JP2008255724A - Jig for execution of work of foundation structure with anchor bolt - Google Patents

Jig for execution of work of foundation structure with anchor bolt Download PDF

Info

Publication number
JP2008255724A
JP2008255724A JP2007101148A JP2007101148A JP2008255724A JP 2008255724 A JP2008255724 A JP 2008255724A JP 2007101148 A JP2007101148 A JP 2007101148A JP 2007101148 A JP2007101148 A JP 2007101148A JP 2008255724 A JP2008255724 A JP 2008255724A
Authority
JP
Japan
Prior art keywords
anchor
plate
horizontal piece
reinforcing plate
anchor bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007101148A
Other languages
Japanese (ja)
Inventor
Masayoshi Shimizu
正義 清水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2007101148A priority Critical patent/JP2008255724A/en
Publication of JP2008255724A publication Critical patent/JP2008255724A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To simply adjust places of set heights of an anchor bolt and a reinforcing plate, and to finely adjust the height of the reinforcing plate when concrete is placed in a foundation structure with the anchor bolt. <P>SOLUTION: A jig 50 for the execution of works of the foundation structure with the anchor bolt has anchor plates 60 and screws 80 for adjusting the reinforcing plates mounted to the anchor plates 60. The anchor plates 60 are held to upper sections of opposite forms 30, and hold the upper end of the anchor bolt 25. The screws 80 for adjusting the reinforcing plates are made to abut against the reinforcing plates 26, and the height places of the reinforcing plates 26 to the anchor plates 60 are adjusted. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明はアンカーボルト付基礎構造の施工用治具に関する。   The present invention relates to a construction jig for a foundation structure with anchor bolts.

従来、住宅等の建物の基礎構造では、コンクリート基礎の上端部にアンカーボルトの下部を埋設固定し、アンカーボルトをコンクリート基礎の上面から突出させている。   Conventionally, in a foundation structure of a building such as a house, a lower portion of an anchor bolt is embedded and fixed to an upper end portion of a concrete foundation, and the anchor bolt protrudes from the upper surface of the concrete foundation.

特許文献1には、対向する型枠間の上部にアンカープレートを保持させ、このアンカープレートの中間部に保持させたアンカーボルトに補強プレートを固定した状態で、生コンクリートを型枠間に流し込み、この補強プレートをコンクリート基礎の上端部に埋設固定するものが開示されている。これによれば、アンカーボルトに水平方向の外力が作用しても、この外力がアンカーボルトの部分からコンクリート基礎に直接入力されずに補強プレートを介して分散して入力されることになり、コンクリート基礎のアンカーボルトに対応する角部が破壊されるのを未然に防止できる。
特開2002-88775
In Patent Document 1, the anchor plate is held at the upper part between the opposing molds, and the concrete is poured between the molds in a state where the reinforcing plate is fixed to the anchor bolts held in the middle part of the anchor plate. There is disclosed a technique in which the reinforcing plate is embedded and fixed to an upper end portion of a concrete foundation. According to this, even if a horizontal external force acts on the anchor bolt, this external force is not input directly from the anchor bolt portion to the concrete foundation but is distributed and input via the reinforcing plate. It is possible to prevent the corner portion corresponding to the anchor bolt of the foundation from being destroyed.
JP2002-88775

特許文献1のアンカーボルト付基礎構造には以下の不都合がある。
(1)型枠に対するアンカープレートの高さ位置調整手段がなく、ひいては基礎に埋設固定化されるアンカーボルト及び補強プレートのセット高さ位置を簡易に調整できない。
The foundation structure with anchor bolts of Patent Document 1 has the following disadvantages.
(1) There is no means for adjusting the height position of the anchor plate relative to the formwork, and as a result, the set height position of the anchor bolt and the reinforcing plate embedded and fixed to the foundation cannot be easily adjusted.

(2)コンクリート打設時に、アンカーボルトに固定した補強プレートが生コンクリートの圧力によって浮き上がるのに対抗する手段がなく、補強プレートが対向する型枠間で傾くことを防止したり、微妙な高さ調整ができない。   (2) When placing concrete, there is no means to resist the reinforcement plate fixed to the anchor bolts from being lifted by the pressure of ready-mixed concrete, preventing the reinforcement plate from tilting between opposing molds, Adjustment is not possible.

本発明の課題は、アンカーボルト付基礎構造において、アンカーボルト及び補強プレートのセット高さ位置を簡易に調整可能にし、かつコンクリート打設時に補強プレートを微妙に高さ調整可能にすることにある。   SUMMARY OF THE INVENTION An object of the present invention is to make it possible to easily adjust the set height position of an anchor bolt and a reinforcing plate in a foundation structure with an anchor bolt, and to make the height of a reinforcing plate finely adjustable when placing concrete.

請求項1の発明は、アンカーボルトの中間部に設けた補強プレートをコンクリート基礎の上部に埋設固定してなるアンカーボルト付基礎構造の施工用治具であって、アンカープレートと、該アンカープレートに設けられる補強プレート調整用ねじとを有し、アンカープレートは対向する型枠の上部に保持され、アンカーボルトの上端部を保持し、補強プレート調整用ねじは補強プレートに衝合し、アンカープレートに対する補強プレートの高さ位置を調整するようにしたものである。   The invention of claim 1 is a construction jig for a foundation structure with an anchor bolt formed by embedding and fixing a reinforcing plate provided in an intermediate portion of an anchor bolt in an upper portion of a concrete foundation, and includes an anchor plate and the anchor plate. A reinforcing plate adjusting screw provided, the anchor plate is held at the upper part of the opposite formwork, holds the upper end of the anchor bolt, and the reinforcing plate adjusting screw abuts the reinforcing plate, The height position of the reinforcing plate is adjusted.

請求項2の発明は、請求項1の発明において更に、前記アンカープレートが型枠の上部に保持される第1水平片と、補強プレート調整用ねじを備えた第2水平片とを有し、第1水平片から下方に折曲げた下向き折曲げ部の下端に第2水平片を設けたものである。   The invention of claim 2 further comprises a first horizontal piece in which the anchor plate is held on the upper part of the mold, and a second horizontal piece having a reinforcing plate adjusting screw. A second horizontal piece is provided at the lower end of the downward bent portion bent downward from the first horizontal piece.

請求項3の発明は、請求項1の発明において更に、前記アンカープレートが型枠の上部に保持される第1水平片と、補強プレート調整用ねじを備えた第2水平片とを有し、第1水平片から上方に折曲げた上向き折曲げ部の上端に第2水平片を設けたものである。   The invention of claim 3 further includes a first horizontal piece in which the anchor plate is held on the upper part of the mold, and a second horizontal piece having a reinforcing plate adjusting screw. A second horizontal piece is provided at the upper end of the upward bent portion bent upward from the first horizontal piece.

請求項4の発明は、請求項1〜3のいずれかの発明において更に、前記アンカープレートが型枠の長手方向に沿う複数位置のそれぞれにアンカーボルト保持部を備え、各アンカーボルト保持部毎に補強プレート調整用ねじを付帯して有するようにしたものである。   According to a fourth aspect of the present invention, in the invention according to any one of the first to third aspects, the anchor plate further includes an anchor bolt holding portion at each of a plurality of positions along the longitudinal direction of the mold, and for each anchor bolt holding portion. A reinforcing plate adjusting screw is provided as an accessory.

(請求項1)
(a)アンカープレートに設けた補強プレート調整用ねじが補強プレートに衝合し、アンカープレートに対する補強プレートの高さ位置を調整する。従って、補強プレート調整用ねじは、コンクリート打設時に、アンカーボルトに固定した補強プレートが生コンクリートの圧力によって浮き上がるのに対抗し、補強プレートが対向する型枠間で傾くことを防止したり、微妙な高さ調整することができる。
(Claim 1)
(a) The reinforcing plate adjusting screw provided on the anchor plate abuts on the reinforcing plate to adjust the height position of the reinforcing plate with respect to the anchor plate. Therefore, the reinforcing plate adjustment screw prevents the reinforcing plate fixed to the anchor bolts from being lifted by the pressure of ready-mixed concrete during concrete placement, and prevents the reinforcing plate from tilting between the opposing molds. Height can be adjusted.

(請求項2)
(b)アンカープレートが型枠の上部に保持される第1水平片と、補強プレート調整用ねじを備えた第2水平片とを有し、第1水平片から下方に折曲げた下向き折曲げ部の下端に第2水平片を設けた。従って、アンカープレートの第1水平片が型枠の上部に配置されたとき、第2水平片を型枠の内側下方に近づく側に配置するものになり、このアンカープレートを全高の高い大型の型枠に好適に適用にできる。
(Claim 2)
(b) The first horizontal piece on which the anchor plate is held on the upper part of the formwork and the second horizontal piece having the reinforcing plate adjusting screw, and the downward bending that is bent downward from the first horizontal piece. The 2nd horizontal piece was provided in the lower end of the part. Therefore, when the first horizontal piece of the anchor plate is arranged on the upper part of the mold, the second horizontal piece is arranged on the side closer to the inside and lower side of the mold, and this anchor plate is placed on a large mold having a high overall height. It can be suitably applied to a frame.

(請求項3)
(c)アンカープレートが型枠の上部に保持される第1水平片と、補強プレート調整用ねじを備えた第2水平片とを有し、第1水平片から上方に折曲げた上向き折曲げ部の上端に第2水平片を設けた。従って、アンカープレートの第1水平片が型枠の上部に配置されたとき、第2水平片を型枠の上方に配置するものになり、このアンカープレートを全高の低い小型の型枠に好適に適用できる。
(Claim 3)
(c) The first horizontal piece in which the anchor plate is held on the upper part of the mold, and the second horizontal piece having a reinforcing plate adjusting screw, and the upper plate is bent upward from the first horizontal piece. The 2nd horizontal piece was provided in the upper end of the part. Therefore, when the first horizontal piece of the anchor plate is arranged on the upper part of the formwork, the second horizontal piece is arranged above the formwork, and this anchor plate is suitable for a small formwork having a low overall height. Applicable.

(請求項4)
(d)アンカープレートが型枠の長手方向に沿う複数位置のそれぞれにアンカーボルト保持部を備え、各アンカーボルト保持部毎に補強プレート調整用ねじを付帯して有するようにした。従って、基礎の近接する複数位置にアンカーボルトを埋設固定するとき、単一のアンカープレートによりそれらのアンカーボルト及び補強プレートに対応でき、アンカープレートの使用個数を削減し、補強工数も削減できる。
(Claim 4)
(d) The anchor plate is provided with an anchor bolt holding portion at each of a plurality of positions along the longitudinal direction of the mold, and a reinforcing plate adjusting screw is attached to each anchor bolt holding portion. Therefore, when anchor bolts are embedded and fixed at a plurality of positions adjacent to the foundation, the anchor bolts and the reinforcement plates can be handled by a single anchor plate, and the number of anchor plates used can be reduced and the number of reinforcement steps can be reduced.

図1はアンカーボルト付基礎構造を示す断面図、図2はアンカーボルト付基礎構造を示す模式斜視図、図3はアンカーボルト付基礎構造に建物構造体を据付けた例を示す断面図、図4は施工用治具を示す平面図、図5は施工用治具を示す端面図、図6は施工用治具を示す端面図、図7は施工用治具をユニット建物に使用した位置を示す模式図、図8は施工用治具をユニット建物に使用した位置を示す模式図、図9は施工用治具を型枠にセットした状態を示す断面図、図10は生コンクリートの流し込み状態を示す断面図、図11は施工用治具を示す端面図、図12は施工用治具を型枠にセットした状態を示す断面図である。   1 is a sectional view showing a foundation structure with anchor bolts, FIG. 2 is a schematic perspective view showing a foundation structure with anchor bolts, FIG. 3 is a sectional view showing an example in which a building structure is installed on the foundation structure with anchor bolts, and FIG. Is a plan view showing the construction jig, FIG. 5 is an end view showing the construction jig, FIG. 6 is an end view showing the construction jig, and FIG. 7 is a position where the construction jig is used in the unit building. Schematic diagram, Fig. 8 is a schematic diagram showing the position where the construction jig is used in the unit building, Fig. 9 is a cross-sectional view showing a state where the construction jig is set on the formwork, and Fig. 10 shows the pouring state of the ready-mixed concrete. FIG. 11 is an end view showing the construction jig, and FIG. 12 is a sectional view showing the construction jig set on the mold.

図1において、地面20には建物に沿わせる基礎溝21が形成され、基礎溝21の底部に割栗を投入して搗固た割栗層22が形成されている。この割栗層22上にはコンクリートを打って形成したフーチング層23が形成され、このフーチング層23上にはコンクリート基礎24が形成されている。このコンクリート基礎24の上端部にはアンカーボルト25の下部が埋設固定されて、アンカーボルト25の上端部がコンクリート基礎24の上面から突出させられている。このアンカーボルト25は、図1、図2において、コンクリート基礎24の幅方向中央から右側にずらして配置されているので、右側の角部24aがアンカーボルト25に外力が矢印B方向から作用したとき、アンカーボルト25からコンクリート基礎24に外力が直接入力された場合には、アンカーボルト25から受ける外力で角部24aが破壊されやすい傾向にある。   In FIG. 1, a foundation groove 21 that extends along a building is formed on the ground 20, and a split chestnut layer 22 is formed by adding the chestnut to the bottom of the foundation groove 21. A footing layer 23 formed by hitting concrete is formed on the split chestnut layer 22, and a concrete foundation 24 is formed on the footing layer 23. A lower portion of the anchor bolt 25 is embedded and fixed at the upper end portion of the concrete foundation 24, and the upper end portion of the anchor bolt 25 is protruded from the upper surface of the concrete foundation 24. 1 and 2, the anchor bolt 25 is arranged so as to be shifted from the center of the width direction of the concrete foundation 24 to the right side. Therefore, when the right corner 24a acts on the anchor bolt 25 from the direction of the arrow B, When an external force is directly input from the anchor bolt 25 to the concrete foundation 24, the corner portion 24a tends to be easily broken by the external force received from the anchor bolt 25.

しかし、コンクリート基礎24の上端部には、図1、図2に示したように、アンカーボルト25に対応して補強プレート26が埋設固定されている。このとき、アンカーボルト25には補強プレート26が遊挿されるとともに、上下のナット27a、27bが螺着され、下ナット27bは補強プレート26の下面側にてコンクリート基礎24に埋設される。   However, as shown in FIGS. 1 and 2, a reinforcing plate 26 is embedded and fixed to the upper end portion of the concrete foundation 24 in correspondence with the anchor bolt 25. At this time, the reinforcing plate 26 is loosely inserted into the anchor bolt 25, and upper and lower nuts 27 a and 27 b are screwed, and the lower nut 27 b is embedded in the concrete foundation 24 on the lower surface side of the reinforcing plate 26.

補強プレート26は、コンクリート基礎24の上部に埋設された水平板部26aと、水平板部26aの左端と右端のそれぞれにおいて下方に向けて突設された側板部26b、26cを有する。側板部26cは必須とされない。側板部26bは、アンカーボルトに矢印Bで示した外力が作用する方向と反対側の側面において、コンクリート基礎24の上端部の側部に埋設係合している。この水平板部26aの上面はコンクリート基礎24の上面と面一に形成され、側板部26b、26cの外側面はコンクリート基礎24の側面と面一に形成されている。尚、この補強プレート26には金属プレートを用いることができるが、この場合にはコンクリート等に含まれる成分と化学反応をしない材質のものが用いられる。また、この補強プレート26には金属以外の合成樹脂材料やその他の材料を用いることもできる。要は、アンカーボルトBに作用する外力がアンカーボルト24からコンクリート基礎24に直接入力されて局部的に作用せず、この外力が分散されてコンクリート基礎24に入力されたコンクリート基礎24の部分的破損を防止できれば良い。   The reinforcing plate 26 has a horizontal plate portion 26a embedded in the upper portion of the concrete foundation 24, and side plate portions 26b and 26c protruding downward at each of the left end and the right end of the horizontal plate portion 26a. The side plate part 26c is not essential. The side plate portion 26 b is embedded and engaged with the side portion of the upper end portion of the concrete foundation 24 on the side surface opposite to the direction in which the external force indicated by the arrow B acts on the anchor bolt. The upper surface of the horizontal plate portion 26 a is formed flush with the upper surface of the concrete foundation 24, and the outer surfaces of the side plate portions 26 b and 26 c are formed flush with the side surface of the concrete foundation 24. A metal plate can be used for the reinforcing plate 26. In this case, a material that does not chemically react with components contained in concrete or the like is used. The reinforcing plate 26 may be made of a synthetic resin material other than metal or other materials. In short, the external force acting on the anchor bolt B is directly input from the anchor bolt 24 to the concrete foundation 24 and does not act locally, and this external force is dispersed and input to the concrete foundation 24 to cause partial damage. If it can prevent.

尚、水平板部26aには、アンカーボルト25が遊挿されるボルト挿通穴28と確認穴29が形成されている。   The horizontal plate portion 26a has a bolt insertion hole 28 and a confirmation hole 29 into which the anchor bolt 25 is loosely inserted.

このような構造において、アンカーボルト25に水平方向の外力が矢印B方向から作用すると、この外力がアンカーボルト25の部分からコンクリート基礎24に直接入力されずに補強プレート26を介して分散して入力されることになる。この際、アンカーボルト25に作用する外力は、外力が作用する方向とは反対側の側板部26bを介してコンクリート基礎25に入力される。この結果、アンカーボルト25に大きな外力が矢印B方向から入力されても、この入力によりコンクリート基礎24のアンカーボルト25に対応する角部24aが破壊されるようなことは回避される。このように、コンクリート基礎24のアンカーボルト25に対応する角部24aが破壊されるのを未然に防止できる。   In such a structure, when a horizontal external force acts on the anchor bolt 25 from the direction of the arrow B, the external force is not input directly from the anchor bolt 25 portion to the concrete foundation 24 but is distributed and input via the reinforcing plate 26. Will be. At this time, the external force acting on the anchor bolt 25 is input to the concrete foundation 25 via the side plate portion 26b on the side opposite to the direction in which the external force acts. As a result, even if a large external force is input to the anchor bolt 25 from the direction of the arrow B, it is avoided that the corner portion 24a corresponding to the anchor bolt 25 of the concrete foundation 24 is broken by this input. Thus, it is possible to prevent the corner portion 24a corresponding to the anchor bolt 25 of the concrete foundation 24 from being broken.

尚、コンクリート基礎24の上面に据付けられる建物構造体の床梁1は、図3に示す如く、コンクリート基礎24の上面に突出しているアンカーボルト25に挿通され、アンカーボルト25に螺着される上ナット27Aによりコンクリート基礎24に締結される。   The floor beam 1 of the building structure installed on the upper surface of the concrete foundation 24 is inserted into an anchor bolt 25 protruding from the upper surface of the concrete foundation 24 and screwed to the anchor bolt 25 as shown in FIG. Fastened to the concrete foundation 24 by the nut 27A.

しかるに、左右の対向する型枠30、30間で基礎24に埋設固定されるアンカーボルト25及び補強プレート26のセット高さ位置を簡易に調整可能にし、かつコンクリート打設時に補強プレート26を微妙に高さ調整可能にするための、施工用治具50について説明する。   However, it is possible to easily adjust the set height position of the anchor bolt 25 and the reinforcing plate 26 embedded and fixed in the foundation 24 between the left and right opposite molds 30 and 30, and the reinforcing plate 26 is delicately set when placing concrete. The construction jig 50 for enabling height adjustment will be described.

施工用治具50は、図4〜図6に示す如く、アンカープレート60と、アンカープレート60に設けられる型枠調整用ねじ70及び補強プレート調整用ねじ80とを有する。   As shown in FIGS. 4 to 6, the construction jig 50 includes an anchor plate 60, a mold adjusting screw 70 and a reinforcing plate adjusting screw 80 provided on the anchor plate 60.

アンカープレート60は左右の対向する型枠30、30の上部に保持され、アンカーボルト25の上端部を保持する。アンカーボルト25を取着したアンカーボルト25の上端部をアンカープレート60の後述する第2水平片62に遊挿し、かつアンカーボルト25に螺着した2個のナット64a、64bによりアンカープレート60を挟み、アンカープレート60にアンカーボルト25を保持する。アンカープレート60は、例えば金属板の曲げ成形体又は樹脂成形体からなり、型枠調整用ねじ70を備える左右の第1水平片61と、左右の第1水平片61の間で補強プレート調整用ねじ80を備える中央の第2水平片62とを有し、第1水平片61から下方に折曲げた下向き折曲げ部63の下端に第2水平片62を設けている。アンカープレート60の第2水平片62はアンカーボルト25のためのボルト挿通孔64(大径ボルト用孔と小径ボルト用孔の2個のボルト挿通孔64)を備える。   The anchor plate 60 is held on top of the left and right molds 30, 30 and holds the upper end of the anchor bolt 25. The upper end portion of the anchor bolt 25 to which the anchor bolt 25 is attached is loosely inserted into a second horizontal piece 62 described later of the anchor plate 60, and the anchor plate 60 is sandwiched between two nuts 64a and 64b that are screwed to the anchor bolt 25. The anchor bolt 25 is held on the anchor plate 60. The anchor plate 60 is made of, for example, a metal plate bending molded body or a resin molded body, and is used to adjust the reinforcing plate between the left and right first horizontal pieces 61 provided with the mold adjusting screws 70 and the left and right first horizontal pieces 61. The second horizontal piece 62 is provided at the lower end of a downward bent portion 63 that is bent downward from the first horizontal piece 61. The second horizontal piece 62 of the anchor plate 60 includes a bolt insertion hole 64 for the anchor bolt 25 (two bolt insertion holes 64 of a large diameter bolt hole and a small diameter bolt hole).

型枠調整用ねじ70は、アンカープレート60の左右に第1水平片61に螺着された蝶ねじからなり、ねじ先端を型枠30のフランジ31の上面に衝合し、型枠30に対するアンカープレート60の高さ位置を調整する。71はロックナットである。高さ位置を調整されたアンカープレート60は、第1水平片61を型枠30のフランジ31に締結するしゃこまん90により固定化される。   The mold adjusting screw 70 is composed of a thumbscrew screwed to the first horizontal piece 61 on the left and right of the anchor plate 60, and the screw tip abuts on the upper surface of the flange 31 of the mold 30, thereby anchoring the mold 30. The height position of the plate 60 is adjusted. Reference numeral 71 denotes a lock nut. The anchor plate 60 whose height position has been adjusted is fixed by a squat 90 that fastens the first horizontal piece 61 to the flange 31 of the mold 30.

補強プレート調整用ねじ80は、アンカープレート60の中央の第2水平片62に螺着された蝶ねじからなり、ねじ先端を補強プレート26のボルト挿通孔64を挟む左右の上面に衝合し、アンカープレート60に対する補強プレート26の高さ位置を調整する。   The reinforcing plate adjusting screw 80 is composed of a butterfly screw screwed to the second horizontal piece 62 at the center of the anchor plate 60, and the tip of the screw abuts on the left and right upper surfaces sandwiching the bolt insertion hole 64 of the reinforcing plate 26, The height position of the reinforcing plate 26 with respect to the anchor plate 60 is adjusted.

ここで、施工用治具50は、アンカープレート60として、シングル用のアンカープレート60A(図4)と、ダブル用のアンカープレート60B(図5)を有する。   Here, the construction jig 50 includes a single anchor plate 60 </ b> A (FIG. 4) and a double anchor plate 60 </ b> B (FIG. 5) as the anchor plate 60.

シングル用のアンカープレート60Aは、図4に示す如く、基礎30の長手方向に沿う単一位置にアンカーボルト25のためのボルト挿通孔64(大径ボルト用孔と小径ボルト用孔の2個のボルト挿通孔64)を第2水平片62に備え、左右の第1水平片61に各2個の型枠調整用ねじ70を螺着され、第2水平片62に左右各2個の補強プレート調整用ねじ80を螺着される。   As shown in FIG. 4, the single anchor plate 60A has bolt insertion holes 64 for anchor bolts 25 (two holes, a large diameter bolt hole and a small diameter bolt hole) at a single position along the longitudinal direction of the foundation 30. Bolt insertion holes 64) are provided in the second horizontal piece 62, two formwork adjusting screws 70 are screwed into the left and right first horizontal pieces 61, and two left and right reinforcing plates are attached to the second horizontal piece 62. The adjusting screw 80 is screwed.

ダブル用のアンカープレート60Bは、図5に示す如く、基礎30の長手方向に沿う長尺をなし、左右の長尺第1水平片61の間の両端2位置に互いに分離される2個の第2水平片62を備える。2個の第2水平片62のそれぞれにアンカーボルト25のためのボルト挿通孔64(大径ボルト用孔と小径ボルト用孔の2個のボルト挿通孔64)を備え、左右の長尺第1水平片61の両端部のそれぞれに型枠調整用ねじ70を螺着され、各第2水平片62に左右各2個の補強プレート調整用ねじ80を螺着される。   As shown in FIG. 5, the double anchor plate 60 </ b> B is long along the longitudinal direction of the foundation 30, and is separated from each other at two positions at both ends between the left and right long first horizontal pieces 61. Two horizontal pieces 62 are provided. Each of the two second horizontal pieces 62 is provided with a bolt insertion hole 64 for the anchor bolt 25 (two bolt insertion holes 64 of a large diameter bolt hole and a small diameter bolt hole). Formwork adjustment screws 70 are screwed to both ends of the horizontal piece 61, and two reinforcing plate adjustment screws 80 are attached to each second horizontal piece 62.

図7、図8のユニット建物100の各建物ユニット101が据付けられる基礎において、建物ユニット101の長手方向において、建物100の外郭に位置するコーナー部に対応する部分に各1個のアンカーボルト25を設けるとき、相隣り合う建物ユニット101のための相隣るアンカーボルト25については、2個のシングル用のアンカープレート60Aを隣り合せて使用し(図7)、又は唯1個のダブル用のアンカープレート60Bを使用する(図8)。7個の建物ユニット101からなる建物100において、図7ではシングル用のアンカープレート60Aを16個使用し、図8ではシングル用のアンカープレート60Aを6個、ダブル用のアンカープレート60Bを5個使用するものになる。   In the foundation on which each building unit 101 of the unit building 100 shown in FIGS. 7 and 8 is installed, one anchor bolt 25 is attached to a portion corresponding to a corner portion located on the outer wall of the building 100 in the longitudinal direction of the building unit 101. When installing, for adjacent anchor bolts 25 for adjacent building units 101, two single anchor plates 60A are used next to each other (FIG. 7), or only one double anchor. Plate 60B is used (FIG. 8). In the building 100 composed of seven building units 101, FIG. 7 uses 16 single anchor plates 60A, and FIG. 8 uses six single anchor plates 60A and five double anchor plates 60B. To become.

以下、コンクリート基礎24の施工手順について説明する。
(1)図9に示す如く、地面20に建物に沿わせる基礎溝21を形成し、基礎溝21の底部に割栗を投入して搗固て割栗層22を形成し、割栗層22上にコンクリートを打ったフーチング層23を形成する。次に、このフーチング層23上に型枠30、30を対向させると共に間隔を置いて配設し、この型枠30、30を図示しない支持部材で地面20に支持させる。
Hereinafter, the construction procedure of the concrete foundation 24 will be described.
(1) As shown in FIG. 9, a foundation groove 21 is formed on the ground 20 along the building, and the split chestnut layer 22 is formed by throwing the split chestnut into the bottom of the foundation groove 21 to form the split chestnut layer 22. A footing layer 23 in which concrete is struck is formed. Next, the molds 30 and 30 are arranged on the footing layer 23 so as to face each other and spaced apart from each other, and the molds 30 and 30 are supported on the ground 20 by a support member (not shown).

(2)施工用治具50のアンカープレート60の左右の第1水平片61を、該第1水平片61に螺着されている型枠調整用ねじ70を介して型枠30のフランジ31の上面に載せる。型枠調整用ねじ70により型枠30に対するアンカープレート60の高さ位置を調整した後、しゃこまん90によりアンカープレート60の第1水平片61を型枠30のフランジ31に締結する。   (2) The left and right first horizontal pieces 61 of the anchor plate 60 of the construction jig 50 are connected to the flange 31 of the mold 30 via the mold adjusting screws 70 screwed to the first horizontal piece 61. Place on top. After the height position of the anchor plate 60 with respect to the mold 30 is adjusted by the mold adjusting screw 70, the first horizontal piece 61 of the anchor plate 60 is fastened to the flange 31 of the mold 30 by the scissors 90.

(3)アンカーボルト25の中間部に補強プレート26のボルト挿通穴28を遊挿し、かつアンカーボルト25に螺着した上下のナット27a、27bにより補強プレート26を挟み、アンカーボルト25に補強プレート26を取着する。補強プレート26に対するアンカーボルト25の首出し長さを一定長さにセットする。   (3) The bolt insertion hole 28 of the reinforcing plate 26 is loosely inserted in the middle part of the anchor bolt 25, and the reinforcing plate 26 is sandwiched between the upper and lower nuts 27a and 27b screwed to the anchor bolt 25. To attach. The neck length of the anchor bolt 25 with respect to the reinforcing plate 26 is set to a certain length.

(4)補強プレート26を取着したアンカーボルト25の上端部をアンカープレート60の第2水平片62に遊挿し、かつアンカーボルト25に螺着した2個のナット64a、64bによりアンカープレート60の第2水平片62を挟み、アンカープレート60の第2水平片62にアンカーボルト25を保持させる。アンカーボルト25のフック25aがコンクリート基礎24の内部の所定位置たる厚み中央部に設定され得るように、このフック25aを相対する型枠30、30の間隔の概ね中央部にセットする。   (4) The upper end portion of the anchor bolt 25 to which the reinforcing plate 26 is attached is loosely inserted into the second horizontal piece 62 of the anchor plate 60, and the anchor plate 60 is screwed to the anchor bolt 60 by two nuts 64a and 64b. The anchor bolt 25 is held by the second horizontal piece 62 of the anchor plate 60 with the second horizontal piece 62 interposed therebetween. The hook 25a of the anchor bolt 25 is set at a substantially central portion of the interval between the opposing molds 30 and 30 so that the hook 25a of the anchor bolt 25 can be set at the central portion of the thickness which is a predetermined position inside the concrete foundation 24.

(5)補強プレート26の上下レベルを必要により調整する。アンカーボルト25に螺着してある上下のナット27a、27bを緩めることにより、補強プレート26は上下のナット27a、27bの間隔Lの範囲内で型枠30の内側面に沿って平行移動されてレベル調整できる。このとき、アンカープレート60の第2水平片62に螺着されている補強プレート調整用ねじ80によりアンカープレート60に対する補強プレート26の高さレベル、水平度を調整する。   (5) Adjust the upper and lower levels of the reinforcing plate 26 as necessary. By loosening the upper and lower nuts 27a, 27b screwed to the anchor bolt 25, the reinforcing plate 26 is translated along the inner side surface of the mold 30 within the distance L between the upper and lower nuts 27a, 27b. The level can be adjusted. At this time, the height level and level of the reinforcing plate 26 with respect to the anchor plate 60 are adjusted by the reinforcing plate adjusting screw 80 screwed to the second horizontal piece 62 of the anchor plate 60.

(6)型枠30、30間に生コンクリート33を図10に示したように流し込む。この際、生コンクリート33はアンカーボルト25の下部が没入するまで流し込むと共に、生コンクリート33を補強プレート26の部分まで満たす。しかも、このときに生コンクリート33がコンクリート確認穴29から上方に溢れ出始めたのを確認して、この位置で生コンクリートの流し込みを停止する。このようにすることで、補強プレート26を目安に生コンクリート33の流し込み高さを容易に確認できる。下ナット27bは補強プレート26の下面側にて生コンクリートに埋設される。このとき、アンカープレート60の第2水平片62に螺着されている補強プレート調整用ねじ80によりアンカープレート60に対する補強プレート26の高さレベル、水平度を再調整できる。   (6) Pour the ready-mixed concrete 33 between the molds 30 and 30 as shown in FIG. At this time, the ready-mixed concrete 33 is poured until the lower part of the anchor bolt 25 is immersed, and the ready-mixed concrete 33 is filled up to the reinforcing plate 26. Moreover, at this time, it is confirmed that the ready-mixed concrete 33 has started to overflow upward from the concrete confirmation hole 29, and the pouring of ready-mixed concrete is stopped at this position. By doing in this way, the pouring height of the ready-mixed concrete 33 can be easily confirmed using the reinforcing plate 26 as a guide. The lower nut 27 b is embedded in the ready-mixed concrete on the lower surface side of the reinforcing plate 26. At this time, the height level and level of the reinforcing plate 26 relative to the anchor plate 60 can be readjusted by the reinforcing plate adjusting screw 80 screwed to the second horizontal piece 62 of the anchor plate 60.

(7)生コンクリート33を硬化した後、型枠30、30を取外して形成したコンクリート基礎24の周囲に土盛りすることで、コンクリート基礎24にアンカーボルト25及び補強プレート26が取付けられた基礎構造の施工が完了し、図1に示したような基礎構造が得られる。   (7) After the ready-mixed concrete 33 is hardened, the foundation 30 in which the anchor bolts 25 and the reinforcing plate 26 are attached to the concrete foundation 24 by embedding around the concrete foundation 24 formed by removing the molds 30, 30. The construction is completed, and the basic structure as shown in FIG. 1 is obtained.

本実施例によれば以下の作用効果を奏する。
(a)アンカープレート60に設けた型枠調整用ねじ70が型枠30に衝合し、型枠30に対するアンカープレート60の高さ位置を調整する。従って、アンカープレート60に保持されているアンカーボルト25及び補強プレート26のセット高さ位置を簡易に調整することができる。
According to the present embodiment, the following operational effects can be obtained.
(a) The mold adjusting screw 70 provided on the anchor plate 60 abuts on the mold 30 to adjust the height position of the anchor plate 60 with respect to the mold 30. Therefore, the set height position of the anchor bolt 25 and the reinforcing plate 26 held by the anchor plate 60 can be easily adjusted.

(b)アンカープレート60に設けた補強プレート調整用ねじ80が補強プレート26に衝合し、アンカープレート60に対する補強プレート26の高さ位置を調整する。従って、補強プレート調整用ねじ80は、コンクリート打設時に、アンカーボルト25に固定した補強プレート26が生コンクリート33の圧力によって浮き上がるのに対抗し、補強プレート26が対向する型枠30間で傾くことを防止したり、微妙な高さ調整することができる。   (b) The reinforcing plate adjusting screw 80 provided on the anchor plate 60 abuts on the reinforcing plate 26 to adjust the height position of the reinforcing plate 26 with respect to the anchor plate 60. Therefore, the reinforcing plate adjusting screw 80 counteracts that the reinforcing plate 26 fixed to the anchor bolt 25 is lifted by the pressure of the ready-mixed concrete 33 when the concrete is placed, and the reinforcing plate 26 is inclined between the facing molds 30. Can be prevented or delicate height adjustment.

(c)アンカープレート60が型枠調整用ねじ70を備えた第1水平片61と、補強プレート調整用ねじ80を備えた第2水平片62とを有し、第1水平片61から下方に折曲げた下向き折曲げ部63の下端に第2水平片62を設けた。従って、アンカープレート60の第1水平片61が型枠調整用ねじ70を介して型枠30の上部に配置されたとき、第2水平片62を型枠30の内側下方に近づく側に配置するものになり、このアンカープレート60を全高の高い大型の型枠30に好適に適用にできる。   (c) The anchor plate 60 has a first horizontal piece 61 provided with a mold adjusting screw 70 and a second horizontal piece 62 provided with a reinforcing plate adjusting screw 80, and is below the first horizontal piece 61. A second horizontal piece 62 was provided at the lower end of the bent downward bent portion 63. Accordingly, when the first horizontal piece 61 of the anchor plate 60 is arranged on the upper part of the mold 30 via the mold adjusting screw 70, the second horizontal piece 62 is arranged on the side closer to the inner lower side of the mold 30. This anchor plate 60 can be suitably applied to the large formwork 30 having a high overall height.

(d)アンカープレート60が型枠30の長手方向に沿う複数位置のそれぞれにアンカーボルト保持部(ボルト挿通孔64)を備え、各アンカーボルト保持部(ボルト挿通孔64)毎に型枠調整用ねじ70と補強プレート調整用ねじ80を付帯して有するようにした。従って、基礎の近接する複数位置にアンカーボルト25を埋設固定するとき、単一のアンカープレート60(60B)によりそれらのアンカーボルト25及び補強プレート26に対応でき、アンカープレート60の使用個数を削減し、補強工数も削減できる。   (d) The anchor plate 60 is provided with an anchor bolt holding portion (bolt insertion hole 64) at each of a plurality of positions along the longitudinal direction of the mold frame 30, and the mold is adjusted for each anchor bolt holding portion (bolt insertion hole 64). The screw 70 and the reinforcing plate adjusting screw 80 are attached. Accordingly, when the anchor bolts 25 are embedded and fixed at a plurality of positions adjacent to the foundation, the single anchor plate 60 (60B) can correspond to the anchor bolts 25 and the reinforcing plate 26, and the number of anchor plates 60 used can be reduced. Also, the number of reinforcement steps can be reduced.

図11の施工用治具50Aは、アンカープレート60が型枠調整用ねじ70を備えた第1水平片61と、補強プレート調整用ねじ80を備えた第2水平片62を有するとき、第1水平片61から上方に折曲げた上向き折曲げ部63Aの上端に第2水平片62を設けたものである。   When the anchor plate 60 has a first horizontal piece 61 provided with a mold adjusting screw 70 and a second horizontal piece 62 provided with a reinforcing plate adjusting screw 80, the construction jig 50A shown in FIG. A second horizontal piece 62 is provided at the upper end of an upward bent portion 63A bent upward from the horizontal piece 61.

この施工用治具50Aにあっては、図12に示す如く、アンカープレート60の第1水平片61が型枠調整用ねじ70を介して型枠30の上部に配置されたとき、第2水平片62を型枠60の上方に配置するものになり、このアンカープレート60を全高の低い小型の型枠30に好適に適用できる。   In the construction jig 50A, as shown in FIG. 12, when the first horizontal piece 61 of the anchor plate 60 is arranged on the upper part of the mold 30 via the mold adjusting screw 70, the second horizontal The piece 62 is disposed above the mold 60, and the anchor plate 60 can be suitably applied to the small mold 30 having a low overall height.

以上、本発明の実施例を図面により詳述したが、本発明の具体的な構成はこの実施例に限られるものではなく、本発明の要旨を逸脱しない範囲の設計の変更等があっても本発明に含まれる。   Although the embodiments of the present invention have been described in detail with reference to the drawings, the specific configuration of the present invention is not limited to these embodiments, and even if there is a design change or the like without departing from the gist of the present invention. It is included in the present invention.

図1はアンカーボルト付基礎構造を示す断面図である。FIG. 1 is a cross-sectional view showing a foundation structure with anchor bolts. 図2はアンカーボルト付基礎構造を示す模式斜視図である。FIG. 2 is a schematic perspective view showing a foundation structure with anchor bolts. 図3はアンカーボルト付基礎構造に建物構造体を据付けた例を示す断面図である。FIG. 3 is a cross-sectional view showing an example in which a building structure is installed on a foundation structure with anchor bolts. 図4は施工用治具を示す平面図である。FIG. 4 is a plan view showing a construction jig. 図5は施工用治具を示す端面図である。FIG. 5 is an end view showing the construction jig. 図6は施工用治具を示す端面図である。FIG. 6 is an end view showing the construction jig. 図7は施工用治具をユニット建物に使用した位置を示す模式図である。FIG. 7 is a schematic diagram showing a position where the construction jig is used in a unit building. 図8は施工用治具をユニット建物に使用した位置を示す模式図である。FIG. 8 is a schematic diagram showing a position where the construction jig is used in a unit building. 図9は施工用治具を型枠にセットした状態を示す断面図である。FIG. 9 is a cross-sectional view showing a state in which the construction jig is set on the mold. 図10は生コンクリートの流し込み状態を示す断面図である。FIG. 10 is a cross-sectional view showing the pouring state of ready-mixed concrete. 図11は施工用治具を示す端面図である。FIG. 11 is an end view showing the construction jig. 図12は施工用治具を型枠にセットした状態を示す断面図である。FIG. 12 is a cross-sectional view showing a state in which the construction jig is set on the mold.

符号の説明Explanation of symbols

24 コンクリート基礎
25 アンカーボルト
26 補強プレート
30 型枠
50、50A 施工用治具
60 アンカープレート
61 第1水平片
62 第2水平片
63 下向き折曲げ部
63A 上向き折曲げ部
64 ボルト挿通孔(アンカーボルト保持部)
80 補強プレート調整用ねじ
24 Concrete foundation 25 Anchor bolt 26 Reinforcement plate 30 Formwork 50, 50A Construction jig 60 Anchor plate 61 First horizontal piece 62 Second horizontal piece 63 Downward bending portion 63A Upward bending portion 64 Bolt insertion hole (anchor bolt holding) Part)
80 Reinforcing plate adjustment screw

Claims (4)

アンカーボルトの中間部に設けた補強プレートをコンクリート基礎の上部に埋設固定してなるアンカーボルト付基礎構造の施工用治具であって、
アンカープレートと、該アンカープレートに設けられる補強プレート調整用ねじとを有し、
アンカープレートは対向する型枠の上部に保持され、アンカーボルトの上端部を保持し、
補強プレート調整用ねじは補強プレートに衝合し、アンカープレートに対する補強プレートの高さ位置を調整するアンカーボルト付基礎構造の施工用治具。
A construction jig for a foundation structure with anchor bolts, in which a reinforcing plate provided in the middle part of the anchor bolt is embedded and fixed in the upper part of the concrete foundation,
An anchor plate and a reinforcing plate adjusting screw provided on the anchor plate;
The anchor plate is held at the top of the opposite formwork, holding the upper end of the anchor bolt,
Reinforcement plate adjustment screw is a jig for construction of foundation structure with anchor bolts that abuts the reinforcement plate and adjusts the height position of the reinforcement plate relative to the anchor plate.
前記アンカープレートが型枠の上部に保持される第1水平片と、補強プレート調整用ねじを備えた第2水平片とを有し、第1水平片から下方に折曲げた下向き折曲げ部の下端に第2水平片を設けた請求項1に記載のアンカーボルト付基礎構造の施工用治具。   The anchor plate has a first horizontal piece that is held on the upper part of the mold, and a second horizontal piece that includes a reinforcing plate adjustment screw, and is a downward bent portion that is bent downward from the first horizontal piece. The construction jig for a foundation structure with anchor bolts according to claim 1, wherein a second horizontal piece is provided at the lower end. 前記アンカープレートが型枠の上部に保持される第1水平片と、補強プレート調整用ねじを備えた第2水平片とを有し、第1水平片から上方に折曲げた上向き折曲げ部の上端に第2水平片を設けた請求項1に記載のアンカーボルト付基礎構造の施工用治具。   The anchor plate has a first horizontal piece that is held on the upper part of the formwork, and a second horizontal piece that is provided with a reinforcing plate adjusting screw, and is an upward bent portion that is bent upward from the first horizontal piece. The construction jig for a foundation structure with anchor bolts according to claim 1, wherein a second horizontal piece is provided at an upper end. 前記アンカープレートが型枠の長手方向に沿う複数位置のそれぞれにアンカーボルト保持部を備え、各アンカーボルト保持部毎に補強プレート調整用ねじを付帯して有する請求項1〜3のいずれかに記載のアンカーボルト付基礎構造の施工用治具。   The said anchor plate is provided with the anchor bolt holding | maintenance part in each of the several position along the longitudinal direction of a formwork, The reinforcement plate adjustment screw is attached to each anchor bolt holding | maintenance part, It has in any one of Claims 1-3. Jig for construction of foundation structure with anchor bolts.
JP2007101148A 2007-04-06 2007-04-06 Jig for execution of work of foundation structure with anchor bolt Pending JP2008255724A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007101148A JP2008255724A (en) 2007-04-06 2007-04-06 Jig for execution of work of foundation structure with anchor bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007101148A JP2008255724A (en) 2007-04-06 2007-04-06 Jig for execution of work of foundation structure with anchor bolt

Publications (1)

Publication Number Publication Date
JP2008255724A true JP2008255724A (en) 2008-10-23

Family

ID=39979577

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007101148A Pending JP2008255724A (en) 2007-04-06 2007-04-06 Jig for execution of work of foundation structure with anchor bolt

Country Status (1)

Country Link
JP (1) JP2008255724A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013087446A (en) * 2011-10-14 2013-05-13 Kowa Industry Co Ltd Construction method of anchor
CN106514279A (en) * 2016-11-09 2017-03-22 北京工业大学 Foundation-machine tool base structure and machine body connecting structure
JP2017095993A (en) * 2015-11-25 2017-06-01 大和ハウス工業株式会社 Anchor bolt positioning ruler and installation method thereof
JP2020105766A (en) * 2018-12-27 2020-07-09 大和ハウス工業株式会社 Anchor bolt construction jig and basic formwork structure
JP2020165097A (en) * 2019-03-28 2020-10-08 大和ハウス工業株式会社 Anchor bolt construction jig and foundation formwork structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS541923U (en) * 1977-06-07 1979-01-08
JPS6030744A (en) * 1983-07-27 1985-02-16 日鐵建材工業株式会社 Foundation corrosion preventing construction method in foundation of wood house
JPH03119262A (en) * 1989-09-29 1991-05-21 Natl House Ind Co Ltd Jig for support of anchor bolt
JPH0411860U (en) * 1990-05-21 1992-01-30
JPH08312134A (en) * 1995-05-23 1996-11-26 Sekisui House Ltd Implanting jig for anchor bolt and form ruler
JP2000038727A (en) * 1998-07-21 2000-02-08 Kato Kanamono Kk Foundation concrete and execution therefor
JP2001081870A (en) * 1999-09-09 2001-03-27 Sekisui Chem Co Ltd Joint pin mounting device and prefabricated building installation method
JP2002088775A (en) * 2000-09-14 2002-03-27 Sekisui Chem Co Ltd Foundation structure equipped with anchor bolt and method for constructing the same
JP2002348883A (en) * 2001-05-29 2002-12-04 Nippon Steel Corp Structure of foundation and construction method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS541923U (en) * 1977-06-07 1979-01-08
JPS6030744A (en) * 1983-07-27 1985-02-16 日鐵建材工業株式会社 Foundation corrosion preventing construction method in foundation of wood house
JPH03119262A (en) * 1989-09-29 1991-05-21 Natl House Ind Co Ltd Jig for support of anchor bolt
JPH0411860U (en) * 1990-05-21 1992-01-30
JPH08312134A (en) * 1995-05-23 1996-11-26 Sekisui House Ltd Implanting jig for anchor bolt and form ruler
JP2000038727A (en) * 1998-07-21 2000-02-08 Kato Kanamono Kk Foundation concrete and execution therefor
JP2001081870A (en) * 1999-09-09 2001-03-27 Sekisui Chem Co Ltd Joint pin mounting device and prefabricated building installation method
JP2002088775A (en) * 2000-09-14 2002-03-27 Sekisui Chem Co Ltd Foundation structure equipped with anchor bolt and method for constructing the same
JP2002348883A (en) * 2001-05-29 2002-12-04 Nippon Steel Corp Structure of foundation and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013087446A (en) * 2011-10-14 2013-05-13 Kowa Industry Co Ltd Construction method of anchor
JP2017095993A (en) * 2015-11-25 2017-06-01 大和ハウス工業株式会社 Anchor bolt positioning ruler and installation method thereof
CN106514279A (en) * 2016-11-09 2017-03-22 北京工业大学 Foundation-machine tool base structure and machine body connecting structure
JP2020105766A (en) * 2018-12-27 2020-07-09 大和ハウス工業株式会社 Anchor bolt construction jig and basic formwork structure
JP7281129B2 (en) 2018-12-27 2023-05-25 大和ハウス工業株式会社 Foundation formwork structure
JP2020165097A (en) * 2019-03-28 2020-10-08 大和ハウス工業株式会社 Anchor bolt construction jig and foundation formwork structure
JP7341420B2 (en) 2019-03-28 2023-09-11 大和ハウス工業株式会社 Anchor bolt construction jig and foundation formwork structure

Similar Documents

Publication Publication Date Title
JP4738886B2 (en) Equipment foundation
KR101990065B1 (en) Joint of PC column using steel block
EP2261430A2 (en) Constructing an overhang
JP2008255724A (en) Jig for execution of work of foundation structure with anchor bolt
JP2011226066A (en) Method of installing base isolation device and installation structure
JP4915653B2 (en) Anchor bolt positioning jig
JP2018123537A (en) Method of constructing mat foundation, tubular formwork and mat foundation structure
JP2018100488A (en) Base-isolation construction, base plate and method for construction of lower foundation member
JP3165719U (en) Infrastructure for facilities
JP7476044B2 (en) Temporary opening formwork
JP5028323B2 (en) Ground anchor method
JP4758803B2 (en) Foundation structure with anchor bolt and its construction method
FI3816369T3 (en) Anchoring device, anchoring with anchoring device and method for producing anchoring device
KR100715515B1 (en) Strengthening Device to Increase Strength of Grout Layer
KR200442551Y1 (en) Bracket for supporting a mold
JP2009150067A (en) Method of and structure for renewing existing bearing apparatus
JP3713192B2 (en) Foundation structure with anchor bolt and its construction method
KR20160043501A (en) A sump or elevator pit under structure
JP7149744B2 (en) Seismic isolation upper foundation structure, its fabrication method, and seismic isolation foundation construction method
JP7143208B2 (en) Formwork for precast concrete and method for manufacturing foundation block
JP7083285B2 (en) Seismic isolation upper foundation structure and its manufacturing method
JP6678060B2 (en) Concrete filling method and concrete filling structure
KR200234872Y1 (en) An iron reinforcing bar prop
KR20100124577A (en) A joint device for concrete slab and construction method using the same
GB2450401A (en) Support for casting foundations

Legal Events

Date Code Title Description
A621 Written request for application examination

Effective date: 20100121

Free format text: JAPANESE INTERMEDIATE CODE: A621

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110609

A131 Notification of reasons for refusal

Effective date: 20110614

Free format text: JAPANESE INTERMEDIATE CODE: A131

A521 Written amendment

Effective date: 20110722

Free format text: JAPANESE INTERMEDIATE CODE: A523

A131 Notification of reasons for refusal

Effective date: 20120105

Free format text: JAPANESE INTERMEDIATE CODE: A131

A02 Decision of refusal

Effective date: 20120424