JPH0444526A - Built-up type concrete basement and execution method therefor - Google Patents

Built-up type concrete basement and execution method therefor

Info

Publication number
JPH0444526A
JPH0444526A JP2150302A JP15030290A JPH0444526A JP H0444526 A JPH0444526 A JP H0444526A JP 2150302 A JP2150302 A JP 2150302A JP 15030290 A JP15030290 A JP 15030290A JP H0444526 A JPH0444526 A JP H0444526A
Authority
JP
Japan
Prior art keywords
basement
concrete
units
unit
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2150302A
Other languages
Japanese (ja)
Other versions
JP2936492B2 (en
Inventor
Takashi Mizuguchi
隆 水口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP2150302A priority Critical patent/JP2936492B2/en
Publication of JPH0444526A publication Critical patent/JPH0444526A/en
Application granted granted Critical
Publication of JP2936492B2 publication Critical patent/JP2936492B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PURPOSE:To promote work efficiency in a construction site by placing cast-in- place concrete in the foundation bed after the perimeter of a basement is constructed. CONSTITUTION:The first second concrete units 10 are placed at four corners of a basement, and the concrete units 11A and 11B are placed to join with them. A square hole is formed on the foundation bed, cast-in-place concrete is placed therein, and it is compacted to complete a floor section of the basement body 1. Precast concrete panels 2a are erected on the floor section of the basement body 1, and they are joined in the direction of the face to construct a partition wall 2. After that, beams 13 are built on the upper end of the basement body 1 and the upper end of the partition wall 2 to complete the main section of the basement.

Description

【発明の詳細な説明】[Detailed description of the invention]

「産業上の利用分野」 本発明は住宅の地下室として好適なコンクリート部組立
型地下室およびコンクリート製組立型地下室の施工方法
にかかわり、特に上面が開口した矩形箱型の地下室本体
と、この地下室本体の内側に配設されて地下室本体の内
部を仕切る間仕切り壁とからなりかつこれらの上に家屋
等を構成する建築物を載せるようにした地下室およびそ
の施工方法に関するものである。 「従来の技術」 近年における住宅事情の悪化などから、一般の住宅にお
いても地下室を設置することが行なわれるようになって
きた。 従来、住宅の地下室は、地下収蔵庫として構成されたも
のが多いため、その構造も例えば容器状のカプセルを、
地面に掘った穴の中にアンカーボルトを介して据え付け
、穴を埋め戻してなる構成のものなどであった(例えば
特公平1−15663号「地下庫およびその製造方法」
参照)。 しかし、このような構成の地下室は、地下収蔵庫として
機能された構成であるため、全体的に内部の大きさが小
さく、住宅の居室として要求される機能を十分満足させ
るものではなかった。したがって、近年では、地下室を
コンクリート造りとして部屋全体を大型化する傾向にあ
る。 このような鉄筋コンクリート製の地下室は、例えば現場
打ちコンクリートにより築造されたものが一般的である
。 これは、まず、パワーショベル等を用いて地下室の敷地
よりやや広めに掘削工事を行ない、次に、その底部に砂
利等を敷いて、該砂利等を敷いた上にコンクリートを打
設して、いわゆる基礎コンクリートの施工を行なう。 そして、床鉄筋を格子状に配設して、この床鉄筋にコン
クリートを打設し、このとき、側壁が立設される位置に
側壁の鉄筋に連設される突出筋をコンクリートの表面か
ら突出するように配設しておく。 次に、床部のコンクリートが固まった後に、その所定の
位置に突出した突出筋に側壁の縦筋を連結し、これら側
壁の縦筋に、横筋を連結して、側壁の鉄筋を施工する。 次いで、施工した側壁の鉄筋の両側に型枠を組立てて、
その中にコンクリートを打設して側壁を施工する。 そして、側壁のコンクリートが固まった後に、型枠を解
体し、側壁の外側の空間を埋めて完成させるものである
。 「発明が解決しようとする課題」 前記従来の地下室の技術においては、その施工作業が現
場打ちコンクリートの施工作業となるため、現場での作
業能率が悪く、工期が長くなるなどの難点があった。 しかも、現場打ちコンクリートによる施工作業では、側
壁を構築する場合に、側壁鉄筋の両側に型枠を組立てる
ための空間を設けなければならず、施工面積よりも広め
に地盤を掘り下げなければならず、コスト高になるなど
の問題点があった。 そこで、本発明者等はこれらの問題点を解決すべく鋭意
研究した結果、地下室全体をプレキャストコンクリート
製ユニットの接合により築造すれば、現場での作業能率
が向上し、またユニットの据え付けだけで地下室が形成
されるので、掘削面積も少なくてすむとの考えに至った
。 しかしながら、単に地下室の内部を区画し、それぞれを
プレキャストコンクリート製ユニットに分割してもユニ
ット自身の大きさが大型化し、またその種類も多くなる
などの解決すべき課題が残されている。 また地下室自体をプレキャスト化した場合、地山とユニ
ットとの間を埋めて、これらを一体化する必要があり、
このためのグラウト作業に手間がかかるといった課題も
残されている。 本発明は、前記事情に鑑みてなされたもので、その目的
とするところは、少ない種類のプレキャストコンクリー
ト製ユニットにより、地下室を形成し得て、現場での作
業能率を向上させることができ−1また特に、グラウト
作業を施すことなく、地下室本体と地山とを一体化する
ことのできるコンクリート製組立型地下室及びその施工
方法を提供することにある。 「課題を解決するための手段」 かかる目的を達成するために本発明の地下室は、上面が
開口した矩形箱型の地下室本体と、この地下室本体の内
側に配設されて地下室本体の内部を仕切る間仕切り壁と
からなりかつこれらの上に家屋等を構成する建築物を載
せるようにした地下室であって、前記地下室本体を、地
下室のコーナー部に位置しかつ底板部の隣接する2つの
縁部に側板部を立設した第1のコンクリートユニットと
、地下室のコーナー部に位置する第1のコンクリートユ
ニットの間に並べられかつ底板部の縁部に側板部を立設
した第2のコンクリートユニットと、これら第1及び第
2のコンクリートユニットを組んだときにそれらの底板
部によって囲まれる四角穴の内部に現場打ちコンクリー
トより形成された床コンクリート部とから構成したこと
を特徴とするものである。 また、このような地下室の施工方法としては、底板部の
隣接する2つの縁部に側板部を立設した第1のコンクリ
ートユニットを、地下室の四隅となるコーナー部に据え
付けるとともに、これら第1のコンクリートユニットの
間に底板部の縁部に側板部を立設したL字型の第2のコ
ンクリートユニットを配置し、隣接するコンクリートユ
ニットどうしを相互に緊結接合した後、第1及び第2の
コンクリートユニットを組んだときにそれらの底板部に
よって囲まれる四角穴の内部に現場打ちによってコンク
リートを打設する方法などが好適である。 「作用」 本発明によれば、底板部の隣接する2つの縁部に側板部
を立設した第1のコンクリートユニットを地下室のコー
ナー部に位置させ、これら第1のコンクリートユニット
の間に、L字型をした第2のコンクリートユニットを並
べて、隣接するコンクリートユニットの側板部及び底板
部どうしを相互に接合することにより地下室の周囲を構
築でき、その後、基盤部に現場打ちでコンクリートを打
設することによって、地下室の主体となる地下室本体を
築造することができるので、現場での施工作業を効率化
させることができる。 また本発明では、地下室本体の床部の大部分を現場打ち
コンクリートにより形成したので、地下室本体と基盤部
との間を一体化することができ、特にコンクリートユニ
ット施工後のグラウト作業を省略することが可能になる
。 「実施例」 以下、本発明の一実施例を第1図ないし第9図を参照し
て説明する。 これらの図において、符号Gが本発明にかかる地下室で
あり、この地下室Gは上面が開口した矩形箱型の地下室
本体1と、この地下室本体1の内側に配設されて地下室
本体1の内部を仕切る間仕切り壁2とを主体として構成
され、かつ、これら地下室本体1及び間仕切り壁2の上
に家屋等を構成する建築物Hを載せるようにした基本構
造となっている。 そして、前記地下室本体1は、第2図および第3図など
に示すように、地下室の四隅となるコーナー部に位置し
かつ底板部10aの隣接する2つの縁部に側板部10b
、10cを立設した第1のコンクリートユニット10と
、これら第1のコンクリートユニットlOの間に並べら
れかつ底板部11aの縁部に側板部11bを立設した第
2のコンクリートユニットIIA、IIBとによってそ
の周囲が構成されるとともに、これら第1及び第2のコ
ンクリートユニット10、IIA、IIBを組んだとき
にそれらの底板部10a、llaによって囲まれる四角
穴の内部に打設された現場打ちコンクリートCによって
その床部が構成されており、また前記コンクリートユニ
ット10.11A、11Bの側板部10b、loc、l
lbおよび間仕切り壁2の上にプレキャストコンクリー
ト製の梁部13が架は渡されて建築物Hが載置されるよ
うになっている。 地下室本体1を構成するコンクリートユニット10、I
IA、IIBについて具体的に説明すると、これらコン
クリートユニット10、IIA、11Bはそれぞれ予め
工場において所定の形状、寸法に製作されるもので、こ
れらコンクリートユニット10、IIA、IIBのうち
第1のコンクリ−トユニット10は、実施例では地下室
の四隅のコーナー部を構成するようになっており、また
第2のコンクリートユニットIIA、IIBは相互に複
数接合されて地下室の中央の側壁部を構成するようにな
っている。 なお、これらコンクリートユニット10、IIA。 11Bの端面には目地材が施工されてコンクリートユニ
ット10.IIA、IIBに十分な水蜜性が確保される
ことは勿論である。 そして、実施例でlま、第1のコンクリートユニット1
0は、地下室の長手方向に細長い形状の底板部10aと
、この底板部10aの隣接する2辺に立設された幅の大
きな側板部10bおよび幅の小さな側板部10cとを主
体として構成されており、また前記底板部10aの端面
には現場打ちコンクリートからなる床部との接合を強固
にするためにアンカー筋Tが端面よりも突出した状態で
埋設されている。 なお、前記底板部10aおよび側板部10b、10cの
接合端面にはそれぞれ第5図および第6図に示すように
、ボルト・ナツト20.21により止められる構造の継
手金物22が埋設され、隣接するユニットどうしをさら
に強固に接合できるようになっている。 なお、このコンクリートユニット10の底板部10aに
は、継手金物22とは別に、必要に応じてインサート2
3を埋設した凹部24が形成され、凹部24に埋設され
たインサート23にボルト25止めされるユニット連結
用の連結金物30を介して隣接するコンクリートユニッ
ト10どうじを固定できるようになっている(第7図お
よび第8図参照)。 また、第9図は側板部10b110cと梁部13との接
続構造を示すもので、梁部13は側板部10b、10c
の上端に埋設されたインサート26に梁部13を貫通す
る長ボルト16をねじ込むことにより固定されるもので
ある。なお、図示例では、前記長ボルト16は、おねじ
の形成された軸体16aと、この軸体16aの6上部に
定着板16bを介して螺合されるナツト16cとを主体
として構成されている。 次に、第2のコンクリートユニットllA111Bにつ
いて説明すると、地下室の長手方向に沿う側壁部を構成
するコンクリートユニットIIAは、もう一方のコンク
リートユニットIIBよりも側板部11bの幅が大きく
形成され、また底板部11aがもう一方のコンクリート
ユニットIIBよりも短く形成された基本構造となって
いる。 より具体的には、コンクリートユニットIIAの底板部
11aは、第1のコンクリートユニット10の底板部1
0aの幅寸法に合わせて形成されており、コンクリート
ユニットIIBの底板部11aは第1のコンクリートユ
ニット10の底板部10aの長さ寸法に合わせて形成さ
れている。 なお、これらコンクリートユニットIIA、11Bにお
いても、底板部11aの端面にはアンカー筋Tが突出し
た状態で埋設されるとともに、ユニットどうしの接合面
(すなわち、底板部及び側板部の端面)には止水用の目
地材が介在させられてその水密性が確保されるようにな
っており、またコンクリートユニットIIA、IIBど
うしは、例えば第5図及び第6図に示すようなユニット
の端面に埋設された継手金物22を介してボルト20、
ナツト21により一体化されるとともに、側壁部の上端
に架は渡されたプレキャストコンクリート製の梁部13
により固定される点は先のコンクリートユニット10と
同様である。 一方、前記ブロックIIA、IIBの各側板部llb、
llcの上端にも、梁部13を止める長ボルト16をね
じ込むためのインサート26が埋設され、また底板部1
1aには必要に応じて連結金物30を固定するためのイ
ンサート23を埋設した凹部24が形成されている。 さて前記第1及び第2のコンクリートユニット10、I
IA、IIBの上端に架は渡されるプレキャーストコン
クリート製の梁部13について説明すると、これはコン
クリートによって四角柱状に形成されていて長手方向に
連結されたコンクリートユニット10、IIA、IIB
の上端ならびに間仕切り壁2の上端を固定すると共に、
上部建築物(図示例では家屋)Hの1階床パネルを支持
するようになっている。 なお、間仕切り壁2は予め工場において、平板状に形成
された複数のプレキャストコンクリートパネル2aを底
板部上に立設し、パネルの面方向につないで形成された
ものである。 なお、間仕切り壁2を構成するプレキャストコンクリー
トパネル2aの立設手段は例えば地下室本体1の床部に
突設したアンカーボルトやあるいは継手金物などを介し
て固定するようにすればよく、またパネルどうしの連結
手段はボルト・ナツトにより連結される継手金物などを
介して実施するようにすればよい。 ところで、家屋Hとしては、例えばユニット化した床パ
ネルを梁部13の上に敷き込み、その上に1階の壁パネ
ルおよび2階の床パネル、2階の壁パネルを組み上げ、
さらに、軸組、木組等をして、屋根パネルを組み立てて
なる構成のものなどが挙げられるが、家屋の構成はこの
ようなものに限定されるものではなく、在来工法で構築
されるものや、ユニット住宅などであっても良い。 なお、前記各パネル工法による家屋の場合における家屋
と梁部との接合は、例えば梁部の上面に、アンカーボル
トを突出させて設けておき、このアンカーボルトを介し
て壁、床等のパネルを一体化するようにすればよい。 次に、このように構成されたコンクリート製組立型地下
室の施工方法および作用を説明する。 まず、地下室本体1を構成する各プレキャストコンクリ
ートユニット10、IIA、IIBは、工場において、
予め一定の寸法、形状にコンクリート等によって一体に
打設して形成される。 そして、これらユニットは、トラックによって作業現場
に運搬されるが、この際、地下室本体lは、コーナー部
を構成する第1のコンクリートユニット10と、このユ
ニット10の間に配設されたL字型の第2のコンクリー
トユニットIIA、11Bとから構成されているため、
基本的に2形態をしたプレキャストコンクリート製品を
工場から運搬すれば良く、また地下室の形態を大型化す
る場合には、第1のコンクリートユニット10の間に挾
まれる第2のコンクリートユニットIIA、11Bの数
を増すことにより対応できるので、コンクリートユニッ
ト自身を大型化する必要がなく、現場への運搬性をきわ
めて良好にすることができる。 次に、現場において、地下室を組立てるには、地下室を
構築すべき地面の根切り作業を行ない、所定の大きさの
穴を掘った後、割栗地業工程、捨てコンクリートの打設
工程を経て、基盤部の施工を行ない、また、この際にコ
ンクリートユニット10、llA111Bの据え付はレ
ベルの基準となる鋼管を埋め込む。 次いで、各コンクリートユニットをトラックからクレー
ン等を使って吊り下ろし、次々にこれらを組合わせて接
合していくわけであるが、その組立て順序は例えば以下
に説明するような工程により行なう。なお、以下に説明
する施工工程は一例であって、他の工程によるものであ
って・もよいことは勿論である。
"Industrial Field of Application" The present invention relates to a prefabricated concrete basement and a method for constructing a prefabricated concrete basement, which are suitable as basements for residential buildings, and particularly relates to a rectangular box-shaped basement body with an open top, and a method for constructing a prefabricated concrete basement. The present invention relates to a basement which is comprised of a partition wall disposed on the inside to partition the inside of the basement main body, and on which a building such as a house is placed, and a construction method thereof. ``Prior Art'' Due to the worsening housing situation in recent years, basements have been installed in ordinary houses as well. Traditionally, the basements of houses were often configured as underground storage, so the structure was also made up of, for example, container-shaped capsules.
It was installed in a hole dug in the ground using an anchor bolt, and then the hole was backfilled.
reference). However, since the basement of this type of configuration functions as an underground storage, the overall internal size is small and does not fully satisfy the functions required as a living room in a house. Therefore, in recent years, there has been a trend to make basements made of concrete and make the entire room larger. Such reinforced concrete basements are generally constructed using cast-in-place concrete, for example. First, use a power shovel or the like to excavate a bit wider than the basement site, then spread gravel at the bottom of the excavation, and pour concrete on top of the gravel. So-called foundation concrete construction will be carried out. Then, the floor reinforcing bars are arranged in a grid pattern, and concrete is poured onto the floor reinforcing bars. At this time, protruding bars connected to the side wall reinforcing bars protrude from the surface of the concrete at the positions where the side walls will be erected. Set it up so that it does. Next, after the concrete on the floor hardens, the vertical reinforcements of the sidewalls are connected to the protruding reinforcements protruding at predetermined positions, and the horizontal reinforcements are connected to these vertical reinforcements of the sidewalls, and the reinforcements of the sidewalls are constructed. Next, formwork was assembled on both sides of the constructed side wall reinforcing bars,
Concrete will be poured inside and the side walls will be constructed. After the concrete for the side walls has hardened, the formwork is dismantled and the space outside the side walls is filled in to complete the construction. ``Problem to be solved by the invention'' In the conventional basement technology described above, the construction work involved pouring concrete on-site, which had disadvantages such as poor work efficiency on-site and a long construction period. . Moreover, in construction work using cast-in-place concrete, when building side walls, it is necessary to provide space for assembling formwork on both sides of the side wall reinforcing bars, and the ground must be dug wider than the construction area. There were problems such as high cost. Therefore, as a result of intensive research to solve these problems, the inventors of the present invention found that if the entire basement is constructed by joining precast concrete units, work efficiency on site will be improved, and the basement can be constructed by simply installing the units. They came up with the idea that the area required for excavation would be small because this would result in the formation of However, simply dividing the inside of the basement into precast concrete units leaves problems to be solved, such as the units themselves becoming larger and the types of units increasing. Also, if the basement itself is precast, it is necessary to fill in the space between the ground and the unit to integrate them.
There remains the problem that the grouting work required for this purpose is time-consuming. The present invention has been made in view of the above circumstances, and its purpose is to be able to form a basement using fewer types of precast concrete units and to improve work efficiency on site. In particular, it is an object of the present invention to provide a prefabricated concrete basement that can integrate the basement main body and the ground without grouting, and a method for constructing the same. "Means for Solving the Problems" In order to achieve the above object, the basement of the present invention includes a rectangular box-shaped basement body with an open top, and a basement body arranged inside the basement body to partition the inside of the basement body. A basement consisting of partition walls and on which a building constituting a house or the like is placed, the basement main body being located at a corner of the basement and at two adjacent edges of the bottom plate. a first concrete unit with a side plate section erected; and a second concrete unit arranged between the first concrete unit located at a corner of the basement and with a side plate section erected on the edge of the bottom plate section; When these first and second concrete units are assembled, a floor concrete part formed from cast-in-place concrete is formed inside a square hole surrounded by the bottom plate parts of the first and second concrete units. In addition, as a construction method for such a basement, a first concrete unit with side panels erected on two adjacent edges of the bottom panel is installed at the four corners of the basement, and these first concrete units are installed at the four corners of the basement. An L-shaped second concrete unit with a side plate erected on the edge of the bottom plate is placed between the concrete units, and after the adjacent concrete units are tightly connected to each other, the first and second concrete units are placed between the concrete units. A suitable method is to pour concrete by on-site pouring into the square hole surrounded by the bottom plate portions of the units when assembled. "Function" According to the present invention, the first concrete unit in which the side plate parts are erected on two adjacent edges of the bottom plate part is located in the corner part of the basement, and between these first concrete units, the L The surroundings of the basement can be constructed by arranging the second concrete units in the shape of a letter and joining the side and bottom plates of adjacent concrete units to each other, and then pouring concrete into the base by pouring on-site. By doing this, the main body of the basement, which is the main part of the basement, can be constructed, and the construction work at the site can be made more efficient. In addition, in the present invention, since most of the floor of the basement main body is formed of cast-in-place concrete, it is possible to integrate the basement main body and the foundation, and in particular, it is possible to omit grouting work after constructing the concrete unit. becomes possible. "Embodiment" An embodiment of the present invention will be described below with reference to FIGS. 1 to 9. In these figures, reference numeral G indicates a basement according to the present invention, and this basement G includes a rectangular box-shaped basement body 1 with an open top, and a basement body 1 arranged inside the basement body 1 so as to allow the inside of the basement body 1 to be viewed. The basic structure is mainly composed of a partition wall 2, and a building H constituting a house or the like is placed on top of the basement main body 1 and partition wall 2. As shown in FIGS. 2 and 3, the basement main body 1 is located at the four corners of the basement, and has side plate portions 10b at two adjacent edges of the bottom plate portion 10a.
. Cast-in-place concrete is placed inside the square hole surrounded by the bottom plate parts 10a and lla when the first and second concrete units 10, IIA, and IIB are assembled. C constitutes the floor part, and the side plate parts 10b, loc, l of the concrete units 10.11A and 11B
A beam section 13 made of precast concrete is placed over the partition wall 2 and the partition wall 2 so that the building H can be placed thereon. Concrete unit 10, I that constitutes the basement main body 1
To explain specifically about IA and IIB, these concrete units 10, IIA, and 11B are each manufactured in advance in a factory to a predetermined shape and size. In the embodiment, the concrete units 10 constitute the four corners of the basement, and a plurality of second concrete units IIA and IIB are connected to each other to constitute the central side wall of the basement. It has become. In addition, these concrete units 10, IIA. Joint material is applied to the end face of 11B, and concrete unit 10. Needless to say, sufficient aqueous properties are ensured in IIA and IIB. In the embodiment, the first concrete unit 1
0 is mainly composed of a bottom plate part 10a having an elongated shape in the longitudinal direction of the basement, and a large width side plate part 10b and a small width side plate part 10c which are erected on two adjacent sides of this bottom plate part 10a. In addition, anchor reinforcements T are embedded in the end face of the bottom plate portion 10a in a state that protrudes from the end face in order to strengthen the connection with the floor made of cast-in-place concrete. As shown in FIGS. 5 and 6, joint hardware 22 is embedded in the joint end surfaces of the bottom plate portion 10a and the side plate portions 10b and 10c, respectively, and is fastened with bolts and nuts 20, 21. This allows the units to be joined together even more firmly. Note that, in addition to the joint hardware 22, an insert 2 may be installed in the bottom plate portion 10a of the concrete unit 10 as needed.
A recess 24 is formed in which a concrete unit 3 is buried, and adjacent concrete units 10 can be fixed via a connecting hardware 30 for connecting the units, which is fixed with a bolt 25 to an insert 23 buried in the recess 24 ( (See Figures 7 and 8). Moreover, FIG. 9 shows the connection structure between the side plate parts 10b110c and the beam part 13, and the beam part 13 is connected to the side plate parts 10b, 10c
It is fixed by screwing a long bolt 16 passing through the beam portion 13 into an insert 26 buried in the upper end of the beam. In the illustrated example, the long bolt 16 is mainly composed of a shaft body 16a formed with a male thread, and a nut 16c screwed onto the upper part of the shaft body 16a via a fixing plate 16b. There is. Next, to explain the second concrete unit llA111B, the concrete unit IIA that constitutes the side wall section along the longitudinal direction of the basement has a side plate section 11b having a width larger than that of the other concrete unit IIB, and a bottom plate section. The basic structure is such that concrete unit 11a is shorter than the other concrete unit IIB. More specifically, the bottom plate portion 11a of the concrete unit IIA is the same as the bottom plate portion 1 of the first concrete unit 10.
The bottom plate portion 11a of the concrete unit IIB is formed to match the length dimension of the bottom plate portion 10a of the first concrete unit 10. In addition, in these concrete units IIA and 11B, anchor reinforcements T are buried in the end surface of the bottom plate part 11a in a protruding state, and anchor reinforcements T are buried in the joint surfaces of the units (i.e., the end faces of the bottom plate part and the side plate parts). Water joint material is interposed to ensure watertightness, and concrete units IIA and IIB are buried in the end faces of the units as shown in Figures 5 and 6, for example. the bolt 20 via the joint hardware 22,
A beam part 13 made of precast concrete is integrated with a nut 21 and a frame is passed over the upper end of the side wall part.
The point of fixation is the same as that of the concrete unit 10 described above. On the other hand, each side plate portion llb of the blocks IIA and IIB,
An insert 26 for screwing in the long bolt 16 that fixes the beam part 13 is also buried in the upper end of the llc, and the bottom plate part 1
A recess 24 is formed in 1a, in which an insert 23 for fixing the connecting hardware 30 is buried, if necessary. Now, the first and second concrete units 10, I
Explaining the precast concrete beam section 13, which is passed over the upper ends of IA and IIB, it is formed into a rectangular column shape of concrete and connects the concrete units 10, IIA, and IIB in the longitudinal direction.
While fixing the upper end and the upper end of the partition wall 2,
It supports the first floor panel of an upper building (a house in the illustrated example) H. The partition wall 2 is formed in advance at a factory by standing a plurality of flat precast concrete panels 2a on a bottom plate and connecting them in the surface direction of the panels. The precast concrete panels 2a constituting the partition wall 2 may be erected by, for example, anchor bolts protruding from the floor of the basement main body 1, or joint hardware. The connection means may be implemented through joint metal fittings connected by bolts and nuts. By the way, for the house H, for example, a unitized floor panel is laid on the beam part 13, and a first floor wall panel, a second floor floor panel, and a second floor wall panel are assembled thereon.
Furthermore, the structure of the house is not limited to these, but it can be constructed using conventional construction methods. It may be a property, a unit house, etc. In addition, in the case of a house constructed using each of the panel construction methods described above, the connection between the house and the beam is achieved by, for example, providing an anchor bolt protruding from the upper surface of the beam, and attaching panels such as walls and floors via the anchor bolt. All you have to do is integrate them. Next, the construction method and operation of the concrete prefabricated basement constructed as described above will be explained. First, each precast concrete unit 10, IIA, and IIB constituting the basement main body 1 is manufactured at a factory.
It is formed in advance by integrally pouring concrete or the like into a certain size and shape. Then, these units are transported to the work site by truck, and at this time, the basement main body l is connected to the first concrete unit 10 constituting the corner part and the L-shaped concrete unit 10 disposed between this unit 10. Since it is composed of the second concrete units IIA and 11B,
Basically, it is sufficient to transport precast concrete products in two forms from the factory, and when the form of the basement is enlarged, the second concrete units IIA and 11B sandwiched between the first concrete units 10 are used. This can be achieved by increasing the number of concrete units, so there is no need to increase the size of the concrete unit itself, making it extremely easy to transport to the site. Next, to assemble the basement at the site, the roots of the ground where the basement is to be constructed are cut, a hole of a specified size is dug, and then the process of quarrying the ground and placing concrete is carried out. , the foundation is constructed, and at this time, the concrete unit 10 and 11A111B are installed by embedding steel pipes that serve as level standards. Next, each concrete unit is lowered from the truck using a crane or the like, and these units are assembled and joined one after another, and the assembly order is performed, for example, by the steps described below. Note that the construction process described below is an example, and it goes without saying that other processes may be used.

【コーナー部のユニットの据え付け】[Installing the corner unit]

一番最初の据え付けは、地下室の配置を決めるコーナー
部のユニット10がら始め、このユニット10を地下室
の四隅となる位置に置く。
The first installation starts with the corner unit 10 that determines the layout of the basement, and this unit 10 is placed at the four corners of the basement.

【第2のユニットの据え付け1 地下室の四隅となる位置に第1のコンクリートユニット
10を据え付けたならば、これらのコンクリートユニッ
トlOを基準に第2のコンクリートユニットIIA、I
IBを据え付は接合する。 この際(コンクリートユニット10111A、11Bを
接合する際)、各コンクリートユニット1O1IIAS
 IIBの間に連結金物3oを差し渡すとともに、これ
らユニットの接合面に埋設した継手金物を介して各ユニ
ットを一体化する。 【コンクリート床部の施工1 以上の工程によって根切り穴の内部にコンクリートユニ
ット10、IIA、IIBが接合されると、基盤部の位
置に四角い穴が開いた形となるので、この部分に現場打
ちによってコンクリートを打設し、締め固めれば、地下
室本体lの床部が完成する。 【間仕切り壁と梁部の施工】 以上の工程によって地下室本体1の施工が完了したなら
ば、地下室本体1の床部の上にプレキャストコンクリー
トパネル2aを立設し、それらを面方向に接合して間仕
切り壁2の施工を行なう。その後、地下室本体1の側壁
部上端及び間仕切り壁2の上端に梁部13を架は渡して
地下室の主要部を完成させる。 以上のようにして、地下室本体1と間仕切り壁2との施
工を終えたならば、内部の仕上げ工事等を完了させると
、第1図に示すような地下室が完成する。 一方、前記家屋Hの施工は、例えば、家屋の構成がパネ
ルを主体として構成されている場合には、梁部13の上
にユニット化した床パネルを敷き込み、その上に1階お
よび2階の壁パネルを組み上げ、さらに、軸組、木組等
をして、屋根パネルを組み立てて、建築物を構築すると
いった方法が採られる。 なお、1階部分の各壁パネルは、コンクリート製の梁部
の上面より突出するアンカーボルトへ壁パネルの下端の
穴を落とし込んでボルト締めにより、一体化すれば良い
。 以上の手順によれば、掘削穴の壁に沿って、コンクリー
トユニット10、IIA、IIBを据え付け、地下室本
体1をその周囲から築造していくようにしているので、
組立てられたコンクリートユニット10、IIA、II
Bが土留め壁となり、地下室内部の施工作業を現場にお
いて簡易に実施できるといった利点がある。 実施例では、地下室本体1を、地下室のコーナー部を構
成する第1のコンクリートユニット10と、地下室の側
壁を形成するL字型をした第2のコンクリートユニット
IIA、】lBとによりプレキャスト化し、現場におい
てはこれらユニットの接合と床部を構成するコンクリー
トの打設作業だけで、地下室本体1を形成し得て、現場
での組立てを容易に実施することができる。 また実施例では、隣接するコンクリートユニットは、ユ
ニット端面に埋設された継手金具22および連結金物3
0を介してそれぞれ接合される構成であるため、コンク
リートユニット及びコンクリート床板どうしが強固に接
合され、地下室本体1全体の強度を向上させることがで
きるといった利点がある。 また、このように構成された地下室本体1の梁部13を
基礎として、この上に家屋Hを組立てていく構成として
いるので、従来必要であった基礎の施工作業を省略する
ことができ、また、これにより基礎の位置に制限を受け
ることなく、地下室を形成することができるので、大型
の地下室を容易に築造することができるといった利点が
ある。 なお、本発明は前述した実施例に限定されるものではな
く、その設計要求などに応じて、ユニットの大きさ等を
変更できることは言うまでもない。 「発明の効果」 以上説明したように本発明によれば、次のような優れた
効果を奏する。 (a)請求項1記載のコンクリート製組立型地下室は、
上面が開口した矩形箱型の地下室本体と、この地下室本
体の内側に配設されて地下室本体の内部を仕切る間仕切
り壁とからなりかつこれらの上に家屋等を構成する建築
物を載せるようにした地下室であって、前記地下室本体
を、地下室のコーナー部に位置しかつ底板部の隣接する
2つの縁部に側板部を立設した第1のコンクリートユニ
ットと、地下室のコーナー部に位置する第1のコンクリ
ートユニットの間に並べられかつ底板部の縁部に側板部
を立設した第2のコンクリートユニットと、これら第1
及び第2のコンクリートユニットを組んだときにそれら
の底板部によって囲まれる四角穴の内部に現場打ちコン
クリートより形成された床コンクリート部とから構成し
たことを特徴とするものであるから、各コンクリート製
品を相互に連結する単純作業と床部への打設作業とによ
って地下室本体を簡単に形成し得て、現場での作業能率
を向上させることができる。 また本発明では、この地下室本体の内側に間仕切り壁を
立て、地下室本体と間仕切り壁の上端にそれぞれプレキ
ャストコンクリート製の梁部を架は渡すことにより、地
下室本体の内部を仕切ってその上に家屋等を構成する建
築物を載せることができるので、住宅基礎の施工を省略
することが可能になるといった長所もある。 なお、本発明では、地下室本体の床部の大部分を現場打
ちコンクリートにより形成したので、地下室本体と基盤
部との間を一体化することができ、特にコンクリートユ
ニット施工後のグラウト作業を省略することが可能にな
るといった効果もある。 (b)請求項2記載の地下室の施工方法は、底板部の隣
接する2つの縁部に側板部を立設した第1のコンクリー
トユニットを、地下室の四隅となるコーナー部に据え付
けるとともに、これら第1のコンクリートユニットの間
に底板部の縁部に側板部を立設したL字型の第2のコン
クリートユニットを配置し、隣接するコンクリートユニ
ットどうしを相互に緊結接合した後、第1及び第2のコ
ンクリートユニットを組んだときにそれらの底板部によ
って囲まれる四角穴の内部に現場打ちによってコンクリ
ートを打設することを特徴とするものであるから、前記
地下室を有効適切に製造することができるといった効果
もある。
[Installation of the second unit 1 Once the first concrete unit 10 is installed at the four corners of the basement, the second concrete units IIA and I are installed based on these concrete units IO.
The IB is installed and joined. At this time (when joining concrete units 10111A and 11B), each concrete unit 1O1IIAS
A connecting hardware 3o is passed between IIB, and each unit is integrated via a joint hardware embedded in the joint surfaces of these units. [Concrete floor construction 1] Once the concrete units 10, IIA, and IIB are joined inside the root cut holes through the above process, a square hole will be made at the base position, so this part will be poured on-site. By pouring concrete and compacting it, the floor of the basement main body l is completed. [Construction of partition walls and beams] Once the construction of the basement main body 1 is completed through the above steps, the precast concrete panels 2a are erected on the floor of the basement main body 1, and they are joined in the plane direction. Partition wall 2 will be constructed. Thereafter, the beam portions 13 are passed over the upper ends of the side walls of the basement main body 1 and the upper ends of the partition walls 2 to complete the main part of the basement. After completing the construction of the basement main body 1 and the partition wall 2 as described above, and completing the interior finishing work, etc., the basement as shown in FIG. 1 is completed. On the other hand, in the construction of the house H, for example, if the house is mainly composed of panels, a unitized floor panel is laid on the beam part 13, and the first and second floors are constructed on top of the unitized floor panel. A method is used to construct a building by assembling the wall panels, then assembling frames, timber, etc., and then assembling the roof panels. In addition, each wall panel of the first floor portion may be integrated by inserting a hole at the lower end of the wall panel into an anchor bolt protruding from the upper surface of a concrete beam and tightening the bolt. According to the above procedure, the concrete units 10, IIA, and IIB are installed along the walls of the excavation hole, and the basement main body 1 is constructed from around them.
Assembled concrete unit 10, IIA, II
B serves as an earth retaining wall, which has the advantage that construction work inside the basement can be easily carried out on site. In the example, the basement main body 1 is precast by a first concrete unit 10 that forms the corner part of the basement and L-shaped second concrete units IIA, ]lB that form the side walls of the basement. In this case, the basement main body 1 can be formed only by joining these units and pouring concrete that will constitute the floor, and assembly can be easily carried out on site. In addition, in the embodiment, adjacent concrete units have a joint fitting 22 and a connecting fitting 3 buried in the end face of the unit.
Since the concrete unit and the concrete floor plate are connected to each other through 0, the concrete unit and the concrete floor plate are firmly connected to each other, and there is an advantage that the strength of the entire basement main body 1 can be improved. Moreover, since the structure is such that the house H is assembled on the beam part 13 of the basement main body 1 constructed in this way as a foundation, the construction work of the foundation that was conventionally necessary can be omitted, and As a result, a basement can be formed without being restricted by the location of the foundation, so there is an advantage that a large basement can be easily constructed. It should be noted that the present invention is not limited to the embodiments described above, and it goes without saying that the size of the unit, etc. can be changed depending on the design requirements. "Effects of the Invention" As explained above, the present invention provides the following excellent effects. (a) The prefabricated concrete basement according to claim 1 comprises:
The basement consists of a rectangular box-shaped basement with an open top, and a partition wall placed inside the basement to partition the interior of the basement, on which a building such as a house is placed. In the basement, the basement main body is divided into a first concrete unit located at a corner of the basement and having side panels erected on two adjacent edges of a bottom plate, and a first concrete unit located at the corner of the basement. a second concrete unit arranged between the concrete units and having a side plate section erected on the edge of the bottom plate section;
and a floor concrete part formed from cast-in-place concrete inside the square hole surrounded by the bottom plate part of the second concrete unit when assembled, so each concrete product The main body of the basement can be easily formed by the simple work of interconnecting the parts and the work of pouring into the floor, and the work efficiency on site can be improved. In addition, in the present invention, a partition wall is erected inside the basement main body, and a frame made of precast concrete is passed between the basement main body and the upper end of the partition wall, so that the inside of the basement main body is partitioned and a house etc. It also has the advantage of being able to mount the buildings that make up the building, making it possible to omit the construction of a housing foundation. In addition, in the present invention, since most of the floor of the basement main body is formed of cast-in-place concrete, the basement main body and the base can be integrated, and in particular, grouting work after concrete unit construction can be omitted. It also has the effect of making it possible. (b) The method for constructing a basement according to claim 2 is to install a first concrete unit in which side panels are erected on two adjacent edges of a bottom panel at the four corners of the basement; A second L-shaped concrete unit with a side plate erected on the edge of the bottom plate is placed between the first concrete unit, and after the adjacent concrete units are tightly connected to each other, the first and second concrete units are placed between the first and second concrete units. When the concrete unit is assembled, concrete is cast in the square hole surrounded by the bottom plate of the concrete unit, so that the basement can be manufactured effectively and appropriately. It's also effective.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明にかかるコンクリート製組立型地下室及び
その施工方法の一実施例を説明するために示したもので
、第1図は地下室の上に家屋等を構成する建築物を載置
した状態を示す断面図、第2図は床部の施工前の地下室
の概略を示す斜視図、第3図は床部を施工した後の地下
室の概略を示す斜視図、第4図は床部の施工前の地下室
を示す断面図、第5図は隣接するコンクリートユニット
の接合構造を示す平面図、第6図はその断面図、第7図
は隣接するコンクリートユニットを繋ぐ連結金物を示す
平面図、第8図はその断面図、第9図は梁部の接合構造
を示す断面図である。 G・・・・・・地下室、H・・・・・・家屋、C・・・
・・・コンクリート床部、1・・・・・・地下室本体、
2・・・・・・間仕切り壁、lO・・・・・・第1のコ
ンクリートユニット、IIA、11B・・・・・・第2
のコンクリートユニット、13・・・・・・プレキャス
トコンクリート製の梁部、16・・・・・・長ボルト、
22・・・・・・継手金物、30・・・・・・連結金物
The drawings are shown to explain an example of a prefabricated concrete basement and its construction method according to the present invention, and FIG. Figure 2 is a perspective view showing the outline of the basement before floor construction, Figure 3 is a perspective view showing the outline of the basement after floor construction, and Figure 4 is before floor construction. Fig. 5 is a plan view showing the joint structure of adjacent concrete units, Fig. 6 is a cross-sectional view thereof, Fig. 7 is a plan view showing the connecting hardware connecting adjacent concrete units, Fig. 8 The figure is a sectional view thereof, and FIG. 9 is a sectional view showing the joint structure of the beam portion. G... Basement, H... House, C...
... Concrete floor part, 1 ... Basement main body,
2... Partition wall, lO... First concrete unit, IIA, 11B... Second
concrete unit, 13... precast concrete beam section, 16... long bolt,
22...Joint hardware, 30...Connection hardware.

Claims (1)

【特許請求の範囲】 1)上面が開口した矩形箱型の地下室本体と、この地下
室本体の内側に配設されて地下室本体の内部を仕切る間
仕切り壁とからなりかつこれらの上に家屋等を構成する
建築物を載せるようにした地下室であって、前記地下室
本体は、地下室のコーナー部に位置しかつ底板部の隣接
する2つの縁部に側板部を立設した第1のコンクリート
ユニットと、地下室のコーナー部に位置する第1のコン
クリートユニットの間に並べられかつ底板部の縁部に側
板部を立設した第2のコンクリートユニットと、これら
第1及び第2のコンクリートユニットを組んだときにそ
れらの底板部によって囲まれる四角穴の内部に現場打ち
コンクリートより形成された床コンクリート部とから構
成されていることを特徴とするコンクリート製組立型地
下室。 2)上面が開口した矩形箱型の地下室本体と、この地下
室本体の内側に配設されて地下室本体の内部を仕切る間
仕切り壁とからなりかつこれらの上に家屋等を構成する
建築物を載せるようにした地下室の施工方法であって、 底板部の隣接する2つの縁部に側板部を立設した第1の
コンクリートユニットを、地下室の四隅となるコーナー
部に据え付けるとともに、これら第1のコンクリートユ
ニットの間に底板部の縁部に側板部を立設したL字型の
第2のコンクリートユニットを配置し、隣接するコンク
リートユニットどうしを相互に緊結接合した後、第1及
び第2のコンクリートユニットを組んだときにそれらの
底板部によって囲まれる四角穴の内部に現場打ちによっ
てコンクリートを打設することを特徴とするコンクリー
ト製組立型地下室の施工方法。
[Scope of Claims] 1) Consisting of a rectangular box-shaped basement main body with an open top surface and a partition wall arranged inside the basement main body to partition the inside of the basement main body, and a house etc. is constructed on top of these. The basement is adapted to house a building, and the basement main body includes a first concrete unit that is located at a corner of the basement and has side panels erected on two adjacent edges of a bottom panel; When these first and second concrete units are assembled with a second concrete unit that is arranged between the first concrete units located at the corner of the A prefabricated concrete basement characterized by comprising a floor concrete part formed from cast-in-place concrete inside a square hole surrounded by the bottom plate part. 2) Consisting of a rectangular box-shaped basement with an open top and a partition wall placed inside the basement to partition the inside of the basement, and on which a building such as a house is placed. A construction method for a basement in which a first concrete unit with side panels erected on two adjacent edges of a bottom panel is installed at the four corners of the basement, and these first concrete units are installed at four corners of the basement. A second L-shaped concrete unit with a side plate erected on the edge of the bottom plate is placed between them, and after the adjacent concrete units are tightly connected to each other, the first and second concrete units are connected. A construction method for a prefabricated concrete basement, characterized by pouring concrete by on-site pouring into a square hole surrounded by the bottom plate parts when assembled.
JP2150302A 1990-06-08 1990-06-08 Concrete assembling basement and concrete assembling basement construction method Expired - Fee Related JP2936492B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2150302A JP2936492B2 (en) 1990-06-08 1990-06-08 Concrete assembling basement and concrete assembling basement construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2150302A JP2936492B2 (en) 1990-06-08 1990-06-08 Concrete assembling basement and concrete assembling basement construction method

Publications (2)

Publication Number Publication Date
JPH0444526A true JPH0444526A (en) 1992-02-14
JP2936492B2 JP2936492B2 (en) 1999-08-23

Family

ID=15494037

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2150302A Expired - Fee Related JP2936492B2 (en) 1990-06-08 1990-06-08 Concrete assembling basement and concrete assembling basement construction method

Country Status (1)

Country Link
JP (1) JP2936492B2 (en)

Also Published As

Publication number Publication date
JP2936492B2 (en) 1999-08-23

Similar Documents

Publication Publication Date Title
US5493838A (en) Method of constructing a concrete basement from prefabricated concrete panels
KR100462236B1 (en) panel for external underground wall of building, structure and construction method using the same
JPH0444526A (en) Built-up type concrete basement and execution method therefor
JPH0427018A (en) Construction of concrete assembly-type basement
JP2854168B2 (en) Structural structure of concrete basement
JP2941893B2 (en) Concrete basement basement
JP2877896B2 (en) Concrete basement basement
JP2506484B2 (en) Concrete assembled basement
JP2931158B2 (en) Structural structure of concrete basement
JPH0427077A (en) House with concrete built-up type basement
JP2669708B2 (en) Concrete assembling basement skeleton structure
JPH0427022A (en) Structure of concrete assembly-type basement
JPH0444529A (en) Built-up type concrete basement and execution method thereof
JP2781640B2 (en) Construction method of concrete basement
JPH0427023A (en) Structure of concrete assembly-type basement
KR200266585Y1 (en) panel for external underground wall of building and external underground wall- structure using the same
JPH0427021A (en) Structure of concrete assembly-type basement
JP2960479B2 (en) Building block for concrete underground unit
JPH1121916A (en) Basement made of steel and construction method thereof
JPH1121917A (en) Basement made of steel
JPH0444528A (en) Built-up type concrete basement and execution method thereof
JPS63300124A (en) Wall panel of basement and the like
JPH0444527A (en) Skeleton construction of concrete built-up type basement
JPH0427027A (en) Assembly type concrete underground room
JPH0427020A (en) Block unit for basement construction

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees