JPH03106780A - Main rope exchange method for elevator - Google Patents

Main rope exchange method for elevator

Info

Publication number
JPH03106780A
JPH03106780A JP24057189A JP24057189A JPH03106780A JP H03106780 A JPH03106780 A JP H03106780A JP 24057189 A JP24057189 A JP 24057189A JP 24057189 A JP24057189 A JP 24057189A JP H03106780 A JPH03106780 A JP H03106780A
Authority
JP
Japan
Prior art keywords
rope
existing
new
hoistway
cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP24057189A
Other languages
Japanese (ja)
Other versions
JP2542086B2 (en
Inventor
Masahiro Murase
正宏 村瀬
Hiroshi Goko
郷古 洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Elevator Engineering and Service Co Ltd
Original Assignee
Hitachi Elevator Engineering and Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Elevator Engineering and Service Co Ltd filed Critical Hitachi Elevator Engineering and Service Co Ltd
Priority to JP1240571A priority Critical patent/JP2542086B2/en
Publication of JPH03106780A publication Critical patent/JPH03106780A/en
Application granted granted Critical
Publication of JP2542086B2 publication Critical patent/JP2542086B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

PURPOSE:To perform safe and efficient exchange of a main rope by a method wherein an existing rope is cut at the upper part of an elevation passage and joined with the one end of a new rope, the existing rope is cut at the lower part of the elevation passage to recover the existing rope through the lower part of the elevation passage, and the both ends of the new rope are respectively coupled to an elevating body. CONSTITUTION:A balance weight 3 is held to a support stand 14. At the upper part of an elevation passage 1, a cage 2 is hoisted by means of a chain block, and when the tension of an existing rope 7 is increased to a value approximately equal to that generated by the own weight of the rope, the existing rope 7 is fixed by means of a rope fixing device 12. The chain block is further hoisted to slacken the existing rope 7, which is fully cut in the vicinity of an end part (b). A new rope is unwound from a new rope unwinding device 8 and connected at a part (a) with the existing rope, the existing rope is cut at an end part (c) above a balance weight 3 and connected to an existing rope winding device 17. The new rope 9 is run as the existing rope 7 is wound, a joining point (a) between the two ropes is cut, and the two end part of the new rope 9 are joined together at the end parts (b) and (c).

Description

【発明の詳細な説明】 [産業上の利用分野] 本@明はエレベータの主ロープ交換方法に係り、特に高
揚程エレベータに好適なエレベータの主ロープ交換方法
に関する. [従来の技術] 一般に、エレベータの昇降路内には、かごと釣合錘とか
ら或る昇降体が設けられており、これらは主ロープによ
って連結され昇降するよう構成されている.この主ロー
プは、特開昭63 − 282081号公報に記載のよ
うに交換される。
Detailed Description of the Invention [Field of Industrial Application] This invention relates to a method for replacing the main rope of an elevator, and particularly to a method for replacing the main rope of an elevator suitable for high-lift elevators. [Prior Art] Generally, a certain lifting body consisting of a car and a counterweight is provided in the hoistway of an elevator, and these are connected by a main rope so as to move up and down. This main rope is replaced as described in Japanese Patent Application Laid-Open No. 63-282081.

まず、最上階またはこれに近い階を新設ロープ繰り出し
階として設定し、最下階またはこれに近い階を既設ロー
プ巻き取り階として設定する.次に、かご上での運転に
より、かごまたは釣合錘のうち一方の昇降体の上端を昇
降路上部に設定した新設ロープ繰り出し階の床面にほぼ
一致させて固設し、両昇降体をそれぞれ位置固定する.
普通、かごを昇降路上部に、また釣合錘を昇降路下部に
固設するのが一般的である. そして、昇降路下部に固設された釣合錘側の既設ロープ
を、昇降路上部に固設されたかごの上端とほぼ同一高さ
の位置に設けられたロープ固定治具に固定すると共に、
この固定部上方の中間切断点で切断する.その後、既設
ロープをかご上の上端切断点で切断し、この切断部に、
新設ロープ繰り出し機から引き出した新設ロープの先端
を連結する。次いで,切断された部分の既設ロープを昇
降路上方の機械室に引き上げて、新設ロープを巻上機の
シーブプーりとそらせプーりに巻き掛け、その先端をロ
ープ固定治具上方に出ている既設ロープに連結する.そ
れから、既設ロープを釣合錘上の下端切断点で切断し,
ロープ固定治具による既設ロープの固定を解除して、既
設ロープ巻き取り階である最下階に設置された既設ロー
プ巻き取り機で既設ロープを巻き取って行く.それによ
って、新設ロープの先端は釣合錘のある昇降路下部にま
で導かれ,最後に、新設ロープの両端をかごおよび釣合
錘の両昇降体に連結することによって主ロープを交換し
ていた. [発明が解決しようとする課題] 従来のエレベータの主ロープ交換方法は上述のように行
なわれていたため、昇降体を固設した後に既設ロープを
2つに分割して行なうことになり、新設ロープとの連結
工程が多く、作業人員や作業時間の増大が考えられた.
また新設ロープと既設ロープの連結やロープの固定およ
び解除といった作業がいずれも高所でのものとなり,工
具等の落下や作業員の墜落等の事故の危険がある.本発
明の目的は、主ロープを安全にかつ能率的に交換するこ
とのできるエレベータの主ロープ交換方法を提供するに
ある。
First, the top floor or a floor close to this is set as the new rope payout floor, and the bottom floor or a floor close to this is set as the existing rope winding floor. Next, by operating on the car, the upper end of one of the elevators, either the car or the counterweight, is fixed almost in line with the floor of the new rope payout floor set above the hoistway, and both elevators are fixed. Fix each position.
Normally, the car is fixed to the top of the hoistway, and the counterweight is fixed to the bottom of the hoistway. Then, the existing rope on the counterweight side fixed to the lower part of the hoistway is fixed to a rope fixing jig provided at a position approximately at the same height as the upper end of the car fixed to the upper part of the hoistway.
Cut at the middle cutting point above this fixed part. Then, cut the existing rope at the upper end cut point on the car, and attach the
Connect the tips of the newly installed ropes pulled out from the new rope payout machine. Next, pull the cut part of the existing rope up to the machine room above the hoistway, wrap the new rope around the sheave pulley and deflection pulley of the hoisting machine, and attach the tip of the new rope to the existing rope that is protruding above the rope fixing jig. Connect to the rope. Then, cut the existing rope at the lower end cut point on the counterweight,
The existing rope is unfixed by the rope fixing jig, and the existing rope is wound up using the existing rope winding machine installed on the lowest floor, which is the existing rope winding floor. As a result, the tip of the new rope was guided to the bottom of the hoistway where the counterweight was located, and finally the main rope was replaced by connecting both ends of the new rope to both the car and the counterweight lifting bodies. .. [Problems to be Solved by the Invention] The conventional method for replacing the main rope of an elevator was as described above, so the existing rope was divided into two after the elevating body was fixed, and the new rope was replaced. There were many processes that were connected to the system, and it was thought that the number of workers and work time would increase.
In addition, work such as connecting new ropes to existing ropes and securing and releasing ropes must be done at high places, which poses the risk of accidents such as tools falling and workers falling. SUMMARY OF THE INVENTION An object of the present invention is to provide an elevator main rope replacement method that allows the main rope to be replaced safely and efficiently.

[課題を解決するための手段] 本発明による第1番目の発明は上記目的を達或するため
に、昇降体の一方を昇降路上部に、他方を昇降路下部に
固設し、昇降路上部に設けられた一方の昇降体側の端部
で既設ロープを切断すると共に,その切断部と新設ロー
プの一端とを接合し、昇降路下部に設けられた他方の昇
降体側の端部で既設ロープを切断し、次いで、昇降路下
部で他方の昇降体側の既設ロープの端部から回収し、新
設ロープが所定の位置に達したとき両ロープの接合を解
除し、その後,新設ロープの両端をそれぞれ昇降体に連
結したことを特徴とする。
[Means for Solving the Problems] In order to achieve the above-mentioned object, the first invention according to the present invention is such that one of the lifting bodies is fixed to the upper part of the hoistway and the other is fixed to the lower part of the hoistway. At the same time as cutting the existing rope at the end on the side of one lifting body installed at the bottom of the hoistway, the cut part and one end of the new rope are joined, and the existing rope is cut at the end on the side of the other lifting body installed at the bottom of the hoistway. Then, at the bottom of the hoistway, collect the existing rope from the end of the other hoisting body, and when the new rope reaches the designated position, release the joint between both ropes, and then lift and lower both ends of the new rope, respectively. It is characterized by being connected to the body.

また本発明による第2番目の発明は上記目的を達或する
ため、昇降体の一方を昇降路上部に、他方を昇降路下部
に固設し、既設ロープをロープ固定装置で固定して既設
ロープの自重による落下を防止し,昇降路上部に設けら
れた一方の昇降体側の端部で既設ロープを切断すると共
に、その切断部と新設ロープの一端とを接合し、昇降路
下部に設けられた他方の昇降体側の端部で既設ロープを
切断し、ロープ固定装置による既設ロープの固定を解除
し、次いで、昇降路下部で他方の昇降体側の既設ロープ
から回収し、新般ロープが所定の位置に達したとき新設
ロープと既設ロープとの接合部で両ロープの接合を解除
し、その後、新設ロープの両端をそれぞれ昇降体に連結
したことを特徴とする。
In addition, in order to achieve the above object, the second invention according to the present invention fixes one of the lifting bodies to the upper part of the hoistway and the other to the lower part of the hoistway, fixes the existing rope with a rope fixing device, and fixes the existing rope to the existing rope. In order to prevent the rope from falling due to its own weight, the existing rope is cut at the end of one of the elevators installed at the top of the hoistway, and the cut end is joined to one end of the new rope. Cut the existing rope at the end on the other lifting body side, release the fixation of the existing rope by the rope fixing device, and then collect it from the existing rope on the other lifting body side at the bottom of the hoistway, and secure the new rope in the specified position. The present invention is characterized in that when the new rope reaches the point where the new rope and the existing rope are joined, the connection between the two ropes is released, and then both ends of the new rope are respectively connected to the elevating body.

[作用] 本発明によるエレベータの主ロープ交換方法は上述の如
く行なうため,第1番目の発明によれば、両昇降体を固
設した後、既設ロープを昇降路上部に固設した一方の昇
降体側の接合部で切断すると共に、その切断部を、この
昇降体近傍に設けられた新設ロープの一端と接合し,一
方,昇降路下部に固設した他方の昇降体側の接合部を切
断し、それから、昇降路下部にて既設ロープを回収する
ので、一方で新設ロープを送り込みながら他方で新設ロ
ープを回収するようにして,新設ロープの巻回と既設ロ
ープの回収を同時に進行させることができ、主ロープを
効率良く迅速に交換することができる.また、既設ロー
プと新設ロープの接合作業は墜落の危険性の小さい乗場
で行なうことができ、安全に作業を行なうことができる
.第2番目の発明によれば、両昇降体を固設した後,既
設ロープをロープ固定装置で固定し,既設ロープを昇降
路上部に固設した一方の昇降体側の接合部で切断すると
共に、その切断部を,この昇降体近傍に設けられた新設
ロープの一端と接合し、一方昇降路下部に固設した他方
の昇降体側の既設ロープの接合部を切断し,ロープ固定
装置を解除して,それから昇降路下部にて既設ロープを
回収して行くので、高揚程のエレベータで,昇降路上方
での主ロープの自重が数百キログラムを超えるような場
合でも,ロープ固定装置によって既設ロープを十分に保
持することができ、主ロープが自重により落下してそれ
によって事故を起こすようなことがない. [実施例] 以下本発明による一実施例を図面から説明する.第1図
に示すように、多数の階床に渡って形或された昇降路l
には、図示しないそれぞれのガイドレールに沿って昇降
するかご2および釣合錘3が昇降可能に納められている
.昇降路の最上方に形成された第1機械室4には、図示
しない巻上機により駆動するシーブプーり5およびそら
せプーリ6が設置されており、それぞれのプーりに複数
本の既設ロープ7が巻き掛けられている.これら既設ロ
ープ7は昇降路1の上部の端部bでかと2に、また昇降
路1の下部の端部Cで受台14上の釣合錘3にそれぞれ
固定されている.第2機械室10を通る既設ロープ7の
かと2側には、新設ロープ9の繰り出し速度を調整する
ブレーキ装置11が設けられており、既設ロープ7の釣
合錘3側には,ロープ固定装ii!12が設けられてい
る.両装置について、第2図〜第5図で説明する.第2
図と第3図はブレーキ装置11の平面図と正面図である
.上枠19の下部にある一対の扶持部材18は,既設ロ
ープ7または新設ロープ9を扶持しており、その強度は
、ボルト20と調整ばね21によって調整され、必要な
ブレーキ力を与える. 第4図と第5図はロープ固定装置12の平面図と正面図
である.下枠25に立設された保持板22には溝が設け
られており、その溝と圧接板23の溝との間に既設ロー
プ7または新設ロープ9を固定し、ボルト24でその固
定および解除を行なっている。
[Function] Since the method for replacing the main rope of an elevator according to the present invention is performed as described above, according to the first invention, after both the elevating bodies are fixed, the existing rope is fixed on the upper part of the hoisting path and one of the elevating and descending bodies is replaced. At the same time as cutting at the joint on the body side, the cut part is joined to one end of the new rope installed near this lifting body, while cutting the joint on the other lifting body side fixed at the bottom of the hoistway, Then, since the existing rope is recovered at the bottom of the hoistway, the new rope is sent in on one hand and the new rope is recovered on the other hand, so that the winding of the new rope and the recovery of the existing rope can proceed at the same time. The main rope can be replaced efficiently and quickly. In addition, the work of joining existing ropes and new ropes can be done at landings where there is little risk of falling, making the work safer. According to the second invention, after both the lifting bodies are fixed, the existing rope is fixed with a rope fixing device, and the existing rope is cut at the joint on the side of one of the lifting bodies fixed on the upper part of the lifting path. Connect the cut part to one end of the new rope installed near this elevator, cut the joint of the existing rope on the other elevator that is fixed at the bottom of the hoistway, and release the rope fixing device. ,Then, the existing rope is recovered at the bottom of the hoistway, so even if the main rope weighs more than several hundred kilograms above the hoistway in a high-lift elevator, the rope fixing device can securely secure the existing rope. This prevents the main rope from falling due to its own weight and causing an accident. [Example] An example according to the present invention will be described below with reference to the drawings. As shown in Figure 1, a hoistway extending over many floors
A car 2 and a counterweight 3 which are movable up and down along respective guide rails (not shown) are housed in the car. A sheave pulley 5 and a deflection pulley 6 driven by a hoisting machine (not shown) are installed in the first machine room 4 formed at the top of the hoistway, and a plurality of existing ropes 7 are attached to each pulley. It's wrapped around. These existing ropes 7 are fixed to the heel 2 at the upper end b of the hoistway 1, and to the counterweight 3 on the pedestal 14 at the lower end C of the hoistway 1. A brake device 11 is provided on the heel 2 side of the existing rope 7 passing through the second machine room 10 to adjust the payout speed of the new rope 9, and a rope fixing device is provided on the counterweight 3 side of the existing rope 7. ii! 12 are provided. Both devices will be explained with reference to Figs. 2 to 5. Second
3 and 3 are a plan view and a front view of the brake device 11. A pair of supporting members 18 at the bottom of the upper frame 19 support the existing rope 7 or the new rope 9, and their strength is adjusted by bolts 20 and adjustment springs 21 to provide the necessary braking force. 4 and 5 are a plan view and a front view of the rope fixing device 12. The retaining plate 22 erected on the lower frame 25 is provided with a groove, and the existing rope 7 or the new rope 9 is fixed between the groove and the groove of the pressure contact plate 23, and the bolt 24 is used to fix and release the existing rope 7 or the new rope 9. is being carried out.

ところで、最上階l5には新設ロープ繰り出し装置8が
設けられており,新設ロープ9が巻かれている.またこ
の装I8には簡単なブレーキ機構を持たせることもでき
る.また,最下階16には既設ロープ巻き取り装117
が設けられており、既設ロープ7が巻かれて行く. 第6図は,既設ロープ7と新設ロープ9の接合について
説明している.この接合は,ロープの自重を十分に保持
する強度をもち、かつロープ径が極端に太くならないよ
うに接続する。その一例としては,電線圧着用のスリー
ブ13を使用して油圧ラム等で圧着する方法がある.こ
の他にもロープ間を溶接する方法もある. 次に、主ロープの交換方法について説明する.まず、昇
降路1の下部において、釣合113をその受台14で保
持し,昇plhJI1の上部において、かご2を図示し
ないチェーンブロックで吊り上げる.ここで既設ロープ
7の張カがロープの自重による程度となったら、ロープ
固定装W1l2で既設ロープ7を固定する. 次に、かご2を吊り上げたチェーンブロックを更に巻き
上げて、既設ロープ7が緩んだら、既設ロープ7のかと
2の上方の端部b近傍で全部切断する6 最上階15の新設ロープ繰り出し装置8から新設ロープ
9を引き出し,a部において既設ロープ7と接続する.
次に釣合錘3の上方の端部Cで既設ロープ7を切断し、
その切断部を最下階l6にある既設ロープ巻き取り装置
l7に接続する.ここで、ロープ固定装置12に固定さ
れた既設ロープ7を1本だけ解除し、既設ロープ7を巻
き取りながら新設ロープ9を巻き掛けて゜行く.このと
き、ブレーキ装置11を操作すれば新設ロープ9の繰り
出し速度を調整することができる.こうして、新設ロー
プ9と既設ロープ7の接合部aが既設ロープ巻き取り装
置17まで降りたならば、新設ロープ繰り出し装置8を
止め,両ロープの接合部aを切断し、端部b,cにおい
て新設ロープ9の端部を接合する.残りの3本について
も同様に交換し、チェーンブロック、受台14を取り外
し、ブレーキ装置11,ロープ固定装1112、および
新設ロープ繰り出し装置8を片付ける。
By the way, a newly installed rope feeding device 8 is installed on the top floor l5, and a newly installed rope 9 is wound around it. This I8 can also be equipped with a simple brake mechanism. In addition, the existing rope winding device 117 is installed on the lowest floor 16.
is installed, and the existing rope 7 is wound around it. Figure 6 explains the joining of the existing rope 7 and the new rope 9. This joint is strong enough to hold the rope's own weight, and is connected in such a way that the rope diameter does not become extremely thick. One example is a method of using a sleeve 13 for crimping wires and crimping them with a hydraulic ram or the like. There are other methods of welding between ropes. Next, we will explain how to replace the main rope. First, the counterbalance 113 is held by its pedestal 14 at the bottom of the hoistway 1, and the car 2 is hoisted by a chain block (not shown) at the top of the lift plhJI1. When the tension of the existing rope 7 reaches the level due to the rope's own weight, fix the existing rope 7 with the rope fixing device W1l2. Next, the chain block that has lifted the car 2 is further hoisted, and when the existing rope 7 becomes loose, the existing rope 7 is completely cut near the upper end b of the heel 2 6 From the newly installed rope feeding device 8 on the top floor 15 Pull out the new rope 9 and connect it to the existing rope 7 at part a.
Next, cut the existing rope 7 at the upper end C of the counterweight 3,
Connect the cut section to the existing rope winding device l7 on the lowest floor l6. At this point, only one of the existing ropes 7 fixed to the rope fixing device 12 is released, and the new rope 9 is wound while winding the existing rope 7. At this time, the speed at which the newly installed rope 9 is fed out can be adjusted by operating the brake device 11. In this way, when the joint a of the new rope 9 and the existing rope 7 has descended to the existing rope winding device 17, the new rope payout device 8 is stopped, the joint a of both ropes is cut, and the ends b and c are cut. Join the end of the new rope 9. The remaining three are replaced in the same way, the chain block and pedestal 14 are removed, and the brake device 11, rope fixing device 1112, and newly installed rope feeding device 8 are put away.

これによって、既設ロープ7の端部に新設ロープ9を接
合し.既設ロープの巻き取りと同時に、新設ロープを巻
き掛けることができ、作業効率を大幅に向上させること
ができる.また、高所作業の低減により作業員の安全を
も高いものにできる。
This allows the new rope 9 to be joined to the end of the existing rope 7. It is possible to wind a new rope at the same time as winding an existing rope, greatly improving work efficiency. In addition, worker safety can be improved by reducing the need for work at heights.

[発明の効果] 以上説明したように本発明は、第1の発明によれば、既
設ロープと新設ロープを接合し、その一度の接合だけで
既設ロープの回収と新設ロープの巻回とを行なうため,
作業を効率よく、安全に行なうことができる. また、第2の発明によれば、既設ロープの切断の前にロ
ープ固定装置で既設ロープを固定するため,ロープの自
重により落下してしまうことを防止できるので、より安
全性を向上させることができる。
[Effects of the Invention] As explained above, according to the first aspect of the present invention, an existing rope and a newly installed rope are joined, and the existing rope can be recovered and the newly installed rope can be wound with only one joining. For,
Work can be done efficiently and safely. Furthermore, according to the second invention, since the existing rope is fixed with the rope fixing device before cutting the existing rope, it is possible to prevent the rope from falling due to its own weight, thereby further improving safety. can.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の一実施例によるエレベータの主ロープ
交換方法を図示したエレベータの側面図、第2図はブレ
ーキ装置の平面図、第3図はブレーキ装置の正面図、第
4図は本発明の一実施例によるロープ固定装置の平面図
、第5図は第4図の正面図、第6図はロープの接合部を
示す正面図である。 1・・・・・・昇降路、2・・・・・・かご、3・・・
・・・釣合錘、7・・・・・・既設ロープ、9・・・・
・・新設ロープ,12・・・・・・ロープ固定装置. 第1 図 第 2 第 3 図 図 図 第4図 第5図
FIG. 1 is a side view of an elevator illustrating a method for replacing the main rope of an elevator according to an embodiment of the present invention, FIG. 2 is a plan view of the brake device, FIG. 3 is a front view of the brake device, and FIG. FIG. 5 is a plan view of a rope fixing device according to an embodiment of the invention, FIG. 5 is a front view of FIG. 4, and FIG. 6 is a front view showing a rope joint. 1... Hoistway, 2... Car, 3...
... Counterweight, 7... Existing rope, 9...
...New rope, 12...Rope fixing device. Figure 1 Figure 2 Figure 3 Figure 4 Figure 5

Claims (1)

【特許請求の範囲】 1、昇降路内のかごと釣合錘とから成る昇降体に両端が
接続された既設ロープを、新設ロープと交換するエレベ
ータの主ロープ交換方法において、上記昇降体の一方を
昇降路上部に、他方を昇降路下部に固設し、上記昇降路
上部に設けられた上記一方の昇降体側の端部で上記既設
ロープを切断すると共に、その切断部と上記新設ロープ
の一端とを接合し、上記昇降路下部に設けられた上記他
方の昇降体側の端部で上記既設ロープを切断し、次いで
、上記昇降路下部で上記他方の昇降体側の上記既設ロー
プの端部から回収し、上記新設ロープが所定の位置に達
したとき上記新設ロープと上記既設ロープとの接合部で
両ロープの接合を解除し、その後、上記新設ロープの両
端をそれぞれ上記昇降体に連結したことを特徴とするエ
レベータの主ロープ交換方法。 2、昇降路内のかごと釣合錘とから成る昇降体に両端が
接続された既設ロープを、新設ロープと交換するエレベ
ータの主ロープ交換方法において、上記昇降体の一方を
昇降路上部に、他方を昇降路下部に固設し、上記既設ロ
ープをロープ固定装置で固定して上記既設ロープの自重
による落下を防止し、上記昇降路上部に設けられた上記
一方の昇降体側の端部で上記既設ロープを切断すると共
に、その切断部と上記新設ロープの一端とを接合し、上
記昇降路下部に設けられた上記他方の昇降体側の端部で
上記既設ロープを切断し、上記ロープ固定装置による上
記既設ロープの固定を解除し、次いで、上記昇降路下部
で上記他方の昇降体側の上記既設ロープの端部から回収
し、上記新設ロープが所定の位置に達したとき上記新設
ロープと上記既設ロープとの接合部で両ロープの接合を
解除し、その後、上記新設ロープの両端をそれぞれ上記
昇降体に連結したことを特徴とするエレベータの主ロー
プ交換方法。
[Claims] 1. An elevator main rope replacement method in which an existing rope, both ends of which are connected to a lifting body consisting of a car and a counterweight in a hoistway, is replaced with a new rope, in which one of the lifting bodies is replaced with a new rope. The existing rope is fixed to the upper part of the hoistway and the other rope is fixed to the lower part of the hoistway, and the existing rope is cut at the end of one of the hoisting body side provided in the upper part of the hoistway, and the cut part and one end of the new rope are connected to each other. and cutting the existing rope at the end on the side of the other hoisting body provided at the lower part of the hoistway, and then collecting it from the end of the existing rope on the side of the other hoisting body at the lower part of the hoistway. , when the newly installed rope reaches a predetermined position, the connection between the new rope and the existing rope is released, and then both ends of the newly installed rope are respectively connected to the elevating body. How to replace the main rope of an elevator. 2. In an elevator main rope replacement method in which an existing rope, both ends of which are connected to a lifting body consisting of a car and a counterweight in a hoistway, is replaced with a new rope, one of the lifting bodies is placed above the hoistway and the other is fixed at the bottom of the hoistway, and the existing rope is fixed with a rope fixing device to prevent the existing rope from falling due to its own weight, and the existing rope is fixed at the end of the one elevator body side provided at the top of the hoistway. At the same time as cutting the rope, the cut portion is joined to one end of the new rope, and the existing rope is cut at the end on the other elevator body side provided at the lower part of the hoistway, and the above rope is fixed by the rope fixing device. The existing rope is unfixed, and then recovered from the end of the existing rope on the side of the other lifting body at the lower part of the hoistway, and when the new rope reaches a predetermined position, the new rope and the existing rope are connected. A method for replacing a main rope of an elevator, characterized in that both ropes are unjoined at the joint, and then both ends of the newly installed rope are respectively connected to the elevating body.
JP1240571A 1989-09-19 1989-09-19 How to replace the main rope of the elevator Expired - Fee Related JP2542086B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1240571A JP2542086B2 (en) 1989-09-19 1989-09-19 How to replace the main rope of the elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1240571A JP2542086B2 (en) 1989-09-19 1989-09-19 How to replace the main rope of the elevator

Publications (2)

Publication Number Publication Date
JPH03106780A true JPH03106780A (en) 1991-05-07
JP2542086B2 JP2542086B2 (en) 1996-10-09

Family

ID=17061504

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1240571A Expired - Fee Related JP2542086B2 (en) 1989-09-19 1989-09-19 How to replace the main rope of the elevator

Country Status (1)

Country Link
JP (1) JP2542086B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002265162A (en) * 2001-03-07 2002-09-18 Toshiba Elevator Co Ltd Rope gripping device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103332558A (en) * 2013-07-10 2013-10-02 嘉兴市华东建设机械有限公司 Balance weight end steel wire rope used for elevator

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63282081A (en) * 1987-05-12 1988-11-18 三菱電機株式会社 Method fo main cable replacing construction of elevator
JPH01181689A (en) * 1988-01-12 1989-07-19 Hitachi Elevator Eng & Service Co Ltd Lift rope replacing method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63282081A (en) * 1987-05-12 1988-11-18 三菱電機株式会社 Method fo main cable replacing construction of elevator
JPH01181689A (en) * 1988-01-12 1989-07-19 Hitachi Elevator Eng & Service Co Ltd Lift rope replacing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002265162A (en) * 2001-03-07 2002-09-18 Toshiba Elevator Co Ltd Rope gripping device
JP4606621B2 (en) * 2001-03-07 2011-01-05 東芝エレベータ株式会社 Rope gripping device

Also Published As

Publication number Publication date
JP2542086B2 (en) 1996-10-09

Similar Documents

Publication Publication Date Title
EP3569550A1 (en) Compensation line storing apparatus, jump lift and the usage method thereof
JP6969686B2 (en) How to extend the lift of a construction elevator
JP3807775B2 (en) How to lift the construction elevator
JPH03106780A (en) Main rope exchange method for elevator
JP2510732B2 (en) Main loop replacement auxiliary device
JP2603730B2 (en) How to change the elevator main rope
JP2011102177A (en) Confinement rescue method for elevator
CN212229077U (en) Electric block rapid test platform
JP4118126B2 (en) Elevator equipment
JP2001097648A (en) Passenger rescue method of elevator
JPS6417788A (en) Method of exchange construction of main cable for elevator
JP5841929B2 (en) How to change the main rope of the elevator
JP2839970B2 (en) Elevator main cable replacement method
JPH08245116A (en) Installation engineering of elevator
JPH082850A (en) Work method in elevator shaft
JP2000344440A (en) Method of operation for hanging main rope of 2:1 roping elevator and main rope guide device therefor
JPH0818774B2 (en) How to change the elevator main rope
JP3020325B2 (en) Elevator main cable replacement method
JPH07133085A (en) Replacement of main rope of elevator
JP2508939B2 (en) Elevator device main rope installation method
JPH0312788Y2 (en)
JPS5918309B2 (en) Installation method of mobile mechanical room elevator
JP2654409B2 (en) Elevator main cable replacement method
JPH05147854A (en) Linear motor type elevator system
JP2601921B2 (en) Method and apparatus for supporting a counterweight

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees