JP2845298B2 - Maintenance patrol work table creation device - Google Patents

Maintenance patrol work table creation device

Info

Publication number
JP2845298B2
JP2845298B2 JP30381591A JP30381591A JP2845298B2 JP 2845298 B2 JP2845298 B2 JP 2845298B2 JP 30381591 A JP30381591 A JP 30381591A JP 30381591 A JP30381591 A JP 30381591A JP 2845298 B2 JP2845298 B2 JP 2845298B2
Authority
JP
Japan
Prior art keywords
work
business trip
days
day
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP30381591A
Other languages
Japanese (ja)
Other versions
JPH05120291A (en
Inventor
正喜 本間
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP30381591A priority Critical patent/JP2845298B2/en
Publication of JPH05120291A publication Critical patent/JPH05120291A/en
Application granted granted Critical
Publication of JP2845298B2 publication Critical patent/JP2845298B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Time Recorders, Dirve Recorders, Access Control (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は保守巡回作業表作成装置
に係り、特に保守契約を締結した顧客建造物(以下ビル
という)に、保守点検作業のために作業員を巡回させる
ための保守巡回作業表を作成する保守巡回作業表作成装
置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a maintenance patrol work table creating apparatus, and more particularly to a maintenance patrol for allowing a customer building (hereinafter referred to as a "building") for which a maintenance contract has been concluded to patrol workers for maintenance and inspection work. The present invention relates to a maintenance patrol work table creation device that creates a work table.

【0002】[0002]

【従来の技術】ビルには、エレベータ、マンコンベア、
火災報知器など各種の設備機器が設置されていて、これ
らの設備機器が故障すると当該ビルの居住者や当該ビル
の出入人に、多大の支承を来すことになり、故障の類似
によっては人命に関わる重大事故を誘起するおそれもあ
る。このような事態の発生を防止するために、ビルの管
理を委託された保守会社では、管理すべきビルに専門の
作業員を定期的に巡回させて、設備機器の保守点検や修
理・調整を行なっている。このような定期巡回を行なう
ために、保守会社の各地区の営業所では、予め一ヶ月単
位で巡回すべきビル名、作業員名、巡回日を特定する保
守巡回作業表を作成している。
2. Description of the Related Art Buildings include elevators, man conveyors,
Various types of equipment such as fire alarms are installed, and if these equipments break down, resident of the building and people entering and exiting the building will receive a great deal of support. It may cause a serious accident related to In order to prevent such a situation from occurring, a maintenance company outsourced to building management regularly dispatches specialized workers to the building to be managed to perform maintenance inspections and repair / adjustment of equipment. I do. In order to perform such periodic patrols, the sales offices in each district of the maintenance company have previously created a maintenance patrol work table that specifies the names of buildings, workers, and patrol dates to be patroled on a monthly basis.

【0003】従来、この保守巡回作業表は、日付ボード
にビル名板や作業員名板を磁石で吸着させて、巡回すべ
きビル名、作業員名、巡回日を特定する保守巡回作業表
を作成していた。しかし、この従来の作成法では、かな
り熟練した巡回表作成者でも、何度かビル名板や作業員
名板を並べて直し、最適な保守巡回作業表が得られるの
が現状で、巡回表作成者には多大の負担がかかる。
Conventionally, this maintenance patrol work table is a maintenance patrol work table that specifies a building name, a worker name, and a patrol date to be patrol by adhering a building name plate or a worker name plate to a date board with a magnet. Had been created. However, with this conventional method, even the most skilled patrol table creator can rearrange the building name plate and worker name plate several times to obtain the optimal maintenance patrol work table. Burdens the person.

【0004】この問題を解決するために、本願の出願人
は特願平2−321145号により、自動的な割り付け
ができる保守巡回作業表作成装置を提案している。図1
3及び図14は、提案に係る保守巡回作業表作成装置の
構成を示す図で、図13に示すように、ビルのデータ処
理を総括して行なうセンタ1と保守会社の複数の営業所
2とが、通信回線3で互いに接続してある。センタ1
は、各営業所の管轄するビルの保守データを総括的に格
納する記憶部1aと、この記憶部1aに接続する送受信
装置1bとを具備し、営業所2は送受信装置2sと作業
表作成部10とを具備している。この作業表作成部10
は、現場情報記憶部11、表示部15、入力部16、個
人情報記憶部12、制御部14及びスケジュール情報記
憶部13を具備し、制御部14に、現場情報記憶部1
1、二つの表示領域を持つ表示部15、キーボードなど
の入力部16、個人情報記憶部12及びスケジュール情
報記憶部13が接続してあり、入力部16に表示部15
が接続してある。また、送受信装置2sが制御部14に
接続してあり、送受信装置2sとセンタ1の送受信装置
1bとが、通信回線3で互いに接続してある。
[0004] In order to solve this problem, the applicant of the present invention has proposed a maintenance patrol work table creating apparatus capable of automatic assignment according to Japanese Patent Application No. 2-321145. FIG.
3 and FIG. 14 are diagrams showing the configuration of a maintenance patrol work table creating apparatus according to the proposal. As shown in FIG. 13, a center 1 that performs overall data processing of a building and a plurality of sales offices 2 of a maintenance company are provided. Are connected to each other by a communication line 3. Center 1
Comprises a storage unit 1a for comprehensively storing the maintenance data of the building under the jurisdiction of each sales office, and a transmission / reception device 1b connected to the storage unit 1a. The sales office 2 includes a transmission / reception device 2s and a work table creation unit. 10 is provided. This work table creation unit 10
Comprises a site information storage unit 11, a display unit 15, an input unit 16, a personal information storage unit 12, a control unit 14, and a schedule information storage unit 13.
A display unit 15 having one or two display areas, an input unit 16 such as a keyboard, a personal information storage unit 12 and a schedule information storage unit 13 are connected to each other.
Is connected. Further, the transmission / reception device 2s is connected to the control unit 14, and the transmission / reception device 2s and the transmission / reception device 1b of the center 1 are connected to each other via the communication line 3.

【0005】ここで、現場情報記憶部11は、巡回月の
作業対象ビル名、作業内容、前回作業日、契約保守回数
を格納する機能を有し、個人情報記憶部12は、巡回月
の作業員の勤務情報と作業資格を記憶する機能を有し、
スケジュール情報記憶部13は、表示部15に表示され
る表示内容を記憶する機能を有している。
The site information storage unit 11 has a function of storing the name of the building to be worked in the patrol month, the contents of the work, the last work day, and the number of contract maintenance. The personal information storage unit 12 stores the work of the patrol month. It has a function to memorize work information and work qualifications of employees,
The schedule information storage unit 13 has a function of storing display contents displayed on the display unit 15.

【0006】センタ1では、予め与えられたデータに基
づいて、記憶部1aに格納されている顧客データを、ビ
ルの存在地域毎、一人作業二人作業の種別毎に分類して
置く。この場合、標準の保守点検作業は一つのビルに対
して月2回、一人作業と二人作業を交互に行なうので、
同一ビル名を一人作業と二人作業の両方に分類する。
In the center 1, customer data stored in the storage unit 1a is classified and stored for each area where a building is located and for each type of one-person work and two-person work based on data given in advance. In this case, the standard maintenance and inspection work is performed twice a month for one building, and one person and two people work alternately.
Classify the same building name as both one-person and two-person.

【0007】図14に示すように、表示部15には第1
の表示領域15Aと第2の表示領域15Bとが設けてあ
り、営業所からの要求によって、前述のように分類され
た当該営業所2が担当するビル名B1、B2、・・・B
nが、通信回線3を介して送信されて第1の表示領域1
5Aに表示される。そして、制御部14が作動して、個
人情報記憶部12及び現場情報記憶部11のデータを参
照しながら、顧客が作業日を指定した指定現場を先ず割
り付け、作業員の残り作業時間及び資格をチェックしな
がら二人作業を割り付け、次いで一人作業を割り付け
る。
[0007] As shown in FIG.
, A display area 15A and a second display area 15B are provided, and the names of the buildings B1, B2,.
n is transmitted via the communication line 3 to the first display area 1
5A is displayed. Then, the control unit 14 operates to allocate a designated site where the customer has designated a work day first, referring to the data in the personal information storage unit 12 and the site information storage unit 11, and determine the remaining work time and qualification of the worker. Assign two-person work while checking, then assign one-person work.

【0008】[0008]

【発明が解決しようとする課題】前述の提案に係る保守
巡回作業表作成装置では、遠隔地へ出張して複数日にわ
たって保守点検作業を行なう場合の割り付けは配慮され
ておらず、このような事態が生じた場合は、指定現場の
割り付け、二人作業の割り付け及び一人作業の割り付け
の中で処理されていたので、割り付け終了後に手動作業
によって、出張現場の割り付けの修正が必要であった。
In the maintenance patrol work table creating apparatus according to the above-mentioned proposal, no consideration is given to the assignment when a business trip to a remote place is performed and maintenance and inspection work is performed over a plurality of days. When the problem occurred, it was processed during the assignment of the designated site, the assignment of two people, and the assignment of one person. Therefore, it was necessary to correct the assignment at the business trip site by manual work after the assignment was completed.

【0009】本発明は、前述したようなこの種の保守巡
回作業表作成の現状に鑑みてなされたものであり、その
目的は複数日にわたって出張して保守点検作業を行なう
場合の割り付けも自動的に行なうことができる保守巡回
作業表作成装置を提供することにある。
The present invention has been made in view of the above-described current situation of creating a maintenance patrol work table as described above. It is an object of the present invention to provide a maintenance patrol work table creating device which can be carried out at any time.

【0010】[0010]

【課題を解決するための手段】前記目的を達成するため
に、本発明は、作業表を作成する所定期間内の日付と保
守巡回作業を行なう作業員名とで特定される欄を有する
表示部を具備する保守巡回作業表作成装置において、前
記作業員の前記所定期間内の勤務情報及び前記作業員の
作業上の資格が格納された作業員データ記憶部と、前記
所定期間内に作業対象となるビル名、作業内容、指定作
業日及び契約条件を記憶するビルデータ記憶部と、この
ビルデータ記憶部から出張作業が必要な出張ビル名を抽
出する抽出手段と、前記出張ビル名を同一地域毎に区分
する区分手段と、この区分手段で区分された出張ビル名
を前回の所定期間に実施された作業日順に配列する配列
手段と、作業日が同一日及び隣接日である出張ビル名を
集合する集合手段と、この集合手段で集合された出張ビ
ル名に対して、作業員と作業日とを決定する決定手段と
を有する構成となっている。
In order to achieve the above object, the present invention provides a display unit having a column specified by a date within a predetermined period for creating a work table and a name of a worker who performs maintenance patrol work. In a maintenance patrol work table creating apparatus comprising: a worker data storage unit in which the worker's work information within the predetermined period and the work qualification of the worker are stored, and a work target within the predetermined period. A building data storage unit for storing a building name, work contents, a designated work date, and contract conditions, extracting means for extracting a business trip building name requiring a business trip from the building data storage unit, and Classifying means for classifying each business trip, arranging means for arranging the names of business trip buildings classified by the classifying means in the order of work days performed in the previous predetermined period, and Means of gathering , For the business trip building name that has been set in this set means, and has a configuration and a determination means for determining the working day and workers.

【0011】[0011]

【作用】このような構成なので、所定期間内に作業対象
となるビル名、作業内容、指定作業日及び契約条件を記
憶するビルデータ記憶部から、抽出手段によって出張作
業が必要な出張ビル名が抽出され、区分手段によって出
張ビル名が同一地域毎に区分される。そして、配列手段
によって前回の所定期間に実施した作業日順に配列さ
れ、集合手段によって作業日が同一及び隣接日である出
張ビル名が集合され、集合された出張ビル名に対して、
決定手段によって作業員と作業日とが決定される。
With such a construction, the name of the building to be worked on within a predetermined period, the contents of the work, the specified work day, and the building data storage section for storing the contract conditions are used to extract the name of the business trip building requiring a business trip by the extracting means. It is extracted and the business trip building name is classified for each same area by the classification means. Then, the arrangement means are arranged in the order of the work days performed in the previous predetermined period, and the business trip building names having the same and adjacent work days are aggregated by the gathering means, and for the aggregated business trip building names,
The determining means determines the worker and the work date.

【0012】この場合、作業日、週及び曜日の指定や出
張日数等に基づいて、作業実施の候補日(一日または数
日)が決定され、次いで作業員の資格とこの候補日を勘
案して、出張ビルの作業実施日と作業者とが決定され
る。
In this case, a candidate day (one or several days) for performing the work is determined based on the designation of the work day, the week and the day of the week, and the number of business days, and then the qualification of the worker and this candidate day are taken into consideration. Thus, the work execution date and the worker of the business trip building are determined.

【0013】[0013]

【実施例】以下、本発明の一実施例を図1ないし図15
を参照して説明する。ここで、図1は実施例の構成を示
すブロック図、図2ないし図15は実施例の動作を示す
フローチャートである。
1 to 15 show an embodiment of the present invention.
This will be described with reference to FIG. Here, FIG. 1 is a block diagram showing the configuration of the embodiment, and FIGS. 2 to 15 are flowcharts showing the operation of the embodiment.

【0014】図1に示すように、記憶部1aと送受信装
置1bを具備するセンタ1が、通信回線3を介して、送
受信装置2aと作業表作成部10とからなる営業所2に
接続してあり、センタ1の送受信装置1bと営業所2の
送受信装置2とが、互いに通信回線3で接続してある。
作業表作成部10には、スケジュール情報記憶部13、
現場情報記憶部11a、制御部14、資格情報記憶部1
2a及び勤休情報記憶部12bを具備する個人情報記憶
部12、入力部16、表示部15及び印字部17が設け
てある。また、前記制御部14は、スケジュール割付処
理部14c、現場情報処理部14a、入出力情報処理部
14d及び個人情報処理部14bを具備し、スケジュー
ル情報記憶部13がスケジュール割付処理部14cに接
続してある。このスケジュール割付処理部14cは、現
場情報処理部14a、入出力情報処理部14d、個人情
報処理部14bに接続してあり、個人情報処理部14b
は個人情報記憶部12に接続してあり、入出力情報処理
部14dは、入力部16、表示部15及び印字部17に
接続してある。そして、送受信装置2aが現場情報記憶
部11aに接続してあり、現場情報記憶部11aは現場
情報処理部14aに接続してある。表示部15は、すで
に図14を参照して説明した従来の表示部と同一の欄構
成となっている。
As shown in FIG. 1, a center 1 having a storage unit 1a and a transmission / reception device 1b is connected via a communication line 3 to a business office 2 comprising a transmission / reception device 2a and a work table creation unit 10. The transmitting / receiving device 1b of the center 1 and the transmitting / receiving device 2 of the business office 2 are connected to each other via the communication line 3.
The work table creation unit 10 includes a schedule information storage unit 13,
Site information storage unit 11a, control unit 14, qualification information storage unit 1
2a and a personal information storage unit 12 having a work absence information storage unit 12b, an input unit 16, a display unit 15, and a printing unit 17 are provided. The control unit 14 includes a schedule allocation processing unit 14c, a site information processing unit 14a, an input / output information processing unit 14d, and a personal information processing unit 14b, and the schedule information storage unit 13 is connected to the schedule allocation processing unit 14c. It is. The schedule allocation processing unit 14c is connected to the site information processing unit 14a, the input / output information processing unit 14d, and the personal information processing unit 14b.
Is connected to the personal information storage unit 12, and the input / output information processing unit 14d is connected to the input unit 16, the display unit 15, and the printing unit 17. The transmitting / receiving device 2a is connected to the site information storage unit 11a, and the site information storage unit 11a is connected to the site information processing unit 14a. The display unit 15 has the same column configuration as the conventional display unit already described with reference to FIG.

【0015】ここで、本発明のビルデータ記憶部に対応
する現場情報記憶部11aには、センタ1の記憶部1a
に格納されている情報の内、営業所2が管轄するビルの
保守に関する情報(ビル所在地、指定作業日、作業内容
など)が、送受信装置2aを介して受診格納されてい
る。また、本発明の作業員データ記憶部に対応する個人
情報記憶部12には、営業所2に属す全作業員につい
て、作業員としての資格と当該月の勤務状況(年次休
暇、会議、研修の予定日等)とが格納されている。この
作業上の資格には、「整備」「作業照準」「点検」があ
り、二人作業では少なくとも一方の作業員が「整備」の
資格を有する必要があり、「整備」或いは「作業標準」
の資格を有する作業員は、二人作業の内一人で実施可能
な作業または一人作業を担当することができる。「点
検」の資格を有する作業員は、一人作業の内の点検作業
を行なうことができ、この他の無資格の作業員は、有資
格作業員の補助作業を行なう。
Here, the site information storage unit 11a corresponding to the building data storage unit of the present invention includes the storage unit 1a of the center 1.
The information (maintenance of the building, designated work date, work content, etc.) concerning the maintenance of the building managed by the sales office 2 among the information stored in the office 2 is stored through the transmitting / receiving device 2a. In addition, the personal information storage unit 12 corresponding to the worker data storage unit of the present invention stores the qualifications as workers and the working status of the month (annual leave, meeting, training, etc.) for all the workers belonging to the sales office 2. , Etc.) are stored. The qualifications for this work include "maintenance", "working aim" and "inspection". For two-person work, at least one of the workers must have the qualification of "maintenance", and "maintenance" or "work standard"
Can be assigned to one of the two tasks that can be performed or one task. A worker who is qualified for "inspection" can perform a check operation in one operation, and another unqualified worker performs auxiliary work for a qualified worker.

【0016】前記現場情報処理部14aは、現場情報記
憶部11aに格納されている情報の取出しとその処理を
行なう機能を有し、個人情報処理部14bは個人情報記
憶部12に格納されている情報の取出しとその処理を行
なう機能を有し、スケジュール割付処理部14cは、保
守巡回作業の割付制御を実行する機能を有し、入出力情
報処理部14dは、データや指令の入力、処理データの
表示部への表示を行なう機能を有し、これらの処理部は
マイクロコンピュータで構成されている。また、制御部
14に本発明の抽出手段、区分手段、配列手段、集合手
順及び決定手段が設けてある。
The on-site information processing section 14a has a function of extracting and processing information stored in the on-site information storage section 11a, and the personal information processing section 14b is stored in the personal information storage section 12. It has a function of taking out information and processing the information. The schedule allocation processing unit 14c has a function of executing allocation control of maintenance patrol work. The input / output information processing unit 14d has a function of inputting data and instructions, Are displayed on the display unit, and these processing units are constituted by microcomputers. Further, the control unit 14 is provided with the extracting means, the sorting means, the arranging means, the set procedure and the deciding means of the present invention.

【0017】次に、このような構成の実施例のスケジュ
ール割付処理部14cの制御により行なわれる動作を、
図2ないし図15を参照して説明する。
Next, the operation performed under the control of the schedule allocation processing section 14c of the embodiment having such a configuration will be described.
This will be described with reference to FIGS.

【0018】最初に、図2のフローチャートに基づい
て、実施例の動作の概要を説明すると、ステップS1で
スケジュール割付処理部14cの指令によって、個人情
報処理部14bが個人情報記憶部12に格納されている
データを整理して、実働可能時間のデータをスケジュー
ル割付処理部14cに入力し、実働可能時間のデータが
スケジュール情報記憶部13に格納される。次いで、ス
テップS2に進んで、スケジュール割付処理部14cに
よって、当該月の作業対象ビルの内、出張して作業を行
なうことが必要なビル(現場)の割付が行なわれ、ステ
ップS3では、作業日が指定されているビルの指定の作
業日への割付が行なわれる。そして、ステップS4に進
んで、ビルの所在地、作業域の資格及び作業時間、作業
日を考慮しながら、ステップS2で割付けたビルの内二
人作業のビルの欄に二人作業を行なうべき他のビルを割
付け、当該欄の作業時間が限界に達すると、ステップS
5に進んで、ステップS3で割付けた二人作業の他の欄
に二人作業のビルを割付け、順次空欄に対して二人作業
のビルの割付が行なわれる。
First, the outline of the operation of the embodiment will be described with reference to the flowchart of FIG. 2. In step S1, the personal information processing unit 14b is stored in the personal information storage unit 12 according to a command from the schedule allocation processing unit 14c. Then, the data of the operable time is input to the schedule allocation processing unit 14c, and the data of the operable time are stored in the schedule information storage unit 13. Then, the process proceeds to step S2, in which the schedule allocation processing unit 14c allocates a building (site) that requires a business trip to perform work among the work target buildings for the month. Is assigned to the specified work day of the building for which is specified. Then, proceeding to step S4, the two-person work should be performed in the column of the two-person work among the buildings allocated in step S2 while considering the location of the building, the qualification of the work area, the work time, and the work day. Are allocated, and when the work time in the column reaches the limit, step S
Proceeding to 5, the building of the two-person work is allocated to the other fields of the two-person work allocated in step S3, and the buildings of the two-person work are sequentially allocated to the blanks.

【0019】そして、二人作業のビルの割付が終了する
と、ステップS6に進んで、すでにビルが割付られ且つ
残り時間のある欄へ一人作業が割付られ、この割付が終
了すると、ステップS7に進んで、残りの一人作業を空
欄に順次割付けて行き全割付作業を終了する。
When the allocation of the two-person building is completed, the process proceeds to step S6, where the building is already allocated and the one-person operation is allocated to the column having the remaining time. When the allocation is completed, the process proceeds to step S7. Then, the remaining one-person work is sequentially allocated to the blanks, and all the allocated work is completed.

【0020】次に、スケジュール割付処理部14cが行
なう前記ステップS2での処理の詳細を、図3のフロー
チャートを参照して説明する。
Next, the details of the processing in step S2 performed by the schedule allocation processing section 14c will be described with reference to the flowchart in FIG.

【0021】図3のステップS10において、スケジュ
ール割付処理部14cの指令によって、現場情報処理部
14aは現場情報記憶部11aから、全ての出張現場を
抜き出す。そこで、スケジュール割付処理部14cは、
抜き出された出張現場の中からステップS11におい
て、週や曜日などが指定され割付日が特定している指定
現場に対する出張現場の割付を行い、この出張現場の割
付が終了すると、ステップS12に進んで指定以外の出
張現場の割付を行なう。
In step S10 of FIG. 3, the site information processing unit 14a extracts all business trip sites from the site information storage unit 11a in response to a command from the schedule allocation processing unit 14c. Therefore, the schedule assignment processing unit 14c
In step S11, a business trip site is assigned from the extracted business trip sites to a designated site where a week, a day of the week, etc. are specified and the assignment date is specified. When the assignment of the business trip site is completed, the process proceeds to step S12. Assign a non-designated business trip site.

【0022】ここで、図3のステップS10の処理の詳
細を、図4及び図5のフローチャートを参照して説明す
る。
Here, the details of the processing in step S10 in FIG. 3 will be described with reference to the flowcharts in FIGS.

【0023】ステップS13において、スケジュール割
付処理部14cからの指令によって、現場情報処理部1
4aは現場情報記憶部11aから、出張現場を全て抜き
出し、ステップS14で抜き出した出張現場を巡回コー
ドの小さい順に並び換える。
In step S13, the on-site information processing unit 1 receives a command from the schedule allocation processing unit 14c.
4a extracts all the business trip sites from the site information storage unit 11a, and sorts the business trip sites extracted in step S14 in ascending order of the traveling code.

【0024】ここで、巡回コードとは、営業所のテリト
リーを大区分(例えば市)、中区分(例えば区)及び小
区分(例えば町)の複数のブロックに分割し、これに付
される現場毎のコードで3000〜999の3桁の数字
からなっている。
Here, the cyclic code means that a territory of a business office is divided into a plurality of blocks of a large section (for example, a city), a middle section (for example, a ward) and a small section (for example, a town), and a site attached thereto. Each code is composed of three digits of 3000 to 999.

【0025】ステップS15において、現場情報処理部
14aは、巡回コード順に並べ換えられた出張現場に対
して、同一地域の現場(巡回コードの100位が同一の
現場)を前月割付日の小さい順に並び換える。次いで、
ステップS16において、ステップS15で並べ換えら
れた出張現場に対して、前月の割付日が連続している現
場(例えば巡回コードの100位が1で前月割付日が2
日の現場と3日の現場)を一つのブロックとして分類し
ていく。従って、同一地域で前月割付日が連続している
出張現場は、同一のブロックに属することになる。そし
て、現場情報処理部14aによって、ステップS15で
分類されたブロックに属する出張現場の最初の前月割付
日(前月の出張開始日)と連続している日数(出張日
数)及び当該ブロックに属する出張現場が、現場情報記
憶部11aに格納される。そして、ステップS17にお
いて、現場情報処理部14aは、ブロック分けした出張
現場を出張日数の長い順に並び換え、スケジュール割付
処理部14cからの指令がある度に、出張日数の長い順
に出張現場を出力できるようにして置く。
In step S15, the site information processing unit 14a rearranges the sites in the same region (sites having the same 100th place of the tour code) in ascending order of the previous month's allocation date with respect to the business trip sites sorted in the order of the tour code. . Then
In step S16, for the business trip site rearranged in step S15, a site where the previous month's allocation date is continuous (for example, the 100th place of the tour code is 1 and the previous month's allocation date is 2)
Day scene and 3 day scene) as one block. Therefore, business trip sites in the same area where the previous month's allocation dates are consecutive belong to the same block. Then, the number of days (business trip days) that are continuous with the first previous month allocation date (business trip start date of the previous month) of the business trip sites belonging to the block classified in step S15 and the business trip site belonging to the block are determined by the site information processing unit 14a. Is stored in the site information storage unit 11a. Then, in step S17, the on-site information processing unit 14a sorts the divided business trip sites in ascending order of the number of business days, and can output the business sites in ascending order of the number of business trips every time there is a command from the schedule allocation processing unit 14c. Put it like that.

【0026】次に図3のステップS11の出張現場の割
付を図6ないし図13のフローチャートを参照して説明
する。
Next, the assignment of the business trip site in step S11 of FIG. 3 will be described with reference to the flowcharts of FIGS.

【0027】図6のステップS20において、スケジュ
ール割付処理部14cは、出張現場の並び換えの指令
後、割付ける出張現場の中で先ず週や曜日が指定されて
いる指定の出張現場とその割付候補日と出張日数を現場
情報処理部14aに問い合せる。このステップS20で
の問い合わせに対する現場情報処理部14aの処理につ
いて、図7のフローチャートを参照して証明すると、ス
テップS25でスケジュール割付処理部14cからの指
令を受けた現場情報処理部14aは、前記のブロック毎
に出張日数の長い順に並び換えられた出張現場のブロッ
クから、先ず先頭のブロックを取り出す。次いで、ステ
ップS26に進んで取り出したブロック内に、指定の出
張現場があるかどうかの判定を行い、指定の出張現場が
一つでもこのブロックに含まれていると、当該ブロック
は指定の出張現場のブロックであると認識しステップS
28に進む。ステップS28では、当該ブロック内の全
ての出張現場(指定の出張現場、或いは指定の出張現場
と指定外の出張現場との混合した出張現場)に対する共
通の割付候補日を求める。
In step S20 of FIG. 6, the schedule assignment processing unit 14c, after instructing the reordering of the business trip sites, first designates the designated business trip site in which the week or the day of the week is designated and the assignment candidate. The day and the number of business days are inquired to the site information processing section 14a. When the processing of the site information processing unit 14a in response to the inquiry in step S20 is proved with reference to the flowchart of FIG. 7, the site information processing unit 14a, which has received the instruction from the schedule allocation processing unit 14c in step S25, First, the leading block is extracted from the blocks at the business trip site sorted in the order of the longest business trip days for each block. Next, the process proceeds to step S26, where it is determined whether there is a designated business trip site in the extracted block. If at least one specified business trip site is included in this block, the block is replaced with the designated business trip site. Step S
Proceed to 28. In step S28, a common assignment candidate date is determined for all the business sites in the block (designated business sites or mixed business sites of the specified business sites and unspecified business sites).

【0028】一方、ステップS26で、当該ブロック内
に指定の出張現場が一つも含まれていないと判定される
と、ステップS27に進んで、次のブロックを取出して
ステップS26に戻り、指定の出張現場があるブロック
が見つかるまでこの処理を繰り返す。
On the other hand, if it is determined in step S26 that no specified business trip site is included in the block, the flow advances to step S27 to take out the next block and return to step S26 to return to the specified business trip. This process is repeated until a block is found at the site.

【0029】前記ステップS28の詳細を図8のフロー
チャートを参照して説明する。
The details of step S28 will be described with reference to the flowchart of FIG.

【0030】ステップS30において、現場情報処理部
14aは、指定の出張現場を含み、前月割付日が連続し
出張日数の多いブロック内の出張現場について、先ず、
一日目の前月割付日の出張現場の全てについて、割付候
補日を各出張現場について算出する。この場合、例えば
前月出張日が2日と3日の二日間であると、一日目の前
月割付日は2日であり、2日に割付けられている出張現
場の数が3現場であれば、その3現場全てに割付候補日
を算出する。次いで、ステップS31で現場情報処理部
14aは、一日目の各出張現場について算出した割付候
補日について、各出張現場全てに共通している候補日を
探し、その共通日を一日目の出張日の出張現場の候補日
とする。例えば、一日目に3箇所の出張現場があり、そ
の候補日が2日〜10日、4日〜12日、5日〜13日
であると、この共通候補日は5日〜10日となる。
In step S30, the site information processing unit 14a firstly determines, for a business trip site in a block including a designated business trip site and having a large number of business trip days in which the previous month's allocation day is continuous.
For all the business trip sites on the assignment day of the previous month on the first day, the allocation candidate date is calculated for each business site. In this case, for example, if the previous month's business trip day is two days, two days and three days, the first month's previous month allocation date is two days, and if the number of business trip sites allocated on the two days is three, Calculate the allocation candidate dates for all three sites. Next, in step S31, the site information processing unit 14a searches for a candidate day common to all the business trip sites for the allocation candidate day calculated for each business trip site on the first day, and identifies the common date as the first business trip day. The candidate day of the day's business trip site. For example, if there are three business trip sites on the first day and the candidate dates are 2 to 10, 4 to 12, 5 to 13 days, the common candidate date is 5 to 10 days. Become.

【0031】次いで、ステップS32に進んで、共通の
候補日の算出を当該ブロックの出張日全てについて取り
出したかどうかを判定し、この判定がNOであるとステ
ップS33に進んで、翌日の出張の出張現場全てについ
て、各割付候補日を算出しステップS31に戻る。ステ
ップS32の判定がYESであると、ステップS34に
進んで、各出張日の共通の候補日を求める。例えば3日
間の出張で一日目の出張現場の共通候補日が5日〜10
日で、二日目の出張現場の共通候補日が3日〜9日で、
三日目の出張現場の共通候補日が4日〜9日であれば、
このブロックの各出張日の共通候補日は5日〜9日とな
る。次いで、ステップS35に進んで、この共通候補日
で出張日数の先頭日を、当該ブロックの割付候補日とす
る。例えば、出張日数が三日間で共通候補日が5日〜9
日であれば、当該ブロックの出張の候補日は、5日〜7
日、6日〜8日、7日〜9日の三通りになる。ここで、
現場情報処理部14aは当該ブロックの候補日として、
この先頭日5日、6日、7日を取出し、さらに出張日数
3日を取出し図7のフローチャートのステップS29に
進む。このステップS29では、前述のブロックの割付
候補日(先頭日の配列)と出張日をスケジュール割付処
理部14cに問い合わせの返答として入力する。
Next, the process proceeds to step S32, where it is determined whether or not the calculation of the common candidate date has been extracted for all of the business trip days of the block. If the determination is NO, the process proceeds to step S33 to perform the business trip of the next day. For each of the sites, the assignment candidate date is calculated, and the process returns to step S31. If the determination in step S32 is YES, the process proceeds to step S34, and a common candidate day for each business trip day is obtained. For example, in a three-day business trip, the common candidate day of the first business trip site is 5 to 10 days.
Day, the common candidate day of the second business trip site is 3-9 days,
If the common candidate day of the third day of the business trip site is 4 to 9 days,
The common candidate days for each business day in this block are 5 to 9 days. Next, the process proceeds to step S35, and the first day of the number of business trip days in the common candidate day is set as the allocation candidate date of the block. For example, the number of business trip days is three days, and the common candidate days are five to nine.
If it is a day, the business trip candidate date of the block is 5 to 7
Day, 6 to 8 days, 7 to 9 days. here,
The site information processing unit 14a sets the candidate date of the block as
The first five days, the sixth day, and the seventh day are taken out, and the number of business trip days is taken out, and the process proceeds to step S29 in the flowchart of FIG. In this step S29, the above-mentioned allocation candidate date of the block (arrangement of the head date) and the business trip date are input to the schedule allocation processing unit 14c as a response to the inquiry.

【0032】このようにして、図6のステップS20
で、スケジュール割付処理部14cは、現場情報処理部
14aから割付ける指定出張現場、割付候補日及び出張
日数を受け取ると、ステップS21に進んで指定出張現
場を割り付ける責任者、同伴者及び作業日を決定する。
ここで、出張現場の割付はその作業が一人作業であろう
となかろうと、責任者と同伴者の組に割付け、ステップ
S22で責任者、同伴者及び作業日が決定したかどうか
が判定される。ステップS22の判定がYESである
と、ステップS23に進んで、当該責任者と同伴者に指
定の出張現場を割付け、それをスケジュール情報記憶部
13に格納する。次いで、ステップS24に進んで、指
定の出張現場が他にもあるかどうかが判定され、この判
定がYESであるとステップS20に戻って、他に指定
の出張現場がなくなるまで処理が繰り返されるが、ステ
ップS24の判定がNOであると、指定の出張現場の割
付処理が終了する。
As described above, step S20 in FIG.
When the schedule assignment processing unit 14c receives the designated business trip site, the assignment candidate date, and the number of business days to be assigned from the site information processing unit 14a, the process proceeds to step S21, in which the scheduler, the accompanying person, and the work day to assign the designated business site are assigned. decide.
Here, the assignment of the business trip site is assigned to a set of a responsible person and a companion, whether or not the task is a single task. In step S22, it is determined whether the responsible person, the companion, and the work date are determined. If the determination in step S22 is YES, the process proceeds to step S23, where a designated business trip site is assigned to the responsible person and the accompanying person, and this is stored in the schedule information storage unit 13. Next, the process proceeds to step S24, where it is determined whether there is another designated business trip site. If the determination is YES, the process returns to step S20, and the process is repeated until there is no other designated business trip site. If the determination in step S24 is NO, the allocation process for the designated business trip site ends.

【0033】ここで、図9ないし図13のフローチャー
トを参照して、図6のステップS21の処理を詳細に説
明する。
Here, the processing in step S21 in FIG. 6 will be described in detail with reference to the flowcharts in FIGS.

【0034】図9のステップS40において、スケジュ
ール情報処理部14cは、現場情報処理部14aから受
け取った割付候補日の中から、一番目の候補日を取り出
す。例えば、前述の候補日5日、6日、7日、出張日数
3日という指定現場の場合には、一番目の候補日は5日
となる。次いで、ステップS41に進んで、この候補日
と出張日数から出張日を算出する。例えば、候補日が5
日で出張日数が3日であると、出張日は5日、6日及び
7日の三日間となる。このようにして出張日が決まる
と、ステップS42に進んでこの出張日に出張可能な責
任者の候補を決め、ステップS43で責任者の候補が決
定したかどうかの判定を行い、この判定がYESである
と、ステップS44で同伴者の候補を決め、ステップS
45で同伴者の候補が決定したかどうかの判定を行な
う。
In step S40 of FIG. 9, the schedule information processing unit 14c extracts the first candidate date from the allocation candidate dates received from the site information processing unit 14a. For example, in the case of the designated site where the aforementioned candidate days are 5, 6, 7 and the number of business trip days is 3, the first candidate day is 5 days. Next, the process proceeds to step S41 to calculate a business trip day from the candidate day and the number of business trip days. For example, if the candidate date is 5
If the number of business trip days is three days, the business trip days are three days of five days, six days, and seven days. When the day of the business trip is determined in this way, the process proceeds to step S42, in which candidates of the person in charge of the business trip on the day of the business trip are determined. In step S43, it is determined whether or not the candidate of the person in charge is determined. In step S44, a companion candidate is determined, and in step S44
At 45, it is determined whether a companion candidate has been determined.

【0035】このステップS45の判定がYESである
と、ステップS46に進んで責任者の候補の中で出張回
数の一番少ない者を責任者とし、同伴者の候補の中で出
張回数の一番少ない者を同伴者とし、この責任者と同伴
者とを出張現場に割付ける。また、ステップS43で責
任者の候補が決定していないと判定された時、或いはス
テップS45で同伴者の候補が決定していないと判定さ
れた時は、ステップS47に進んで他の候補日があるか
どうかが判定され、この判定がYESであるとステップ
S48に進んで他の候補日が取り出され、ステップS4
1に戻ってその候補日について、前述した同一の動作が
繰り返される。一方、ステップS47の判定がNOであ
ると、当該出張現場を割付ける責任者と同伴者がいない
ことになるので、図6のステップS24に戻って他の出
張現場があればその割付けを行なう。
If the determination in step S45 is YES, the process proceeds to step S46, where the person who has the least number of business trips among the candidates for the responsible person is the responsible person, and The person with few persons is taken as a companion, and the responsible person and the companion are assigned to the business trip site. When it is determined in step S43 that the candidate for the responsible person has not been determined, or when it is determined in step S45 that the candidate for the accompanying person has not been determined, the process proceeds to step S47 and another candidate date is set. It is determined whether or not there is, and if the determination is YES, the process proceeds to step S48, another candidate date is extracted, and step S4 is performed.
1, the same operation as described above is repeated for the candidate date. On the other hand, if the determination in step S47 is NO, it means that there is no person in charge of assigning the business trip site or a companion, and the process returns to step S24 in FIG.

【0036】ここで、図9のステップS42とステップ
S44の動作の詳細を、図10ないし及び図13のフロ
ーチャートを参照して説明する。
Here, the details of the operations in steps S42 and S44 of FIG. 9 will be described with reference to the flowcharts of FIGS.

【0037】図10及び図11は責任者の候補を決める
フローチャートで、ステップS50で一番目の出張日を
取出し(例えば、出張日が5日〜7日の三日間であれ
ば、5日が一番目の出張日となる)、ステップS51に
進んで取出した出張日において、作業表(作業表の作業
員名は資格が上位の作業員から順に配列してある)の一
番目の作業者を取り出す。次いで、ステップS52にお
いて、取り出した作業員に未だ現場が割付いていないこ
との確認の判定をし、この判定がYESであるとステッ
プS53に進んで、当該作業員に責任者の資格があるか
どうかを、個人情報処理部14bに問い合せる、この問
い合わせに対して、ステップS54で当該作業員に責任
者の資格があるかどうかの判定が行なわれ、この判定が
YESであると、ステップS55に進んで当該作業員に
会議などの勤休情報が割付いているかどうかを、個人情
報処理部14bに問い合せる。この問い合わせに対し
て、ステップS56で当該作業員に勤休情報が割付いて
いるかどうかの判定が行なわれ、この判定がNOである
と、ステップS57に進んで当該作業員に翌日の出張日
があるかどうかの判定が行なわれる。この場合は、5日
〜7日の出張日の全てに対して条件が満足され、ステッ
プS57の判定がNOであると、ステップS59に進ん
で当該作業員を責任者の候補とする。ステップS57の
判定がYESであると、ステップS58に進んで翌日の
出張日を取出し、ステップS51に戻って、翌日の出張
日がなくなるまで前述の動作が繰り返される。一方、ス
テップS52の判定がNOである場合、ステップS54
の判定がNOである場合、ステップS56の判定がYE
Sである場合に、ステップS60に進んで、当該出張日
には他に作業員がいるかどうかを判定し、この判定がY
ESであるとステップS60aでその作業員を取出し、
ステップS52に戻ってすでに述べた動作を繰り返す。
FIGS. 10 and 11 are flowcharts for determining a candidate for the responsible person. In step S50, the first business trip day is taken out (for example, if the business trip day is three days of five to seven days, one day is taken out of five days). In the business day taken out in step S51, the first worker is taken out of the work table (the worker names in the work table are arranged in order from the one with the highest qualification). . Next, in step S52, a determination is made to confirm that the site has not yet been assigned to the removed worker, and if this determination is YES, the flow advances to step S53 to determine whether the worker is qualified as a responsible person. In response to this inquiry, it is determined in step S54 whether or not the worker is qualified as a responsible person. If the determination is YES, the process advances to step S55. Then, the personal information processing unit 14b is inquired as to whether the worker is assigned work leave information such as a meeting. In response to this inquiry, a determination is made in step S56 as to whether or not the employee is assigned work leave information. If this determination is NO, the process proceeds to step S57, and the worker has a next business day. Is determined. In this case, if the conditions are satisfied for all the business days from the 5th to the 7th and the determination in step S57 is NO, the process proceeds to step S59, and the worker is set as a candidate for the responsible person. If the decision in the step S57 is YES, the process proceeds to a step S58 to take out the next business day, returns to the step S51, and repeats the above operation until the next business day disappears. On the other hand, if the determination in step S52 is NO, step S54
Is NO, the determination in step S56 is YE
If the answer is S, the process proceeds to step S60, where it is determined whether or not another worker is present on the business trip day.
If it is ES, the worker is taken out in step S60a,
Returning to step S52, the operation described above is repeated.

【0038】次に、同伴者の候補の決定を図12及び図
13のフローチャートを参照して説明する。
Next, determination of a companion candidate will be described with reference to the flowcharts of FIGS.

【0039】まず、ステップS61において一番目の出
張日を取出し、ステップS62に進んで作業表の最後の
作業員を取り出す(作業表の作業員名は資格が下位の作
業員程後に配列してある)。次いで、ステップS63に
進んで取り出した作業員に、未だ現場が割付いていない
ことを確認の判定をし、この判定がYESであると、ス
テップS64において、当該作業員に会議などの勤休情
報が割付いているかどうかを、個人情報処理部14bに
問い合せる。この問い合わせに対して、ステップS65
で当該作業員に勤休情報が割付いているかどうかの判定
が行なわれ、この判定がNOであれば、ステップS66
に進んで翌日の出張日があるかどうかを判定する。この
場合は、5日〜7日の出張日の全てに対して条件が満足
され、ステップS66の判定がNOであると、ステップ
S68に進んで当該作業員を同伴者の候補とする。ま
た、ステップS66の判定がYESであると、ステップ
S67に進んで翌日の出張日を取出し、ステップS62
に戻って、翌日の出張がなくなるまで前述の動作が繰り
返される。一方、ステップS63の判定がNOである場
合、ステップS65の判定がYESである場合には、ス
テップS69に進んで、当該出張日には他に作業員がい
るかどうかを判定し、この判定がYESであるとステッ
プS70でその作業員を取出し、ステップS63に戻っ
てすでに述べた動作を繰り返す。
First, in step S61, the first business trip day is taken out, and the process proceeds to step S62 to take out the last worker in the work table (worker names in the work table are arranged after workers with lower qualifications). ). Next, proceeding to step S63, a determination is made to confirm that the site has not yet been assigned to the worker taken out, and if this determination is YES, then in step S64, the worker is notified of the absence from work such as a meeting. The personal information processing unit 14b is inquired as to whether or not is assigned. In response to this inquiry, step S65
In step S66, it is determined whether or not the work leave information has been assigned to the worker.
To determine if there is a next business day. In this case, if the conditions are satisfied for all the business days from the 5th to the 7th and the determination in step S66 is NO, the process proceeds to step S68, and the worker is set as a candidate for the accompanying person. If the determination in step S66 is YES, the process proceeds to step S67, where the next business day is taken out, and step S62 is taken.
And the above-described operation is repeated until the next business trip disappears. On the other hand, if the determination in step S63 is NO, and if the determination in step S65 is YES, the process proceeds to step S69, where it is determined whether or not another worker is present on the business trip day. If so, the worker is taken out in step S70, and the process returns to step S63 to repeat the operation described above.

【0040】ここで、図3のフローチャートのステップ
12の指定以外の出張現場の割付の詳細を、図14のフ
ローチャートを参照して説明する。
The details of the assignment of the business trip site other than the designation in step 12 of the flowchart of FIG. 3 will be described with reference to the flowchart of FIG.

【0041】まず、ステップS71において、スケジュ
ール割付処理部14cは、指定以外の出張現場、割付候
補日及び出張日数を現場情報処理部14aに問い合せ
る。この問い合わせに対する現場情報処理部14aの処
理を、図15のフローチャートに基づいて説明すると、
ステップS76において、現場情報処理部14aは、前
記のルールにより配列してある出張現場のブロック(こ
のブロックには、指定の出張現場を含むブロックはすで
に取り出されていて配列していない)から、先頭のブロ
ックを取り出す。次いで、ステップS77に進んで取り
出したブロック内の出張現場全てに対する共通の割付候
補日を求め、ステップS78においては、当該ブロック
の出張現場、割付候補日及び出張日数をスケジュール割
付処理部14cに問い合わせに対する返答として入力す
る。
First, in step S71, the schedule allocation processing unit 14c inquires the business site information processing unit 14a about a business trip site other than the designated one, an allocation candidate date, and the number of business days. The processing of the site information processing unit 14a in response to this inquiry will be described based on the flowchart of FIG.
In step S76, the site information processing unit 14a starts from the block of the business trip site arranged according to the above rule (the block including the designated business trip site has already been taken out and has not been arranged yet). Take out the block. Next, in step S77, a common assignment candidate date for all the business trip sites in the extracted block is obtained. In step S78, the schedule assignment processing unit 14c is inquired of the business trip site, the allocation candidate date, and the number of business days of the block. Enter as a reply.

【0042】そこで、図14のステップS72におい
て、スケジュール割付処理部14cでは、現場情報処理
部14aからの返答に基づき、指定以外の出張現場を割
付ける責任者、同伴者及び作業日を決定(処理はすでに
述べた指定の出張現場と同一なので、その説明は省略す
る)し、ステップS73で責任者、同伴者及び作業日が
決定したと判定されるとステップS74に進む。このス
テップS74では、当該責任者と同伴者に指定以外の出
張現場を割付け、スケジュール情報記憶部13に格納
し、ステップS75に進んで他に出張現場があるかどう
かの判定を行なう。このステップS75の判定がNOで
あると処理を終了し、ステップS75の判定がYESで
あると、ステップS71に戻って出張現場がなくなるま
で処理を繰り返す。
Therefore, in step S72 of FIG. 14, the schedule assignment processing unit 14c determines the person in charge of assigning a business trip site other than the designated one, the accompanying person, and the work day based on the response from the site information processing unit 14a (processing Is the same as the already-specified business trip site, the description of which is omitted). If it is determined in step S73 that the responsible person, accompanying person, and work date have been determined, the process proceeds to step S74. In this step S74, a business trip site other than the designated one is assigned to the responsible person and the accompanying person, stored in the schedule information storage unit 13, and the process proceeds to step S75 to determine whether there is another business site. If the determination in step S75 is NO, the process ends. If the determination in step S75 is YES, the process returns to step S71 to repeat the process until there is no business trip site.

【0043】このようにして、実施例では出張現場の割
付が自動的に実行されるが、この方法で出張現場の割付
が不能となる場合には、全ての出張現場に対する処理を
終了した後に、作業員の勤休の必要などを行いながら、
割付不能となった出張現場の割付が手動で行なわれる。
As described above, in the embodiment, the assignment of the business trip site is automatically executed. However, if the assignment of the business trip site becomes impossible by this method, after the processing for all the business trip sites is completed, While doing the work leave of the worker etc.,
The assignment of the non-assignable business trip site is performed manually.

【0044】以上に説明したように、実施例によると、
設置された設備機器の保守巡回作業を行なう顧客ビルの
出張現場に対して、出張日数や地域を考慮して最適な責
任者と同伴者の組を選択して、出張現場の自動割付を行
なって、保守巡回作業表を作成する保守巡回作業表作成
装置を提供することが可能になる。
As described above, according to the embodiment,
At the customer site where maintenance and patrol work is performed on the installed equipment and equipment, select the optimal group of responsible persons and accompanying persons in consideration of the number of business days and the region, and automatically assign the site. In addition, it is possible to provide a maintenance patrol work table creating apparatus that creates a maintenance patrol work table.

【0045】[0045]

【発明の効果】本発明では、保守巡回作業の対象となる
ビルについて、作業日の条件、出張日数及び前回作業日
のデータに基づいて作業候補日を決定し、この作業候補
日と作業者データに基づいて作業実施日と作業者を決定
するので、出張作業条件も配慮して顧客ビルに対する保
守巡回作業表を自動的に作成する保守巡回作業作成装置
を提供することが可能になる。
According to the present invention, a candidate work day is determined for a building to be subjected to maintenance patrol work on the basis of the work day conditions, the number of business days, and the previous work day data. Therefore, it is possible to provide a maintenance patrol work creating apparatus that automatically creates a maintenance patrol work table for a customer building in consideration of business trip work conditions.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例の構成を示すブロック図であ
る。
FIG. 1 is a block diagram showing the configuration of an embodiment of the present invention.

【図2】本発明の一実施例の全体の処理動作を示すフロ
ーチャートである。
FIG. 2 is a flowchart showing the overall processing operation of one embodiment of the present invention.

【図3】図2のステップS2の処理動作を示すフローチ
ャートである。
FIG. 3 is a flowchart showing a processing operation of step S2 in FIG. 2;

【図4】図3のステップS10の前半の処理動作を示す
フローチャートである。
FIG. 4 is a flowchart showing a processing operation in the first half of step S10 in FIG. 3;

【図5】図3のステップS10の後半の処理動作を示す
フローチャートである。
FIG. 5 is a flowchart showing a processing operation in the second half of step S10 in FIG. 3;

【図6】図3のステップS11の処理動作を示すフロー
チャートである。
FIG. 6 is a flowchart showing a processing operation of step S11 in FIG. 3;

【図7】図6のステップS20の処理動作を示すフロー
チャートである。
FIG. 7 is a flowchart showing the processing operation of step S20 in FIG. 6;

【図8】図7のステップS28の処理動作を示すフロー
チャートである。
FIG. 8 is a flowchart showing the processing operation of step S28 in FIG. 7;

【図9】図6のステップS21の処理動作を示すフロー
チャートである。
FIG. 9 is a flowchart showing the processing operation of step S21 in FIG. 6;

【図10】図9のステップS42の前半の処理動作を示
すフローチャートである。
FIG. 10 is a flowchart showing the processing operation in the first half of step S42 in FIG. 9;

【図11】図9のステップS42の後半の処理動作を示
すフローチャートである。
FIG. 11 is a flowchart illustrating a processing operation in the second half of step S42 in FIG. 9;

【図12】図9のステップS44の前半の処理動作を示
すフローチャートである。
FIG. 12 is a flowchart showing a processing operation in the first half of step S44 in FIG. 9;

【図13】図9のステップS44の後半の処理動作を示
すフローチャートである。
FIG. 13 is a flowchart showing a processing operation in the second half of step S44 in FIG. 9;

【図14】図3のステップS12の処理動作を示すフロ
ーチャートである。
FIG. 14 is a flowchart showing a processing operation in step S12 of FIG. 3;

【図15】図14のステップS71の処理動作を示すフ
ローチャートである。
FIG. 15 is a flowchart showing the processing operation of step S71 in FIG.

【図16】従来の保守巡回作業表作成装置の構成を示す
ブロック図である。
FIG. 16 is a block diagram showing a configuration of a conventional maintenance patrol work table creation device.

【図17】図16の表示部の構成を示す説明図である。FIG. 17 is an explanatory diagram illustrating a configuration of a display unit in FIG. 16;

【符号の説明】 10 作業表作成部 11a 現場情報記憶部 12 個人情報記憶部 13 スケジュール情報記憶部 14 制御部 14a 現場情報処理部 14b 個人情報処理部 14c スケジュール割付処理部 15 表示部[Description of Signs] 10 Work table creation unit 11a Site information storage unit 12 Personal information storage unit 13 Schedule information storage unit 14 Control unit 14a Site information processing unit 14b Personal information processing unit 14c Schedule allocation processing unit 15 Display unit

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 作業表を作成する所定期間内の日時と保
守巡回作業を行なう作業員名とで特定される欄を有する
表示部を具備する保守巡回作業表作成装置において、前
記作業員の前記所定期間内の勤務情報及び前記作業員の
作業上の資格が格納された作業員データ記憶部と、前記
所定期間内に作業対象となるビル名、作業内容、指定休
業日及び契約条件を記憶するビルデータ記憶部と、この
ビルデータ記憶部から出張作業が必要な出張ビル名を抽
出する抽出手段と、前記出張ビル名を同一地域毎に区分
する区分手段と、この区分手段で区分された出張ビル名
を前回の所定期間に実施された作業日順に配列する配列
手段と、作業日が同一日及び隣接日である出張ビル名を
集合する集合手段と、この集合手段で集合された出張ビ
ル名に対して、作業員と作業日とを決定する決定手段と
を有することを特徴とする保守巡回作業表作成装置。
1. A maintenance patrol work table creating apparatus, comprising: a display unit having a column specified by a date and time within a predetermined period for creating a work table and a name of an operator performing a maintenance patrol work. A worker data storage unit in which work information within a predetermined period and work qualifications of the worker are stored, and a building name, work contents, designated holidays, and contract conditions to be worked within the predetermined period are stored. A building data storage unit, an extracting unit for extracting a name of a business trip building that requires a business trip from the building data storage unit, a classifying unit for classifying the business trip building name for each region, and a business trip classified by the classifying unit. Arrangement means for arranging the building names in the order of the work days performed in the previous predetermined period, collection means for collecting the names of business trip buildings whose work days are the same day and adjacent days, and business trip building names collected by this collection means Working against A maintenance patrol work table creating apparatus, comprising: a determining means for determining a worker and a work day.
【請求項2】 決定手段が、集合手段が集合した同一日
の出張ビル名から、共通する作業候補日に基づいて、作
業日を決定することを特徴とする請求項1に記載の保守
巡回作業表作成装置。
2. The maintenance patrol work according to claim 1, wherein the deciding means decides the work day based on the common work candidate day from the name of the business trip building on the same day where the gathering means has gathered. Table maker.
【請求項3】 決定手段が、集合手段が集合した複数の
作業日の出張ビル名から、共通する作業候補日に基づい
て、複数の作業日の隣接する日を作業日に決定すること
を特徴とする請求項1に記載の保守巡回作業表作成装
置。
3. The method according to claim 1, wherein the deciding means decides adjacent days on the plurality of work days based on the common work candidate days from the names of the business trip buildings on the plurality of work days gathered by the gathering means. The maintenance patrol work table creating device according to claim 1, wherein
JP30381591A 1991-10-24 1991-10-24 Maintenance patrol work table creation device Expired - Fee Related JP2845298B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30381591A JP2845298B2 (en) 1991-10-24 1991-10-24 Maintenance patrol work table creation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30381591A JP2845298B2 (en) 1991-10-24 1991-10-24 Maintenance patrol work table creation device

Publications (2)

Publication Number Publication Date
JPH05120291A JPH05120291A (en) 1993-05-18
JP2845298B2 true JP2845298B2 (en) 1999-01-13

Family

ID=17925638

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30381591A Expired - Fee Related JP2845298B2 (en) 1991-10-24 1991-10-24 Maintenance patrol work table creation device

Country Status (1)

Country Link
JP (1) JP2845298B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10105611A (en) * 1996-09-30 1998-04-24 Mitsubishi Electric Corp Nursing visit scheduling system
WO2001073632A1 (en) * 2000-03-31 2001-10-04 Hitachi Construction Machinery Co., Ltd. Patrol service schedule preparation method, preparation system and preparation device
JP5357838B2 (en) * 2010-06-29 2013-12-04 三菱重工業株式会社 Traveling route candidate creation device, traveling route candidate creation method, and traveling route candidate creation program
CN114819219B (en) * 2022-04-29 2024-01-16 北京轨道交通路网管理有限公司 Maintenance plan generation method, maintenance plan generation device, and nonvolatile storage medium

Also Published As

Publication number Publication date
JPH05120291A (en) 1993-05-18

Similar Documents

Publication Publication Date Title
KR0123535B1 (en) Cyclic maintenance work schedule table preparation system
JP2845298B2 (en) Maintenance patrol work table creation device
KR910017343A (en) Building maintenance system
JP2845297B2 (en) Maintenance patrol work table creation device
JPH0736969A (en) Schedule making device for building maintenance work
JPH1027200A (en) Generation device for maintenance patrol operation table
JP3080470B2 (en) Maintenance patrol work table creation device
JP2760414B2 (en) Maintenance patrol work table creation device
JP3056325B2 (en) Maintenance patrol work table creation device
JP3248952B2 (en) Maintenance patrol work table creation device
JPH07325858A (en) Maintenance cyclic operation table preparation device
JPH06139485A (en) Maintenance patrol work table preparing device
JPH07210596A (en) Preparing device for maintenance patorol work table
JP2793889B2 (en) Building patrol maintenance work table creation device
JP2793885B2 (en) Building patrol maintenance work table creation device
JP2762408B2 (en) Maintenance patrol work table creation device
JPH06332904A (en) Preparing device for maintenance patrol work table
JP2912987B2 (en) Maintenance patrol work table creation device
JPH09244922A (en) Maintenance operation management device for elevator
Sanvido et al. Site analysis using controller-function charts
JP2708919B2 (en) Building patrol maintenance work table creation device
JPH03149686A (en) Formation of building circulating work table and display device for working state
JP2831438B2 (en) Building patrol maintenance work table creation device
JPH0822493A (en) Preparation device for maintenance patrol operation table
JPH04294452A (en) Maintenance patrol work tabulating device

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees