JPH04265332A - Structure for anchoring rc beam main reinforcing bar - Google Patents

Structure for anchoring rc beam main reinforcing bar

Info

Publication number
JPH04265332A
JPH04265332A JP2452791A JP2452791A JPH04265332A JP H04265332 A JPH04265332 A JP H04265332A JP 2452791 A JP2452791 A JP 2452791A JP 2452791 A JP2452791 A JP 2452791A JP H04265332 A JPH04265332 A JP H04265332A
Authority
JP
Japan
Prior art keywords
column
reinforcement
main
anchoring
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2452791A
Other languages
Japanese (ja)
Inventor
Minoru Cho
稔 長
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hazama Ando Corp
Original Assignee
Hazama Gumi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hazama Gumi Ltd filed Critical Hazama Gumi Ltd
Priority to JP2452791A priority Critical patent/JPH04265332A/en
Publication of JPH04265332A publication Critical patent/JPH04265332A/en
Pending legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

PURPOSE:To facilitate the working efficiency of bar arrangement in a joining section and to enable beam main reinforcing bars of precast beams in a column beam joining section to have bearing force and anchoring force sufficient against concrete. CONSTITUTION:Opposed precast beams 3 are mounted on a column and beam joining section 1 on the upper part of a column 2. Beam main reinforcing bars 4 projected straight to the ends of the precast beams are fixed to the front end sections 5 of the beam main reinforcing bars using anchoring plates 7 as screw reinforcing bars in the direction of the intersection with them with nuts 6, and concrete is placed in a form of the column and beam joining section 1.

Description

【発明の詳細な説明】[Detailed description of the invention]

【0001】0001

【産業上の利用分野】本発明は、鉄筋コンクリート造(
RC造)における柱はり内部の定着構造、特にはり部材
をプレキャストとする場合におけるRC造はり主筋の定
着構造に関する。
[Industrial Application Field] The present invention relates to reinforced concrete construction (
The present invention relates to an anchoring structure inside a column beam in a RC construction (RC construction), and particularly to an anchoring structure for the main reinforcement of an RC construction beam when the beam member is precast.

【0002】0002

【従来の技術】元来、プレキャストはりの端部に突設し
たはり主筋は、柱はりの接合部内において、後打ちコン
クリートとに大きな定着力(付着力)を得るために十分
な定着長をとっていた。例えば、図4に示すRC造はり
主筋は、曲げ上げ定着構造と称するものであるが、この
構造は柱101の上部に相対向して配置したプレキャス
トはり102,102′を用い、これらプレキャストは
りの端部に突設したL字状の下端筋103,103′を
それぞれ水平面において重なるように配筋することによ
り、柱はり接合部内の下端筋を後打ちするコンクリート
105に対して十分な定着長をとっている。
[Prior Art] Originally, the beam main reinforcements protruding from the ends of precast beams were designed to have a sufficient anchoring length to obtain a large anchoring force (adhesion force) to the post-cast concrete within the joints of the column beams. was. For example, the main reinforcement of the RC building beam shown in FIG. By arranging the L-shaped lower end reinforcements 103 and 103' that protrude from the ends so that they overlap each other in the horizontal plane, a sufficient anchorage length can be provided for the concrete 105 that is later cast for the lower end reinforcement in the column beam joint. I'm taking it.

【0003】また、図5に示すRC造のプレキャストは
りは、はりの端部に圧接コブ104を設け、はり端部の
鉄筋とコンクリートの付着および圧接コブ部分の支圧力
によってはり主筋を十分に定着させようとしたものであ
る。
[0003] In addition, the RC precast beam shown in Fig. 5 has a pressure welding bump 104 at the end of the beam, and the main reinforcement of the beam is sufficiently anchored by the adhesion of the reinforcing bars and concrete at the end of the beam and the bearing force of the pressure bump portion. This is what I was trying to do.

【0004】0004

【発明が解決しようとする課題】しかしながら、上記図
4のRC造はり主筋の構造では、はり主筋が異形鉄筋で
あるため、はり主筋を十分に定着するには、25dフッ
ク付(d:異径鉄筋径)の定着長さを必要とし、このフ
ックのために柱はり接合部内の配筋が複雑になった。ま
た、上記従来のものは、はり主筋を曲げ加工した状態で
プレキャストはりを製作するためにRC型枠の取り外し
が困難であった。この場合、はり主筋を型枠の取り外し
後に曲げることも考えられるが、プレキャストはりに重
量があって曲げ加工の作業が大へんであるといった問題
点があった。
[Problem to be Solved by the Invention] However, in the structure of the RC building beam main reinforcement shown in Fig. 4, the beam main reinforcement is a modified reinforcing steel, so in order to sufficiently anchor the beam main reinforcement, it is necessary to use a 25d hook (d: different diameter). The hooks required a fixed length of 300 mm (diameter), and this hook complicated the reinforcement arrangement within the column-beam joint. In addition, in the conventional method described above, it was difficult to remove the RC formwork because the precast beam was manufactured with the main reinforcement of the beam being bent. In this case, it is possible to bend the beam main reinforcement after removing the formwork, but there is a problem that the precast beam is heavy and the bending work is difficult.

【0005】一方、上記図5のRC造はり主筋の構造は
、圧接と加熱により圧接コブを設けるが、支圧力を増大
するために圧接コブを多数設けることは手間が掛り、ま
た圧接コブ自体それほど大きなものは作れず、したがっ
て支圧力も大きいものとは云えないという問題点があっ
た。
On the other hand, in the structure of the main reinforcement of the RC building beam shown in FIG. 5, pressure welding bumps are provided by pressure welding and heating, but it takes time and effort to provide a large number of pressure bumps to increase the bearing force, and the pressure bumps themselves are not very large. The problem was that it was not possible to make large ones, and therefore the bearing force could not be said to be large.

【0006】本発明は、これらの問題点を解決せんとし
たものであり、その目的とするところはプレキャストは
りにおいて、直物(ストレート)の鉄筋をはり主筋とし
て用いることにより曲げ加工を行なわず、しかも従来の
ものより相対的にはり主筋を短くしながらも、コンクリ
ートに対する十分な支圧力と定着力を有するRC造はり
主筋の定着構造を提供するものである。
The present invention aims to solve these problems, and its purpose is to use a straight reinforcing bar as the main reinforcing bar in a precast beam, thereby eliminating the need for bending. Moreover, the present invention provides an anchoring structure for RC beam main reinforcements that has sufficient bearing force and anchoring force against concrete, even though the beam main reinforcements are relatively shorter than conventional ones.

【0007】[0007]

【課題を解決するための手段】本発明は、上記目的に着
目して完成したものであり、その要旨は柱はりの接合部
内におけるプレキャストはりの定着構造であって、該定
着構造が、相対向するプレキャストはりの端部にストレ
ートに突設したはり主筋と、該はり主筋と交差する方向
に固定した定着板とを含むRC造はり主筋の定着構造に
ある。
[Means for Solving the Problems] The present invention was completed focusing on the above object, and its gist is a fixing structure for a precast beam within a joint of a column beam, the fixing structure having The anchoring structure of the RC beam main reinforcement includes a beam main reinforcement straightly protruding from the end of a precast beam, and a fixing plate fixed in a direction intersecting the beam main reinforcement.

【0008】なお、上記本発明の特徴としての定着板は
、柱上の前後、左右のプレキャストはりの端部から突設
した多数のはり主筋を位置決めし、かつこの定着板を少
なくともはり鉄筋先端部に設けたネジとナットにより固
定するようにしている。
The fixing plate as a feature of the present invention positions a large number of beam main reinforcements protruding from the ends of the front and rear, left and right precast beams on the column, and the fixing plate is attached to at least the tip of the beam reinforcing bars. It is fixed using screws and nuts provided in the.

【0009】[0009]

【作用】本発明は、プレキャストはりの端部にストレー
トに突設したはり主筋から型枠を取り外した後、このス
トレートのはり主筋を柱はり接合部内でこれと交差する
方向に定着板を固定しているので、はり主筋の定着長が
比較的短くともこれと交差する定着板により支圧力を十
分に負担する。
[Operation] In the present invention, after removing the formwork from the main beam bar that projects straight from the end of the precast beam, a fixing plate is fixed to the straight main bar in a direction that intersects this straight main bar within the column beam joint. Therefore, even if the anchoring length of the main beam reinforcement is relatively short, the anchoring plate that intersects with it can sufficiently bear the bearing force.

【0010】また、定着板とはり主筋をナットにより固
定すればナット径にも支圧力を負わせることができる。
Furthermore, if the fixing plate and the main reinforcing beam are fixed with nuts, bearing force can also be applied to the diameter of the nut.

【0011】[0011]

【実施例】図1は本発明の一実施例である上下方向のは
り主筋と定着板を省略したRC造はり主筋の定着構造の
平面図、図2は図1で使用している定着板の斜視図であ
る。
[Example] Fig. 1 is a plan view of the anchoring structure of the RC beam main reinforcement, in which the vertical beam main reinforcement and anchor plate are omitted, which is an embodiment of the present invention. FIG.

【0012】柱はり接合部1は、柱2の上部と前後左右
のプレキャストはり3を接合する箇所である。この場合
、柱1の上部は直接はり3を納めるか、柱上部の四方に
張り出したキャピタル上に載置できるようにしたもので
ある。
The column-beam joint 1 is a place where the upper part of the column 2 and the front, rear, left and right precast beams 3 are joined. In this case, the upper part of the pillar 1 is designed to accommodate the beam 3 directly or to be placed on capitals that extend in all directions at the upper part of the pillar.

【0013】プレキャストはり3の各端部には、同一平
面上にある左右と、別の同一平面上にある上下からそれ
ぞれ4本づつのはり主筋4を突設し、はり主筋4として
全体をネジ鉄筋とした先部5において、ナット6で別途
用意した四角枠の定着板7に固定している。この場合、
左右のはり主筋を別平面上に固定するには、図2に示す
ように、定着板の相対向する左右の上端に設けた右方溝
9と左方溝9′に行き違いに嵌入して配置する。なお、
図示していないが、上下のはり主筋も、上記と同様に、
上方溝10と下方溝10′とに嵌入して配置する。
At each end of the precast beam 3, four main beam reinforcements 4 are provided protruding from the left and right sides on the same plane, and from the top and bottom on another same plane, and the whole is screwed as the main beam reinforcement 4. The tip 5, which is made of a reinforcing bar, is fixed with a nut 6 to a square frame fixing plate 7 prepared separately. in this case,
To fix the left and right beam main reinforcements on different planes, as shown in Fig. 2, they are inserted into the right groove 9 and the left groove 9' provided at the upper ends of the left and right opposite sides of the fixing plate in opposite directions. do. In addition,
Although not shown, the upper and lower beam main reinforcements are also similar to the above.
It is disposed by fitting into the upper groove 10 and the lower groove 10'.

【0014】なお、8は柱上部に立設した柱筋である。[0014] Reference numeral 8 denotes a column reinforcement that is erected at the top of the column.

【0015】上記構成からなる柱はり接合部1の施工方
法を説明すると、まず、上下に対向するプレキャストは
り3を柱2の上部所定箇所に載置する。ついで、第2図
に示す四角枠の定着板7における下向きの上方溝10と
下方溝10′とを、上記した上下のプレキャストはりの
はり主筋4としてのネジ鉄筋の先部5に上方からそれぞ
れ嵌入する(図示せず)。ついで、左右に対向するプレ
キャストはり3の先部5を上記上下のはり主筋4より上
方において90度交差するようにして上記四角枠の定着
板7に設けた上向きの左方溝9と右方溝9′に嵌入する
。このようにして、定着板7とはり主筋4とは、予め先
部5のねじに仮着している32本のナット6を締め付け
ることにより一体に固定される。さらに、型枠(図示せ
ず)内へコンクリートを打設してスラブと共に柱2とは
り3の接合を行なう。
To explain the construction method of the pillar-beam joint 1 having the above-mentioned structure, first, vertically opposing precast beams 3 are placed at predetermined positions on the upper part of the pillar 2. Next, the downwardly directed upper grooves 10 and lower grooves 10' of the rectangular frame fixing plate 7 shown in FIG. (not shown). Next, an upward left groove 9 and a right groove are provided in the rectangular frame fixing plate 7 so that the tip portions 5 of the precast beams 3 facing left and right intersect at 90 degrees above the upper and lower beam main reinforcements 4. 9'. In this way, the fixing plate 7 and the main beam reinforcement 4 are fixed together by tightening the 32 nuts 6 that are temporarily attached to the screws of the tip portion 5 in advance. Further, concrete is poured into a formwork (not shown) to join the columns 2 and beams 3 together with the slab.

【0016】図3は、上記とは更に別の実施例を示すR
C造はり主筋の定着構造の縦断面図である。本実施例で
は、上下に対向するプレキャストはり3AはU型はりで
あり、まずこれを上下に対向してキャピタル2A上に載
置することによりプレキャストとして予め組み込まれた
はり主筋としての下端筋4aをを配置しておき、ついで
異なる上下の平面に2段のはり主筋である下筋4b,4
b′をプレキャストとして配筋した左右のプレキャスト
はり3をキャピタル上に載置し、さらに、その上から上
下方向のU型プレキャストはり3の内側下端に下筋4c
を配筋したものである。この場合、定着板7は左右方向
の下筋4b,4b′のネジ鉄筋の先部5に螺着したナッ
ト6により締め付けられて柱主筋8との間に挾持して固
定する。
FIG. 3 shows another embodiment of R
It is a longitudinal cross-sectional view of the anchoring structure of the C beam main reinforcement. In this embodiment, the vertically opposing precast beams 3A are U-shaped beams, and by first placing them vertically opposing each other on the capital 2A, the lower end reinforcements 4a as the beam main reinforcements that have been incorporated in advance as precast are removed. , and then lower reinforcements 4b and 4, which are two-stage main beam reinforcement, on different upper and lower planes.
Place the left and right precast beams 3 on which b' is precast reinforcement, and then place the lower reinforcement 4c on the inner lower end of the U-shaped precast beam 3 in the vertical direction from above.
This is the reinforcement. In this case, the fixing plate 7 is tightened by nuts 6 screwed onto the ends 5 of the threaded reinforcing bars of the lower reinforcements 4b and 4b' in the left and right direction, and is clamped and fixed between the column main reinforcements 8.

【0017】さらに、上下方向と左右方向の上端筋11
と12は、下端筋などの配設後に型枠内に自在に配筋し
、その後コンクリートを打設する。
Furthermore, upper end strips 11 in the vertical and horizontal directions
In step 12, after installing the bottom reinforcement, etc., the reinforcement is freely arranged in the formwork, and then concrete is poured.

【0018】なお、本発明における上記実施例のはり主
筋はその直径φが同一径のもので図示しているが、この
他に異径鉄筋を用いても差しつかえない。
Although the beam main reinforcing bars in the above embodiments of the present invention are shown as having the same diameter φ, reinforcing bars of different diameters may be used.

【0019】[0019]

【発明の効果】以上述べたように、本発明のRC造はり
主筋の定着構造は、はり主筋をプレキャストはり端部に
ストレートに突設させ、これと交差して定着板を設けた
ことにより、従来のように柱はりの接合部内におけるは
り主筋の定着長を長くとらなくても、十分な支圧力が得
られる。また、はり主筋がストレートなので柱はり接合
部内の配筋が従来の方法より簡略化されて現場作業の省
力化を図ると共に、プレキャストはりの製作段階でも型
枠の取り外しが容易である。
[Effects of the Invention] As described above, the anchoring structure of the main reinforcing bars for RC construction of the present invention has the main reinforcing bars protruding straight from the end of the precast beam, and the fixing plates intersecting with the main reinforcing bars. Sufficient bearing force can be obtained without increasing the anchoring length of the beam main reinforcement within the joint of the column and beam as in the past. In addition, since the beam main reinforcement is straight, the reinforcement arrangement within the column-beam joint is simpler than in conventional methods, saving on-site work, and the formwork can be easily removed during the precast beam manufacturing stage.

【図面の簡単な説明】[Brief explanation of the drawing]

【図1】本発明のRC造はり主筋の定着構造におけるは
り主筋の配筋を示す一部を省略した平面図である。
FIG. 1 is a partially omitted plan view showing the reinforcement arrangement of beam main reinforcements in an RC beam main reinforcement anchoring structure of the present invention.

【図2】図1に使用した定着板7の斜視図である。FIG. 2 is a perspective view of the fixing plate 7 used in FIG. 1.

【図3】図1とは別の実施例である縦断面図である。FIG. 3 is a longitudinal cross-sectional view of another embodiment from FIG. 1;

【図4】従来のRC造はり主筋の定着構造を示す縦断面
図である。
FIG. 4 is a vertical cross-sectional view showing a conventional RC beam main reinforcement anchoring structure.

【図5】従来のRC造はり主筋の定着構造を示す縦断面
図である。
FIG. 5 is a longitudinal cross-sectional view showing a conventional RC beam main reinforcement anchoring structure.

【符号の説明】[Explanation of symbols]

1  柱はり接合部 2  柱 3  はり 4  はり主筋 7  定着板 1 Column beam joint 2 Pillar 3. Acupuncture 4. Beam main reinforcement 7 Fixing plate

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】  柱はりの接合部内におけるプレキャス
トはりの定着構造であって、該定着構造が、相対向する
プレキャストはりの端部にストレートに突設したはり主
筋と、該はり主筋と交差する方向に固定した定着板とを
含むRC造はり主筋の定着構造。
Claim 1: An anchoring structure for a precast beam in a joint of a column beam, the anchoring structure comprising a beam main reinforcement straightly protruding from opposing ends of the precast beam, and a direction intersecting the beam main reinforcement. An anchoring structure for the main reinforcement of the RC beam, including an anchor plate fixed to the.
【請求項2】  請求項1記載の定着板が、前後、左右
のプレキャストはりの端部から突設した多数のはり主筋
を位置決めして配筋し、かつ前記先端部におけるネジと
ナットにより固定するものであるRC造はり主筋の定着
構造。
2. The fixing plate according to claim 1 positions and arranges a large number of beam main reinforcements protruding from the front and rear, left and right ends of the precast beam, and fixes them by screws and nuts at the tip ends. This is a main reinforcement structure for RC beams.
JP2452791A 1991-02-19 1991-02-19 Structure for anchoring rc beam main reinforcing bar Pending JPH04265332A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2452791A JPH04265332A (en) 1991-02-19 1991-02-19 Structure for anchoring rc beam main reinforcing bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2452791A JPH04265332A (en) 1991-02-19 1991-02-19 Structure for anchoring rc beam main reinforcing bar

Publications (1)

Publication Number Publication Date
JPH04265332A true JPH04265332A (en) 1992-09-21

Family

ID=12140629

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2452791A Pending JPH04265332A (en) 1991-02-19 1991-02-19 Structure for anchoring rc beam main reinforcing bar

Country Status (1)

Country Link
JP (1) JPH04265332A (en)

Similar Documents

Publication Publication Date Title
JPH0711710A (en) Reinforced concrete column and steel frame beam jointing structure and building constructing method
JPH04265332A (en) Structure for anchoring rc beam main reinforcing bar
JP4057204B2 (en) Formwork fixing structure
JPH0449340A (en) Lay-in joint structure for column and beam
JP2004052389A (en) Panel zone constructing method and precast beam
JP2891113B2 (en) Installation method of reinforced concrete shear walls
JPH0673786A (en) Junction of precast concrete column
JPH03275839A (en) Connection construction of reinforced concrete column and steel beam
JPS6029524Y2 (en) Three-dimensional truss joint hardware
JPH084203A (en) Steel framed reinforcement beam and execution method thereof
JPH06272378A (en) Supporting structure for precast concrete form
JPH06341167A (en) Working method for concrete structure
JPH04371635A (en) Connection of floorslab and post
JPH076252Y2 (en) Joint structure of PC beam and beam
JP2004027647A (en) Steel structure of house, and its construction method
JPS6321604Y2 (en)
JP2901889B2 (en) Beam main bar anchorage device at the connection between column and beam
JPH06257218A (en) Frame mounting structure of post/beam joint
JPS6044473B2 (en) Connection method of main beam reinforcement for extension
JPH0327166Y2 (en)
JPH0459978B2 (en)
JPH06995B2 (en) Method for joining columns and PC beams
JPS649426B2 (en)
JPS61196036A (en) Connection of precast pillar and precast beam
JPH01187237A (en) Method for beam-column joining in precast reinforced concrete structure