JPH0736969A - Schedule making device for building maintenance work - Google Patents

Schedule making device for building maintenance work

Info

Publication number
JPH0736969A
JPH0736969A JP15738593A JP15738593A JPH0736969A JP H0736969 A JPH0736969 A JP H0736969A JP 15738593 A JP15738593 A JP 15738593A JP 15738593 A JP15738593 A JP 15738593A JP H0736969 A JPH0736969 A JP H0736969A
Authority
JP
Japan
Prior art keywords
building
maintenance work
schedule
work
worker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15738593A
Other languages
Japanese (ja)
Inventor
Masaki Honma
正喜 本間
Toshiaki Suenobe
寿朗 末延
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Engineering and Service Co Ltd
Hitachi Building Systems Engineering Co Ltd
Original Assignee
Hitachi Building Systems Engineering and Service Co Ltd
Hitachi Building Systems Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Engineering and Service Co Ltd, Hitachi Building Systems Engineering Co Ltd filed Critical Hitachi Building Systems Engineering and Service Co Ltd
Priority to JP15738593A priority Critical patent/JPH0736969A/en
Publication of JPH0736969A publication Critical patent/JPH0736969A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE:To provide the schedule making device for building maintenance work which automatically makes a schedule where the correction of combinations between buildings as the object of maintenance work and workers can be reduced. CONSTITUTION:This device is provided with an assined worker information storage part 32 where information related propriety of the combination between a building as the object of maintenance work and workers assigned to maintenance work of this building is stored and a field information processing part 14a which sets the rank of propriety of workers for each building based on information stored in the assigned worker information storage part 32. The propriety of the combination between the building and workers is automatically discriminated based on the set rank, and workers familiar with the building as the object of maintenance work are selectively assigned by a schedule assignment processing part 14c, and a schedule is made and is displayed on a display part 17. Thus, a work manager can easily and quickly determine the assignment of workers.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、複数のビルの保守作業
に用いられる予定表を作成するビル保守作業の予定表作
成装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for creating a schedule table for building maintenance work for creating a schedule table used for maintenance work of a plurality of buildings.

【0002】[0002]

【従来の技術】一般にビルにおいて、エレベータやエス
カレータなどを含む多種多様の設備機器が設置されてお
り、これらの設備機器に故障が生じた場合、ビルの居住
者やビルに出入りする人に多くの支障を来すことになる
ので、前記の設備機器の定期的な保守作業を行なうよう
になっている。そして、このビル内設備機器の保守作業
を行なうには、作業上の資格や専門的な知識を要するこ
とから、前記のビルの所有者または管理責任者は、設備
機器の保守作業を専門的に行なう保守会社と保守契約を
結んで前記の保守作業を委託することが多く、この場
合、保守会社は、作業上の資格や専門的な知識を有する
作業員を前記のビルに派遣し、設備機器の点検、修理、
整備等の保守サービスを提供している。そして、前記の
ビルを作業員が定期的に巡回するため、保守会社では所
定期間中の日付、保守作業の対象となるビルの名称、お
よび当該ビルの保守作業に割り付けられる作業員の名前
を表示するビル保守作業の予定表を作成するようになっ
ている。
2. Description of the Related Art In general, a wide variety of equipments such as elevators and escalators are installed in a building, and when a failure occurs in these equipments, many people in the building and people who go in and out of the building receive many Since it causes trouble, the maintenance work of the above equipment is regularly performed. Since maintenance work for equipment in the building requires work qualifications and specialized knowledge, the building owner or manager in charge of the above-mentioned operation must be specialized in maintenance work for equipment. In many cases, a maintenance contract is signed with a maintenance company to outsource the maintenance work. In this case, the maintenance company dispatches a worker having work qualifications and specialized knowledge to the building to install equipment. Inspection, repair,
We provide maintenance services such as maintenance. And since the workers regularly visit the above buildings, the maintenance company displays the date during the predetermined period, the name of the building that is the target of the maintenance work, and the name of the worker assigned to the maintenance work of the building. It is designed to create a schedule for building maintenance work.

【0003】そこで従来、前記の保守会社に所属する営
業所の壁面に表示ボードを設け、この表示ボードにビル
銘板や作業員銘板を磁石で吸着させることにより作業予
定表を作成する方法が実用化されている。この従来技術
では、外部の振動、あるいは近くを通る人の接触などに
よってビル銘板や作業員銘板が落下したり、表示ボード
自体が壁面から落下することが懸念され、この表示ボー
ド上に表示されるビルの名称や作業員の名前に関する情
報の信頼性が乏しいという問題があった。また、前述し
た作業予定表を作成する際、多岐にわたる諸条件を勘案
することから、熟練した職員を要するとともに、長い時
間がかかるという問題もあった。
Therefore, conventionally, a method has been put into practical use in which a display board is provided on the wall surface of a sales office belonging to the maintenance company and a work schedule is prepared by attracting a building nameplate or a worker nameplate to the display board with a magnet. Has been done. In this conventional technique, it is feared that the building nameplate or the worker nameplate may drop due to external vibration or the contact of a person passing nearby, or the display board itself may drop from the wall surface. There was a problem that information on building names and worker names was not reliable. In addition, when creating the work schedule described above, since various conditions are taken into consideration, there is a problem that it requires skilled staff and takes a long time.

【0004】このような問題を解決する一手段として、
例えば特願平3−62487号に記載されるように、作
業員の割り付けを自動的に行なうビル保守作業の予定表
作成装置が提案されている。図4はこの種のビル保守作
業の予定表作成装置を備える遠隔監視装置の全体構成を
示すブロック図、図5は図4の予定表作成装置により作
成される予定表を示す説明図、図6は図4の予定表作成
装置の構成を示すブロック図、図7は図4の予定表作成
装置の処理手順を示すフローチャートである。
As one means for solving such a problem,
For example, as described in Japanese Patent Application No. 3-62487, there has been proposed a schedule maintenance device for building maintenance work which automatically assigns workers. FIG. 4 is a block diagram showing the overall configuration of a remote monitoring device equipped with this type of building maintenance work schedule creation device, and FIG. 5 is an explanatory diagram showing a schedule created by the schedule creation device of FIG. 4 is a block diagram showing the configuration of the schedule table creating apparatus of FIG. 4, and FIG. 7 is a flowchart showing the processing procedure of the schedule table creating apparatus of FIG.

【0005】図4に示す遠隔監視装置は、図示しない複
数のビルのデータ処理を総括して行なう監視センタ1
と、この監視センタ1と電話回線2を介して接続される
営業所3と、図示を省略した他の営業所とからなってい
る。前記の監視センタ1は記憶部4および送受信装置5
を有し、前記の営業所3は送受信装置6、制御部7およ
び予定表作成装置8を有しており、その他の営業所も同
様である。
The remote monitoring device shown in FIG. 4 is a monitoring center 1 that performs overall data processing of a plurality of buildings (not shown).
And a business office 3 connected to the monitoring center 1 via a telephone line 2 and another business office not shown. The monitoring center 1 includes a storage unit 4 and a transmission / reception device 5
The above-mentioned business office 3 has a transmitting / receiving device 6, a control unit 7, and a schedule creation device 8, and the other business offices are the same.

【0006】この予定表作成装置8は、図6に示すよう
に、前記のビルに関する種々の情報を記憶する現場情報
記憶部11と、前記のビルの保守作業を行なう複数の作
業員に関する種々の情報を記憶する個人情報記憶部12
と、前記のビルのスケジュール情報を記憶するスケジュ
ール情報記憶部13と、現場情報記憶部11および個人
情報記憶部12でそれぞれ記憶される情報を処理する情
報処理手段14と、この情報処理手段14に接続される
キーボード等の入力部15と、この入力部15に接続さ
れるマウス16と、前記の処理結果を出力する表示部1
7および印字部18とを備えている。
As shown in FIG. 6, the schedule table creating apparatus 8 includes a site information storage section 11 for storing various information on the building and various information on a plurality of workers who perform maintenance work on the building. Personal information storage unit 12 for storing information
A schedule information storage unit 13 that stores the building schedule information, an information processing unit 14 that processes information stored in the site information storage unit 11 and the personal information storage unit 12, and the information processing unit 14. An input unit 15 such as a keyboard to be connected, a mouse 16 connected to the input unit 15, and a display unit 1 for outputting the processing result.
7 and the printing unit 18.

【0007】前記の表示部17で表示される予定表は、
図5に示すように、第1の表示領域21および第2の表
示領域22を含んでいる。第1の表示領域21は、当該
営業所3が管轄するビルの名称「B1」、「B2」、……
「Bn」を表示する。一方、第2の表示領域22は、各
月の日付と曜日を表示する上部の欄23と、当該営業所
3に所属する作業員の氏名「a」、「b」、「c」を表
示する左端の欄24と、各日付ごとに各作業員を割り付
けられるビルの名称や作業員の予定をそれぞれ表示する
表示欄25a、25b、25c……25nとを有してい
る。この第2の表示領域22でビルの名称「B1」〜
「B15」を表示するとき、これらのビルの名称「B1
〜「B15」を第1の表示領域21から消去し、他のビル
の名称「B16」〜「Bn」のみを第1の表示領域21で
表示するようになっている。なお、図5では、理解を容
易にするため、第1の表示領域21からビルの名称「B
1」〜「B15」などを消去しない状態を示している。
The schedule displayed on the display unit 17 is
As shown in FIG. 5, it includes a first display area 21 and a second display area 22. The first display area 21 includes the names of buildings “B 1 ”, “B 2 ”, ...
"Bn" is displayed. On the other hand, the second display area 22 displays the upper column 23 for displaying the date and the day of the week of each month and the names “a”, “b”, and “c” of the workers who belong to the sales office 3. It has a leftmost column 24 and display columns 25a, 25b, 25c ... 25n for displaying the names of buildings to which each worker is assigned and the schedule of each worker for each date. In the second display area 22, the building name "B 1 "
When displaying "B 15 ", the names of these buildings "B 1 "
Clear ~ the "B 15" from the first display area 21, and displays only the names of the other building "B 16" - "Bn" in the first display region 21. In addition, in FIG. 5, in order to facilitate understanding, the building name “B” is displayed in the first display area 21.
1 ”to“ B 15 ”, etc. are not erased.

【0008】前記の現場情報記憶部11には、センタ1
の記憶部4に記憶される情報の内容、営業所3が管轄す
るビルの保守に関する情報、例えば所在地、作業日の指
定の有無、作業内容などを送受信装置6を介して読み込
むようになっている。前記の個人情報記憶部12は、営
業所3に所属する全作業員の作業上の資格を記憶する資
格情報記憶部12aと、作業員の所定期間、例えば当該
月の勤務予定を記憶する勤休情報記憶部12bとからな
っている。前記の作業員の資格は、「整備」、「作業標
準」、「点検」等の種類があるとともに、その他に無資
格の作業員もいる。ビルの保守作業を2人の作業員が組
んで行なうように割り付ける場合、少なくとも一方の作
業員は「整備」の資格を有することが求められる。「作
業標準」は本来2人作業現場、すなわち2人で組んで作
業すべきビルの作業のうち1人で作業可能な作業を行な
うことのできる資格であり、「点検」は点検作業のみ行
なうことのできる資格である。前記の勤務予定として
は、年次休暇、会議、出張、研修などの保守作業に従事
不可能な予定も表示される。
The site information storage unit 11 has a center 1
The contents of the information stored in the storage unit 4 and the information about the maintenance of the building under the jurisdiction of the sales office 3, for example, the location, the presence / absence of designation of the work day, the work contents, etc. are read through the transmission / reception device 6. . The personal information storage unit 12 includes a qualification information storage unit 12a that stores work qualifications of all workers who belong to the sales office 3, and a work leave that stores a work schedule for a predetermined period of the workers, for example, the month. The information storage unit 12b. The qualifications of the above-mentioned workers include “maintenance”, “work standard”, “inspection” and the like, and there are other unqualified workers. When allocating the building maintenance work to be performed by two workers, at least one of the workers is required to have the qualification of "maintenance". The “work standard” is a qualification that allows one person to work in a work site where two people are supposed to work together, that is, a building where two people should work together. It is a qualification that can As the work schedule, a schedule that cannot be engaged in maintenance work such as annual leave, meetings, business trips, and training is also displayed.

【0009】前記の情報処理手段14は、それぞれマイ
クロコンピュータからなる現場情報処理部14a、個人
情報処理部14b、およびスケジュール割付処理部14
cから構成されている。このスケジュール割付処理部1
4cは、現場情報処理部14aを介して現場情報記憶部
11のデータを取出すともに、個人情報処理部14bを
介して個人情報記憶部12のデータを取出し、これらの
データに基づいて図5に示す表示部17の表示欄25a
〜25nに保守作業の対象となるビルの名称「B1」〜
「B15」などを表示する。
The above-mentioned information processing means 14 includes a site information processing unit 14a, a personal information processing unit 14b, and a schedule assignment processing unit 14 each of which is a microcomputer.
It is composed of c. This schedule allocation processing unit 1
4c takes out the data of the on-site information storage section 11 via the on-site information processing section 14a, takes out the data of the personal information storage section 12 via the personal information processing section 14b, and is shown in FIG. 5 based on these data. Display column 25a of the display unit 17
~ 25n is the name of the building "B 1 " that is the target of maintenance work ~
"B 15 " is displayed.

【0010】この従来の予定表作成装置では、図7に示
す処理手順にしたがって保守作業の予定が割り付けられ
る。すなわち、まず手順S1として営業所3に所属する
各作業員の実働可能時間を取り出し、手順S2として保
守作業の対象となるビルのうち、作業日が指定されるビ
ルの作業を当該指定日、例えば第1の日付に行なうよう
に設定するとともに、手順S3として、2人作業、すな
わち2人の作業員が組んで作業する必要のあるビルを作
業者に割り付けて、当該ビルの名称「B1」、「B2」を
当該作業者の氏名「a」の表示欄25aで表示し、この
表示欄25aでの作業時間が所定時間に到達するとき、
2人作業を要する他のビルを他の作業者に割り付けて、
当該他のビルの名称「B10」を当該他の作業者の名前
「b」の表示欄25bで表示する。このようにして2人
作業の割り付けを第1の日付で行ない表示欄25a〜2
5cに表示した後、手順S4としてその他の日付でも2
人作業の割り付けを順次行ない表示欄25d〜25nに
表示する。次いで、手順S5として第1の日付で残りの
実働可能時間のある作業者に1人作業、すなわち1人の
作業者が作業するビルの割り付けを行なって表示欄25
a〜25cに表示した後、手順S6としてその他の日付
でも1人作業の割り付けを順次行ない表示欄25d〜2
5nに表示する。これにより、予定表を自動的に作成し
て表示部17で表示することができることから、前記の
予定表を作成するのに煩雑な手間を要せずに済む。
In this conventional schedule table creating apparatus, a schedule for maintenance work is allocated according to the processing procedure shown in FIG. That is, first, in step S1, the actual workable time of each worker who belongs to the sales office 3 is extracted, and in step S2, the work of the building whose work date is specified among the buildings to be maintained is specified on the specified date, for example, It is set to be performed on the first date, and in step S3, a building that requires two people's work, that is, two workers to work together is assigned to the workers, and the name of the building is "B 1 ". , "B 2 " is displayed in the display field 25a for the worker's name "a", and when the work time in this display field 25a reaches a predetermined time,
Allocating another building that requires two people to other workers,
The name "B 10" of the other building is displayed on the display section 25b of the other workers of the name "b". In this way, the two-person work is allocated on the first date and displayed in the display columns 25a-2.
After displaying on 5c, 2 on any other date as step S4
The human work is sequentially allocated and displayed in the display columns 25d to 25n. Next, in step S5, one worker is assigned to the worker who has the remaining workable time on the first date, that is, the building in which one worker is assigned is assigned to the display field 25.
After displaying in a to 25c, in step S6, one person's work is sequentially allocated on other dates, and the display columns 25d to 2 are displayed.
Display on 5n. As a result, since the schedule can be automatically created and displayed on the display unit 17, it is possible to save the troublesome preparation of the schedule.

【0011】このような表示部17の表示に基づいて作
業管理者は、各作業者の資格や作業時間、ビルの所在
地、およびビルの作業候補日、すなわち前回の作業日か
ら所定の日数が経過した日の前後数日を考慮しながら、
保守作業の割り付けを最終的に決定するようになってい
る。そして、表示部17で表示されるデータのうち、作
業内容を除くデータを電話回線2を介して監視センタ1
に送信し、この監視センタ1は前記の送信データを記憶
部4で記憶する。このとき、記憶部4は、以前に記憶し
たビルの名称を消去して新たなデータを格納することか
ら、記憶部4には所定期間、例えば1ヵ月間に保守作業
が予定されるビルの名称が日付、地域ごとに分類された
状態で記憶される。この記憶されたデータ、および他の
データに基づいて次の月の作業予定データを作成するよ
うになっている。
Based on the display on the display unit 17, the work manager determines that the qualifications and working time of each worker, the location of the building, and the candidate work date of the building, that is, a predetermined number of days have passed since the last working day. Considering several days before and after the day,
The assignment of maintenance work is finally decided. Then, of the data displayed on the display unit 17, the data excluding the work content is sent to the monitoring center 1 via the telephone line 2.
The monitoring center 1 stores the transmission data in the storage unit 4. At this time, since the storage unit 4 deletes the previously stored building name and stores new data, the storage unit 4 stores the name of the building scheduled for maintenance work for a predetermined period, for example, one month. Are stored in a state of being sorted by date and region. Work schedule data for the next month is created based on this stored data and other data.

【0012】[0012]

【発明が解決しようとする課題】ところで、一般にビル
の保守作業を行なう作業員間にはかなりの格差、例えば
保守作業の対象となるビルの構造、入居者、および保守
作業を要する設備機器の設置状況等について熟知の度合
いに差があることから、保守作業の効率を考慮した場
合、保守作業の対象となるビルについて熟知した作業員
を選択的に割り付けることが望ましい。
By the way, generally, there is a considerable disparity among workers who perform maintenance work on buildings, for example, the structure of the building subject to the maintenance work, the occupants, and the installation of equipment and devices requiring maintenance work. Considering the efficiency of maintenance work, it is desirable to selectively assign workers who are familiar with the building that is the target of maintenance work, because there is a difference in the degree of familiarity with the situation.

【0013】しかしながら、上述した従来の予定表作成
装置では、ビルの保守作業に必要な人数の作業員を各作
業員の配列順にしたがって機械的に選定して割り付ける
ので、前記のビルと作業員との組合せが不適切な場合が
あり、そのため作業管理者が前記のビルと作業員との組
合せを修正することにより、各作業員がよく熟知してい
るビルを選定して割り付ける必要があった。したがっ
て、作業管理者はかなり大きな手間と時間を要し、大き
な負担となるという問題があった。
However, in the above-mentioned conventional schedule making apparatus, the number of workers required for the maintenance work of the building is mechanically selected and assigned according to the arrangement order of each worker. In some cases, the work manager may have to select and allocate a building that each worker is familiar with by correcting the combination of the building and the worker as described above. Therefore, there is a problem in that the work manager requires a considerable amount of time and labor and is a heavy burden.

【0014】本発明はこのような従来技術における実情
に鑑みてなされたもので、その目的は、保守作業の対象
となるビルと当該ビルに割り当てられる作業員との組み
合わせの修正が少なくて済む予定表を自動的に作成する
ことのできるビル保守作業の予定表作成装置を提供する
ことにある。
The present invention has been made in view of the actual situation in the prior art as described above, and an object of the present invention is to modify the combination of a building to be subjected to maintenance work and a worker assigned to the building with few modifications. An object of the present invention is to provide a schedule creation device for building maintenance work that can automatically create a table.

【0015】[0015]

【課題を解決するための手段】この目的を達成するため
に本発明は、複数のビルの保守作業を行なう複数の作業
員の作業上の資格に関する情報、および前記作業員の所
定期間中の勤務予定に関する情報を記憶する個人情報記
憶部と、前記ビルに関する種々の情報を記憶する現場情
報記憶部と、これらの個人情報記憶部および現場情報記
憶部でそれぞれ記憶される情報に基づいて前記ビルの保
守作業に前記作業員のうちの少なくとも1人を割り付け
るスケジュール割付処理部と、このスケジュール割付処
理部から出力される処理結果に基づいて所定期間中の日
付、保守作業の対象となるビルの名称、および当該ビル
の保守作業に割り付けられる作業員の名前を表示する表
示部とを備えたビル保守作業の予定表作成装置におい
て、前記保守作業の対象となるビルと当該ビルの保守作
業に割り付けられる作業員との組合せの適否に関する情
報を記憶する割付作業者情報記憶部と、この割付作業者
情報記憶部に記憶される情報に基づいて前記保守作業の
対象となるビル毎に前記作業員の適応性の順位を設定す
る順位設定手段とを設けた構成にしてある。
In order to achieve this object, the present invention provides information on work qualifications of a plurality of workers who perform maintenance work on a plurality of buildings, and the work of the workers during a predetermined period. A personal information storage unit that stores information about a schedule, a site information storage unit that stores various kinds of information about the building, and a personal information storage unit for the building based on the information stored in each of the personal information storage unit and the site information storage unit. A schedule allocation processing unit that allocates at least one of the workers to the maintenance work, a date during a predetermined period based on the processing result output from the schedule allocation processing unit, the name of the building that is the target of the maintenance work, In the building maintenance work schedule creation device including a display unit that displays the names of workers assigned to the maintenance work of the building, An allocation worker information storage unit that stores information about suitability of a combination of an elephant building and a worker assigned to maintenance work of the building, and the maintenance based on the information stored in the allocation worker information storage unit. An order setting means for setting the order of adaptability of the worker is provided for each building to be worked.

【0016】[0016]

【作用】本発明は上記のように構成したので、スケジュ
ール情報記憶部は、保守作業の対象となるビルと当該ビ
ルの保守作業に割り付けられる作業員との組合せの適否
に関する情報を記憶しており、ビルの保守作業に割り付
ける際、前記の情報に基づいて前記のビルと作業員の組
合せの適否を判定し、順位設定手段により保守作業の対
象となるビル毎に前記の作業員の適応性の順位を設定
し、この順位に応じてスケジュール割付処理部により、
前記のビルの保守作業に作業員を割り付ける。これによ
って、保守作業の対象となるビルについて熟知した作業
員を選択的に割り付けてビル保守作業の予定表を作成で
きることから、この予定表に基づいて作業管理者が作業
員の割り付けを最終的に決定する際、この作業員とビル
との組み合わせの修正が少なくて済む。
Since the present invention is configured as described above, the schedule information storage unit stores information on the suitability of the combination of the building subject to the maintenance work and the workers assigned to the maintenance work of the building. When assigning to the maintenance work of the building, the suitability of the combination of the building and the worker is determined based on the information, and the order setting means determines the adaptability of the worker for each building to be the maintenance work. Set the ranking and according to this ranking, the schedule allocation processing unit
Allocate workers for the above-mentioned building maintenance work. As a result, it is possible to create a schedule for building maintenance work by selectively allocating workers who are familiar with the building that is the target of maintenance work, and based on this schedule, the work manager finally assigns workers. When making a decision, the number of modifications to the combination of this worker and the building is small.

【0017】[0017]

【実施例】以下、本発明のビル保守作業の予定表作成装
置の実施例を図に基づいて説明する。図1は本発明のビ
ル保守作業の予定表作成装置の一実施例を備えた遠隔監
視装置の全体構成を示すブロック図、図2は図1の予定
表作成装置に設けられる割付作業者情報記憶部の記憶内
容を説明する図、図3は図1の予定表作成装置の処理手
順を示すフローチャートである。なお、図1および図2
において前述した図4、図5および図6に示すものと同
等のものには同一符号を付してある。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a building maintenance schedule table of the present invention will be described below with reference to the drawings. FIG. 1 is a block diagram showing an overall configuration of a remote monitoring device including an embodiment of a building maintenance schedule table according to the present invention, and FIG. 2 is an allocation worker information storage provided in the schedule schedule apparatus of FIG. FIG. 3 is a diagram for explaining the stored contents of the unit, and FIG. 3 is a flowchart showing the processing procedure of the schedule table creating apparatus of FIG. 1 and 2
In FIG. 4, the same components as those shown in FIGS. 4, 5 and 6 described above are designated by the same reference numerals.

【0018】図1に示す本実施例の予定表作成装置31
は、前述した図4および図6に示すものと比べて、現場
情報処理部14aに接続される割付作業者情報記憶部2
2を有している。そして、前記の現場情報処理部14a
は、割付作業者情報記憶部22に記憶される情報に基づ
いて保守作業の対象となるビル毎に作業員の適応性の順
位を設定する順位設定手段を構成している。その他の構
成は、前述した図4および図6に示すものと同様であ
る。
The schedule creation device 31 of this embodiment shown in FIG.
Compared with the ones shown in FIGS. 4 and 6 described above, the allocation operator information storage unit 2 connected to the on-site information processing unit 14a.
Have two. Then, the above-mentioned on-site information processing unit 14a
Configures order setting means for setting the order of adaptability of workers for each building subject to maintenance work based on the information stored in the assigned worker information storage unit 22. Other configurations are the same as those shown in FIGS. 4 and 6 described above.

【0019】前記の割付作業者情報記憶部32は、図2
で説明するように、保守作業の対象となるビルと当該ビ
ルの保守作業に割り付けられる作業員との組合せの適否
に関する情報を数値として記憶するようになっている。
すなわち、図2の左側の欄には、ビルの名称「B1」〜
「Bn」が配列され、図2の上部の欄には、作業者の氏
名「a」〜「p」が配列され、その他の欄には、これら
のビルと作業員との組み合わせの適否を示す数値が配置
されている。この組み合わせの適否を示す数値は、大き
ければ大きい程、ビルと作業者との組み合わせがより適
切であり、反対に前記の数値が小さいものである程、ビ
ルと作業者との組み合わせが適切でないことを示してい
る。
The allocation operator information storage unit 32 is shown in FIG.
As will be described later, the information about the suitability of the combination of the building to be the maintenance work and the workers assigned to the maintenance work of the building is stored as a numerical value.
That is, the left column of FIG. 2, the name of the building "B 1" -
“Bn” is arranged, the names of the workers “a” to “p” are arranged in the upper column of FIG. 2, and the other columns show the suitability of the combination of these buildings and workers. Numerical values are arranged. The larger the numerical value indicating the suitability of this combination, the more appropriate the combination of the building and the worker, and conversely, the smaller the numerical value, the less appropriate the combination of the building and the worker. Is shown.

【0020】そして、予定表作成装置31の表示部17
により表示される予定表に基づいて、作業管理者が作業
員の割り付けを最終的に決定する際、前記のビルに自動
的に割り付けられた作業員を変更した場合、この組み合
わせを外された作業員に対して数値「−1」を加算し、
一方、外された作業員に代わる別の作業員に対して数値
「+1」を加算して、これらの加算された数値を割付作
業者情報記憶部32で再び記憶するようになっている。
例えば名称「B3」のビルと氏名「a」の作業者との組
み合わせの適否を示す数値「−8」は、この氏名「a」
の作業者は少なくとも8回、名称「B3」のビルとの組
み合わせを外されたことを意味している。
Then, the display unit 17 of the schedule creation device 31.
When the work manager finally decides the assignment of workers based on the schedule displayed by, if the workers automatically assigned to the building are changed, the work that has been removed from this combination Add the numerical value "-1" to the member,
On the other hand, the numerical value "+1" is added to another worker in place of the removed worker, and these added numerical values are stored again in the assigned worker information storage unit 32.
For example, a name "B 3" numerical value "-8" indicating the appropriateness of the combination of the operator of the building and name "a", the name "a"
Of the worker at least eight times, which means that it has been removed the combination of the building of the name "B 3".

【0021】この実施例にあっては、例えば、前述した
図7に示す手順S4の未割付日へ2人作業を割り付ける
際、次のような手順で当該割り付け処理を行なうように
なっている。すなわち、スケジュール割付処理部14c
により残りの2人作業のビル、すなわち2人で組んで作
業すべきビルのうちの先頭順位のものを現場情報処理部
14aに問い合わせ、この現場情報処理部14aは先頭
順位のビルと、このビルの作業候補日とをスケジュール
割付処理部14cに返答する。この返答に基づいて、ス
ケジュール割付処理部14cは、前記の先頭順位のビル
の割付日と2人の作業員(例えば責任者および同伴者)
とを決定し、これらの割付日および作業員により特定さ
れる欄に前記の先頭のビルを割り付けて、これらの情報
をスケジュール情報記憶部13に書き込む。次いで、前
記の2人の作業員(すなわち作業責任者および同伴者)
の残りの実働可能時間を計算し、この残りの実働可能時
間内で作業可能なビルがあるか否かを現場情報処理部1
4aに問い合わせる。このとき現場情報処理部14aが
作業可能なビルがあると判断する場合、この作業可能な
ビルを返答し、これに伴い、スケジュール割付処理部1
4cは、前記の割付日および作業員により特定される欄
に前記の作業可能なビルを割り付けて、これらの情報を
スケジュール情報記憶部13に書き込む。
In this embodiment, for example, when allocating a two-person work to an unallocated day in step S4 shown in FIG. 7, the allocation process is performed in the following procedure. That is, the schedule allocation processing unit 14c
Asks the on-site information processing unit 14a about the remaining two-person working building, that is, the building of the first rank among the buildings to be assembled by two people. And the work candidate date of No. 1 to the schedule assignment processing unit 14c. Based on this reply, the schedule allocation processing unit 14c determines the allocation date of the building in the top order and two workers (for example, a manager and a companion).
Is determined, the above-mentioned building is allocated to the fields specified by the allocation date and the worker, and these pieces of information are written in the schedule information storage unit 13. Then the two workers mentioned above (ie work manager and companion)
Of the remaining workable hours of the building is calculated, and it is determined whether or not there is a building that can work within the remaining workable time of the site.
Contact 4a. At this time, when the on-site information processing unit 14a determines that there is a workable building, this workable building is returned, and along with this, the schedule allocation processing unit 1
4c allocates the workable buildings to the fields specified by the allocation date and the worker, and writes these pieces of information in the schedule information storage unit 13.

【0022】そして本実施例では、前記の2人の作業員
(すなわち作業責任者および同伴者)を決定する処理を
図3に示す処理手順にしたがって行なうようになってい
る。すなわち、手順S11として、現場情報処理部14
aから前記のように2人作業のビルとこのビルの作業候
補日とが返答されたとき、この作業候補日は最も適切な
候補日から順に並べられているので、スケジュール割付
処理部14cは前記の作業候補日の中から第1番目の候
補日を取出して、手順S12としてこの第1番目の候補
日に作業可能な作業責任者の候補者グループを決める処
理を行ない、手順S13として作業責任者の候補者グル
ープが決定されたと判定されるとき、手順S14として
前記のグループ中の作業責任者を次のように並べ替え
る。
In the present embodiment, the process for determining the two workers (that is, the work manager and the companion) is performed according to the process procedure shown in FIG. That is, as step S11, the on-site information processing unit 14
When a building for two-person work and a candidate work date for this building are replied from a as described above, the candidate work dates are arranged in order from the most appropriate candidate date. The first candidate date is extracted from the candidate work days, and the process of determining the candidate group of the work managers who can work on the first candidate day is performed as step S12, and the work manager is performed as step S13. When it is determined that the candidate group is determined, the work managers in the group are rearranged as follows in step S14.

【0023】この手順S14では、まずスケジュール割
付処理部14cは、前記の2人作業のビルに関して、前
記のグループ中の各作業責任者の作業の熟知の度合いを
現場情報処理部14aに対して問い合わせた後、この現
場情報処理部14aは、割付作業者情報記憶部32で記
憶されるビルと作業員との組合せの適否を示す数値を読
み出し、この数値の大きい順に作業責任者を並べて、こ
の情報をスケジュール割付処理部14cへ送り出す。こ
れにより、前記のグループ中の各作業責任者は、保守作
業の対象となるビルに適応する順に並べられる。その結
果、割付作業者情報記憶部32に記憶される情報に基づ
いて保守作業の対象となるビル毎に作業員の適応性の順
位が設定される。
In step S14, the schedule allocation processing section 14c first inquires of the on-site information processing section 14a about the degree of familiarity with the work of each work manager in the above-mentioned group regarding the above-mentioned two-person work building. After that, the on-site information processing unit 14a reads the numerical value indicating the suitability of the combination of the building and the worker stored in the assigned worker information storage unit 32, arranges the work managers in descending order of this numerical value, and reads this information. Is sent to the schedule allocation processing unit 14c. As a result, the work managers in the group are arranged in an order suitable for the building that is the target of the maintenance work. As a result, based on the information stored in the assigned worker information storage unit 32, the rank of the worker's adaptability is set for each building targeted for maintenance work.

【0024】次いで、手順S15として、前記の手順S
12と同様に前記の第1番目の候補日に作業可能な同伴
者の候補者グループを決める処理を行ない、手順S16
として、前記の手順S13と同様に前記の同伴者の候補
者グループが決定されたと判定されるとき、手順S17
として、前記の手順S14と同様に前記のグループ中の
同伴者を保守作業の対象となるビルに適応する順に並べ
替える。
Then, as step S15, the above step S
Similar to step 12, the process of determining the candidate group of the companion who can work on the first candidate day is performed, and step S16 is performed.
When it is determined that the candidate group of the companion has been determined as in step S13, step S17
As in step S14, the companions in the group are rearranged in the order in which they are applied to the building to be subjected to the maintenance work.

【0025】次いで、手順S13としてスケジュール割
付処理部14cは、前記の各候補者グループの中の作業
責任者および同伴者の実働可能時間の差が最小となる組
み合わせを演算して選び出し、この組み合わせの2人の
作業員(すなわち作業責任者および同伴者)に決定す
る。
Then, in step S13, the schedule allocation processing section 14c calculates and selects a combination that minimizes the difference in the actual workable time of the work manager and the accompanying person in each of the candidate groups, and selects this combination. Decide on two workers (that is, the work manager and the companion).

【0026】一方、前記の手順S13で第1番目の候補
日に作業可能な作業責任者の候補者グループが決定され
ないと判定した場合、手順S19として他の候補日があ
るか否かを判定し、この他の候補日がある場合、手順S
20としてこの候補日を取り出して、前記の手順S12
から順次処理を行なう。また、前記の手順S16で第1
番目の候補日に作業可能な同伴者の候補者グループが決
定されないと判定した場合も同様である。さらに、前記
の手順S19で第2番目以降の候補日がないと判定した
場合、一連の割付処理を終了し、作業管理者が手動によ
り、例えば実働可能時間を延長する等の処理を行ない、
前記の2人作業を割り付けるようになっている。
On the other hand, when it is determined in step S13 that the candidate group of work managers who can work on the first candidate day is not determined, it is determined in step S19 whether there is another candidate day. , If there are other candidate dates, go to step S
This candidate date is taken out as 20, and the procedure S12 is executed.
The processing is sequentially performed from. In step S16, the first
The same applies when it is determined that the candidate group of companions who can work on the second candidate day is not determined. Furthermore, when it is determined in the above step S19 that there is no second or subsequent candidate date, the series of allocation processing is terminated, and the work manager manually performs processing such as extending the actual workable time,
The above two-person work is assigned.

【0027】このようにして2人の作業員(すなわち作
業責任者および同伴者)を決定する処理を行なった後、
表示部17で表示される予定表に基づいて、作業管理者
は必要に応じて前記の作業責任者および同伴者の組み合
わせを修正する。これに伴い、上述したように保守作業
の対象となるビルに自動的に割り付けられた作業員を変
更した場合、この組み合わせを外された作業員に対して
数値「−1」を加算し、一方、外された作業員に代わる
別の作業員に対して数値「+1」を加算して、これらの
加算された数値を割付作業者情報記憶部32で再び記憶
するようになっている。
After performing the processing for determining the two workers (that is, the work manager and the companion) in this way,
Based on the schedule displayed on the display unit 17, the work manager corrects the combination of the work manager and the companion as needed. Along with this, when the workers automatically assigned to the building subject to maintenance work are changed as described above, the numerical value "-1" is added to the workers who have been excluded from this combination, while The number “+1” is added to another worker in place of the removed worker, and the added worker numbers are stored again in the assigned worker information storage unit 32.

【0028】このように構成した実施例では、割付作業
者情報記憶部32で記憶される各ビルに対する作業員の
適応性の順位に基づいてビルと作業員の組合せの適否を
自動的に判定し、スケジュール割付処理部14cによ
り、保守作業の対象となるビルについて熟知した作業員
を選択的に割り付けて予定表を作成し、この予定表を表
示部17で表示するので、この予定表に基づいて作業管
理者が作業員の割り付けを最終的に決定する際、この作
業員とビルとの組み合わせの修正が少なくて済む。この
ため作業員の割り付けを容易に、かつ迅速に決定するこ
とができるので、作業管理者の手間や時間をかなり少な
くすることができる。また、前記の予定表を作成する回
数が増えれば増える程、割付作業者情報記憶部32で記
憶される情報の精度を向上させることができ、これによ
って、作業管理者が作業員の割り付けを修正させる必要
性がさらに小さくなる。
In the embodiment constructed as described above, the suitability of the combination of the building and the worker is automatically determined based on the rank of the worker's adaptability to each building stored in the assigned worker information storage unit 32. The schedule allocation processing unit 14c selectively allocates a worker who is familiar with the target building for the maintenance work to create a schedule, and the schedule is displayed on the display unit 17. Therefore, based on the schedule. When the work manager finally decides the assignment of the worker, the correction of the combination of the worker and the building is small. For this reason, the assignment of the workers can be determined easily and quickly, and the labor and time of the work manager can be considerably reduced. Further, as the number of times the schedule table is created increases, the accuracy of the information stored in the allocated worker information storage unit 32 can be improved, whereby the work manager corrects the worker allocation. The need to do this becomes even smaller.

【0029】なお、本実施例では、前述した図7に示す
手順S4として未割付日へ2人作業を割り付ける処理を
行なう場合を例示したが、同様な手順で他の手順S2、
S3、S5、S6の割り付け処理を行なうこともでき
る。さらに、割付作業者情報記憶部32で記憶されるデ
ータ、すなわち、ビルと作業員との組み合わせの適否を
示す数値が所定の負の数値に達する場合、前記のビルと
作業員の組み合わせを禁止するようにデータを設定して
もよい。
In the present embodiment, as the procedure S4 shown in FIG. 7 described above, the case where the process of allocating the work by two persons to the unallocated day is performed is exemplified, but the other procedures S2,
The allocation process of S3, S5, S6 can also be performed. Further, when the data stored in the assigned worker information storage unit 32, that is, the numerical value indicating the suitability of the combination of the building and the worker reaches a predetermined negative numerical value, the combination of the building and the worker is prohibited. The data may be set as follows.

【0030】[0030]

【発明の効果】本発明は以上のように構成したので、保
守作業の対象となるビルと当該ビルに割り当てられる作
業員との組み合わせの修正が少なくて済む予定表を自動
的に作成することができる。したがって、作業管理者が
作業員の割り付けを容易に、かつ迅速に決定することが
できる。
Since the present invention is configured as described above, it is possible to automatically create a schedule that requires less modification of the combination of the building to be maintained and the workers assigned to the building. it can. Therefore, the work manager can easily and quickly determine the worker assignment.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明のビル保守作業の予定表作成装置の一実
施例を備えた遠隔監視装置の全体構成を示すブロック図
である。
FIG. 1 is a block diagram showing an overall configuration of a remote monitoring device including an embodiment of a building maintenance schedule table according to the present invention.

【図2】図1の予定表作成装置に設けられる割付作業者
情報記憶部の記憶内容を説明する図である。
FIG. 2 is a diagram for explaining the storage contents of an allocation operator information storage unit provided in the schedule table creation device of FIG.

【図3】図1の予定表作成装置の処理手順を示すフロー
チャートである。
FIG. 3 is a flowchart showing a processing procedure of the schedule table creating apparatus of FIG.

【図4】従来のビル保守作業の予定表作成装置を備える
遠隔監視装置の全体構成を示すブロック図である。
FIG. 4 is a block diagram showing an overall configuration of a remote monitoring device including a conventional schedule table preparation device for building maintenance work.

【図5】図4の予定表作成装置により作成される予定表
を示す説明図である。
5 is an explanatory diagram showing a schedule created by the schedule creation device of FIG. 4. FIG.

【図6】図4の予定表作成装置の構成を示すブロック図
である。
FIG. 6 is a block diagram showing a configuration of the schedule table creating apparatus of FIG.

【図7】図4の予定表作成装置の処理手順を示すフロー
チャートである。
FIG. 7 is a flowchart showing a processing procedure of the schedule table creating apparatus of FIG.

【符号の説明】[Explanation of symbols]

1 監視センタ 2 電話回線 3 営業所 11 現場情報記憶部 12 個人情報記憶部 13 スケジュール情報記憶部 14 情報処理手段 14a 現場情報処理部(順位設定手段) 17 表示部 31 予定表作成装置 32 割付作業者情報記憶部 1 Monitoring Center 2 Telephone Line 3 Sales Office 11 On-site Information Storage 12 Personal Information Storage 13 Schedule Information Storage 14 Information Processing Means 14a On-site Information Processing (Order Setting Means) 17 Display 31 Schedule Creation Device 32 Allocation Worker Information storage

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 複数のビルの保守作業を行なう複数の作
業員の作業上の資格に関する情報、および前記作業員の
所定期間中の勤務予定に関する情報を記憶する個人情報
記憶部と、前記ビルに関する種々の情報を記憶する現場
情報記憶部と、これらの個人情報記憶部および現場情報
記憶部でそれぞれ記憶される情報に基づいて前記ビルの
保守作業に前記作業員のうちの少なくとも1人を割り付
けるスケジュール割付処理部と、このスケジュール割付
処理部から出力される処理結果に基づいて所定期間中の
日付、保守作業の対象となるビルの名称、および当該ビ
ルの保守作業に割り付けられる作業員の名前を表示する
表示部とを備えたビル保守作業の予定表作成装置におい
て、前記保守作業の対象となるビルと当該ビルの保守作
業に割り付けられる作業員との組合せの適否に関する情
報を記憶する割付作業者情報記憶部と、この割付作業者
情報記憶部に記憶される情報に基づいて前記保守作業の
対象となるビル毎に前記作業員の適応性の順位を設定す
る順位設定手段とを設けたことを特徴とするビル保守作
業の予定表作成装置。
1. A personal information storage unit for storing information on work qualifications of a plurality of workers who perform maintenance work on a plurality of buildings, and information on a work schedule of the workers during a predetermined period, and the building. A site information storage unit that stores various kinds of information, and a schedule that allocates at least one of the workers to the maintenance work of the building based on the information stored in each of the personal information storage unit and the site information storage unit. Displays the allocation processing unit and the date during a predetermined period based on the processing results output from this schedule allocation processing unit, the name of the building subject to maintenance work, and the name of the worker assigned to the maintenance work of the building In the building maintenance work schedule creation device having a display unit for performing the maintenance work, the building to be subjected to the maintenance work and the maintenance work of the building are allocated. An allocation worker information storage unit that stores information regarding the suitability of a combination with a worker, and an adaptation of the worker for each building that is the target of the maintenance work based on the information stored in the allocation worker information storage unit. An apparatus for creating a schedule for building maintenance work, which is provided with an order setting means for setting the order of gender.
【請求項2】 割付作業者情報記憶部が、保守作業の対
象となるビルと当該ビルの保守作業に割り付けられる作
業員との組合せの適否に関する情報を数値として記憶す
るようにしたことを特徴とする請求項1記載のビル保守
作業の予定表作成装置。
2. The assigned worker information storage unit stores, as a numerical value, information regarding the suitability of a combination of a building to be maintained and a worker assigned to the maintenance work of the building. The schedule creation device for building maintenance work according to claim 1.
JP15738593A 1993-06-28 1993-06-28 Schedule making device for building maintenance work Pending JPH0736969A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15738593A JPH0736969A (en) 1993-06-28 1993-06-28 Schedule making device for building maintenance work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15738593A JPH0736969A (en) 1993-06-28 1993-06-28 Schedule making device for building maintenance work

Publications (1)

Publication Number Publication Date
JPH0736969A true JPH0736969A (en) 1995-02-07

Family

ID=15648492

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15738593A Pending JPH0736969A (en) 1993-06-28 1993-06-28 Schedule making device for building maintenance work

Country Status (1)

Country Link
JP (1) JPH0736969A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003108827A (en) * 2001-09-28 2003-04-11 Mazda Motor Corp Information processing method, information processing device, information processing program, and recording medium recording the same information processing program
JP2003108828A (en) * 2001-09-28 2003-04-11 Mazda Motor Corp Information processing method, information processing device, information processing program, and recording medium recording the same information processing program
JP2003187062A (en) * 2001-12-20 2003-07-04 Tokyo Nissan Auto Sales Co Ltd Business support system
JP2003242336A (en) * 2002-02-18 2003-08-29 Tokyo Nissan Auto Sales Co Ltd System for managing customer service information

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003108827A (en) * 2001-09-28 2003-04-11 Mazda Motor Corp Information processing method, information processing device, information processing program, and recording medium recording the same information processing program
JP2003108828A (en) * 2001-09-28 2003-04-11 Mazda Motor Corp Information processing method, information processing device, information processing program, and recording medium recording the same information processing program
JP2003187062A (en) * 2001-12-20 2003-07-04 Tokyo Nissan Auto Sales Co Ltd Business support system
JP2003242336A (en) * 2002-02-18 2003-08-29 Tokyo Nissan Auto Sales Co Ltd System for managing customer service information

Similar Documents

Publication Publication Date Title
JPH04191974A (en) Maintenance patrol work table preparing device
JPH0736969A (en) Schedule making device for building maintenance work
JPH1027200A (en) Generation device for maintenance patrol operation table
JP2845298B2 (en) Maintenance patrol work table creation device
JPH07325858A (en) Maintenance cyclic operation table preparation device
JP2760414B2 (en) Maintenance patrol work table creation device
JP2793889B2 (en) Building patrol maintenance work table creation device
JP3080470B2 (en) Maintenance patrol work table creation device
JPH07219993A (en) Preparing device for maintenance patrol work table
JP3056325B2 (en) Maintenance patrol work table creation device
JPH06139485A (en) Maintenance patrol work table preparing device
JP2793885B2 (en) Building patrol maintenance work table creation device
JPH06223075A (en) Maintenance patrol work table generating device
JP2762408B2 (en) Maintenance patrol work table creation device
JP2912987B2 (en) Maintenance patrol work table creation device
JPH07311803A (en) Maintenance patrol job table producing device
JPH07210596A (en) Preparing device for maintenance patorol work table
JP2708919B2 (en) Building patrol maintenance work table creation device
JP2831438B2 (en) Building patrol maintenance work table creation device
JP2728140B2 (en) Building patrol maintenance work table creation device
JPH07302282A (en) Maintenance patrol work table preparing device
JPH06332904A (en) Preparing device for maintenance patrol work table
JP2845297B2 (en) Maintenance patrol work table creation device
JPH0822493A (en) Preparation device for maintenance patrol operation table
JP3248952B2 (en) Maintenance patrol work table creation device