KR200354124Y1 - Structure fixing plate - Google Patents

Structure fixing plate Download PDF

Info

Publication number
KR200354124Y1
KR200354124Y1 KR20-2004-0004085U KR20040004085U KR200354124Y1 KR 200354124 Y1 KR200354124 Y1 KR 200354124Y1 KR 20040004085 U KR20040004085 U KR 20040004085U KR 200354124 Y1 KR200354124 Y1 KR 200354124Y1
Authority
KR
South Korea
Prior art keywords
plate
screw pipe
fixing
fixed
fixing plate
Prior art date
Application number
KR20-2004-0004085U
Other languages
Korean (ko)
Inventor
이종근
Original Assignee
이종근
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이종근 filed Critical 이종근
Priority to KR20-2004-0004085U priority Critical patent/KR200354124Y1/en
Application granted granted Critical
Publication of KR200354124Y1 publication Critical patent/KR200354124Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F8/00Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
    • E01F8/0005Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
    • E01F8/0023Details, e.g. foundations

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

본 고안은 콘크리트 기초물의 시공시 엘형 앵커를 설치하고 상기 엘형 앵커의 상측에 구조물의 하부에 고정된 플레이트를 끼워 고정시킴에 있어서, 기초물 시공시 나사 파이프가 하부에 고정된 고정 플레이트를 설치 시공함으로서 구조물의 시공시 간편하게 시공이 이루어질 수 있도록 하는 것이다.The present invention is to install an el-shaped anchor during the construction of the concrete foundation and to fix the plate fixed to the lower portion of the structure on the upper side of the el-shaped anchor, by installing a fixed plate fixed to the lower portion of the pipe when the foundation construction When the construction of the structure is to make the construction can be made easily.

이와 같이 구조물의 설치를 용이하게 할 수 있도록 하기 위한 본 고안은 콘크리트 타설시 철근에 나사 파이프의 하부를 용접 고정시켜 기초물을 성형하므로서 설치가 완료되는 것으로, 상기 나사 파이프의 상하부는 막음부재를 이용하여 막아주고 상부 막음부재는 플레이트의 고정 작업시 벗겨내고 작업하여 고정볼트가 나사 파이프에 끼워져 고정될 수 있도록 하면 된다.As such, the present invention for facilitating the installation of the structure is completed by forming a foundation by welding and fixing the lower part of the screw pipe to the reinforcing steel when placing concrete, and the upper and lower parts of the screw pipe use a blocking member. The upper blocking member should be peeled off during the fixing work of the plate and work so that the fixing bolt can be inserted into the screw pipe and fixed.

Description

구조물 고정 플레이트{omitted}Structure fixing plate {omitted}

본 고안은 콘크리트 기초물의 시공시 엘형 앵커를 설치하고 상기 엘형 앵커의 상측에 구조물의 하부에 고정된 플레이트를 끼워 고정시킴에 있어서, 기초물 시공시 나사 파이프가 하부에 고정된 고정 플레이트를 설치 시공함으로서 구조물의 시공시 간편하게 시공이 이루어질 수 있도록 하는 것이다.The present invention is to install an el-shaped anchor during the construction of the concrete foundation and to fix the plate fixed to the lower portion of the structure on the upper side of the el-shaped anchor, by installing a fixed plate fixed to the lower portion of the pipe when the foundation construction When the construction of the structure is to make the construction can be made easily.

기존에 도 1에 도시된 방음벽(7) 등의 구조물을 콘크리트 기초물(1)에 설치시공하기 위해서는 먼저 콘크리트 기초물(1)을 설치하기에 앞서 기초물(1)의 내부에 설치된 철근(2)의 상부에 엘형 앵커(3)를 설치하고, 콘크리트를 타설하여 기초 물(1)을 완성한 후 상기 기초물(1)의 상부로 돌출된 엘형 앵커(3)에 H빔(5)의 하부에 고정된 플레이트(6)를 끼우고 너트(8)로 고정시키도록 하고 있다.In order to install structures such as the soundproof wall 7 shown in FIG. 1 in the concrete foundation 1, first, the reinforcing bars 2 installed inside the foundation 1 before the concrete foundation 1 is installed. After installing the el-shaped anchor (3) in the upper part of, and the concrete is completed to the foundation (1) and the el-shaped anchor (3) protruding to the upper part of the foundation (1) in the lower portion of the H beam (5) The fixed plate 6 is inserted and fixed with the nut 8.

위와 같은 방식에 의해 구조물을 고정시키기 위해 H빔(5)을 엘형 앵커(3)에 고정시키는 방식은 먼저 기초물(1)에 엘형 앵커(3)를 고정시키는 작업이 필요하며, 이때 엘형 앵커(3)는 하부가 철근(2)에 용접 고정되고 나사가 형성된 상부가 콘크리트 위로 돌출되게 설치한 후 상기 돌출부위를 테이핑 처리하여 콘크리트 타설시콘크리트가 묻지 않도록 하고, 콘크리트 양생 후 테이프를 벗기고 H빔(5)의 하부에 고정된 플레이트(6)를 앵커볼트(3)에 끼워 너트(8)로 고정시키게 된다.The method of fixing the H-beam 5 to the el-type anchor (3) in order to fix the structure by the above method first needs to fix the el-type anchor (3) to the base (1), wherein the el-type anchor ( 3) The lower part is welded and fixed to the reinforcing bar (2), and the upper part where the screw is formed is installed to protrude above the concrete, and then taping the protruding part so that the concrete does not get stuck when the concrete is placed, and after curing the concrete, the tape is peeled off and the H beam ( 5) is fixed to the nut (8) by fixing the plate (6) fixed to the lower part of the anchor bolt (3).

그러나 상기 방식은 첫째, 4개의 엘형 앵커(3)를 철근(2)에 고정시킬 때 정확한 위치를 설정하여 고정시켜야 하고, 콘크리트가 묻지 않도록 테이핑 처리를 하여야 하는 불편과 함께, 콘크리트 양생 후 콘크리트의 상부를 평편하게 다듬어 주는 동시에 엘형 앵커(3) 주위를 깨끗하게 처리해 주어야 하는 불편이 있으며, 4개의 엘형 앵커(3)가 돌출된 상태에서 플레이트(6)를 끼우기 위해서는 4곳이 동시에맞아야만 플레이트(6)가 엘형 앵커(3)에 끼워지게 되어 무거운 중량의 H빔(5)에 고정된 플레이트(6)를 끼우는 작업이 대단히 어려운 것이었다.However, in the above method, first, when fixing the four el-shaped anchors (3) to the reinforcing bars (2), the correct position must be set and fixed, with the inconvenience that the taping treatment to prevent the concrete, with the inconvenience of curing the concrete after the top of the concrete In order to smooth out the flat and at the same time clean the surroundings of the el-shaped anchor (3), the four el-shaped anchors (3) in order to fit the plate (6) in order to fit the plate (6) must fit at the same time the plate (6) Was fitted to the el-shaped anchor (3) was a very difficult task to fit the plate (6) fixed to the heavy weight H beam (5).

본 고안은 콘크리트 기초물에 구조물을 설치함에 있어서, 콘크리트 기초물의 상부에 미리 내측으로 나사가 형성된 나사 파이프를 하부에 일정 간격으로 용접 고정시킨 고정 플레이트를 기초물의 콘크리트 상부와 높이가 일치되게 설치하므로서 H빔에 고정된 플레이트를 고정 플레이트 상부에 놓고 고정볼트를 이용하여 손쉽게 고정시킬 수 있도록 한 것이다.The present invention is to install the structure on the concrete foundation, by installing a fixed plate in which the screw pipe formed with a screw inwards on the upper portion of the concrete foundation at regular intervals in the lower portion by installing the same height as the concrete upper portion of the foundation H The plate fixed to the beam is placed on top of the fixing plate so that the fixing bolt can be easily fixed.

이와 같이 구조물의 설치를 용이하게 할 수 있도록 하기 위한 본 고안은 콘크리트 타설시 철근에 나사 파이프의 하부를 용접 고정시켜 기초물을 성형하므로서 설치가 완료되는 것으로, 상기 나사 파이프의 상하부는 막음부재를 이용하여 막아주고 상부 막음부재는 플레이트의 고정 작업시 벗겨내고 작업하여 고정볼트가 나사 파이프에 끼워져 고정될 수 있도록 하면 된다.As such, the present invention for facilitating the installation of the structure is completed by forming a foundation by welding and fixing the lower part of the screw pipe to the reinforcing steel when placing concrete, and the upper and lower parts of the screw pipe use a blocking member. The upper blocking member should be peeled off during the fixing work of the plate and work so that the fixing bolt can be inserted into the screw pipe and fixed.

이러한 본 고안은 평면인 고정 플레이트의 상부에 평면인 플레이트가 얹어져 고정볼트를 하나씩 구멍에 맞추어 끼워주면 되므로 플레이트의 고정작업이 간편하게 이루어지게 된다.The present invention is a flat plate is placed on top of the fixed plate is flat, so that the fixing bolts are fitted into the holes one by one so that the fixing operation of the plate is made easily.

도 1은 기존의 구조물 설치상태 사시도1 is a perspective view of a conventional structure installation state

도 2는 기존의 구조물 고정을 위한 앵커 볼트 설치 상태도2 is an anchor bolt installation state diagram for fixing the existing structure

도 3은 본 고안의 사용상태 설명도3 is a diagram illustrating the use state of the present invention

도 4는 본 고안의 설치 상태 단면도4 is a cross-sectional view of the installation state of the present invention

도 5는 본 고안의 사용상태 단면도5 is a cross-sectional view of the state of use

도 6은 본 고안의 평면도6 is a plan view of the present invention

도 7은 본 고안의 상부캡을 벗긴 상태의 단면도7 is a cross-sectional view of the peeled off the upper cap of the present invention

도 8은 본 고안의 상,하부캡을 씌운 상태의 단면도8 is a cross-sectional view of the upper and lower caps of the present invention

*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

1 : 기초물 2 : 철근1: foundation 2: rebar

3 : 엘형 앵커 6 : 플레이트3: El type anchor 6: Plate

10 : 고정 플레이트 11 : 나사 파이프10 fixing plate 11: screw pipe

15 : 고정볼트15: Fixing bolt

본 고안은 평판형의 고정 플레이트(10)와, 상기 고정 플레이트(10)의 모서리 부위에 하측으로 용접 고정되며 내측으로 나사가 형성되는 나사파이프(11)와, 상기 나사 파이프(11)의 상하부에 끼워져 막아주는 막음부재로 이루어지며, 상기 고정플레이트(10)의 상부와 나사파이프(11)는 서로 관통되게 형성하고, 나사파이프(11)의 고정위치는 플레이트(10)에 뚫인 나사 구멍 위치와 일치시킨다.The present invention is a flat plate-shaped fixing plate 10, the screw pipe 11 is welded fixed to the corner portion of the fixing plate 10 to the lower side and the screw is formed in the inner and upper and lower portions of the screw pipe 11 It is made of a blocking member to prevent the insertion, the upper portion of the fixing plate 10 and the screw pipe 11 is formed to pass through each other, the fixing position of the screw pipe 11 coincides with the position of the screw hole drilled in the plate 10 Let's do it.

여기서 막음부재는 나사 파이프(11)에 이물질이 들어가지 않도록 하는 것으로, 고무로 된 캡(12)(13)을 사용할 수도 있고, 길이가 짧은 볼트를 이용하여 나사파이프(11)의 상하부를 막아주어도 무방하며, 나사 파이프(11)의 하부에 끼워진 막음부재는 그대로 콘크리트 타설이 이루어지도록 하고, 상부에 끼워진 막음부재는 플레이트(6)의 결합시 제거하고 결합이 이루어지도록 한다.Here, the blocking member prevents foreign matter from entering the screw pipe 11, and may be made of rubber caps 12 and 13, and even if the upper and lower portions of the screw pipe 11 are blocked using a short bolt. Mubang, the blocking member fitted to the lower portion of the screw pipe 11 is to be made of concrete pouring as it is, the blocking member fitted to the upper to remove the coupling when the plate 6 is to be made.

또한 고정 플레이트(10)의 상부에서 나사 파이프(11)의 상부를 막아주는 막음부재는 접착과 탈리가 용이한 종이, 합성수지 등을 이용하여도 무방한 것으로, 콘크리트 타설시는 종이나 합성수지를 붙여놓은 상태에서 타설이 이루어지게 하고, 플레이트(6)의 설치작업시 탈리하도록 한다.In addition, the blocking member which blocks the upper part of the screw pipe 11 from the upper part of the fixing plate 10 may be made of paper, synthetic resin, etc., which is easily adhered and detached. The casting is made in the state, it is to be detached during the installation of the plate (6).

고정 플레이트(10)에는 미리 나사 파이프(11)가 용접되는 위치에 구멍을 뚫어주고, 그 구멍에 맞추어 고정 플레이트(10)의 하부에서 나사 파이프(11)를 용접고정시킴으로서 고정볼트(15)가 고정 플레이트(10)의 구멍을 통하여 나사파이프(11)에서 나사 결합될 수 있도록 한다.The fixing plate 10 is fixed to the fixing plate 10 by drilling a hole at the position where the screw pipe 11 is welded in advance, and fixing the welding screw to the screw pipe 11 at the lower portion of the fixing plate 10 in accordance with the hole. It can be screwed in the screw pipe (11) through the hole of the plate (10).

여기서 나사 파이프(11)는 내측에 고정볼트(15)와 같은 나사산을 갖도록 형성하여야 하며, 상기 나사 파이프(11)는 고정 플레이트(10)의 하부에 용접되게 하거나, 고정 플레이트(10)에 형성된 구멍에 끼워진 상태에서 용접되게 한다.Here, the screw pipe 11 should be formed to have the same thread as the fixing bolt 15 on the inside, the screw pipe 11 is to be welded to the lower portion of the fixing plate 10, or a hole formed in the fixing plate 10 To be welded while fitted.

본 고안은 고정 플레이트(10)에 나사 파이프(11)가 고정된 상태에서 나사 파이프(11)의 상하부에 막음부재를 씌운 상태에서 제품의 출하가 이루어지게 되고,상기 나사 파이프(11)의 간격에 따라 각기 다른 규격을 준비하게 된다.According to the present invention, the product is shipped in a state in which a blocking member is covered on the upper and lower portions of the screw pipe 11 in a state where the screw pipe 11 is fixed to the fixing plate 10, and at intervals of the screw pipe 11. Different specifications will be prepared accordingly.

본 고안을 설치하기 위해서는 기초물(1)의 설치 공사시 철근(2)의 상부에 나사 파이프(11)의 하부를 용접 고정시켜야 하는 것으로, 상기 나사 파이프(11)를 철근(2)에 용접시킬 때 고정 플레이트(10)가 기초물(1)의 상부 높이와 일치되도록 높이를 맞추어 고정시켜야 한다.In order to install the present invention, the lower part of the screw pipe 11 must be fixed to the upper part of the reinforcing bar 2 during the installation work of the foundation 1, and the screw pipe 11 is welded to the reinforcing bar 2. When the fixing plate 10 is to be fixed to match the height of the upper height of the base (1).

즉 고정 플레이트(10)는 콘크리트 타설치 콘크리트의 높이와 일치되도록 그 높이를 설정하여 고정시켜야 한다.That is, the fixing plate 10 should be fixed by setting its height to match the height of the concrete of the other concrete installation.

고정 플레이트(10)의 나사 파이프(11) 고정이 완료되면 콘크리트 타설을 하게 되는 것으로, 콘크리트 타설시 콘크리트 몰탈은 나사 파이프(11)의 하부와 상부로 들어가지 못하는 것으로, 그 이유는 나사 파이프(11)의 상하부에 막음부재인 캡(12)(13)을 씌워 놓았기 때문이다.When the fixing of the screw pipe 11 of the fixing plate 10 is completed, concrete pouring is performed. When concrete pouring, the concrete mortar does not enter the lower part and the upper part of the screw pipe 11. This is because caps 12 and 13, which are blocking members, are placed on the upper and lower portions of the "

나사 파이프(11)의 하부는 캡(13)을 씌우지 않고, 용접에 의해 막아주거나 길이가 짧은 볼트를 채워 주어도 실시에 지장이 없는 것으로, 나사 파이프(11)의 하부로 콘크리트 몰탈이 주입되지 않도록 하는 것이면 본 고안의 범주를 벗어난다고 볼 수 없는 것이다.The lower part of the screw pipe 11 does not cover the cap 13 and does not interfere with the welding even if it is blocked by welding or filled with a short bolt, so that concrete mortar is not injected into the lower part of the screw pipe 11. If it does not fall outside the scope of the present invention.

이 같이 고정 플레이트(10)가 설치된 상태에서 콘크리트 타설이 완료되어 콘크리트가 굳게 되면 기초물(1)성형을 위하여 설치하였던 거푸집을 제거하고, 고정 플레이트(10)의 상부를 청소한다.When the concrete is poured in the state in which the fixing plate 10 is installed in this way and the concrete is hardened, the molds installed for forming the foundation 1 are removed, and the upper part of the fixing plate 10 is cleaned.

이때 고정플레이트(10)는 철판으로 제작되므로, 콘크리트 몰탈이 일부 묻어 있더라도 쉽게 떨어져 깨끗이 청소가 된다.At this time, since the fixed plate 10 is made of iron plate, even if some of the concrete mortar is easily cleaned off clean.

그리고 고정 플레이트(10)의 상부에 H빔(5)의 하부에 고정된 플레이트(6)를 올려놓고 고정볼트(15)로 조여주면 된다.Then, the plate 6 fixed on the lower part of the H beam 5 is placed on the fixing plate 10 and tightened with the fixing bolt 15.

고정 플레이트(10)는 평판형이고 플레이트(6)도 평판형이므로 플레이트(6)를 고정 플레이트(10)에 올려 놓기가 용이하며, 특히 볼트 구멍을 맞추지 않은 상태에서 올려 놓을 수 있고, 플레이트(6)가 고정 플레이트(10)에 올려지면 플레이트(6)를 약간씩 회전하며 플레이트(6)에 형성된 볼트 구멍과 고정 플레이트(10)에 고정된 나사 파이프(11)의 구멍을 일치시켜 고정볼트(15)로 조여주면 된다.Since the fixed plate 10 is flat and the plate 6 is also flat, it is easy to place the plate 6 on the fixed plate 10, and in particular, without the bolt holes aligned, and the plate 6 ) Is placed on the fixing plate 10, the plate 6 is rotated slightly, and the fixing bolt 15 is made by matching the hole of the screw pipe 11 fixed to the fixing plate 10 with the bolt hole formed in the plate 6. ) To tighten.

이때 고정볼트(15)는 하나씩 볼트구멍이 일치될 때마다 끼워서 고정시키면 되므로 기존의 엘형 앵커(3)를 사용하는 경우와 같이 4개의 구멍에 4개의 엘형 앵커(3)를 일치시켜야 하는 불편이 사라지게 된다.At this time, the fixing bolt 15 is inserted and fixed every time the bolt holes match one by one, so that the inconvenience of having to match the four el-type anchors (3) to four holes, as in the case of using the conventional el-type anchor (3) disappears do.

그리고 플레이트(6)를 고정 플레이트(10)에 올려 놓기 전에 고정 플레이트(10)의 상부에서 나사 파이프(11)의 상부를 막아주는 막음부재를 제거한 후 플레이트(6)의 결합이 이루어지게 한다.Then, before the plate 6 is placed on the fixing plate 10, the blocking member blocking the upper portion of the screw pipe 11 is removed from the upper portion of the fixing plate 10, and then the plate 6 is coupled.

이 같이 구조물의 설치를 위하여 H빔(5)에 고정된 플레이트(6)를 기초물(1)위에 고정시킴에 있어서, 미리 기초물(1)에 나사 파이프(11)가 고정된 고정 플레이트(10)를 설치하므로서 평판형의 고정 플레이트(10)와 플레이트(6)를 맞닿게 하여 고정 볼트(15)로 결합시키게 되어 결합이 간편하게 이루어질 수 있게 된다.Thus, in fixing the plate 6 fixed to the H beam 5 on the foundation 1 for the installation of the structure, the fixing plate 10 in which the screw pipe 11 is fixed to the foundation 1 in advance. By installing), the plate-shaped fixing plate 10 and the plate 6 abuts to be coupled to the fixing bolt 15 can be easily combined.

본 고안은 기초물의 상부에 고정 플레이트의 높이가 일치되게 고정시키되 상기 고정 플레이트의 하부에 나사 파이프를 용접 고정시키되 상기 나사 파이프의 하부는 철근에 용접 고정시켜 콘크리트 타설을 하도록 하고, 상기 고정 플레이트에 플레이트를 올려 놓고 고정 볼트로 고정시키게 되어 결합 작업이 편리하게 이루어질 수 있다.The present invention is fixed to match the height of the fixing plate to the upper portion of the base to weld the screw pipe to the lower portion of the fixing plate, but the lower portion of the screw pipe is welded fixed to the reinforcing bars to perform concrete pouring, the plate on the fixing plate The mounting work can be conveniently made by fixing the bolts.

이러한 본 고안을 기존의 엘형 앵커를 사용하는 경우와 비교하면, 첫째, 앵커의 폭과 위치를 맞추어 용접하는 불편 없이 단지 높이만을 측정하여 용접하면 되는 편리함이 있고, 둘째, 기초물의 상부를 평편하게 다듬어 주는 작업없이 고정 플레이트에 의해 평편함을 유지할 수 있는 편리함이 있으며, 셋째, 4곳을 동시에 끼워주어야 플레이트를 고정시킬 수 있었던 것에 비하여 하나씩 고정볼트를 채워줄 수 있는 이점이 있고, 넷째, 평판이 고정 플레이트에 평판이 플레이트를 맞추게 되어 맞춤 작업이 간편한 이점이 있는 것이다.Compared to the case of using the present invention using the conventional el-shaped anchor, first, there is the convenience of only measuring the height of welding without the inconvenience of welding to match the width and position of the anchor, and second, to smooth the top of the base There is a convenience that can maintain the flatness by the fixing plate without giving work, and third, there is an advantage to fill the fixing bolts one by one compared to being able to fix the plate by inserting four places at the same time, fourth, the plate is fixed plate The plate fits the plate, which makes the fitting easier.

Claims (2)

평판형의 철판으로 이루어지고 기초물(1)의 상부 콘크리트 높이와 일치되게 설치되는 고정 플레이트(10)와, 상기 고정 플레이트(10)의 모서리 부위에 뚫린 구멍의 하측으로 용접 고정되고 내측으로 나사가 형성되며 기초물(1)의 철근(2)에 하부가 용접 고정되는 나사파이프(11)와, 상기 나사 파이프(11)의 상하부에 끼워져 이물질 투입을 방지하는 막음부재로 이루어진 구조물 고정 플레이트.The fixing plate 10 is made of a flat iron plate and installed to match the height of the upper concrete of the foundation 1, and is welded and fixed to the lower side of the hole drilled in the corner portion of the fixing plate 10, The structure fixing plate formed of a screw pipe (11) formed and welded to the bottom of the reinforcing bar (2) of the base (1), and the blocking member is inserted into the upper and lower portions of the screw pipe (11) to prevent the introduction of foreign substances. 제1항에 있어서, 막음부재는 나사 파이프(11)의 상하부에 끼워지는 고무캡(12)(13)인 것을 특징으로 하는 구조물 고정 플레이트.The structure fixing plate according to claim 1, wherein the blocking member is a rubber cap (12) (13) fitted to upper and lower portions of the screw pipe (11).
KR20-2004-0004085U 2004-02-17 2004-02-17 Structure fixing plate KR200354124Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2004-0004085U KR200354124Y1 (en) 2004-02-17 2004-02-17 Structure fixing plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2004-0004085U KR200354124Y1 (en) 2004-02-17 2004-02-17 Structure fixing plate

Publications (1)

Publication Number Publication Date
KR200354124Y1 true KR200354124Y1 (en) 2004-06-23

Family

ID=49347378

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0004085U KR200354124Y1 (en) 2004-02-17 2004-02-17 Structure fixing plate

Country Status (1)

Country Link
KR (1) KR200354124Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190010947A (en) 2017-07-24 2019-02-01 이윤경 Base plate upside buried integral concrete foundation block
KR20220012690A (en) 2020-07-23 2022-02-04 이종근 Soundproof Wall
KR102592016B1 (en) 2022-11-01 2023-10-20 주식회사디자인랜드 Fixing bracke plate upside buried integral concrete foundation block for fixing steel square pipe pole of landscape facilities

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190010947A (en) 2017-07-24 2019-02-01 이윤경 Base plate upside buried integral concrete foundation block
KR20220012690A (en) 2020-07-23 2022-02-04 이종근 Soundproof Wall
KR102592016B1 (en) 2022-11-01 2023-10-20 주식회사디자인랜드 Fixing bracke plate upside buried integral concrete foundation block for fixing steel square pipe pole of landscape facilities

Similar Documents

Publication Publication Date Title
JP4738886B2 (en) Equipment foundation
KR101638155B1 (en) Anchor connector by using cube
JP4915653B2 (en) Anchor bolt positioning jig
JPH11181795A (en) Machine foundation
KR200354124Y1 (en) Structure fixing plate
US20230258006A1 (en) Anchorage template for building walls and method
KR20190032824A (en) Joint of PC column using steel block
KR200201561Y1 (en) Head reinforcement structure of steel pipe pile
JP2008255724A (en) Jig for execution of work of foundation structure with anchor bolt
JP2004011203A (en) Precast src-column joining section structure
KR20130113067A (en) Basic-level fixed anchor and it using construction method
JP2009293198A (en) Column base structure and its construction method
JP2009257006A (en) Ground anchor construction method
GB2403736A (en) Shroud for a bolt to be set in concrete
KR100820596B1 (en) Trench-form
JPS63184665A (en) Method for embedding anchor for mounting handrail support
KR20190000607U (en) Safety railing for Form Meong-yeoi
KR200246507Y1 (en) Land reclamation type anchor for concrete structure
KR20190081605A (en) Installation structure and method of precast concrete culvert
JPS61176731A (en) Mounting of weight member to concrete structure wall body
KR102198442B1 (en) A SPACE-BAR For Concrete Forms
JP2002147027A (en) Fixing construction method for safety fence column
KR200415591Y1 (en) The euroform for slab
JPH10331179A (en) Concrete block coupling method and metal piece for coupling
JP2891107B2 (en) SRC column base anchoring structure

Legal Events

Date Code Title Description
REGI Registration of establishment
LAPS Lapse due to unpaid annual fee