Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000280259A
Other languages
Japanese (ja)
Other versions
JP3713192B2 (en
Inventor
Yuji Sugihara
雄司 杉原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEKISUI HARMONATE SEKO GIJUTSU
Sekisui Chemical Co Ltd
Sekisui Harmonate Seko Gijutsu Center:Kk
Original Assignee
SEKISUI HARMONATE SEKO GIJUTSU
Sekisui Chemical Co Ltd
Sekisui Harmonate Seko Gijutsu Center:Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEKISUI HARMONATE SEKO GIJUTSU, Sekisui Chemical Co Ltd, Sekisui Harmonate Seko Gijutsu Center:Kk filed Critical SEKISUI HARMONATE SEKO GIJUTSU
Priority to JP2000280259A priority Critical patent/JP3713192B2/en
Publication of JP2002088775A publication Critical patent/JP2002088775A/en
Application granted granted Critical
Publication of JP3713192B2 publication Critical patent/JP3713192B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a foundation structure equipped with an anchor bolt, which can prevent breakage of a corner portion of a concrete foundation corresponding to the anchor bolt by a horizontal external force even if the force acts on the anchor bolt. SOLUTION: The foundation structure equipped with the anchor bolt is constructed by rigidly burying a lower portion of the anchor bolt 25 in an upper end of the concrete foundation 24, and protruding the anchor bolt 25 from an upper surface of the concrete foundation 24. According to the foundation structure thus constructed, a reinforcing plate 26 through which the anchor bolt 25 has penetrated, is rigidly buried in an upper portion of the concrete foundation 24. The method for constructing the concrete foundation equipped with the anchor bolt is also provided.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、住宅等の建物の
コンクリート基礎の上面にアンカーボルトが突設された
アンカーボルト付基礎構造及びその施工方法に関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation structure with anchor bolts having an anchor bolt protruding from an upper surface of a concrete foundation of a building such as a house, and a method of constructing the same.

【0002】[0002]

【従来の技術】この種のアンカーボルト付基礎構造を施
工する場合、例えば、まず図8に示したように、地面1
に建物に沿わせる基礎溝2を形成し、基礎溝2の底部に
割栗を投入して搗固て割栗層3を形成した後、割栗層3
上にコンクリートを打って割栗層3上にフーチング層4
を設けた後、このフーチング層4上に対向する型枠5,
5を配設して、型枠5,5を支持部材6,6で支持させ
る。次に、型枠5,5の上端にアンカープレート7の両
端部を保持させ、アンカープレート7に上下に延びるア
ンカーボルト8を保持させたる。この状態で、型枠5,
5間に生コンクリート9をアンカーボルト8の下部が没
入するまで流し込んだ後、生コンクリート9を硬化させ
て型枠5,5を取り外し、土盛りすることにより、図9
に示したようにコンクリート10にアンカーボルト8が
植立固定された基礎構造の施工が完了する(実公昭56
−28275号公報参照)。
2. Description of the Related Art When constructing this type of foundation structure with anchor bolts, for example, first, as shown in FIG.
The base groove 2 is formed along the building, and the chestnut layer 3 is formed by pouring split chestnut into the bottom of the base groove 2 to form a split chestnut layer 3.
Pour concrete on top and split footing layer 3 on split chestnut layer 3
Is provided, the facing mold 5 on the footing layer 4 is provided.
5 is disposed, and the molds 5 and 5 are supported by the support members 6 and 6. Next, both ends of the anchor plate 7 are held at the upper ends of the molds 5, 5, and the anchor bolts 8 that extend vertically are held by the anchor plate 7. In this state, formwork 5,
After the ready-mixed concrete 9 is poured into the lower portion of the anchor bolt 8 until the lower part of the anchor bolt 8 is immersed, the ready-mixed concrete 9 is hardened, the molds 5 and 5 are removed, and the soil is laid.
The construction of the foundation structure in which the anchor bolts 8 are erected and fixed on the concrete 10 is completed as shown in FIG.
-28275).

【0003】[0003]

【発明が解決しようとする課題】ところで、この様な基
礎構造においては、アンカーボルト8に矢印A方向から
外力が作用した場合、アンカーボルト8からコンクリー
ト基礎に直接外力が入力されるため、アンカーボルト8
の部分においてコンクリート基礎10に一点鎖線11で
示した方向への剪断力が作用し、図10に示したように
角部10aが破壊される虞があった。
By the way, in such a foundation structure, when an external force acts on the anchor bolt 8 in the direction of arrow A, the external force is directly input from the anchor bolt 8 to the concrete foundation. 8
In this portion, a shearing force acts on the concrete foundation 10 in the direction indicated by the alternate long and short dash line 11, and the corners 10a may be broken as shown in FIG.

【0004】このため、この様な破壊が生ずるのを防止
するために、コンクリート強度を高くしたり、コンクリ
ート基礎10の厚さを厚くしたり、或いは鉄筋で補強し
たりする必要がある。
[0004] Therefore, in order to prevent such breakage, it is necessary to increase the concrete strength, increase the thickness of the concrete foundation 10, or reinforce it with reinforcing steel.

【0005】しかし、この様にすると、コンクリート基
礎10の施工にかかるコストが高くなる。また、コンク
リート基礎10の強度を高くするには生コンクリートの
水分を少なくすれば良いが、水分を少なくすると生コン
クリートの流動性が低下し、又、鉄筋で補強したりすれ
ばこの部分のコンクリートの流動性も低下するので、コ
ンクリートの充填不良が生じやすく、かぶり(鉄筋に対
するコンクリートの被覆厚さ)を確保するのが困難であ
る。
However, in this case, the cost for constructing the concrete foundation 10 increases. In order to increase the strength of the concrete foundation 10, it is sufficient to reduce the water content of the ready-mixed concrete. However, when the water content is reduced, the fluidity of the ready-mixed concrete is reduced. Since the fluidity also decreases, poor filling of the concrete is likely to occur, and it is difficult to secure cover (the thickness of the concrete covering the reinforcing steel).

【0006】そこで、この発明は、アンカーボルトに水
平方向の外力が作用しても、この外力によりコンクリー
ト基礎のアンカーボルトに対応する角部が破壊されるの
を未然に防止できるアンカーボルト付基礎構造及びその
施工方法を提供することを目的とするものである。
Accordingly, the present invention provides a foundation structure with an anchor bolt capable of preventing a corner portion corresponding to the anchor bolt of a concrete foundation from being broken even if a horizontal external force acts on the anchor bolt. And an execution method thereof.

【0007】[0007]

【課題を解決するための手段】この目的を達成するた
め、請求項1の発明のアンカーボルト付基礎構造は、コ
ンクリート基礎の上端部にアンカーボルトの下部が埋設
固定されて、前記アンカーボルトが前記コンクリート基
礎の上面から突出させられたアンカーボルトを備えた基
礎構造において、前記アンカーボルトを貫通させた補強
プレートが前記コンクリート基礎の上部に埋設固定され
ていることを特徴とする。この構成によれば、アンカー
ボルトに水平方向の外力が作用しても、この外力がアン
カーボルトの部分からコンクリート基礎に直接入力され
ずに補強プレートを介して分散して入力されることにな
る。これにより、コンクリート基礎のアンカーボルトに
対応する角部が破壊されるのを未然に防止できる。
In order to achieve the above object, according to the first aspect of the present invention, there is provided a foundation structure with an anchor bolt, wherein a lower portion of the anchor bolt is embedded and fixed to an upper end of a concrete foundation, and In a foundation structure having anchor bolts protruding from the upper surface of a concrete foundation, a reinforcing plate having the anchor bolts penetrated is embedded and fixed on an upper portion of the concrete foundation. According to this configuration, even when an external force in the horizontal direction acts on the anchor bolt, the external force is not directly input from the anchor bolt portion to the concrete foundation but is dispersed and input via the reinforcing plate. This can prevent the corners corresponding to the anchor bolts of the concrete foundation from being destroyed.

【0008】また、請求項2の発明のアンカーボルト付
基礎構造は、請求項1において、前記補強プレートは、
前記アンカーボルトが貫通し且つ前記コンクリート基礎
の上部に埋設された水平板部と、前記水平板部に下方に
向けて突設され且つ前記アンカーボルトに外力が作用す
る方向と反対側の側面に埋設係合する側板部を有する構
成としたので、アンカーボルトに作用する外力はアンカ
ーボルトからコンクリート基礎に直接入力されずに外力
が作用する方向とは反対側の側板部で受けられる。この
結果、アンカーボルトに大きな外力が入力されても、こ
の入力によりコンクリート基礎のアンカーボルトに対応
する角部が破壊されるようなことは回避される。
[0008] Further, according to a second aspect of the present invention, there is provided a foundation structure with an anchor bolt according to the first aspect, wherein the reinforcing plate comprises:
A horizontal plate portion through which the anchor bolt penetrates and is buried in the upper part of the concrete foundation; and a side plate protruding downward from the horizontal plate portion and buried in a side surface opposite to a direction in which an external force acts on the anchor bolt. Since the configuration has the side plate portion to be engaged, the external force acting on the anchor bolt is not directly input from the anchor bolt to the concrete foundation, but is received by the side plate portion opposite to the direction in which the external force acts. As a result, even if a large external force is input to the anchor bolt, it is possible to prevent the corner corresponding to the anchor bolt of the concrete foundation from being broken by the input.

【0009】更に、請求項3の発明のアンカーボルト付
基礎構造の施工方法は、対向する型枠間の上部にアンカ
ープレートを保持させると共に、前記アンカープレート
に上下に延びるアンカーボルトを保持させた状態で、前
記型枠間に生コンクリートを前記アンカーボルトの下部
が没入するまで流し込んだ後、前記生コンクリートを硬
化させて前記型枠を取り外すことによりアンカーボルト
付基礎構造を施工する方法において、前記アンカープレ
ートの下方に位置させた補強プレートを前記アンカーボ
ルトの中間部に保持させると共に、前記生コンクリート
を前記補強プレートの部分まで満たして硬化させる様に
したので、簡易に補強プレートをコンクリート基礎の上
端部に埋設できる。
Further, according to a third aspect of the present invention, there is provided the method of constructing a foundation structure with anchor bolts, wherein the anchor plate is held above the opposing formwork and the anchor plate holds vertically extending anchor bolts. In the method of constructing a foundation structure with anchor bolts by pouring ready-mixed concrete between the formwork until the lower part of the anchor bolt is immersed, then hardening the ready-mixed concrete and removing the formwork, The reinforcing plate positioned below the plate is held at the intermediate portion of the anchor bolt, and the ready-mixed concrete is filled up to the reinforcing plate and hardened, so that the reinforcing plate can be easily attached to the upper end of the concrete foundation. Can be buried in

【0010】また、請求項4のアンカーボルト付基礎構
造を施工する方法は、請求項3において、前記補強プレ
ートにコンクリート確認穴を設けておいて、前記生コン
クリートを前記補強プレートの部分まで満たしたときに
前記生コンクリートがコンクリート確認穴から溢れる位
置で前記生コンクリートの流し込みを停止する様にした
ので、補強プレートを目安に生コンクリートの流し込み
高さを容易に確認できる。
According to a fourth aspect of the present invention, in the method for constructing a foundation structure with anchor bolts according to the third aspect, a concrete confirmation hole is provided in the reinforcing plate, and the fresh concrete is filled up to the portion of the reinforcing plate. Since the pouring of the ready-mixed concrete is sometimes stopped at a position where the ready-mixed concrete overflows from the concrete confirmation hole, the pouring height of the ready-mixed concrete can be easily confirmed using the reinforcing plate as a guide.

【0011】[0011]

【発明の実施の形態1】以下、この発明の実施の形態を
図1〜図7に基づいて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below with reference to FIGS.

【0012】図1(a)にいて、地面20には建物に沿
わせる基礎溝21が形成され、基礎溝21の底部に割栗
を投入して搗固た割栗層22が形成されている。この割
栗層22上にはコンクリートを打って形成したフーチン
グ層23が形成され、このフーチング層23上にはコン
クリート基礎24が形成されている。このコンクリート
基礎24の上端部にはアンカーボルト25の下部が埋設
固定されて、アンカーボルト25の上端部がコンクリー
ト基礎24の上面から突出させられている。このアンカ
ーボルト25は、図1(a),(b)中、コンクリート
基礎24の幅方向中央から左側にずらして配置されてい
るので、左側の角部24aがアンカーボルト25に外力
が矢印B方向から作用したとき、アンカーボルト25か
らコンクリート基礎24に外力が直接入力された場合に
は、アンカーボルト25から受ける外力で角部24aが
破壊されやすい傾向にある。
In FIG. 1 (a), a foundation groove 21 is formed along the building on the ground 20, and a split chestnut layer 22 formed by pouring chestnut into the bottom of the foundation groove 21 is formed. . A footing layer 23 formed by hitting concrete is formed on the split chestnut layer 22, and a concrete foundation 24 is formed on the footing layer 23. The lower part of the anchor bolt 25 is embedded and fixed to the upper end of the concrete foundation 24, and the upper end of the anchor bolt 25 projects from the upper surface of the concrete foundation 24. 1 (a) and 1 (b), since the anchor bolt 25 is displaced to the left from the center in the width direction of the concrete foundation 24, external force is applied to the anchor bolt 25 in the direction of arrow B by the left corner 24a. When an external force is directly input to the concrete foundation 24 from the anchor bolt 25 when acting from the angle, the corner 24a tends to be easily broken by the external force received from the anchor bolt 25.

【0013】しかし、コンクリート基礎24の上端部に
は、図1に示したように、アンカーボルト25に対応し
て補強プレート26が埋設固定されている。この補強プ
レート26は、コンクリート基礎24の上端部に埋設さ
れた水平板部26aと、水平板部26aの一端に下方に
向けて突設された厚肉の側板部26bを有する(図2,
図3参照)。そして、側板部26bは、アンカーボルト
に矢印Bでしめした外力が作用する方向と反対側の側面
において、コンクリート基礎24の上端部の側部に埋設
係合している。この水平板部26aの上面はコンクリー
ト基礎24の上面と面一に形成され、側板部26bの外
側面はコンクリート基礎24の側面と面一に形成されて
いる。この側板部26bは、コンクリート基礎24の内
側に位置する。尚、この補強プレート26には金属プレ
ートを用いることができるが、この場合にはコンクリー
ト等に含まれる成分と化学反応をしない材質のものがも
ちいられる。また、この補強プレート26には金属以外
の合成樹脂材料やその他の材料を用いることもできる。
要は、アンカーボルトBに作用する外力がアンカーボル
ト24からコンクリート基礎24に直接入力されて局部
的に作用せず、この外力が分散されてコンクリート基礎
24に入力されたコンクリート基礎24の部分的破損を
防止できれば良い。
However, at the upper end of the concrete foundation 24, as shown in FIG. 1, a reinforcing plate 26 corresponding to the anchor bolt 25 is embedded and fixed. The reinforcing plate 26 has a horizontal plate 26a buried at the upper end of the concrete foundation 24 and a thick side plate 26b protruding downward at one end of the horizontal plate 26a (FIG. 2, FIG. 2).
(See FIG. 3). The side plate 26b is buried and engaged with the side of the upper end of the concrete foundation 24 on the side opposite to the direction in which the external force indicated by the arrow B acts on the anchor bolt. The upper surface of the horizontal plate portion 26a is formed flush with the upper surface of the concrete foundation 24, and the outer surface of the side plate portion 26b is formed flush with the side surface of the concrete foundation 24. The side plate portion 26b is located inside the concrete foundation 24. A metal plate can be used as the reinforcing plate 26. In this case, a material that does not chemically react with components contained in concrete or the like is used. In addition, a synthetic resin material other than metal or another material can be used for the reinforcing plate 26.
The point is that the external force acting on the anchor bolt B is directly input from the anchor bolt 24 to the concrete foundation 24 and does not act locally, and this external force is dispersed and the concrete foundation 24 is partially damaged and input to the concrete foundation 24. It is good if it can be prevented.

【0014】また、水平板部26aには、ネジ穴27と
確認穴28が形成されている。そして、ネジ穴27には
アンカーボルト25のネジ部25aが螺着されていると
共に上方に貫通している。
A screw hole 27 and a confirmation hole 28 are formed in the horizontal plate portion 26a. The screw portion 25a of the anchor bolt 25 is screwed into the screw hole 27 and penetrates upward.

【0015】次に、この様な構造の基礎構造の作用を説
明する。
Next, the operation of the basic structure having such a structure will be described.

【0016】このような構造において、アンカーボルト
25に水平方向の外力が矢印B方向から作用すると、こ
の外力がアンカーボルト25の部分からコンクリート基
礎24に直接入力されずに補強プレート26を介して分
散して入力されることになる。この際、アンカーボルト
25に作用する外力は、外力が作用する方向とは反対側
の側板部26bを介してコンクリート基礎25に入力さ
れる。この結果、アンカーボルト25に大きな外力が矢
印B方向から入力されても、この入力によりコンクリー
ト基礎24のアンカーボルト25に対応する角部24a
が破壊されるようなことは回避される。この様に、コン
クリート基礎24のアンカーボルト25に対応する角部
24aが破壊されるのを未然に防止できる。
In such a structure, when a horizontal external force acts on the anchor bolt 25 from the direction of arrow B, the external force is not directly input from the anchor bolt 25 to the concrete foundation 24 but is dispersed via the reinforcing plate 26. Will be entered. At this time, the external force acting on the anchor bolt 25 is input to the concrete foundation 25 via the side plate 26b opposite to the direction in which the external force acts. As a result, even if a large external force is input to the anchor bolt 25 from the direction of arrow B, the input causes the corner portion 24a corresponding to the anchor bolt 25 of the concrete foundation 24 to be input.
Is prevented from being destroyed. In this manner, the corners 24a of the concrete foundation 24 corresponding to the anchor bolts 25 can be prevented from being destroyed.

【0017】[0017]

【発明の実施の形態2】次に、この様な基礎構造の施工
方法を説明する。
[Embodiment 2] Next, a method of constructing such a foundation structure will be described.

【0018】まず、地面20に建物に沿わせる基礎溝2
1を形成し、基礎溝21の底部に割栗を投入して搗固て
割栗層22を形成し、割栗層22上にコンクリートを打
ってたフーチング層23を形成する。次に、このフーチ
ング層23上に型枠29,29を対向させると共に間隔
を置いて配設し、この型枠29,29を図示しない支持
部材で地面20に支持させる。
First, a foundation groove 2 on the ground 20 along the building
1 is formed, and split chestnuts are put into the bottom of the base groove 21 and crushed to form a split chestnut layer 22, and a footing layer 23 made of concrete is formed on the split chestnut layer 22. Next, the molds 29, 29 are arranged on the footing layer 23 so as to face each other and at an interval, and the molds 29, 29 are supported on the ground 20 by a support member (not shown).

【0019】一方、アンカーボルト25のネジ部25a
をネジ穴27に螺合して、ネジ部25aを水平板部26
aから図5に示したように上方に突出させることによ
り、アンカーボルト25に補強プレート26を保持させ
(取り付け)る。そして、図6に示したように、このネ
ジ部25aに固定ナット30を螺着した後、ネジ部25
aをアンカープレート31の図示しない挿通孔に挿通
し、固定ナット32を更にネジ部25aに螺着すること
により、固定ナット30,32間にアンカープレート3
1を保持させる。この様にしてアンカーボルト24及び
補強プレート26が保持されたアンカープレート31を
用意する。
On the other hand, the screw portion 25a of the anchor bolt 25
Is screwed into the screw hole 27, and the screw portion 25a is
5A, the reinforcing plate 26 is held (attached) to the anchor bolt 25 by projecting upward as shown in FIG. Then, as shown in FIG. 6, after the fixing nut 30 is screwed to the screw portion 25a, the screw portion 25a is
a into the insertion hole (not shown) of the anchor plate 31, and the fixing nut 32 is further screwed to the screw portion 25 a, so that the anchor plate 3 is fixed between the fixing nuts 30 and 32.
Hold 1 Thus, the anchor plate 31 holding the anchor bolt 24 and the reinforcing plate 26 is prepared.

【0020】次に、このアンカープレート31に保持さ
せたアンカーボルト24及び補強プレート26を図4に
示したように型枠29,29間に挿入配設すると共に、
アンカープレート31の両端部を型枠29,29の上端
部に図示しないボルトで固定する。この際、補強プレー
ト26の側板部26bが型枠29,29の一方に内接す
る。この状態で固定ナット30,32を緩めて、固定ナ
ット30の上下位置を調整すると共に、アンカーボルト
25を回転操作して、補強プレート26の高さを調節し
た後、固定ナット30,32で補強プレートを締め付け
固定する。
Next, as shown in FIG. 4, the anchor bolt 24 and the reinforcing plate 26 held by the anchor plate 31 are inserted and arranged between the mold frames 29, 29, and
Both ends of the anchor plate 31 are fixed to upper ends of the molds 29, 29 with bolts (not shown). At this time, the side plate 26b of the reinforcing plate 26 is inscribed in one of the molds 29,29. In this state, the fixing nuts 30 and 32 are loosened, the vertical position of the fixing nut 30 is adjusted, the anchor bolt 25 is rotated, and the height of the reinforcing plate 26 is adjusted. Tighten and fix the plate.

【0021】この後、型枠29,29間に生コンクリー
ト33を図7に示したように流し込む。この際、生コン
クリート33はアンカーボルト25の下部が没入するま
で流し込むと共に、生コンクリート33を補強プレート
26の部分まで満たす。しかも、このときに生コンクリ
ート33がコンクリート確認穴28から上方に溢れ出始
めたのを確認して、この位置で生コンクリートの流し込
みを停止する。この様にすることで、補強プレート26
を目安に生コンクリート33の流し込み高さを容易に確
認できる。
Thereafter, ready-mixed concrete 33 is poured between the molds 29, 29 as shown in FIG. At this time, the ready-mixed concrete 33 is poured until the lower portion of the anchor bolt 25 is immersed, and the ready-mixed concrete 33 is filled up to the reinforcing plate 26. In addition, at this time, it is confirmed that the fresh concrete 33 has begun to overflow from the concrete confirmation hole 28, and the pouring of the ready-mixed concrete is stopped at this position. By doing so, the reinforcing plate 26
As a guide, the pouring height of the ready-mixed concrete 33 can be easily confirmed.

【0022】そして、この生コンクリート33を硬化し
た後、型枠29,29を取り外して形成したコンクリー
ト基礎24の周囲に土盛りすることで、コンクリート基
礎24にアンカーボルト25及び補強プレート26が取
り付けられた基礎構造の施工が完了し、図1に示したよ
うな基礎構造が得られる。
After the ready-mixed concrete 33 has hardened, the anchors 25 and the reinforcing plates 26 are attached to the concrete foundation 24 by removing the formwork 29, 29 and embedding the concrete foundation 24 around the concrete foundation 24. The construction of the foundation structure is completed, and the foundation structure as shown in FIG. 1 is obtained.

【0023】[0023]

【発明の効果】請求項1の発明のアンカーボルト付基礎
構造は、コンクリート基礎の上端部にアンカーボルトの
下部が埋設固定されて、前記アンカーボルトが前記コン
クリート基礎の上面から突出させられたアンカーボルト
を備えた基礎構造において、前記アンカーボルトを貫通
させた補強プレートが前記コンクリート基礎の上部に埋
設固定されていることを特徴とする。この構成によれ
ば、アンカーボルトに水平方向の外力が作用しても、こ
の外力がアンカーボルトの部分からコンクリート基礎に
直接入力されずに補強プレートを介して分散して入力さ
れることになる。これにより、コンクリート基礎のアン
カーボルトに対応する角部が破壊されるのを未然に防止
できる。
According to the first aspect of the present invention, there is provided a foundation structure with an anchor bolt, wherein a lower portion of the anchor bolt is embedded and fixed to an upper end portion of the concrete foundation, and the anchor bolt projects from an upper surface of the concrete foundation. Wherein the reinforcing plate having the anchor bolts penetrated therein is embedded and fixed on the upper part of the concrete foundation. According to this configuration, even when an external force in the horizontal direction acts on the anchor bolt, the external force is not directly input from the anchor bolt portion to the concrete foundation but is dispersed and input via the reinforcing plate. This can prevent the corners corresponding to the anchor bolts of the concrete foundation from being destroyed.

【0024】また、請求項2の発明のアンカーボルト付
基礎構造は、請求項1において、前記補強プレートは、
前記アンカーボルトが貫通し且つ前記コンクリート基礎
の上部に埋設された水平板部と、前記水平板部に下方に
向けて突設され且つ前記アンカーボルトに外力が作用す
る方向と反対側の側面に埋設係合する側板部を有する構
成としたので、アンカーボルトに作用する外力はアンカ
ーボルトからコンクリート基礎に直接入力されずに外力
が作用する方向とは反対側の側板部で受けられる。この
結果、アンカーボルトに大きな外力が入力されても、こ
の入力によりコンクリート基礎のアンカーボルトに対応
する角部が破壊されるようなことは回避される。
According to a second aspect of the present invention, there is provided a foundation structure with an anchor bolt according to the first aspect, wherein the reinforcing plate comprises:
A horizontal plate portion through which the anchor bolt penetrates and is buried in the upper part of the concrete foundation; and a side plate protruding downward from the horizontal plate portion and buried in a side surface opposite to a direction in which an external force acts on the anchor bolt. Since the configuration has the side plate portion to be engaged, the external force acting on the anchor bolt is not directly input from the anchor bolt to the concrete foundation, but is received by the side plate portion opposite to the direction in which the external force acts. As a result, even if a large external force is input to the anchor bolt, it is possible to prevent the corner corresponding to the anchor bolt of the concrete foundation from being broken by the input.

【0025】更に、請求項3の発明のアンカーボルト付
基礎構造の施工方法は、対向する型枠間の上部にアンカ
ープレートを保持させると共に、前記アンカープレート
に上下に延びるアンカーボルトを保持させた状態で、前
記型枠間に生コンクリートを前記アンカーボルトの下部
が没入するまで流し込んだ後、前記生コンクリートを硬
化させて前記型枠を取り外すことによりアンカーボルト
付基礎構造を施工する方法において、前記アンカープレ
ートの下方に位置させた補強プレートを前記アンカーボ
ルトの中間部に保持させると共に、前記生コンクリート
を前記補強プレートの部分まで満たして硬化させる様に
したので、簡易に補強プレートをコンクリート基礎の上
端部に埋設できる。
Further, in the construction method of a foundation structure with an anchor bolt according to the third aspect of the present invention, the anchor plate is held above the opposing formwork and the anchor plate holds the vertically extending anchor bolt. In the method of constructing a foundation structure with anchor bolts by pouring ready-mixed concrete between the formwork until the lower part of the anchor bolt is immersed, then curing the ready-mixed concrete and removing the formwork, The reinforcing plate positioned below the plate is held at the intermediate portion of the anchor bolt, and the ready-mixed concrete is filled up to the reinforcing plate and hardened, so that the reinforcing plate can be easily attached to the upper end of the concrete foundation. Can be buried in

【0026】また、請求項4のアンカーボルト付基礎構
造を施工する方法は、請求項3において、前記補強プレ
ートにコンクリート確認穴を設けておいて、前記生コン
クリートを前記補強プレートの部分まで満たしたときに
前記生コンクリートがコンクリート確認穴から溢れる位
置で前記生コンクリートの流し込みを停止する様にした
ので、補強プレートを目安に生コンクリートの流し込み
高さを容易に確認できる。
According to a fourth aspect of the present invention, in the method for constructing a foundation structure with anchor bolts according to the third aspect, a concrete confirmation hole is provided in the reinforcing plate, and the fresh concrete is filled up to the portion of the reinforcing plate. Since the pouring of the ready-mixed concrete is sometimes stopped at a position where the ready-mixed concrete overflows from the concrete confirmation hole, the pouring height of the ready-mixed concrete can be easily confirmed using the reinforcing plate as a guide.

【図面の簡単な説明】[Brief description of the drawings]

【図1】(a)はこの発明にかかるアンカーボルト付基
礎構造の断面図、(b)は(a)のコンクリート基礎の
斜視図である。
FIG. 1A is a sectional view of a foundation structure with anchor bolts according to the present invention, and FIG. 1B is a perspective view of a concrete foundation of FIG.

【図2】図1(a),(b)に示した補強プレートの平
面図である。
FIG. 2 is a plan view of a reinforcing plate shown in FIGS. 1 (a) and 1 (b).

【図3】図1(a),(b)に示した補強プレートの側
面図である。
FIG. 3 is a side view of the reinforcing plate shown in FIGS. 1 (a) and 1 (b).

【図4】この発明にかかるアンカーボルト付補強プレー
トを型枠に組み付けた断面図である。
FIG. 4 is a cross-sectional view in which a reinforcing plate with anchor bolts according to the present invention is assembled to a mold.

【図5】図4のアンカーボルトと補強プレートとの関係
を示す側面図である。
FIG. 5 is a side view showing a relationship between the anchor bolt and the reinforcing plate of FIG. 4;

【図6】図5のアンカーボルトにアンカープレートを取
り付けた側面図である。
FIG. 6 is a side view in which an anchor plate is attached to the anchor bolt of FIG. 5;

【図7】図4の型枠間に生コンクリートを流した状態の
断面図である。
FIG. 7 is a cross-sectional view of a state in which ready-mixed concrete is poured between the molds of FIG.

【図8】従来のアンカーボルト付基礎構造の施工方法の
断面図である。
FIG. 8 is a sectional view of a conventional method for constructing a foundation structure with anchor bolts.

【図9】図8の型枠を取り外して土盛りをした断面図で
ある。
FIG. 9 is a cross-sectional view in which the mold of FIG.

【図10】図8のコンクリート基礎の作用説明のための
断面図である。
FIG. 10 is a sectional view for explaining the operation of the concrete foundation of FIG. 8;

【符号の説明】 24・・・コンクリート基礎 25・・・アンカーボルト 26・・・補強プレート 26a・・・水平板部 26b・・・側板部 28・・・コンクリート確認穴 29・・・型枠[Description of Signs] 24 ・ ・ ・ Concrete Foundation 25 ・ ・ ・ Anchor Bolt 26 ・ ・ ・ Reinforcement Plate 26a ・ ・ ・ Horizontal Plate 26b ・ ・ ・ Side Plate 28 ・ ・ ・ Concrete Confirmation Hole 29 ・ ・ ・ Form

フロントページの続き Fターム(参考) 2D046 AA03 BA00 BA11 2E125 AA02 AA45 AB12 AB13 AC04 AC14 AC18 AG03 AG52 BA04 BA22 BB02 BB22 BB24 BB27 BD01 BD03 BE07 BE08 BF01 CA05 CA13 EA00 EA11 EB12Continued on the front page F term (reference) 2D046 AA03 BA00 BA11 2E125 AA02 AA45 AB12 AB13 AC04 AC14 AC18 AG03 AG52 BA04 BA22 BB02 BB22 BB24 BB27 BD01 BD03 BE07 BE08 BF01 CA05 CA13 EA00 EA11 EB12

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】コンクリート基礎の上端部にアンカーボル
トの下部が埋設固定されて、前記アンカーボルトが前記
コンクリート基礎の上面から突出させられたアンカーボ
ルトを備えた基礎構造において、 前記アンカーボルトを貫通させた補強プレートが前記コ
ンクリート基礎の上部に埋設固定されていることを特徴
とするアンカーボルト付基礎構造。
1. A foundation structure having an anchor bolt buried and fixed to an upper end portion of a concrete foundation, the anchor bolt protruding from an upper surface of the concrete foundation, wherein the anchor bolt is penetrated. A foundation structure with anchor bolts, characterized in that a reinforcing plate is embedded and fixed above the concrete foundation.
【請求項2】前記補強プレートは、前記アンカーボルト
が貫通し且つ前記コンクリート基礎の上部に埋設された
水平板部と、前記水平板部に下方に向けて突設され且つ
前記アンカーボルトに外力が作用する方向と反対側の側
面に埋設係合する側板部を有することを特徴とする請求
項1に記載のアンカーボルト付基礎構造。
2. The reinforcing plate has a horizontal plate portion penetrated by the anchor bolt and buried in the upper portion of the concrete foundation, and a reinforcing plate protruded downward from the horizontal plate portion, and an external force is applied to the anchor bolt. The base structure with an anchor bolt according to claim 1, further comprising a side plate portion buried and engaged on a side surface opposite to a working direction.
【請求項3】対向する型枠間の上部にアンカープレート
を保持させると共に、前記アンカープレートに上下に延
びるアンカーボルトを保持させた状態で、前記型枠間に
生コンクリートを前記アンカーボルトの下部が没入する
まで流し込んだ後、前記生コンクリートを硬化させて前
記型枠を取り外すことによりアンカーボルト付基礎構造
の施工方法において、 前記アンカープレートの下方に位置させた補強プレート
を前記アンカーボルトの中間部に保持させると共に、前
記生コンクリートを前記補強プレートの部分まで満たし
て硬化させることを特徴とするアンカーボルト付基礎構
造の施工方法。
3. An anchor plate is held at an upper portion between opposing molds, and in a state where an anchor bolt extending up and down is held by the anchor plate, ready-mixed concrete is placed between the molds and a lower portion of the anchor bolts. After pouring until immersed, in the construction method of the foundation structure with anchor bolts by hardening the ready-mixed concrete and removing the formwork, a reinforcing plate located below the anchor plate is placed in the middle part of the anchor bolt A method of constructing a foundation structure with anchor bolts, wherein the foundation is held and at the same time, the ready-mixed concrete is filled up to the reinforcing plate and hardened.
【請求項4】前記補強プレートにコンクリート確認穴を
設けておいて、前記生コンクリートを前記補強プレート
の部分まで満たしたときに前記生コンクリートがコンク
リート確認穴から溢れる位置で前記生コンクリートの流
し込みを停止することを特徴とする請求項3に記載のア
ンカーボルト付基礎構造の施工方法。
4. A concrete confirmation hole is provided in the reinforcing plate, and when the ready-mixed concrete is filled up to the portion of the reinforcing plate, pouring of the ready-mixed concrete is stopped at a position where the ready-mixed concrete overflows from the concrete confirmation hole. The method for constructing a foundation structure with anchor bolts according to claim 3, wherein:
JP2000280259A 2000-09-14 2000-09-14 Foundation structure with anchor bolt and its construction method Expired - Fee Related JP3713192B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000280259A JP3713192B2 (en) 2000-09-14 2000-09-14 Foundation structure with anchor bolt and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000280259A JP3713192B2 (en) 2000-09-14 2000-09-14 Foundation structure with anchor bolt and its construction method

Publications (2)

Publication Number Publication Date
JP2002088775A true JP2002088775A (en) 2002-03-27
JP3713192B2 JP3713192B2 (en) 2005-11-02

Family

ID=18765135

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000280259A Expired - Fee Related JP3713192B2 (en) 2000-09-14 2000-09-14 Foundation structure with anchor bolt and its construction method

Country Status (1)

Country Link
JP (1) JP3713192B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006265893A (en) * 2005-03-23 2006-10-05 Misawa Homes Co Ltd Foundation structure
JP2006316478A (en) * 2005-05-12 2006-11-24 Sekisui Chem Co Ltd Joint structure of building unit for joining to foundation
JP2007277964A (en) * 2006-04-07 2007-10-25 Sekisui Chem Co Ltd Foundation structure with anchor bolt and execution method therefor
JP2008255724A (en) * 2007-04-06 2008-10-23 Sekisui Chem Co Ltd Jig for execution of work of foundation structure with anchor bolt

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006265893A (en) * 2005-03-23 2006-10-05 Misawa Homes Co Ltd Foundation structure
JP4519689B2 (en) * 2005-03-23 2010-08-04 ミサワホーム株式会社 Foundation structure
JP2006316478A (en) * 2005-05-12 2006-11-24 Sekisui Chem Co Ltd Joint structure of building unit for joining to foundation
JP2007277964A (en) * 2006-04-07 2007-10-25 Sekisui Chem Co Ltd Foundation structure with anchor bolt and execution method therefor
JP2008255724A (en) * 2007-04-06 2008-10-23 Sekisui Chem Co Ltd Jig for execution of work of foundation structure with anchor bolt

Also Published As

Publication number Publication date
JP3713192B2 (en) 2005-11-02

Similar Documents

Publication Publication Date Title
JP2002088775A (en) Foundation structure equipped with anchor bolt and method for constructing the same
JPH1113072A (en) Basement structural body, and construction method thereof
JP3029343U (en) Form tool for mortar material injection in exposed elastic fixed column base method
JPS59192145A (en) Fixing of iron pillar
JPS6134535B2 (en)
JP2516653B2 (en) Exposed type fixed pedestal
JPH0674591B2 (en) Anchor support beam construction method
JPH0115763Y2 (en)
JPH0626395Y2 (en) Installation structure of septic tanks
JP4758803B2 (en) Foundation structure with anchor bolt and its construction method
JP3028011B2 (en) Concrete wall fixing structure and construction method
JPS6145240Y2 (en)
JPH07113240A (en) Housing long-strip footing and construction method thereof
JP4231344B2 (en) The method of erection of pillars in the lightweight embankment method and the anchor bolt positioning jig used therefor
JP2889856B2 (en) Concrete block
JP2723418B2 (en) Formwork for foundation construction
JP2507676Y2 (en) Concrete cloth foundation assembly member positioning jig
JP3126097B2 (en) Basic structure of two-stage parking device
JP2891107B2 (en) SRC column base anchoring structure
JPH0376929A (en) Steel-framed foundation
JPH0988082A (en) Fixing method and structure of building material
JPH0743177Y2 (en) Mounting structure of concrete cloth foundation and precast concrete wall slab
JP2997661B2 (en) Base plate material
JPH10152990A (en) Method for vertical placing joint, and embedded sheathing board therefor
JP2599258Y2 (en) Beam main bar anchorage device at the connection between column and beam

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050518

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050629

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050727

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050819

R151 Written notification of patent or utility model registration

Ref document number: 3713192

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090826

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090826

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100826

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110826

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110826

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120826

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120826

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130826

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees