JPH01163320A - Method and apparatus for fixing anchor bolt - Google Patents

Method and apparatus for fixing anchor bolt

Info

Publication number
JPH01163320A
JPH01163320A JP31999387A JP31999387A JPH01163320A JP H01163320 A JPH01163320 A JP H01163320A JP 31999387 A JP31999387 A JP 31999387A JP 31999387 A JP31999387 A JP 31999387A JP H01163320 A JPH01163320 A JP H01163320A
Authority
JP
Japan
Prior art keywords
anchor
fixed
plate
fixing
anchor bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP31999387A
Other languages
Japanese (ja)
Inventor
Hiroshi Sakuma
弘 佐久間
Shinichi Kiriyama
伸一 桐山
Hiroto Gomi
五味 寛人
Harukatsu Kadoya
治克 角屋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okabe Co Ltd
Asahi Chemical Industry Co Ltd
Original Assignee
Okabe Co Ltd
Asahi Chemical Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okabe Co Ltd, Asahi Chemical Industry Co Ltd filed Critical Okabe Co Ltd
Priority to JP31999387A priority Critical patent/JPH01163320A/en
Publication of JPH01163320A publication Critical patent/JPH01163320A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE:To simplify field operations by a method in which the lower ends of anchor bolts fixed to a base concrete are fixed to a lower doubling plate with a fixing part which is fixed to the upside of PC plate of a given thickness. CONSTITUTION:The lower ends of anchor bolts 4 are connected with a lower doubling plate 3 with a fixing part 2 to make up an anchor frame A. The frame A is set through the fixing part 2 of the plate 3 on a precast concrete place 1 of a given thickness. Field operations can thus be simplified and the construction accuracy can also be raised.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は建造物の柱脚等の固定に使用するアンカーボ
ルトの固定方法およびアンカーボルトの定着装置に関す
るものである。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a method for fixing an anchor bolt used for fixing a pillar base of a building, and an anchor bolt fixing device.

〔従来の技術〕[Conventional technology]

建造物の柱脚を基礎構造物に固定する形式としては、埋
込み型、根巻き型およびアンカーボルトを利用する露出
型があるが、露出型では基礎床面の利用空間が広くとれ
ること、施工性がよいこと等の利点がある。
There are three types of methods for fixing the column bases of buildings to the foundation structure: embedded type, root wrapping type, and exposed type that uses anchor bolts.The exposed type allows for a larger amount of space on the foundation floor, and is easier to construct. There are advantages such as good performance.

露出型はあらかじめ基礎梁等の基礎構造物のコンクリー
ト中にアンカーボルトを埋め込んでおき、柱脚下端のベ
ースプレートをアンカーボルトに接続固定し、柱脚の固
定を行うものである。特公昭61−1574号公報には
このような露出型の柱脚固定構造の一例が示されており
、実開昭60−8305号公報、実開昭62−1540
44号公報等には柱脚固定用のアンカーボルトの定着構
造が開示されている。
In the exposed type, anchor bolts are embedded in the concrete of the foundation structure such as foundation beams in advance, and the base plate at the lower end of the column base is connected and fixed to the anchor bolts to secure the column base. Japanese Patent Publication No. 61-1574 shows an example of such an exposed type column base fixing structure, and Japanese Utility Model Application Publication No. 60-8305 and Japanese Utility Model Application Publication No. 62-1540
Publication No. 44 and the like disclose a fixing structure for anchor bolts for fixing column bases.

従来の露出型の柱脚固定構造における一般的な施工方法
としては、まず、根切り、敷砂利等の地業を行い、捨て
コンを打設した上に墨出しを行い、その上にアンカーボ
ルト固定用のフレームを固定している。上述の実開昭6
0−8305号公報および実開昭62−154044号
公報記載の考案はその際の施工性の向上、施工精度の向
上環を図ったもので、複数本のアンカーボルトを上下の
添プレートで連結する等して、アンカーボルト自体でア
ンカーフレームを形成している。
The general construction method for conventional exposed column base fixed structures is to first perform soil work such as root cutting and laying gravel, then place concrete and mark it out, and then install anchor bolts on top of that. A fixed frame is fixed. The above-mentioned Jikai Showa 6
The ideas described in Publication No. 0-8305 and Publication of Utility Model Application No. 62-154044 are intended to improve workability and accuracy, and connect multiple anchor bolts with upper and lower attachment plates. The anchor bolt itself forms an anchor frame.

アンカーボルトは基礎底盤および基礎梁等の配筋の後、
コンクリート中に埋め込まれ、実開昭60−8305号
および実開昭62−154044号の考案の場合は、上
部添プレートを外し、ナツト等を利用して柱脚下端のベ
ースプレートを固定している。
Anchor bolts are installed after reinforcing the foundation base and foundation beams, etc.
It is embedded in concrete, and in the case of the designs of Utility Model Application No. 60-8305 and Utility Model Application No. 62-154044, the upper attachment plate is removed and the base plate at the lower end of the column base is fixed using nuts or the like.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

ところで、従来のアンカーボルトの定着構造では、現場
打ちされる捨てコン上に墨出しを行い、その上にアンカ
ーボルト支持用の鋼製フレームあるいはアンカーフレー
ム用の定着部材を固定しており、あらかじめこれらを定
着させるための定着ボルトあるいはホールインアンカー
等を捨てコン中に埋め込んでおくか、アンカーを打ち込
む必要がある。そのため、埋め込みの精度や、捨てコン
表面の水平精度が問題となり、これらが、アンカーボル
ト自体の施工精度に影響を与え、施工性向上のネックに
もなっている。
By the way, in the conventional anchor bolt fixing structure, markings are made on the disposable concrete cast on site, and a steel frame for supporting the anchor bolt or a fixing member for the anchor frame is fixed on top of the marking. It is necessary to discard a fixing bolt or hole-in anchor, etc. to fix it, and embed it in the concrete, or to drive an anchor. Therefore, the accuracy of embedding and the horizontal accuracy of the surface of the concrete become problems, which affect the installation accuracy of the anchor bolt itself and become a bottleneck in improving workability.

この発明のアンカーボルトの固定方法およびアンカーボ
ルトの定着装置は上述のような問題点を解決することを
目的としたものである。
The anchor bolt fixing method and anchor bolt fixing device of the present invention are intended to solve the above-mentioned problems.

〔問題点を解決するための手段〕[Means for solving problems]

以下、この発明の概要を実施例に対応する図面の符号を
用いて説明する。
Hereinafter, an overview of the present invention will be explained using reference numerals in the drawings corresponding to the embodiments.

この発明のアンカーボルトの定着装置は、所要厚のプレ
キャストコンクリート板(以下、PC板という)■上に
、アンカーフレームAを固定したもので、アンカーフレ
ームAは複数本のアンカーボルト4の下端部を定着部材
2を備えた下部添プレート3で連結したものである。ア
ンカーフレームAを形成するアンカーボルト4はPCC
10上面に固定した下部添プレート3によって鉛直に保
持され、基礎底盤12、基礎梁13等の基礎コンクリー
ト中に埋設される。
The anchor bolt fixing device of this invention has an anchor frame A fixed on a precast concrete board (hereinafter referred to as a PC board) of a required thickness, and the anchor frame A holds the lower ends of a plurality of anchor bolts 4. They are connected by a lower attachment plate 3 provided with a fixing member 2. Anchor bolts 4 forming anchor frame A are PCC
10 is held vertically by a lower attachment plate 3 fixed to the upper surface thereof, and is buried in the foundation concrete of the foundation base 12, foundation beam 13, etc.

この発明のアンカーボルトの固定方法においては、前述
のPCC10、根切りした地盤上の所定位置に設置し、
定着部材2を備えた下部添プレート3をPC仮1上に固
定し、複数本のアンカーボルト4を鉛直に立設する。各
アンカーボルト4の下端部は下部添プレート3により、
連結され、次に各アンカーボルト4の上端部を上部添プ
レート5で連結することにより、アンカーフレームAを
形成する。この状態で基礎底盤12、基礎梁13等の配
筋を行い、型枠を組んでコンクリートを打設することに
より、アンカーボルト4がコンクリート中に埋め込まれ
る。その後、上部添プレート5を外し、基礎コンクリー
ト上に立設される柱15のベースプレート16がアンカ
ーボルト4に接続固定される。
In the anchor bolt fixing method of the present invention, the above-mentioned PCC 10 is installed at a predetermined position on the cut ground,
A lower attachment plate 3 provided with a fixing member 2 is fixed on a temporary PC 1, and a plurality of anchor bolts 4 are vertically arranged. The lower end of each anchor bolt 4 is connected to the lower end plate 3.
The anchor frame A is formed by connecting the upper ends of each anchor bolt 4 with the upper support plate 5. In this state, reinforcing the foundation base 12, foundation beams 13, etc. is arranged, a formwork is assembled, and concrete is poured, so that the anchor bolts 4 are embedded in the concrete. Thereafter, the upper support plate 5 is removed, and the base plate 16 of the column 15 erected on the foundation concrete is connected and fixed to the anchor bolt 4.

なお、上述の定着部材2は下部添プレート3と一体とし
たものでも、別体としたものでもよい。
Note that the fixing member 2 described above may be integrated with the lower attachment plate 3 or may be separate.

〔実施例〕〔Example〕

次に、図示した実施例について説明する。 Next, the illustrated embodiment will be described.

第1図はこの発明のアンカーボルトの定着装置の一実施
例を示したもので、工場生産により、あらかじめホール
インアンカー8等を埋め込んだPCC板上上定着部材2
を備えた下部添プレート3を固定し、端部にねじを形成
した複数本のアンカーボルト4の下端部を定着部材2お
よび下部添プレート3のボルト挿通孔に通し、上下から
ナツト9により固定している。各アンカーボルト4の上
端部は、同様に上部添プレート5のボルト挿通孔に通し
、上下からナンド10により固定し、アンカーフレーム
Aを形成している。
FIG. 1 shows an embodiment of the anchor bolt fixing device of the present invention, in which a fixing member 2 on a PCC board in which hole-in anchors 8 etc. are embedded in advance is manufactured in a factory.
A lower support plate 3 equipped with a screwdriver is fixed, and the lower ends of a plurality of anchor bolts 4 having threaded ends are passed through the bolt insertion holes of the fixing member 2 and the lower support plate 3, and fixed with nuts 9 from above and below. ing. The upper end of each anchor bolt 4 is similarly passed through the bolt insertion hole of the upper attachment plate 5 and fixed from above and below with pads 10 to form an anchor frame A.

この実施例における定着部材2は、溝形鋼を十字に交差
させ、その上に下部添プレート3とほぼ同形のm板を溶
接したもので、ホールインアンカー8等を利用して、p
c板1の上面に固定され、PCC10上面と下部添プレ
ート3との間に間隙を形成して、ナツト9によるアンカ
ーボルト4の固定を可能としている。
The fixing member 2 in this embodiment is made by crisscrossing channel steel and welding an m-plate approximately the same shape as the lower attachment plate 3 thereon.
It is fixed to the upper surface of the c-board 1, and a gap is formed between the upper surface of the PCC 10 and the lower support plate 3, so that the anchor bolt 4 can be fixed with the nut 9.

第2図および第3図はこの発明におけるアンカ−フレー
ムA下端部の取り付は構造の詳細を示したもので、第4
図および第5図はこの発明のアンカーボルトの固定方法
における施工の様子を示したものである。
Figures 2 and 3 show details of the structure of the lower end of the anchor frame A in this invention;
The drawings and FIG. 5 show how the anchor bolt fixing method of the present invention is carried out.

施工手順は、まず地業として、所定深さまで根切りを行
い、敷砂利の上にモルタル6を打設し、その上にPC板
1を水平に設置する。PC板1の周囲には天端がPC板
1の上面と一致するように捨てコン7を打設し、PC板
1を固定する。
The construction procedure is as follows: First, the roots are cut to a predetermined depth as ground work, mortar 6 is placed on top of the gravel, and the PC board 1 is installed horizontally on top of the mortar 6. A sacrificial concrete 7 is cast around the PC board 1 so that its top end coincides with the top surface of the PC board 1, and the PC board 1 is fixed.

次に、ホールインアンカー8等を利用して、定着部材2
をPC板1の上面に固定し、その上に下部添プレート3
を載せる。
Next, using hole-in anchor 8 or the like, fixing member 2
is fixed on the upper surface of the PC board 1, and the lower attachment plate 3 is placed on top of it.
Put on.

各アンカーボルト4の下端部を定着部材2および下部添
プレート3のボルト挿通孔に通し、上下からナツト9に
より固定し、さらにアンカーボルト4の上端部をナンド
10を利用して、上部添プレート5で固定し、アンカー
フレームAを形成する。
The lower end of each anchor bolt 4 is passed through the bolt insertion hole of the fixing member 2 and the lower attachment plate 3, and fixed with nuts 9 from above and below. to form anchor frame A.

続いて、アンカーフレームAとして、所定位置にセット
されたアンカーボルト4の上から、フープ筋と立上り筋
とからなる枕型筋11を被せるようにして配筋し、さら
に底盤の配筋および基礎梁の配筋14を行う(第4図参
照)。
Next, as the anchor frame A, pillow-shaped reinforcements 11 consisting of hoop reinforcements and upright reinforcements are placed over the anchor bolts 4 set in a predetermined position, and reinforcement is then placed on the bottom plate and foundation beams. Reinforcement arrangement 14 is performed (see Fig. 4).

配筋後、型枠を組み、底盤12のコンクリートの打設後
、基礎梁13のコンクリートを打設するが、立上り部の
打設高さはアンカーフレームAの上部がコンクリート表
面から突出する高さとなる。
After reinforcing, the formwork is assembled, and after pouring the concrete for the bottom plate 12, the concrete for the foundation beam 13 is poured. Become.

なお、アンカーボルト4の上端部のねじはコンクリート
が付着しないように、ビニールテープ等で保護しておく
とよい。
Note that it is advisable to protect the screw at the upper end of the anchor bolt 4 with vinyl tape or the like to prevent concrete from adhering to it.

コンクリートが硬化し、型枠を脱型した後、ナンド10
を緩め、上部添プレート5を外す。
After the concrete has hardened and the formwork has been removed, Nando 10
Loosen and remove the upper support plate 5.

次に、吊り上げた鉄骨柱15の柱芯を合わせ、各アンカ
ーボルト4の上端部に柱15のベースプレート16のボ
ルト挿通孔を通してナツト18で固定する(第5図参照
)。図中、17は特公昭61−1574号に開示された
注入座金と同様のもので、この注入座金17より、グラ
ウト材を注入し、柱脚の結合強度を高めることができる
Next, the pillar cores of the lifted steel columns 15 are aligned, and the upper ends of each anchor bolt 4 are passed through the bolt insertion holes of the base plate 16 of the column 15 and fixed with nuts 18 (see FIG. 5). In the figure, reference numeral 17 is similar to the injection washer disclosed in Japanese Patent Publication No. 61-1574, and grout can be injected through this injection washer 17 to increase the joint strength of the column base.

上記実施例における寸法の一例を挙げると、設計によっ
ても異なるが、断面が一辺300mmの角形銅管柱の柱
脚固定の場合、厚さ40mm、−辺470mm程度のP
C板1を使用し、アンカーボルト4としては両端にねじ
を形成した直径30mm程度の異形鉄筋を使用する。ま
た、アンカーボルト4の数、配置等は適宜変更すること
ができる。
To give an example of the dimensions in the above embodiment, although it varies depending on the design, in the case of fixing the column base of a rectangular copper pipe column with a cross section of 300 mm on a side, a P with a thickness of 40 mm and a side of about 470 mm.
A C plate 1 is used, and the anchor bolt 4 is a deformed reinforcing bar with a diameter of about 30 mm with threads formed at both ends. Further, the number, arrangement, etc. of the anchor bolts 4 can be changed as appropriate.

〔発明の効果〕〔Effect of the invention〕

■ この発明の方法および装置では、定着部材を備えた
下部添プレートおよびアンカーフレームをPC板に固定
するよう構成したため、従来の現場打設による捨てコン
の上に固定する場合に比べ、現場作業が簡単となり、か
つ精度の高い施工が可能となる。
■ In the method and device of the present invention, the lower attachment plate with the fixing member and the anchor frame are fixed to the PC board, so the on-site work is easier than in the case of fixing it on top of the conventional concrete poured on-site. This makes construction easier and allows for highly accurate construction.

■ PC板は工場生産が可能であり、寸法精度が高く、
かつ高強度のものが容易に入手でき、かつ定着部材を固
定するための固定金具等もあらかじめ正確に埋め込んで
おくことができるので、信頼性の高い構造物が施工でき
る。
■ PC boards can be produced in factories and have high dimensional accuracy.
In addition, high-strength materials are easily available, and fixing fittings for fixing the fixing member can be embedded accurately in advance, so a highly reliable structure can be constructed.

■ この発明の定着装置はアンカーボルト自体を利用し
たアンカーフレームとPC板というように、精度の高い
、最小限の部材を用いて構成されているため、取り扱い
も容易で、大幅な施工性の向上が図れる。
■ The fixing device of this invention is constructed using a minimum number of highly accurate members, such as an anchor frame that uses the anchor bolt itself and a PC board, so it is easy to handle and greatly improves workability. can be achieved.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明の一実施例におけるアンカーフレーム
の取付けを示す斜視図、第2図は同じく水平断面図、第
3図は鉛直断面図、第4図は枕型筋の取付けを示す斜視
図、第5図は柱脚の固定状態を示す斜視図である。 A・・・アンカーフレーム、1・・・PC板、2・・・
定着部材、3・・・下部添プレート、4・・・アンカー
ボルト、5・・・上部添プレート、6・・・モルタル、
7・・・捨てコン、8・・・ホールインアンカー、9・
・・ナンド、10・・・ナツト、11・・・枕型筋、1
2・・・基礎底盤、13・・・基礎梁、14・・・基礎
梁配筋、15・・・柱、16・・・ベースプレート、1
7・・・注入座金、18・・・ナンド特許出願人   
 旭化成工業株式会社茅5図 \ 第4図
FIG. 1 is a perspective view showing the attachment of an anchor frame in an embodiment of the present invention, FIG. 2 is a horizontal sectional view, FIG. 3 is a vertical sectional view, and FIG. 4 is a perspective view showing the attachment of pillow-shaped reinforcements. , FIG. 5 is a perspective view showing the fixed state of the column base. A... Anchor frame, 1... PC board, 2...
Fixing member, 3... Lower attachment plate, 4... Anchor bolt, 5... Upper attachment plate, 6... Mortar,
7... Discarded con, 8... Hole in anchor, 9.
...Nando, 10...Natsuto, 11...Pillow-shaped muscle, 1
2... Foundation bottom plate, 13... Foundation beam, 14... Foundation beam reinforcement, 15... Column, 16... Base plate, 1
7... Injection washer, 18... Nando patent applicant
Asahi Kasei Kogyo Co., Ltd. Kaya Figure 5\ Figure 4

Claims (2)

【特許請求の範囲】[Claims] (1)複数本のアンカーボルトの上下端部を、それぞれ
上部添プレートおよび定着部材を備えた下部添プレート
に固定してアンカーフレームを形成し、基礎底盤に定着
させるアンカーボルトの固定方法において、前記アンカ
ーフレーム設置位置に所要厚のプレキャストコンクリー
ト板を敷設して、前記プレキャストコンクリート板上に
下部添プレートの定着部材を介して、前記アンカーフレ
ームを設置することを特徴とするアンカーボルトの固定
方法。
(1) An anchor bolt fixing method in which the upper and lower ends of a plurality of anchor bolts are each fixed to an upper support plate and a lower support plate provided with a fixing member to form an anchor frame, and the anchor bolts are fixed to the foundation bottom plate, as described above. A method for fixing an anchor bolt, comprising: laying a precast concrete plate of a required thickness at an anchor frame installation position, and installing the anchor frame on the precast concrete plate via a fixing member of a lower attachment plate.
(2)基礎コンクリート中に定着させた複数本のアンカ
ーボルトの下端部を、定着部材を備えた下部添プレート
に固定してあり、前記下部添プレートの定着部材を、所
要厚のプレキャストコンクリート板上に固定してあるこ
とを特徴とするアンカーボルトの定着装置。
(2) The lower ends of the plurality of anchor bolts fixed in the foundation concrete are fixed to a lower attachment plate equipped with an anchoring member, and the anchoring member of the lower attachment plate is attached to a precast concrete plate of a required thickness. An anchor bolt fixing device, characterized in that it is fixed to.
JP31999387A 1987-12-17 1987-12-17 Method and apparatus for fixing anchor bolt Pending JPH01163320A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31999387A JPH01163320A (en) 1987-12-17 1987-12-17 Method and apparatus for fixing anchor bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31999387A JPH01163320A (en) 1987-12-17 1987-12-17 Method and apparatus for fixing anchor bolt

Publications (1)

Publication Number Publication Date
JPH01163320A true JPH01163320A (en) 1989-06-27

Family

ID=18116549

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31999387A Pending JPH01163320A (en) 1987-12-17 1987-12-17 Method and apparatus for fixing anchor bolt

Country Status (1)

Country Link
JP (1) JPH01163320A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02120535U (en) * 1989-03-14 1990-09-28
JPH0711658A (en) * 1993-06-24 1995-01-13 Toda Constr Co Ltd Construction of underground skeleton

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02120535U (en) * 1989-03-14 1990-09-28
JPH0711658A (en) * 1993-06-24 1995-01-13 Toda Constr Co Ltd Construction of underground skeleton

Similar Documents

Publication Publication Date Title
JP2000008483A (en) Baseplate fixing device
JPS627344B2 (en)
JP4844926B2 (en) Column base joint structure and construction method
JPH02164931A (en) Foundation construction method for building
JPH01163320A (en) Method and apparatus for fixing anchor bolt
JPH01203523A (en) Fixing of column base
JP2002021096A (en) Building and constructing method therefor
JPH09151463A (en) Column-integrated column base anchoring foundation structire and work execution method therefor
JPH0533351A (en) Steel column base of steel frame structure and execution thereof
JPH02164930A (en) Foundation structure for building
JPH01163321A (en) Method and apparatus for fixing anchor bolt
JPH0674591B2 (en) Anchor support beam construction method
JPH0371537B2 (en)
JP2000345719A (en) Reinforcing method of through opening in existing bearing wall
JP3678695B2 (en) Fixing method of column to concrete foundation
JPH0138947B2 (en)
JP2002097818A (en) Method of installing base isolating foundation frame for building
JP4511080B2 (en) Construction method of underground structure
JP2516653B2 (en) Exposed type fixed pedestal
JP4231344B2 (en) The method of erection of pillars in the lightweight embankment method and the anchor bolt positioning jig used therefor
JP2812641B2 (en) Precast concrete fabric base member and method of construction
JPH0532536B2 (en)
JPS6039816B2 (en) Anchor bolt burial method
JP3024518U (en) Anchor plate
JPH0376929A (en) Steel-framed foundation