JP4915653B2 - Anchor bolt positioning jig - Google Patents

Anchor bolt positioning jig Download PDF

Info

Publication number
JP4915653B2
JP4915653B2 JP2006261483A JP2006261483A JP4915653B2 JP 4915653 B2 JP4915653 B2 JP 4915653B2 JP 2006261483 A JP2006261483 A JP 2006261483A JP 2006261483 A JP2006261483 A JP 2006261483A JP 4915653 B2 JP4915653 B2 JP 4915653B2
Authority
JP
Japan
Prior art keywords
jig
anchor bolt
concrete
positioning
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006261483A
Other languages
Japanese (ja)
Other versions
JP2008081980A (en
Inventor
武志 松川
信夫 堀
英之 岡本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Corp
Panasonic Holdings Corp
Original Assignee
Panasonic Corp
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Corp, Matsushita Electric Industrial Co Ltd filed Critical Panasonic Corp
Priority to JP2006261483A priority Critical patent/JP4915653B2/en
Publication of JP2008081980A publication Critical patent/JP2008081980A/en
Application granted granted Critical
Publication of JP4915653B2 publication Critical patent/JP4915653B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、アンカーボルトの位置出し治具に関し、詳しくはアンカーボルトの基礎立ち上がり部への設置の際に設置精度を高める位置出し治具に関するものである。   The present invention relates to an anchor bolt positioning jig, and more particularly to a positioning jig that increases installation accuracy when the anchor bolt is installed on a foundation rising portion.

従来より、建物の鉄骨柱の根元に設けられた脚金物をコンクリート基礎上に固定するためのアンカーボルトを、コンクリート基礎形成前に位置出しする方法として、図8に示すように、捨てコンクリート上に設置した木製型枠17の上端部に支持プレート30の四隅を仮支持する。この支持プレート30には例えば4つの貫通孔が形成されており、4本のアンカーボルト5の上部が各貫通孔をそれぞれ貫通していると共に、貫通孔の上下からナット36を締結することで、各アンカーボルト5の上部を支持プレート30に固定している。そして、支持プレート30の四隅を木製型枠17の上端部に仮支持した状態で、水平器を用いて支持プレート30の水平出しを行なうと共に、2本の直交する基準芯ラインに沿って水平に水糸33を張り、水糸33に沿って支持プレート30の切欠30aを沿わせるようにして支持プレート30の芯出しを行なった後に、支持プレート30の四隅を木製型枠17の上端部に釘32で固着し(或いはクリップなどで挟着し)、その後、型枠17内に立ち上がりコンクリートを流し込む。一定時間養生後に型枠17を解体し、アンカーボルト5から支持プレート30を取り外し、脚金物をアンカーボルト5とナット36とでコンクリート基礎上に緊結するものである。   Conventionally, as shown in FIG. 8, anchor bolts for fixing a foot bracket provided at the base of a steel column of a building on a concrete foundation are positioned on the discarded concrete as shown in FIG. 8. The four corners of the support plate 30 are temporarily supported on the upper end of the installed wooden formwork 17. For example, four through holes are formed in the support plate 30, and the upper portions of the four anchor bolts 5 penetrate the respective through holes, and by fastening the nuts 36 from above and below the through holes, The upper part of each anchor bolt 5 is fixed to the support plate 30. Then, in a state where the four corners of the support plate 30 are temporarily supported by the upper end portion of the wooden formwork 17, the support plate 30 is leveled using a leveling device and horizontally along two orthogonal reference core lines. After the water string 33 is stretched and the support plate 30 is centered so that the notch 30 a of the support plate 30 is along the water thread 33, the four corners of the support plate 30 are nailed to the upper end of the wooden formwork 17. Then, it is fixed at 32 (or clamped with a clip or the like), and then rises into the mold 17 and pours concrete. The mold 17 is disassembled after curing for a certain period of time, the support plate 30 is removed from the anchor bolt 5, and the legs are fastened on the concrete foundation with the anchor bolt 5 and the nut 36.

ところが、従来では、立ち上がりコンクリートの打設前に、アンカーボルト5の上部のみを支持プレート30を用いて位置出ししている。このため、立ち上がりコンクリートを流し込む際の流動圧でアンカーボルト5の下部が動き、複数本のアンカーボルト5の水平方向の位置がずれてしまうことがある。なお従来では脚金物の部分でアンカーボルト5の施工誤差を吸収できるのは±2.5mm程度であり、このためアンカーボルト5の位置設計寸法の施工誤差が生じやすいという課題を有していた。さらに、従来では支持プレート30を位置出ししてから木製型枠17に対して釘止めする方式であるため、型枠17の材質は木製に限られる。例えば金属材料からなる鋼製型枠では予め取付孔が穿孔されるため、支持プレート30の位置出しによって支持プレート30の貫通孔と鋼製型枠の取付孔との位置がずれてしまい、支持プレート30を鋼製型枠に固定できなくなる。このため従来では使用できる型枠17は木製に制約されるという課題も有していた。
特開2001−279683号公報
However, conventionally, only the upper portion of the anchor bolt 5 is positioned using the support plate 30 before the rising concrete is placed. For this reason, the lower part of the anchor bolt 5 moves by the fluid pressure at the time of pouring the rising concrete, and the horizontal position of the plurality of anchor bolts 5 may shift. Conventionally, it is about ± 2.5 mm that the construction error of the anchor bolt 5 can be absorbed in the leg metal part, and therefore, there is a problem that the construction error of the position design dimension of the anchor bolt 5 is likely to occur. In addition, since the support plate 30 is conventionally positioned and nailed to the wooden mold 17, the material of the mold 17 is limited to wood. For example, in a steel mold made of a metal material, the mounting holes are drilled in advance. Therefore, the positioning of the support plate 30 causes the positions of the through holes of the support plate 30 and the mounting holes of the steel mold to be shifted, and the support plate. 30 cannot be fixed to the steel formwork. For this reason, the mold 17 that can be used conventionally has a problem that it is restricted to wood.
JP 2001-279683 A

本発明は上記の従来の問題点に鑑みて発明したものであって、アンカーボルトの基礎立ち上がり部への設置の際にアンカーボルトの設置精度を高め、且つ打設されたコンクリートの流動圧にも影響を受けることがなく、そのうえ、あらゆる材質の型枠に対応できるアンカーボルトの位置出し治具を提供することを課題とするものである。   The present invention has been invented in view of the above-described conventional problems, and improves the installation accuracy of the anchor bolt when the anchor bolt is installed on the foundation rising portion, and also applies the fluid pressure of the placed concrete. It is another object of the present invention to provide an anchor bolt positioning jig that is not affected and that can be applied to molds of any material.

前記課題を解決するために本発明は、建物の躯体フレームの根元に設けられた脚金物4をコンクリート基礎3上に固定するためのアンカーボルト5の位置出しをコンクリート打設前に行なうアンカーボルトの位置出し治具であって、型枠17内の捨てコンクリート6上に設置されて複数本のアンカーボルト5の下部5bを相互に連結する第1の治具1と、この第1の治具1の上方に配置されて上記複数本のアンカーボルト5の上部5aを相互に連結する第2の治具2とを備え、上記第1の治具1は、この第1の治具1の底板部1aを捨てコンクリート6上に水平出しと芯出しとをして固定する位置出し手段10と、底板部1aの両端から上方に立ち上がる複数の立ち上がり部1bに対して上記複数本のアンカーボルト5の下部5bを各々固定する固定手段8aとを備えており、上記第2の治具2は、上記第1の治具1にて下部が位置出しされた複数本のアンカーボルト5の上部5aをそれぞれ着脱可能に固定する着脱固定手段9aと、前記型枠17に記された基準芯ラインに沿って位置決めするために設けられた切欠26aとを備えており、この着脱固定手段9aは、上記第2の治具2の上方に突出する上記複数本のアンカーボルト5の高さ調整及び上記第2の治具2の水平出しを可能とすることを特徴としている。 In order to solve the above-mentioned problems, the present invention provides an anchor bolt for positioning the anchor bolt 5 for fixing the leg metal 4 provided on the base of the building frame of the building on the concrete foundation 3 before placing the concrete. A first jig 1 which is a positioning jig, which is installed on the discarded concrete 6 in the mold 17 and connects the lower portions 5b of the plurality of anchor bolts 5 to each other, and the first jig 1 And a second jig 2 that connects the upper portions 5a of the plurality of anchor bolts 5 to each other, and the first jig 1 is a bottom plate portion of the first jig 1. Positioning means 10 for discarding 1a and fixing it on the concrete 6 by leveling and centering, and lower portions of the plurality of anchor bolts 5 with respect to a plurality of rising portions 1b rising upward from both ends of the bottom plate portion 1a 5b each fixed Fixing means 8a, and the second jig 2 removably fixes the upper parts 5a of the plurality of anchor bolts 5 whose lower parts are positioned by the first jig 1 respectively. Attaching / detaching / fixing means 9a and a notch 26a provided for positioning along a reference core line marked on the mold 17 are provided . The attaching / detaching / fixing means 9a is provided on the second jig 2. It is characterized in that to enable the plurality of height adjustment and the second leveling jig 2 of the anchor bolt 5 protruding upward.

このような構成とすることで、複数本のアンカーボルト5の位置出しを第1の治具1と第2の治具2を用いて上下2点で行なうことにより、立ち上がりコンクリート7の打設時にアンカーボルト5が動くことがないので、アンカーボルト5の施工位置精度を確保できる。従って、第2の治具2を型枠17に対しては固定する必要がなくなり、型枠17の材質が従来のように木製に限られることもなくなる。   By adopting such a configuration, the positioning of the plurality of anchor bolts 5 is performed at the upper and lower two points using the first jig 1 and the second jig 2, so that the rising concrete 7 is placed. Since the anchor bolt 5 does not move, the construction position accuracy of the anchor bolt 5 can be ensured. Therefore, it is not necessary to fix the second jig 2 to the mold 17 and the material of the mold 17 is not limited to wood as in the prior art.

また、上記第1の治具1の固定手段8a及び上記第2の治具2の着脱固定手段9aは、それぞれ、上記アンカーボルト5に対して高さ調整可能なダブルナット8a1,8a2:9a1,9a2で構成されているのが好ましく、この場合、アンカーボルト5の高さ調節や第2の治具2の水平出しをダブルナット8a1,8a2:9a1,9a2を利用して容易に行なえるようになる。 Further, the first fixing means 8a and the second detachable fixing means 9a of the jig 2 jigs 1 are each height-adjustable double nut with respect to the anchor bolts 5 8a1 and 8a2: 9a1, 9a2 is preferable. In this case, the height of the anchor bolt 5 and the leveling of the second jig 2 can be easily adjusted using the double nuts 8a1, 8a2: 9a1, 9a2. Become.

また、上記第1の治具1及び上記第2の治具2にて支持された上記アンカーボルト5が、立ち上がりコンクリート7が打設される基礎立ち上がり部13の下側から上側まで通して延びているのが好ましく、この場合、基礎立ち上がり部13の下側から上側まで通して延びるアンカーボルト5が縦主筋を兼ねるようになり、コンクリート基礎3内の配筋量を削減できるようになる。 Furthermore, the anchor bolt 5 which is supported by the first jig 1 and the second jig 2, extends through the bottom of the foundation rising portion 13 rising concrete 7 is pouring to the upper In this case, the anchor bolts 5 extending from the lower side to the upper side of the foundation rising portion 13 also serve as the longitudinal main reinforcing bars, so that the bar arrangement amount in the concrete foundation 3 can be reduced.

本発明にあっては、コンクリート打設前にアンカーボルトの位置出しを上下2点で行なうことにより、複数本のアンカーボルトの施工位置精度を確保できると共に、打設されたコンクリートの流動圧にも影響を受けることがないものであり、これによりアンカーボルトの上部を固定する第2の治具を型枠に対して固定しなくて済むので、あらゆる材質の型枠に対応できるアンカーボルトの位置出し治具を提供できるものである。   In the present invention, by positioning the anchor bolts at the upper and lower two points before placing the concrete, it is possible to secure the construction position accuracy of the plurality of anchor bolts and also to the flow pressure of the placed concrete. Because it is not affected, it is not necessary to fix the second jig for fixing the upper part of the anchor bolt to the mold, so the position of the anchor bolt that can correspond to the mold of any material is determined. A jig can be provided.

以下、本発明を添付図面に示す実施形態に基いて説明する。   Hereinafter, the present invention will be described based on embodiments shown in the accompanying drawings.

本発明に係るアンカーボルト5の位置出し治具は、建物の鉄骨柱16の根元に設けられた脚金物4をコンクリート基礎3上に固定するためのアンカーボルト5の位置出しをコンクリート打設前に行なうものであって、図1に示すように、型枠17内の捨てコンクリート6上に設置されて複数本のアンカーボルト5の下部5bを相互に連結する第1の治具1と、第1の治具1の上方に配置されて複数本のアンカーボルト5の上部5aを相互に連結する第2の治具2とで構成されている。   The positioning jig for the anchor bolt 5 according to the present invention determines the positioning of the anchor bolt 5 for fixing the leg 4 provided at the base of the steel column 16 of the building on the concrete foundation 3 before placing the concrete. As shown in FIG. 1, a first jig 1 installed on the discarded concrete 6 in the mold 17 and connecting the lower portions 5b of the plurality of anchor bolts 5 to each other, The second jig 2 is arranged above the jig 1 and connects the upper portions 5a of the plurality of anchor bolts 5 to each other.

第1の治具1は、図4(b)に示すように、底板部1aと、底板部1aの両端から上方に立ち上がる左右一対の立ち上がり部1bとが上向きコ字形に一体化されたアンカーフレームにより構成されている。この第1の治具1は、底板部1aを捨てコンクリート6上に位置出しして固定する位置出し手段10と、複数本のアンカーボルト5の下部5bを一対の立ち上がり部1bの両外側に固定する固定手段8aとを備えている。位置出し手段10は、底板部1aを捨てコンクリート6の下穴50に対して締結するための複数の芯棒打ち込み式アンカー51(ナット付き)で構成されている。固定手段8aは、例えば4組のダブルナット8a1,8a2で構成されている。図5に示すように、各組のダブルナット8a1,8a2のうちの一方8a1が立ち上がり部1bの外側に固着され、他方8a2がアンカーボルト5の下部5bに螺着されている。各組のダブルナット8a1,8a2をアンカーボルト5に沿って高さ調整することで、第1の治具1に対するアンカーボルト5の高さ調整が可能となっている。   As shown in FIG. 4B, the first jig 1 is an anchor frame in which a bottom plate portion 1a and a pair of left and right rising portions 1b rising upward from both ends of the bottom plate portion 1a are integrated in an upward U-shape. It is comprised by. The first jig 1 has a positioning means 10 for positioning and fixing the bottom plate portion 1a on the concrete 6, and fixing the lower portions 5b of the plurality of anchor bolts 5 to both outer sides of the pair of rising portions 1b. Fixing means 8a. The positioning means 10 is composed of a plurality of core rod driving anchors 51 (with nuts) for discarding the bottom plate portion 1a and fastening the bottom plate portion 1a to the prepared hole 50 of the concrete 6. The fixing means 8a is composed of, for example, four sets of double nuts 8a1 and 8a2. As shown in FIG. 5, one of the pairs of double nuts 8 a 1 and 8 a 2 is fixed to the outside of the rising portion 1 b and the other 8 a 2 is screwed to the lower portion 5 b of the anchor bolt 5. By adjusting the height of the double nuts 8a1 and 8a2 of each set along the anchor bolt 5, the height of the anchor bolt 5 with respect to the first jig 1 can be adjusted.

第2の治具2は、上記第1の治具1の上方に配置され、中央が開口した平面視矩形状の鋼板材からなる平板プレートで構成されており、型枠17内部に納まる外形寸法を有している。この第2の治具2は、第1の治具1にて下部が位置出しされた4本のアンカーボルト5の上部5aをそれぞれ着脱可能に固定する着脱固定手段9aを備えている。着脱固定手段9aは、図1に示すように、高さ調整可能な4組のダブルナット9a1,9a2で構成されており、第2の治具2には中央開口部21を挟んでアンカーボルト5が貫通する4つの貫通孔20が形成されており、4本のアンカーボルト5の上部5aが貫通孔20をそれぞれ貫通した状態で、ダブルナット9a1,9a2間で第2の治具2を上下から挟持することで、4本のアンカーボルト5の上部5aが第2の治具2に一体的に連結され、4本のアンカーボルト5の互いに相対的な連結が行なわれている。各組のダブルナット9a1,9a2をアンカーボルト5に沿って高さ調整することで、アンカーボルト5の高さ調整及び第2の治具2の水平出しが可能となっている。   The second jig 2 is arranged above the first jig 1 and is composed of a flat plate made of a steel plate material having a rectangular shape in plan view with an opening at the center. have. The second jig 2 includes attachment / detachment fixing means 9a for detachably fixing the upper portions 5a of the four anchor bolts 5 whose lower portions are positioned by the first jig 1. As shown in FIG. 1, the detachable fixing means 9 a is composed of four sets of double nuts 9 a 1 and 9 a 2 capable of adjusting the height, and the anchor bolt 5 is sandwiched between the second opening 2 and the central opening 21. Are formed, and the second jig 2 is vertically moved between the double nuts 9a1 and 9a2 with the upper portions 5a of the four anchor bolts 5 penetrating the through holes 20, respectively. By sandwiching, the upper portions 5a of the four anchor bolts 5 are integrally connected to the second jig 2, and the four anchor bolts 5 are relatively connected to each other. By adjusting the height of the double nuts 9a1 and 9a2 of each set along the anchor bolt 5, the height of the anchor bolt 5 can be adjusted and the second jig 2 can be leveled.

上記第1の治具1及び第2の治具2にて支持されるアンカーボルト5は、図6に示すように、立ち上がりコンクリート7が打設される基礎立ち上がり部13の下側から上側まで通して延びている。さらに、脚金物4のアンカーボルト通し孔14は、図3(b)に示すように、アンカーボルト5に対して所定の遊びが与えられるようにルーズホール化されており、コンクリート打設後におけるアンカーボルト5の水平方向の施工誤差を吸収できる構造となっている。   As shown in FIG. 6, the anchor bolt 5 supported by the first jig 1 and the second jig 2 passes from the lower side to the upper side of the foundation rising part 13 on which the rising concrete 7 is placed. It extends. Further, as shown in FIG. 3 (b), the anchor bolt through hole 14 of the leg metal piece 4 is formed into a loose hole so that a predetermined play is given to the anchor bolt 5, and the anchor bolt after the concrete is cast is placed. It has a structure that can absorb construction errors in the horizontal direction of the bolt 5.

次に、施工の一例を説明する。図4に示すように、捨てコンクリート6を打設して表面を平滑に仕上げて、その上面に型枠線dと2本の直交する基準芯ラインL1とを描く。型枠線dに沿って型枠17を設置する。基準芯ラインL1を基準にして捨てコンクリート6に下穴50(例えば、φ10.5、深さ40mm)をあけ、芯棒打ち込み式アンカー51(ナット付き)を仮締めして、捨てコンクリート6上に第1の治具1を水平方向に動ける状態で仮保持する。この状態で気泡式水平器によって底板部1aの水平確認を行ない、水平でないときは調整材を使って水平出しを行なうと共に、捨てコンクリート6上に記された2本の直交する基準芯ラインL1に底板部1aのけがき線26bを沿わせるようにして水平方向の芯出しを行なう。このように第1の治具1の位置出しを行なった後に、図5(a)に示すように、振れ止め用のコンクリート釘52によって底板部1aが動かないように釘打ちした後で、芯棒打ち込み式アンカー51のナットを本締めする。このように第1の治具1を捨てコンクリート6に対して動かないように固定することによって、後工程の立ち上がりコンクリート7の打設時にその流動圧によってアンカーボルト5の下部5bがずれ動かない構造となる。   Next, an example of construction will be described. As shown in FIG. 4, abandoned concrete 6 is cast to finish the surface smoothly, and a mold line d and two orthogonal reference core lines L1 are drawn on the upper surface. The mold 17 is installed along the mold line d. A pilot hole 50 (for example, φ10.5, depth 40 mm) is made in the discarded concrete 6 with reference to the reference core line L1, and a core rod driving type anchor 51 (with nut) is temporarily tightened on the discarded concrete 6 The first jig 1 is temporarily held in a state where it can move in the horizontal direction. In this state, the level of the bottom plate 1a is confirmed by the bubble leveler, and when it is not horizontal, leveling is performed using an adjusting material, and two orthogonal reference core lines L1 written on the discarded concrete 6 are provided. Horizontal alignment is performed along the marking line 26b of the bottom plate 1a. After positioning the first jig 1 in this way, as shown in FIG. 5A, after nailing the bottom plate portion 1a with the concrete nail 52 for steadying so as not to move, the core Fully tighten the nut of the rod driving type anchor 51. In this way, by discarding the first jig 1 and fixing it so as not to move with respect to the concrete 6, a structure in which the lower part 5b of the anchor bolt 5 does not move due to the fluid pressure when the rising concrete 7 is placed in the subsequent process. It becomes.

上記のように第1の治具1を固定した後に、第1の治具1に取り付けた4つのナット8a1に、4本のアンカーボルト5の下部5bのネジ部分をそれぞれ螺合させ、アンカーボルト5に取り付けたナット8a2を仮締めしておく。アンカーボルト5の上部5aは、それぞれ、第2の治具2の4つの貫通孔20に貫通しており、図2に示すように、貫通孔20の上下からダブルナット9a1,9a2を締結することで、各アンカーボルト5の上部5aを第2の治具2に対して固定する。ここにおいて、第2の治具2の水平出しは図7(a)(b)に示すように、気泡式水平器27によって確認し、水平でないときはダブルナット9a1,9a2を上下させることで第2の治具2の水平出しを行なう。さらに図7(c)(d)に示すように型枠17に記された2本の直交する基準芯ラインに沿って張られた水糸28に第2の治具2に形成した切欠26aを位置決めすることで、第2の治具2の芯出しを行なう。ダブルナット8a1,8a2:9a1,9a2の本締めを行なう。ここで本発明では、第2の治具2は型枠17に対しては固定されないものである。なお図1中の25は4本のアンカーボルト5に結束されるせん断補強材であり、例えば、150mm以内の間隔で配置される。   After fixing the first jig 1 as described above, the screw portions of the lower portions 5b of the four anchor bolts 5 are screwed into the four nuts 8a1 attached to the first jig 1, respectively. The nut 8a2 attached to 5 is temporarily tightened. The upper portions 5a of the anchor bolts 5 respectively penetrate the four through holes 20 of the second jig 2, and the double nuts 9a1 and 9a2 are fastened from above and below the through holes 20 as shown in FIG. Then, the upper part 5 a of each anchor bolt 5 is fixed to the second jig 2. Here, as shown in FIGS. 7 (a) and 7 (b), the leveling of the second jig 2 is confirmed by the bubble type leveler 27. When the level is not horizontal, the double nuts 9a1 and 9a2 are moved up and down. The jig 2 of 2 is leveled. Further, as shown in FIGS. 7C and 7D, a notch 26a formed in the second jig 2 is formed on the water string 28 stretched along two orthogonal reference core lines marked on the mold 17. By positioning, the second jig 2 is centered. Double nuts 8a1, 8a2: 9a1, 9a2 are finally tightened. Here, in the present invention, the second jig 2 is not fixed to the mold 17. Note that reference numeral 25 in FIG. 1 denotes a shear reinforcement material bound to the four anchor bolts 5 and is arranged, for example, at intervals of 150 mm or less.

その後、型枠17内に立ち上がりコンクリート7を流し込み、一定時間養生後に型枠17を解体し、アンカーボルト5から第2の治具2を取り外し、立ち上がりコンクリート7の天端をモルタルで均すことで、図3に示すように、天端レベラー18を形成する。その後、天端レベラー18の上方に突出しているアンカーボルト5の上部5aに脚金物4のアンカーボルト通し孔14を嵌め込むようにして、脚金物4を天端レベラー18の天面に載せ、図2(b)に示すように、アンカーボルト5の上端から偏心座金40を介してダブルナット12を締め付けることで、脚金物4とコンクリート基礎3とをアンカーボルト5にて緊結する。このときダブルナット12によって脚金物4の緊結強度が確保され、脚金物4の引抜き耐力が向上する。なおこのとき、脚金物4の上方に突出するアンカーボルト5の突出高さe(図3(a))は、ダブルナット12を螺入可能な突出高さであって且つダブルナット12を締め付けのための工具が入る程度の高さ(例えば、55mm±5mm程度)とされる。   Thereafter, the rising concrete 7 is poured into the mold 17, and after curing for a certain time, the mold 17 is disassembled, the second jig 2 is removed from the anchor bolt 5, and the top end of the rising concrete 7 is leveled with mortar. As shown in FIG. 3, the top end leveler 18 is formed. Thereafter, the leg bolt 4 is placed on the top surface of the top end leveler 18 so that the anchor bolt through hole 14 of the leg bracket 4 is fitted into the upper portion 5a of the anchor bolt 5 protruding above the top end leveler 18, and FIG. As shown in b), by fastening the double nut 12 from the upper end of the anchor bolt 5 via the eccentric washer 40, the leg metal 4 and the concrete foundation 3 are fastened together by the anchor bolt 5. At this time, the tightness of the leg metal 4 is secured by the double nut 12, and the pull-out strength of the leg metal 4 is improved. At this time, the protruding height e (FIG. 3A) of the anchor bolt 5 protruding above the leg metal piece 4 is a protruding height at which the double nut 12 can be screwed and the double nut 12 is tightened. The height is high enough to accommodate a tool for the purpose (for example, about 55 mm ± 5 mm).

しかして、アンカーボルト5の位置出しを第1の治具1と第2の治具2とを用いて上下2点で行なうことにより、立ち上がりコンクリート7の打設時にアンカーボルト5が動くことがないので、アンカーボルト5の基礎立ち上がり部への設置の際に設置精度を高め、且つ打設されたコンクリートの流動圧にも影響を受けないものとなる。従って、第2の治具2を従来のように型枠17に固定する必要がなくなるので、型枠17と第2の治具2との位置ずれによって第2の治具2を鋼製型枠に固定できなくなるといった問題も生じなくなる。これにより、本発明では型枠17の材質は木製に限られず、あらゆる材質の型枠、例えば、鋼製型枠やプラスチック製型枠などに広く対応できる効果も得られる。   Thus, the anchor bolt 5 is positioned at two points using the first jig 1 and the second jig 2 so that the anchor bolt 5 does not move when the rising concrete 7 is placed. Therefore, when the anchor bolt 5 is installed on the foundation rising portion, the installation accuracy is improved and the flow pressure of the placed concrete is not affected. Accordingly, since it is not necessary to fix the second jig 2 to the mold 17 as in the prior art, the second jig 2 is removed from the steel mold by the positional deviation between the mold 17 and the second jig 2. The problem of being unable to be fixed to the screen no longer occurs. Thereby, in the present invention, the material of the mold 17 is not limited to wood, and an effect that can be widely applied to molds of any material, for example, steel molds and plastic molds.

ここで、脚金物4のアンカーボルト通し孔14(図3(b))をルーズホール化しているので、脚金物4部分でアンカーボルト5の水平方向の施工誤差を吸収できるようになる。そのうえ、脚金物4のアンカーボルト通し孔14とダブルナット12との間に偏心座金40を介在させることによって、アンカーボルト5の水平方向の施工誤差を偏心座金40部分でも吸収できるようになる。これにより脚金物4部分で吸収できるアンカーボルト5の位置設計寸法の施工誤差は±5.0mmまで拡大することができる。この結果、第2の治具2を型枠17に対して固定しない構造において、第2の治具2の位置出しが若干不正確であったとしても、後工程の脚金物4部分で施工誤差を吸収できるので、結果的に、アンカーボルト5の施工位置寸法の水平方向の施工誤差(±2.5mm以内)に納まるようにアンカーボルト5を施工することが可能となる。   Here, since the anchor bolt through hole 14 (FIG. 3 (b)) of the leg metal piece 4 is formed as a loose hole, the horizontal construction error of the anchor bolt 5 can be absorbed by the leg metal piece 4 portion. In addition, by placing the eccentric washer 40 between the anchor bolt through hole 14 of the leg metal 4 and the double nut 12, the horizontal construction error of the anchor bolt 5 can be absorbed even in the eccentric washer 40 portion. Thereby, the construction error of the position design dimension of the anchor bolt 5 that can be absorbed by the leg metal part 4 can be increased to ± 5.0 mm. As a result, in the structure in which the second jig 2 is not fixed to the mold 17, even if the positioning of the second jig 2 is slightly inaccurate, a construction error occurs in the leg metal part 4 in the subsequent process. As a result, it is possible to construct the anchor bolt 5 so as to be within the construction error (within ± 2.5 mm) in the horizontal direction of the construction position dimension of the anchor bolt 5.

また本例では、アンカーボルト5の高さ調節や第2の治具2の水平出しを上下のダブルナット8a1,8a2:9a1,9a2によって据付現場で、簡単かつ短時間に行なえると共に、ダブルナット8a1,8a2:9a1,9a2のそれぞれの本締めによって、緊結効果が十分に発揮されるようになる。   In this example, the height of the anchor bolt 5 and the leveling of the second jig 2 can be easily and quickly performed at the installation site by the upper and lower double nuts 8a1, 8a2: 9a1, 9a2, and the double nut 8a1, 8a2: Each of the 9a1 and 9a2 final tightening sufficiently exhibits the binding effect.

また本例では、アンカーボルト5を基礎立ち上がり部13の下側から上側まで通して配置することで、アンカーボルト5が縦主筋を兼ねるようになり、コンクリート基礎3内の配筋量を削減できる。しかもアンカーボルト5の下部5bを位置決め固定する第1の治具1はコンクリート内に埋設されてアンカーボルト5の下部5bを補強する部材として機能することとなるので、コンクリート基礎3内の配筋量の削減と施工性の向上の両方を図ることができる。   Moreover, in this example, the anchor bolt 5 is arranged to pass from the lower side to the upper side of the foundation rising portion 13 so that the anchor bolt 5 also serves as a longitudinal main reinforcing bar, and the amount of bar arrangement in the concrete foundation 3 can be reduced. Moreover, since the first jig 1 for positioning and fixing the lower portion 5b of the anchor bolt 5 is embedded in the concrete and functions as a member for reinforcing the lower portion 5b of the anchor bolt 5, the amount of bar arrangement in the concrete foundation 3 is achieved. Both reduction of construction and improvement of workability can be achieved.

さらに本例では、アンカーボルト5から取り外した第2の治具2は次の現場で再利用できる利点があり、さらに、アンカーボルト5と第2の治具2との固定に用いたダブルナット9a1,9a2は、後工程での脚金物4をアンカーボルト5に緊結するためのダブルナット12として再利用できる利点もある。   Further, in this example, the second jig 2 removed from the anchor bolt 5 has an advantage that it can be reused at the next site. Further, the double nut 9a1 used for fixing the anchor bolt 5 and the second jig 2 is used. , 9a2 has an advantage that it can be reused as a double nut 12 for fastening the leg bracket 4 in a later process to the anchor bolt 5.

本発明の位置出し治具は、柱脚金物の柱脚アンカーボルトの位置出しに限らず、門用や壁脚用などのアンカーボルトの位置出しにも広く適用できるのはいうまでもない。   Needless to say, the positioning jig of the present invention is not limited to the positioning of the column base anchor bolts of the column base hardware, but can be widely applied to the positioning of anchor bolts for gates and wall legs.

本発明の一実施形態の位置出し治具の斜視図である。It is a perspective view of the positioning jig of one Embodiment of this invention. (a)は同上のアンカーボルトの上部を第2の治具に固定した状態の斜視図、(b)は同上のコンクリート基礎上に突出するアンカーボルトに脚金物を固定した状態の斜視図である。(A) is a perspective view of the state which fixed the upper part of the anchor bolt same as the above to a 2nd jig | tool, (b) is a perspective view of the state which fixed the leg metal object to the anchor bolt which protrudes on a concrete foundation same as the above. . (a)は同上のアンカーボルトの上部に柱脚金物を固定した状態の側面図、(b)は柱脚金物のアンカーボルト通し孔とアンカーボルトの遊び状態を説明する断面図である。(A) is a side view of a state in which a column base metal is fixed to the upper part of the anchor bolt of the above, and (b) is a cross-sectional view illustrating an idle state of an anchor bolt through hole and an anchor bolt of the column base metal. (a)は同上の捨てコンクリートの上面に描かれる型枠線と基準芯ラインを説明する平面図、(b)は同上の第1の治具を捨てコンクリート上面に位置出しする場合を説明する斜視図である。(A) is a plan view for explaining the formwork line and the reference core line drawn on the upper surface of the abandoned concrete, and (b) is a perspective view for explaining the case where the first jig is abandoned and positioned on the upper surface of the concrete. FIG. (a)は同上の第1の治具をコンクリート釘で固定する場合の斜視図、(b)は同上の第1の治具にアンカーボルトの下部を固定する場合の斜視図である。(A) is a perspective view in the case of fixing a 1st jig | tool same as the above with a concrete nail, (b) is a perspective view in the case of fixing the lower part of an anchor bolt to the 1st jig | tool same as the above. 同上の位置出し治具を用いてアンカーボルトを上下2点で位置出しした状態を説明する側面図である。It is a side view explaining the state which positioned the anchor bolt by two upper and lower points using the positioning jig same as the above. (a)(b)は水平器を用いて同上の第2の治具の水平出しを行なう場合の説明図、(c)(d)は水糸を用いて同上の第2の治具の芯出しを行なう場合の説明図である。(A) (b) is explanatory drawing at the time of leveling the 2nd jig | tool same as the above using a level device, (c) (d) is the core of the 2nd jig | tool same as above using a water thread. It is explanatory drawing in the case of taking out. 従来の支持プレートを位置出しして型枠に固定する場合を説明する斜視図である。It is a perspective view explaining the case where the conventional support plate is located and fixed to a formwork.

符号の説明Explanation of symbols

1 第1の治具
1a 底板部
1b 立ち上がり部
2 第2の治具
3 コンクリート基礎
4 脚金物
5 アンカーボルト
5a 上部
5b 下部
6 捨てコンクリート
7 立ち上がりコンクリート
8a 固定手段
9a 着脱固定手段
10 位置出し手段
13 基礎立ち上がり部
17 型枠
DESCRIPTION OF SYMBOLS 1 1st jig 1a Bottom plate part 1b Standing part 2 2nd jig 3 Concrete foundation 4 Leg metal fitting 5 Anchor bolt 5a Upper part 5b Lower part 6 Discarding concrete 7 Standing concrete 8a Fixing means 9a Detachment fixing means 10 Positioning means 13 Foundation Rising part 17 Formwork

Claims (3)

建物の躯体フレームの根元に設けられた脚金物をコンクリート基礎上に固定するためのアンカーボルトの位置出しをコンクリート打設前に行なうアンカーボルトの位置出し治具であって、
型枠内の捨てコンクリート上に設置されて複数本のアンカーボルトの下部を相互に連結する第1の治具と、
この第1の治具の上方に配置されて上記複数本のアンカーボルトの上部を相互に連結する第2の治具と
を備え、
上記第1の治具は、
この第1の治具の底板部を捨てコンクリート上に水平出しと芯出しとをして固定する位置出し手段と、
底板部の両端から上方に立ち上がる複数の立ち上がり部に対して上記複数本のアンカーボルトの下部を各々固定する固定手段と
を備えており、
上記第2の治具は、上記第1の治具にて下部が位置出しされた上記複数本のアンカーボルトの上部をそれぞれ着脱可能に固定する着脱固定手段と、
前記型枠に記された基準芯ラインに沿って位置決めするために設けられた切欠と
を備えており、
この着脱固定手段は、上記第2の治具の上方に突出する上記複数本のアンカーボルトの高さ調整及び上記第2の治具の水平出しを可能とする
ことを特徴とするアンカーボルトの位置出し治具。
An anchor bolt positioning jig for positioning an anchor bolt for fixing a metal base provided at the base of a building frame on a concrete foundation before placing the concrete,
A first jig installed on abandoned concrete in a mold and connecting lower portions of a plurality of anchor bolts to each other;
A second jig disposed above the first jig and interconnecting the upper portions of the plurality of anchor bolts;
The first jig is
A positioning means for discarding the bottom plate portion of the first jig and leveling and fixing it on the concrete;
Fixing means for fixing each of the lower portions of the plurality of anchor bolts to a plurality of rising portions rising upward from both ends of the bottom plate portion,
The second jig is detachable fixing means for detachably fixing the upper parts of the plurality of anchor bolts, the lower parts of which are positioned by the first jig ,
A notch provided for positioning along a reference core line marked on the mold , and
The attachment / detachment fixing means is capable of adjusting the height of the plurality of anchor bolts protruding above the second jig and leveling the second jig, and positioning the anchor bolts. Out jig.
上記第1の治具の固定手段及び上記第2の治具の着脱固定手段は、それぞれ、上記アンカーボルトに対して高さ調整可能なダブルナットで構成されていることを特徴とする請求項1記載のアンカーボルトの位置出し治具。   The fixing means for the first jig and the attaching / detaching / fixing means for the second jig are each constituted by a double nut whose height is adjustable with respect to the anchor bolt. The anchor bolt positioning jig described. 上記第1の治具及び上記第2の治具にて支持された上記アンカーボルトが、立ち上がりコンクリートが打設される基礎立ち上がり部の下側から上側まで通して延びていることを特徴とする請求項1又は2記載のアンカーボルトの位置出し治具。   The anchor bolt supported by the first jig and the second jig extends from the lower side to the upper side of the foundation rising part on which the rising concrete is placed. Item 3. An anchor bolt positioning jig according to item 1 or 2.
JP2006261483A 2006-09-26 2006-09-26 Anchor bolt positioning jig Active JP4915653B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006261483A JP4915653B2 (en) 2006-09-26 2006-09-26 Anchor bolt positioning jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006261483A JP4915653B2 (en) 2006-09-26 2006-09-26 Anchor bolt positioning jig

Publications (2)

Publication Number Publication Date
JP2008081980A JP2008081980A (en) 2008-04-10
JP4915653B2 true JP4915653B2 (en) 2012-04-11

Family

ID=39353116

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006261483A Active JP4915653B2 (en) 2006-09-26 2006-09-26 Anchor bolt positioning jig

Country Status (1)

Country Link
JP (1) JP4915653B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI20105954L (en) * 2010-09-17 2012-03-18 Peikko Group Oy Mounting frame and procedure
CN106759943A (en) * 2017-03-21 2017-05-31 中国五冶集团有限公司 A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN106801470A (en) * 2017-03-21 2017-06-06 中国五冶集团有限公司 A kind of quick pedestal anchor bolt structure in place
CN108691423A (en) * 2017-04-05 2018-10-23 通州建总集团有限公司 A kind of foundation bolt assembling fixing device
JP7311111B2 (en) * 2019-05-31 2023-07-19 株式会社ティ・カトウ bolt support unit
CN114603499A (en) * 2022-02-15 2022-06-10 中国一冶集团有限公司 Adjustable device for mounting and fixing foundation bolt

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01203523A (en) * 1988-02-09 1989-08-16 Asahi Chem Ind Co Ltd Fixing of column base
JPH09302675A (en) * 1996-05-20 1997-11-25 Sumitomo Forestry Co Ltd Anchor bolt installation method and metal fitting
JP2000345567A (en) * 1999-06-08 2000-12-12 Okabe Co Ltd Anchor-bolt fixing device

Also Published As

Publication number Publication date
JP2008081980A (en) 2008-04-10

Similar Documents

Publication Publication Date Title
JP4915653B2 (en) Anchor bolt positioning jig
JP4732915B2 (en) Foundation construction method and device, and anchor bolt support device for construction
JP4738886B2 (en) Equipment foundation
KR100659606B1 (en) Spacer for arrary of an iron rod
KR101606439B1 (en) Spacer for fixing between truss girder and deck plate combine
KR101990065B1 (en) Joint of PC column using steel block
JP2000008483A (en) Baseplate fixing device
JP2006322154A (en) Foundation construction method of building
JP2008255724A (en) Jig for execution of work of foundation structure with anchor bolt
GB2565907A (en) A formwork apparatus for a building support
JP2010216196A (en) Anchor bolt installation method for continuous footing, and anchor bolt-tool set
JP3771177B2 (en) Joining structure of reinforced concrete column and steel column, and joining method thereof
JPH0138947B2 (en)
JPH01278620A (en) Installation method for anchor bolt and anchor bolt supporting device used therefor
JP2007177559A (en) Method for mounting handrail and its mounting structure
JP6646959B2 (en) Column and beam frame and its construction method
KR200354124Y1 (en) Structure fixing plate
JP3740232B2 (en) Anchor bolt mounting bracket
JP2015105523A (en) Device and method for fixing column base
JP6220645B2 (en) Column base fixing structure and column base fixing method
JP4774268B2 (en) Column base hardware
JP2716357B2 (en) Rising section formwork fixing jig
JP2001193079A (en) Work method for mat foundation
KR102202853B1 (en) Concrete Embedded Rail Anchor Construction Method for Adjusting a Horizontal Level Easily
JPH0572503B2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080922

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20100820

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101117

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101124

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110124

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110809

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20111011

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20111220

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20120111

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150203

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4915653

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150