JP4732915B2 - Foundation construction method and device, and anchor bolt support device for construction - Google Patents

Foundation construction method and device, and anchor bolt support device for construction Download PDF

Info

Publication number
JP4732915B2
JP4732915B2 JP2006033716A JP2006033716A JP4732915B2 JP 4732915 B2 JP4732915 B2 JP 4732915B2 JP 2006033716 A JP2006033716 A JP 2006033716A JP 2006033716 A JP2006033716 A JP 2006033716A JP 4732915 B2 JP4732915 B2 JP 4732915B2
Authority
JP
Japan
Prior art keywords
anchor bolt
template
foundation
support device
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006033716A
Other languages
Japanese (ja)
Other versions
JP2007211514A (en
Inventor
庄次 松沢
Original Assignee
庄次 松沢
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 庄次 松沢 filed Critical 庄次 松沢
Priority to JP2006033716A priority Critical patent/JP4732915B2/en
Publication of JP2007211514A publication Critical patent/JP2007211514A/en
Application granted granted Critical
Publication of JP4732915B2 publication Critical patent/JP4732915B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

本発明は、木造やRC壁構造などによる住宅用の低層建物を構築する際のコンクリート基礎に適用するものであって、型枠内に打設した基礎コンクリートに上端ねじ部を突設する態様で埋設するアンカーボルトに対し、柱の取付位置に適合した所定位置及び所定間隔で水平及び鉛直方向の位置決めを行うと共に、当該上端ねじ部に直接又は土台を介して柱を連結する基礎の構築方法と装置及び構築用アンカーボルト支持装置に関する。   The present invention is applied to a concrete foundation when constructing a low-rise building for a house such as a wooden or RC wall structure, and in a mode in which an upper end screw portion is projected from a foundation concrete placed in a formwork. A method of constructing a foundation that performs horizontal and vertical positioning at a predetermined position and at a predetermined interval adapted to the mounting position of the column with respect to the anchor bolt to be embedded, and connects the column directly to the upper end screw part or via a base. The present invention relates to an apparatus and an anchor bolt support apparatus for construction.

この種のコンクリート基礎には、布基礎や独立基礎又はベタ基礎などがあり、例えば布基礎の場合には逆T字形の断面で壁の長さ方向に沿って帯状に連続するコンクリート基礎を構築し、木造やRC壁構造などの建物を定着するために基礎中にアンカーボルトを埋設すると共に、基礎上に突出させたアンカーボルトの上端ねじ部に直接又は土台を介して柱を立設する構造を採り、施工する際には型枠上に設けたアンカー支持具で上端ねじ部を支持した状態にして型枠内に基礎コンクリートを打設する。   This type of concrete foundation includes a cloth foundation, an independent foundation or a solid foundation. For example, in the case of a cloth foundation, a concrete foundation that is continuous in a strip shape along the length of the wall with an inverted T-shaped cross section is constructed. In order to fix buildings such as wooden structures and RC wall structures, anchor bolts are buried in the foundation, and a pillar is erected directly or via a base on the upper end thread of the anchor bolt protruding on the foundation. When picking and constructing, foundation concrete is placed in the mold with the upper end thread supported by an anchor support provided on the mold.

従って、基礎コンクリート中に埋設したアンカーボルトの取付け位置及び取付け間隔は、土台や柱の取付け位置及び取付け間隔に適合して設定した所定の位置及び間隔で精度良く施工する必要があり、施工方法の不備や作業者の未熟などによって精度が低下すると、その修復作業に多大な労力と費用が掛かると共に、工期の遅延を生ずるなど被害は甚大であるから、改善のために特許文献1〜4などを含む各種の提案がされている。   Therefore, it is necessary to install the anchor bolts embedded in the foundation concrete with a predetermined position and interval that are set in conformity with the mounting positions and intervals of the foundation and pillars. If accuracy decreases due to deficiencies or immaturity of workers, the repair work takes a lot of labor and cost, and the damage is enormous, such as causing a delay in the construction period. Various proposals have been made.

特開2005−315021号公報JP 2005-315021 A 特開2000−104263号公報JP 2000-104263 A 特許第3632948号公報Japanese Patent No. 3632948 特開2000−248747号公報JP 2000-248747 A 特開平09−88083号公報JP 09-88083 A

これらの先行技術では、例えば特許文献1の場合は上下の水平面板に設けた各挿通孔にアンカーボルトを挿通させ、押しねじの圧接によって着脱可能に係止保持すると共に、型枠の天端上に載置する両端側にスリット状に開口した複数の位置決め部を並設し、この位置決め部を天端上の墨線に一致させて幅方向及び長手方向の位置決めを行う基礎用アンカーボルトの支持装置が開示されている。   In these prior arts, for example, in the case of Patent Document 1, an anchor bolt is inserted into each insertion hole provided in the upper and lower horizontal plates, and is detachably locked and held by press-contact of a push screw. A support device for a foundation anchor bolt for positioning in the width direction and in the longitudinal direction by arranging a plurality of positioning portions opened in a slit shape on both ends to be placed on the base plate, and aligning the positioning portions with the black line on the top end Is disclosed.

特許文献1による基礎用アンカーボルトの支持装置は、押しねじを緩めてアンカーボルトの高さ調整を行うようにすると共に、離間した上下の各挿通孔にアンカーボルトを挿通させることによって、傾きのない鉛直状態でアンカーボルトを支持するようにし、型枠の天端上で支持装置を幅方向及び長手方向に移動させ、位置決め部を墨線に整合させることによって、アンカーボルトの位置決めをするようにしたものである。   The support device for a foundation anchor bolt according to Patent Document 1 has no inclination by loosening a push screw to adjust the height of the anchor bolt and inserting the anchor bolt into the spaced upper and lower insertion holes. The anchor bolt is supported in the vertical state, and the anchor bolt is positioned by moving the support device in the width direction and the longitudinal direction on the top end of the formwork and aligning the positioning part with the black line. It is.

また、特許文献2の場合は保持板の中央に設けた挿通部にアンカーボルトを挿通させ、螺合する上下一対の各ナットで狭持して支持する形態又は、保持板の中央上面に溶接などで固着して立設した挿通筒部にアンカーボルトを挿通させ、挿通筒部の上端側に設けた螺合するナットで係止する形態を採ると共に、型枠の天端上に載置する保持板の両端側には、型枠の天端に左右から係合可能な位置決め部を設けたアンカーボルト保持治具が開示されている。   In the case of Patent Document 2, an anchor bolt is inserted into an insertion portion provided in the center of the holding plate, and is supported by being sandwiched by a pair of upper and lower nuts to be screwed together, or welded to the upper center surface of the holding plate. The anchor bolt is inserted into the insertion tube portion that is fixed and fixed in place, and is locked with a screwed nut provided on the upper end side of the insertion tube portion, and is held on the top end of the formwork. An anchor bolt holding jig provided with positioning portions that can be engaged from the left and right at the top end of the formwork is disclosed at both ends of the plate.

特許文献2によるアンカーボルト保持治具は、挿通部に対する上下のナット又は挿通筒部に対する上部のナットを緩めてアンカーボルトの高さ調整を行うようにすると共に、前者では一対の各ナットで狭持することによって、後者では長尺な挿通筒部を挿通させることによって、傾きのない鉛直状態でアンカーボルトを支持するようにし、型枠の天端に係合した位置決め部で保持治具の幅方向を規制し且つ、保持治具を長手方向に移動させることによって、アンカーボルトの位置決めをするようにしたものである。   In the anchor bolt holding jig according to Patent Document 2, the height of the anchor bolt is adjusted by loosening the upper and lower nuts with respect to the insertion portion or the upper nut with respect to the insertion tube portion. In the latter case, the anchor bolt is supported in a vertical state without inclination by inserting a long insertion tube portion, and the width direction of the holding jig is determined by the positioning portion engaged with the top end of the mold. And anchor bolts are positioned by moving the holding jig in the longitudinal direction.

また、特許文献3の場合は両端側を型枠の天端に架設して載置する長尺板状の位置決め具本体に対し、コンクリート打設用の開口部と型枠の間を橋渡しする横桟状の中枠材を設けると共に、開口部の口縁部にはアンカーボルトの取付け孔を切欠状に形成した取付け片を中枠材から突設させ、さらに取付け片が設けられていない開口部の口縁部には切欠状の補助取付け孔を設けたアンカーボルト位置決め具が開示されている。   Further, in the case of Patent Document 3, a long plate-shaped positioning tool main body that is installed with both end sides laid on the top end of the mold frame is bridged between the concrete placing opening and the mold frame. In addition to providing a frame-shaped medium frame material, an opening in which an anchor bolt mounting hole is formed in a cutout shape at the opening edge of the opening protrudes from the medium frame material, and an opening in which no mounting piece is provided An anchor bolt positioning tool provided with a notch-shaped auxiliary mounting hole in the mouth edge portion of this is disclosed.

特許文献3によるアンカーボルト位置決め具は、アンカーボルトを取付け孔に係止して直接取り付けることで、位置決め精度を高めるようにすると共に、型枠のコーナー部や入隅部で隣接する各位置決め具本体を重合させた際に、一方の取付け孔と他方の補助取付け孔が整合した状態で、取付け孔に対するアンカーボルトの取付けができるようにし、また取付け孔及び補助取付け孔を切欠状に形成して開口部に連通させることで、長尺なアンカーボルトを水平に移動して各取付け孔に挿入できるようにしたものである。   The anchor bolt positioning tool according to Patent Document 3 is designed to increase positioning accuracy by locking the anchor bolt directly in the mounting hole, and adjacent each positioning tool main body at the corner or the corner of the mold. When one of the mounting holes is aligned with the other auxiliary mounting hole, the anchor bolt can be attached to the mounting hole, and the mounting hole and the auxiliary mounting hole are formed in a notch shape and opened. The long anchor bolt can be moved horizontally and inserted into each mounting hole by communicating with the portion.

また、特許文献4の場合は長手寸法を建物ユニットのモジュール(柱間隔に相当する基本寸法)の整数倍にし、短手寸法を型枠の天端間に架設して載置できる幅にした長尺板状で形成すると共に、長尺板にはコンクリート投入用窓状部とアンカーボルトの挿通孔を形成して型枠の間を橋渡しする横桟を設けた設置冶具であって、梁端用の端治具と梁中間部用の中間治具及び接続部用のジョイント治具の3種類を用いるアンカーボルト設置冶具が開示されている。   In the case of Patent Document 4, the longitudinal dimension is an integral multiple of the module of the building unit (basic dimension corresponding to the column interval), and the short dimension is a width that can be placed between the top ends of the formwork. It is an installation tool that is formed in the shape of a long plate, and is provided with a horizontal beam that bridges the formwork by forming a concrete loading window and an anchor bolt insertion hole in the long plate. An anchor bolt installation jig using three types of end jigs, intermediate jigs for beam intermediate parts, and joint jigs for connection parts is disclosed.

特許文献4によるアンカーボルト設置治具は、長手寸法を建物ユニットのモジュールの整数倍に設定したことによって、複数の治具を単に接続するだけで各種長さの基礎に対応できるようにすると共に、標準化された3種類の治具を基礎の各所に割り付けて用いることによって、アンカーボルトの設置を含む基礎工事を容易に施工できるようにしたものである。   The anchor bolt installation jig according to Patent Document 4 has a longitudinal dimension set to an integral multiple of the module of the building unit, so that it can cope with the foundations of various lengths by simply connecting a plurality of jigs. By allocating and using three types of standardized jigs at various locations on the foundation, foundation work including installation of anchor bolts can be easily performed.

特許文献5の場合はアンカーボルトの上端ねじ部側に対して概略舟型のグラウト充填用の型枠本体を設けると共に、型枠本体の底面にはボルトとナットによるレベル調整具を吊下げ状態で装着し、基礎コンクリートを打設した際に天端に凹部を形成し且つ、凹部の底面からレベル調整具の高さ調整ボルトが突出するようにし、レベル調整具によってボルトの頭部頂面をテンプレートに宛がった状態で凹部にレベルモルタルを打設するようにした柱脚下端部のグラウト充填工法とグラウト充填用凹部の成形用型枠が開示されている。   In the case of Patent Document 5, a substantially boat-shaped grout filling mold body is provided on the upper end thread portion side of the anchor bolt, and a level adjuster using bolts and nuts is suspended from the bottom surface of the mold body. When the foundation concrete is installed, a recess is formed at the top and the height adjustment bolt of the level adjustment tool protrudes from the bottom of the recess. A grout filling method at the lower end of the column base and a forming mold for forming a grout filling recess are disclosed in which level mortar is placed in the recess in a state of being directed to the groove.

特許文献5によるグラウト充填工法及び成形用型枠は、基礎コンクリートの天端上にグラウト充填用の型枠を設けて盛り上げた状態でグラウトを充填していた従来工法に対し、柱脚下端の設置面が基礎コンクリートの天端と略同一のレベルになるよう凹部内にグラウトを充填することによって、従来工法の課題であったアンカーボルトと床板との干渉及び、グラウトと外壁パネルとの干渉を防止するようにしたものである。   The grout filling method and forming mold according to Patent Document 5 are installed at the lower end of the column base, compared to the conventional method in which grout is filled with a grout filling form on the top edge of the foundation concrete. By filling the recess with grout so that the surface is almost at the same level as the top edge of the foundation concrete, interference between the anchor bolt and the floorboard and the interference between the grout and the outer wall panel, which was a problem of the conventional construction method, is prevented. It is what you do.

しかしながら、これらの先行技術を含む従来技術には未だ改善を必要とする課題が残されており、例えば特許文献1の場合には支持装置の形状が平板状ではなく、型抜き及び折り曲げ加工などを必要として製造単価を安価にすることが困難であること、柱の取付位置に適合するようにアンカーボルトを位置決めする際に、スケールなどを用いて計測しながら各支持装置の設置位置を設定するので、位置決め精度及び作業能率を向上させることが困難であること、などの課題があった。   However, there are still problems that need to be improved in the prior art including these prior arts. For example, in the case of Patent Document 1, the shape of the support device is not flat, and die cutting and bending are performed. It is difficult to reduce the manufacturing unit cost as necessary, and when installing the anchor bolt to match the mounting position of the pillar, the installation position of each support device is set while measuring using a scale etc. There are problems such as difficulty in improving positioning accuracy and work efficiency.

また、特許文献2の場合にはアンカーボルトを一対の各ナットで狭持する形態では倒れ防止機能が不十分であること、アンカーボルトを長尺な挿通筒部を挿通させる形態では長尺な挿通筒部を溶接で鉛直に立設する加工作業が容易でないこと、幅方向を規制する位置決め部が各種の木製又は鋼製型枠に適用できないこと、柱の取付位置に適合するようにアンカーボルトを位置決めする際には特許文献1の場合と同様に、スケールなどを用いて計測しながら各支持装置の設置位置を設定すので、位置決め精度及び作業能率を向上させることが困難であること、などの課題があった。   Moreover, in the case of patent document 2, in the form which clamps an anchor bolt with a pair of each nut, a fall prevention function is inadequate, and long insertion is carried out in the form which inserts an anchor bolt through a long insertion cylinder part. It is not easy to work vertically to weld the cylinder part vertically, the positioning part that regulates the width direction cannot be applied to various wooden or steel molds, and anchor bolts are fitted to fit the mounting position of the column. When positioning, as in the case of Patent Document 1, since the installation position of each support device is set while measuring using a scale or the like, it is difficult to improve positioning accuracy and work efficiency, etc. There was a problem.

また、特許文献3及び特許文献4の場合には平板ながら長尺で多数の打抜き加工孔を形成するために、大型で高価な製造設備を必要とするので製造単価を安価にすることが困難であること、長尺で且つ重量も嵩むことから、現場への搬送に大型の車両が必要であると共に、現場での型枠に対する架設作業には多数の人力が必要であること、予め工場などでアンカーボルトを組み付けておくことも不可能ではないが、現場への搬送や現場での架設作業を考えると、予め組み付けておくことは実質的に不可能であること、など製作上とコスト状及び施工上での課題があった。   In addition, in the case of Patent Document 3 and Patent Document 4, it is difficult to reduce the manufacturing unit price because a large and expensive manufacturing facility is required in order to form a large number of punching holes while being flat. Because it is long and heavy, it requires a large vehicle to be transported to the site, and it requires a lot of human power to erection the formwork at the site. It is not impossible to assemble the anchor bolts, but considering the transportation to the site and the construction work at the site, it is practically impossible to assemble in advance. There was a problem in construction.

さらに、特許文献5の場合にはグラウト充填用の型枠本体は両側を基礎コンクリート打設用の型枠上に高さ調整可能に支持し、当該グラウト充填用の型枠本体の中央底面に対してレベル調整具を吊下げているので、煩雑な型枠本体の高さ調整が必要であって且つこの高さ調整が適性でないとレベル調整具の位置決めを精度良く行うことができないこと、しかも高さ調整ボルトによるレベル調整はアンカーボルトの上端ねじ部との相対位置と関連づけて設定する必要があるが、個別に設定しているので位置決め精度が出しにくいこと、型枠本体にアンカーボルトを挿通させているので、組み付けが容易でないこと、などの課題があった。   Further, in the case of Patent Document 5, the mold body for filling grout supports both sides of the mold body for foundation concrete placement so that the height can be adjusted, and the center of the mold body for grout filling is supported with respect to the center bottom surface. Since the level adjuster is suspended, it is necessary to adjust the height of the mold body in a complicated manner, and the level adjuster cannot be positioned accurately unless this height adjustment is appropriate. The level adjustment using the height adjustment bolt needs to be set in relation to the relative position of the anchor bolt with the upper end thread. However, since it is set individually, positioning accuracy is difficult to obtain, and the anchor bolt is inserted through the mold body. Therefore, there were problems such as that assembly was not easy.

そこで本発明では、これら従来技術の課題を解決し得る基礎の構築方法と装置及び構築用アンカーボルト支持装置を提供するものであって、特に隣接した柱の設置位置毎に各アンカーボルトを強固な支持力によって鉛直に支持できること、隣接した柱の設置位置の間隔を簡単な構造で安価な位置決めプレート(間隔設定板)によって容易且つ精度良く位置決めできること、アンカーボルトの上端ねじ部との相対位置と関連づけて設けたレベル調整具によって、鉄骨柱との間に形成するグラウト層のレベル調整を容易且つ精度良く設定できること、などを主たる目的とする。   Therefore, the present invention provides a foundation construction method and apparatus and a construction anchor bolt support device that can solve the problems of the prior art, and in particular, each anchor bolt is made strong at each installation position of adjacent columns. It can be supported vertically by the supporting force, the interval between the installation positions of adjacent pillars can be easily and accurately positioned with an inexpensive positioning plate (spacing setting plate) with a simple structure, and the relative position to the upper end threaded portion of the anchor bolt The main purpose is to be able to easily and accurately set the level adjustment of the grout layer formed between the steel column and the level adjuster provided.

本発明による基礎の構築方法は、上端ねじ部をテンプレートにねじ固着してアンカーボルトを垂設したアンカーボルト支持装置を用意し、テンプレートの両端側を型枠の天端部間に架設する態様で柱の設置位置毎にアンカーボルト支持装置を載置すると共に、各アンカーボルト支持装置の上端ねじ部を位置決めした後に、テンプレートの両端側を型枠の天端部に固着して基礎コンクリートを打設する基礎の構築方法であって、
アンカーボルト支持装置にはアンカーボルトの上端ねじ部に連結した補助プレートを、テンプレートの下側に離間して平行状に設けると共に、補助プレートに高さ調整ボルトを備えたレベル調整具を設け、補助プレートを埋設して高さ調整ボルトの頭部を突出する態様で型枠内に基礎コンクリートを打設した後に、テンプレートを取り外して柱の接地面に設定した高さ調整ボルトの頭部頂面まで、基礎コンクリート上にグラウト材を充填してグラウト層を形成したことを特徴とする。(請求項1)
The foundation construction method according to the present invention is an aspect in which an anchor bolt support device is provided in which an upper end screw portion is screwed to a template and anchor bolts are suspended, and both ends of the template are installed between the top ends of the mold. Place anchor bolt support devices at each column installation position, and after positioning the upper end threaded portion of each anchor bolt support device, fix both ends of the template to the top end of the mold and place the foundation concrete A basic construction method,
In the anchor bolt support device, an auxiliary plate connected to the upper end threaded portion of the anchor bolt is provided in parallel and spaced apart from the lower side of the template, and a level adjuster equipped with a height adjustment bolt is provided on the auxiliary plate to assist After placing the concrete in the formwork so that the head of the height adjustment bolt protrudes by embedding the plate, remove the template and reach the top surface of the height adjustment bolt head set on the ground contact surface of the column It is characterized in that a grout layer is formed by filling grout material on basic concrete . (Claim 1)

請求項1に記載した基礎の構築方法において、柱を構築する所定間隔毎にアンカーボルトと連結する取付け孔を設けた長尺な間隔設定板を用意し、隣接する各アンカーボルト支持装置の間を着脱可能に連結して位置決めを行う。(請求項2) In the foundation construction method according to claim 1, a long interval setting plate provided with a mounting hole for connecting with an anchor bolt is prepared for each predetermined interval for constructing a pillar, and between adjacent anchor bolt support devices. Positioning by detachably connecting . (Claim 2)

請求項1または請求項2に記載した基礎の構築方法において、アンカーボルト支持装置を挟んで型枠の間に取り外し可能な仕切り板を設け、仕切り板の外側から型枠内に基礎コンクリートを打設し、仕切り板の間にグラウト材の充填用凹部を形成すると共に、仕切り板の間にグラウト材を充填して局部的にグラウト層を形成する。(請求項 The foundation construction method according to claim 1 or 2 , wherein a partition plate is provided between the molds with the anchor bolt support device interposed therebetween, and the foundation concrete is placed in the mold from the outside of the partition plates. A recess for filling the grout material is formed between the partition plates, and a grout layer is locally formed by filling the grout material between the partition plates. (Claim 3 )

本発明による基礎の構築装置は、上端ねじ部をテンプレートにねじ固着してアンカーボルトを垂設したアンカーボルト支持装置を用意し、テンプレートの両端側を型枠の天端部間に架設する態様で柱の設置位置毎にアンカーボルト支持装置を載置すると共に、各アンカーボルト支持装置の上端ねじ部を位置決めした後に、テンプレートの両端側を型枠の天端部に固着して基礎コンクリートを打設する基礎の構築装置であって、
アンカーボルト支持装置は、型枠間に架設する平板状のテンプレートと、テンプレートの下側に離間して平行状に設けた補助プレートと、上端ねじ部がテンプレートと補助プレートを挿通すると共に、上端ねじ部に螺合させた狭持用ナットでテンプレート及び補助プレートを上下から狭持して固着したアンカーボルトとを有し、補助プレートには柱を設置するグラウト層の上面を設定する高さ調整ボルトを備えたレベル調整具を設けたことを特徴とする。(請求項
The foundation construction apparatus according to the present invention provides an anchor bolt support device in which an upper end screw portion is fixed to a template and anchor bolts are suspended, and both ends of the template are installed between the top end portions of the formwork. Place anchor bolt support devices at each column installation position, and after positioning the upper end threaded portion of each anchor bolt support device, fix both ends of the template to the top end of the mold and place the foundation concrete A basic construction device that performs
The anchor bolt support device includes a flat template laid between the molds, an auxiliary plate spaced in parallel to the lower side of the template, an upper end screw portion passing through the template and the auxiliary plate, and an upper end screw. And an anchor bolt that is fixed by holding the template and the auxiliary plate from above and below with a holding nut screwed to the portion, and the auxiliary plate has a height adjusting bolt that sets the upper surface of the grout layer on which the column is installed It is characterized by providing a level adjuster comprising (Claim 4 )

請求項に記載した基礎の構築装置において、前記レベル調整具は、補助プレートに固着した高さ調整ナットと、高さ調整ナットにねじ軸が螺合して頭部頂面の高さが調整可能な高さ調整ボルトと、高さ調整ボルトのねじ軸に螺合するねじ孔を穿設して高さ調整ボルトの緩み止めを行う係止保持板とを有する。(請求項 5. The foundation construction device according to claim 4 , wherein the level adjuster includes a height adjustment nut fixed to the auxiliary plate, and a screw shaft that is screwed to the height adjustment nut to adjust a height of a head top surface. It has a possible height adjustment bolt, and a locking holding plate for preventing the height adjustment bolt from loosening by drilling a screw hole to be screwed into the screw shaft of the height adjustment bolt . (Claim 5 )

請求項4または請求項5に記載した基礎の構築装置において、隣接する各アンカーボルト支持装置の間に、柱を構築する所定間隔毎にアンカーボルトと連結する取付け孔を設けた長尺な間隔設定板を架設すると共に、取付け孔を介してアンカーボルトの上端ねじ部と着脱可能に連結する。(請求項6. The foundation construction device according to claim 4 or 5 , wherein a long interval setting is provided between each adjacent anchor bolt support device with a mounting hole connected to the anchor bolt at every predetermined interval for constructing a pillar. The plate is erected and is detachably connected to the upper end thread portion of the anchor bolt through the attachment hole . (Claim 6 )

本発明による基礎の構築用アンカーボルト支持装置は、上端ねじ部をテンプレートにねじ固着してアンカーボルトを垂設すると共に、テンプレートの両端側を型枠の天端部間に架設する態様で柱の設置位置毎に載置するアンカーボルト支持装置であって、型枠間に架設する平板状のテンプレートと、テンプレートの下側に離間して平行状に設けた補助プレートと、上端ねじ部がテンプレートと補助プレートを挿通すると共に、当該上端ねじ部に螺合させた狭持用ナットでテンプレート及び補助プレートを上下から狭持して固着したアンカーボルトで構成し、補助プレートには柱を設置するグラウト層の上面を設定する高さ調整ボルトを備えたレベル調整具を設けたことを特徴とした。(請求項The anchor bolt support device for constructing a foundation according to the present invention is such that the upper end screw portion is fixed to the template and the anchor bolt is vertically suspended, and both ends of the template are installed between the top end portions of the formwork. An anchor bolt support device placed at each installation position, a flat template laid between molds, an auxiliary plate spaced in parallel to the lower side of the template, and an upper end screw portion as a template A grout layer in which the auxiliary plate is inserted and anchor bolts are fixed by holding the template and the auxiliary plate from above and below with a holding nut screwed into the upper end threaded portion, and a column is installed on the auxiliary plate. A level adjuster provided with a height adjusting bolt for setting the upper surface of is provided . (Claim 7 )

請求項の基礎の構築用アンカーボルト支持装置において、前記レベル調整具は補助プレートに固着した高さ調整ナットと、高さ調整ナットにねじ軸が螺合して頭部頂面の高さが調整可能な高さ調整ボルトと、高さ調整ボルトのねじ軸に螺合するねじ孔を穿設して高さ調整ボルトの緩み止めを行う係止保持板とを有する。(請求項In the construction anchor bolt support device of the foundation according to claim 7, wherein the level adjustment device includes a height adjustment nut fixed to the auxiliary plate, screw shaft height adjustment nut screwed to the height of the head top surface Has a height adjustment bolt that can be adjusted, and a locking holding plate that is provided with a screw hole that is screwed into a screw shaft of the height adjustment bolt to prevent the height adjustment bolt from loosening. (Claim 8 )

請求項1による基礎の構築方法では、上下へ平行状に配置したテンプレートと補助プレートに対し、各アンカーボルトをそれぞれねじ固着するアンカーボルト支持装置によって、各アンカーボルトを自立した鉛直状態で懸吊することができるので、倒れ防止を図って各アンカーボルトの上端ねじ部を正確な柱の設置位置に立設することができと共に、アンカーボルト支持装置を予め工場や現場近くの作業所で仮組みしてユニット化した状態にしておくことにより、型枠の天端部にそのまま載置して施工することができるので、現場における作業能率を向上して工期の短縮を図ることが可能である。 In the foundation construction method according to claim 1 , each anchor bolt is suspended in a self-supporting vertical state by an anchor bolt support device that screw-fixes each anchor bolt to the template and the auxiliary plate arranged in parallel vertically. Therefore, it is possible to prevent the body from falling over and to set the upper end threaded portion of each anchor bolt at the correct column installation position. In addition, the anchor bolt support device is preliminarily assembled at a factory or work site near the site. By making it unitized, it can be placed and constructed as it is on the top end of the formwork, so it is possible to improve work efficiency at the site and shorten the construction period.

請求項2による基礎の構築方法では、間隔設定板を用いて隣接する各アンカーボルト支持装置3各アンカーボルトを相互に連結することにより、各アンカーボルト支持装置におけるテンプレート及びアンカーボルトの上端ねじ部の相対位置を容易に規制して位置決めできるので、各アンカーボルト支持装置に対する水平方向及び鉛直方向の位置決め調整作業を迅速且つ精度良く行うことが可能である。In the foundation construction method according to claim 2, the anchor bolt support devices 3 adjacent to each other using the interval setting plate are connected to each other so that the template bolt and the upper end thread portion of the anchor bolt are connected to each other. Since the relative position can be easily regulated and positioned, the horizontal and vertical positioning adjustment operations for each anchor bolt support device can be performed quickly and accurately.

また、各型枠間に架設する特許文献3,4などの従来技術による位置決め具とは異なり、各型枠の幅間隔に制約されることなく間隔設定板を設置できるので、各種の幅寸法をした基礎コンクリートの構築に対して共通に使用することが可能であるから、この標準化によって間隔設定板の調達や在庫管理が容易になる。In addition, unlike conventional positioning tools such as Patent Documents 3 and 4 installed between the molds, the interval setting plate can be installed without being restricted by the width intervals of the molds. This standardization makes it easy to procure interval setting plates and inventory management.

さらに、間隔設定板は簡単な構造であると共に、アンカーボルト支持装置の各アンカーボルトへの装着も極めて容易であるから、安価で且つ能率良く施工することが可能であって、複数種類を予め用意しておくことによって、各種の建物構造に適合させることができ、アンカーボルト支持装置の位置決めを行った後には、取り外して繰り返して再使用することができる。Furthermore, since the interval setting plate has a simple structure and it is very easy to attach the anchor bolt support device to each anchor bolt, it can be constructed inexpensively and efficiently, and multiple types are prepared in advance. Thus, it is possible to adapt to various building structures, and after positioning the anchor bolt support device, it can be removed and reused repeatedly.

請求項による基礎の構築方法では、基礎の立ち上がり部に設けた充填用凹部にグラウト層を形成して鉄骨柱を立設するようにしたので、鉄骨柱を設置する高さが立ち上がり部とほぼ同一レベルになり、建物の設計を容易に行うことができると共に、無収縮モルタルなどのグラウト材の使用が局部的になって、充填作業及び均し作業が容易であると共に、水平度及び鉛直度を高めることが可能であり且つ、グラウト材の使用量を少なくすることができる。 In the foundation construction method according to claim 3, since the steel column is erected by forming a grout layer in the filling recess provided in the rising part of the foundation, the height at which the steel column is installed is substantially the same as that of the rising part. At the same level, the building can be designed easily, and the use of grout materials such as non-shrink mortar is localized, so that filling and leveling operations are easy, and the levelness and verticality And the amount of grout used can be reduced.

請求項による基礎の構築装置は、請求項1による基礎の構築方法に用いる補助プレートおよびレベル調整具を特定した基礎の構築装置であって、レベル調整は公知の各種レベル調整手段を用いて行うようにしたものであるから、上記した請求項1の場合と同様の効果を期待することができる。 The foundation construction device according to claim 4 is a foundation construction device that specifies the auxiliary plate and the level adjuster used in the foundation construction method according to claim 1 , and the level adjustment is performed using various known level adjustment means. Thus, the same effect as in the case of claim 1 can be expected.

請求項による基礎の構築装置は、請求項による基礎の構築方法に用いるアンカーボルト支持装置を、レベル調整具の具体的構成を含めた状態で特定した基礎の構築装置であるから、上記した請求項におけるレベル調整具による効果と同様の効果を期待することができる。 Since the foundation construction device according to claim 5 is the foundation construction device that identifies the anchor bolt support device used in the foundation construction method according to claim 1 in a state including the specific configuration of the level adjuster, it has been described above. the same effects as effects by the level adjuster in claim 1 can be expected.

請求項による基礎の構築装置は、請求項2による基礎の構築方法に用いるアンカーボルト支持装置を、間隔設定板を含めた状態で特定した基礎の構築装置であるから、上記した請求項2の場合と同様の効果を期待することができる。 Builder foundation of claim 6, the anchor bolt support apparatus used strategy for a foundation by claim 2, since a builder foundation specified in condition including a spacing plate, according to claim 2 described above The same effect as in the case of can be expected.

請求項による基礎の構築用アンカーボルト支持装置では、上下へ平行状に配置したテンプレートと補助プレートに対し、各アンカーボルトをそれぞれねじ固着することによって、各アンカーボルトを自立した鉛直状態で懸吊することができるので、倒れ防止を図って各アンカーボルトの上端ねじ部を正確な柱の設置位置に立設することができる。 In the anchor bolt supporting device for constructing a foundation according to claim 7 , each anchor bolt is suspended in a self-standing vertical state by screwing each anchor bolt to a template and an auxiliary plate arranged in parallel vertically. Therefore, the upper end threaded portion of each anchor bolt can be erected at an accurate column installation position in order to prevent falling.

また、テンプレートと補助プレートは平板状で全体構造も簡単であって、部品の単価が安価で組立作業も容易であるから、製造コストを低減することが可能であると共に、予め工場や現場近くの作業所で仮組みしてユニット化した状態にしておくことにより、型枠の天端部にそのまま載置して施工することができるので、現場における作業能率を向上して工期の短縮を図ることが可能である。さらに、高さ調整ボルトによる高さ調整によって、充填するグラウト材の高さ及び鉄骨柱を設置する高さを設定することができる。 In addition, the template and auxiliary plate are flat and the overall structure is simple. The unit price of the parts is low and the assembly work is easy. Therefore, it is possible to reduce the manufacturing cost. By temporarily assembling at the work site into a unitized state, it can be placed and installed on the top edge of the formwork as it is, improving work efficiency at the work site and shortening the work period. Is possible. Furthermore, the height of the grout material to be filled and the height at which the steel column is installed can be set by adjusting the height with the height adjusting bolt.

請求項による基礎の構築用アンカーボルト支持装置では、特にレベル調整具は補助プレートを介してアンカーボルトに連結されているので、レベル調整具の取付け位置が安定でレベル調整を容易に精度良く行うことが可能である。 Building anchor bolt support device of the foundation according to claim 8, since the level adjustment device especially is connected to the anchor bolt through the auxiliary plate may easily precision mounting position stable and level adjustment of the level adjuster Is possible.

また、設置した鉄骨柱は高さ調整ボルトの頭部頂面で支持することができるので、鉄骨柱の載荷重に対する支持力が高くて係止保持板による緩み防止と相俟って強固に支持することができると共に、補助プレートは基礎コンクリート中に埋設されているので、アンカーボルトに作用する引き抜き力に抵抗する定着板として機能し、引き抜き耐力を向上させることができる。   In addition, since the installed steel column can be supported by the top surface of the head of the height adjustment bolt, the support force against the loading load of the steel column is high, and it is firmly supported in combination with the prevention of loosening by the locking holding plate. In addition, since the auxiliary plate is embedded in the foundation concrete, it functions as a fixing plate that resists the pulling force acting on the anchor bolt, and can improve the pulling strength.

本発明による基礎の構築方法及び構築用アンカーボルト支持装置について、本発明を布基礎に適用した好適な実施形態を添付図面に基づいて詳細に説明すると、図1は組立状態の分解斜視図を、図2は組立後における幅方向に沿った要部断面図を、図3は組立後における長手方向に沿った要部断面図を示す。   A preferred embodiment in which the present invention is applied to a fabric foundation will be described in detail with reference to the accompanying drawings for a foundation construction method and a construction anchor bolt support device according to the present invention. FIG. 1 is an exploded perspective view of an assembled state. 2 is a cross-sectional view of the main part along the width direction after assembly, and FIG. 3 is a cross-sectional view of the main part along the longitudinal direction after assembly.

図示の実施例では、布基礎を構成する基礎コンクリートの一部であるフーチングを形成するベース部101が既に構築され、ベース鉄筋102に下端側を連結してベース部101から突設した立ち上がり鉄筋103に対し、基礎コンクリートを打設して立ち上がり部を構築する場合に適用しているが、一度のコンクリート打設でベース部と立ち上がり部を同時施工する場合にも適用することができる。   In the illustrated embodiment, a base portion 101 that forms a footing that is a part of the foundation concrete that constitutes the fabric foundation has already been constructed, and a rising reinforcing rod 103 that protrudes from the base portion 101 by connecting the lower end side to the base rebar 102. On the other hand, although it applies to the case where the foundation concrete is placed and the rising portion is constructed, it can also be applied to the case where the base portion and the rising portion are simultaneously constructed by a single concrete placement.

ベース部101上には、所定間隔毎に柱を構築する長手方向Yに沿って立ち上がり鉄筋103が配筋されており、幅方向Xに離間した状態で立ち上がり鉄筋103の左右両側に対して型枠(図示の型枠は鋼製型枠)1(1A,1A)を立設し、各型枠1Aは公知の型枠支持手段(図示を省略)を用いて支持すると共に、L字状に折り曲げ加工された型枠1Aの天端部2には柱を構築する所定間隔毎に、複数のアンカーボルト支持装置3(3A,3B)を載置する。   On the base portion 101, rising reinforcing bars 103 are arranged along the longitudinal direction Y that constructs the pillars at predetermined intervals, and the frame is formed on both the left and right sides of the rising reinforcing bars 103 while being separated in the width direction X. (The formwork shown is a steel formwork) 1 (1A, 1A) is erected, and each formwork 1A is supported using known formwork support means (not shown) and bent into an L shape. A plurality of anchor bolt support devices 3 (3A, 3B) are placed on the top end 2 of the processed mold 1A at predetermined intervals for constructing the pillar.

アンカーボルト支持装置3(3A,3B)は、図4で拡大正面図を示すように、テンプレート4と複数本(図示の実施例では4本)の各アンカーボルト5及び、補助プレート6とレベル調整具7を主要部品として構成されており、これらの構成部品を用いて現場で組立することも可能であるが、現場での作業能率を向上させるように、予め工場又は現場近くの作業場で仮組みした状態で型枠1の間に載置できる構造を採っている。   As shown in an enlarged front view in FIG. 4, the anchor bolt support device 3 (3A, 3B) includes a template 4 and a plurality of anchor bolts 5 (four in the illustrated embodiment) and auxiliary plates 6 and level adjustment. The tool 7 is configured as a main part and can be assembled on site using these components. However, in order to improve work efficiency at the site, temporary assembly is performed in advance at the factory or a workplace near the site. In this state, a structure that can be placed between the molds 1 is adopted.

すなわち、横長の平板状に形成した長尺のテンプレート4と、方形の平板状に形成した短尺の補助プレート6を上下平行状に配置させ、各プレート4,6に対して上下連通状に穿設した通孔に4本の各アンカーボルト5の上端ねじ部5aを挿通させると共に、各上端ねじ部5aに狭持用ナット8,9を螺合させ、各プレート4,6を上下から狭持できるようにしている。   That is, a long template 4 formed in a horizontally long flat plate shape and a short auxiliary plate 6 formed in a rectangular flat plate shape are arranged in parallel in the vertical direction, and are drilled in a vertical communication manner with respect to the plates 4 and 6. The upper end screw portions 5a of the four anchor bolts 5 are inserted into the through holes, and the holding nuts 8 and 9 are screwed into the upper end screw portions 5a so that the plates 4 and 6 can be sandwiched from above and below. I am doing so.

また、図示の実施例ではアンカーボルト5の下端側を折り曲げ加工しているが、直状その他公知の各種形状のものを必要な本数だけ使用することが可能であると共に、テンプレート4と補助プレート6に対するアンカーボルト5の挿通孔を、図6の仮想線で示すように切欠状の挿通孔16にして側面側から挿入して容易に組み付ける形態を採ることが可能であり、テンプレート4の中央には監視用窓孔17を設けている。   In the illustrated embodiment, the lower end side of the anchor bolt 5 is bent. However, it is possible to use a necessary number of straight or other known shapes, and the template 4 and the auxiliary plate 6 can be used. As shown by the phantom lines in FIG. 6, the anchor bolt 5 can be inserted into the notch-shaped insertion hole 16 from the side surface and assembled easily. A monitoring window hole 17 is provided.

レベル調整具7は、補助プレート6の中央に溶接その他の固着手段で連結した高さ調整ナット10に高さ調整ボルト11を螺合させると共に、高さ調整ボルト11のねじ軸に対して、中央にねじ孔を穿設し且つ一端側に回転操作用の把手部を突出形成した薄板状の係止保持板12を装着している。   The level adjuster 7 is configured such that a height adjusting bolt 11 is screwed into a height adjusting nut 10 connected to the center of the auxiliary plate 6 by welding or other fixing means, and at the center with respect to the screw shaft of the height adjusting bolt 11. A thin plate-like locking and holding plate 12 having a screw hole drilled in it and having a handle portion for rotation operation protruding from one end is mounted.

レベル調整具7は、高さ調整ナット10に対する高さ調整ボルト11の螺合を緩めると、高さ調整ボルト11の頭部頂面の高さ調整してレベル調整を行うことができ、把手部を把持して係止保持板12を回転操作すると、高さ調整ナット10の上端面に当接した位置で高さ調整ボルト11の緩み止めを行うことができる。   When the level adjustment tool 7 loosens the screw of the height adjustment bolt 11 to the height adjustment nut 10, the level adjustment tool 7 can adjust the level by adjusting the height of the top surface of the head of the height adjustment bolt 11. When the latch holding plate 12 is rotated, the height adjustment bolt 11 can be prevented from loosening at the position where it comes into contact with the upper end surface of the height adjustment nut 10.

アンカーボルト支持装置3は、テンプレート4の両側を天端部2,2に架設する態様で柱を構築する所定間隔毎に型枠1(1A,1A)に載置し、隣接する各アンカーボルト支持装置3A,3Bのアンカーボルト5の間を1本又は2本の間隔設定板13で連結すると共に、各アンカーボルト支持装置3A,3Bのテンプレート4は、着脱可能な狭持固定具14を介して両側を天端部2に固定すると、図5Aの部分拡大正面図及び図6の部分拡大平面図で示すように、型枠1に組み付けられる。   The anchor bolt support device 3 is placed on the formwork 1 (1A, 1A) at predetermined intervals for constructing the pillars in such a manner that both sides of the template 4 are installed on the top ends 2 and 2, and each adjacent anchor bolt is supported. The anchor bolts 5 of the devices 3A and 3B are connected by one or two spacing setting plates 13, and the template 4 of each anchor bolt support device 3A and 3B is connected via a detachable holding fixture 14. When both sides are fixed to the top end portion 2, as shown in the partial enlarged front view of FIG. 5A and the partial enlarged plan view of FIG.

間隔設定板13は、幅狭な長尺板で形成すると共に、柱を構築する所定間隔毎にアンカーボルト5に対する取付け孔15を設けた構造であって、隣接する2個所のアンカーボルト支持装置3間に架設することが可能な長さを最小単位とするが、隣接する3個所に亘って架設する長さのものや、取付け孔15の取付ピッチを変えたものなどを複数種を用意し、建物の柱構造に適合させて適正な長さ及び取付ピッチのものを選択的に使用する形態を採ることが可能である。   The interval setting plate 13 is formed by a narrow and long plate, and has a structure in which mounting holes 15 for the anchor bolts 5 are provided at predetermined intervals for constructing the pillar, and the two adjacent anchor bolt support devices 3 are provided. The length that can be installed in between is the minimum unit, but a plurality of types are available, such as those that are installed over three adjacent locations, those that change the mounting pitch of the mounting holes 15, etc. It is possible to adopt a form in which an appropriate length and a mounting pitch are selectively used according to the building column structure.

また、図示の実施例では取付け孔15を切欠状孔で形成することによって、アンカーボルト支持装置3に対して間隔設定板13を装着する際に、狭持用ナット8を緩めた状態にして側面から容易に挿入できるようにしているが、取付け孔15を円孔で形成して狭持用ナット8を一旦取り外した状態で装着する形態を採ることも可能である。   Further, in the illustrated embodiment, the attachment hole 15 is formed as a notch-like hole so that when the interval setting plate 13 is attached to the anchor bolt support device 3, the holding nut 8 is loosened and the side surface is set. However, it is also possible to adopt a form in which the attachment hole 15 is formed as a circular hole and the holding nut 8 is once removed and mounted.

狭持固定具14は、上下の支持板18a,18bを側板18cで連結してコ字状に形成した支持部材18と、上部支持板18aにねじ孔を穿設すると共に、当該ねじ孔に連通するねじ孔を設けて上部支持板18aの上面に溶接などの固着手段を介して接合した案内筒19と、上部支持板18a及び案内筒19のねじ孔に螺合するねじ軸20aの下端側にクランプ片20bを設けると共に、ねじ軸20aの上端側に回転操作片20cを設けた加圧部材20で構成されている。   The holding fixture 14 has upper and lower support plates 18a and 18b connected by side plates 18c and a U-shaped support member 18 and a screw hole formed in the upper support plate 18a and communicated with the screw hole. The guide cylinder 19 is provided on the upper surface of the upper support plate 18a through a fixing means such as welding, and the lower end side of the screw shaft 20a is screwed into the screw holes of the upper support plate 18a and the guide cylinder 19. The clamp member 20b is provided and the pressure member 20 is provided with a rotary operation piece 20c on the upper end side of the screw shaft 20a.

狭持固定具14は、型枠1Aの天端部2上に両側端部を架設して重合させたテンプレート4に対し、クランプ片20bと下部支持板18bを上下から宛がうと共に、回転操作片20cで加圧部材20のねじ軸20aを回転させることによって、クランプ片20bと下部支持板18bとの間でテンプレート4と型枠1Aの天端部2(2a)を圧接状態で狭持し、着脱可能に固着することが可能である。   The nipping fixture 14 rotates the clamping piece 20b and the lower support plate 18b from above and below the template 4 which is superposed on the top end 2 of the formwork 1A by laying both ends. By rotating the screw shaft 20a of the pressure member 20 with the piece 20c, the template 4 and the top end 2 (2a) of the mold 1A are sandwiched between the clamp piece 20b and the lower support plate 18b. It can be detachably fixed.

また、狭持固定具14は図5Aで示す型枠(鋼製型枠)1Aを用いた場合だけではなく、図5Bで示す型枠(木製型枠)1Bを用いた場合にも共用することが可能であって、その際には角材で形成した天端部2b上にテンプレート4の両側端部を重合状態で架設し、型枠(鋼製型枠)1Aの場合と同様に天端部2(2b)を圧接状態で狭持して着脱可能に固着することができるが、簡便な方法としてテンプレート4の両側端部に釘の取付け孔21を複数個所に設け、釘22で天端部2(2b)に固着することもできる。   Further, the holding fixture 14 is shared not only when the mold (steel mold) 1A shown in FIG. 5A is used but also when the mold (wood mold) 1B shown in FIG. 5B is used. In this case, both end portions of the template 4 are laid in a superposed state on the top end portion 2b formed of square bars, and the top end portion is the same as in the case of the mold (steel mold) 1A. 2 (2b) can be nipped and detachably fixed in a pressure contact state, but as a simple method, a plurality of nail attachment holes 21 are provided at both ends of the template 4 and 2 (2b) can also be fixed.

次に、図7は入り隅部を含む基礎コンクリート打設用の型枠1に対し、各アンカーボルト支持装置3及び間隔設定板13の配置状態を平面図で示しており、入り隅部で交差する各型枠1の天端部2間には、柱を構築する所定間隔毎にアンカーボルト支持装置3を配置して狭持固定具14で仮固着すると共に、隣接する各アンカーボルト支持装置3間はアンカーボルト5の上端ねじ部5aに装着した間隔設定板13を介して相互に連結される。   Next, FIG. 7 shows the arrangement state of each anchor bolt support device 3 and the interval setting plate 13 with respect to the formwork 1 for foundation concrete placing including the corners, and intersects at the corners. Anchor bolt support devices 3 are arranged between the top end portions 2 of the respective molds 1 to be arranged at predetermined intervals for constructing the pillars, and are temporarily fixed by the holding fixtures 14, and the adjacent anchor bolt support devices 3 are also fixed. The gaps are connected to each other via a gap setting plate 13 attached to the upper end screw portion 5a of the anchor bolt 5.

アンカーボルト支持装置3は、例えば入り隅部やコーナー部に設けたアンカーボルト支持装置3に対して、トランシットその他による公知の測量手段を用いてアンカーボルト5の上端ねじ部5aの絶対位置を計測し、設定位置とのズレはテンプレート4の水平移動で水平位置の調整を行うと共に、狭持用ナット8を緩めて鉛直位置の調整を行って補正すると、間隔設定板13を介して連結された隣接するアンカーボルト支持装置3はほぼ定位置に位置決めされるので、必要に応じて微調整を行ってより精度を高めることができる。   The anchor bolt support device 3 measures the absolute position of the upper end threaded portion 5a of the anchor bolt 5 by using a known surveying means such as transit or the like with respect to the anchor bolt support device 3 provided at the corner or the corner portion, for example. The deviation from the set position is adjusted by adjusting the horizontal position by horizontally moving the template 4, and by adjusting the vertical position by loosening the holding nut 8 and adjusting the vertical position. Since the anchor bolt support device 3 to be positioned is positioned at a substantially fixed position, the accuracy can be further improved by performing fine adjustment as necessary.

微調整する際には、例えば曲尺などの汎用スケールを用いてテンプレート4に対する間隔設定板13の直角度を合わせると、水平方向の位置決め調整を行うことができるが、特に隣接する各アンカーボルト支持装置3の間を平行状に配置した2本の間隔設定板13を用いて連結すると、長方形状に枠組みされてテンプレート4に対する間隔設定板13の直角度を容易且つほぼ自動的に合わせることが可能であり、鉛直方向の位置決め調整は基準となる計測した入り隅部やコーナー部に設けたアンカーボルト支持装置3に準じて、テンプレート4から突出するアンカーボルト5の上端ねじ部5aの高さを一致させる。   When fine adjustment is performed, for example, by using a general-purpose scale such as a curved scale and the perpendicularity of the interval setting plate 13 with respect to the template 4 is adjusted, horizontal positioning adjustment can be performed. 3 are connected using two interval setting plates 13 arranged in parallel, it is possible to easily and almost automatically adjust the squareness of the interval setting plate 13 with respect to the template 4 by being framed in a rectangular shape. Yes, in the vertical positioning adjustment, the height of the upper end threaded portion 5a of the anchor bolt 5 protruding from the template 4 is made to coincide with the anchor bolt support device 3 provided at the measured corners or corners as a reference. .

以上のアンカーボルト支持装置3では、平板状のテンプレート4と補助プレート6の平行する間隔を所望に設定し、当該各プレート4,6に複数(図示の実施例では4本)のアンカーボルト5の上端ねじ部5aを挿通させると共に、螺合させた狭持用ナット8,9で上下から各プレート4,6にねじ固着することによって、各アンカーボルト5を自立した鉛直状態で懸吊して倒れ防止を図ることが可能である。   In the anchor bolt support device 3 described above, a parallel interval between the flat template 4 and the auxiliary plate 6 is set as desired, and a plurality of (four in the illustrated embodiment) anchor bolts 5 are provided on each of the plates 4 and 6. The upper end screw portion 5a is inserted, and the anchor bolts 5 and 9 are screwed and fixed to the plates 4 and 6 from above and below by the screwed nuts 8 and 9 so that the anchor bolts 5 are suspended in a vertical state and fall down. It is possible to prevent it.

また、テンプレート4と補助プレート6は平板状で全体構造も簡単であって、部品の単価が安価で組立作業も容易であるから、製造コストを低減することが可能であると共に、予め工場や現場近くの作業所で仮組みしてユニット化した状態にしておくことにより、型枠1の天端部2上にそのまま載置して施工することができるので、現場における作業能率を向上して工期の短縮を図ることが可能である。   In addition, the template 4 and the auxiliary plate 6 are flat and have a simple overall structure, and the unit price is low and the assembly work is easy. By temporarily assembling a unit at a nearby work place and placing it in a united state, it can be placed on the top end 2 of the formwork 1 as it is, so that the work efficiency at the site is improved and the construction period is improved. Can be shortened.

さらに、型枠1の天端部2上に載置した各アンカーボルト支持装置3は、間隔設定板13を用いて隣接する各アンカーボルト支持装置3の各アンカーボルト5を相互に連結することにより、各アンカーボルト支持装置3におけるテンプレート4及びアンカーボルト5の上端ねじ部5aの相対位置を容易に規制して位置決めできるので、各アンカーボルト支持装置3に対する水平方向及び鉛直方向の位置決め調整作業を迅速且つ精度良く行うことが可能である。   Further, each anchor bolt support device 3 placed on the top end 2 of the mold 1 is connected to each other by using the interval setting plate 13 to connect the anchor bolts 5 of the adjacent anchor bolt support devices 3 to each other. Since the relative positions of the template 4 and the upper end screw portion 5a of the anchor bolt 5 in each anchor bolt support device 3 can be easily regulated and positioned, the horizontal and vertical positioning adjustment operations for each anchor bolt support device 3 can be performed quickly. And it is possible to carry out with high precision.

間隔設定板13は、幅狭な長尺板で柱を構築する所定間隔毎にアンカーボルト5に対する取付け孔15を設けた簡単な構造であると共に、アンカーボルト支持装置3の各アンカーボルト5への装着も極めて容易であるから、安価で且つ能率良く施工することが可能であって、複数種類を予め用意しておくことによって、各種の建物構造に適合させることができ、アンカーボルト支持装置3の位置決めを行った後には、取り外して繰り返して再使用することができる。   The interval setting plate 13 has a simple structure in which mounting holes 15 for the anchor bolts 5 are provided at predetermined intervals for constructing a column with a narrow long plate, and each anchor bolt 5 of the anchor bolt support device 3 is attached to each anchor bolt 5. Since it is very easy to install, it can be constructed inexpensively and efficiently. By preparing a plurality of types in advance, it can be adapted to various building structures, and the anchor bolt support device 3 After positioning, it can be removed and reused repeatedly.

次に、アンカーボルト支持装置3を装着した型枠1に対する立ち上がり部の構築及び柱の構築について図8〜10で説明するが、図8のようにアンカーボルト支持装置3を挟んで両型枠1A,1Aの間に仕切り板23,23を設け、仕切り板23の外側から型枠1内に基礎コンクリートを打設すると、仕切り板23,23の間にはコンクリートの荷重によって、底部側から多少は基礎コンクリートが流入するものの、仕切り板23,23の間にグラウト材の充填用凹部24が形成された状態で、ベース部101と一体化した立ち上がり部25が構築される。   Next, the construction of the rising portion and the construction of the pillar with respect to the mold 1 to which the anchor bolt support device 3 is mounted will be described with reference to FIGS. 8 to 10. Both molds 1A are sandwiched between the anchor bolt support device 3 as shown in FIG. , 1A are provided between the partition plates 23 and 23, and when the foundation concrete is placed in the mold 1 from the outside of the partition plate 23, the space between the partition plates 23 and 23 is slightly increased from the bottom side due to the concrete load. Although basic concrete flows in, a rising portion 25 integrated with the base portion 101 is constructed in a state in which a grout filling recess 24 is formed between the partition plates 23 and 23.

これにより、充填用凹部24の底面からアンカーボルト5の上端ねじ部5a及び、レベル調整具7の高さ調整ボルト11が突出する態様で、立ち上がり部25内にアンカーボルト支持装置3が埋設されるが、基礎コンクリートを打設する際には、レベル調整具7の高さ調整ナット10と高さ調整ボルト11及び係止保持板12のねじ部にコンクリートが付着しないように、監視用窓孔17を介して充填用凹部24の底面におけるコンクリートのレベルを監視すると共に、必要ならばレベル調整具7に対してゴムキャップ等のシール部材を予め被着しておく。   Accordingly, the anchor bolt support device 3 is embedded in the rising portion 25 in such a manner that the upper end screw portion 5a of the anchor bolt 5 and the height adjustment bolt 11 of the level adjuster 7 protrude from the bottom surface of the filling recess 24. However, when placing the foundation concrete, the monitoring window hole 17 prevents the concrete from adhering to the height adjusting nut 10 and the height adjusting bolt 11 of the level adjuster 7 and the threaded portions of the locking holding plate 12. The level of the concrete on the bottom surface of the filling recess 24 is monitored via a seal, and if necessary, a seal member such as a rubber cap is attached to the level adjuster 7 in advance.

そして、打設した基礎コンクリートが硬化した後には、図9のようにアンカーボルト支持装置3からテンプレート4を取り外すと共に、充填用凹部24から仕切り板23,23を取り外し、レベル調整具7の高さ調整ボルト11を緩めて頭部頂面を立ち上がり部25のレベルに一致させると共に、高さ調整ナット10に圧接するように係止保持板12を締め付けて緩み止めを行い、仕切り板23の取り外し跡を含む充填用凹部24内に無収縮モルタルや無収縮セメントなどによるグラウト材を、高さ調整ボルト11の頭部頂面及び立ち上がり部25のレベルまで充填してグラウト層26を構築する。   Then, after the cast foundation concrete is hardened, the template 4 is removed from the anchor bolt support device 3 as shown in FIG. 9, and the partition plates 23 and 23 are removed from the filling recess 24, so that the height of the level adjuster 7 is increased. The adjustment bolt 11 is loosened so that the top surface of the head coincides with the level of the rising portion 25, and the locking holding plate 12 is tightened so as to be pressed against the height adjustment nut 10 to prevent loosening. The grouting layer 26 is constructed by filling a grouting material such as non-shrinking mortar or non-shrinking cement into the filling recess 24 including the level up to the top surface of the head 11 and the rising portion 25 of the height adjusting bolt 11.

さらに、充填したグラウト材が硬化した後には、図10のように型枠1を取り外すと共に、高さ調整ボルト11の頭部頂面及びグラウト層26の上面に鉄骨柱27を載置し、鉄骨柱27の下端側に設けたフランジ状のベースプレート28に対して、ベースプレート28に穿設した取付け孔にアンカーボルト5の上端ねじ部5aを挿通させ、上端ねじ部5aに螺合する取付けナット29でベースプレート28を固着し、これによって立ち上がり部25の所定位置に鉄骨柱27を構築することができるが、テンプレート4の狭持用ナット8のうち下側のナットを取り外さないで、グラウト層26内に埋設することもできる。   Further, after the filled grout material is hardened, the mold 1 is removed as shown in FIG. 10, and the steel column 27 is placed on the top face of the head of the height adjusting bolt 11 and the top face of the grout layer 26, and the steel frame An attachment nut 29 that is inserted into the attachment hole formed in the base plate 28 with respect to the flange-like base plate 28 provided on the lower end side of the column 27 and is screwed into the upper end screw portion 5a. The base plate 28 is fixed, and thereby the steel column 27 can be constructed at a predetermined position of the rising portion 25, but the lower nut of the holding nut 8 of the template 4 is not removed, and the grout layer 26 is not removed. It can also be buried.

なお、図示の実施例における鉄骨柱27は、平面視した形状が十文字状で上下にフランジ状のベースプレート28を設けた下部側の柱部材27aと、方形の筒状で下端側を上部側のベースプレート28と一体に接合した上部側の柱部材27bで構成しているが、後述する図11Aの鉄骨柱27のように、方形の筒状で下端側にフランジ状のベースプレート28を一体に形成した構造にするなど、公知の各種形態による鉄骨柱を使用できる。   The steel column 27 in the illustrated embodiment has a cross-sectional shape in a plan view and a lower-side column member 27a provided with a flange-like base plate 28 on the top and bottom, and a rectangular tube with a lower end on the upper side. The upper column member 27b is integrally joined to the upper portion 28. However, as a steel column 27 in FIG. 11A described later, a flange-shaped base plate 28 is integrally formed on the lower end side in a rectangular tube shape. For example, steel columns in various known forms can be used.

以上のアンカーボルト支持装置3を用いた布基礎の構築方法では、レベル調整具7の高さ調整ボルト11による高さ調整によって、充填するグラウト材の高さ及び鉄骨柱27を設置する高さを設定することができると共に、特にレベル調整具7は補助プレート6を介してアンカーボルト5に連結されているので、レベル調整具7の取付け位置が安定でレベル調整を容易に精度良く行うことが可能である。   In the construction method of the fabric foundation using the anchor bolt support device 3 described above, the height of the grout material to be filled and the height of the steel column 27 are set by adjusting the height of the level adjuster 7 using the height adjusting bolt 11. In addition, since the level adjuster 7 is connected to the anchor bolt 5 via the auxiliary plate 6 in particular, the level adjuster 7 can be mounted at a stable position and the level can be adjusted easily and accurately. It is.

また、設置した鉄骨柱27は高さ調整ボルト11の頭部頂面で支持することができるので、鉄骨柱27の載荷重に対する支持力が高くて係止保持板12による緩み防止と相俟って強固に支持することができると共に、補助プレート6は基礎コンクリート中に埋設されているので、アンカーボルト5に作用する引き抜き力に抵抗する定着板として機能し、引き抜き耐力を向上させることができる。   Moreover, since the installed steel column 27 can be supported by the top surface of the head of the height adjusting bolt 11, the supporting force against the loading load of the steel column 27 is high, and this is combined with the prevention of loosening by the locking holding plate 12. Since the auxiliary plate 6 is embedded in the foundation concrete, it functions as a fixing plate that resists the pulling force acting on the anchor bolt 5 and can improve the pulling strength.

特に、布基礎の立ち上がり部25に設けた充填用凹部24にグラウト層26を形成して鉄骨柱27を立設するようにしたので、鉄骨柱27を設置する高さが立ち上がり部25とほぼ同一レベルになり、建物の設計を容易に行うことができると共に、無収縮モルタルなどのグラウト材の使用が局部的になって、充填作業及び均し作業が容易であると共に、水平度及び鉛直度を高めることが可能であり且つ、グラウト材の使用量を少なくすることができる。   In particular, the grout layer 26 is formed in the filling recess 24 provided in the rising portion 25 of the fabric foundation so that the steel column 27 is erected, so that the height at which the steel column 27 is installed is substantially the same as the rising portion 25. It is easy to design the building, and the grout material such as non-shrink mortar is used locally, so that the filling and leveling work is easy, and the horizontality and verticality are reduced. It can be increased and the amount of grout used can be reduced.

次に、図11A及び図11Bによって他の実施例を説明するが、図11Aは基礎コンクリートを打設する際に仕切り板23を用いず、充填用凹部24を形成しない状態で立ち上がり部25を平坦面にすると共に、立ち上がり部25の上面全体にグラウト層26を構築したものであって、その他の構造及び構築方法は先の実施例の場合と同様に、レベル調整具7の高さ調整ボルト11による高さ調整によって、充填するグラウト材の高さ及び鉄骨柱27を設置する高さを設定すると共に、高さ調整ボルト11の頭部頂面で設置する鉄骨柱27のベースプレート28を支持するようにしている。   Next, another embodiment will be described with reference to FIGS. 11A and 11B. FIG. 11A does not use the partition plate 23 when placing the foundation concrete, and flattens the rising portion 25 without forming the filling recess 24. The grout layer 26 is constructed on the entire upper surface of the rising portion 25, and the other structure and construction method are the same as in the previous embodiment, and the height adjusting bolt 11 of the level adjuster 7 is used. The height of the grout material to be filled and the height at which the steel column 27 is installed are set by adjusting the height of the steel plate 27, and the base plate 28 of the steel column 27 installed at the top surface of the head of the height adjusting bolt 11 is supported. I have to.

また、図11Bは図11Aの場合と同様に立ち上がり部25の上面全体にグラウト層26を構築すると共に、グラウト層26上に設けた土台30を介して鉄骨柱27を構築したものであって、図示の実施例ではウエブの上下にフランジ部30a,30bを設けたH形鋼による鋼製の土台30を用い、グラウト層26上に載置した下側のフランジ部30bに対して、アンカーボルト5の上端ねじ部5aを連結し、上側のフランジ部30a上に載置した鉄骨柱27に対して、鉄骨柱27のベースプレート28をねじ固着している。   FIG. 11B is similar to FIG. 11A in that the grout layer 26 is constructed on the entire upper surface of the rising portion 25, and the steel column 27 is constructed via the base 30 provided on the grout layer 26. In the illustrated embodiment, a steel base 30 made of H-shaped steel provided with flange portions 30a and 30b on the upper and lower sides of the web is used, and the anchor bolt 5 is fixed to the lower flange portion 30b placed on the grout layer 26. The base plate 28 of the steel column 27 is fixedly screwed to the steel column 27 placed on the upper flange portion 30a.

なお、本発明は図示の実施例による布基礎だけではなく、独立基礎やベタ基礎によるコンクリート基礎にも適用することが可能であると共に、要旨の範囲内において図示以外の各種変形を採り得るものであって、例えば図示の実施例では基礎コンクリートと柱の間に、無収縮モルタルなどのグラウト材を充填したグラウト層を設けたが、グラウト層を設けずに直接柱を基礎コンクリート上に構築する形態を採ることも可能である。   The present invention can be applied not only to the fabric foundation according to the illustrated embodiment, but also to an independent foundation or a solid foundation such as a solid foundation, and can take various modifications other than those shown in the scope of the gist. For example, in the illustrated embodiment, a grout layer filled with a grout material such as a non-shrink mortar is provided between the foundation concrete and the column, but the column is constructed directly on the foundation concrete without providing the grout layer. It is also possible to adopt.

また、図示の実施例では柱に鉄骨柱27を用いているが、柱に木製柱を使用する形態を採ることも可能であり、木製柱の場合には例えば図11Bにおける鋼製の土台30に代えて、木製の土台をアンカーボルト5の上端ねじ部5aに連結すると共に、木製の土台と木製柱をほぞ接ぎしたり、木製柱の下端側側面にホールダウン接合金具を取付け、このホールダウン接合金具とアンカーボルト5の上端ねじ部5aを、直接又は木製の土台を介して連結する形態を採ることができる。   In the illustrated embodiment, the steel column 27 is used as the column, but it is also possible to adopt a form in which a wooden column is used as the column. In the case of a wooden column, for example, the steel base 30 in FIG. Instead, the wooden base is connected to the upper end threaded portion 5a of the anchor bolt 5, and the wooden base and the wooden column are connected to each other, or a hole down joint fitting is attached to the lower side of the wooden column. The form which connects the metal fitting and the upper end screw part 5a of the anchor bolt 5 directly or through a wooden base can be taken.

本発明を布基礎適用した実施例による布基礎構築装置の組立状態を示す分解斜視図。The disassembled perspective view which shows the assembly state of the fabric foundation construction apparatus by the Example to which this invention is applied. 図1の布基礎構築装置の組立後における幅方向に沿った要部断面図。The principal part sectional view along the width direction after the assembly of the cloth foundation construction apparatus of FIG. 図1の布基礎構築装置の組立後における長手方向に沿った要部断面図。The principal part sectional view along the longitudinal direction after the assembly of the cloth foundation construction apparatus of FIG. 図1の布基礎構築装置に用いるアンカーボルト支持装置の正面図。The front view of the anchor bolt support apparatus used for the cloth foundation construction apparatus of FIG. 鋼製型枠を用いた図2の布基礎構築装置の部分拡大断面図。The elements on larger scale of the fabric foundation construction apparatus of FIG. 2 using a steel formwork. 木製型枠を用いた図5Aの変形例による布基礎構築装置の部分拡大図。The elements on larger scale of the cloth foundation construction apparatus by the modification of FIG. 5A using a wooden formwork. 鋼製型枠を用いた図2の布基礎構築装置の部分拡大平面図。The elements on larger scale of the cloth foundation construction apparatus of FIG. 2 using a steel formwork. 入り隅部を含む基礎コンクリート打設用の型枠とアンカーボルト支持装置の配置図。The layout of the formwork and anchor bolt support device for foundation concrete placement including a corner. 型枠に基礎コンクリートを打設して立ち上がり部を構築した施工状態であって、(a)は部分拡大平面図、(b)は部分拡大断面図。It is the construction state which built the foundation concrete in the formwork, and constructed | assembled the standing part, Comprising: (a) is a partial expanded plan view, (b) is a partial expanded sectional view. 図8の立ち上がり部上の凹部にグラウト層を構築した施工状態であって、(a)は部分拡大平面図、(b)は部分拡大断面図。FIG. 9 is a construction state in which a grout layer is constructed in the recess on the rising portion of FIG. 8, (a) is a partially enlarged plan view, and (b) is a partially enlarged sectional view. 図9のグラウト層上に鉄骨柱を構築した施工状態であって、(a)は部分拡大平面図、(b)は部分拡大断面図。It is the construction state which constructed the steel column on the grout layer of Drawing 9, and (a) is a partial expansion plan view, and (b) is a partial expansion sectional view. グラウト層上に鉄骨柱を構築した変形例による施工状態の部分拡大断面図。The partial expanded sectional view of the construction state by the modification which constructed | assembled the steel column on the grout layer. 変形例によるグラウト層上に土台を介して鉄骨柱を構築した他の変形例による施工状態の部分拡大断面図。The partial expanded sectional view of the construction state by the other modification which constructed | assembled the steel column through the foundation on the grout layer by a modification.

符号の説明Explanation of symbols

1 型枠
1A (鋼製)型枠
1B (木製)型枠
2 天端部
2a (鋼製型枠の)天端部
2b (木製型枠の)天端部
3(3A,3B) アンカーボルト支持装置
4 テンプレート
5 アンカーボルト
6 補助プレート
7 レベル調整具
8,9 狭持用ナット
10 高さ調整ナット
11 高さ調整ボルト
12 係止保持板
13 間隔設定板
14 狭持固定具
15 取付け孔
16 挿通孔
17 監視用窓孔
18 支持部材
19 案内筒
20 加圧部材
21 取付け孔
22 釘
23 仕切り板
24 充填用凹部
25 立ち上がり部
26 グラウト層
27 鉄骨柱
28 ベースプレート
29 取付けナット
30 土台
1 Formwork 1A (Steel) Formwork 1B (Wood) Formwork 2 Top End 2a Top End 2a (Steel Formwork) Top End 3 (3A, 3B) Anchor Bolt Support Device 4 Template 5 Anchor bolt 6 Auxiliary plate 7 Level adjusting tool 8, 9 Nipping nut 10 Height adjusting nut 11 Height adjusting bolt 12 Locking holding plate 13 Interval setting plate 14 Nipping fixture 15 Mounting hole 16 Insertion hole 17 Monitoring window hole 18 Support member 19 Guide tube 20 Pressurizing member 21 Mounting hole 22 Nail 23 Partition plate 24 Filling recess 25 Rising portion 26 Grout layer 27 Steel column 28 Base plate 29 Mounting nut 30 Base

Claims (8)

上端ねじ部をテンプレートにねじ固着してアンカーボルトを垂設したアンカーボルト支持装置を用意し、テンプレートの両端側を型枠の天端部間に架設する態様で柱の設置位置毎にアンカーボルト支持装置を載置すると共に、各アンカーボルト支持装置の上端ねじ部を位置決めした後に、テンプレートの両端側を型枠の天端部に固着して基礎コンクリートを打設する基礎の構築方法であって、
アンカーボルト支持装置にはアンカーボルトの上端ねじ部に連結した補助プレートを、テンプレートの下側に離間して平行状に設けると共に、補助プレートに高さ調整ボルトを備えたレベル調整具を設け、補助プレートを埋設して高さ調整ボルトの頭部を突出する態様で型枠内に基礎コンクリートを打設した後に、テンプレートを取り外して柱の接地面に設定した高さ調整ボルトの頭部頂面まで、基礎コンクリート上にグラウト材を充填してグラウト層を形成したことを特徴とする基礎の構築方法。
Prepare an anchor bolt support device that anchors the upper end screw to the template and suspends the anchor bolt, and supports the anchor bolt at each column installation position in such a way that both ends of the template are installed between the top ends of the formwork. A method for constructing a foundation in which the concrete is placed and the upper end screw portion of each anchor bolt support device is positioned, and then the both ends of the template are fixed to the top end portion of the formwork and the foundation concrete is placed,
In the anchor bolt support device, an auxiliary plate connected to the upper end threaded portion of the anchor bolt is provided in parallel and spaced apart from the lower side of the template, and a level adjuster equipped with a height adjustment bolt is provided on the auxiliary plate to assist After placing the concrete in the formwork so that the head of the height adjustment bolt protrudes by embedding the plate, remove the template and reach the top surface of the height adjustment bolt head set on the ground contact surface of the column A foundation construction method characterized in that a grout layer is formed by filling grout material on foundation concrete .
柱を構築する所定間隔毎にアンカーボルトと連結する取付け孔を設けた長尺な間隔設定板を用意し、隣接する各アンカーボルト支持装置の間を着脱可能に連結して位置決めを行う請求項1に記載した基礎の構築方法。 2. A long interval setting plate provided with a mounting hole for connecting to an anchor bolt at every predetermined interval for constructing a pillar is prepared, and positioning is performed by detachably connecting adjacent anchor bolt support devices. The foundation construction method described in 1 . アンカーボルト支持装置を挟んで型枠の間に取り外し可能な仕切り板を設け、仕切り板の外側から型枠内に基礎コンクリートを打設し、仕切り板の間にグラウト材の充填用凹部を形成すると共に、仕切り板の間にグラウト材を充填して局部的にグラウト層を形成する請求項1または請求項2に記載した基礎の構築方法。 A removable partition plate is provided between the molds with the anchor bolt support device interposed therebetween, foundation concrete is placed in the mold from the outside of the partition plate, and a grout filling recess is formed between the partition plates. The foundation construction method according to claim 1 or 2 , wherein a grout layer is locally formed by filling a grout material between partition plates. 上端ねじ部をテンプレートにねじ固着してアンカーボルトを垂設したアンカーボルト支持装置を用意し、テンプレートの両端側を型枠の天端部間に架設する態様で柱の設置位置毎にアンカーボルト支持装置を載置すると共に、各アンカーボルト支持装置の上端ねじ部を位置決めした後に、テンプレートの両端側を型枠の天端部に固着して基礎コンクリートを打設する基礎の構築装置であって、
アンカーボルト支持装置は、型枠間に架設する平板状のテンプレートと、テンプレートの下側に離間して平行状に設けた補助プレートと、上端ねじ部がテンプレートと補助プレートを挿通すると共に、上端ねじ部に螺合させた狭持用ナットでテンプレート及び補助プレートを上下から狭持して固着したアンカーボルトとを有し、補助プレートには柱を設置するグラウト層の上面を設定する高さ調整ボルトを備えたレベル調整具を設けたことを特徴とする基礎の構築装置。
Prepare an anchor bolt support device that anchors the upper end screw to the template and suspends the anchor bolt, and supports the anchor bolt at each column installation position in such a way that both ends of the template are installed between the top ends of the formwork. While placing the device, after positioning the upper end screw portion of each anchor bolt support device, it is a foundation construction device for fixing the both ends of the template to the top end portion of the formwork and placing foundation concrete,
The anchor bolt support device includes a flat template laid between the molds, an auxiliary plate spaced in parallel to the lower side of the template, an upper end screw portion passing through the template and the auxiliary plate, and an upper end screw. And an anchor bolt that is fixed by holding the template and the auxiliary plate from above and below with a holding nut screwed to the portion, and the auxiliary plate has a height adjusting bolt that sets the upper surface of the grout layer on which the column is installed A base construction apparatus characterized by comprising a level adjustment tool provided with
前記レベル調整具は、補助プレートに固着した高さ調整ナットと、高さ調整ナットにねじ軸が螺合して頭部頂面の高さが調整可能な高さ調整ボルトと、高さ調整ボルトのねじ軸に螺合するねじ孔を穿設して高さ調整ボルトの緩み止めを行う係止保持板とを有する請求項記載した基礎の構築装置。 The level adjuster includes a height adjusting nut fixed to the auxiliary plate, a height adjusting bolt capable of adjusting the height of the head top surface by screwing a screw shaft into the height adjusting nut, and a height adjusting bolt. 5. A foundation construction apparatus according to claim 4 , further comprising a locking holding plate that is provided with a screw hole that is screwed into the screw shaft to prevent the height adjusting bolt from loosening . 隣接する各アンカーボルト支持装置の間に、柱を構築する所定間隔毎にアンカーボルトと連結する取付け孔を設けた長尺な間隔設定板を架設すると共に、取付け孔を介してアンカーボルトの上端ねじ部と着脱可能に連結した請求項4または請求項5に記載の基礎の構築装置。 Between each adjacent anchor bolt support device, a long interval setting plate having mounting holes connected to the anchor bolts is installed at every predetermined interval for constructing the pillar, and the upper end screw of the anchor bolt is installed through the mounting holes. The foundation construction device according to claim 4 or 5, wherein the foundation construction device is detachably connected to the unit. 上端ねじ部をテンプレートにねじ固着してアンカーボルトを垂設すると共に、テンプレートの両端側を型枠の天端部間に架設する態様で柱の設置位置毎に載置するアンカーボルト支持装置であって、
型枠間に架設する平板状のテンプレートと、テンプレートの下側に離間して平行状に設けた補助プレートと、上端ねじ部がテンプレートと補助プレートを挿通すると共に、当該上端ねじ部に螺合させた狭持用ナットでテンプレート及び補助プレートを上下から狭持して固着したアンカーボルトで構成し、補助プレートには柱を設置するグラウト層の上面を設定する高さ調整ボルトを備えたレベル調整具を設けたことを特徴とした基礎の構築用アンカーボルト支持装置。
An anchor bolt support device for mounting an anchor bolt to a template by screwing the upper end screw portion and mounting each end of the template at each column installation position in a manner that the both ends of the template are installed between the top ends of the mold. And
A flat template laid between the molds, an auxiliary plate spaced in parallel to the lower side of the template, and an upper threaded portion inserted through the template and the auxiliary plate, and screwed into the upper threaded portion. A level adjuster with a height adjustment bolt that sets the upper surface of the grout layer on which the column is installed on the auxiliary plate. An anchor bolt support device for constructing a foundation, characterized in that it is provided .
前記レベル調整具は補助プレートに固着した高さ調整ナットと、高さ調整ナットにねじ軸が螺合して頭部頂面の高さが調整可能な高さ調整ボルトと、高さ調整ボルトのねじ軸に螺合するねじ孔を穿設して高さ調整ボルトの緩み止めを行う係止保持板とを有する請求項の基礎の構築用アンカーボルト支持装置。 It said level adjuster includes a height adjusting nut fixed to the auxiliary plate, the height adjustment nut screw shaft screwed with adjustable height of the head top surface to a height adjustment bolt, the height adjustment bolt The anchor bolt support device for constructing a foundation according to claim 7 , further comprising a locking holding plate that is provided with a screw hole that is screwed into the screw shaft of the screw and that prevents the height adjusting bolt from loosening.
JP2006033716A 2006-02-10 2006-02-10 Foundation construction method and device, and anchor bolt support device for construction Active JP4732915B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006033716A JP4732915B2 (en) 2006-02-10 2006-02-10 Foundation construction method and device, and anchor bolt support device for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006033716A JP4732915B2 (en) 2006-02-10 2006-02-10 Foundation construction method and device, and anchor bolt support device for construction

Publications (2)

Publication Number Publication Date
JP2007211514A JP2007211514A (en) 2007-08-23
JP4732915B2 true JP4732915B2 (en) 2011-07-27

Family

ID=38490197

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006033716A Active JP4732915B2 (en) 2006-02-10 2006-02-10 Foundation construction method and device, and anchor bolt support device for construction

Country Status (1)

Country Link
JP (1) JP4732915B2 (en)

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5305941B2 (en) * 2009-01-21 2013-10-02 ミサワホーム株式会社 Floor frame height adjustment nut embedding method and floor frame height adjustment nut holder
KR101509201B1 (en) * 2014-06-05 2015-04-07 오형석 Foundation construction device using concrete box for post of photovoltaic module
CN105752863B (en) * 2016-05-13 2024-03-26 中核华兴达丰机械工程有限公司 Typhoon-proof connecting device for underframe of walking tower crane
CN107313442B (en) * 2017-08-30 2023-06-13 中国化学工程第三建设有限公司 Automatic indexing positioning template for installing annular foundation bolts of chemical tower
CN108979290B (en) * 2018-08-22 2024-06-21 中铁十四局集团电气化工程有限公司 Detachable device and method for manually assembling steel column
CN108999622B (en) * 2018-08-30 2023-10-20 中铁大桥局集团有限公司 Ditch cable duct construction device and construction method thereof
CN109113358B (en) * 2018-10-22 2024-04-09 中国建筑一局(集团)有限公司 Limiting device for embedding foundation bolts
CN109281333A (en) * 2018-11-07 2019-01-29 厦门理工学院 The cast iron platform of horizontal adjustable and large-scale cast iron stage+module mode
CN110042931B (en) * 2019-04-30 2020-09-15 洛阳理工学院 Anchoring structure for civil engineering construction
CN110219456B (en) * 2019-05-29 2024-02-06 中国五冶集团有限公司 Wall post template fixing tool
JP7456907B2 (en) 2020-09-30 2024-03-27 大和ハウス工業株式会社 Anchor bolt inspection system and measuring device
CN113210969B (en) * 2021-04-27 2022-07-12 山东恒信建业集团有限公司 Foundation bolt fixing device
CN113089848A (en) * 2021-05-12 2021-07-09 陈德湛 Prefabricated foundation embedded structure and installation method thereof
CN113605303B (en) * 2021-07-19 2022-11-01 江苏筑港建设集团有限公司 Energy-saving and environment-friendly beam type bottom formwork construction method of cast-in-place breast wall
CN113803573A (en) * 2021-08-31 2021-12-17 上海宝冶集团有限公司 Precise foundation bolt of stretcher and mounting method thereof
CN113668597A (en) * 2021-09-29 2021-11-19 中国华西企业有限公司 Multi-group bolt fixing structure and construction method
CN114960787B (en) * 2022-05-31 2023-07-25 南京海骏绿建科技有限公司 Construction device and method for leveling factory foundation
CN115110758A (en) * 2022-07-13 2022-09-27 中国一冶集团有限公司 Combined type template device with height-adjustable plate lowering area
CN115354757B (en) * 2022-08-29 2024-05-17 中国一冶集团有限公司 Mounting embedded part for mounting upright post on cast-in-place concrete structure body
CN115387474B (en) * 2022-09-20 2023-06-27 上海建工四建集团有限公司 Special-shaped oversized overhanging concrete structure and construction method thereof
CN115341597B (en) * 2022-09-21 2023-12-08 深圳市清华苑工程结构鉴定有限公司 Implementation method for four-side additional construction of slope-shaped independent foundation
CN115653307A (en) * 2022-12-02 2023-01-31 中国三冶集团有限公司 Concrete pouring reel structure
CN118564088A (en) * 2024-07-31 2024-08-30 中交第一航务工程局有限公司 Adjustable multifunctional positioning device for pile top embedded steel plate anchor bars

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59165735A (en) * 1983-03-08 1984-09-19 Sekisui Prefab Homes Ltd Positioning work of anchor bolt
JPH05214731A (en) * 1991-12-10 1993-08-24 Sumitomo Ringyo Kk Column base fixing device
JPH0988084A (en) * 1995-09-25 1997-03-31 Sekisui House Ltd Supporter of level metal fitting for column base

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59165735A (en) * 1983-03-08 1984-09-19 Sekisui Prefab Homes Ltd Positioning work of anchor bolt
JPH05214731A (en) * 1991-12-10 1993-08-24 Sumitomo Ringyo Kk Column base fixing device
JPH0988084A (en) * 1995-09-25 1997-03-31 Sekisui House Ltd Supporter of level metal fitting for column base

Also Published As

Publication number Publication date
JP2007211514A (en) 2007-08-23

Similar Documents

Publication Publication Date Title
JP4732915B2 (en) Foundation construction method and device, and anchor bolt support device for construction
JP4491030B2 (en) Anchor bolt set device
JP6046984B2 (en) Seismic isolation construction method and precast concrete footing
JP3175586B2 (en) Column and pile connection method
CN214940096U (en) Column shoe bolt assembling and positioning device
JP7339865B2 (en) How to install wall panels
JP2015055079A (en) Anchor frame, and method for constructing anchor structure using the anchor frame
JP3084654B2 (en) Construction foundation, foundation structure using the same, and construction method thereof
JP2566470Y2 (en) Anchor bolt fixing device for construction
JP2005127064A (en) Hardware for column base
JP7288390B2 (en) Foundation construction method and foundation
JP3244102U (en) Steel house foundation structure and anchor set used therein
JP2716357B2 (en) Rising section formwork fixing jig
WO2024047878A1 (en) Anchor bolt setting jig, and anchor bolt setting method
CN113216169A (en) Column shoe bolt assembling and positioning device and construction method thereof
JPH0532536B2 (en)
RU110765U1 (en) FOUNDATION DESIGN AND FORM FOR LAYING THE FOUNDATION
JP4993487B2 (en) Clay concrete construction method of building using outer wall panel and steel foundation
JP3025638B2 (en) Formwork equipment for fabric foundation
JP3609664B2 (en) Retaining wall and its construction method
JP2005330649A (en) Unit form, unit form buildup tool and construction method for ground concrete structure
JPH06322980A (en) Form for concrete for column, and construction thereof
JP2005320686A (en) Reinforcement assembly body used for housing foundation and construction method of the housing foundation making use of the assembly body
JP2591314Y2 (en) Underground beam anchor frame
JP2952784B2 (en) Formwork structure and installation method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20081105

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101216

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110105

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110225

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110405

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110421

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140428

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4732915

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250