択画面に戻る。   As shown in FIG. 19, the settlement procedure detail list output screen includes a number display area 19.1, a main procedure display area 19.2, a procedure name display area 19.3, a disclosure document display area 19.4, an execution button 19 .5, Cancel button 19.6 is displayed. When the detailed data of the work summary relating to the procedure name of the main procedure is already stored in the main procedure file or work item file of the database 17, a number (sequential number) that specifies the procedure name of each main procedure is not shown. ) Is displayed in the number display area 19.1, the main procedure of the serial number is displayed in the main procedure display area 19.2, the procedure name is displayed in the procedure name display area 19.3, and the disclosure document display area The disclosure document is displayed at 19.4. Disclosure documents include securities reports, quarterly reports, financial statements, and financial statements. When the cancel button 19.6 is pressed, the screen returns to the data input selection screen of FIG.

特定の主要手続の手続名に関連する作業概要や作業手順、リスク内容を入力するには、図19の決算手続詳細リスト出力画面に表示された主要手続のうちの所定の主要手続(番号や手続名を含む)を反転させて指定し、実行ボタン19.5を押す。実行ボタン19.5を押すと、図20の決算手続マニュアル表示画面(作業概要)がディスプレイ23に表示される。なお、決算手続詳細リスト出力画面に番号や主要手続の手続名が1つも表示されていない場合も、実行ボタン19.5を押すと、図20の決算手続マニュアル表示画面(作業概要)が表示される。   In order to enter the work summary, work procedure, and risk details related to the procedure name of a specific main procedure, a predetermined main procedure (number or procedure) among the main procedures displayed on the settlement procedure details list output screen of FIG. (Including the name) is highlighted and the execute button 19.5 is pressed. When the execute button 19.5 is pressed, the settlement procedure manual display screen (work outline) shown in FIG. Note that even if the number and the name of the main procedure are not displayed on the settlement procedure details list output screen, pressing the execution button 19.5 will display the settlement procedure manual display screen (work summary) in FIG. The

決算手続マニュアル表示画面には、図20に示すように、連番自動設定エリア20.1、主要手続表示エリア20.2、主要手続番号表示エリア20.3、手続名表示エリア20.4、作業概要タブ20.5、作業手順タブ20.6、リスク内容タブ20.7、開示書類選択エリア20.8、作業目的入力エリア20.9、解説図表入力エリア20.10、成果物入力エリア20.11、仕訳タイプ入力エリア20.12、実行ボタン20.13、クリアボタン20.14、キャンセルボタン20.15が表示される。主要手続番号表示エリアには、指定された主要手続の番号が表示される。キャンセルボタン20.15を押すと、図19の決算手続詳細リスト出力画面に戻る。   In the settlement procedure manual display screen, as shown in FIG. 20, a serial number automatic setting area 20.1, main procedure display area 20.2, main procedure number display area 20.3, procedure name display area 20.4, work Overview tab 20.5, work procedure tab 20.6, risk content tab 20.7, disclosure document selection area 20.8, work purpose input area 20.9, explanatory chart input area 20.10, product input area 20. 11. A journal type input area 20.12, an execution button 20.13, a clear button 20.14, and a cancel button 20.15 are displayed. In the main procedure number display area, the number of the designated main procedure is displayed. When a cancel button 20.15 is pressed, the screen returns to the settlement procedure detailed list output screen of FIG.

手続名表示エリア20.4にその主要手続の手続名を入力すると、主要手続の番号にそれにつながる新たな番号が自動的に生成され、生成された番号がつながる連番が主要手続と手続名とに設定されるとともに、その連番が連番自動設定エリア20.1に表示される。主要手続とそれの手続名とは連番(主要手続識別子:主要手続および手続名を特定するための連番表示エリア20.1に表示された連番)によって特定される。   When the procedure name of the main procedure is entered in the procedure name display area 20.4, a new number linked to the number of the main procedure is automatically generated. And the sequence number is displayed in the sequence number automatic setting area 20.1. The main procedure and its procedure name are specified by a serial number (main procedure identifier: a serial number displayed in the serial number display area 20.1 for specifying the main procedure and the procedure name).

次に、開示書類選択エリア20.7においてその主要手続の手続名の開示書類を選択し、作業目的入力エリア20.9に作業目的を入力し、解説図表がある場合は解説図表入力エリア20.10に解説図表を貼り付ける。さらに、その主要手続の手続名によって作成される成果物を成果物入力エリア20.11のプルダウンリストから指定し、その主要手続の手続名の仕訳タイプを仕訳タイプ入力エリア20.12のプルダウンリストから指定した後、実行ボタン20.13を押す。   Next, the disclosure document of the procedure name of the main procedure is selected in the disclosure document selection area 20.7, the work purpose is input in the work purpose input area 20.9, and if there is an explanatory chart, the explanatory chart input area 20. Paste the explanatory chart to 10. Further, the product created by the procedure name of the main procedure is specified from the pull-down list of the product input area 20.11, and the journal type of the procedure name of the main procedure is selected from the pull-down list of the journal type input area 20.12. After specifying, press the execution button 20.13.

実行ボタン20.13を押すと、指定した解説図表(解説図表ID番号を含む)がデータベース17の解説図表ファイルから転送され、図示はしていないが、作業概要確認画面がディスプレイ23に表示される。作業概要確認画面には、入力した各データが表示された入力エリア20.1〜20.12の他に、YESボタン、NOボタンが表示される。NOボタンを押すと、作業概要データ(主要手続、手続名、担当者、開示書類、作業目的、解説図表、成果物、仕訳タイプ)の格納は行われず、図19の決算手続詳細リスト出力画面に戻る。   When the execute button 20.13 is pressed, the specified explanatory chart (including the explanatory chart ID number) is transferred from the explanatory chart file of the database 17, and although not shown, a work summary confirmation screen is displayed on the display 23. . On the work summary confirmation screen, a YES button and a NO button are displayed in addition to the input areas 20.1 to 20.12 in which each input data is displayed. When the NO button is pressed, the work summary data (main procedure, procedure name, person in charge, disclosure document, work purpose, explanatory chart, deliverable, journal type) is not stored, and the settlement procedure details list output screen in FIG. 19 is displayed. Return.

作業概要確認画面において、YESボタンを押すと、作業概要データ(連番、主要手続、手続名、開示書類、作業目的、解説図表)に、それを特定(識別)するための連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)が設定されるとともに、作業概要データがデータベース17に転送され、作業概要データ(格納日時を含む)が連番に関連付けられた状態でデータベース17の主要手続ファイルに格納される(主要手続格納手段)。なお、作業概要は、各主要手続の手続名毎に格納される。   Press the YES button on the work summary confirmation screen to identify (identify) the work summary data (serial number, main procedure, procedure name, disclosure document, work purpose, explanatory chart). And the serial number displayed in the serial number display area for specifying the procedure name), the work summary data is transferred to the database 17, and the work summary data (including the storage date and time) is associated with the serial number. Stored in the main procedure file of the database 17 (main procedure storage means). The work summary is stored for each procedure name of each main procedure.

各主要手続の手続名によって作成される成果物データに、連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)が設定されるとともに、その成果物データがデータベース17に転送され、その成果物データ(格納日時を含む)が連番に関連付けられた状態でデータベース17の主要手続ファイルに格納される(成果物格納手段)。各主要手続の手続名によって計上される仕訳タイプデータに、連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)が設定されるとともに、その仕訳タイプデータがデータベース17に転送され、その仕訳タイプデータ(格納日時を含む)が連番に関連付けられた状態でデータベース17の主要手続ファイルに格納される(仕訳タイプ格納手段)。図20の決算手続マニュアル(作業概要)表示画面において、クリアボタン20.14を押すと、各入力エリア20.1〜20,12に入力された作業概要データが消去され、データの入力を初めからやり直す。   A serial number (serial number displayed in the serial number display area for identifying the main procedure and procedure name) is set in the product data created by the procedure name of each main procedure, and the product data is It is transferred to the database 17 and the product data (including the storage date and time) is stored in the main procedure file of the database 17 in a state associated with the serial number (product storage means). A serial number (sequence number displayed in the serial number display area for specifying the main procedure and procedure name) is set in the journal type data recorded by the procedure name of each main procedure, and the journal type data is It is transferred to the database 17, and the journal type data (including the storage date and time) is stored in the main procedure file of the database 17 in a state associated with the serial number (journal type storage means). When the clear button 20.14 is pressed on the settlement procedure manual (work summary) display screen shown in FIG. 20, the work summary data entered in each of the input areas 20.1 to 20 and 12 is deleted, and data entry is started from the beginning. Try again.

図21は、作業手順を入力する決算手続マニュアル表示画面の他の一例を示す図である。作業概要データの主要手続に関連する作業手順データを入力するには、作業概要データを入力した後、図20の決算手続マニュアル(作業概要)表示画面の作業手順タブ20.6を押す。作業手順タブ20.6を押すと、図21の決算手続マニュアル(作業手順)表示画面がディスプレイ23に表示される。   FIG. 21 is a diagram showing another example of the settlement procedure manual display screen for inputting work procedures. In order to enter work procedure data related to the main procedure of the work summary data, the work summary data is entered, and then the work procedure tab 20.6 of the settlement procedure manual (work summary) display screen of FIG. 20 is pressed. When the work procedure tab 20.6 is pressed, the settlement procedure manual (work procedure) display screen shown in FIG.

決算手続マニュアル(作業手順)表示画面には、図21に示すように、連番が表示された連番表示エリア21.1、主要手続が表示された主要手続表示エリア21.2、主要手続番号が表示された主要手続番号表示エリア21.3、手続名が表示された手続名表示エリア21.4、作業概要タブ21.5、作業手順タブ21.6、リスク内容タブ21.7、作業順番表示エリア21.19、作業区分入力エリア21.8、担当者入力エリア21.9、作業タイトル入力エリア21.10、作業内容入力エリア21.11、作業基準日入力エリア21.12、見積工数入力エリア21.13、資料名入力エリア21.14、作業注意事項入力エリア21.15、実行ボタン21.16、クリアボタン21.17、キャンセルボタン21.18が表示される。キャンセルボタン21.18を押すと、図20の決算手続マニュアル表示画面(作業概要)に戻る。   On the settlement procedure manual (work procedure) display screen, as shown in FIG. 21, a serial number display area 21.1 displaying serial numbers, a main procedure display area 21.2 displaying main procedures, and a main procedure number Main procedure number display area 21.3 displaying the procedure name, procedure name display area 21.4 displaying the procedure name, work summary tab 21.5, work procedure tab 21.6, risk content tab 21.7, work order Display area 21.19, work division input area 21.8, person in charge input area 21.9, work title input area 21.10, work content input area 21.11, work base date input area 21.12, estimated man-hour input Area 21.13, material name input area 21.14, work precaution input area 21.15, execute button 21.16, clear button 21.17, cancel button 21.18 It is shown. When the cancel button 21.18 is pressed, the screen returns to the settlement procedure manual display screen (work outline) shown in FIG.

作業区分入力エリア21.8のプルダウンリストから1番目に処理を行う作業の作業区分を指定すると、指定した作業区分とその作業区分の作業項目(作業種類、作業項目説明を含む)とがデータベース17の作業項目データファイルから転送され、作業区分と作業項目とが作業区分入力エリア21.8に表示されるとともに、作業順番表示エリア21.19にその作業区分の作業順番(1)が表示される。2番目に処理を行う作業の作業区分を指定すると作業区分と作業項目とが作業区分入力エリア21.8に表示されるとともに、作業順番表示エリア21.19にその作業区分の作業順番(2)が表示される。このように、作業区分を順次指定するとその作業区分に作業順番(1〜N)が付与され、作業区分や作業項目の作業順番が決定される。
次に、作業区分の作業項目を担当する担当者を担当者入力エリア21.9のプルダウンリストから指定すると、指定した担当者データ(担当者ID番号を含む)がデータベース17の担当者データファイルから転送され、担当者が担当者入力エリア21.9に表示される。作業タイトル入力エリア21.10に作業タイトルを入力し、作業内容入力エリア21.11に指定した作業項目の作業内容を入力し、作業基準日入力エリア21.12に日数を入力するとともに、見積工数入力エリア21.13に見積工数(分)を入力する。資料名入力エリア21.14のプルダウンリストから資料名を指定すると、指定した資料名の資料データ(資料ID番号、資料名、主管部署、成果物○,×、スプレッドシート○,×、資料媒体)がデータベース17の資料データファイルから転送され、その資料名が資料名入力エリア21.14に表示される。
When the work category of the work to be processed first is designated from the pull-down list of the work category input area 21.8, the designated work category and the work items (including the work type and work item description) of the work category are stored in the database 17. The work category and the work item are displayed in the work category input area 21.8 and the work order (1) of the work category is displayed in the work order display area 21.19. . When the work category of the work to be processed second is designated, the work category and the work item are displayed in the work category input area 21.8, and the work order (2) of the work category is displayed in the work order display area 21.19. Is displayed. As described above, when work sections are sequentially designated, work orders (1 to N) are assigned to the work sections, and work orders of work sections and work items are determined.
Next, when the person in charge of the work item of the work category is designated from the pull-down list in the person-in-charge input area 21.9, the designated person-in-charge data (including the person-in-charge ID number) is retrieved from the person-in-charge data file in the database 17. The person in charge is transferred and displayed in the person-in-charge input area 21.9. The work title is input in the work title input area 21.10, the work content of the specified work item is input in the work content input area 21.11, the number of days is input in the work base date input area 21.12, and the estimated man-hours Enter the estimated man-hours (minutes) in the input area 21.13. When a material name is specified from the pull-down list in the material name input area 21.14, the material data of the specified material name (material ID number, material name, supervising department, deliverable ○, ×, spreadsheet ○, ×, material medium) Is transferred from the material data file of the database 17, and the material name is displayed in the material name input area 21.14.

作業項目に作業注意事項がある場合において、作業注意事項入力エリア21.15の作業順番入力エリアのプルダウンリストから作業順番を指定すると、指定した作業順番が注意事項入力エリア21.15の作業順番入力エリアに表示される。その作業順番の作業注意事項を注意事項入力エリア21.15に入力する。それらデータを入力した後、実行ボタン21.16を押す。なお、図21の決算手続マニュアル(作業手順)表示画面において、クリアボタン21.17を押すと、各入力エリア21.8〜21.15に入力された作業手順データが消去され、データの入力を初めからやり直す。   When a work item has a work precaution, when the work order is designated from the pull-down list in the work order input area 21.15, the designated work order is entered in the work order input area 21.15. Displayed in the area. The work notes of the work order are input to the note input area 21.15. After inputting these data, the execution button 21.16 is pushed. When the clear button 21.17 is pressed on the settlement procedure manual (work procedure) display screen shown in FIG. 21, the work procedure data input to each of the input areas 21.8 to 21.15 is erased, and the data is input. Start over from the beginning.

実行ボタン21.16を押すと、図示はしていないが、作業手順確認画面がディスプレイ23に表示される。作業手順確認画面には、入力した各データが表示された入力エリア21.1〜21.15の他に、YESボタン、NOボタンが表示される。NOボタンを押すと、作業手順データ(作業順番、作業区分、作業項目、作業担当者、作業内容、作業基準日、見積工数、作業種類、作業項目説明)や資料データ(資料ID番号、資料名、主管部署、成果物○,×、スプレッドシート○,×、資料媒体)、作業注意事項データ(注意事項の作業順番、注意事項の内容)の格納は行われず、図20の決算手続マニュアル表示画面(作業概要)に戻る。   When the execute button 21.16 is pressed, a work procedure confirmation screen is displayed on the display 23 (not shown). On the work procedure confirmation screen, a YES button and a NO button are displayed in addition to the input areas 21.1 to 21.15 in which each input data is displayed. When the NO button is pressed, work procedure data (work order, work category, work item, work person, work content, work base date, estimated man-hour, work type, work item description) and data (material ID number, material name) , Main department, deliverables ○, ×, spreadsheet ○, ×, document media), work notes data (work order of notes, contents of notes) are not stored, and the settlement procedure manual display screen in FIG. Return to (Summary).

作業手順確認画面において、YESボタンを押すと、作業手順データのうちの作業項目情報(作業順番、作業区分、作業項目、作業内容、作業基準日、見積工数、作業種類、作業項目説明)に、それを特定(識別)するための作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)とが設定されるとともに(たとえば、連番0001−01に作業順番1をつなげた0001−01−1、連番0001−01に作業順番2をつなげた0001−01−2等)、作業項目情報がデータベース17に転送され、作業項目情報(格納日時を含む)が連番(主要手続識別子)と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルに格納される(作業項目格納手段、作業内容格納手段)。   On the work procedure confirmation screen, if you press the YES button, the work item information (work order, work category, work item, work content, work base date, estimated man-hours, work type, work item description) in the work procedure data will be displayed. A work order (work item identifier) for specifying (identifying) and a serial number (a serial number displayed in a serial number display area for specifying a main procedure and a procedure name) are set (for example, The work item information is transferred to the database 17 and the work item is transferred to the database 17 (0001-01-1 with the work number 1 connected to the serial number 0001-01, 0001-01-2 with the work order 2 connected to the serial number 0001-01). Information (including storage date and time) is stored in the work item file of the database 17 in a state in which it is associated with the serial number (main procedure identifier) and the work order (work item storage means, work content It paid means).

作業項目情報の格納は、各作業項目毎(図21には、(A)提出依頼、(B)資料入手、(C)要件確認、(D)作成の4つが図示されているが、図示はしていないが、その後に(E)照合、(F)確認、(G)起票、(H)記帳、(I)検証、(J)承認、(K)資料保管、(L)準備が続く)に行われる。なお、作業タイトルには、基礎資料の準備、起票元資料作成、仕訳伝票起票、仕訳伝票の再鑑、仕訳伝票の承認、開示項目の重要性判定資料作成、開示文案の元資料用意、開示文案作成、開示文案の再鑑、開示文案の承認等がある。   The work item information is stored for each work item (FIG. 21 shows (A) submission request, (B) material acquisition, (C) requirement confirmation, and (D) creation. (E) verification, (F) confirmation, (G) drafting, (H) bookkeeping, (I) verification, (J) approval, (K) material storage, (L) preparation ). For work titles, basic material preparation, drafting source material creation, journal entry drafting, journal entry slip review, journal entry slip approval, disclosure item importance judgment material creation, disclosure document draft source preparation, Disclosure document drafting, disclosure draft review, disclosure draft approval, etc.

担当者入力エリア21.9に表示された担当者データ(担当者ID番号)に、作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)とが設定されるとともに、その担当者データがデータベース17に転送され、担当者データ(格納日時を含む)が連番と作業順番とに関連付けられた状態(たとえば、0001−01−1や0001−01−2に関連付けた状態)でデータベース17の作業項目ファイルに格納される(作業担当者格納手段)。担当者データの格納は、作業項目情報の格納と同様に、各作業項目毎に行われる。   In the person-in-charge data (person-in-charge ID number) displayed in the person-in-charge input area 21.9, the work order (work item identifier) and serial number (displayed in the serial number display area for specifying the main procedure and procedure name) are displayed. The person-in-charge data is transferred to the database 17, and the person-in-charge data (including the storage date and time) is associated with the serial number and the work order (for example, 0001-01-). 1 or 0001-01-2) and stored in the work item file of the database 17 (worker storage means). The person-in-charge data is stored for each work item in the same manner as the work item information is stored.

さらに、担当者入力エリア21.9に表示された担当者データ(担当者ID番号)に、連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)が設定されるとともに、その担当者データ(主要手続表示エリアに表示された主要手続の手続名を担当する担当者)(格納日時を含む)が連番に関連付けられた状態で主要手続ファイルに格納される(手続担当者格納手段)。   Furthermore, serial numbers (serial numbers displayed in the serial number display area for specifying the main procedure and procedure name) are set in the person-in-charge data (person-in-charge ID number) displayed in the person-in-charge input area 21.9. The person-in-charge data (the person in charge of the procedure name of the main procedure displayed in the main procedure display area) (including the storage date and time) is stored in the main procedure file in a state associated with the serial number. (Procedure person storage means).

資料データ(資料ID番号、資料名、主管部署、成果物○,×、スプレッドシート○,×、資料媒体)に、連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)が設定されるとともに、その資料データがデータベース17に転送され、その資料データ(格納日時を含む)が連番に関連付けられた状態でデータベース17の主要手続ファイルに格納される(資料データ格納手段)。作業注意事項データ(注意事項の作業順番、注意事項の内容)に、作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)とが設定されるとともに、その作業注意事項データがデータベース17に転送され、その注意事項データ(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルの作業注意事項アドレスに格納される(作業注意事項格納手段)。なお、注意事項の作業順番は、作業順番入力エリア21.19に表示された作業順番に対応する。   Displayed in material data (material ID number, material name, main department, deliverable ○, ×, spreadsheet ○, ×, material medium) in the serial number display area for identifying the main procedure and procedure name (Serial number) is set, the material data is transferred to the database 17, and the material data (including the storage date and time) is stored in the main procedure file of the database 17 in a state associated with the serial number (material). Data storage means). In the work precaution data (work order of precautions, content of precautions), the work order (work item identifier) and serial number (the serial number displayed in the serial number display area for identifying the main procedure and procedure name) Is set, and the work precaution data is transferred to the database 17, and the work item file work of the database 17 is performed in a state where the precaution data (including the storage date and time) is associated with the serial number and the work order. Stored in the notes address (work notes storage means). Note that the work order of the notes corresponds to the work order displayed in the work order input area 21.19.

作業手順データにおける作業基準日は、決算日の翌日から起算する日数(休日を除く営業日)であり、たとえば、作業基準日が3日であり、決算日が3月31日とすると、その基準日に対応する作業項目の終了日が4月3日となる(4月1日〜3日までに休日がない場合)。したがって、作業順番1の提出依頼(作業項目)の基準日が2であるから、提出依頼の作業を4月2日までに行うことになり、作業順番1の提出依頼の作業完了予定期日が4月2日となる。作業順番4の作成(作業項目)の基準日が4であるから、作成の作業を4月4日までに行うことになり、作業順番4の作成の作業完了予定期日が4月4日となる。   The work base date in the work procedure data is the number of days (business days excluding holidays) calculated from the next day of the settlement date. For example, if the work base date is 3 days and the settlement date is March 31, the standard The end date of the work item corresponding to the day is April 3 (when there is no holiday by April 1 to 3). Therefore, since the reference date of the submission request (work item) for work order 1 is 2, the work of the submission request will be performed by April 2, and the scheduled work completion date of the submission request for work order 1 is 4. January 2nd. Since the reference date for creation of the work order 4 (work item) is 4, the creation work is performed by April 4, and the work completion scheduled date for creation of the work order 4 is April 4. .

上記作業基準日から算出された各作業項目の作業完了予定期日データに、作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)とが設定されるとともに、その作業完了予定期日データがデータベース17に転送され、その作業完了予定期日データ(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルに格納される(作業完了予定期日格納手段)。作業完了予定期日の格納は、作業項目情報の格納と同様に、各作業項目毎に行われる。   The work order (work item identifier) and serial number (sequential number displayed in the serial number display area for identifying the main procedure and procedure name) are added to the scheduled work completion date data for each work item calculated from the above work base date. ) Is set, the scheduled work completion date data is transferred to the database 17, and the scheduled work completion date data (including the storage date / time) is associated with the serial number and the work order. It is stored in the item file (work completion scheduled date storage means). The work completion scheduled date is stored for each work item in the same manner as the work item information is stored.

コンピュータ11の中央処理部は、それら基準日を参照しつつ、最も基準日が小さい作業順番の作業項目の基準日から算出した作業の最終日を主要手続表示エリア21.4に表示された主要手続の手続名の作業項目の開始日と決定する。また、それら基準日を参照しつつ、最も基準日が大きい作業順番の作業項目の基準日から算出した作業の最終日を主要手続表示エリア21.4に表示された主要手続の手続名の作業項目の終了日と決定する。具体的には、作業順番1の提出依頼(作業項目)の基準日が2であり、もっとも小さいから、その基準日に対応する作業項目の終了日である4月2日が主要手続表示エリア21.4に表示された主要手続の手続名の開始日(作業開始予定期日)となる。さらに、作業順番4の作成(作業項目)の基準日が4であり、もっとも大きいから、その基準日に対応する作業項目の終了日である4月4日が主要手続表示エリア21.4に表示された主要手続の手続名の終了日(作業完了予定期日)となる。   The central processing unit of the computer 11 refers to these reference dates, and the main procedure displayed in the main procedure display area 21.4 is the final date of the work calculated from the reference date of the work item with the work order having the smallest reference date. The start date of the work item with the name of the procedure is determined. In addition, referring to these reference dates, the work item of the procedure name of the main procedure displayed in the main procedure display area 21.4 is the final date of the work calculated from the reference date of the work item with the work order with the largest reference date. Determine the end date. Specifically, the reference date of the submission request (work item) for work order 1 is 2, and since it is the smallest, April 2 which is the end date of the work item corresponding to the reference date is the main procedure display area 21. This is the start date (scheduled work start date) of the procedure name of the main procedure displayed in .4. Furthermore, since the reference date for creation of work order 4 (work item) is 4, which is the largest, April 4th, which is the end date of the work item corresponding to the reference date, is displayed in the main procedure display area 21.4. This is the end date (scheduled date for completion of work) of the name of the main procedure that has been completed.

各作業項目の作業基準日から算出された主要手続の手続名の手続開始予定期日データ(主要手続の開始日)に、連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)が設定されるとともに、その手続開始予定期日データがデータベース17に転送され、その手続開始予定期日データ(格納日時を含む)が連番に関連付けられた状態でデータベース17の主要手続ファイルに格納される。また、各作業項目の作業基準日から算出された主要手続の手続名の手続完了予定期日データ(主要手続の終了日)に、連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)が設定されるとともに、その手続完了予定期日データがデータベース17に転送され、その手続完了予定期日データ(格納日時を含む)が連番に関連付けられた状態でデータベース17の主要手続ファイルに格納される(手続完了予定期日格納手段)。   Displayed in the scheduled procedure start date data (main procedure start date) of the procedure name of the main procedure calculated from the work base date of each work item in the serial number display area for identifying the main procedure and procedure name The scheduled procedure start date data is transferred to the database 17, and the procedure start scheduled date data (including the storage date) is associated with the sequence number in the main procedure of the database 17. Stored in a file. In addition, the serial number (sequential number display area for identifying the main procedure and procedure name) is added to the scheduled procedure completion date data (end date of main procedure) of the procedure name of the main procedure calculated from the work base date of each work item. (Sequential number displayed in FIG. 4) is set, the scheduled completion date data of the procedure is transferred to the database 17, and the scheduled completion date data (including the storage date and time) of the procedure is stored in the database 17 Stored in the main procedure file (procedure completion date storage means).

作業手順データにおける見積工数(分)は、各作業項目の処理に要する時間である。したがって、作業順番1の提出依頼(作業項目)の見積工数(分)が15であるから、提出依頼の処理時間が15分となる。作業順番4の作成(作業項目)の見積工数(分)が25であるから、作成の処理時間が25分となる。各作業項目(リスクを伴う作業項目を含む)の見積工数データ(分)に、作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)とが設定されるとともに、その見積工数データがデータベース17に転送され、その工数データ(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルに格納される(作業処理見込時間格納手段)。   The estimated man-hour (minutes) in the work procedure data is the time required for processing each work item. Therefore, since the estimated man-hour (minute) of the submission request (work item) of the work order 1 is 15, the processing time of the submission request is 15 minutes. Since the estimated man-hour (minute) for creation of work order 4 (work item) is 25, the creation processing time is 25 minutes. In the estimated man-hour data (minutes) for each work item (including work items with risk), the work order (work item identifier) and serial number (displayed in the serial number display area to identify the main procedure and procedure name) The estimated man-hour data is transferred to the database 17 and the man-hour data (including the storage date and time) is associated with the serial number and the work order in the work item file of the database 17. Stored (work processing expected time storage means).

また、リスクを伴う作業項目の見積工数データ(分)に、作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)とが設定されるとともに、その見積工数データがデータベース17に転送され、その工数データ(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルのリスクアドレスに格納される(リスク作業処理見込時間格納手段)。作業処理見込時間の格納は、作業項目情報の格納と同様に、各作業項目毎に行われる。   In addition, the estimated man-hour data (minutes) of the work item with risk includes the work order (work item identifier) and the serial number (the serial number displayed in the serial number display area for identifying the main procedure and procedure name). In addition, the estimated man-hour data is transferred to the database 17, and the man-hour data (including the storage date and time) is stored in the risk address of the work item file in the database 17 in a state associated with the serial number and the work order. (Risk work processing expected time storage means). The work process expected time is stored for each work item in the same manner as the work item information is stored.

コンピュータ11の中央処理部は、各作業項目(リスクを伴う作業項目を含む)の見積工数(分)を参照しつつ、それら見積工数(分)を合計した見積工数合計を算出し、その見積工数合計を主要手続表示エリア21.4に表示された主要手続の手続名の処理に要する時間(手続処理見込時間)とする。各主要手続の手続名の手続処理見込時間データに、連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)が設定されるとともに、その手続処理見込時間データがデータベース17に転送され、その手続処理見込時間データ(格納日時を含む)が連番に関連付けられた状態でデータベース17の主要手続ファイルに格納される(手続処理見込時間格納手段)。   The central processing unit of the computer 11 calculates the total estimated man-hours by summing up the estimated man-hours (minutes) while referring to the estimated man-hours (minutes) of each work item (including work items with risk). The total is the time required for processing the procedure name of the main procedure displayed in the main procedure display area 21.4 (expected time for procedure processing). A sequence number (sequence number displayed in the sequence number display area for specifying the main procedure and procedure name) is set in the procedure processing expected time data of the procedure name of each main procedure, and the procedure processing expected time data Is transferred to the database 17, and the procedure processing expected time data (including storage date and time) is stored in the main procedure file of the database 17 in a state associated with the serial number (procedure processing expected time storage means).

図22は、リスクを入力する決算手続マニュアル表示画面の他の一例を示す図であり、図23は、リスクを入力する決算手続マニュアル表示画面の他の一例を示す図である。図22,23のマニュアル表示画面は、リスク作業順番入力エリア22.8に表示された作業順番の作業項目に所定のリスクがある場合に使用される。作業概要データの主要手続の手続名に関連するリスクデータを入力するには、作業手順データを入力した後、図21の決算手続マニュアル(作業手順)表示画面のリスク内容タブ21.7を押す。リスク内容タブ21.7を押すと、図22の決算手続マニュアル(リスク内容1)表示画面がディスプレイ23に表示される。   FIG. 22 is a diagram illustrating another example of a settlement procedure manual display screen for inputting a risk, and FIG. 23 is a diagram illustrating another example of a settlement procedure manual display screen for inputting a risk. The manual display screens of FIGS. 22 and 23 are used when there is a predetermined risk in the work items in the work order displayed in the risk work order input area 22.8. To input risk data related to the procedure name of the main procedure of the work summary data, after inputting the work procedure data, the risk content tab 21.7 of the settlement procedure manual (work procedure) display screen of FIG. 21 is pressed. When the risk content tab 21.7 is pressed, the settlement procedure manual (risk content 1) display screen shown in FIG.

決算手続マニュアル(リスク内容1)表示画面には、図22に示すように、図21の決算手続マニュアル(作業手順)表示画面に表示された連番と同一の連番が表示された連番表示エリア22.1、主要手続(図示せず)が表示された主要手続表示エリア22.2、主要手続番号が表示された主要手続番号表示エリア22.3、手続名(図示せず)が表示された手続名表示エリア22.4、作業概要タブ22.5、作業手順タブ22.6、リスク内容タブ22.7、リスク作業順番入力エリア22.8、リスク入力エリア22.9、アサーション入力エリア22.10、コントロール作業順番入力エリア22.11、コントロール作業項目入力エリア22.12、コントロール内容入力エリア22.13、実行ボタン22.14、クリアボタン22.15、キャンセルボタン22.16が表示される。キャンセルボタン22.16を押すと、図21の決算手続マニュアル表示画面(作業手順)に戻る。   On the settlement procedure manual (risk content 1) display screen, as shown in FIG. 22, a serial number display showing the same sequence number as the sequence number displayed on the settlement procedure manual (work procedure) display screen of FIG. Area 22.1, main procedure display area 22.2 displaying main procedures (not shown), main procedure number display area 22.3 displaying main procedure numbers, and procedure name (not shown) are displayed Procedure name display area 22.4, work summary tab 22.5, work procedure tab 22.6, risk content tab 22.7, risk work order input area 22.8, risk input area 22.9, assertion input area 22 .10, control work order input area 22.11, control work item input area 22.12, control content input area 22.13, execute button 22.14, clear button 22.15, Cancel button 22.16 is displayed. When the cancel button 22.16 is pressed, the screen returns to the settlement procedure manual display screen (work procedure) of FIG.

リスク作業順番入力エリア22.8のプルダウンリストから作業順番を指定すると、指定した作業順番がデータベース17の作業項目データファイルから転送され、作業順番が作業順番入力エリア22.8に表示される。指定した作業順番は、図21の決算手続マニュアル表示画面において指定した作業順番と対応する。なお、図示はしていないが、図21の決算手続マニュアル表示画面において指定した作業順番と異なる作業順番を指定すると、エラーメッセージがディスプレイ23に表示される。リスク入力エリア22.9にリスク(リスク名、リスク内容等)を入力し、アサーション入力エリア22.10において該当するアサーション(実在性、網羅性、権利義務、評価、期間配分、表示のうちの少なくとも1つ)を指定する。リスクには、「原稿文案の転記を誤る」や「連結パッケージ計数データ集計を誤る」等がある。   When the work order is designated from the pull-down list in the risk work order input area 22.8, the designated work order is transferred from the work item data file in the database 17, and the work order is displayed in the work order input area 22.8. The designated work order corresponds to the work order designated on the settlement procedure manual display screen of FIG. Although not shown, an error message is displayed on the display 23 when a work order different from the work order designated on the settlement procedure manual display screen of FIG. Enter the risk (risk name, risk content, etc.) in the risk input area 22.9, and at least the relevant assertions (existence, completeness, rights and obligations, evaluation, period allocation, display) in the assertion input area 22.10. One). Risks include “wrong manuscript posting” and “wrong consolidated package count data”.

コントロール作業項番入力エリア22.11のプルダウンリストから作業順番を指定すると、指定した作業順番がデータベース17の作業項目データファイルから転送され、作業順番がコントロール作業順番入力エリア22.11に表示される。指定したコントロール作業順番は、図21の決算手続マニュアル表示画面において指定した作業順番と対応する。なお、図示はしていないが、図21の決算手続マニュアル表示画面において指定した作業順番と異なる作業順番を指定すると、エラーメッセージがディスプレイ23に表示される。   When the work order is designated from the pull-down list in the control work item number input area 22.11, the designated work order is transferred from the work item data file in the database 17, and the work order is displayed in the control work order entry area 22.11. . The designated control work order corresponds to the work order designated on the settlement procedure manual display screen of FIG. Although not shown, an error message is displayed on the display 23 when a work order different from the work order designated on the settlement procedure manual display screen of FIG.

コントロール作業項目入力エリア22.12のプルダウンリストから作業項目を指定すると、指定した作業項目がデータベース17の作業項目データファイルから転送され、作業項目がコントロール作業項目入力エリア22.12に表示される。コントロール内容入力エリア22.13にコントロール内容を入力する。コントロールは、各作業項目のリスクを管理し、そのリスクを回避する役割を有する。コントロール内容には、「文案の検証」や「文案の承認」等がある。   When a work item is designated from the pull-down list in the control work item input area 22.12, the designated work item is transferred from the work item data file in the database 17, and the work item is displayed in the control work item input area 22.12. The control content is input to the control content input area 22.13. The control is responsible for managing the risk of each work item and avoiding that risk. The control contents include “sentence verification” and “sentence approval”.

それらデータを入力した後、実行ボタン22.14を押す。なお、図22の決算手続マニュアル(リスク内容1)表示画面において、クリアボタン22.15を押すと、各入力エリア22.8〜22.13に入力された各データが消去され、データの入力を初めからやり直す。実行ボタン22.14を押すと、図示はしていないが、リスク確認画面(リスク内容1)がディスプレイ23に表示される。リスク確認画面には、各データが入力された入力エリアの他に、YESボタン、NOボタンが表示される。NOボタンを押すと、リスクデータ(リスク、アサーション、コントロール作業順番、コントロール作業項目、コントロール内容)の格納は行われず、図21の決算手続マニュアル表示画面(作業手順)に戻る。   After inputting these data, the execution button 22.14 is pushed. When the clear button 22.15 is pressed on the settlement procedure manual (risk content 1) display screen of FIG. 22, each data input to each input area 22.8 to 22.13 is erased, and the data input is Start over from the beginning. When the execute button 22.14 is pressed, a risk confirmation screen (risk content 1) is displayed on the display 23 (not shown). On the risk confirmation screen, a YES button and a NO button are displayed in addition to the input area where each data is input. When the NO button is pressed, risk data (risk, assertion, control work order, control work item, control content) is not stored, and the screen returns to the settlement procedure manual display screen (work procedure) in FIG.

リスク確認画面(リスク内容1)において、YESボタンを押すと、リスクデータのうちのリスク情報(リスク作業順番、リスク)に、作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)とが設定されるとともに、リスク情報がデータベース17に転送され、それらリスク情報(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルのリスクアドレスに格納される(リスク格納手段)。リスク情報の格納は、各リスク作業項目毎(図22には、(1)提出依頼、(3)要件確認の2つが図示されている)に行われる。   When the YES button is pressed on the risk confirmation screen (risk content 1), the work order (work item identifier) and serial number (main procedure and procedure name) are specified in the risk information (risk work order, risk) in the risk data. Serial number displayed in the serial number display area) is set, risk information is transferred to the database 17, and the risk information (including storage date and time) is associated with the serial number and the work order. In the state, it is stored in the risk address of the work item file in the database 17 (risk storage means). The risk information is stored for each risk work item (FIG. 22 shows (1) submission request and (3) requirement check).

リスクデータのうちのアサーション情報に、作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)とが設定されるとともに、そのアサーション情報がデータベース17に転送され、そのアサーション情報(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルのリスクアドレスに格納される(アサーション格納手段)。アサーション情報の格納は、リスク作業順番やリスクの格納と同様に、各リスク作業項目毎に行われる。   The work order (work item identifier) and serial number (the serial number displayed in the serial number display area for identifying the main procedure and procedure name) are set in the assertion information in the risk data, and the assertion The information is transferred to the database 17, and the assertion information (including the storage date and time) is stored in the risk address of the work item file in the database 17 in a state where it is associated with the serial number and the work order (assertion storage means). Assertion information is stored for each risk work item in the same manner as risk work order and risk storage.

リスクデータのうちのリスクをコントロールするコントロール作業順番とコントロール作業項目(管理作業項目)とに、作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)とが設定されるとともに、コントロール作業順番とコントロール作業項目とがデータベース17に転送され、コントロール作業順番およびコントロール作業項目(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルのリスクアドレスに格納される(リスク管理作業項目格納手段)。コントロール作業順番およびコントロール作業項目の格納は、リスク作業順番やリスクの格納と同様に、各リスク作業項目毎に行われる。   In the control work order and control work item (management work item) that controls the risk in the risk data, the work order (work item identifier) and the serial number (in the serial number display area to identify the main procedure and procedure name) Display sequence number) is set, the control work order and the control work item are transferred to the database 17, and the control work order and the control work item (including storage date and time) are associated with the serial number and the work order. Stored in the risk address of the work item file in the database 17 (risk management work item storage means). The storage of the control work order and the control work item is performed for each risk work item in the same manner as the risk work order and risk storage.

リスクデータのうちのリスクをコントロールするコントロール内容(管理作業項目の管理作業内容)に、作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)とが設定されるとともに、コントロール内容(格納日時を含む)がデータベース17に転送され、コントロール内容が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルのリスクアドレスに格納される(リスク管理作業内容格納手段)。コントロール内容の格納は、リスク作業順番やリスクの格納と同様に、各リスク作業項目毎に行われる。   It is displayed in the serial number display area to identify the work order (work item identifier) and serial number (main procedure and procedure name) in the control content (management work content of the management work item) that controls the risk in the risk data. The control contents (including the storage date and time) are transferred to the database 17, and the risk address of the work item file in the database 17 in a state where the control contents are associated with the serial number and the work order. (Risk management work content storage means). The control contents are stored for each risk work item in the same manner as the risk work order and risk storage.

なお、リスク作業項目のリスク作業内容が作業項目ファイルから抽出され、リスク作業項目のリスク作業内容に、作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)とが設定されるとともに、そのリスク作業内容がデータベース17に転送され、そのリスク作業内容(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルのリスクアドレスに格納される(リスク作業内容格納手段)。また、リスクを伴う作業項目のリスク作業完了予定期日が作業項目ファイルから抽出され、リスク作業完了予定期日に、作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)とが設定されるとともに、そのリスク作業完了予定期日がデータベース17に転送され、そのリスク作業完了予定期日(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルのリスクアドレスに格納される(リスク作業完了予定期日格納手段)。   The risk work content of the risk work item is extracted from the work item file, and the work order (work item identifier) and serial number (sequential number display for identifying the main procedure and procedure name are displayed in the risk work content of the risk work item. Serial number displayed in the area), the risk work content is transferred to the database 17, and the risk work content (including storage date and time) is associated with the serial number and the work order. 17 stored in the risk address of the work item file 17 (risk work content storage means). In addition, the risk work completion due date of the work item with risk is extracted from the work item file, and the work order (work item identifier) and serial number (the main procedure and the sequence name for identifying the procedure name) are added to the risk work completion due date. Serial number displayed in the number display area) is set, and the risk work completion due date is transferred to the database 17, and the risk work completion due date (including the storage date and time) is set as the serial number and work order. It is stored in the risk address of the work item file in the database 17 in the associated state (risk work completion scheduled date storage means).

それらデータの格納が終了すると、図23の決算手続マニュアル(リスク内容2)表示画面がディスプレイ23に表示される。決算手続マニュアル(リスク内容2)表示画面には、図23に示すように、図21の決算手続マニュアル(作業手順)表示画面に表示された連番と同一の連番が表示された連番表示エリア23.1、主要手続(図示せず)が表示された主要手続表示エリア23.2、主要手続番号が表示された主要手続番号表示エリア23.2、手続名(図示せず)が表示された手続名表示エリア23.4、作業概要タブ23.5、作業手順タブ23.6、リスク内容タブ23.7、リスク作業順番が表示されたリスク作業順番表示エリア23.8、財務報告リスク入力エリア23.9、アサーションが表示されたアサーション表示エリア23.10、リスク作業項目(提出依頼、要件確認)が表示されたリスク作業項目表示エリア23.11、リスク作業項目の担当者(図示せず)が表示された担当者表示エリア23.12、リスク作業項目の内容(図示せず)が表示された内容表示エリア23.13、リスク作業のリスク作業注意事項入力エリア23.14、実行ボタン23.15、クリアボタン23.16、キャンセルボタン23.17が表示される。キャンセルボタン23.17を押すと、図22の決算手続マニュアル(リスク内容1)表示画面に戻る。   When the storage of the data is completed, the settlement procedure manual (risk content 2) display screen shown in FIG. On the settlement procedure manual (risk content 2) display screen, as shown in FIG. 23, a serial number display showing the same sequence number as that displayed on the settlement procedure manual (work procedure) display screen of FIG. Area 23.1, main procedure display area 23.2 displaying main procedures (not shown), main procedure number display area 23.2 displaying main procedure numbers, and procedure name (not shown) are displayed. Procedure name display area 23.4, work summary tab 23.5, work procedure tab 23.6, risk content tab 23.7, risk work order display area 23.8 displaying risk work order, financial reporting risk input Area 23.9, assertion display area 23.10 displaying assertions, risk work item display area 23.11 displaying risk work items (submission request, requirement confirmation), risk work items Person in charge display area 23.12 in which the person in charge (not shown) is displayed, content display area 23.13 in which the contents of risk work items (not shown) are displayed, risk work precaution input area for risk work 23.14, an execution button 23.15, a clear button 23.16, and a cancel button 23.17 are displayed. When the cancel button 23.17 is pressed, the screen returns to the settlement procedure manual (risk content 1) display screen of FIG.

財務報告リスク入力エリア23.9に財務報告リスクを入力し、リスク作業項目を処理する場合にリスク作業注意事項がある場合はその注意事項をリスク作業注意事項入力エリア23.14に入力する。財務報告リスクには、「架空に計上されるリスク」や「計上が重複または漏れるリスク」、「正当でない取引が計上されるリスク」、「計上金額を誤るリスク」、「計上日付・主要手続を誤るリスク」等がある。それらデータを入力した後、実行ボタン23.15を押す。なお、図23の決算手続マニュアル(リスク内容2)表示画面において、クリアボタン23.16を押すと、各入力エリア23.9〜23.14に入力された各データが消去され、データの入力を初めからやり直す。   When a financial report risk is input in the financial report risk input area 23.9 and a risk work precaution is present when a risk work item is processed, the precaution is input to the risk work precaution input area 23.14. Financial reporting risks include “risk of being recorded fictitiously”, “risk of overlap or omission of recording”, “risk of recording of unjustified transaction”, “risk of incorrect recording amount”, “recording date / main procedure” There is a risk of error. After inputting these data, the execution button 23.15 is pushed. When the clear button 23.16 is pressed on the settlement procedure manual (risk content 2) display screen of FIG. 23, each data input to each input area 23.9 to 23.14 is erased, and data input is performed. Start over from the beginning.

実行ボタン23.15を押すと、図示はしていないが、リスク確認画面(リスク内容2)がディスプレイ23に表示される。リスク確認画面には、各データが入力された入力エリアの他に、YESボタン、NOボタンが表示される。NOボタンを押すと、リスクデータ(財務報告リスク、リスク作業注意事項)の格納は行われず、図21の決算手続マニュアル表示画面(作業手順)に戻る。   When the execute button 23.15 is pressed, a risk confirmation screen (risk content 2) is displayed on the display 23 (not shown). On the risk confirmation screen, a YES button and a NO button are displayed in addition to the input area where each data is input. When the NO button is pressed, risk data (financial reporting risk, risk work precautions) is not stored, and the screen returns to the settlement procedure manual display screen (work procedure) in FIG.

リスク確認画面(リスク内容2)において、YESボタンを押すと、リスクデータのうちのリスク情報(財務報告リスク)に、作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)とが設定されるとともに、財務報告リスクがデータベース17に転送され、財務報告リスク(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルのリスクアドレスに格納される(リスク格納手段)。財務報告リスクの格納は、各リスク作業項目毎(図23には、(1)提出依頼、(3)要件確認の2つが図示されている)に行われる。   When the YES button is pressed on the risk confirmation screen (risk content 2), work order (work item identifier) and serial number (main procedure and procedure name are specified) in the risk information (financial reporting risk) in the risk data. The serial number displayed in the serial number display area) is set, the financial report risk is transferred to the database 17, and the financial report risk (including the storage date and time) is associated with the serial number and the work order. Is stored in the risk address of the work item file in the database 17 (risk storage means). Financial reporting risk is stored for each risk work item (FIG. 23 shows (1) submission request and (3) requirement confirmation).

リスク作業注意事項に、作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番)とが設定されるとともに、リスク作業注意事項がデータベース17に転送され、リスク作業注意事項(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルの作業注意事項アドレスに格納される(リスク作業注意事項格納手段)。リスク作業注意事項の格納は、財務報告リスクの格納と同様に、各リスク作業項目毎に行われる。   The work order (work item identifier) and serial number (the serial number displayed in the serial number display area for identifying the main procedure and procedure name) are set in the risk work precautions. It is transferred to the database 17, and the risk work notes (including the storage date and time) are stored in the work note address of the work item file in the database 17 in a state where the risk work notes (including the storage date and time) are associated with each other (the risk work notice storage). means). The risk work precautions are stored for each risk work item in the same manner as the financial report risk.

図24は、作業管理選択画面の一例を示す図であり、図25は、手続一覧表の一例を示す図である。図26は、作業一覧表の一例を示す図である。図25,26は、管理用コンピュータ11のディスプレイ23に表示される手続一覧表や作業一覧表を示す。管理用コンピュータ11のディスプレイ23には、すべての担当者が表示されるとともに、それら担当者が担当する主要手続の手続名の手続一覧表が表示される。このシステム10A,10Bでは、管理用コンピュータ11において各種データを入力し、それらデータがデータベース17に格納された後、ディスプレイ23に手続一覧表や作業一覧表を表示させることができる。管理者は、手続一覧表や作業一覧表にしたがって各主要手続の手続名や各作業項目の進捗状況を把握し、決算業務を担当する各担当者に各主要手続の手続名や各作業項目の処理上の助言を与え、または、各主要手続の手続名や各作業項目の処理の迅速化を促す。   FIG. 24 is a diagram illustrating an example of a work management selection screen, and FIG. 25 is a diagram illustrating an example of a procedure list. FIG. 26 is a diagram illustrating an example of a work list. 25 and 26 show a procedure list and a work list displayed on the display 23 of the management computer 11. All the persons in charge are displayed on the display 23 of the management computer 11 and a procedure list of the procedure names of the main procedures in charge of those persons in charge is displayed. In the systems 10 </ b> A and 10 </ b> B, various data are input to the management computer 11, and after the data is stored in the database 17, a procedure list and a work list can be displayed on the display 23. The administrator grasps the procedure name of each main procedure and the progress status of each work item according to the procedure list and work list, and sends the procedure name and each work item of each main procedure to each person in charge of settlement work. Providing processing advice, or accelerating the processing of each major procedure name and work item.

管理用コンピュータ11のディスプレイ23に表示された図4の初期画面において作業管理ボタン4.1を押すと、図24の作業管理選択画面が表示される。作業管理選択画面には、図24に示すように、手続一覧表ボタン24.1、作業一覧表ボタン24.2、伝達事項一覧表ボタン24.3、新旧対照表ボタン24.4、戻るボタン24.5、ログアウトボタン24.6が表示される。手続一覧表ボタン24.1を押すと、データベース17から手続一覧表に対応する各種データが転送され、図25の手続一覧表がコンピュータ11のディスプレイ23に表示される。   When the work management button 4.1 is pressed on the initial screen of FIG. 4 displayed on the display 23 of the management computer 11, a work management selection screen of FIG. 24 is displayed. On the work management selection screen, as shown in FIG. 24, a procedure list button 24.1, a work list button 24.2, a transmission item list button 24.3, an old and new comparison table button 24.4, and a return button 24 .5, logout button 24.6 is displayed. When the procedure list button 24.1 is pressed, various data corresponding to the procedure list is transferred from the database 17, and the procedure list shown in FIG. 25 is displayed on the display 23 of the computer 11.

手続一覧表には、連番表示エリア25.1、主要手続表示エリア25.2、手続名表示エリア25.3、担当者表示エリア25.4、主要手続の手続名を再鑑・承認する再鑑者・承認者入出力エリア25.5、主要手続の手続名の手続予定日表示エリア25.6、主要手続の手続名の作業項目総数表示エリア25.7、主要手続の手続名の工数見積表示エリア25.8、主要手続の手続名の工数実測表示エリア25.9、主要手続の手続名の手続進捗状況表示エリア2510、CL(チェックリスト)ボタン25.11、伝達事項ボタン25.12、戻るボタン25.13、作業一覧表ボタン25.14、ログアウトボタン25.15が表示される。戻るボタン25.13を押すと、図24の作業管理選択画面に戻る。   The procedure list includes a serial number display area 25.1, a main procedure display area 25.2, a procedure name display area 25.3, a person-in-charge display area 25.4, and a procedure for reviewing and approving the procedure name of the main procedure. Expert / approver input / output area 25.5, scheduled procedure date display area 25.6 for main procedure name, total work item display area 25.7 for main procedure name, man-hour estimate for main procedure name A display area 25.8, an actual measurement display area 25.9 for the procedure name of the main procedure, a procedure progress display area 2510 for the procedure name of the main procedure, a CL (check list) button 25.11, a transmission item button 25.12, A return button 25.13, a work list button 25.14, and a logout button 25.15 are displayed. When the return button 25.13 is pressed, the screen returns to the work management selection screen shown in FIG.

コンピュータ11のデータ転送指令にしたがって、作業概要データ(連番、主要手続、手続名)がデータベース17の主要手続ファイルから転送され、各主要手続の手続名に設定された連番が連番表示エリア25.1に表示され、その連番に対応する主要手続が主要手続表示エリア25.2に表示されるとともに、その主要手続に対応する手続名が手続名表示エリア25.3に表示される(主要手続出力手段)。連番に設定された担当者ID番号に基づいて担当者データ(担当者名)がデータベース17の主要手続ファイルから転送され、各主要手続の手続名毎の担当者データ(図示せず)が担当者表示エリア25.4に表示される(手続担当者出力手段)。   In accordance with the data transfer command of the computer 11, work summary data (serial number, main procedure, procedure name) is transferred from the main procedure file in the database 17, and the serial number set in the procedure name of each main procedure is the serial number display area. The main procedure corresponding to the serial number is displayed in the main procedure display area 25.2 and the procedure name corresponding to the main procedure is displayed in the procedure name display area 25.3 ( Main procedure output means). The person-in-charge data (person-in-charge name) is transferred from the main procedure file in the database 17 based on the person-in-charge ID number set in the serial number, and the person-in-charge data (not shown) for each procedure name of each main procedure is in charge. Displayed in the person display area 25.4 (procedure person output means).

連番に基づいて各主要手続の手続名の手続完了予定期日が特定され、各主要手続の手続名の手続完了予定期日がデータベース17の主要手続ファイルから転送され、各主要手続の手続名の手続完了予定期日(図示せず)が手続予定日表示エリア25.6に表示される(手続完了予定期日出力手段)。連番に基づいて各主要手続の手続名の処理に必要な作業項目の作業項目総数が特定され、作業項目総数がデータベース17の作業データファイルから転送され、各主要手続の手続名の処理に必要な作業項目総数が作業項目総数表示エリア25.7に表示される(主要手続出力手段)。   The scheduled completion date of the procedure name of each main procedure is specified based on the serial number, the scheduled procedure completion date of the procedure name of each main procedure is transferred from the main procedure file of the database 17, and the procedure of the procedure name of each main procedure The scheduled completion date (not shown) is displayed in the scheduled procedure date display area 25.6 (procedure completion scheduled date output means). Based on the serial number, the total number of work items necessary for processing the procedure name of each main procedure is specified, and the total number of work items is transferred from the work data file of the database 17 and is necessary for processing the procedure name of each main procedure. The total number of work items is displayed in the total work item display area 25.7 (main procedure output means).

連番に基づいて各主要手続の手続名の処理に要する処理見込時間(作業工数見積)が特定され、各主要手続の手続名の処理見込時間がデータベース17の主要手続ファイルから転送され、各主要手続の手続名の処理見込時間(図示せず)が工数見積表示エリア25.8に表示される(手続処理見込時間出力手段)。連番に基づいて各主要手続の手続名の処理に要した処理実測時間(作業工数実績)が特定され、各主要手続の手続名の処理実測時間がデータベース17の主要手続ファイルから転送され、各主要手続の手続名の処理実測時間(図示せず)が工数実測表示エリア25.9に表示される(手続処理実測時間出力手段)。   Based on the serial number, the expected processing time (work man-hour estimate) required for processing the procedure name of each main procedure is specified, and the expected processing time of the procedure name of each main procedure is transferred from the main procedure file in the database 17 to The expected processing time (not shown) of the procedure name of the procedure is displayed in the man-hour estimate display area 25.8 (procedure processing expected time output means). Based on the serial number, the actual processing time (work man-hours) required for processing the procedure name of each main procedure is specified, and the actual processing time of the procedure name of each main procedure is transferred from the main procedure file of the database 17. The process actual measurement time (not shown) of the procedure name of the main procedure is displayed in the man-hour actual measurement display area 25.9 (procedure process actual measurement time output means).

手続進捗データがデータベース17に格納されている場合は、連番に基づいて各主要手続の手続名の手続進捗データが特定され、各主要手続の手続名の手続進捗データがデータベース17の主要手続ファイルから転送され、各主要手続の手続名の手続進捗データが進捗状況表示エリア25.10に表示される(手続進捗データ出力手段)。進捗状況表示エリア25.10には、手続が完了している作業項目の作業順番が表示され、さらに、主要手続の手続名の現在の進捗状況である完了、遅延完了、遅延、未着手、作業中、遅延作業中のいずれかのメッセージが表示される。なお、主要手続の手続名に再鑑者・承認者(管理者)が必要である場合は、再鑑者・承認者名入力エリア25.5のプルダウンリストから再鑑者・承認者を選択し、再鑑者・承認者名入力エリア25.5に再鑑者・承認者を入力する。図25の手続一覧表は、プリンタから出力することができる。   When the procedure progress data is stored in the database 17, the procedure progress data of the procedure name of each main procedure is specified based on the serial number, and the procedure progress data of the procedure name of each main procedure is stored in the main procedure file of the database 17. The procedure progress data of the procedure name of each main procedure is displayed in the progress status display area 25.10 (procedure progress data output means). In the progress status display area 25.10, the work order of work items for which the procedure has been completed is displayed. Furthermore, the current progress status of the procedure name of the main procedure is completed, delayed completed, delayed, not started, work One of the messages is displayed during middle or delayed work. If a reviewer / approver (administrator) is required for the procedure name of the main procedure, select the reviewer / approver from the pull-down list in the reviewer / approver name input area 25.5. In the reviewer / authorizer name input area 25.5, the reviewer / authorizer is entered. The procedure list in FIG. 25 can be output from a printer.

決算業務促進システム10A,10Bは、決算業務の手続期間に処理を要する各種複数の主要手続を出力し、それら主要手続の手続名の処理を担当する担当者データを各主要手続の手続名毎に出力するから、各主要手続の内容や主要手続の手続名の担当者の明確化を図ることができることはもちろん、各主要手続の内容や主要手続の手続名の担当者を事前に把握することができ、各担当者に対して主要手続の処理作業を支援することができる。   The settlement business promotion systems 10A and 10B output a plurality of main procedures that require processing during the procedure period of the settlement business, and the person-in-charge data in charge of processing the procedure names of these major procedures for each procedure name of each major procedure. Since it is output, it is possible to clarify the person in charge of the contents of each main procedure and the name of the procedure of the main procedure, as well as grasping the person in charge of the contents of each main procedure and the name of the procedure of the main procedure in advance It is possible to support each person in charge of the processing of the main procedure.

決算業務促進システム10A,10Bは、主要手続の手続名の手続完了予定期日を各主要手続の手続名毎に出力し、主要手続の手続名の手続進捗データを各主要手続の手続名毎に出力するから、主要手続の処理に対する計画を事前に立てることができ、計画に従って主要手続を処理することで、主要手続の処理を計画に沿って迅速かつ正確に処理することができる。また、管理者が主要手続の手続名の完了予定や現在の手続進捗状況を各主要手続の手続名毎に把握することができ、それに基づいて、管理者が各担当者に主要手続の手続名の処理上の助言を与えることや各担当者の主要手続の手続名の処理の迅速化を促すことができ、各担当者の主要手続の手続名の処理に対する注意を喚起することで、各担当者毎に主要手続の手続名の処理の促進を図ることができる。   The settlement business promotion systems 10A and 10B output the scheduled completion date of the procedure name of the main procedure for each procedure name of each main procedure, and output the procedure progress data of the procedure name of the main procedure for each procedure name of each main procedure Therefore, a plan for the processing of the main procedure can be made in advance, and the processing of the main procedure can be processed promptly and accurately according to the plan by processing the main procedure according to the plan. In addition, the administrator can grasp the completion schedule of the procedure name of the main procedure and the current procedure progress status for each procedure name of each main procedure, and based on this, the administrator can tell each person in charge the procedure name of the main procedure. It is possible to prompt the processing of the procedure name of the main procedure of each person in charge, and to prompt the attention of each person in charge of processing the procedure name of the main procedure. It is possible to promote the processing of the procedure name of the main procedure for each person.

決算業務促進システム10A,10Bは、主要手続の手続名の処理に要する処理見込時間を各主要手続の手続名毎に出力し、主要手続の手続名の処理に要した処理実測時間を各主要手続の手続名毎に出力するから、管理者が各主要手続の手続名の処理に要する処理見込時間や処理実測時間を把握することができ、各主要手続の手続名の処理時間の適正や各担当者の処理能力を把握することができるとともに、各主要手続の手続名の処理時間を適格に決定することや主要手続の手続名を処理させる担当者を適格に選出することができる。   The settlement business promotion systems 10A and 10B output the expected processing time required for processing the procedure name of the main procedure for each procedure name of each main procedure, and the actual processing time required for processing the procedure name of the main procedure. Because it is output for each procedure name, the administrator can grasp the expected processing time and actual processing time required for processing the procedure name of each main procedure. It is possible to grasp the processing ability of each person, and to appropriately determine the processing time of the procedure name of each main procedure, and to appropriately select the person in charge who processes the procedure name of each main procedure.

管理用コンピュータ11のディスプレイ23に表示された図4の初期画面において作業管理ボタン4.1を押し、図24の作業管理選択画面を表示させた後、作業一覧表ボタン24.2を押すと、データベース17から作業一覧表に対応する各種データが転送され、図26の作業一覧表がコンピュータ23のディスプレイ11に表示される。なお、管理者用コンピュータ11のディスプレイ23には、すべての担当者が表示されるとともに、それら担当者が担当する作業項目の作業一覧表が表示される。   When the work management button 4.1 is pressed on the initial screen of FIG. 4 displayed on the display 23 of the management computer 11 to display the work management selection screen of FIG. 24, and then the work list button 24.2 is pressed, Various data corresponding to the work list are transferred from the database 17, and the work list of FIG. 26 is displayed on the display 11 of the computer 23. All the persons in charge are displayed on the display 23 of the manager computer 11 and a work list of work items for which the persons in charge are in charge is displayed.

作業一覧表には、作業種類表示エリア26.1、連番表示エリア26.2、手続名表示エリア26.3、作業順番表示エリア26.4、作業項目表示エリア26.5、作業内容表示エリア26.6、担当者表示エリア26.7、作業項目の作業進捗状況表示エリア26.8、作業項目の作業予定日表示エリア26.9、作業項目の作業完了日表示エリア26.10、工数見積表示エリア26.11、工数実測表示エリア26.12、CL(チェックリスト)ボタン26.13、伝達事項ボタン26.14、戻るボタン26.15、手続一覧表ボタン26.16、ログアウトボタン26.17が表示される。戻るボタン26.15を押すと、図24の作業管理選択画面に戻る。手続一覧表ボタン26.16を押すと、図25の手続一覧表が表示される。   The work list includes a work type display area 26.1, a serial number display area 26.2, a procedure name display area 26.3, a work order display area 26.4, a work item display area 26.5, and a work content display area. 26.6, person-in-charge display area 26.7, work item work progress display area 26.8, work item scheduled work date display area 26.9, work item work completion date display area 26.10, man-hour estimate Display area 26.11, man-hour measurement display area 26.12, CL (check list) button 26.13, transmission item button 26.14, return button 26.15, procedure list button 26.16, logout button 26.17 Is displayed. When the return button 26.15 is pressed, the screen returns to the work management selection screen shown in FIG. When the procedure list button 26.16 is pressed, the procedure list shown in FIG. 25 is displayed.

コンピュータ11のデータ転送指令にしたがって、作業項目データ(作業種類、連番、手続名、作業順番、作業項目、作業内容)がデータベース17の作業項目ファイルから転送され、作業種類が作業種類表示エリア26.1に表示され、各作業項目に設定された連番が連番表示エリア26.2に表示され、その連番に対応する手続名が手続名表示エリア26.3に表示される。さらに、連番に対応する作業順番が作業順番表示エリア26.4に表示され、連番に対応する作業項目が作業項目表示エリア26.5に表示され、その作業項目の作業内容が作業内容表示エリア26.6に表示される(作業項目出力手段、作業内容出力手段)。連番に設定された担当者ID番号に基づいて担当者データ(担当者名)がデータベース17の作業項目ファイルから転送され、各作業項目毎の担当者データ(図示せず)が担当者表示エリア26.7に表示される(作業担当者出力手段)。   In accordance with a data transfer command from the computer 11, work item data (work type, serial number, procedure name, work order, work item, work content) is transferred from the work item file in the database 17, and the work type is displayed in the work type display area 26. .1, and the serial number set for each work item is displayed in the serial number display area 26.2, and the procedure name corresponding to the serial number is displayed in the procedure name display area 26.3. Furthermore, the work order corresponding to the serial number is displayed in the work order display area 26.4, the work item corresponding to the serial number is displayed in the work item display area 26.5, and the work content of the work item is displayed as the work content display. Displayed in area 26.6 (work item output means, work content output means). The person-in-charge data (person-in-charge name) is transferred from the work item file in the database 17 based on the person-in-charge ID number set in the serial number, and the person-in-charge data (not shown) for each work item is displayed in the person-in-charge display area. 26.7 (worker output means).

作業進捗データがデータベース17に格納されている場合は、連番と作業順番とに基づいて各作業項目の作業進捗データ(作業進捗状況、作業完了日)が特定され、各作業項目の作業進捗データがデータベース17の作業項目ファイルから転送され、各主要手続の手続名の作業進捗データが作業進捗状況表示エリア26.8や作業完了日表示エリア26.10に表示される(作業進捗データ出力手段)。作業進捗状況表示エリア26.8には、各作業項目の現在の作業進捗状況である完了、遅延完了、遅延、未着手、作業中、遅延作業中のいずれかのメッセージが表示され、作業完了日表示エリア26.10には、作業項目が完了している場合に各作業項目の完了日(図示せず)が表示される。   When the work progress data is stored in the database 17, the work progress data (work progress status, work completion date) of each work item is specified based on the serial number and the work order, and the work progress data of each work item is specified. Are transferred from the work item file of the database 17, and the work progress data of the procedure name of each main procedure is displayed in the work progress display area 26.8 and the work completion date display area 26.10 (work progress data output means). . In the work progress status display area 26.8, a message indicating the current work progress status of each work item, completion, delayed completion, delay, not started, working, delayed work is displayed, and the work completion date is displayed. The display area 26.10 displays the completion date (not shown) of each work item when the work item is completed.

連番と作業順番とに基づいて各作業項目の作業完了予定期日が特定され、各作業項目の作業完了予定期日がデータベース17の作業項目ファイルから転送され、各作業項目の作業完了予定期日(図示せず)が作業予定日表示エリア26.9に表示される(作業完了予定期日出力手段)。連番と作業順番とに基づいて各作業項目の処理に要する処理見込時間(作業工数見積)が特定され、処理見込時間がデータベース17の作業項目ファイルから転送され、各作業項目の処理に要する処理見込時間(図示せず)が工数見積表示エリア26.11に表示される(作業処理見込時間出力手段)。連番と作業順番とに基づいて各作業項目の処理に要した処理実測時間(作業工数実績)が特定され、処理実測時間がデータベース17の作業項目ファイルから転送され、各作業項目の処理に要した処理実測時間(図示せず)が工数実測表示エリア26.12に表示される(作業処理実測時間出力手段、)。図26の作業一覧表は、プリンタから出力することができる。   Based on the serial number and the work order, the scheduled work completion date of each work item is specified, the scheduled work completion date of each work item is transferred from the work item file in the database 17, and the scheduled work completion date of each work item (see FIG. (Not shown) is displayed in the scheduled work date display area 26.9 (work completion scheduled date output means). Process expected time (work man-hour estimation) required for processing each work item based on the serial number and the work order is specified, and the expected process time is transferred from the work item file in the database 17 to process each work item. Expected time (not shown) is displayed in the man-hour estimation display area 26.11 (work processing expected time output means). Based on the serial number and the work order, the actual processing time (work man-hour results) required for processing each work item is specified, and the actual processing time is transferred from the work item file in the database 17 and required for processing each work item. The process actual measurement time (not shown) is displayed in the man-hour actual measurement display area 26.12 (work process actual measurement time output means). The work list in FIG. 26 can be output from the printer.

決算業務促進システム10A,10Bは、決算業務の各種複数の主要手続の手続名の処理に必要な作業項目(作業内容を含む)をその処理順に順番付けた状態で各主要手続の手続名毎に出力し、作業項目を担当する担当者を各作業項目毎に出力するから、各作業項目の担当者の明確化を図ることができることはもちろん、各作業項目の内容や作業項目の担当者を事前に把握することができ、各担当者に対して作業項目の処理作業を支援することができる。   The settlement work promotion systems 10A and 10B are arranged for each procedure name of each major procedure in a state in which work items (including work contents) necessary for processing of procedure names of various major procedures of settlement work are ordered in the processing order. Since the person in charge of the work item is output for each work item, the person in charge of each work item can be clarified as well as the contents of each work item and the person in charge of the work item in advance It is possible to grasp the work item and to assist each person in charge of the work item processing.

決算業務促進システム10A,10Bは、作業項目の作業完了予定期日を各作業項目毎に出力し、作業項目の作業進捗データを各作業項目毎に出力するから、担当者が自ら担当する作業項目の現在の進捗状況を各作業項目毎に把握することができ、作業項目の処理に対する計画を事前に立てることができ、計画に従って作業項目を処理することで、作業項目の処理を計画に沿って迅速かつ正確に処理することができる。また、管理者が作業項目の完了予定や現在の作業進捗状況を各作業項目毎に把握することができ、それに基づいて、管理者が各担当者に作業項目の処理上の助言を与えることや各担当者の作業項目の処理の迅速化を促すことができ、各担当者の作業項目の処理に対する注意を喚起することで、各担当者毎に作業項目の処理の促進を図ることができる。   Since the settlement work promotion systems 10A and 10B output the work completion scheduled due date of the work item for each work item and output the work progress data of the work item for each work item, the person in charge of the work item himself / herself is responsible for. The current progress can be grasped for each work item, a plan for processing the work item can be made in advance, and the work item is processed according to the plan so that the work item can be processed quickly according to the plan. And can be processed accurately. In addition, the administrator can grasp the completion schedule of the work item and the current work progress status for each work item, and based on this, the administrator can give advice on the processing of the work item to each person in charge. It is possible to accelerate the processing of the work item of each person in charge, and to promote the processing of the work item for each person in charge by calling attention to the work item processing of each person in charge.

決算業務促進システム10A,10Bは、作業項目の処理に要する処理見込時間を各作業項目毎に出力し、作業項目の処理に要した処理実測時間を各作業項目毎に出力するから、管理者が各作業項目の処理に要する処理見込時間や処理実測時間を把握することができ、各作業項目の処理時間の適正や各担当者の処理能力を把握することができるとともに、各作業項目の処理時間を適格に決定することや作業項目を処理させる担当者を適格に選出することができる。   The settlement work promotion systems 10A and 10B output the estimated processing time required for processing the work item for each work item, and output the actual processing time required for processing the work item for each work item. It is possible to grasp the expected processing time and actual processing time required for processing each work item, to understand the appropriate processing time for each work item and the processing capability of each person in charge, and to process each work item. It is possible to qualify the person in charge and to select the person in charge for processing the work item.

図27は、手続一覧表の他の一例を示す図であり、図28は、手続一覧表の他の一例を示す図である。図27,28は、業務用コンピュータ12〜16のディスプレイ24に表示される手続一覧表を示す。業務用コンピュータ12〜16のディスプレイ24には、コンピュータ12〜16を介してシステム10A,10Bにログインした担当者が担当する主要手続の手続名のみの手続一覧表が表示される。決算業務を担当する各担当者は、手続一覧表や作業一覧表にしたがって各主要手続の手続名や各作業項目を処理する。業務用コンピュータ12〜16のディスプレイ24に表示された図4の初期画面において作業管理ボタン4.1を押し、図24の作業管理選択画面を表示させた後、手続一覧表ボタン24.1を押すと、データベース17から各担当者に対応した手続一覧表の各種データが転送され、図27の手続一覧表がコンピュータ12〜16のディスプレイ24に表示される。   FIG. 27 is a diagram illustrating another example of the procedure list, and FIG. 28 is a diagram illustrating another example of the procedure list. 27 and 28 show a procedure list displayed on the display 24 of the business computers 12-16. On the display 24 of the business computers 12-16, a procedure list of only the procedure names of the main procedures handled by the person in charge who has logged into the systems 10A, 10B via the computers 12-16 is displayed. Each person in charge of settlement work processes the procedure name and each work item of each main procedure according to the procedure list and work list. Press the work management button 4.1 on the initial screen of FIG. 4 displayed on the display 24 of the business computers 12 to 16 to display the work management selection screen of FIG. 24, and then press the procedure list button 24.1. Then, various data of the procedure list corresponding to each person in charge is transferred from the database 17, and the procedure list of FIG. 27 is displayed on the display 24 of the computers 12-16.

図27の手続一覧表には、担当者表示エリア27.1、直前進捗状況表示エリア27.2、連番表示エリア27.3、主要手続表示エリア27.4、手続名表示エリア27.5、主要手続の手続予定日表示エリア27.6、主要手続の作業項目総数表示エリア27.7、主要手続の手続名の工数見積表示エリア27.8、主要手続の手続名の工数実測表示エリア27.9、主要手続の手続名の手続進捗状況表示エリア27.10、CL(チェックリスト)ボタン27.11、伝達事項ボタン27.12、戻るボタン27.13、作業一覧表ボタン27.14、ログアウトボタン27.15が表示される。戻るボタン27.13を押すと、図24の作業管理選択画面に戻る。   The procedure list in FIG. 27 includes a person-in-charge display area 27.1, a previous progress status display area 27.2, a serial number display area 27.3, a main procedure display area 27.4, a procedure name display area 27.5, Scheduled procedure date display area 27.6 of the main procedure, work item total number display area 27.7 of the main procedure, man-hour estimate display area 27.8 of the procedure name of the main procedure, man-hour measurement display area 27. of the procedure name of the main procedure 9. Procedure progress status display area 27.10 for the procedure name of the main procedure, CL (check list) button 27.11, transmission item button 27.12, return button 27.13, work list button 27.14, logout button 27.15 is displayed. When the return button 27.13 is pressed, the screen returns to the work management selection screen in FIG.

コンピュータ12〜16のデータ転送指令にしたがって、作業概要データ(連番、主要手続、手続名)がデータベース17の主要手続ファイルから転送され、各主要手続に設定された連番が連番表示エリア27.3に表示され、その連番に対応する主要手続が主要手続表示エリア27.4に表示されるとともに、その主要手続に対応する手続名が手続名表示エリア27.5に表示される(主要手続出力手段)。連番に設定された担当者ID番号に基づいて担当者データ(担当者名)がデータベース17の主要手続ファイルから転送され、担当者データが担当者表示エリア27.1に表示される(手続担当者出力手段)。   In accordance with the data transfer command of the computers 12 to 16, the work summary data (serial number, main procedure, procedure name) is transferred from the main procedure file in the database 17, and the serial number set for each main procedure is displayed in the serial number display area 27. The main procedure corresponding to the serial number is displayed in the main procedure display area 27.4, and the procedure name corresponding to the main procedure is displayed in the procedure name display area 27.5 (main Procedure output means). The person-in-charge data (person-in-charge name) is transferred from the main procedure file in the database 17 based on the person-in-charge ID number set in the serial number, and the person-in-charge data is displayed in the person-in-charge display area 27.1 (procedure person in charge) Output means).

連番に基づいて図27の主要手続表示エリア27.4に表示された主要手続の手続名の直前の主要手続の手続名を担当する担当者の手続進捗データが特定され、その手続進捗データがデータベース17の主要手続ファイルから転送され、直前の主要手続の手続名の手続進捗データ(図示せず)が直前進捗状況表示エリア27.2に表示される(手続進捗データ出力手段)。直前進捗状況表示エリア27.2には、完了、遅延完了、遅延、未着手、作業中、遅延作業中のいずれかのメッセージが表示されるとともに、詳細タブが表示される。   Based on the serial number, the procedure progress data of the person in charge of the procedure name of the main procedure immediately before the procedure name of the main procedure displayed in the main procedure display area 27.4 of FIG. 27 is specified. The procedure progress data (not shown) of the procedure name of the immediately preceding main procedure is transferred from the main procedure file of the database 17 and displayed in the immediately preceding progress display area 27.2 (procedure progress data output means). In the immediately preceding progress display area 27.2, a message indicating completion, delay completion, delay, not yet started, working, or delayed work is displayed, and a detailed tab is displayed.

連番に基づいて各主要手続の手続名の手続完了予定期日が特定され、各主要手続の手続名の手続完了予定期日がデータベース17の主要手続ファイルから転送され、各主要手続の手続名の手続完了予定期日(図示せず)が手続予定日表示エリア27.6に表示される(手続完了予定期日出力手段)。連番に基づいて各主要手続の手続名の処理に必要な作業項目の作業項目総数が特定され、作業項目総数がデータベース17の作業データファイルから転送され、各主要手続の手続名の処理に必要な作業項目総数が作業項目総数表示エリア27.7に表示される(主要手続出力手段)。   Based on the serial number, the scheduled completion date of the procedure name of each major procedure is specified, the scheduled procedure completion date of the procedure name of each major procedure is transferred from the major procedure file in the database 17, and the procedure of the procedure name of each major procedure The scheduled completion date (not shown) is displayed in the scheduled procedure date display area 27.6 (procedure completion scheduled date output means). Based on the serial number, the total number of work items necessary for processing the procedure name of each main procedure is specified, and the total number of work items is transferred from the work data file of the database 17 and is necessary for processing the procedure name of each main procedure. The total number of work items is displayed in the total work item display area 27.7 (main procedure output means).

連番に基づいて各主要手続の手続名の処理に要する処理見込時間(作業工数見積)が特定され、各主要手続の手続名の処理見込時間がデータベース17の主要手続ファイルから転送され、各主要手続の手続名の処理見込時間(図示せず)が工数見積表示エリア27.8に表示される(手続処理見込時間出力手段)。連番に基づいて各主要手続の手続名の処理に要した処理実測時間(作業工数実績)が特定され、各主要手続の手続名の処理実測時間がデータベース17の主要手続ファイルから転送され、各主要手続の手続名の処理実測時間(図示せず)が工数実測表示エリア27.9に表示される(手続処理実測時間出力手段)。   Based on the serial number, the expected processing time (work man-hour estimate) required for processing the procedure name of each main procedure is specified, and the expected processing time of the procedure name of each main procedure is transferred from the main procedure file of the database 17 and The expected processing time (not shown) of the procedure name of the procedure is displayed in the man-hour estimate display area 27.8 (procedure processing expected time output means). Based on the serial number, the actual processing time (work man-hour results) required for processing the procedure name of each main procedure is specified, and the actual processing time of the procedure name of each main procedure is transferred from the main procedure file in the database 17. The process actual measurement time (not shown) of the procedure name of the main procedure is displayed in the man-hour actual measurement display area 27.9 (procedure process actual measurement time output means).

手続進捗データがデータベース17に格納されている場合は、連番に基づいて各主要手続の手続名の手続進捗データが特定され、各主要手続の手続名の手続進捗データがデータベース17の主要手続ファイルから転送され、各主要手続の手続名の手続進捗データが進捗状況表示エリア27.10に表示される(手続進捗データ出力手段)。進捗状況表示エリア27.10には、手続が完了している作業項目の作業順番が表示され(または手続が完了している作業項目の作業順番の次の作業項目の作業順番が表示される場合もある。)、さらに、主要手続の手続名の現在の手続進捗状況である完了、遅延完了、遅延、未着手、作業中、遅延作業中のいずれかのメッセージが表示される。図27の手続一覧表は、プリンタから出力することができる。   When the procedure progress data is stored in the database 17, the procedure progress data of the procedure name of each main procedure is specified based on the serial number, and the procedure progress data of the procedure name of each main procedure is stored in the main procedure file of the database 17. The procedure progress data of the procedure name of each main procedure is displayed in the progress status display area 27.10 (procedure progress data output means). In the progress display area 27.10, the work order of work items for which the procedure has been completed is displayed (or the work order of the work item next to the work order of the work item for which the procedure has been completed is displayed. In addition, a message indicating completion, delayed completion, delay, not started, working, or delayed work, which is the current procedure progress status of the procedure name of the main procedure, is displayed. The procedure list in FIG. 27 can be output from a printer.

直前進捗状況表示エリア27.2の詳細タブを押すと、図28の手続一覧表が表示される。図28の手続一覧表では、自己が担当する主要手続の手続名の手続一覧表の他に、その直前に処理を行う主要手続の手続名の担当者の手続一覧表が表示される。図28の手続一覧表には、担当者表示エリア28.1、直前担当者表示エリア28.2、連番表示エリア28.3、主要手続表示エリア28.4、手続名表示エリア28.5、手続予定日表示エリア28.6、作業項目総数表示エリア28.7、工数見積表示エリア28.8、工数実測表示エリア28.9、手続進捗状況表示エリア28.10、CL(チェックリスト)タブ28.11、伝達事項タブ28.12、戻るボタン28.13、作業一覧表ボタン28.14、ログアウトボタン28.15が表示される。戻るボタン28.13を押すと、図24の作業管理選択画面に戻る。   When the detail tab in the immediately preceding progress display area 27.2 is pressed, the procedure list shown in FIG. 28 is displayed. In the procedure list of FIG. 28, in addition to the procedure list of the procedure name of the main procedure in charge of itself, the procedure list of the person in charge of the procedure name of the main procedure to be processed immediately before is displayed. The procedure list of FIG. 28 includes a person-in-charge display area 28.1, a previous person-in-charge display area 28.2, a serial number display area 28.3, a main procedure display area 28.4, a procedure name display area 28.5, Scheduled procedure date display area 28.6, total work item display area 28.7, man-hour estimate display area 28.8, man-hour measurement display area 28.9, procedure progress display area 28.10, CL (check list) tab 28 .11, a transmission item tab 28.12, a back button 28.13, a work list button 28.14, and a logout button 28.15 are displayed. When the return button 28.13 is pressed, the screen returns to the work management selection screen shown in FIG.

コンピュータ12〜16のデータ転送指令にしたがって、直前担当者の作業概要データ(連番、主要手続、手続名)がデータベース17の主要手続ファイルから転送され、各主要手続の手続名に設定された連番が連番表示エリア28.3に表示され、その連番に対応する主要手続が主要手続表示エリア28.4に表示されるとともに、その主要手続に対応する手続名が手続名表示エリア28.5に表示される(主要手続出力手段)。連番に設定された担当者ID番号に基づいて直前担当者の担当者データ(担当者名)がデータベース17の主要手続ファイルから転送され、各主要手続の手続名毎の直前担当者の担当者データ(図示せず)が直前担当者表示エリア28.2に表示される。   In accordance with the data transfer command of the computers 12 to 16, the work summary data (serial number, main procedure, procedure name) of the person in charge immediately before is transferred from the main procedure file in the database 17 and set to the procedure name of each main procedure. No. is displayed in the serial number display area 28.3, the main procedure corresponding to the serial number is displayed in the main procedure display area 28.4, and the procedure name corresponding to the main procedure is displayed in the procedure name display area 28. 5 (main procedure output means). The person-in-charge data (person-in-charge name) of the person in charge immediately before is transferred from the main procedure file in the database 17 based on the person-in-charge ID number set in the serial number, and the person in charge of the person in charge immediately before for each procedure name of each main procedure Data (not shown) is displayed in the previous person-in-charge display area 28.2.

連番に基づいて直前担当者の各主要手続の手続名の手続完了予定期日が特定され、各主要手続の手続名の手続完了予定期日がデータベース17の主要手続ファイルから転送され、各主要手続の手続名の手続完了予定期日(図示せず)が手続予定日表示エリア28.6に表示される(手続完了予定期日出力手段)。連番に基づいて直前担当者の各主要手続の手続名の処理に必要な作業項目総数が特定され、作業項目総数がデータベース17の作業データファイルから転送され、各主要手続の手続名の処理に必要な作業項目総数が作業項目総数表示エリア28.7に表示される(主要手続出力手段)。   Based on the serial number, the scheduled completion date of the procedure name of each main procedure of the person in charge immediately before is specified, and the scheduled procedure completion date of the procedure name of each main procedure is transferred from the main procedure file of the database 17 and The scheduled procedure completion date (not shown) of the procedure name is displayed in the scheduled procedure date display area 28.6 (procedure completion scheduled date output means). Based on the serial number, the total number of work items necessary for processing the procedure name of each main procedure of the person in charge immediately before is specified, and the total number of work items is transferred from the work data file of the database 17 to process the procedure name of each main procedure. The total number of necessary work items is displayed in the total work item display area 28.7 (main procedure output means).

連番に基づいて直前担当者の各主要手続の手続名の処理に要する処理見込時間(作業工数見積)が特定され、各主要手続の手続名の処理見込時間がデータベース17の主要手続ファイルから転送され、各主要手続の手続名の処理見込時間(図示せず)が工数見積表示エリア28.8に表示される(手続処理見込時間出力手段)。連番に基づいて直前担当者の各主要手続の手続名の処理に要した処理実測時間(作業工数実績)が特定され、各主要手続の手続名の処理実測時間がデータベース17の主要手続ファイルから転送され、各主要手続の手続名の処理実測時間(図示せず)が工数実測表示エリア28.9に表示される(手続処理実測時間出力手段)。   The expected processing time (estimated work man-hours) required to process the procedure name of each main procedure of the person in charge immediately before is specified based on the serial number, and the estimated processing time of the procedure name of each main procedure is transferred from the main procedure file in the database 17 Then, the expected processing time (not shown) of the procedure name of each main procedure is displayed in the man-hour estimate display area 28.8 (procedure processing expected time output means). Based on the serial number, the actual processing time (work man-hours) required for processing the procedure name of each main procedure of the person in charge immediately before is specified, and the actual processing time of the procedure name of each main procedure is determined from the main procedure file in the database 17. The process actual measurement time (not shown) of the procedure name of each main procedure is displayed in the man-hour actual measurement display area 28.9 (procedure process actual measurement time output means).

手続進捗データがデータベース17に格納されている場合は、連番に基づいて直前担当者の各主要手続の手続名の手続進捗データが特定され、各主要手続の手続名の手続進捗データがデータベース17の主要手続ファイルから転送され、各主要手続の手続名の手続進捗データが進捗状況表示エリア28.10に表示される(手続進捗データ出力手段)。進捗状況表示エリア28.10には、手続が完了している作業項目の作業順番が表示され(または手続が完了している作業項目の作業順番の次の作業項目の作業順番が表示される場合もある。)、さらに、主要手続の手続名の現在の手続進捗状況である完了、遅延完了、遅延、未着手、作業中、遅延作業中のいずれかのメッセージが表示される。図28の手続一覧表は、プリンタから出力することができる。   When the procedure progress data is stored in the database 17, the procedure progress data of the procedure name of each main procedure of the person in charge immediately before is specified based on the serial number, and the procedure progress data of the procedure name of each main procedure is stored in the database 17. The procedure progress data of the procedure name of each main procedure is displayed in the progress status display area 28.10 (procedure progress data output means). In the progress status display area 28.10, the work order of the work item for which the procedure has been completed is displayed (or the work order of the work item next to the work order of the work item for which the procedure has been completed is displayed. In addition, a message indicating completion, delay completion, delay, not started, working, or delayed work is displayed as the current procedure progress status of the procedure name of the main procedure. The procedure list in FIG. 28 can be output from the printer.

決算業務促進システム10A,10Bは、決算業務の手続期間に処理を要する各種複数の主要手続を出力し、それら主要手続の手続名の処理を担当する担当者データを各主要手続の手続名毎に出力するから、各主要手続の手続名の担当者の明確化を図ることができることはもちろん、各担当者が自己の処理すべき主要手続の手続名を事前に把握することで、それら主要手続の手続名の処理に対する計画を立てることができ、計画に従って主要手続の手続名を処理することで、決算業務をスケジュールどおりに進めることができる。   The settlement business promotion systems 10A and 10B output a plurality of main procedures that require processing during the procedure period of the settlement business, and the person-in-charge data in charge of processing the procedure names of the main procedures for each procedure name of each major procedure. Since it is output, it is possible to clarify the person in charge of the procedure name of each main procedure, and by knowing in advance the procedure name of each main procedure that each person in charge should handle, It is possible to make a plan for processing the procedure name, and by processing the procedure name of the main procedure according to the plan, it is possible to proceed with the settlement operation as scheduled.

決算業務促進システム10A,10Bは、主要手続の手続名の手続完了予定期日を各主要手続の手続名毎に出力し、主要手続の手続名の手続進捗データを各主要手続の手続名毎に出力するから、各担当者が処理すべき主要手続の手続名の完了予定や現在の手続進捗状況を各主要手続の手続名毎に把握することができ、手続の処理計画を見直すことができるとともに、手続の遅れを取り戻すための計画を立てることができる。決算業務促進システム10A,10Bは、主要手続の手続名の処理に要する処理見込時間を各主要手続の手続名毎に出力し、主要手続の手続名の処理に要した処理実測時間を各主要手続の手続名毎に出力するから、担当者が各主要手続の手続名の処理に要する処理見込時間を把握することができ、主要手続の手続名の処理に対する計画を立てることができ、処理見込時間に従って主要手続の手続名を処理することで、主要手続の手続名の処理をスケジュールどおりに進めることができる。   The settlement business promotion systems 10A and 10B output the scheduled completion date of the procedure name of the main procedure for each procedure name of each main procedure, and output the procedure progress data of the procedure name of the main procedure for each procedure name of each main procedure Therefore, it is possible to grasp the completion schedule of the procedure name of the main procedure to be processed by each person in charge and the current procedure progress status for each procedure name of each main procedure, and to review the procedure processing plan, Plans can be made to recover delays in proceedings. The settlement business promotion systems 10A and 10B output the expected processing time required for processing the procedure name of the main procedure for each procedure name of each main procedure, and the actual processing time required for processing the procedure name of the main procedure. Because it is output for each procedure name, the person in charge can grasp the expected processing time for processing the procedure name of each main procedure, can make a plan for processing the procedure name of the main procedure, and the expected processing time By processing the procedure name of the main procedure according to the above, the processing of the procedure name of the main procedure can be proceeded as scheduled.

決算業務促進システム10A,10Bは、主要手続の手続名を遅延している担当者のみならず、主要手続の手続名を遅延している担当者の後に後続の主要手続の手続名を担当する直近の担当者に対し、主要手続の手続名を遅延している担当者のその手続の遅延メッセージを出力するから、後続の主要手続の手続名を担当する担当者が前の主要手続の手続名を担当する担当者に手続に対する処理の遅延を指摘し、前の担当者に対して手続の処理の迅速化を促すことで、前の担当者の主要手続の手続名の遅延による後続の主要手続の手続名の遅延を防ぐことができ、その結果、手続全体の処理の促進を図ることができる。   The settlement business promotion systems 10A and 10B are not only responsible for delaying the name of the procedure of the main procedure, but also the latest responsible for the name of the procedure of the subsequent main procedure after the person who is delaying the name of the procedure of the main procedure. The person in charge of the procedure name of the main procedure is output, so that the person in charge of the procedure name of the subsequent main procedure is assigned the procedure name of the previous main procedure. By pointing out to the person in charge the delay in processing of the procedure, and encouraging the previous person in charge to expedite the processing of the procedure, The delay of the procedure name can be prevented, and as a result, the processing of the entire procedure can be promoted.

決算業務促進システム10A,10Bは、主要手続の手続名の未着手または遅延作業中の担当者のみならず、主要手続の手続名を未着手または遅延作業中の担当者の後に後続の主要手続の手続名を担当する直近の担当者に対し、主要手続の手続名を未着手または遅延作業中の担当者のその主要手続の手続名の未着手メッセージまたは遅延作業中メッセージを出力するから、後続の主要手続の手続名を担当する担当者が前の主要手続の手続名を担当する担当者に主要手続の手続名に対する処理の未着手または遅延作業中を指摘し、前の担当者に対して主要手続の手続名の処理の迅速化を促すことで、前の担当者の主要手続の手続名の未着手または遅延作業中による後続の主要手続の手続名の遅延を防ぐことができ、その結果、手続全体の処理の促進を図ることができる。   The settlement-of-business promotion system 10A, 10B is not limited to the person who has not yet started the procedure name of the main procedure or the person in charge of the delayed procedure. For the person in charge of the procedure name, the message for the procedure name of the main procedure of the person who has not yet started or delayed the procedure for the main procedure is output. The person in charge of the procedure name of the main procedure points out to the person in charge of the procedure name of the previous main procedure that processing of the procedure name of the main procedure has not been started or is being delayed, and By accelerating the processing of the procedure name of the procedure, it is possible to prevent the delay of the procedure name of the subsequent main procedure due to the start of the procedure name of the main procedure of the previous person in charge or during the delay work, The processing of the whole procedure Advances can be achieved.

決算業務促進システム10A,10Bは、主要手続の手続名の作業中の担当者のみならず、主要手続の手続名を作業中の担当者の後に後続の主要手続の手続名を担当する直近の担当者に対し、主要手続の手続名を作業中の担当者のその主要手続の手続名の作業中メッセージを出力するから、後続の主要手続の手続名を担当する担当者が前の主要手続の手続名を担当する担当者の処理の進捗データを把握することで、後続の主要手続の手続名の担当者が処理の準備をすることができ、その結果、手続全体の処理の促進を図ることができる。   The settlement business promotion system 10A, 10B is not only the person in charge of the procedure name of the main procedure, but also the person in charge of the procedure name of the subsequent main procedure after the person in charge of the procedure name of the main procedure. The person in charge of the procedure name of the main procedure is output to the person in charge of the procedure name of the main procedure. By grasping the processing progress data of the person in charge of the name, the person in charge of the procedure name of the subsequent main procedure can prepare for the processing, and as a result, the processing of the entire procedure can be promoted. it can.

図29は、作業一覧表の他の一例を示す図であり、図30は、作業一覧表の他の一例を示す図である。図29,30は、業務用コンピュータ12〜16のディスプレイ24に表示される作業一覧表を示す。業務用コンピュータ12〜16のディスプレイ24には、コンピュータ12〜16を介してシステム10A,10Bにログインした担当者が担当する作業項目のみの作業一覧表が表示される。業務用コンピュータ12〜16のディスプレイ24に表示された図4の初期画面において作業管理ボタン4.1を押し、図24の作業管理選択画面を表示させた後、作業一覧表ボタン24.2を押すと、データベース17から各担当者に対応する作業一覧表の各種データが転送され、図29の作業一覧表がコンピュータ12〜16のディスプレイ24に表示される。   FIG. 29 is a diagram illustrating another example of the work list, and FIG. 30 is a diagram illustrating another example of the work list. 29 and 30 show work lists displayed on the display 24 of the business computers 12-16. On the display 24 of the business computers 12-16, a work list of only the work items handled by the person in charge who has logged into the systems 10A, 10B via the computers 12-16 is displayed. On the initial screen of FIG. 4 displayed on the display 24 of the business computer 12-16, the work management button 4.1 is pressed to display the work management selection screen of FIG. 24, and then the work list button 24.2 is pressed. Then, various data of the work list corresponding to each person in charge are transferred from the database 17, and the work list of FIG. 29 is displayed on the display 24 of the computers 12-16.

図29の作業一覧表には、担当者表示エリア29.1、直前進捗状況表示エリア29.2、作業種類表示エリア29.3、連番表示エリア29.4、手続名表示エリア29.5、作業順番表示エリア29.6、作業項目表示エリア29.7、作業内容表示エリア29.8、作業進捗状況表示エリア29.9、作業予定日表示エリア29.10、作業完了日表示エリア29.11、工数見積表示エリア29.12、工数実測表示エリア29.13、CL(チェックリスト)ボタン29.14、伝達事項ボタン29.15、戻るボタン29.16、手続一覧表ボタン29.17、ログアウトボタン29.18が表示される。   29 includes a person-in-charge display area 29.1, a previous progress display area 29.2, a work type display area 29.3, a serial number display area 29.4, a procedure name display area 29.5, Work order display area 29.6, work item display area 29.7, work content display area 29.8, work progress status display area 29.9, scheduled work date display area 29.10, work completion date display area 29.11 , Man-hour estimation display area 29.12, man-hour measurement display area 29.13, CL (check list) button 29.14, transmission item button 29.15, return button 29.16, procedure list button 29.17, logout button 29.18 is displayed.

コンピュータ12〜16のデータ転送指令にしたがって、作業項目データ(作業種類、連番、手続名、作業順番、作業項目、作業内容)がデータベース17の作業項目ファイルから転送され、作業種類が作業種類表示エリア29.3に表示され、各作業項目に設定された連番(図示せず)が連番表示エリア29.4に表示され、その連番に対応する手続名(図示せず)が手続名表示エリア29.5に表示される。さらに、連番に対応する作業順番が作業順番表示エリア29.6に表示され、連番に対応する作業項目が作業項目表示エリア29.7に表示され、その作業項目の作業内容が作業内容表示エリア29.8に表示される(作業項目出力手段、作業内容出力手段)。連番に設定された担当者ID番号に基づいて担当者データ(担当者名)がデータベース17の作業項目ファイルから転送され、各作業項目毎の担当者データ(図示せず)が担当者表示エリア29.1に表示される(作業担当者出力手段)。   Work item data (work type, serial number, procedure name, work order, work item, work content) is transferred from the work item file in the database 17 according to the data transfer command of the computers 12 to 16, and the work type is displayed as the work type. The serial number (not shown) displayed in the area 29.3 and set for each work item is displayed in the serial number display area 29.4, and the procedure name (not shown) corresponding to the serial number is the procedure name. It is displayed in the display area 29.5. Further, the work order corresponding to the serial number is displayed in the work order display area 29.6, the work item corresponding to the serial number is displayed in the work item display area 29.7, and the work content of the work item is displayed as the work content display. Displayed in area 29.8 (work item output means, work content output means). The person-in-charge data (person-in-charge name) is transferred from the work item file in the database 17 based on the person-in-charge ID number set in the serial number, and the person-in-charge data (not shown) for each work item is displayed in the person-in-charge display area. 29.1 (worker output means).

連番と作業順番とに基づいて図29の作業項目表示エリア29.7に表示された作業項目の直前の作業項目を担当する担当者の作業進捗データが特定され、その作業進捗データがデータベース17の作業項目ファイルから転送され、直前の作業項目の作業進捗データが直前進捗状況表示エリア29.2に表示される(作業進捗データ出力手段)。直前進捗状況表示エリア29.2には、完了、遅延完了、遅延、未着手、作業中、遅延作業中のいずれかのメッセージが表示されるとともに、詳細タブが表示される。   Based on the serial number and the work order, the work progress data of the person in charge of the work item immediately before the work item displayed in the work item display area 29.7 in FIG. 29 is specified, and the work progress data is stored in the database 17. The work progress data of the previous work item is displayed in the previous progress status display area 29.2 (work progress data output means). In the immediately preceding progress display area 29.2, a message indicating completion, delay completion, delay, not yet started, working, or delayed work is displayed, and a detailed tab is displayed.

連番と作業順番とに基づいて各作業項目の作業進捗データ(作業進捗状況、作業完了日)が特定され、各作業項目の作業進捗データがデータベース17の作業項目ファイルから転送され、各作業項目の作業進捗データが作業進捗状況表示エリア29.9や作業完了日表示エリア29.11に表示される(作業進捗データ出力手段)。作業進捗状況表示エリア29.9には、各作業項目の現在の作業進捗状況である完了、遅延完了、遅延、未着手、作業中、遅延作業中のいずれかのメッセージが表示され、作業完了日表示エリア29.11には、作業項目が完了している場合に各作業項目の完了日(図示せず)が表示される。   The work progress data (work progress status, work completion date) of each work item is specified based on the serial number and the work order, and the work progress data of each work item is transferred from the work item file of the database 17 to each work item. Is displayed in the work progress status display area 29.9 and the work completion date display area 29.11 (work progress data output means). In the work progress status display area 29.9, a message indicating the current work progress status of each work item, completion, delayed completion, delay, not started, working, or delayed work is displayed. The display area 29.11 displays the completion date (not shown) of each work item when the work item is completed.

連番と作業順番とに基づいて各作業項目の作業完了予定期日が特定され、各作業項目の作業完了予定期日がデータベース17の作業項目ファイルから転送され、各作業項目の作業完了予定期日(図示せず)が作業予定日表示エリア29.10に表示される(作業完了予定期日出力手段)。連番と作業順番とに基づいて各作業項目の処理に要する処理見込時間(作業工数見積)が特定され、処理見込時間がデータベース17の作業項目ファイルから転送され、各作業項目の処理に要する処理見込時間が工数見積表示エリア29.12に表示される(作業処理見込時間出力手段)。連番と作業順番とに基づいて各作業項目の処理に要した処理実測時間が特定され、処理実測時間がデータベース17の作業項目ファイルから転送され、各作業項目の処理に要した処理実測時間が工数実測表示エリア29.13に表示される(作業処理実測時間出力手段)。図29の作業一覧表は、プリンタから出力することができる。   Based on the serial number and the work order, the scheduled work completion date of each work item is specified, the scheduled work completion date of each work item is transferred from the work item file in the database 17, and the scheduled work completion date of each work item (see FIG. (Not shown) is displayed in the scheduled work date display area 29.10 (work completion scheduled date output means). Processing expected time (work man-hour estimation) required for processing each work item based on the serial number and the work order is specified, and the expected processing time is transferred from the work item file in the database 17 and processing required for processing each work item. The expected time is displayed in the man-hour estimation display area 29.12 (work processing expected time output means). Based on the serial number and the work order, the actual process time required for processing each work item is specified, the actual process time is transferred from the work item file in the database 17, and the actual process time required for processing each work item is determined. It is displayed in the man-hour actual measurement display area 29.13 (work processing actual measurement time output means). The work list in FIG. 29 can be output from the printer.

直前進捗状況表示エリア29.2の詳細タブを押すと、図30の作業一覧表が表示される。図30の作業一覧表では、自己が担当する作業項目の作業一覧表の他に、その直前に処理を行う作業項目(主要手続)の担当者の作業一覧表が表示される。図30の作業項目には、担当者表示エリア30.1、直前担当者表示エリア30.2、作業種類表示エリア30.3、連番表示エリア30.4、手続名表示エリア30.5、作業順番表示エリア30.6、作業項目表示エリア30.7、作業内容表示エリア30.8、作業進捗状況表示エリア30.9、作業予定日表示エリア30.10、作業完了日表示エリア30.11、工数見積表示エリア30.12、工数実測表示エリア30.13、CL(チェックリスト)ボタン30.14、伝達事項ボタン30.15、戻るボタン30.16、手続一覧表ボタン30.17、ログアウトボタン30.18が表示される。戻るボタン30.16を押すと、図24の作業管理選択画面に戻る。   When the detail tab in the immediately preceding progress display area 29.2 is pressed, the work list shown in FIG. 30 is displayed. In the work list of FIG. 30, in addition to the work list of work items for which the user is responsible, the work list of the person in charge of the work item (main procedure) to be processed immediately before is displayed. The work items in FIG. 30 include a person-in-charge display area 30.1, a previous person-in-charge display area 30.2, a work type display area 30.3, a serial number display area 30.4, a procedure name display area 30.5, a work Order display area 30.6, work item display area 30.7, work content display area 30.8, work progress status display area 30.9, scheduled work date display area 30.10, work completion date display area 30.11. Effort estimate display area 30.12, Effort actual measurement display area 30.13, CL (check list) button 30.14, transmission item button 30.15, back button 30.16, procedure list button 30.17, logout button 30 .18 is displayed. When a return button 30.16 is pressed, the screen returns to the work management selection screen in FIG.

コンピュータ12〜16のデータ転送指令にしたがって、直前担当者の作業項目データ(作業種類、連番、手続名、作業順番、作業項目、作業内容)がデータベース17の作業項目ファイルから転送され、作業種類が作業種類表示エリア30.3に表示され、各作業項目に設定された連番(図示せず)が連番表示エリア30.4に表示され、その連番に対応する手続名(図示せず)が手続名表示エリア30.5に表示される。さらに、連番に対応する作業順番が作業順番表示エリア30.6に表示され、連番に対応する作業項目が作業項目表示エリア30.7に表示され、その作業項目の作業内容が作業内容表示エリア30.8に表示される(作業項目出力手段、作業内容出力手段)。連番に設定された担当者ID番号に基づいて直前担当者の担当者データ(担当者名)がデータベース17の作業項目ファイルから転送され、各作業項目毎の直前担当者の担当者データ(図示せず)が直前担当者表示エリア30.2に表示される(作業担当者出力手段)。   In accordance with the data transfer command of the computers 12 to 16, the work item data (work type, serial number, procedure name, work order, work item, work content) of the person in charge immediately before is transferred from the work item file of the database 17, and the work type. Is displayed in the work type display area 30.3, a serial number (not shown) set for each work item is displayed in the serial number display area 30.4, and a procedure name (not shown) corresponding to the serial number is displayed. ) Is displayed in the procedure name display area 30.5. Further, the work order corresponding to the serial number is displayed in the work order display area 30.6, the work item corresponding to the serial number is displayed in the work item display area 30.7, and the work content of the work item is displayed as the work content. Displayed in area 30.8 (work item output means, work content output means). The person-in-charge data (person-in-charge) of the immediately preceding person in charge is transferred from the work item file in the database 17 based on the person-in-charge ID number set in the serial number, and the person-in-charge data (see FIG. (Not shown) is displayed in the previous person-in-charge display area 30.2 (operation person output means).

連番と作業順番とに基づいて直前担当者の各作業項目の作業進捗データ(作業進捗状況、作業完了日)が特定され、各作業項目の作業進捗データがデータベース17の作業項目ファイルから転送され、直前担当者の各作業項目の作業進捗データが作業進捗状況表示エリア30.9や作業完了日表示エリア30.11に表示される(作業進捗データ出力手段)。作業進捗状況表示エリア30.9には、各作業項目の現在の作業進捗状況である完了、遅延完了、遅延、未着手、作業中、遅延作業中のいずれかのメッセージが表示され、作業完了日表示エリア30.11には、作業項目が完了している場合に各作業項目の完了日(図示せず)が表示される。   Based on the serial number and the work order, the work progress data (work progress status, work completion date) of each work item of the person in charge immediately before is specified, and the work progress data of each work item is transferred from the work item file of the database 17. The work progress data of each work item of the person in charge immediately before is displayed in the work progress display area 30.9 and the work completion date display area 30.11 (work progress data output means). In the work progress status display area 30.9, a message indicating the current work progress status of each work item, completion, delayed completion, delay, not started, working, or delayed work is displayed. The display area 30.11 displays the completion date (not shown) of each work item when the work item is completed.

連番と作業順番とに基づいて直前担当者の各作業項目の作業完了予定期日が特定され、各作業項目の作業完了予定期日がデータベース17の作業項目ファイルから転送され、直前担当者の各作業項目の作業完了予定期日(図示せず)が作業予定日表示エリア30.10に表示される(作業完了予定期日出力手段)。連番と作業順番とに基づいて直前担当者の各作業項目の処理に要する処理見込時間(作業工数見積)が特定され、処理見込時間がデータベース17の作業項目ファイルから転送され、直前担当者の各作業項目の処理に要する処理見込時間が工数見積表示エリア30.12に表示される(作業処理見込時間出力手段)。連番と作業順番とに基づいて直前担当者の各作業項目の処理に要した処理実測時間が特定され、処理実測時間がデータベース17の作業項目ファイルから転送され、直前担当者の各作業項目の処理に要した処理実測時間が工数実測表示エリア30.13に表示される(作業処理実測時間出力手段)。図30の作業一覧表は、プリンタから出力することができる。   Based on the serial number and the work order, the scheduled work completion date of each work item of the immediately preceding person in charge is specified, and the scheduled work completion date of each work item is transferred from the work item file in the database 17, so The scheduled work completion date (not shown) of the item is displayed in the scheduled work date display area 30.10 (work completion scheduled date output means). Based on the serial number and the work order, the expected processing time (work man-hour estimate) required for processing each work item of the immediately preceding person in charge is specified, and the expected processing time is transferred from the work item file in the database 17 and The expected processing time required for processing each work item is displayed in the man-hour estimation display area 30.12 (work processing expected time output means). Based on the serial number and the work order, the actual measurement time required for processing each work item of the previous person in charge is specified, the actual process time is transferred from the work item file in the database 17, and The process actual measurement time required for the process is displayed in the man-hour actual measurement display area 30.13 (work process actual measurement time output means). The work list in FIG. 30 can be output from a printer.

決算業務促進システム10A,10Bは、決算業務の各種複数の主要手続の手続名の処理に必要な作業項目をその処理順に順番付けた状態で各作業項目毎に出力し、作業項目を担当する担当者を各作業項目毎に出力するから、各作業項目の担当者の明確化を図ることができることはもちろん、各担当者が自己の処理すべき作業項目を事前に把握することで、それら作業項目の処理に対する計画を立てることができ、計画に従って作業項目を処理することで、決算業務をスケジュールどおりに進めることができる。   The settlement business promotion systems 10A and 10B output work items necessary for processing of procedure names of a plurality of main procedures of settlement business for each work item in order of processing order, and are in charge of the work items. Since the person is output for each work item, the person in charge of each work item can be clarified, as well as the work items that each person in charge understands in advance, It is possible to make a plan for the process, and to process the work items according to the plan, it is possible to proceed with the settlement work according to the schedule.

決算業務促進システム10A,10Bは、作業項目の作業完了予定期日を各作業項目毎に出力し、作業項目の作業進捗データを各作業項目毎に出力するから、各担当者が処理すべき作業項目の完了予定や現在の作業進捗状況を把握することができ、作業の処理計画を見直すことができるとともに、作業の遅れを取り戻すための計画を立てることができる。決算業務促進システム10A,10Bは、作業項目の処理に要する処理見込時間を各作業項目毎に出力し、作業項目の処理に要した処理実測時間を各作業項目毎に出力するから、担当者が各作業項目の処理に要する処理見込時間を把握することができ、作業項目の処理に対する計画を立てることができ、処理見込時間に従って作業項目を処理することで、作業項目の処理をスケジュールどおりに進めることができる。   Since the settlement work promotion systems 10A and 10B output the work completion scheduled due date of the work item for each work item and output the work progress data of the work item for each work item, the work items to be processed by each person in charge The completion schedule and the current work progress status can be grasped, the work processing plan can be reviewed, and a plan for recovering the work delay can be made. The settlement work promotion systems 10A and 10B output the estimated processing time required for processing the work item for each work item, and output the actual processing time required for processing the work item for each work item. It is possible to grasp the expected processing time required to process each work item, to make a plan for processing the work item, and to process the work item according to the schedule by processing the work item according to the expected processing time. be able to.

決算業務促進システム10A,10Bは、作業項目を遅延している担当者のみならず、作業項目を遅延している担当者の後に後続の作業項目を担当する直近の担当者に対し、作業項目を遅延している担当者のその作業の遅延メッセージを出力するから、後続の作業項目を担当する担当者が前の作業項目を担当する担当者に作業に対する処理の遅延を指摘し、前の担当者に対して作業の処理の迅速化を促すことで、前の担当者の作業項目の遅延による後続の作業項目の遅延を防ぐことができ、その結果、手続全体の処理の促進を図ることができる。   The settlement work promotion systems 10A and 10B provide work items not only to the person in charge of the work item but also to the person in charge of the next work item after the person in charge of the work item. A delay message for the work of the person in charge is output, so the person in charge of the subsequent work item points out the process delay for the work to the person in charge of the previous work item. By accelerating the processing of work, it is possible to prevent the delay of the subsequent work item due to the delay of the work item of the previous person in charge, and as a result, the processing of the entire procedure can be promoted. .

決算業務促進システム10A,10Bは、作業項目の未着手または遅延作業中の担当者のみならず、作業項目を未着手または遅延作業中の担当者の後に後続の作業項目を担当する直近の担当者に対し、作業項目を未着手または遅延作業中の担当者のその作業項目の未着手メッセージまたは遅延作業中メッセージを出力するから、後続の作業項目を担当する担当者が前の作業項目を担当する担当者に作業項目に対する処理の未着手または遅延作業中を指摘し、前の担当者に対して作業項目の処理の迅速化を促すことで、前の担当者の作業項目の未着手または遅延作業中による後続の作業項目の遅延を防ぐことができ、その結果、手続全体の処理の促進を図ることができる。   The financial settlement business promotion systems 10A and 10B are not only those who have not yet started work or delayed work, but also those who are in charge of subsequent work items after those who have not started work or have been late. In response, the person in charge of a work item that has not started work or is in delayed work outputs a message for that work item that has not been started or is in progress, so the person in charge of the subsequent work item is responsible for the previous work item. By notifying the person in charge that work on the work item has not been started or being delayed, and urging the previous person to expedite processing of the work item, the work item on the previous person has not been started or delayed. It is possible to prevent delay of subsequent work items due to the inside, and as a result, it is possible to promote the processing of the entire procedure.

決算業務促進システム10A,10Bは、作業項目の作業中の担当者のみならず、作業項目を作業中の担当者の後に後続の作業項目を担当する直近の担当者に対し、作業項目を作業中の担当者のその作業項目の作業中メッセージを出力するから、後続の作業項目を担当する担当者が前の作業項目を担当する担当者の処理の進捗データを把握することで、後続の作業項目の担当者が処理の準備をすることができ、その結果、手続全体の処理の促進を図ることができる。   The settlement work promotion systems 10A and 10B are working on work items not only for the person in charge of the work item but also for the person in charge of the subsequent work item after the person in charge of the work item. Since the in-progress message for the work item of the person in charge is output, the person in charge of the subsequent work item grasps the progress data of the process of the person in charge of the previous work item, so that the subsequent work item The person in charge can prepare for the processing, and as a result, the processing of the entire procedure can be promoted.

図31は、チェックリスト出力画面の一例を示す図であり、図32は、チェックリスト出力画面の他の一例を示す図である。図33は、チェックリスト出力画面の他の一例を示す図である。図32では、チェックリスト出力画面に資料詳細画面が表示され、図33では、チェックリスト出力画面に伝達事項入力画面が表示されている。図25〜図30の手続一覧表または作業一覧表においてCLボタンを押すと、そのCLボタンに対応する作業項目のチェックリストがディスプレイ23,24に表示される。   FIG. 31 is a diagram illustrating an example of a check list output screen, and FIG. 32 is a diagram illustrating another example of the check list output screen. FIG. 33 is a diagram illustrating another example of the checklist output screen. In FIG. 32, a material detail screen is displayed on the check list output screen, and in FIG. 33, a transmission item input screen is displayed on the check list output screen. When the CL button is pressed in the procedure list or the work list of FIGS. 25 to 30, a check list of work items corresponding to the CL button is displayed on the displays 23 and 24.

図31のチェックリスト出力画面には、連番表示エリア31.1、手続名表示エリア31.2、主要手続表示エリア31.3、注意事項ボタン31.4、伝達事項ボタン31.5、リスク作業ボタン31.6、作業注意事項有無表示エリア31.7、伝達事項有無表示エリア31.8、作業順番表示エリア31.9、リスク有無表示エリア31.10、作業項目表示エリア31.11、作業タイトル表示エリア31.12、作業内容表示エリア31.13、作業予定日表示エリア31.14、作業完了日表示エリア31.15、見積工数表示エリア31.16、実測工数表示エリア31.17、担当者名表示エリア31.18、進捗状況表示エリア31.19、作業開始ボタン31.20、作業完了ボタン31.21、保留ボタン31.22、資料名表示エリア31.23、成果物表示エリア31.24、仕訳タイプ表示エリア31.25、作業注意事項表示エリア31.26、作業管理ボタン31.27、手続一覧表ボタン31.28、作業一覧表ボタン31.29、更新ボタン31.30、ログアウトボタン31.31が表示される。   The check list output screen of FIG. 31 includes a serial number display area 31.1, a procedure name display area 31.2, a main procedure display area 31.3, a caution item button 31.4, a transmission item button 31.5, a risk work Button 31.6, work precautions presence / absence display area 31.7, transmission items presence / absence display area 31.8, work order display area 31.9, risk presence / absence display area 31.10, work item display area 31.11, work title Display area 31.12, work content display area 31.13, scheduled work date display area 31.14, work completion date display area 31.15, estimated man-hour display area 31.16, measured man-hour display area 31.17, person in charge Name display area 31.18, progress display area 31.19, work start button 31.20, work completion button 31.21, hold button 31.22 Material name display area 31.23, deliverables display area 31.24, journal type display area 31.25, work precautions display area 31.26, work management button 31.27, procedure list button 31.28, work list A table button 31.29, an update button 31.30, and a logout button 31.31 are displayed.

コンピュータ11〜16のデータ転送指令にしたがって、作業概要データ(連番、主要手続、手続名)がデータベース17の主要手続ファイルから転送され、各主要手続の手続名に設定された連番が連番表示エリア31.1に表示され、その連番に対応する主要手続(図示せず)が主要手続表示エリア31.3に表示されるとともに、その主要手続に対応する手続名(図示せず)が手続名表示エリア31.2に表示される(主要手続出力手段)。作業項目データ(連番、作業順番、作業項目、作業内容)がデータベース17の作業項目ファイルから転送され、各作業項目に設定された連番が連番表示エリア31.1に表示され、連番に対応する作業順番が作業順番表示エリア31.9に表示されるとともに、連番に対応する作業項目が作業項目表示エリア31.11に表示され、その作業項目の作業内容が作業内容表示エリア31.13に表示される(作業項目出力手段、作業内容出力手段)。連番に設定された担当者ID番号に基づいて担当者データ(担当者名)がデータベース17の作業項目ファイルから転送され、各作業項目毎の担当者データ(図示せず)が担当者表示エリア31.18に表示される(作業担当者出力手段)。   In accordance with the data transfer command of the computers 11 to 16, the work summary data (serial number, main procedure, procedure name) is transferred from the main procedure file in the database 17, and the serial number set in the procedure name of each main procedure is serial number. The main procedure (not shown) displayed in the display area 31.1 and corresponding to the serial number is displayed in the main procedure display area 31.3, and the procedure name (not shown) corresponding to the main procedure is displayed. It is displayed in the procedure name display area 31.2 (main procedure output means). The work item data (serial number, work order, work item, work content) is transferred from the work item file in the database 17, and the serial number set for each work item is displayed in the serial number display area 31.1. Is displayed in the work order display area 31.9, work items corresponding to the serial numbers are displayed in the work item display area 31.11, and the work contents of the work items are displayed in the work content display area 31. .13 (work item output means, work content output means). The person-in-charge data (person-in-charge name) is transferred from the work item file in the database 17 based on the person-in-charge ID number set in the serial number, and the person-in-charge data (not shown) for each work item is displayed in the person-in-charge display area. 31.18 (worker output means).

作業進捗データがすでに作業項目ファイルに格納されている場合は、連番(主要手続識別子)と作業順番(作業項目識別子)とに基づいて各作業項目の作業進捗データ(作業進捗状況、作業完了日)が特定され、各作業項目の作業進捗データがデータベース17の作業項目ファイルから転送され、各作業項目の作業進捗データが作業進捗状況表示エリア31.19や作業完了日表示エリア31.15に表示される(作業進捗データ出力手段)。作業進捗状況表示エリア31.19には、各作業項目の現在の作業進捗状況である完了、遅延完了、遅延、未着手、作業中、遅延作業中のいずれかのメッセージが表示され、作業完了日表示エリア31.15には、作業項目が完了している場合に各作業項目の完了日(図示せず)が表示される。   If work progress data is already stored in the work item file, work progress data (work progress status, work completion date) for each work item based on the serial number (main procedure identifier) and work order (work item identifier) ) Is specified, the work progress data of each work item is transferred from the work item file of the database 17, and the work progress data of each work item is displayed in the work progress status display area 31.19 and the work completion date display area 31.15. (Work progress data output means). In the work progress status display area 31.19, a message indicating the current work progress status of each work item, completion, delayed completion, delay, not started, working, or delayed work is displayed. The display area 31.15 displays the completion date (not shown) of each work item when the work item is completed.

連番と作業順番とに基づいて各作業項目の作業完了予定期日が特定され、各作業項目の作業完了予定期日がデータベース17の作業項目ファイルから転送され、各作業項目の作業完了予定期日(図示せず)が作業予定日表示エリア31.14に表示される(作業完了予定期日出力手段)。連番と作業順番とに基づいて各作業項目の処理に要する処理見込時間(作業工数見積)が特定され、処理見込時間がデータベース17の作業項目ファイルから転送され、各作業項目の処理に要する処理見込時間が工数見積表示エリア31.16に表示される(作業処理見込時間出力手段)。連番と作業順番とに基づいて各作業項目の処理に要した処理実測時間(作業工数実績)が特定され、処理実測時間がデータベース17の作業項目ファイルから転送され、各作業項目の処理に要した処理実測時間が工数実測表示エリア31.17に表示される(作業処理実測時間出力手段)。   Based on the serial number and the work order, the scheduled work completion date of each work item is specified, the scheduled work completion date of each work item is transferred from the work item file in the database 17, and the scheduled work completion date of each work item (see FIG. (Not shown) is displayed in the scheduled work date display area 31.14 (scheduled work completion date output means). Processing expected time (work man-hour estimation) required for processing each work item based on the serial number and the work order is specified, and the expected processing time is transferred from the work item file in the database 17 and processing required for processing each work item. The expected time is displayed in the man-hour estimation display area 31.16 (work processing expected time output means). Based on the serial number and the work order, the processing actual measurement time (work man-hour results) required for processing each work item is specified, and the actual processing time is transferred from the work item file in the database 17 and is required for processing each work item. The measured process actual time is displayed in the man-hour actual measurement display area 31.17 (work process actual measurement time output means).

連番と作業順番とに基づいて各作業項目の作業注意事項有無が判断され、確認事項有無が確認事項有無表示エリア31.7に表示される。確認事項有りの場合は、確認事項有無表示エリア31.7に●が表示され、確認事項無しの場合は、確認事項有無表示エリア31.7になにも表示されない。連番と作業順番とに基づいて各作業項目の伝達事項有無が判断され、伝達事項有無が伝達事項有無表示エリア31.8に表示される(伝達事項有無情報出力手段、リスク作業伝達事項有無情報出力手段)。伝達事項有りの場合は、伝達事項有無表示エリア31.8に○または●が表示され、伝達事項無しの場合は、伝達事項有無表示エリア31.8になにも表示されない。なお、○は、未確認または未回答の場合の表示であり、●は、確認済みまたは回答済みの場合の表示である。   The presence / absence of work precautions for each work item is determined based on the serial number and the work order, and the presence / absence of confirmation items is displayed in the confirmation item presence / absence display area 31.7. When there is a confirmation item, ● is displayed in the confirmation item presence / absence display area 31.7, and when there is no confirmation item, nothing is displayed in the confirmation item presence / absence display area 31.7. Based on the serial number and the work order, the presence / absence of transmission items for each work item is determined, and the presence / absence of transmission items is displayed in the transmission item presence / absence display area 31.8 (transmission item presence / absence information output means, risk work transmission item presence / absence information Output means). When there is a transmission item, ○ or ● is displayed in the transmission item presence / absence display area 31.8, and when there is no transmission item, nothing is displayed in the transmission item presence / absence display area 31.8. In addition, (circle) is a display when it is unconfirmed or unanswered, and (circle) is a display when confirmed or answered.

連番と作業順番とに基づいて各作業項目のリスク有無が判断され、リスク有無がリスク有無表示エリア31.9に表示される。リスク有りの場合は、リスク有無表示エリア31.9に●が表示され、リスク無しの場合は、リスク有無表示エリア31.9になにも表示されない。主要手続の手続名(作業項目)の処理に必要な資料名が連番に基づいて特定され、その資料名(資料ID番号を含む)がデータベース17の主要手続ファイルから転送され、その資料名(図示せず)が資料名表示エリア31.23に表示される(資料データ出力手段)。   The presence or absence of risk for each work item is determined based on the serial number and the work order, and the presence or absence of risk is displayed in the risk presence / absence display area 31.9. When there is a risk, ● is displayed in the risk presence / absence display area 31.9, and when there is no risk, nothing is displayed in the risk presence / absence display area 31.9. The material name necessary for processing the procedure name (work item) of the main procedure is specified based on the serial number, the material name (including the material ID number) is transferred from the main procedure file of the database 17, and the material name ( (Not shown) is displayed in the material name display area 31.23 (material data output means).

主要手続の手続名によって作成される成果物が連番に基づいて特定され、その成果物がデータベース17の主要手続ファイルから転送され、その成果物(図示せず)が成果物表示エリア31.24に表示される(成果物出力手段)。さらに、主要手続の手続名によって計上される仕訳タイプが連番に基づいて特定され、その仕訳タイプがデータベース17の主要手続ファイルから転送され、その仕訳タイプ(図示せず)が仕訳タイプ表示エリア31.25に表示される(仕訳タイプ出力手段)。   The deliverable created by the procedure name of the main procedure is specified based on the serial number, the deliverable is transferred from the main procedure file of the database 17, and the deliverable (not shown) is the deliverable display area 31.24. Is displayed (product output means). Further, the journal type recorded by the procedure name of the main procedure is specified based on the serial number, the journal type is transferred from the main procedure file of the database 17, and the journal type (not shown) is entered in the journal type display area 31. .25 (journal type output means).

作業項目表示エリア31.11に表示された作業項目に作業注意事項がある場合、作業注意事項有無表示エリア31.7のチェックボックスに●が表示される。担当者が注意事項ボタン31.4を押すと、作業項目毎の作業注意事項(作業順番を含む)を表示した作業注意事項表示エリア31.26がチェックリスト出力画面に重ねて表示され(作業注意事項出力手段)、その注意事項の確認有無を確認するための確認有無情報が注意事項表示エリア31.26のチェックボックスに表示される(確認有無情報出力手段)。なお、チェックボックスにチェックマークが表示されていれば、確認事項の実施有りとなり、チェックボックスにチェックマークが表示されていなければ、確認事項の実施無しとなる。   When the work item displayed in the work item display area 31.11 has work precautions, ● is displayed in the check box of the work precaution presence / absence display area 31.7. When the person in charge presses the precautions button 31.4, a work precaution display area 31.26 displaying work precautions (including the work order) for each work item is displayed on the checklist output screen (work precautions). Item output means), confirmation presence / absence information for confirming the presence / absence of the precautions is displayed in a check box in the precaution display area 31.26 (confirmation presence / absence information output means). If a check mark is displayed in the check box, the confirmation item is executed. If no check mark is displayed in the check box, the confirmation item is not executed.

各作業担当者(管理者を含む)は、各作業項目の作業を行う場合、予定日を確認しつつ、作業開始ボタン31.20を押した後、実際の作業に取り掛かる。たとえば、作業順番1の提出依頼に取り掛かる場合、作業順番1に対応する作業開始ボタン31.20を押す。作業開始ボタン31.20を押すと、その日時(年月日、時分)が作業順番1の提出依頼の作業開示日時(作業開始期日)として認識され、その作業開示日時が連番(主要手続識別子)と作業順番(作業項目識別子)とに関連付けられた状態でデータベース17の作業項目ファイルに格納される(作業開始期日格納手段)。なお、その作業項目にリスクがある場合は、その日時(年月日、時分)がリスクを伴う作業項目の作業開始日時(リスク作業開始期日)として認識され、その作業開始日時が連番(主要手続識別子)と作業順番(作業項目識別子)とに関連付けられた状態でデータベース17の作業項目ファイルのリスクアドレスに格納される(リスク作業開始期日格納手段)。   When each work person (including the manager) performs the work of each work item, he / she starts the actual work after pressing the work start button 31.20 while confirming the scheduled date. For example, when a work order 1 submission request is started, the work start button 31.20 corresponding to the work order 1 is pressed. When the work start button 31.20 is pressed, the date / time (year / month / day, hour / minute) is recognized as the work disclosure date / time (work start date) of the submission request for work order 1, and the work disclosure date / time is a serial number (main procedure). (Identifier) and work order (work item identifier) are stored in the work item file of the database 17 (work start date storage means). If the work item has a risk, the date and time (year, month, day, hour and minute) is recognized as the work start date and time (risk work start date) of the risky work item, and the work start date and time is a serial number ( It is stored in the risk address of the work item file in the database 17 in a state associated with the main procedure identifier) and the work order (work item identifier) (risk work start date storage means).

主要手続の手続名の処理に必要なすべての作業項目の開始ボタンが押されると、その日時(年月日、時分)が主要手続の手続名の手続開示日時(手続開始期日)として認識され、その手続開示日時が連番(主要手続識別子)に関連付けられた状態でデータベース17の主要手続ファイルに格納される(手続開始期日格納手段)。   When the start button of all work items necessary for processing the procedure name of the main procedure is pressed, the date and time (year, month, hour, minute) is recognized as the procedure disclosure date (procedure start date) of the procedure name of the main procedure. The procedure disclosure date and time is stored in the main procedure file of the database 17 in a state associated with the serial number (main procedure identifier) (procedure start date storage means).

各担当者(管理者を含む)は、各作業項目の作業が終了した場合、作業完了ボタン31.21を押し、作業完了を確定する。たとえば、作業順番1の提出依頼の処理が終了した場合、作業順番1に対応する作業完了ボタン31.21を押す。作業完了ボタン31.21を押すと、その日時(年月日、時分)が作業順番1の提出依頼の作業完了日時(作業完了期日)として認識され、その作業完了日時が連番(主要手続識別子)と作業順番(作業項目識別子)とに関連付けられた状態でデータベース17の作業項目ファイルに格納される(作業完了期日格納手段)。なお、その作業項目にリスクがある場合は、その日時(年月日、時分)がリスクを伴う作業項目の作業完了日時(リスク作業完了期日)として認識され、その作業完了日時が連番(主要手続識別子)と作業順番(作業項目識別子)とに関連付けられた状態でデータベース17の作業項目ファイルのリスクアドレスに格納される(リスク作業完了期日格納手段)。また、その作業項目の作業進捗データ(完了、遅延完了、未着手、作業中、遅延作業中)が連番(主要手続識別子)と作業順番(作業項目識別子)とに関連付けられた状態でデータベース17の作業項目ファイルに格納され(作業進捗データ格納手段)、リスクを伴う作業項目のリスク作業進捗データ(完了、遅延完了、未着手、作業中、遅延作業中)が連番(主要手続識別子)と作業順番(作業項目識別子)とに関連付けられた状態でデータベース17の作業項目ファイルのリスクアドレスに格納される(リスク作業進捗データ格納手段)。   Each person in charge (including the administrator) presses the work completion button 31.21 to finalize the work when the work for each work item is completed. For example, when the process for submitting the work order 1 is completed, the work completion button 31.21 corresponding to the work order 1 is pressed. When the work completion button 31.21 is pressed, the date / time (year / month / day, hour / minute) is recognized as the work completion date / time (work completion date) of the submission request in the work order 1, and the work completion date / time is a serial number (main procedure). (Identifier) and work order (work item identifier) are stored in a work item file in the database 17 (work completion date storage means). If there is a risk in the work item, the date and time (year / month / day, hour / minute) is recognized as the work completion date / time (risk work completion date) of the work item with risk, and the work completion date / time is a serial number ( It is stored in the risk address of the work item file in the database 17 in a state associated with the main procedure identifier) and the work order (work item identifier) (risk work completion date storage means). Further, the database 17 in a state where the work progress data (completed, delayed completed, not started, working, delayed work) of the work item is associated with the serial number (main procedure identifier) and the work order (work item identifier). Are stored in the work item file (work progress data storage means), and the risk work progress data (completed, delayed completed, not started, working, delayed work) of work items with risks are serial numbers (main procedure identifiers) It is stored in the risk address of the work item file in the database 17 in a state associated with the work order (work item identifier) (risk work progress data storage means).

主要手続の手続名の処理に必要なすべての作業項目の完了ボタンが押されると、その日時(年月日、時分)が主要手続の手続名の手続完了日時(手続完了期日)として認識され、その手続完了日時が連番(主要手続識別子)に関連付けられた状態でデータベース17の主要手続ファイルに格納される(手続完了期日格納手段)。また、その作業項目に関連する主要手続の手続名の手続進捗データ(完了、遅延完了、未着手、作業中、遅延作業中)が連番(主要手続識別子)に関連付けられた状態でデータベース17の主要手続ファイルに格納される(手続進捗データ格納手段)。作業順番1の進捗状況表示エリア31.19には、完了メッセージが表示され、作業順番1の提出依頼の処理が終了したことがわかる。なお、主要手続の手続名の処理に要するすべての作業項目に対して作業完了日時が格納された場合、その主要手続の手続名の処理が終了したことになる。   When the completion button for all work items required for processing the procedure name of the main procedure is pressed, the date and time (date, time, and minute) is recognized as the procedure completion date and time (procedure completion date) of the procedure name of the main procedure. The procedure completion date and time is stored in the main procedure file of the database 17 in a state associated with the serial number (main procedure identifier) (procedure completion date storage means). In addition, the procedure progress data (completed, delayed completed, not started, working, delayed work) of the procedure name of the main procedure related to the work item is associated with the serial number (main procedure identifier) in the database 17. Stored in the main procedure file (procedure progress data storage means). In the progress status display area 31.19 of the work order 1, a completion message is displayed, and it can be seen that the processing of the submission request of the work order 1 has been completed. If the work completion date / time is stored for all work items required for processing the procedure name of the main procedure, the processing of the procedure name of the main procedure is completed.

作業注意事項表示エリア31.26のチェックボックスにチェックマークを入れ、または、チェックボックスにチェックマークを入れずに更新ボタン31.30を押すと、コンピュータ11〜16は、チェックマークによって作業項目(リスクを伴う作業項目を含む)の注意事項の確認の有無を判断する(確認有無判断手段)。作業項目の注意事項の確認有無情報(確認有り、確認無し)(作業項目にリスクがある場合の確認事項の実施有無情報を含む)に連番(主要手続識別子)と作業順番(作業項目識別子)とが設定され、確認有無情報(格納日時を含む)が連番(主要手続識別子)と作業順番(作業項目識別子)とに関連付けられた状態でデータベース17の作業項目ファイルの作業注意事項アドレスに格納される(確認有無情報格納手段)。   When a check mark is put in the check box in the work precaution display area 31.26, or when the update button 31.30 is pushed without putting a check mark in the check box, the computers 11 to 16 are changed to the work item (risk risk). (Including work items accompanied with) is determined (confirmation means). Confirmation information on work item precautions (confirmed, unconfirmed) (including information on presence / absence of confirmation items when there is a risk in the work item) and serial number (main procedure identifier) and work order (work item identifier) Is set, and the confirmation presence / absence information (including the storage date / time) is stored in the work precaution address of the work item file in the database 17 in a state in which the serial number (main procedure identifier) and the work order (work item identifier) are associated with each other. (Confirmation presence / absence information storage means).

コンピュータ11〜16は、主要手続の手続名の手続完了予定期日を参照しつつ、その主要手続の手続名の手続完了期日(主要手続の手続名の処理に要するすべての作業項目に対する作業完了日時)が手続完了予定期日までに入力された場合、その主要手続の手続名に完了情報を設定する。完了情報が設定された主要手続の手続名の進捗状況には、完了メッセージが表示される。コンピュータ11〜16は、主要手続の手続名の手続完了予定期日を参照しつつ、その主要手続の手続名の手続完了期日が手続完了予定期日を越えて入力された場合、その主要手続の手続名に遅延完了情報を設定する。遅延完了情報が設定された主要手続の手続名の進捗状況には、遅延完了メッセージが表示される。   The computers 11-16 refer to the scheduled procedure completion date of the procedure name of the main procedure, and the procedure completion date of the procedure name of the main procedure (work completion date and time for all work items required for processing the procedure name of the main procedure) If is entered by the due date for completing the procedure, completion information is set in the procedure name of the main procedure. A completion message is displayed in the progress status of the procedure name of the main procedure for which completion information is set. The computers 11 to 16 refer to the scheduled procedure completion date of the procedure name of the main procedure, and if the procedure completion date of the procedure name of the main procedure is entered beyond the scheduled procedure completion date, the procedure name of the main procedure Set delay completion information in. A delay completion message is displayed in the progress status of the procedure name of the main procedure in which the delay completion information is set.

コンピュータ11〜16は、主要手続の手続名の手続完了予定期日を参照しつつ、その主要手続の手続名の手続開始期日(主要手続の手続名の処理に要するすべての作業項目に対する作業開始日時)が手続完了予定期日を越えても入力されない場合、その主要手続の手続名に遅延情報を設定する。遅延情報が設定された主要手続の手続名の進捗状況には、遅延メッセージが表示される。コンピュータ11〜16は、主要手続の手続名の手続完了予定期日を参照しつつ、その主要手続の手続名の手続開始期日が手続完了予定期日までに入力されない場合、その主要手続の手続名に未着手情報を設定する。未着手情報が設定された主要手続の手続名の進捗状況には、未着手メッセージが表示される。   The computers 11-16 refer to the scheduled procedure completion date of the procedure name of the main procedure, and the procedure start date of the procedure name of the main procedure (work start date and time for all work items required for processing the procedure name of the main procedure) If it is not entered even after the scheduled completion date of the procedure, delay information is set in the procedure name of the main procedure. A delay message is displayed in the progress status of the procedure name of the main procedure in which the delay information is set. When the computer 11-16 refers to the scheduled procedure completion date of the procedure name of the main procedure and the procedure start date of the procedure name of the main procedure is not entered by the scheduled procedure completion date, Set start information. An unstarted message is displayed in the progress status of the procedure name of the main procedure for which unstarted information is set.

コンピュータ11〜16は、主要手続の手続名の手続完了予定期日を参照しつつ、その主要手続の手続名の手続開始期日が手続完了予定期日までに入力された場合、その主要手続の手続名に作業中情報を設定する。作業中情報が設定された主要手続の手続名の進捗状況には、作業中メッセージが表示される。コンピュータ11〜16は、主要手続の手続名の手続完了予定期日を参照しつつ、その主要手続の手続名の手続開始期日が手続完了予定期日までに入力され、かつ、その主要手続の手続名の手続完了期日が手続完了予定期日を越えても入力されない場合、その主要手続の手続名に遅延作業中情報を設定する。遅延作業中情報が設定された主要手続の手続名の進捗状況には、遅延作業中メッセージが表示される。   The computer 11-16 refers to the scheduled procedure completion date of the procedure name of the main procedure, and if the procedure start date of the procedure name of the main procedure is entered by the scheduled procedure completion date, Set working information. A working message is displayed in the progress status of the procedure name of the main procedure for which working information is set. The computers 11 to 16 refer to the scheduled procedure completion date of the procedure name of the main procedure, input the procedure start date of the procedure name of the main procedure by the scheduled procedure completion date, and If the procedure completion date exceeds the scheduled procedure completion date and is not entered, information on late work is set in the procedure name of the main procedure. A delayed work in progress message is displayed in the progress status of the procedure name of the main procedure in which the delayed work in progress information is set.

コンピュータ11〜16は、作業項目(リスクを伴う作業項目を含む)の作業完了予定期日を参照しつつ、その作業項目の作業完了期日(作業項目の作業完了日時)が作業完了予定期日までに入力された場合、その作業項目に完了情報を設定する。作業項目(リスクを伴う作業項目を含む)を処理する際に必要な作業注意事項が存在する場合、コンピュータ11〜16は、作業項目の作業完了予定期日と確認有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日までに入力され、かつ、その作業項目の作業注意事項の確認有りが作業完了予定期日までに確認された場合、その作業項目に完了情報を設定する。完了情報が設定された作業項目の進捗状況には、完了メッセージが表示される。   The computers 11 to 16 input the work completion due date (work item work completion date and time) of the work item by the scheduled work completion date while referring to the work completion due date of the work item (including the work item with risk). If completed, complete information is set for the work item. When there are work precautions necessary for processing work items (including work items with risk), the computers 11 to 16 refer to the work completion scheduled date and confirmation information of the work item, When the work completion date of the work item is input by the scheduled work completion date and the confirmation of the work precautions for the work item is confirmed by the scheduled work completion date, completion information is set for the work item. A completion message is displayed in the progress status of the work item for which completion information is set.

作業項目(リスクを伴う作業項目を含む)を処理する際に必要な作業注意事項が存在するとともに、作業伝達事項が質問事項である場合、コンピュータ11〜16は、作業項目の作業完了予定期日と確認有無情報と回答有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日までに入力され、かつ、その作業項目の作業注意事項の確認有りが作業完了予定期日までに確認され、かつ、その作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日までに確認された場合、その作業項目に完了情報を設定する。完了情報が設定された作業項目の進捗状況には、完了メッセージが表示される。   When there are work precautions necessary for processing work items (including work items with risks) and the work communication items are questions, the computers 11 to 16 can determine the work completion scheduled date of the work item. The work completion date of the work item is entered by the scheduled work completion date while referring to the confirmation presence / absence information and the response presence / absence information, and the confirmation of the work precautions for the work item is confirmed by the scheduled work completion date. In addition, when it is confirmed that there is an answer to the question for the work item by the scheduled work completion date, completion information is set for the work item. A completion message is displayed in the progress status of the work item for which completion information is set.

コンピュータ11〜16は、作業項目(リスクを伴う作業項目を含む)の作業完了予定期日を参照しつつ、その作業項目の作業完了期日が作業完了予定期日を越えて入力された場合、その作業項目に遅延完了情報を設定する。作業項目(リスクを伴う作業項目を含む)を処理する際に必要な作業注意事項が存在する場合、コンピュータ11〜16は、作業項目の作業完了予定期日と確認有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日を越えて入力され、または、その作業項目の作業注意事項の確認有りが作業完了予定期日を越えて確認された場合、その作業項目に遅延完了情報を設定する。   When the computer 11-16 refers to the work completion scheduled date of the work item (including the work item with risk) and the work completion date of the work item is input beyond the scheduled work completion date, the work item Set delay completion information in. When there are work precautions necessary for processing work items (including work items with risk), the computers 11 to 16 refer to the work completion scheduled date and confirmation information of the work item, If the work completion date of a work item is entered beyond the planned work completion date, or if the work item's work precautions have been confirmed beyond the planned work completion date, delayed completion information will be added to the work item. Set.

作業項目(リスクを伴う作業項目を含む)を処理する際に必要な作業注意事項が存在するとともに、作業伝達事項が質問事項である場合、コンピュータ11〜16は、作業項目の作業完了予定期日と確認有無情報と回答有無情報とを参照しつつ、その作業項目の作業完了期日が作業完了予定期日を越えて入力され、または、その作業項目の作業注意事項の確認有りが作業完了予定期日を越えて確認され、または、その作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日を越えて確認された場合、その作業項目に遅延完了情報を設定する。遅延完了情報が設定された作業項目の進捗状況には、遅延完了メッセージが表示される。   When there are work precautions necessary for processing work items (including work items with risks) and the work communication items are questions, the computers 11 to 16 can determine the work completion scheduled date of the work item. The work completion date of the work item is entered beyond the scheduled completion date while referring to the confirmation presence information and the response presence information, or the confirmation of the work precautions for the work item exceeds the planned completion date If there is an answer to the question for the work item, and if it is confirmed that the work has been completed beyond the due date, the delayed completion information is set for the work item. A delay completion message is displayed in the progress status of the work item for which the delay completion information is set.

コンピュータ11〜16は、作業項目(リスクを伴う作業項目を含む)の作業完了予定期日を参照しつつ、その作業項目の作業開始期日が作業完了予定期日を越えても入力されない場合、その作業項目に遅延情報を設定する。遅延情報(リスクを伴う作業項目を含む)が設定された作業項目の進捗状況には、遅延メッセージが表示される。作業項目を処理する際に必要な作業注意事項が存在する場合、コンピュータ11〜16は、作業項目の作業完了予定期日と確認有無情報とを参照しつつ、その作業項目の作業開始期日が作業完了予定期日を越えても入力されず、または、その作業項目の注意事項の確認有りが作業完了予定期日を越えても確認されない場合、その作業項目に遅延情報を設定する。遅延情報が設定された作業項目の進捗状況には、遅延メッセージが表示される。   If the computers 11 to 16 refer to the work completion scheduled date of the work item (including the work item with risk) and the work start date of the work item exceeds the scheduled work completion date, the work item is not input. Set delay information in. A delay message is displayed in the progress status of the work item for which delay information (including a work item with risk) is set. When there are work precautions necessary for processing the work item, the computers 11 to 16 refer to the work completion scheduled date and confirmation information of the work item, and the work start date of the work item is completed. If it is not entered even if the scheduled date is exceeded, or if the confirmation of the precautions for the work item is not confirmed even if the scheduled work completion date is exceeded, delay information is set for the work item. A delay message is displayed in the progress status of the work item for which the delay information is set.

作業項目(リスクを伴う作業項目を含む)を処理する際に必要な作業注意事項が存在するとともに、作業伝達事項が質問事項である場合、コンピュータ11〜16は、作業項目の作業完了予定期日と確認有無情報と回答有無情報とを参照しつつ、その作業項目の作業開始期日が作業完了予定期日を越えても入力されず、または、その作業項目の作業注意事項の確認有りが作業完了予定期日を越えても確認されず、または、その作業項目の質問事項に対する回答事項の回答有りが作業完了予定期日を越えても確認されない場合、その作業項目に遅延情報を設定する。遅延情報が設定された作業項目の進捗状況には、遅延メッセージが表示される。   When there are work precautions necessary for processing work items (including work items with risks) and the work communication items are questions, the computers 11 to 16 can determine the work completion scheduled date of the work item. Referring to the confirmation presence / absence information and the presence / absence information, even if the work start date of the work item exceeds the scheduled work completion date, it will not be entered, or the work precautions for that work item will be confirmed. If it is not confirmed even if it exceeds, or if there is an answer to the question for the work item and it is not confirmed even if the scheduled work completion date is exceeded, delay information is set for the work item. A delay message is displayed in the progress status of the work item for which the delay information is set.

コンピュータ11〜16は、作業項目(リスクを伴う作業項目を含む)の完了予定期日を参照しつつ、その作業項目の作業開始期日が作業完了予定期日までに入力されない場合、その作業項目に作業未着手情報を設定する。作業未着手情報が設定された作業項目の進捗状況には、作業未着手メッセージが表示される。コンピュータ11〜16は、作業項目(リスクを伴う作業項目を含む)の作業完了予定期日を参照しつつ、その作業項目の作業開始期日が作業完了予定期日までに入力された場合、その作業項目に作業中情報を設定する。作業中情報が設定された作業項目の進捗状況には、作業中メッセージが表示される。コンピュータ11〜16は、作業項目(リスクを伴う作業項目を含む)の作業完了予定期日を参照しつつ、その作業項目の作業開始期日が作業完了予定期日までに入力され、かつ、その作業項目の作業完了期日が作業完了予定期日を越えても入力されない場合、その作業項目に遅延作業中情報を設定する。遅延作業中情報が設定された作業項目の進捗状況には、遅延作業中メッセージが表示される。   The computers 11 to 16 refer to the scheduled completion date of a work item (including a risky work item), and if the work start date of the work item is not input by the scheduled work completion date, Set start information. A work not started message is displayed in the progress status of the work item for which work not started information is set. When the work start date of the work item is input by the scheduled work completion date while referring to the scheduled work completion date of the work item (including the work item with risk), the computers 11 to 16 Set working information. A work message is displayed in the progress status of the work item for which work information is set. The computers 11 to 16 refer to the scheduled work completion date of the work item (including the risky work item), and the work start date of the work item is input by the scheduled work completion date. If the work completion date exceeds the scheduled work completion date and is not entered, the delayed work in progress information is set in the work item. A delayed work in progress message is displayed in the progress status of the work item for which the delayed work in progress information is set.

コンピュータ11〜16は、主要手続の手続名に完了情報を設定すると同時に、主要手続の手続名の処理に要するすべての作業項目に対する作業開始期日(開始日時)から作業完了期日(完了日時)までの時間(分)を計測し、主要手続の手続名の手続実測時間を求める。主要手続の手続名の手続実測時間(分)(格納日時を含む)は、連番連番(主要手続識別子)に関連付けられた状態でデータベース17の主要手続ファイルに格納される(手続処理実測時間格納手段)。また、コンピュータ11〜16は、作業項目に完了情報を設定すると同時に、各作業項目の作業開始期日(開始日時)から作業完了期日(完了日時)までの時間(分)を計測し、作業項目(リスクを伴う作業項目を含む)の作業実測時間を求める。作業項目の作業実測時間(分)(格納日時を含む)は、連番連番(主要手続識別子)と作業順番(作業項目識別子)とに関連付けられた状態でデータベース17の作業項目ファイルに格納される(作業処理実測時間格納手段、リスク作業処理実測時間格納手段)。   The computers 11 to 16 set completion information in the procedure name of the main procedure, and at the same time, from the work start date (start date) to the work completion date (completion date) for all work items required for processing the procedure name of the main procedure. Measure the time (minutes) and obtain the actual procedure time for the procedure name of the main procedure. The procedure actual measurement time (minutes) (including the storage date and time) of the procedure name of the main procedure is stored in the main procedure file of the database 17 in a state associated with the serial number (main procedure identifier) (procedure processing actual measurement time). Storage means). In addition, the computers 11 to 16 set the completion information for the work item, and at the same time, measure the time (minutes) from the work start date (start date / time) to the work completion date (completion date / time) of each work item. Work actual measurement time (including work items with risk). The actual work time (minutes) (including the storage date and time) of the work item is stored in the work item file of the database 17 in a state associated with the serial number (main procedure identifier) and the work order (work item identifier). (Work processing actual measurement time storage means, risk work processing actual measurement time storage means).

図31のチェックリスト出力画面の資料名表示エリア31.23において詳細タブを押すと、図32のチェックリスト出力画面がディスプレイ23,24に表示される。図32のチェックリスト出力画面には、図31のチェックリスト出力画面に重ねて資料詳細画面が表示される。資料詳細画面には、資料ID番号表示エリア32.1、資料名表示エリア32.2、主管部署表示エリア32.3、成果物表示エリア32.4、スプレッドシートエリア32.5、資料媒体表示エリア32.6、資料イメージ表示エリア32.7が表示される。   When the detailed tab is pressed in the material name display area 31.23 of the check list output screen of FIG. 31, the check list output screen of FIG. In the check list output screen of FIG. 32, a material detail screen is displayed so as to overlap the check list output screen of FIG. The material details screen includes a material ID number display area 32.1, a material name display area 32.2, a supervising department display area 32.3, a product display area 32.4, a spreadsheet area 32.5, and a material medium display area. 32.6, a document image display area 32.7 is displayed.

連番に基づいて各主要手続の手続名に対応する資料データが特定され、コンピュータ11〜16のデータ転送指令にしたがって、資料データがデータベース17の主要手続ファイルから転送される。資料ID番号(図示せず)が資料ID番号表示エリア32.1に表示され、資料名(図示せず)が資料名表示エリア32.2に表示され、主管部署(図示せず)が主管部署表示エリア32.3に表示される。成果物(○または×)(図示せず)が成果物表示エリア32.4に表示され、スプレッドシート(○または×)(図示せず)がスプレッドシートエリア32.5に表示され、資料媒体(図示せず)が資料媒体表示エリア32.6に表示されるとともに、資料イメージ(図示せず)が資料イメージ表示エリア32.7に表示される(資料データ出力手段)。管理者または担当者は、資料詳細画面を確認することで、主要手続の手続名や作業項目の処理に必要な資料の詳細を知ることができる。   The material data corresponding to the procedure name of each main procedure is specified based on the serial number, and the material data is transferred from the main procedure file of the database 17 in accordance with the data transfer command of the computers 11-16. The material ID number (not shown) is displayed in the material ID number display area 32.1, the material name (not shown) is displayed in the material name display area 32.2, and the supervising department (not shown) is the supervising department. It is displayed in the display area 32.3. The deliverable (◯ or ×) (not shown) is displayed in the deliverable display area 32.4, the spreadsheet (◯ or ×) (not shown) is displayed in the spreadsheet area 32.5, and the document medium ( (Not shown) is displayed in the material medium display area 32.6, and a material image (not shown) is displayed in the material image display area 32.7 (material data output means). The administrator or the person in charge can confirm the details of the material necessary for processing the procedure name and work item of the main procedure by checking the material detail screen.

図31のチェックリスト出力画面において伝達事項ボタン31.5を押すと、図33のチェックリスト出力画面がディスプレイ23,24に表示される。図33のチェックリスト出力画面には、図31のチェックリスト出力画面に重ねて伝達事項入力画面が表示される。伝達事項入力画面には、手続名(図示せず)が表示された手続名表示エリア33.1、作業順番入力エリア33.2、トピックス番号が表示されたトピックス番号表示エリア33.3、伝達区分入力エリア33.4、記入者入力エリア33.5、記入日入力エリア33.6、伝達内容入力エリア33.7、伝達状態入力エリア33.8、重要度入力エリア33.9、クリアボタン33.10、キャンセルボタン33.11が表示される。   When the transmission item button 31.5 is pressed on the check list output screen of FIG. 31, the check list output screen of FIG. 33 is displayed on the displays 23 and 24. In the check list output screen of FIG. 33, a transmission item input screen is displayed so as to overlap the check list output screen of FIG. The transmission item input screen has a procedure name display area 33.1 displaying a procedure name (not shown), a work order input area 33.2, a topic number display area 33.3 displaying a topic number, and a transmission category. Input area 33.4, Entry input area 33.5, Entry date input area 33.6, Transmission content input area 33.7, Transmission state input area 33.8, Importance input area 33.9, Clear button 33. 10. Cancel button 33.11 is displayed.

作業順番入力エリア33.2のプルダウンリストから作業順番を選択して作業順番入力エリア33.2に作業順番を入力し、伝達区分入力エリア33.4のプルダウンリストから伝達区分(注意、要望、質問、回答)を選択して伝達区分入力エリア33.4に伝達区分を入力し、記入者入力エリア33.5のプルダウンリストから記入者を選択して記入者入力エリア33.5に記入者を入力する。記入日入力エリア33.6に記入日を入力し、記入内容入力エリア33.7に記入内容を入力し、伝達状態入力エリア33.8のプルダウンリストから伝達状態(確認済み、回答済み、未確認、未回答)を選択して伝達状態入力エリア33.8に伝達状態を入力する。さらに、重要度入力エリア33.9のプルダウンリストから重要度を選択して重要度入力エリア33.9に重要度を入力する。   Select the work order from the pull-down list in the work order input area 33.2, enter the work order in the work order input area 33.2, and then select the transfer category (caution, request, question) from the pull-down list in the transfer category input area 33.4. , Answer) and input the transfer category in the transfer category input area 33.4, select the entrant from the pull-down list in the writer input area 33.5, and enter the writer in the entrant input area 33.5 To do. Enter the entry date in the entry date input area 33.6, enter the entry contents in the entry content input area 33.7, and transmit status (confirmed, answered, unconfirmed, (Unanswered) is selected and the transmission state is input in the transmission state input area 33.8. Further, the importance level is selected from the pull-down list in the importance level input area 33.9, and the importance level is input to the importance level input area 33.9.

それらを入力した後、更新ボタン33.12を押すと、図示はしていないが、伝達事項入力確認画面がディスプレイ23,24に表示される。伝達事項入力確認画面には、各データ33.2〜33.9が入力された入力エリアの他に、YESボタン、NOボタンが表示される。NOボタンを押すと、伝達データ(伝達区分、記入者、記入日、記入内容、伝達状態、重要度)の格納は行われず、図31のチェックリスト出力画面に戻る。   When the update button 33.12 is pressed after inputting them, a transmission item input confirmation screen is displayed on the displays 23 and 24, although not shown. In addition to the input area where each data 33.2 to 33.9 is input, a YES button and a NO button are displayed on the transmission item input confirmation screen. When the NO button is pressed, transmission data (transmission category, entry person, entry date, entry contents, transmission state, importance) is not stored, and the screen returns to the check list output screen of FIG.

伝達事項入力確認画面において、YESボタンを押すと、伝達データ(リスクを伴う作業項目の作業伝達事項データを含む)に作業順番(作業項目識別子)と連番(主要手続および手続名を特定するための連番表示エリアに表示された連番:主要手続識別子)とが設定されるとともに(伝達事項が質問事項である場合、その伝達事項を質問事項と判断するためのアドレス情報(質問事項識別子)が設定される)、伝達データがデータベース17に転送され、伝達データ(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルの作業伝達事項アドレスに格納される(作業伝達事項格納手段、リスク作業伝達事項格納手段)。   When the YES button is pressed on the transmission item input confirmation screen, the work order (work item identifier) and serial number (main procedure and procedure name are specified) in the transmission data (including work transmission item data of work items with risks). (Serial number displayed in the serial number display area: main procedure identifier) is set (if the item to be transmitted is a question, address information for determining the item to be transmitted as a question (question item identifier)) Transfer data is transferred to the database 17, and the transfer data (including the storage date and time) is stored in the work transfer item address of the work item file in the database 17 in a state in which the transfer data is associated with the serial number and the work order. (Work transmission item storage means, risk work transmission item storage means).

コンピュータ11〜16は、伝達状態データ(確認済み、未確認、回答済み、未回答)(リスクを伴う作業項目の伝達状態データを含む)によって質問事項に対する回答事項の有無を判断する(回答事項有無判断手段、リスク作業回答事項有無判断手段)。回答データ(回答事項)(リスクを伴う作業項目の回答データを含む)に作業順番(作業項目識別子)と連番(主要手続識別子)とが設定されるとともに、回答データがデータベース17に転送され、回答データ(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルの作業伝達事項アドレスに格納される(回答事項格納手段、リスク作業回答事項格納手段)。   The computers 11 to 16 determine the presence / absence of an answer to the question based on the transmission status data (confirmed, unconfirmed, answered, unanswered) (including the transmission status data of the work item with risk). Means, means for judging whether there is a risk work answer item). The work order (work item identifier) and serial number (main procedure identifier) are set in the reply data (answer items) (including work item reply data with risk), and the reply data is transferred to the database 17, The response data (including the storage date and time) is stored in the work transmission item address of the work item file in the database 17 in a state where the response data is associated with the serial number and the work order (answer item storage means, risk work answer item storage means).

伝達状態データ(確認済み、未確認、回答済み、未回答)(リスクを伴う作業項目の伝達状態データを含む)に作業順番(作業項目識別子)と連番(主要手続識別子)とが設定されるとともに、伝達状態データがデータベース17に転送され、伝達状態データ(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベース17の作業項目ファイルの作業伝達事項アドレスに格納される(作業伝達事項格納手段、リスク作業伝達事項格納手段)。また、伝達事項重要度データ(作業伝達事項のランク付けされた重要度)(リスクを伴う作業項目の作業伝達事項の重要度を含む)に作業順番(作業項目識別子)と連番(主要手続識別子)とが設定されるとともに、伝達事項重要度データがデータベース17に転送され、伝達事項重要度データ(格納日時を含む)が連番と作業順番とに関連付けられた状態でデータベースの作業項目ファイルの作業伝達事項アドレスに格納される(作業伝達事項重要度格納手段、リスク作業伝達事項重要度格納手段)。   The work order (work item identifier) and serial number (main procedure identifier) are set in the communication status data (confirmed, unconfirmed, answered, unanswered) (including the communication status data of work items with risk) The transfer state data is transferred to the database 17, and the transfer state data (including the storage date and time) is stored in the work transfer item address of the work item file in the database 17 in a state associated with the serial number and the work order (work). Communication item storage means, risk work transmission item storage means). In addition, the work order (work item identifier) and serial number (main procedure identifier) are included in the communication item importance data (ranked importance of work communication items) (including the importance of work communication items for risky work items). ) Is transferred, the transmission item importance data is transferred to the database 17, and the transmission item importance data (including the storage date and time) is associated with the serial number and the work order in the database work item file. Stored in the work transmission item address (work transmission item importance storage means, risk work transmission item importance storage means).

図34は、伝達事項一覧表出力画面の一例を示す図である。図24の作業管理選択画面において伝達事項一覧表ボタン24.3を押すと、伝達事項一覧表出力画面がディスプレイ23,24に表示される。伝達事項一覧表示画面には、連番表示エリア34.14、手続名表示エリア34.15、作業順番表示エリア34.1、作業項目表示エリア34.2、トピックス番号表示エリア34.3、伝達区分表示エリア34.4、記入者表示エリア34.5、伝達内容表示エリア34.6、伝達日付表示エリア34.7、伝達状態表示エリア34.8、重要度表示エリア34.9、戻るボタン34.10、手続一覧表ボタン34.11、作業一覧表ボタン34.12、ログアウトボタン34.13が表示される。戻るボタン34.10を押すと、図24の作業管理選択画面に戻る。図34の伝達事項一覧表は、プリンタから出力することができる。   FIG. 34 is a diagram illustrating an example of a transmission item list output screen. When the transmission item list button 24.3 is pressed on the work management selection screen in FIG. 24, a transmission item list output screen is displayed on the displays 23 and 24. The transmission item list display screen includes a serial number display area 34.14, a procedure name display area 34.15, a work order display area 34.1, a work item display area 34.2, a topic number display area 34.3, and a transmission category. Display area 34.4, entry display area 34.5, transmission content display area 34.6, transmission date display area 34.7, transmission status display area 34.8, importance display area 34.9, return button 34. 10. A procedure list button 34.11, a work list button 34.12, and a logout button 34.13 are displayed. When the return button 34.10 is pressed, the screen returns to the work management selection screen shown in FIG. The transmission item list shown in FIG. 34 can be output from the printer.

連番と作業順番とに基づいて各作業項目に対応する伝達データが特定され、コンピュータ11〜16のデータ転送指令にしたがって、伝達データがデータベース17の作業項目ファイルの作業伝達事項アドレスから転送される。伝達事項一覧表示画面では、連番が連番表示エリア34.14に表示され、手続名が手続名表示エリア34.15に表示され、作業順番が作業順番表示エリア34.1に表示される。さらに、作業項目(図示せず)が作業項目表示エリア34.2に表示され、トピックス番号(図示せず)がトピックス番号表示エリア34.3に表示され、伝達区分(注意、要望、質問、回答)が伝達区分表示エリア34.4に表示される。記入者(図示せず)が記入者表示エリア34.5に表示され、伝達内容(図示せず)が伝達内容表示エリア34.6に表示され、伝達日付(図示せず)が伝達日付表示エリア34.7に表示される。伝達状態(確認済み、回答済み、未確認、未回答)が伝達状態表示エリア34.8に表示され、重要度が重要度表示エリア34.9に表示される(作業伝達事項出力手段、作業伝達事項重要度出力手段、回答有無情報出力手段、回答事項出力手段)。管理者および担当者は、伝達事項一覧表示画面を見ることで、各作業項目に対する伝達事項の内容や伝達区分、伝達状態、重要度を知ることができ、次回の決算業務の処理にそれらの伝達事項を採用かつ参照することで、決算業務の円滑な処理を行うことができる。   The transmission data corresponding to each work item is specified based on the serial number and the work order, and the transmission data is transferred from the work transmission item address of the work item file in the database 17 in accordance with the data transfer command of the computers 11 to 16. . On the transmission item list display screen, the serial number is displayed in the serial number display area 34.14, the procedure name is displayed in the procedure name display area 34.15, and the work order is displayed in the work order display area 34.1. Further, the work item (not shown) is displayed in the work item display area 34.2, the topic number (not shown) is displayed in the topic number display area 34.3, and the transmission category (attention, request, question, answer). ) Is displayed in the transmission category display area 34.4. The writer (not shown) is displayed in the writer display area 34.5, the transmission content (not shown) is displayed in the transmission content display area 34.6, and the transmission date (not shown) is displayed in the transmission date display area. Is displayed at 34.7. The transmission state (confirmed, answered, unconfirmed, unanswered) is displayed in the transmission state display area 34.8, and the importance is displayed in the importance display area 34.9 (work transmission item output means, work transmission item Importance level output means, answer presence / absence information output means, answer item output means). The administrator and the person in charge can see the contents of the items to be communicated for each work item, the category of communication, the state of communication, and the importance level by looking at the screen for displaying the list of items to be communicated. By adopting and referring to the matters, it is possible to smoothly process the settlement work.

図35は、リスク作業チェックリスト表示画面の一例を示す図であり、図36は、リスク作業チェックリスト表示画面の他の一例を示す図である。図37は、リスク作業チェックリスト表示画面の他の一例を示す図であり、図38は、リスク作業チェックリスト表示画面の他の一例を示す図である。図36では、リスク作業チェックリスト表示画面に重ねてリスク作業確認事項表示画面が表示され、図37では、リスク作業チェックリスト表示画面に重ねてコントロール事項表示画面が表示されている。図38では、リスク作業チェックリスト表示画面に重ねてリスク作業伝達事項表示画面が表示されている。図31のチェックリスト出力画面において、リスク作業ボタン31.6を押すと、図35のリスク作業チェックリスト表示画面がディスプレイ23,24に表示される。   FIG. 35 is a diagram illustrating an example of a risk work check list display screen, and FIG. 36 is a diagram illustrating another example of the risk work check list display screen. FIG. 37 is a diagram illustrating another example of the risk work check list display screen, and FIG. 38 is a diagram illustrating another example of the risk work check list display screen. 36, the risk work check item display screen is displayed over the risk work check list display screen, and in FIG. 37, the control item display screen is displayed over the risk work check list display screen. In FIG. 38, a risk work transmission item display screen is displayed over the risk work check list display screen. When the risk work button 31.6 is pressed on the check list output screen of FIG. 31, the risk work check list display screen of FIG. 35 is displayed on the displays 23 and 24.

リスク作業チェックリスト表示画面には、連番表示エリア35.1、手続名表示エリア35.2、主要手続表示エリア35.3、確認事項タブ35.4、コントロールタブ35.5、伝達事項タブ35.6、作業順番表示エリア35.7、財務報告リスク表示エリア35.8、アサーション表示エリア35.9、作業項目表示エリア35.10、作業タイトル表示エリア35.11、作業内容表示エリア35.12、予定日表示エリア35.13、完了日表示エリア35.14、見積工数表示エリア35.15、実測工数表示エリア35.16、担当者表示エリア35.17、進捗状況表示エリア35.18、戻るボタン35.19、手続一覧表ボタン35.20、作業一覧表ボタン35.21、ログアウトボタン35.22が表示される。戻るボタン35.19を押すと、図31のチェックリスト出力画面に戻る。図35のリスク作業チェックリストは、プリンタから出力することができる。   The risk work checklist display screen includes a serial number display area 35.1, a procedure name display area 35.2, a main procedure display area 35.3, a confirmation item tab 35.4, a control tab 35.5, and a transmission item tab 35. .6, work order display area 35.7, financial report risk display area 35.8, assertion display area 35.9, work item display area 35.10, work title display area 35.11, work content display area 35.12. , Scheduled date display area 35.13, completion date display area 35.14, estimated man-hour display area 35.15, measured man-hour display area 35.16, person-in-charge display area 35.17, progress status display area 35.18, return A button 35.19, a procedure list button 35.20, a work list button 35.21, and a logout button 35.22 are displayed. When the return button 35.19 is pressed, the screen returns to the check list output screen of FIG. The risk work check list in FIG. 35 can be output from a printer.

コンピュータ11〜16のデータ転送指令にしたがって、リスクを伴う作業の作業概要データ(連番、主要手続、手続名)がデータベース17の作業項目ファイルのリスクアドレスから転送される。リスク作業チェックリスト表示画面では、各主要手続に設定された連番(図示せず)が連番表示エリア35.1に表示され、その連番に対応する主要手続(図示せず)が主要手続表示エリア35.3に表示されるとともに、その主要手続に対応する手続名(図示せず)が手続名表示エリア35.2に表示される(リスク出力手段)。   In accordance with the data transfer command of the computers 11 to 16, the work summary data (serial number, main procedure, procedure name) of the work with risk is transferred from the risk address of the work item file in the database 17. On the risk work checklist display screen, the serial number (not shown) set for each main procedure is displayed in the serial number display area 35.1, and the main procedure (not shown) corresponding to the serial number is the main procedure. In addition to being displayed in the display area 35.3, a procedure name (not shown) corresponding to the main procedure is displayed in the procedure name display area 35.2 (risk output means).

連番と作業順番とに基づいてリスクを伴う作業の財務報告リスクデータが特定され、財務報告リスクデータがデータベースの作業項目ファイルのリスクアドレスから転送される。財務報告リスクデータが財務報告リスク表示エリア35.8に表示される(リスク出力手段)。連番と作業項番とに基づいてリスクを伴う作業の作業項目データ(作業項番、作業項目、作業タイトル、作業内容)が特定され、その作業項目データがデータベースの作業項目ファイルから転送される。各作業項目に設定された連番が連番表示エリア35.1に表示され、連番に対応する作業順番が作業順番表示エリア35.7に表示され、連番に対応する作業項目が作業項目表示エリア35.10に表示されるとともに、連番に対応する作業タイトルが作業タイトル表示エリア35.11に表示され、その作業項目の作業内容が作業内容表示エリア35.12に表示される(リスク作業内容出力手段)。   Based on the serial number and the work order, the financial report risk data of the work involving the risk is specified, and the financial report risk data is transferred from the risk address of the work item file of the database. Financial report risk data is displayed in the financial report risk display area 35.8 (risk output means). Work item data (work item number, work item, work title, work content) of work with risk is identified based on serial number and work item number, and the work item data is transferred from the work item file in the database . The serial number set for each work item is displayed in the serial number display area 35.1, the work order corresponding to the serial number is displayed in the work order display area 35.7, and the work item corresponding to the serial number is the work item. In addition to being displayed in the display area 35.10, the work title corresponding to the serial number is displayed in the work title display area 35.11, and the work content of the work item is displayed in the work content display area 35.12. Work content output means).

連番と作業順番とに基づいてリスクを伴う作業のアサーションデータが特定され、そのアサーションデータがデータベースの作業項目ファイルのリスクアドレスから転送される。各作業項目に設定されたアサーション(●)がアサーション表示エリア35.9に表示される(アサーション出力手段)。連番に設定された担当者ID番号に基づいて担当者データ(担当者名)が特定され、その担当者データがデータベース17の作業項目ファイルから転送される。各作業項目毎の担当者データ(図示せず)が担当者表示エリア35.17に表示される(リスク出力手段)。   Assertion data of work with risk is specified based on the serial number and work order, and the assertion data is transferred from the risk address of the work item file in the database. The assertion (●) set for each work item is displayed in the assertion display area 35.9 (assertion output means). Person-in-charge data (person-in-charge name) is specified based on the person-in-charge ID number set in the serial number, and the person-in-charge data is transferred from the work item file in the database 17. Person-in-charge data (not shown) for each work item is displayed in the person-in-charge display area 35.17 (risk output means).

リスクを伴う作業の作業進捗データがすでに作業項目ファイルに格納されている場合は、連番と作業順番とに基づいて各作業項目の作業進捗データ(作業進捗状況、作業完了日)が特定され、各作業項目の作業進捗データがデータベース17の作業項目ファイルから転送される。リスクを伴う作業の作業進捗データが作業完了日表示エリア35.14や作業進捗状況表示エリア35.18に表示される(リスク作業進捗データ出力手段)。作業進捗状況表示エリア35.18には、各作業項目の現在の作業進捗状況である完了、遅延完了、遅延、未着手、作業中、遅延作業中のいずれかのメッセージが表示され、作業完了日表示エリア35.14には、作業項目が完了している場合に各作業項目の完了日が表示される。   If work progress data for work with risks is already stored in the work item file, work progress data (work progress status, work completion date) for each work item is identified based on the serial number and work order, The work progress data of each work item is transferred from the work item file in the database 17. Work progress data of work with risk is displayed in work completion date display area 35.14 and work progress status display area 35.18 (risk work progress data output means). In the work progress status display area 35.18, a message indicating the current work progress status of each work item, completion, delay completion, delay, not yet started, working, or delayed work is displayed. The display area 35.14 displays the completion date of each work item when the work item is completed.

連番と作業順番とに基づいてリスクを伴う作業の作業完了予定期日が特定され、各作業項目の作業完了予定期日がデータベース17の作業項目ファイルから転送される。各作業項目の作業完了予定期日(図示せず)が作業予定日表示エリア35.13に表示される(リスク作業完了予定期日出力手段)。連番と作業順番とに基づいてリスクを伴う作業の処理に要する処理見込時間(作業工数見積)が特定され、処理見込時間がデータベース17の作業項目ファイルから転送され、各作業項目の処理に要する処理見込時間(図示せず)が工数見積表示エリア35.15に表示される(リスク作業処理見込時間出力手段)。連番と作業順番とに基づいてリスクを伴う作業の処理に要した処理実測時間(作業工数実績)が特定され、処理実測時間がデータベース17の作業項目ファイルから転送され、各作業項目の処理に要した処理実測時間が工数実測表示エリア35.16に表示される(リスク作業処理実測時間出力手段)。管理者または担当者は、図35のリスク作業チェックリストを確認することで、リスクを伴う作業のリスクの詳細を知ることができ、各リスクを回避しつつ、決算業務の円滑な処理を行うことができる。   Based on the serial number and the work order, the work completion scheduled date of the work with risk is specified, and the work completion scheduled date of each work item is transferred from the work item file in the database 17. The scheduled work completion date (not shown) of each work item is displayed in the scheduled work date display area 35.13 (risk work completion scheduled date output means). Based on the serial number and the work order, the expected processing time (estimated work man-hours) required for processing the risky work is specified, and the expected processing time is transferred from the work item file in the database 17 and required for processing each work item. Expected processing time (not shown) is displayed in the man-hour estimation display area 35.15 (risk work processing expected time output means). Based on the serial number and the work order, the process actual measurement time (work man-hour record) required for processing the work with risk is specified, and the process actual measurement time is transferred from the work item file in the database 17 to process each work item. The required process measurement time is displayed in the man-hour measurement display area 35.16 (risk work process measurement time output means). By checking the risk work checklist in FIG. 35, the administrator or the person in charge can know the details of the risk of work involving risks, and perform smooth processing of settlement operations while avoiding each risk. Can do.

リスクを伴う作業項目に確認事項がある場合、図35のリスク作業チェックリストにおいて確認事項タブ35.4を押すと、図36に示すように、リスクを伴う作業項目毎の確認事項(作業項番を含む)を表示したリスク作業確認事項表示画面が図35のリスク作業チェックリスト表示画面に重ねて表示される。図36のリスク作業確認事項表示画面には、リスク作業順番表示エリア36.1、リスク作業項目表示エリア36.2、リスク作業確認事項表示エリア36.3、チェックボックス36.4が表示される。   If there are confirmation items in the risky work item, pressing the confirmation item tab 35.4 in the risky work checklist in FIG. 35 will result in confirmation items (work item numbers) for each risky work item as shown in FIG. The risk work confirmation item display screen displaying “)” is displayed on the risk work check list display screen of FIG. In the risk work confirmation item display screen of FIG. 36, a risk work order display area 36.1, a risk work item display area 36.2, a risk work confirmation item display area 36.3, and a check box 36.4 are displayed.

連番と作業順番とに基づいてリスクを伴う作業の作業順番、作業項目が特定され、コンピュータ11〜16のデータ転送指令にしたがって、作業順番、作業項目がデータベース17の作業項目ファイルから転送される。リスクを伴う作業の作業順番、作業項目が作業順番表示エリア36.1、作業項目表示エリア36.2に表示される。さらに、連番と作業順番とに基づいてリスクを伴う作業のリスク作業注意事項が特定され、リスク作業注意事項がデータベース17の作業項目ファイルの作業注意事項アドレスから転送される。リスク作業注意事項がリスク作業注意事項表示エリア36.3に表示され(リスク作業注意事項出力手段)、リスク作業注意事項の確認の有無がチェックボックス36.4に表示される(確認有無情報出力手段)。なお、チェックボックス36.4にチェックマークが表示されていれば、リスク作業確認事項の実施有りとなり、チェックボックス36.4にチェックマークが表示されていなければ、リスク作業確認事項の実施無しとなる。   Based on the serial number and the work order, the work order and work items of the work with risk are specified, and the work order and work items are transferred from the work item file in the database 17 according to the data transfer command of the computers 11 to 16. . The work order and work items of the work with risk are displayed in the work order display area 36.1 and the work item display area 36.2. Furthermore, risky work precautions for work involving risks are specified based on the serial number and work order, and the risky work precautions are transferred from the work precaution address of the work item file in the database 17. Risk work precautions are displayed in the risk work precaution display area 36.3 (risk work precautions output means), and whether or not the risk work precautions are confirmed is displayed in the check box 36.4 (confirmation presence / absence information output means) ). If a check mark is displayed in the check box 36.4, the risk work confirmation item is executed. If no check mark is displayed in the check box 36.4, the risk work check item is not executed. .

図35のリスク作業チェックリスト表示画面においてコントロールタブ35.5を押すと、図37に示すように、リスクを伴う作業項目毎のリスクとそのリスクをコントロールする管理事項を表示したコントロール表示画面が図35のリスク作業チェックリスト表示画面に重ねて表示される。図37のコントロール表示画面には、リスク作業順番表示エリア37.1、リスク表示エリア37.2、コントロール作業順番表示エリア37.3、コントロール作業項目表示エリア37.4、コントロール内容表示エリア37.5が表示される。   When the control tab 35.5 is pressed on the risk work check list display screen of FIG. 35, a control display screen displaying the risk for each work item accompanied by a risk and management items for controlling the risk is shown in FIG. It is displayed on the screen of 35 risk work checklists. The control display screen of FIG. 37 includes a risk work order display area 37.1, a risk display area 37.2, a control work order display area 37.3, a control work item display area 37.4, and a control content display area 37.5. Is displayed.

連番と作業順番とに基づいてリスクを伴う作業のリスク作業順番、リスクが特定され、コンピュータ11〜16のデータ転送指令にしたがって、リスク作業順番、リスクがデータベース17の作業項目ファイルのリスクアドレスから転送される。リスクを伴う作業のリスク作業順番、リスク(図示せず)がリスク作業順番表示エリア37.1、リスク表示エリア37.2に表示される。連番と作業順番とに基づいてリスクを伴う作業のコントロールデータが特定され、コントロールデータがデータベース17の作業項目ファイルのリスクアドレスから転送される。コントロール作業順番がコントロール作業順番表示エリア37.3に表示され、コントロール作業項目がコントロール作業項目表示エリア37.4に表示され、コントロール内容(図示せず)がコントロール内容表示エリア37.5に表示される(リスク管理作業項目出力手段、リスク管理作業内容出力手段)。   Based on the serial number and the work order, the risk work order and the risk of the work involving the risk are specified, and the risk work order and the risk are determined from the risk address of the work item file in the database 17 according to the data transfer command of the computers 11 to 16. Transferred. The risk work order and risk (not shown) of work involving risks are displayed in the risk work order display area 37.1 and the risk display area 37.2. Based on the serial number and the work order, control data for work with risk is specified, and the control data is transferred from the risk address of the work item file in the database 17. The control work order is displayed in the control work order display area 37.3, the control work item is displayed in the control work item display area 37.4, and the control content (not shown) is displayed in the control content display area 37.5. (Risk management work item output means, risk management work content output means).

図35のリスク作業チェックリスト表示画面において伝達事項タブ35.6を押すと、図38に示すように、リスクを伴う作業項目の伝達事項を表示したリスク作業伝達事項表示画面が図35のリスク作業チェックリスト表示画面に重ねて表示される。図38のリスク作業伝達事項表示画面には、リスク作業順番表示エリア38.1、リスク作業項目表示エリア38.2、トピックス番号表示エリア38.3、伝達区分表示エリア38.4、記入者表示エリア38.5、伝達内容表示エリア38.6、伝達日付表示エリア38.7、伝達状態表示エリア38.8、重要度表示エリア38.9が表示される。   When the transmission item tab 35.6 is pressed on the risk work checklist display screen of FIG. 35, the risk work transmission item display screen displaying the transmission items of the work items with risks is displayed as shown in FIG. Overlaid on the checklist display screen. The risk work transmission item display screen of FIG. 38 includes a risk work order display area 38.1, a risk work item display area 38.2, a topic number display area 38.3, a transmission classification display area 38.4, and an writer display area. 38.5, a transmission content display area 38.6, a transmission date display area 38.7, a transmission state display area 38.8, and an importance display area 38.9 are displayed.

連番と作業順番とに基づいて各作業項目に対応するリスク作業伝達データが特定され、コンピュータ11〜16のデータ転送指令にしたがって、リスク作業伝達データがデータベース17の作業項目ファイルの作業伝達事項アドレスから転送される。リスク作業伝達事項表示画面では、リスク作業順番がリスク作業順番表示エリア38.1に表示され、リスク作業項目(図示せず)がリスク作業項目表示エリア38.2に表示され、伝達区分(注意、要望、質問、回答)が伝達区分表示エリア38.4に表示される。記入者(図示せず)が記入者表示エリア38.5に表示され、伝達内容(図示せず)が伝達内容表示エリア38.6に表示され、伝達日付(図示せず)が伝達日付表示エリア38.7に表示される。伝達状態(確認済み、回答済み、未確認、未回答)が伝達状態表示エリア38.8に表示され、重要度が重要度表示エリア38.9に表示される(リスク作業伝達事項出力手段、リスク作業伝達事項重要度出力手段、リスク作業回答有無情報出力手段、リスク作業回答事項出力手段)。管理者および担当者は、リスク作業伝達事項表示画面を見ることで、リスクを伴う作業項目に対する伝達事項の内容や重要度を知ることができ、次回の決算業務の処理にそれらの伝達事項を採用かつ参照することで、決算業務の円滑な処理を行うことができる。図38のリスク作業伝達事項は、プリンタから出力することができる。   The risk work transmission data corresponding to each work item is specified based on the serial number and the work order, and the risk work transmission data is the work transmission item address of the work item file in the database 17 in accordance with the data transfer command of the computers 11-16. Is transferred from. On the risk work transmission item display screen, the risk work order is displayed in the risk work order display area 38.1, the risk work item (not shown) is displayed in the risk work item display area 38.2, and the transmission category (caution, (Request, question, answer) is displayed in the transmission category display area 38.4. The writer (not shown) is displayed in the writer display area 38.5, the transmission content (not shown) is displayed in the transmission content display area 38.6, and the transmission date (not shown) is displayed in the transmission date display area. It is displayed at 38.7. The transmission status (confirmed, answered, unconfirmed, unanswered) is displayed in the transmission status display area 38.8, and the importance is displayed in the importance display area 38.9 (risk work transmission item output means, risk work Communication item importance output means, risk work answer presence / absence information output means, risk work answer item output means). Administrators and staff can see the contents and importance of communication items for risky work items by looking at the display screen of risk work communication items, and adopt those communication items for the next settlement process. In addition, by referring to it, it is possible to smoothly process the settlement work. The risk work transmission items in FIG. 38 can be output from the printer.

図39は、新旧対照表出力画面の一例を示す図である。図24の作業管理選択画面において新旧対照表ボタン24.4を押すと、新旧対照表表示画面がディスプレイ23,24に表示される。新旧対照表表示画面には、番号表示エリア39.1、連番表示エリア39.2、手続名表示エリア39.3、作業項目表示エリア39.4、作業項番表示エリア39.5、変更区分表示エリア39.6、変更箇所表示エリア39.7、比較対象決算期(新)表示エリア39.8、比較対象決算期(旧)表示エリア39.9、戻るボタン39.10、ログアウトボタン39.11が表示される。図39の新旧対照表は、プリンタから出力することができる。   FIG. 39 is a diagram showing an example of an old / new comparison table output screen. When the new / old contrast table button 24.4 is pressed on the work management selection screen shown in FIG. 24, an old / old contrast table display screen is displayed on the displays 23 and 24. The old and new comparison table display screen includes a number display area 39.1, a serial number display area 39.2, a procedure name display area 39.3, a work item display area 39.4, a work item number display area 39.5, and a change category. Display area 39.6, Change location display area 39.7, Comparison target closing period (new) display area 39.8, Comparison target closing period (old) display area 39.9, Back button 39.10, Logout button 39. 11 is displayed. The old and new comparison table of FIG. 39 can be output from the printer.

コンピュータ11〜16のデータ転送指令にしたがって、比較対象決算期(新)表示エリアの各データのうち、比較対象決算期(旧)表示エリアの各データから変更された部分がデータベース17の主要手続ファイルや作業項目ファイルから転送される。新旧対照表表示画面では、変更数を示す番号が番号表示エリア39.1に表示され、各主要手続の手続名に設定された連番が連番表示エリア39.2に表示され、連番に対応する手続名が手続名表示エリア39.3に表示されるとともに、連番に対応する作業項目が作業項目表示エリア39.4に表示され、連番につながる作業順番が作業順番表示エリア39.5に表示される。さらに、変更区分(修正、追加、一部削除)が変更区分表示エリア39.6に表示され、変更箇所が変更箇所表示エリア39.7に表示され、比較対象決算期(新)の変更されたデータが比較対象決算期(新)表示エリア39.8に表示されるとともに、比較対象決算期(新)の変更されたデータに対応する比較対象決算期(旧)データが比較対象決算期(旧)表示エリア39.9に表示される。管理者および担当者は、比較対象決算期(新)の変更されたデータを見ることで、変更された部分の内容を知ることができ、次回の決算業務の処理にそれらの変更部分を参照することで、決算業務の一層円滑な処理を行うことができる。   In accordance with the data transfer command of the computers 11 to 16, a part of each data in the comparative accounting period (new) display area that is changed from each data in the comparative accounting period (old) display area is the main procedure file of the database 17. Or work item files. On the old and new comparison table display screen, the number indicating the number of changes is displayed in the number display area 39.1, the serial number set for the procedure name of each main procedure is displayed in the serial number display area 39.2, The corresponding procedure name is displayed in the procedure name display area 39.3, the work item corresponding to the serial number is displayed in the work item display area 39.4, and the work order leading to the serial number is displayed in the work order display area 39.3. 5 is displayed. Furthermore, the change category (correction, addition, partial deletion) is displayed in the change category display area 39.6, the changed part is displayed in the changed part display area 39.7, and the comparative accounting period (new) is changed. The data is displayed in the comparative accounting period (new) display area 39.8, and the comparative accounting period (old) data corresponding to the changed data in the comparative accounting period (new) is compared with the comparative accounting period (old) ) Displayed in the display area 39.9. The administrator and the person in charge can know the contents of the changed part by looking at the changed data for the comparative accounting period (new), and refer to the changed part in the next accounting process. In this way, it is possible to perform smoother processing of settlement work.

10A 決算業務促進システム
10B 決算業務促進システム
11 管理用コンピュータ
12〜16 業務用コンピュータ
17 データベース
23 ディスプレイ
24 ディスプレイ
10A Settlement Business Promotion System 10B Settlement Business Promotion System 11 Management Computer 12-16 Business Computer 17 Database 23 Display 24 Display

Claims (18)

決算における決算業務を監視する管理者が使用する少なくとも1つの管理用コンピュータと、前記決算業務を担当する複数の担当者が使用する複数の業務用コンピュータと、それらコンピュータに前記決算業務に関する各種情報を提供するデータベースとから所定のネットワークを形成し、前記ネットワークを利用して前記決算業務を支援する決算業務支援システムにおいて、
前記管理用コンピュータが、前記決算業務の手続期間に処理を要する各種複数の主要手続を前記データベースに格納する主要手続格納手段と、前記主要手続の処理に必要な少なくとも1つの作業項目をその処理順に順番付けた状態で各主要手続毎に区分して前記データベースに格納する作業項目格納手段と、前記作業項目の作業内容を各作業項目毎に区分して前記データベースに格納する作業内容格納手段と、それら作業項目の担当者データを各作業項目毎に区分して前記データベースに格納する作業担当者格納手段とを実行し、
前記管理用コンピュータと前記業務用コンピュータとが、前記主要手続を出力する主要手続出力手段と、前記作業項目をその処理順に順番付けた状態で各主要手続毎に出力する作業項目出力手段と、前記作業項目の作業内容を各作業項目毎に出力する作業内容出力手段と、前記作業項目を担当する担当者データを各作業項目毎に出力する作業担当者出力手段とを実行することを特徴とする決算業務支援システム。
At least one management computer used by a manager who monitors the settlement business in the settlement, a plurality of business computers used by a plurality of personnel in charge of the settlement business, and various information relating to the settlement business on those computers In a settlement business support system that forms a predetermined network from a database to be provided and supports the settlement business using the network,
The management computer stores main procedure storage means for storing in the database a plurality of various main procedures that require processing during the procedure period of the settlement work, and at least one work item required for processing the main procedures in the processing order. Work item storage means for storing in the database separately for each main procedure in an ordered state; Work content storage means for storing the work contents of the work items for each work item and stored in the database; The person-in-charge data for those work items is stored for each work item and stored in the database.
The management computer and the business computer, main procedure output means for outputting the main procedure, work item output means for outputting each work procedure in a state in which the work items are ordered in the processing order, A work content output unit that outputs the work content of the work item for each work item, and a work person output unit that outputs data of a person in charge of the work item for each work item are executed. Financial settlement support system.
前記管理用コンピュータが、それら作業項目の作業完了予定期日を各作業項目毎に区分して前記データベースに格納する作業完了予定期日格納手段を実行し、前記管理用コンピュータと前記業務用コンピュータとが、前記作業項目の作業開始期日を各作業項目毎に区分して前記データベースに格納する作業開始期日格納手段と、前記作業項目の作業完了期日を各作業項目毎に区分して前記データベースに格納する作業完了期日格納手段と、前記作業項目の作業進捗データを各作業項目毎に区分して前記データベースに格納する作業進捗データ格納手段と、前記作業項目の作業進捗データを各作業項目毎に出力する作業進捗データ出力手段とを実行する請求項1記載の決算業務支援システム。   The management computer executes work completion scheduled date storage means for classifying the work completion scheduled dates of these work items for each work item and storing them in the database, and the management computer and the business computer include: Work start date storage means for classifying the work start date of the work item for each work item and storing it in the database; and work for classifying the work completion date of the work item for each work item and storing it in the database Completion date storage means, work progress data storage means for classifying work progress data of the work items for each work item and storing them in the database, and work for outputting work progress data of the work items for each work item The settlement business support system according to claim 1, wherein the progress data output means is executed. 前記管理用コンピュータが、前記主要手続を処理する際に必要な資料データを各主要手続毎に区分して前記データベースに格納する資料データ格納手段を実行し、前記管理用コンピュータと前記業務用コンピュータとが、前記主要手続の処理に必要な資料データを各主要手続毎に出力する資料データ出力手段を実行する請求項1または請求項2に記載の決算業務支援システム。   The management computer executes material data storage means for classifying material data required for processing the main procedure for each main procedure and storing the data in the database, the management computer, the business computer, The settlement business support system according to claim 1 or 2, wherein a material data output means for outputting material data necessary for processing of the main procedure is output for each main procedure. 前記管理用コンピュータが、前記作業項目を処理する際に必要な作業注意事項が存在する場合、その作業注意事項を各作業項目毎に区分して前記データベースに格納する作業注意事項格納手段を実行し、前記管理用コンピュータと前記業務用コンピュータとが、前記作業項目を処理する際の作業注意事項の確認有無を判断する確認有無判断手段と、前記作業項目を処理する際に必要な作業注意事項を各作業項目毎に出力する作業注意事項出力手段と、前記確認有無判断手段によって判断した前記作業注意事項の確認有無情報を該注意事項毎に出力する確認有無情報出力手段とを実行する請求項1ないし請求項3いずれかに記載の決算業務支援システム。   When the management computer has a work precaution necessary for processing the work item, the work computer stores a work precaution storage means for classifying the work precaution for each work item and storing it in the database. The management computer and the business computer include confirmation presence / absence judging means for judging whether or not to confirm the work precautions when processing the work item, and work precautions necessary for processing the work item. 2. A work instruction output means for outputting each work item, and a confirmation presence / absence information output means for outputting confirmation information on the work attention determined by the confirmation presence / absence determination means for each attention item. The settlement business support system according to claim 3. 前記管理用コンピュータが、前記主要手続によって作成される成果物を各主要手続毎に区分して前記データベースに格納する成果物格納手段と、前記主要手続によって計上される仕訳タイプを各主要手続毎に区分して前記データベースに格納する仕訳タイプ格納手段とを実行し、前記管理用コンピュータと前記業務用コンピュータとが、前記主要手続によって作成される成果物を各主要手続毎に出力する成果物出力手段と、前記主要手続によって計上される仕訳タイプを各主要手続毎に出力する仕訳タイプ出力手段とを実行する請求項1ないし請求項4いずれかに記載の決算業務支援システム。   The management computer classifies the product created by the main procedure for each main procedure and stores it in the database, and the journal type recorded by the main procedure for each main procedure. A journal output storage unit that executes the journal type storage unit that stores the data in the database in a divided manner, and the management computer and the business computer output a product generated by the main procedure for each main procedure. And a journal type output means for outputting the journal type recorded by the main procedure for each main procedure. 前記管理用コンピュータと前記業務用コンピュータとが、各作業項目に対応しつつそれら作業項目の処理に必要な場合にのみ記載される作業伝達事項を各作業項目毎に区分して前記データベースに格納する作業伝達事項格納手段と、それら作業項目に作業伝達事項が存在するか否かを確認可能な伝達事項有無情報を各作業項目毎に出力する伝達事項有無情報出力手段と、前記作業伝達事項を各作業項目毎に出力する作業伝達事項出力手段とを実行する請求項1ないし請求項5いずれかに記載の決算業務支援システム。   The management computer and the business computer store work communication items described only when necessary for processing the work items while corresponding to the work items for each work item in the database. Work transmission item storage means, transmission item presence / absence information output means for outputting, for each work item, transmission item presence / absence information capable of confirming whether or not there are work transmission items in the work items, and each of the work transmission items. 6. The settlement work support system according to claim 1, wherein a work transmission item output means for outputting each work item is executed. 前記管理用コンピュータと前記業務用コンピュータとが、前記作業伝達事項のランク付けされた重要度を各作業伝達事項毎に区分して前記データベースに格納する作業伝達事項重要度格納手段と、前記作業伝達事項の重要度を各作業伝達事項毎に出力する作業伝達事項重要度出力手段とを実行する請求項6記載の決算業務支援システム。   The management computer and the business computer classify the ranked importance of the work transfer items for each work transfer item and store them in the database, the work transfer item importance storage means, and the work transfer 7. The settlement work support system according to claim 6, wherein a work transmission item importance output means for outputting the importance of the item for each work transmission item is executed. 前記伝達事項には、それら作業項目の処理に必要な注意事項、それら作業項目の処理に必要な質問事項、前記質問事項に対する回答事項、それら作業項目の処理に必要な要望事項、それら伝達事項の記入者、それら伝達事項の記入日が含まれ、前記管理用コンピュータと前記業務用コンピュータとが、前記質問事項に対する前記回答事項を前記作業伝達事項毎に区分して前記データベースに格納する回答事項格納手段と、前記質問事項に対して所定の回答が存在するか否かを確認可能な回答有無情報を各作業伝達事項毎に出力する回答有無情報出力手段と、前記回答事項を各作業伝達事項毎に出力する回答事項出力手段とを実行する請求項6または請求項7に記載の決算業務支援システム。   The communication items include precautions necessary for the processing of these work items, questions necessary for the processing of these work items, answers to the above questions, requests required for the processing of these work items, Answer item storage that includes the date of entry of the person who filled out the items, and the management computer and the business computer store the answer items for the question items in the database by classifying the answer items for each work transfer item Means, answer presence / absence information output means for outputting, for each work transmission item, answer presence / absence information capable of confirming whether or not a predetermined answer exists for the question item, and the answer item for each work transmission item. The settlement work support system according to claim 6 or 7, wherein the answer matter output means for outputting the information is executed. 前記作業進捗データ出力手段では、前記作業項目の作業完了予定期日を参照しつつ、その作業項目の作業完了期日が前記作業完了予定期日までに入力された場合、その作業項目の完了メッセージを出力し、その作業項目の作業開始期日が前記作業完了予定期日を越えても入力されない場合、その作業項目の遅延メッセージを出力する請求項2ないし請求項8いずれかに記載の決算業務支援システム。   The work progress data output means outputs a completion message of the work item when the work completion date of the work item is input by the scheduled work completion date while referring to the work completion scheduled date of the work item. 9. The settlement work support system according to claim 2, wherein when the work start date of the work item exceeds the scheduled work completion date and is not inputted, a delay message for the work item is output. 前記進捗状況出力手段では、前記作業項目の作業完了予定期日と作業注意事項の確認有無情報とを参照しつつ、その作業項目の作業完了期日が前記作業完了予定期日までに入力され、かつ、その作業項目の作業注意事項の確認有りが前記作業完了予定期日までに確認された場合、その作業項目の完了メッセージを出力し、その作業項目の作業開始期日が前記作業完了予定期日を越えても入力されず、または、その作業項目の作業注意事項の確認有りが前記作業完了予定期日を越えても確認されない場合、その作業項目の遅延メッセージを出力する請求項4ないし請求項8いずれかに記載の決算業務支援システム。   In the progress output means, the work completion date of the work item is input by the work completion scheduled date while referring to the work completion scheduled date of the work item and the work presence / absence confirmation information. If confirmation of work precautions for a work item is confirmed by the scheduled work completion date, a completion message for that work item will be output and input even if the work start date for that work item exceeds the scheduled work completion date The delay message of the work item is output if the confirmation of work precautions for the work item is not confirmed even if the work completion scheduled date is exceeded. Financial settlement support system. 前記進捗状況出力手段では、前記作業項目の作業完了予定期日と作業注意事項の確認有無情報と回答有無情報とを参照しつつ、その作業項目の作業完了期日が前記作業完了予定期日までに入力され、かつ、その作業項目の作業注意事項の確認有りが前記作業完了予定期日までに確認され、かつ、その作業項目の質問事項に対する回答事項の回答有りが前記作業完了予定期日までに確認された場合、その作業項目の完了メッセージを出力し、その作業項目の作業開始期日が前記作業完了予定期日を越えても入力されず、または、その作業項目の作業注意事項の確認有りが前記作業完了予定期日を越えても確認されず、または、その作業項目の質問事項に対する回答事項の回答有りが前記作業完了予定期日を越えても確認されない場合、その作業項目の遅延メッセージを出力する請求項8記載の決算業務支援システム。   In the progress output means, the work completion due date of the work item is input by the work completion scheduled due date while referring to the work completion scheduled due date, the work presence notice confirmation presence / absence information, and the reply presence / absence information. In addition, the confirmation of the work precautions for the work item is confirmed by the scheduled date for completion of the work, and the answer to the questions for the work item is confirmed by the scheduled date for completion of the work. The completion message of the work item is output, and the work start date of the work item is not input even if it exceeds the scheduled work completion date, or there is confirmation of the work precautions for the work item. If it is not confirmed even if it exceeds, or if there is an answer to the question for the work item beyond the scheduled completion date, the work Financial service support system according to claim 8, wherein outputting the eyes of the delay message. 前記作業進捗データ出力手段では、自己が担当する作業項目を遅延している担当者に対してその作業項目の遅延メッセージを出力しつつ、前記作業項目を遅延している担当者の後に後続の作業項目を担当する担当者のうちの少なくとも直近の担当者に対し、前記作業項目を遅延している担当者のその作業項目の遅延メッセージを出力する請求項9ないし請求項11いずれかに記載の決算業務支援システム。   The work progress data output means outputs a delay message of the work item to a person who is delaying the work item that he is in charge of, and a subsequent work after the person who is delaying the work item. The settlement of accounts according to any one of claims 9 to 11, wherein a delay message of the work item of the person who has delayed the work item is output to at least the most recent person in charge of the item. Business support system. 前記作業進捗データ出力手段では、前記作業項目の完了予定期日を参照しつつ、その作業項目の作業完了期日が前記作業完了予定期日を越えて入力された場合、その作業項目の遅延完了メッセージを出力する請求項9または請求項12に記載の決算業務支援システム。   The work progress data output means outputs a delayed completion message of the work item when the work completion date of the work item is input beyond the scheduled work completion date while referring to the scheduled completion date of the work item. The settlement operation support system according to claim 9 or claim 12. 前記作業進捗データ出力手段では、前記作業項目の作業完了予定期日と作業注意事項の確認有無情報とを参照しつつ、その作業項目の作業完了期日が前記作業完了予定期日を越えて入力され、または、その作業項目の作業注意事項の確認有りが前記作業完了予定期日を越えて確認された場合、その作業項目の遅延完了メッセージを出力する請求項10または請求項12に記載の決算業務支援システム。   In the work progress data output means, the work completion date of the work item is input beyond the scheduled work completion date while referring to the work completion scheduled date of the work item and the work presence / absence confirmation information, or 13. The settlement work support system according to claim 10 or 12, wherein when the confirmation of work precautions for the work item is confirmed beyond the scheduled work completion date, a delayed completion message for the work item is output. 前記作業進捗データ出力手段では、前記作業項目の作業完了予定期日と作業注意事項の確認有無情報と回答有無情報とを参照しつつ、その作業項目の作業完了期日が前記作業完了予定期日を越えて入力され、または、その作業項目の作業注意事項の確認有りが前記作業完了予定期日を越えて確認され、または、その作業項目の質問事項に対する回答事項の回答有りが前記作業完了予定期日を越えて確認された場合、その作業項目の遅延完了メッセージを出力する請求項11または請求項12に記載の決算業務支援システム。   In the work progress data output means, the work completion date of the work item exceeds the scheduled work completion date while referring to the scheduled work completion date of the work item, the confirmation information on whether or not to confirm the work precautions, and the answer presence / absence information. Confirmed that the work precautions for the work item have been entered and confirmed beyond the scheduled date for completion of the work, or that the answer to the question for the work item has been answered exceeds the scheduled date for completion of the work. 13. The settlement work support system according to claim 11 or 12, wherein when confirmed, a delayed completion message for the work item is output. 前記作業進捗データ出力手段では、前記作業項目の作業完了予定期日を参照しつつ、その作業項目の作業開始期日が前記作業完了予定期日までに入力されない場合、その作業項目の作業未着手メッセージを出力し、その作業項目の作業開始期日が前記作業完了予定期日までに入力された場合、その作業項目の作業中メッセージを出力し、その作業項目の作業開始期日が前記作業完了予定期日までに入力され、かつ、その作業項目の作業完了期日が前記作業完了予定期日を越えても入力されない場合、その作業項目の遅延作業中メッセージを出力する請求項9ないし請求項15いずれかに記載の決算業務支援システム。   The work progress data output means outputs a work not yet started message of the work item when the work start date of the work item is not input by the scheduled work completion date while referring to the work completion scheduled date of the work item If the work start date of the work item is entered by the scheduled work completion date, a work in progress message for the work item is output, and the work start date of the work item is entered by the scheduled work completion date. 16. If the work completion date of the work item exceeds the scheduled work completion date, the settlement work support according to claim 9, wherein a delayed work in progress message is output for the work item. system. 前記作業進捗データ出力手段では、自己が担当する作業項目を未着手または遅延作業中の担当者に対してその作業項目の未着手メッセージまたは遅延作業中メッセージを出力しつつ、前記作業項目を未着手または遅延作業中の担当者の後に後続の作業項目を担当する担当者のうちの少なくとも直近の担当者に対し、前記作業項目を未着手または遅延作業中の担当者のその作業項目の未着手メッセージまたは遅延作業中メッセージを出力する請求項16記載の決算業務支援システム。   The work progress data output means outputs the unstarted message or delayed work in progress message of the work item to the person who has not started the work item in charge of the work progress or the delayed work, and has not started the work item. Or, for the person in charge of the subsequent work item after the person in charge of delayed work, at least the person in charge of the subsequent work item, the work item not yet started or the work item of the person in charge of the delayed work has not started 17. The settlement work support system according to claim 16, wherein a delayed work in progress message is output. 前記作業進捗データ出力手段では、自己が担当する作業項目を作業中の担当者に対してその作業項目の作業中メッセージを出力しつつ、前記作業項目を作業中の担当者の後に後続の主要手続を担当する担当者のうちの少なくとも直近の担当者に対し、前記作業項目を作業中の担当者のその作業項目の作業中メッセージを出力する請求項16または請求項17に記載の決算業務支援システム。   In the work progress data output means, a main procedure subsequent to the person in charge of the work item after the person in charge of the work item while outputting a work-in-progress message of the work item to the person in charge of the work item in charge of the work progress data output means 18. An account settlement operation support system according to claim 16 or 17, wherein a working message of the work item of the person in charge of the work item is output to at least a person in charge of the work in charge of the work item. .
JP2009245231A 2009-10-26 2009-10-26 Account settlement business support system Pending JP2011090607A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009245231A JP2011090607A (en) 2009-10-26 2009-10-26 Account settlement business support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009245231A JP2011090607A (en) 2009-10-26 2009-10-26 Account settlement business support system

Publications (1)

Publication Number Publication Date
JP2011090607A true JP2011090607A (en) 2011-05-06

Family

ID=44108780

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009245231A Pending JP2011090607A (en) 2009-10-26 2009-10-26 Account settlement business support system

Country Status (1)

Country Link
JP (1) JP2011090607A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09138823A (en) * 1995-09-11 1997-05-27 Hitachi Ltd Progress control method for design and development and its system, control method for designing and developing project and its system
JPH1131179A (en) * 1997-07-14 1999-02-02 Hitachi Ltd Method and device for managing inter-company transaction progress
JPH11296578A (en) * 1998-04-10 1999-10-29 Japan Digital Laboratory Co Ltd Accounting processor, transaction data input device, and regressive correcting method for error data
JP2007179399A (en) * 2005-12-28 2007-07-12 Nippon Digital Kenkyusho:Kk Progress management apparatus system, progress management apparatus and progress management program
WO2007132581A1 (en) * 2006-05-12 2007-11-22 Panasonic Corporation Workflow system, management method, program, and recording medium

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09138823A (en) * 1995-09-11 1997-05-27 Hitachi Ltd Progress control method for design and development and its system, control method for designing and developing project and its system
JPH1131179A (en) * 1997-07-14 1999-02-02 Hitachi Ltd Method and device for managing inter-company transaction progress
JPH11296578A (en) * 1998-04-10 1999-10-29 Japan Digital Laboratory Co Ltd Accounting processor, transaction data input device, and regressive correcting method for error data
JP2007179399A (en) * 2005-12-28 2007-07-12 Nippon Digital Kenkyusho:Kk Progress management apparatus system, progress management apparatus and progress management program
WO2007132581A1 (en) * 2006-05-12 2007-11-22 Panasonic Corporation Workflow system, management method, program, and recording medium

Similar Documents

Publication Publication Date Title
US20200117678A1 (en) Document management system
US8190462B2 (en) System and method for internet based procurement and administrative management of workers
US8706569B2 (en) Methods for managing contract procurement
JP2020509483A (en) Systems and interfaces for managing temporary workers
US11797918B2 (en) Method and system for resolving service requests
US20220245539A1 (en) Data processing systems and methods for customizing privacy training
US11416798B2 (en) Data processing systems and methods for providing training in a vendor procurement process
WO2010078446A1 (en) Computer-implemented method and system for posting journal entries to general ledger
US11488085B2 (en) Questionnaire response automation for compliance management
US11087260B2 (en) Data processing systems and methods for customizing privacy training
US20220043894A1 (en) Data processing and scanning systems for assessing vendor risk
KR101807762B1 (en) System and method for human network between employer and employee
US11100444B2 (en) Data processing systems and methods for providing training in a vendor procurement process
US9786004B2 (en) Obtaining missing documents from user
JP2009230380A (en) Support method and support system of maintenance procedure processing, and computer program for making computer execute support of maintenance procedure processing
US11416589B2 (en) Data processing and scanning systems for assessing vendor risk
US11301796B2 (en) Data processing systems and methods for customizing privacy training
JP2011090608A (en) Account settlement business support system
JP5586004B2 (en) Account settlement business promotion system
JP2011090607A (en) Account settlement business support system
JP2011123700A (en) Settlement service evaluation system
JP5135295B2 (en) Project personnel selection support management system and program
JP5578508B2 (en) Earnings data revision promotion system
US20210142239A1 (en) Data processing systems and methods for estimating vendor procurement timing
JP2023161862A (en) Electronic document managing device, electronic document managing method and electronic document managing program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20121017

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130912

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130917

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20140128