JPH08226244A - Foundation structure of two-story parking device - Google Patents

Foundation structure of two-story parking device

Info

Publication number
JPH08226244A
JPH08226244A JP3524395A JP3524395A JPH08226244A JP H08226244 A JPH08226244 A JP H08226244A JP 3524395 A JP3524395 A JP 3524395A JP 3524395 A JP3524395 A JP 3524395A JP H08226244 A JPH08226244 A JP H08226244A
Authority
JP
Japan
Prior art keywords
concrete
ground
bolt
base plate
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3524395A
Other languages
Japanese (ja)
Other versions
JP3126097B2 (en
Inventor
Nobuo Kamiya
伸雄 神谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aisan Industry Co Ltd
Original Assignee
Aisan Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aisan Industry Co Ltd filed Critical Aisan Industry Co Ltd
Priority to JP07035243A priority Critical patent/JP3126097B2/en
Publication of JPH08226244A publication Critical patent/JPH08226244A/en
Application granted granted Critical
Publication of JP3126097B2 publication Critical patent/JP3126097B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE: To reduce a construction cost required for foundation work while securing a required strength with regards to a foundation structure of a two- story parking device. CONSTITUTION: A concrete layer 21 having no reinforcing bars is installed on a ground G. A plurality of concrete short posts 23 buried in the ground, centering on the vicinity of each of bolt installation positions 29a, 29b and 29c equivalent to each anchor bolt of a base plate of a double stage parking device is connected to the concrete layer 21 on the upper end and laid out symmetrically, centering on the vicinity of teach bolt installation position while each vertical reinforcement 24 whose lower part is driven into the ground and each upper part of sloping reinforcements 25 are combined with the concrete short post. Anchor bolts, whose upper end is projected from the top of the concrete short post and inserted into each anchor bolt, are buried and fixedly installed at each bolt installation position which is the central part of each concrete short post.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、二段駐車装置のベース
プレートに形成された複数のアンカボルト孔に挿通され
て同ベースプレートを固定する複数のアンカボルトが、
ベースプレートのアンカボルト孔に挿通される上端部を
除き埋設固着された二段駐車装置の基礎構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention provides a plurality of anchor bolts which are inserted into a plurality of anchor bolt holes formed in a base plate of a two-stage parking device to fix the same.
The present invention relates to a basic structure of a two-stage parking device that is embedded and fixed except an upper end portion that is inserted into an anchor bolt hole of a base plate.

【0002】[0002]

【従来の技術】先ず、この種の基礎構造を介して地面上
に据え付けられる二段駐車装置の一例を図6及び図7に
より説明すれば、車両を搭載するパレット13は、ベー
スプレート10に立設した1対の支柱11により昇降可
能に案内支持されたアーム組立体12により支持され
て、モータ(図示省略)により昇降される。これによ
り、上昇したパレット13下側の空間にも別の車両を駐
車することができるようになっている。支柱11は、使
用状態では、カバー15により覆われている。
2. Description of the Related Art First, referring to FIGS. 6 and 7, an example of a two-tiered parking system installed on the ground through a foundation structure of this type will be described. A pallet 13 for mounting a vehicle is erected on a base plate 10. It is supported by an arm assembly 12 that is guided and supported so as to be able to move up and down by the pair of columns 11 and is moved up and down by a motor (not shown). As a result, another vehicle can be parked in the space below the raised pallet 13. The column 11 is covered with a cover 15 in a use state.

【0003】このような二段駐車装置は、基礎1のコン
クリート2に埋設固着した4本のアンカボルト6のコン
クリート2から上方に突出する上端部にベースプレート
10に形成した4個のアンカボルト孔14a,14b,
14cを挿通し、ナットにより締め付けることにより据
え付けられる。
In such a two-tiered parking system, four anchor bolt holes 14a are formed in the base plate 10 at the upper end portion of the four anchor bolts 6 fixedly embedded in the concrete 2 of the foundation 1 and protruding upward from the concrete 2. , 14b,
It is installed by inserting 14c and tightening it with a nut.

【0004】従来のこのような基礎1は、図8及び図9
に示すように、地面Gを所定深さまで掘り、割栗石を敷
いて突き固めて形成した砕石層4上に、アンカボルト6
の埋設深さよりも厚いコンクリート2を打つことにより
形成している。このコンクリート2は格子状に配置して
交差部を針金により結束した異形鉄筋3を厚さ方向中間
部に埋設して全面的に補強している。鉄筋3はアンカボ
ルト6を設ける各ボルト設置位置5a,5b,5cを避
けて配置し、この各位置にボルト埋設孔を形成してアン
カボルト6を埋設固定している。例えば図6に示すよう
に、コンクリート2の大きさは、幅がパレット13とほ
ゞ同じで長さがベースプレート10の幅よりやや大であ
るが、長さはパレット13とほゞ同じとしてもよい。な
おアンカボルト6としてはストライクアンカボルト及び
ケミカルアンカボルト(何れも詳細は後述)を使用し、
コンクリート2は必要により型枠を用いて施工する。
Such a conventional foundation 1 is shown in FIGS. 8 and 9.
As shown in, the ground bolt G is dug to a predetermined depth, and the anchor bolts 6 are placed on the crushed stone layer 4 formed by laying and crushing split stones.
It is formed by striking concrete 2 thicker than the burial depth. The concrete 2 has reinforcing bars 3 laid in a lattice shape and having crossed portions tied together with a wire, embedded in the middle portion in the thickness direction to reinforce the entire surface. The reinforcing bars 3 are arranged so as to avoid the bolt installation positions 5a, 5b, 5c where the anchor bolts 6 are provided, and bolt embedding holes are formed at these positions to anchor and fix the anchor bolts 6. For example, as shown in FIG. 6, the concrete 2 has a width approximately the same as the pallet 13 and a length slightly larger than the width of the base plate 10, but the length may be approximately the same as the pallet 13. . Strike anchor bolts and chemical anchor bolts (details will be described later) are used as the anchor bolts 6,
Concrete 2 is constructed by using a formwork if necessary.

【0005】[0005]

【発明が解決しようとする課題】上記従来技術の基礎
は、コンクリート全体をアンカボルトの埋設深さよりも
厚くして全面的に鉄筋3により補強しているので、補強
を設ける基礎工事面積が大きくなると共にコンクリート
及び補強鉄筋の量が多くなり、従って基礎工事に要する
コストが大になるという問題があった。本発明は必要な
強度を確保しながら補強を設ける基礎工事面積を少なく
して、基礎工事に要するコストを低下させることを目的
とする。
In the foundation of the prior art described above, the entire concrete is made thicker than the burial depth of the anchor bolts and entirely reinforced by the reinforcing bars 3, so that the area of foundation work for reinforcement becomes large. At the same time, there is a problem that the amount of concrete and reinforcing bars increases, and thus the cost required for foundation work increases. An object of the present invention is to reduce the cost required for foundation work by reducing the area of foundation work where reinforcement is provided while ensuring the required strength.

【0006】[0006]

【課題を解決するための手段】このために、本発明によ
る二段駐車装置の基礎構造は、二段駐車装置のベースプ
レートより広い範囲にわたり地面上に設けられて補強用
鉄筋を有しないコンクリート層と、ベースプレートの各
アンカボルト孔に対応する各ボルト設置位置付近を中心
として地面中に埋設され上端部がコンクリート層と連結
された複数のコンクリート短柱と、各ボルト設置位置付
近を中心としてほゞ対称的にかつほゞ垂直に配置され各
下部が地面中に打ち込まれると共にこの下部を除く各上
部がコンクリート短柱と一体的に結合された複数の垂直
鉄筋と、各ボルト設置位置付近を中心としてほゞ対称的
にかつ下方が広がる八字状に配置され各下部が地面中に
打ち込まれると共にこの下部を除く各上部がコンクリー
ト短柱と一体的に結合された複数の傾斜鉄筋と、各コン
クリート短柱の中心部となる各ボルト設置位置に埋設固
着されて上端部がコンクリート短柱の上面から突出する
複数のアンカボルトを備えたことを特徴とするものであ
る。
To this end, the basic structure of a two-tiered parking system according to the present invention comprises a concrete layer provided on the ground over a wider area than the base plate of the two-tiered parking system and having no reinforcing bars. , A plurality of concrete short columns that are buried in the ground centered around each bolt installation position corresponding to each anchor bolt hole of the base plate and the upper end is connected to the concrete layer, and approximately symmetrical about each bolt installation position Vertical bars, which are vertically arranged and are driven vertically into the ground, and the upper parts other than this lower part are integrally connected to the concrete short columns, and the vertical bars are centered around the bolt installation positions. 〞Symmetrically arranged in the shape of a figure that spreads downward, each lower part is driven into the ground and each upper part except this lower part is integrated with the concrete short column It is characterized by having a plurality of combined inclined rebars and a plurality of anchor bolts that are embedded and fixed at each bolt installation position that is the center of each concrete short column and whose upper end projects from the upper surface of the concrete short column. It is a thing.

【0007】[0007]

【作用】地面中に埋設されて上端部がコンクリート層と
連結されたコンクリート短柱の中心部には各アンカボル
トが埋設固着され、その上端部はコンクリート短柱の上
面から突出される。二段駐車装置のベースプレートは、
この上端部に各アンカボルト孔が挿通されて固定され
る。各コンクリート短柱は地面中に埋設されるだけでな
く、上部がそれぞれ各コンクリート短柱23に一体的に
結合された各複数の垂直鉄筋及び傾斜鉄筋は下部が地面
中に打ち込まれて地面に対する結合強度が補強されるの
で、各コンクリート短柱の地面に対する結合強度は充分
大となる。
The anchor bolts are embedded and fixed at the center of a concrete short column which is buried in the ground and whose upper end is connected to the concrete layer. The upper end of the anchor bolt is projected from the upper surface of the concrete short column. The base plate of the two-tiered parking system is
Each anchor bolt hole is inserted into and fixed to the upper end portion. Each concrete short pillar is not only buried in the ground, but also each upper part of each vertical bar and inclined reinforcing bar whose upper part is integrally connected to each concrete short bar 23 is lower part is driven into the ground and connected to the ground. Since the strength is reinforced, the bond strength of each concrete short column to the ground is sufficiently large.

【0008】[0008]

【実施例】以下に図1〜図5に示す実施例により本発明
による二段駐車装置の基礎構造の説明をする。本発明に
より据え付けられる二段駐車装置は、先に従来技術と関
連して述べた、図6及び図7に示すものと同じである。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The basic structure of the two-stage parking apparatus according to the present invention will be described below with reference to the embodiments shown in FIGS. The two-stage parking device installed according to the present invention is the same as that shown in FIGS. 6 and 7 described above in connection with the prior art.

【0009】図1及び図2に示すように、本実施例の基
礎20の構造は、従来よりも薄いコンクリート層21
と、後述するアンカボルト31,36を埋設固着する4
個のコンクリート短柱23よりなっている。コンクリー
ト層21はアンカボルト31,36の埋設深さよりも肉
厚が薄く補強用鉄筋を有しないものであり、二段駐車装
置のベースプレート10よりも広い範囲にわたって設け
られる。本実施例のコンクリート層21は、幅はパレッ
ト13の幅とほゞ同じで、長さはベースプレート10の
幅の約2倍としたが、幅はこれと同じで長さをパレット
13とほゞ同じとし、あるいは更に広い範囲にわたりコ
ンクリート層21を設けてもよい。このコンクリート層
21は砕石層22上に設けられる。
As shown in FIGS. 1 and 2, the structure of the foundation 20 according to the present embodiment has a concrete layer 21 thinner than the conventional one.
And anchoring anchor bolts 31 and 36 which will be described later by embedding 4
It consists of individual concrete short columns 23. The concrete layer 21 is thinner than the buried depth of the anchor bolts 31 and 36 and has no reinforcing reinforcing bar, and is provided over a wider area than the base plate 10 of the two-tiered parking system. The width of the concrete layer 21 of this embodiment is about the same as the width of the pallet 13 and the length thereof is about twice the width of the base plate 10. However, the width is the same as that of the pallet 13 and the length of the concrete layer 21 is about the same as that of the pallet 13. The concrete layer 21 may be provided over the same area or over a wider area. The concrete layer 21 is provided on the crushed stone layer 22.

【0010】各コンクリート短柱23は二段駐車装置の
ベースプレート10に設けた各アンカボルト孔14a,
14b,14c(図7参照)に対応する各ボルト設置位
置29a,29b,29c付近を中心として地面G中に
埋設されており、各上端部はコンクリート層21と連結
されている。各コンクリート短柱23は地面G中に埋設
される下部を太くした略円柱状で、それぞれ各4本の垂
直鉄筋24及び傾斜鉄筋25の上半部が一体的に埋設固
着されている。各垂直鉄筋24は、コンクリート短柱2
3の中心となる各ボルト設置位置29a,29b,29
c付近を中心としてほゞ対称的にかつほゞ垂直に配置さ
れ、コンクリート短柱23から突出する各下半部は地面
G中に打ち込まれている。各傾斜鉄筋25は、上端が各
垂直鉄筋24の上端に針金26により結束されて下方外
向きに延びる点を除き、垂直鉄筋24と同様、上半部が
コンクリート短柱23に一体的に結合され、コンクリー
ト短柱23から突出する各下半部は地面G中に打ち込ま
れている。各鉄筋24,25はコンクリート短柱23の
中心部を除く周辺部内にあり、またコンクリート短柱2
3から上方には突出していない。
Each short concrete column 23 is an anchor bolt hole 14a provided in the base plate 10 of the two-stage parking device,
The bolts are embedded in the ground G around the bolt installation positions 29a, 29b, 29c corresponding to 14b, 14c (see FIG. 7), and the upper ends of the bolts are connected to the concrete layer 21. Each of the concrete short columns 23 is a substantially columnar shape having a thick lower portion embedded in the ground G, and the upper half of each of the four vertical reinforcing bars 24 and the inclined reinforcing bars 25 is integrally embedded and fixed. Each vertical rebar 24 is a concrete short column 2
Each bolt installation position 29a, 29b, 29 which becomes the center of 3
The lower halves of the concrete short columns 23, which are arranged substantially symmetrically and vertically about c, and project from the concrete short columns 23, are driven into the ground G. Similar to the vertical reinforcing bar 24, the upper half of each inclined reinforcing bar 25 is integrally connected to the concrete short column 23 except that the upper end of the inclined reinforcing bar 25 is bound to the upper end of each vertical reinforcing bar 24 by a wire 26 and extends downward. The lower half parts protruding from the concrete short columns 23 are driven into the ground G. Reinforcing bars 24 and 25 are located in the peripheral part of the concrete short column 23 except the central part, and the concrete short column 2
It does not project upward from 3.

【0011】各コンクリート短柱23の中心部となる各
ボルト設置位置29a,29b,29cには、各1本の
アンカボルト31,36が埋設固着され、各上端部はコ
ンクリート短柱23の上面から突出している。ベースプ
レート10の各アンカボルト孔のうち中央に位置するア
ンカボルト孔14aに対応するコンクリート短柱23中
心のボルト設置位置29aには、位置決めの目的で引き
抜き強度が弱いストライクアンカボルト31が設置さ
れ、その他のアンカボルト孔14b,14cに対応する
コンクリート短柱23中心のボルト設置位置29b,2
9cには、引き抜き強度が強いケミカルアンカボルト3
6が設置される。
One anchor bolt 31, 36 is embedded and fixed at each bolt installation position 29a, 29b, 29c, which is the central portion of each concrete short column 23, and each upper end portion is from the upper surface of the concrete short column 23. It is protruding. A strike anchor bolt 31 having a weak pull-out strength is installed for the purpose of positioning at a bolt installation position 29a at the center of the concrete short column 23 corresponding to the anchor bolt hole 14a located at the center among the anchor bolt holes of the base plate 10. Bolt installation positions 29b, 2 at the center of the concrete short column 23 corresponding to the anchor bolt holes 14b, 14c of
9c is a chemical anchor bolt 3 with high pull-out strength.
6 is installed.

【0012】次に上記実施例の二段駐車装置の基礎構造
の具体的施工工程を、図1〜図5により説明する。先ず
地面Gを従来よりも浅い所定深さまで掘り、その底に割
栗石を敷き突き固めて砕石層22を形成する。この砕石
層22上に型枠を設け、その中にセメントと砂を配合し
骨材として砂利を加えて水で練ったコンクリートを流し
込み、硬化を待って型枠を外して、コンクリート層21
を形成する。コンクリート層21は比較的薄く60〜8
0mm程度であり、鉄筋を設けないので、この施工はきわ
めて簡単である。この状態ではコンクリート短柱23は
設けられていない。またコンクリート層21は厚さ60
mm以上の既設のコンクリート層があれば、それを利用し
てもよい。
Next, a concrete construction process of the basic structure of the two-tiered parking system of the above embodiment will be described with reference to FIGS. First, the ground G is dug to a predetermined depth shallower than the conventional one, and a crushed stone is laid on the bottom of the ground to crush and form a crushed stone layer 22. A mold is provided on the crushed stone layer 22, cement and sand are mixed therein, gravel is added as an aggregate, and concrete kneaded with water is poured into the crushed stone layer 22. After the hardening, the mold is removed, and the concrete layer 21
To form. The concrete layer 21 is relatively thin 60 to 8
This construction is extremely simple because it is about 0 mm and no reinforcing bars are provided. In this state, the concrete short columns 23 are not provided. The concrete layer 21 has a thickness of 60.
If there is an existing concrete layer of mm or more, it may be used.

【0013】次にアンカボルト孔14a,14b,14
cに合わせたテンプレートを用いて、チョークなどによ
りこのコンクリート層21上に4つのボルト設置位置2
9a,29b,29cをけがき、各設置位置を中心とし
てコンクリート短柱23のための4つの堀削孔27の上
部開口27aに相当する円をけがく。そして図3(a)に
示すように、はつり工具によりコンクリート層21に上
部開口27aを明け、小スコップにより砕石層22及び
地面Gを堀削して短柱形成孔27を形成し、底に左官砂
を敷き突き固めて砂層28を形成する。本実施例では、
短柱形成孔27の上部開口27aの直径は200mm、深
さはコンクリート層21表面から250mm、短柱形成孔
27の下部27bは上部開口27aよりも太くその直径
は300mmである。
Next, the anchor bolt holes 14a, 14b, 14
Using the template according to c, use chalk to install four bolts on the concrete layer 21.
Scribing 9a, 29b, 29c, and scribing a circle corresponding to the upper openings 27a of the four excavation holes 27 for the concrete short columns 23 centering on each installation position. Then, as shown in FIG. 3 (a), an upper opening 27a is opened in the concrete layer 21 with a chipping tool, the crushed stone layer 22 and the ground G are excavated with a small scoop to form a short column forming hole 27, and a plasterer is formed at the bottom. Sand is laid and compacted to form a sand layer 28. In this embodiment,
The diameter of the upper opening 27a of the short column forming hole 27 is 200 mm, the depth is 250 mm from the surface of the concrete layer 21, and the lower portion 27b of the short column forming hole 27 is thicker than the upper opening 27a and its diameter is 300 mm.

【0014】次いで図3(b)に示すように、円周方向に
延びる多数の凹凸を外周面に形成した直径が10mmで長
さが550mmの4本の棒状の異形鉄筋24を、ボルト設
置位置29a,29b,29cを中心として点対称にか
つ垂直に配置して、ハンマーにより異形鉄筋24の下部
を短柱形成孔27の底面の地面G中に打ち込む。また同
一形状寸法の4本の傾斜異形鉄筋25を、垂直異形鉄筋
24の上端部から外向き斜め下方に向けて、同様に地面
G中に打ち込む。両鉄筋24,25は、何れも上端がコ
ンクリート層21の上面から10mm下がった位置となる
まで打ち込まれ、両上端部は多少交差されて針金26に
より結束される。
Next, as shown in FIG. 3 (b), four bar-shaped deformed rebars 24 having a diameter of 10 mm and a length of 550 mm each having a large number of irregularities extending in the circumferential direction formed on the outer peripheral surface thereof are installed at bolt mounting positions. 29A, 29b, and 29c are arranged point-symmetrically and vertically, and the lower part of the deformed bar 24 is driven into the ground G at the bottom of the short column forming hole 27 by a hammer. Further, four inclined deformed reinforcing bars 25 having the same shape and dimensions are driven outwardly and obliquely downward from the upper end portion of the vertical deformed reinforcing bars 24 and similarly driven into the ground G. Both of the reinforcing bars 24 and 25 are driven in until the upper ends thereof are located 10 mm below the upper surface of the concrete layer 21, and the upper ends of the reinforcing bars 24 and 25 are crossed to some extent and bound by a wire 26.

【0015】次いで図3(c) に示すように、各短柱形成
孔27内に普通ポルトランドセメントと左官砂を配合し
て水で練ったモルタルが短柱形成孔27内に流し込まれ
る。養生期間(例えば夏場で5日間、冬場で7日間)が
経過して完全に硬化すれば、上端部がコンクリート層2
1と連結され、下半部が地面G中に打ち込まれた各4本
の垂直異形鉄筋24及び傾斜異形鉄筋25の下半部を除
く上半部が一体的に結合されたコンクリート短柱23が
得られる。このように各コンクリート短柱23は下部を
太くして地面G中に埋設されるだけでなく、各上部が各
コンクリート短柱23に一体的に結合された各複数の垂
直鉄筋24及び傾斜鉄筋25は下部が地面G中に打ち込
まれて地面Gに対する結合強度が補強されるので、各コ
ンクリート短柱23の地面Gに対する結合強度は充分大
となる。
Next, as shown in FIG. 3 (c), mortar prepared by mixing ordinary portland cement and plaster sand in each short column forming hole 27 and kneading with water is poured into the short column forming hole 27. When the curing period (for example, 5 days in summer, 7 days in winter) has elapsed and it has completely hardened, the upper end will be the concrete layer 2
A concrete short column 23, which is connected to 1 and in which the upper half except the lower half of each of the four vertically deformed reinforcing bars 24 and the inclined deformed reinforcing bars 25 in which the lower half is driven into the ground G is integrally joined, can get. In this way, each concrete short column 23 is not only embedded in the ground G with a thicker lower part, but also each upper part is integrally connected to each concrete short column 23, and each vertical reinforcing bar 24 and inclined reinforcing bar 25 are connected. Since the lower part is driven into the ground G to reinforce the bonding strength to the ground G, the bonding strength of each concrete short column 23 to the ground G becomes sufficiently large.

【0016】次に各コンクリート短柱23の中央に固定
するアンカボルト31,36及びその埋設工程を図4及
び図5により説明する。先ず、二段駐車装置のベースプ
レート10をコンクリート層21及びコンクリート短柱
23上に載せ、各アンカボルト孔14a,14b,14
cと各コンクリート短柱23の中心のボルト設置位置2
9a,29b,29cが一致するように位置決めする。
Next, the anchor bolts 31, 36 fixed to the center of each concrete short column 23 and the burying process thereof will be described with reference to FIGS. 4 and 5. First, the base plate 10 of the two-stage parking device is placed on the concrete layer 21 and the concrete short columns 23, and the anchor bolt holes 14a, 14b, 14 are provided.
c and the bolt installation position 2 at the center of each concrete short column 23
Positioning is performed so that 9a, 29b, and 29c match.

【0017】ベースプレート10中央のアンカボルト孔
14aに対応するストライクアンカボルト31をケミカ
ルアンカボルト36よりも先に設置するので、その埋設
工程を図4により説明する。ストライクアンカボルト3
1は、図3の(b) 及び(c) に示すように、同軸的に設け
たピン32を備えており、これ打ち込めば軸方向スリッ
トにより複数に分割されたストライクアンカボルト31
の先端部31aがピン32の先端部32aにより押し開
かれるものであり、ストライクアンカボルト31の先端
部31aの外周には円周方向の凹凸が設けられている。
先ず図4(a) に示すように、ドリルによりコンクリート
短柱23の中心にアンカボルト孔14aと同心に所定の
ボルト埋設孔30(本実施例では直径17mm、深さ90
mm)を穿孔し、金属ブラシで切り粉を落とし、ブロワで
切り粉を完全に除去する。
Since the strike anchor bolt 31 corresponding to the anchor bolt hole 14a in the center of the base plate 10 is installed before the chemical anchor bolt 36, its embedding process will be described with reference to FIG. Strike anchor bolt 3
As shown in (b) and (c) of FIG. 3, 1 is equipped with a coaxially provided pin 32, and if it is driven in, the strike anchor bolt 31 divided into a plurality of axial slits 31.
The tip end portion 31a is pushed open by the tip end portion 32a of the pin 32, and the outer periphery of the tip end portion 31a of the strike anchor bolt 31 is provided with unevenness in the circumferential direction.
First, as shown in FIG. 4 (a), a predetermined bolt embedding hole 30 (diameter 17 mm, depth 90 in this embodiment) is concentric with the anchor bolt hole 14a at the center of the concrete short column 23 by a drill.
mm), cut off the cutting powder with a metal brush, and completely remove the cutting powder with a blower.

【0018】次いで図4(b) に示すように、所定位置に
ナット33とワッシャ33aを螺合したストライクアン
カボルト31を、その先端部31aがボルト埋設孔30
内の所定の深さに達するよう、ベースプレート10のア
ンカボルト孔14aを通して挿入する。そしてピン32
の上端をハンマ34により打ち込めば、図3(c) に示す
ように、ストライクアンカボルト31は先端部31aが
開いてボルト埋設孔30内面に係合されて固着される。
この状態でナット33を締め付けてベースプレート10
が動かない程度に固定する。本実施例のストライクアン
カボルト31は外径が16mm、長さが150mmで、ベー
スプレート10上面からの突出量は25mmである。
Next, as shown in FIG. 4 (b), a strike anchor bolt 31 having a nut 33 and a washer 33a screwed together at a predetermined position is provided.
It is inserted through the anchor bolt hole 14a of the base plate 10 so as to reach a predetermined depth therein. And pin 32
When the upper end of the strike anchor bolt 31 is driven by the hammer 34, the strike anchor bolt 31 is fixed by being engaged with the inner surface of the bolt embedding hole 30 with the tip end 31a thereof being opened, as shown in FIG. 3 (c).
In this state, tighten the nut 33 to tighten the base plate 10
Fix it so that it does not move. The strike anchor bolt 31 of this embodiment has an outer diameter of 16 mm and a length of 150 mm, and the protrusion amount from the upper surface of the base plate 10 is 25 mm.

【0019】次に3本のケミカルアンカボルト36の埋
設工程を図5により説明する。通常のスタッドボルトで
あるケミカルアンカボルト36を固着するアンカカプセ
ル37は、複数のくびれを外周面に形成したガラスのカ
プセル内に未硬化のエポキシアクリレート樹脂等の接着
剤を封入し、外側のくびれ部内に硬化剤を設けたもので
ある。先ず図5(a) に示すように、ドリルによりコンク
リート短柱23中心にアンカボルト孔14b,14cと
同心に所定のボルト埋設孔35(直径19mm、深さ14
0mm)を穿孔し、ストライクアンカボルト31の場合と
同様、切り粉を完全に除去する。
Next, the step of burying the three chemical anchor bolts 36 will be described with reference to FIG. The anchor capsule 37 to which the chemical anchor bolt 36, which is a normal stud bolt, is fixed, has an adhesive such as an uncured epoxy acrylate resin enclosed in a glass capsule having a plurality of constrictions formed on the outer peripheral surface, and is formed in the outer constriction portion. It has a curing agent. First, as shown in FIG. 5 (a), a predetermined bolt embedding hole 35 (diameter: 19 mm, depth: 14 mm) is concentric with the anchor bolt holes 14b, 14c at the center of the concrete short column 23 by a drill.
0 mm) is perforated and the chips are completely removed as in the case of the strike anchor bolt 31.

【0020】次いで図5(b) に示すように、ボルト埋設
孔35内にアンカカプセル37(直径16.5mm、長さ
120mm)を挿入し、図5(c) に示すようにストッパ3
8を嵌挿したケミカルアンカボルト36をアンカボルト
孔14bから挿入して、ハンマ39により打ち込む。こ
れによりアンカカプセル37のガラスが砕けて接着剤と
硬化剤と砕けたガラス細片は混合され、その混合物37
Aは図3(d) に示すように、ボルト埋設孔35とケミカ
ルアンカボルト36の間に充填される。所定の養生時間
(例えば0℃では160分、30℃では20分)が経過
すれば混合物37Aが硬化してケミカルアンカボルト3
6はコンクリート短柱23に埋設固着される。この状態
でナット33を締め付けてベースプレート10をしっか
りと固定する。ボルト設置位置29bに設けるケミカル
アンカボルト36は外径が16mm、長さが200mmで、
ベースプレート10上面からの突出量は25mmである。
ベースプレート10の先端となるアンカボルト孔14c
は図5(a) の二点鎖線に示すように座ぐりが設けられ、
このボルト設置位置29cに設けるケミカルアンカボル
ト36は外径が16mm、長さが175mmで、その先端は
ベースプレート10の上面とほゞ同じ高さである。
Next, as shown in FIG. 5 (b), an anchor capsule 37 (diameter 16.5 mm, length 120 mm) is inserted into the bolt embedding hole 35, and the stopper 3 is inserted as shown in FIG. 5 (c).
The chemical anchor bolt 36 in which 8 is inserted is inserted from the anchor bolt hole 14b and driven by the hammer 39. As a result, the glass of the anchor capsule 37 is crushed, and the adhesive, the curing agent, and the crushed glass fragments are mixed, and the mixture 37
As shown in FIG. 3D, A is filled between the bolt embedding hole 35 and the chemical anchor bolt 36. After a predetermined curing time (for example, 160 minutes at 0 ° C., 20 minutes at 30 ° C.), the mixture 37A is cured and the chemical anchor bolt 3
6 is embedded and fixed in the concrete short column 23. In this state, the nut 33 is tightened to firmly fix the base plate 10. The chemical anchor bolt 36 provided at the bolt installation position 29b has an outer diameter of 16 mm and a length of 200 mm.
The amount of protrusion from the upper surface of the base plate 10 is 25 mm.
Anchor bolt hole 14c at the tip of the base plate 10
Is provided with a spot facing as shown by the chain double-dashed line in Fig. 5 (a),
The chemical anchor bolt 36 provided at the bolt installation position 29c has an outer diameter of 16 mm and a length of 175 mm, and its tip is almost level with the upper surface of the base plate 10.

【0021】以上により各アンカボルト31,36は、
各コンクリート短柱23の中心部となる各ボルト設置位
置29a,29b,29cに埋設固着されて、各上端部
はコンクリート短柱23の上面から突出される。ベース
プレート10の先端となるボルト設置位置29cを除く
ボルト設置位置29a及び29bのアンカボルト31,
36の上端は、二段駐車装置の支柱11を覆うカバー1
5内に位置している。
As described above, the anchor bolts 31 and 36 are
It is embedded and fixed in each bolt installation position 29a, 29b, 29c which becomes the center part of each concrete short pillar 23, and each upper end projects from the upper surface of the concrete short pillar 23. Anchor bolts 31 at bolt installation positions 29a and 29b other than the bolt installation position 29c which is the tip of the base plate 10,
The upper end of 36 is a cover 1 that covers the pillar 11 of the two-stage parking device.
Located within 5.

【0022】[0022]

【発明の効果】上述のように、本発明によれば、補強を
設ける基礎工事はアンカボルトを埋設する各コンクリー
ト短柱付近だけであるので、このような基礎工事の面積
が減少すると共にコンクリート及び補強鉄筋の使用量が
少なくなり、従って基礎工事に要するコストを低下させ
ることができる。しかも、各コンクリート短柱は垂直鉄
筋及び傾斜鉄筋により地面に対する必要な結合強度が確
保されるので、ベースプレートの取付強度が低下するこ
とはない。
As described above, according to the present invention, since the foundation work for providing the reinforcement is only near each concrete short column in which the anchor bolt is buried, the area of such foundation work is reduced and the concrete and The amount of reinforcing bars used is reduced, and therefore the cost required for foundation work can be reduced. Moreover, since the vertical reinforcing bars and the inclined reinforcing bars secure the necessary bonding strength to the ground in each concrete short column, the mounting strength of the base plate does not decrease.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明による二段駐車装置の基礎構造の一実
施例を示す全体平面図である。
FIG. 1 is an overall plan view showing an embodiment of a basic structure of a two-stage parking device according to the present invention.

【図2】 図1の2−2断面図である。2 is a sectional view taken along line 2-2 of FIG.

【図3】 図1に示す実施例のコンクリート短柱及びそ
の補強の施工工程の説明図である。
FIG. 3 is an explanatory view of a concrete short column of the embodiment shown in FIG. 1 and a construction process for reinforcement thereof.

【図4】 ストライクアンカボルトの施工工程の説明図
である。
FIG. 4 is an explanatory diagram of a process of constructing a strike anchor bolt.

【図5】 ケミカルアンカボルトの施工工程の説明図で
ある。
FIG. 5 is an explanatory diagram of a process of constructing a chemical anchor bolt.

【図6】 本発明により据え付けられる二段駐車装置の
一例の全体斜視図である。
FIG. 6 is an overall perspective view of an example of a two-stage parking device installed according to the present invention.

【図7】 図6に示す二段駐車装置のベースプレートの
平面図である。
FIG. 7 is a plan view of a base plate of the two-stage parking device shown in FIG.

【図8】 従来技術による二段駐車装置の基礎構造の一
例を示す全体平面図である。
FIG. 8 is an overall plan view showing an example of a basic structure of a two-stage parking device according to a conventional technique.

【図9】 図8に示す基礎構造の横断面図である。9 is a cross-sectional view of the basic structure shown in FIG.

【符号の説明】[Explanation of symbols]

10…ベースプレート、14a,14b,14c…アン
カボルト孔、21…コンクリート層、23…コンクリー
ト短柱、24…垂直鉄筋、25…傾斜鉄筋、29a,2
9b,29c…ボルト設置位置、31,36…アンカボ
ルト、G…地面。
DESCRIPTION OF SYMBOLS 10 ... Base plate, 14a, 14b, 14c ... Anchor bolt hole, 21 ... Concrete layer, 23 ... Concrete short column, 24 ... Vertical reinforcing bar, 25 ... Inclined reinforcing bar, 29a, 2
9b, 29c ... Bolt installation position, 31, 36 ... Anchor bolt, G ... Ground.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 二段駐車装置のベースプレートを固定す
る複数のアンカボルトが前記ベースプレートに形成され
たアンカボルト孔に挿通される上端部を除き埋設固着さ
れた二段駐車装置の基礎構造において、前記ベースプレ
ートより広い範囲にわたり地面上に設けられて補強用鉄
筋を有しないコンクリート層と、前記各アンカボルト孔
に対応する各ボルト設置位置付近を中心として前記地面
中に埋設され上端部が前記コンクリート層と連結された
複数のコンクリート短柱と、前記各ボルト設置位置付近
を中心としてほゞ対称的にかつほゞ垂直に配置され各下
部が前記地面中に打ち込まれると共にこの下部を除く各
上部が前記コンクリート短柱と一体的に結合された複数
の垂直鉄筋と、前記各ボルト設置位置付近を中心として
ほゞ対称的にかつ下方が広がる八字状に配置され各下部
が前記地面中に打ち込まれると共にこの下部を除く各上
部が前記コンクリート短柱と一体的に結合された複数の
傾斜鉄筋と、前記各コンクリート短柱の中心部となる前
記各ボルト設置位置に埋設固着されて上端部が同コンク
リート短柱の上面から突出する複数のアンカボルトを備
えたことを特徴とする二段駐車装置の基礎構造。
1. A basic structure of a two-tiered parking apparatus in which a plurality of anchor bolts for fixing a base plate of the two-tiered parking apparatus are embedded and fixed except an upper end portion which is inserted into an anchor bolt hole formed in the base plate. A concrete layer provided on the ground over a range wider than the base plate and having no reinforcing bar, and an upper end portion embedded in the ground centering around each bolt installation position corresponding to each anchor bolt hole and the concrete layer. A plurality of connected concrete short pillars, and they are arranged almost symmetrically and almost vertically with the vicinity of each bolt installation position as the center, each lower part is driven into the ground, and each upper part other than this lower part is the concrete A plurality of vertical rebars that are integrally connected to the short columns, and are approximately symmetrical and lower with the vicinity of each bolt installation position as the center. A plurality of slanted reinforcing bars arranged in an octagonal shape in which each lower part is driven into the ground and each upper part except this lower part is integrally connected to the concrete short column, and the central part of each concrete short column. A basic structure of a two-tiered parking device, comprising a plurality of anchor bolts, which are embedded and fixed at the respective bolt installation positions and whose upper end projects from the upper surface of the concrete short column.
JP07035243A 1995-02-23 1995-02-23 Basic structure of two-stage parking device Expired - Fee Related JP3126097B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07035243A JP3126097B2 (en) 1995-02-23 1995-02-23 Basic structure of two-stage parking device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07035243A JP3126097B2 (en) 1995-02-23 1995-02-23 Basic structure of two-stage parking device

Publications (2)

Publication Number Publication Date
JPH08226244A true JPH08226244A (en) 1996-09-03
JP3126097B2 JP3126097B2 (en) 2001-01-22

Family

ID=12436404

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07035243A Expired - Fee Related JP3126097B2 (en) 1995-02-23 1995-02-23 Basic structure of two-stage parking device

Country Status (1)

Country Link
JP (1) JP3126097B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101492138B1 (en) * 2014-01-07 2015-02-10 민덕주 Single column type double-stage parking machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101492138B1 (en) * 2014-01-07 2015-02-10 민덕주 Single column type double-stage parking machine

Also Published As

Publication number Publication date
JP3126097B2 (en) 2001-01-22

Similar Documents

Publication Publication Date Title
AU4436702A (en) Foundation construction
JP3486602B2 (en) Pier foundation method and pier foundation structure
JP3126097B2 (en) Basic structure of two-stage parking device
JP4227557B2 (en) Reinforced wall construction method and existing wall structure of existing concrete wall
JP3029343U (en) Form tool for mortar material injection in exposed elastic fixed column base method
JP3889497B2 (en) Molding method for concrete basement
JP3445017B2 (en) Machine foundation and its construction method
JP2002088775A (en) Foundation structure equipped with anchor bolt and method for constructing the same
JPH0376929A (en) Steel-framed foundation
JP3678695B2 (en) Fixing method of column to concrete foundation
JP2833764B2 (en) Pillar fixing method for steel columns
JPH0689588B2 (en) Installation method of handrails to attached buildings such as balconies and balconies
JP2517735Y2 (en) Precast concrete foundation
JPH06330529A (en) Mounting method of cast-in-place concrete strip footing and precast concrete wall slab
JPH07166558A (en) Foundation member made of precast concrete
JP2507676Y2 (en) Concrete cloth foundation assembly member positioning jig
JP3002026B2 (en) Structure of residential continuous foundation
JP2579944Y2 (en) Load-bearing wall assembly structure
JPH0718675A (en) Sc pile and executing method thereof
JPH01203522A (en) Exposed type fixed column base
JPH0522011B2 (en)
KR20020079082A (en) Structure method of head cover for steel tube file and its structure
RU95104303A (en) Method and block for construction of monolithic foundation
JPH03260223A (en) Positioning plate for base construction of housing
JPH09137555A (en) Execution method of building construction

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20001003

LAPS Cancellation because of no payment of annual fees