CN108691423A - A kind of foundation bolt assembling fixing device - Google Patents
A kind of foundation bolt assembling fixing device Download PDFInfo
- Publication number
- CN108691423A CN108691423A CN201710238309.8A CN201710238309A CN108691423A CN 108691423 A CN108691423 A CN 108691423A CN 201710238309 A CN201710238309 A CN 201710238309A CN 108691423 A CN108691423 A CN 108691423A
- Authority
- CN
- China
- Prior art keywords
- plan
- fixing device
- plate
- foundation bolt
- position positioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
- E04G21/185—Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of foundation bolts to assemble fixing device, which is composed of fixed frame, plan-position positioning splint, plan-position positioning cage plate, elevation of top positioning plate.Multiple foundation bolts are placed in assembling fixing device when construction, elevation of top positioning plate is held out against at the top of bolt, bolt upper and lower part is fixed with plan-position positioning splint and plan-position positioning cage plate respectively, foundation bolt group is welded into an overall skeleton with diameter of phi 12mm fixed steel bars again, then can be taken off overall skeleton and be transported to construction site to be installed.The configuration of the present invention is simple, assembly precision are high, can be widely applied to structural steelwork foundation bolt construction field.
Description
One, technical field
The present invention relates to a kind of foundation bolts to assemble fixing device, is mainly used in structural steelwork related foundation bolt
The technical field of construction.
Two, background technology
Light section steel structure is applied more in the buildings such as industrial premises, warehouse at present.In steel structure base construction, lower margin
The assembling of bolt overall skeleton, it is embedded be the one big crucial of steel-structure factory building construction, the precision of foundation bolt skeleton assembling will be direct
Influence pre-buried precision and verticality, the squareness precision of the installation of top steel member.
Previous foundation bolt assembling is fixed using positioning steel bushing plate, and this shaping tool is by steel pipe and steel plate welding group
At making process-cycle length, quality are big, cannot flexibly carry, and the more people of assembling fixing bolt palpus complete, and this tool is by ground
Foot bolt group specifications and models limit, and the bolt group of different size model must prepare different shaping tools, expensive.
Three, invention content
To solve the above problems, the present invention provides a kind of foundation bolts to assemble fixing device.
The technical solution adopted by the present invention to solve the technical problems is:This kind of foundation bolt assembles fixing device by fixing
Frame, plan-position positioning splint, plan-position positioning cage plate, elevation of top positioning plate are composed.Wherein fixed frame by
70 × 5 welding productions of angle steel ∠ form, and there is upper, middle and lower-ranking posting in inside, are respectively used to card and put plan-position locating clip
Plate, plan-position positioning cage plate and elevation of top positioning plate.Plan-position positioning splint uses combined splint form, for controlling
Bolt group integral planar relative position;Plan-position positions cage plate and uses Double-jointed board form, is also used for control bolt group and integrally puts down
Face relative position.Elevation of top positioning plate also uses Double-jointed board form, for controlling bolt group elevation of top.Plan-position positions
Clamping plate, plan-position positioning cage plate and elevation of top positioning plate are all made of 18mm solid woods and are made.Plan-position locating clip
Correspondence drilling hole amount, position and aperture on plate and plan-position positioning cage plate can be adjusted according to scene actual needs.
Multiple foundation bolts are placed in assembling fixing device when construction, elevation of top positioning plate is held out against at the top of bolt,
Bolt upper and lower part is fixed with plan-position positioning splint and plan-position positioning cage plate respectively, then fixes steel with diameter of phi 12mm
Foundation bolt group is welded into an overall skeleton by muscle, then can be taken off overall skeleton and be transported to construction site to be installed.
The configuration of the present invention is simple, easy to operate, the fixed accuracy of bolt assembling is high and reusable, can flexibly install and
The problems such as dismounting is carried, and the fixed progress of effective solution foundation bolt assembling is slow, costly, deviation is big.
Four, it illustrates
The invention will be further described below in conjunction with the accompanying drawings.
Attached drawing 1 is the fixed frame and three layers of positioning plate schematic diagram of the present invention.
Attached drawing 2 is the schematic diagram of the present invention.
In figure:1, fixed frame;2, plan-position positioning splint;3, plan-position positions cage plate;4, elevation of top positions
Plate;5, foundation bolt;6, fixed steel bars.
Five, specific implementation mode
According to the specifications and models of live foundation bolt group, top mark is from bottom to top respectively set inside fixed frame (1)
High positioning plate (2), plan-position positioning cage plate (3) and plan-position positioning splint (4), this completes this kind of foundation bolts
Assemble the assembling of fixing device.Then multiple foundation bolts (5) are placed in a device, elevation of top is held out against at the top of bolt (5)
Positioning plate (2), bolt (5) upper and lower part use plan-position positioning splint (3) and plan-position positioning cage plate (4) fixed respectively, then
Foundation bolt group is welded into an overall skeleton with fixed steel bars (6), that is, completes foundation bolt assembling and fixes.
Claims (4)
1. a kind of foundation bolt assembles fixing device, it is characterised in that:Foundation bolt assembles fixing device by fixed frame, plane
Position positioning splint, plan-position positioning cage plate and elevation of top positioning plate composition.
2. a kind of foundation bolt according to claim 1 assembles fixing device, it is characterised in that:Fixed frame is by angle steel ∠
70 × 5 welding productions form.
3. a kind of foundation bolt according to claim 1 assembles fixing device, it is characterised in that:Plan-position locating clip
Plate, plan-position positioning cage plate and elevation of top positioning plate are all made of 18mm solid woods and are made.
4. a kind of foundation bolt according to claim 1 or 2 or 3 assembles fixing device, it is characterised in that:In fixed frame
There is upper, middle and lower-ranking posting in portion, is respectively used to card and puts plan-position positioning splint, plan-position positioning cage plate and top mark
High positioning plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710238309.8A CN108691423A (en) | 2017-04-05 | 2017-04-05 | A kind of foundation bolt assembling fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710238309.8A CN108691423A (en) | 2017-04-05 | 2017-04-05 | A kind of foundation bolt assembling fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108691423A true CN108691423A (en) | 2018-10-23 |
Family
ID=63843899
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710238309.8A Pending CN108691423A (en) | 2017-04-05 | 2017-04-05 | A kind of foundation bolt assembling fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108691423A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110700605A (en) * | 2019-09-03 | 2020-01-17 | 中冶(上海)钢结构科技有限公司 | Adjustable embedded bolt assembling die and construction method thereof |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05280202A (en) * | 1992-03-30 | 1993-10-26 | Daiwa House Ind Co Ltd | Anchor frame locating tool |
JP2008081980A (en) * | 2006-09-26 | 2008-04-10 | Matsushita Electric Works Ltd | Positioning tool for anchor bolt |
CN201991241U (en) * | 2011-03-30 | 2011-09-28 | 宿迁市科路养护技术有限公司 | Steel structural upright column foundation bolt positioning device |
CN203768941U (en) * | 2014-04-11 | 2014-08-13 | 中国水利水电第五工程局有限公司 | Fast installation mould for foundation bolt set |
CN104695557A (en) * | 2015-01-31 | 2015-06-10 | 陕西建工安装集团有限公司 | Steel structure building construction method for one-step pre-burying of foundation bolts |
CN204626995U (en) * | 2015-02-05 | 2015-09-09 | 中建三局机电工程有限公司 | A kind of bolt rapid fixing for terrace insulation |
CN105696800A (en) * | 2016-01-21 | 2016-06-22 | 中建钢构有限公司 | Temporary fixed sleeve frame for preventing relative displacement generated during construction of steel-structured anchor bolts |
CN207063551U (en) * | 2017-04-05 | 2018-03-02 | 通州建总集团有限公司 | A kind of foundation bolt assembles fixing device |
-
2017
- 2017-04-05 CN CN201710238309.8A patent/CN108691423A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05280202A (en) * | 1992-03-30 | 1993-10-26 | Daiwa House Ind Co Ltd | Anchor frame locating tool |
JP2008081980A (en) * | 2006-09-26 | 2008-04-10 | Matsushita Electric Works Ltd | Positioning tool for anchor bolt |
CN201991241U (en) * | 2011-03-30 | 2011-09-28 | 宿迁市科路养护技术有限公司 | Steel structural upright column foundation bolt positioning device |
CN203768941U (en) * | 2014-04-11 | 2014-08-13 | 中国水利水电第五工程局有限公司 | Fast installation mould for foundation bolt set |
CN104695557A (en) * | 2015-01-31 | 2015-06-10 | 陕西建工安装集团有限公司 | Steel structure building construction method for one-step pre-burying of foundation bolts |
CN204626995U (en) * | 2015-02-05 | 2015-09-09 | 中建三局机电工程有限公司 | A kind of bolt rapid fixing for terrace insulation |
CN105696800A (en) * | 2016-01-21 | 2016-06-22 | 中建钢构有限公司 | Temporary fixed sleeve frame for preventing relative displacement generated during construction of steel-structured anchor bolts |
CN207063551U (en) * | 2017-04-05 | 2018-03-02 | 通州建总集团有限公司 | A kind of foundation bolt assembles fixing device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110700605A (en) * | 2019-09-03 | 2020-01-17 | 中冶(上海)钢结构科技有限公司 | Adjustable embedded bolt assembling die and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103397701B (en) | Adjustable positioning structure for pre-buried bolt double-layered positioning plate and construction method | |
CN104878941A (en) | Height-adjustable steelwork assembly jig frame | |
US9394689B2 (en) | Tiltable beams for flat roof solar sensor structures | |
CN106758787A (en) | A kind of Precast Pier Columns mounting and positioning device | |
CN103835527B (en) | A kind of dismountable supporting device | |
CN207063551U (en) | A kind of foundation bolt assembles fixing device | |
CN108691423A (en) | A kind of foundation bolt assembling fixing device | |
CN104120802A (en) | Simple method for mounting and locating seismic isolation support | |
CN203383332U (en) | Adjustable positioning structure with two positioning plates for embedded bolts | |
CN207104157U (en) | A kind of flange base assembly tooling | |
CN207211784U (en) | A kind of positioner of prefabricated components installation reinforcing bar | |
CN103866993A (en) | Adjustable support and construction method thereof | |
KR101621944B1 (en) | setting device based towers enclosing | |
CN203879041U (en) | Embedded plate positioning support frame | |
CN206815542U (en) | A kind of portable bracket pre-embedded bolt fixed structure | |
CN205369296U (en) | Steel column basis is buried bolt positioner in advance | |
CN201133827Y (en) | Measuring instrument support | |
CN214302188U (en) | Assembled node structure | |
CN204357141U (en) | The assembled moulding bed of a kind of English truss | |
CN209817462U (en) | Overhanging type supporting and positioning device for field installation of prefabricated air conditioner plate | |
CN110258798B (en) | Mounting method of assembled column base connection node | |
KR101622472B1 (en) | Horizontal control device for transportable building | |
CN204139619U (en) | For the support that huge post lifting is installed | |
CN110984400A (en) | Hoop type steel frame installation tool and installation method | |
CN210195233U (en) | Combined assembled plug pin type independent support system for post-cast strip template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |