JPH082850A - Work method in elevator shaft - Google Patents

Work method in elevator shaft

Info

Publication number
JPH082850A
JPH082850A JP13347294A JP13347294A JPH082850A JP H082850 A JPH082850 A JP H082850A JP 13347294 A JP13347294 A JP 13347294A JP 13347294 A JP13347294 A JP 13347294A JP H082850 A JPH082850 A JP H082850A
Authority
JP
Japan
Prior art keywords
hoistway
car
rope
lifting
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP13347294A
Other languages
Japanese (ja)
Inventor
Shinichi Iwata
新一 岩田
Kazuaki Kamata
和明 鎌田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP13347294A priority Critical patent/JPH082850A/en
Publication of JPH082850A publication Critical patent/JPH082850A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

PURPOSE:To provide a work method in a lift path of an elevator in which the cage is run for the work by a winch apparatus capable of being temporarily easily installed and coping with any lift processes of the elevator. CONSTITUTION:A winch apparatus 28 for driving the intermediate part of a winch rope 35 suspended in a lift path 1 is temporarily provided in a cage 10. One end of the winch rope 35 is held on the top part of the lift path 1 through a support beam 5 for a winch and inserted through a main cable inserting hole 4 to engage a winch apparatus 28. The cage 10 is run through the winch rope 35 by the movement of the winch apparatus 28 to carry out operations concerning apparatus for an elevator. Thus, the operations can be easily carried out irrespective of the length of the lift stroke so that the trouble for temporarily providing the winch apparatus can be reduced. The preparatory plan of work is facilitated to reduce cost and improve the safety of the operation.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、新設工事、改修工事
等において昇降路のエレベーター用機器に係わる作業を
行うエレベーター昇降路内工事方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an elevator hoistway construction method for performing work relating to elevator equipment in hoistways in new construction work, repair work, and the like.

【0002】[0002]

【従来の技術】図12及び図13は、例えば特開昭61
−111289号公報に示された従来のエレベーター昇
降路内工事方法を示す図で、図12はエレベーター装置
の縦断面図、図13は図12の要部右側面図である。図
において、(1)は昇降路、(2)は昇降路(1)の上方に配置
されて床(3)に主索挿通孔(4)及び巻上機用支持梁(5)が
設けられた機械室、(6)は巻上機用支持梁(5)の上に設置
された巻上機、(7)は機械室(2)に設けられた制御盤であ
る。
2. Description of the Related Art FIG. 12 and FIG.
FIG. 12 is a view showing a conventional elevator hoistway construction method disclosed in Japanese Patent Application Laid-Open No. -1112989, FIG. 12 is a vertical cross-sectional view of the elevator apparatus, and FIG. 13 is a right side view of a main part of FIG. In the figure, (1) is a hoistway, (2) is located above the hoistway (1), and the floor (3) is provided with a main rope insertion hole (4) and a hoisting machine support beam (5). The machine room, (6) is a hoist installed on the hoist support beam (5), and (7) is a control panel provided in the machine room (2).

【0003】(8)は昇降路(1)に立設されたかご用レー
ル、(9)は昇降路(1)に立設されたつり合おもり用レー
ル、(10)はかご用レール(8)に案内されて昇降するかご
で、上梁(11)、かごドアー装置(12)が設けられている。
(13)はつり合おもり用レール(9)に案内されて昇降する
つり合おもり、(14)は巻上機(6)の駆動綱車に巻掛けら
れて主索挿通孔(4)に挿通され、両端がそれぞれかご(1
0)及びつり合おもり(13)に連結された主索、(15)は機械
室(2)に仮設された工事用運転装置、(16)は上梁(11)に
仮設された工事用操作盤である。
(8) is a rail for a car standing upright in the hoistway (1), (9) is a rail for a counterweight standing upright in the hoistway (1), and (10) is a rail for a car (8 ), An upper beam (11) and a car door device (12) are provided.
(13) The counterweight is guided by the counterweight rail (9) to move up and down, and (14) is wound around the drive sheave of the hoist (6) and inserted into the main rope insertion hole (4). , Both ends are baskets (1
0) and the main rope connected to the counterweight (13), (15) is a construction operating device temporarily installed in the machine room (2), and (16) is a construction operation temporarily installed on the upper beam (11). It is a board.

【0004】(17)は巻上機用支持梁(5)に支持された吊
り具(18)に吊持されて機械室(2)の床下に設けられた巻
胴式の上ウインチ、(19)は上梁(11)に設けられた巻胴式
の下ウインチ、(20)は両端がそれぞれ上ウインチ(17)、
下ウインチ(19)に巻きとられる揚重ロープ、(21),(22)
は工事用運転装置(15)、工事用操作盤(16)、上ウインチ
(17)及び下ウインチ(19)を接続したケーブル、(23)は昇
降路(1)に設けられた乗場である。
(17) is a hoisting type upper winch provided under the floor of the machine room (2) suspended from a hoisting device (18) supported by a hoisting machine supporting beam (5), and (19) ) Is the lower winch of the winding barrel provided on the upper beam (11), (20) is the upper winch (17) at both ends,
Lifting rope wound around the lower winch (19), (21), (22)
Is the operating device for construction (15), operation panel for construction (16), upper winch
A cable connecting the (17) and the lower winch (19), and (23) is a hall provided on the hoistway (1).

【0005】従来のエレベーター昇降路内工事方法は上
記のような装置構成により次に述べるように行われる。
すなわち、工事の作業者がかご(10)上に乗り工事用操作
盤(16)を操作すると、工事用運転装置(15)を介して上ウ
インチ(17)及び下ウインチ(19)が付勢されてかご(10)が
昇降する。
The conventional elevator hoistway construction method is carried out as follows with the above-mentioned device configuration.
That is, when the construction worker rides on the car (10) and operates the construction control panel (16), the upper winch (17) and the lower winch (19) are urged via the construction operation device (15). The basket (10) moves up and down.

【0006】これによって、例えば改修工事において、
巻上機(6)、制御盤(7)を撤去した状態であっても、かご
(10)を昇降させて所要の昇降路(1)内のエレベーター用
機器に係わる作業を行うことができる。すなわち、昇降
路(1)内の乗場(23)の機器、また、乗場(23)側からかご
(10)のかごドアー装置(12)、かご(10)内の操作盤(図示
しない)、かご(10)の位置表示器(図示しない)等の各
機器の撤去、新設等の作業が行われる。
Thus, for example, in repair work,
Even when the hoisting machine (6) and control panel (7) are removed, the car
(10) can be moved up and down to perform work related to elevator equipment in the required hoistway (1). That is, the equipment of the hall (23) in the hoistway (1), and the car from the hall (23) side.
Car door device (12) of (10), operation panel in car (10) (not shown), position indicator of car (10) (not shown) .

【0007】なお、エレベーター装置の改修工事におい
て、巻上機(6)等の老朽化した機器の交換、電子化され
て高性能化された制御盤(7)の交換が行われる。また、
機械室(2)の巻上機用支持梁(5)、かご(10)自体等の構造
用機器は既設品がそのまま使用されることが多い。この
ような工事においてエレベーターの使用不能期間を極力
短縮することが要求される。したがって、昇降路(1)内
に作業用足場を設けず、工事の作業者がかご(10)上に乗
り上ウインチ(17)及び下ウインチ(19)によってかご(10)
を昇降させることによってエレベーター昇降路内工事が
行われる。
[0007] In the repair work of the elevator system, the aging equipment such as the hoisting machine (6) is replaced and the control panel (7) which is computerized and has high performance is replaced. Also,
As for the structural equipment such as the hoisting machine supporting beam (5) in the machine room (2) and the car (10) itself, the existing equipment is often used as it is. In such construction, it is required to shorten the period during which the elevator cannot be used as much as possible. Therefore, without constructing a work scaffold in the hoistway (1), the construction worker rides on the car (10) and uses the upper winch (17) and the lower winch (19) to move the car (10).
The work inside the elevator hoistway is performed by moving up and down.

【0008】[0008]

【発明が解決しようとする課題】上記のような従来のエ
レベーター昇降路内工事方法においては、上ウインチ(1
7)及び下ウインチ(19)が巻胴式であるため、揚重ロープ
(20)の長さが制約されてエレベーターの昇降行程に対応
した揚程のウインチが必要になる。すなわち、昇降行程
が長い場合は高揚程の上ウインチ(17)及び下ウインチ(1
9)を仮設することになる。また、上ウインチ(17)及び下
ウインチ(19)の2台が仮設されるために、仮設の手数が
増えると共に、2台のウインチの運転操作が複雑にな
り、安全のための電気回路も煩雑化するという問題点が
あった。さらに、上ウインチ(17)を主索挿通孔(4)近く
に取付けねばならず、取付作業が困難であった。
In the conventional elevator hoistway construction method described above, the upper winch (1
7) and the lower winch (19) are hoisting type,
Since the length of (20) is restricted, a winch with a lifting head corresponding to the lifting stroke of the elevator is required. That is, when the lifting stroke is long, the upper winch (17) and the lower winch (1
9) will be temporarily installed. In addition, since the upper winch (17) and the lower winch (19) are temporarily installed, the number of temporary installations increases and the operation operation of the two winches becomes complicated, and the electric circuit for safety is complicated. There was a problem that Further, the upper winch (17) must be mounted near the main rope insertion hole (4), which makes mounting work difficult.

【0009】この発明は、かかる問題点を解消するため
になされたものであり、容易に仮設でき、エレベーター
の昇降行程に関わらず対応可能な揚重装置によってかご
の工事用運転ができるエレベーター昇降路内工事方法を
得ることを目的とする。
The present invention has been made to solve the above problems, and is an elevator hoistway that can be easily temporarily installed and that can be operated for car construction by a lifting device that can be used regardless of the elevator hoisting stroke. The purpose is to obtain an internal construction method.

【0010】[0010]

【課題を解決するための手段】この発明に係るエレベー
ター昇降路内工事方法においては、昇降路の上方に配置
されて床に主索挿通孔及び巻上機用支持梁が設けられた
機械室、揚重ロープの一端側を巻上機用支持梁を介して
昇降路頂部に保持し主索挿通孔を通して昇降路に垂下す
る工程と、昇降路内に昇降自在に設けられたかごに揚重
装置を装着する工程と、揚重ロープの長手中間部を揚重
装置を介してかごに係合する工程と、揚重装置を付勢し
て揚重ロープを介してかごを昇降させる工程とが設定さ
れる。
In an elevator hoistway construction method according to the present invention, a machine room is provided above the hoistway and provided with a main rope insertion hole and a hoisting machine support beam on the floor. The process of holding one end of the hoisting rope to the top of the hoistway via the hoisting machine support beam and hanging it down the hoistway through the main rope insertion hole, and the hoisting device for the car that is vertically movable in the hoistway. Is set up, the longitudinal middle part of the lifting rope is engaged with the car through the lifting device, and the process of urging the lifting device to raise and lower the car through the lifting rope is set. To be done.

【0011】また、この発明に係るエレベーター昇降路
内工事方法においては、昇降路の上方に配置されて床に
主索挿通孔及び巻上機用支持梁が設けられた機械室、複
数本の揚重ロープの一端側をそれぞれ巻上機用支持梁を
介して昇降路頂部に保持し主索挿通孔を通して昇降路に
垂下する工程と、昇降路内に昇降自在に設けられたかご
に同仕様の複数台からなる揚重装置を装着する工程と、
揚重ロープそれぞれの長手中間部を揚重装置を介してそ
れぞれかごに係合する工程と、それぞれの揚重装置を付
勢して揚重ロープを介してかごを昇降させる工程とが設
定される。
In the elevator hoistway construction method according to the present invention, a machine room is provided above the hoistway and provided with a main rope insertion hole and a hoisting machine support beam on the floor. One end side of the heavy rope is held at the top of the hoistway through the hoisting machine support beams and hung down to the hoistway through the main rope insertion hole, and the same specifications for the car that can be raised and lowered in the hoistway Installing a lifting device consisting of multiple units,
The steps of engaging the longitudinal intermediate portions of the respective lifting ropes with the respective cars via the lifting device and the steps of urging the respective lifting devices to raise and lower the car via the lifting ropes are set. .

【0012】また、この発明に係るエレベーター昇降路
内工事方法においては、昇降路に立設されたレールの上
端部に支持体を装着する工程と、支持体に揚重装置を装
着する工程と、揚重ロープの長手中間部を揚重装置に係
合して昇降路に垂下する工程と、揚重ロープの下端側
を、昇降路内に昇降自在に設けられたかごに連結する工
程と、揚重装置を付勢して揚重ロープを介してかごを昇
降させる工程とが設定される。
Further, in the elevator hoistway construction method according to the present invention, a step of mounting a support member on an upper end portion of a rail erected in the hoistway, and a step of mounting a lifting device on the support member, Engaging the longitudinal middle part of the lifting rope with a lifting device to hang it down the hoistway; connecting the lower end of the lifting rope to a car that is vertically movable in the hoistway; And a step of urging the heavy device to raise and lower the car through the lifting rope.

【0013】また、この発明に係るエレベーター昇降路
内工事方法においては、昇降路の上方に設けられた機械
室に揚重装置を装着する工程と、揚重ロープの長手中間
部を揚重装置に係合して機械室床の開口部に挿通して昇
降路に垂下する工程と、揚重ロープの下端側を昇降路内
に昇降自在に設けられたかごに連結する工程と、揚重装
置を付勢して揚重ロープを介してかごを昇降させる工程
とが設定される。
Further, in the elevator hoistway construction method according to the present invention, the step of mounting the hoisting device in the machine room provided above the hoistway, and the step of setting the longitudinal intermediate portion of the hoisting rope to the hoisting device. The steps of engaging and inserting into the opening of the machine room floor and hanging down to the hoistway; connecting the lower end side of the lifting rope to a car that is vertically movable in the hoistway; And a step of urging the car to move up and down via a lifting rope.

【0014】[0014]

【作用】上記のように構成されたエレベーター昇降路内
工事方法では、揚重装置の動作により揚重ロープを介し
てかごを昇降させて昇降路のエレベーター用機器に係わ
る作業が行われる。
In the elevator hoistway construction method constructed as described above, the operation of the hoisting device raises and lowers the car through the hoisting rope to perform work related to the elevator equipment in the hoistway.

【0015】また、上記のように構成されたエレベータ
ー昇降路内工事方法では、同仕様の複数台からなる揚重
装置の動作により揚重ロープを介してかごを昇降させて
昇降路のエレベーター用機器に係わる作業が行われる。
In the elevator hoistway construction method configured as described above, the elevator device in the hoistway is operated by raising and lowering the car through the hoisting rope by the operation of the hoisting device having a plurality of units of the same specifications. Related work is performed.

【0016】また、上記のように構成されたエレベータ
ー昇降路内工事方法では、レール上端部の支持体に配置
された揚重装置の動作により揚重ロープを介してかごを
昇降させて昇降路のエレベーター用機器に係わる作業が
行われる。
In the method for constructing an elevator hoistway constructed as described above, the operation of the hoisting device arranged on the support at the upper end of the rail moves the car up and down through the hoisting rope to raise or lower the car. Work related to elevator equipment is performed.

【0017】また、上記のように構成されたエレベータ
ー昇降路内工事方法では、機械室内に配置された揚重装
置の動作により揚重ロープを介してかごを昇降させて昇
降路のエレベーター用機器に係わる作業が行われる。
In the elevator hoistway construction method configured as described above, the elevator device in the hoistway is lifted up and down by the operation of the hoisting device arranged in the machine room to raise and lower the car through the hoisting rope. Related work is performed.

【0018】[0018]

【実施例】【Example】

実施例1.図1〜図3は、この発明の一実施例を示す図
で、図1はエレベーター装置の縦断面図、図2は図1の
要部の説明図、図3は図1の揚重装置の説明図である。
図において、(1)は昇降路、(2)は昇降路(1)の上方に配
置されて床(3)に主索挿通孔(4)及び巻上機用支持梁(5)
が設けられた機械室、(6)は巻上機用支持梁(5)の上に設
置された巻上機、(7)は機械室(2)に設けられた制御盤で
ある。
Example 1. 1 to 3 are views showing an embodiment of the present invention, FIG. 1 is a vertical cross-sectional view of an elevator apparatus, FIG. 2 is an explanatory view of a main part of FIG. 1, and FIG. 3 is a lifting apparatus of FIG. FIG.
In the figure, (1) is a hoistway, (2) is located above the hoistway (1), and a main rope insertion hole (4) and a hoisting machine support beam (5) are provided on the floor (3).
Is a machine room provided with a hoist, (6) is a hoist installed on a hoisting machine support beam (5), and (7) is a control panel provided in the machine room (2).

【0019】(8)は昇降路(1)に立設されたかご用レー
ル、(9)は昇降路(1)に立設されたつり合おもり用レー
ル、(10)はかご用レール(8)に案内されて昇降するかご
で、上梁(11)、かごドアー装置(12)が設けられている。
(13)はつり合おもり用レール(9)に案内されて昇降する
つり合おもり、(14)は巻上機(6)の駆動綱車に巻掛けら
れて主索挿通孔(4)に挿通され、両端がそれぞれかご(1
0)及びつり合おもり(13)に連結された主索、(15)はかご
(10)の上梁(11)に仮設された工事用運転装置、(16)は上
梁(11)に仮設された工事用操作盤である。
(8) is a rail for a car that is erected in the hoistway (1), (9) is a rail for a counterweight that is erected in the hoistway (1), and (10) is a rail for a car (8 ), An upper beam (11) and a car door device (12) are provided.
(13) The counterweight is guided by the counterweight rail (9) to move up and down, and (14) is wound around the drive sheave of the hoist (6) and inserted into the main rope insertion hole (4). , Both ends are baskets (1
0) and main weight connected to counterweight (13), (15) basket
(10) A work operation device temporarily installed on the upper beam (11), and (16) a work control panel temporarily installed on the upper beam (11).

【0020】(24)は巻上機用支持梁(5)の相互間に架設
されてクリップ(図示しない)等によって装着され中間
に吊り手(25)が設けられた支持体、(26)は吊り手(25)に
設けられた連結孔、(27)は上梁(11)の下側にボルトによ
って締結された取付金具、(28)はかご(10)に取付金具(2
7)を介して仮設された揚重装置で、図3に示すように後
述する揚重ロープの長手中間部が係合されたV溝車(2
9)、V溝車(29)の外周に設けられたロープ把握機構(3
0)、ガイドローラ(31)、取付金具(27)に固定するための
固定ピン(32)、揚重ロープ入口(33)及び揚重ロープ出口
(34)が設けられている。
Reference numeral (24) is a support body which is installed between the hoisting machine support beams (5) and is attached by a clip (not shown) or the like, and a hanging hand (25) is provided in the middle, and (26) is Connecting hole provided in the hanging hand (25), (27) is a mounting bracket fastened to the underside of the upper beam (11) by a bolt, (28) is a mounting bracket (2) on the basket (10).
The V-groove (2) in which a longitudinal intermediate portion of a lifting rope, which will be described later, is engaged, as shown in FIG.
9), a rope gripping mechanism (3
0), guide roller (31), fixing pin (32) for fixing to the mounting bracket (27), lifting rope inlet (33) and lifting rope outlet
(34) is provided.

【0021】(35)は一端が機械室(2)床(3)の主索挿通孔
(4)に挿通され、吊り手(25)の連結孔(26)にシャックル
(図示しない)によって連結されて昇降路(1)に垂下さ
れた揚重ロープで、揚重装置(28)の揚重ロープ入口(33)
に挿入されて長手中間部がV溝車(29)に巻掛けられ、揚
重ロープ出口(34)から引き出されてかご(10)の上梁(11)
に枢着された滑車(36)に巻掛けられて昇降路(1)に垂下
されている。(21),(22)は工事用運転装置(15)、工事用
操作盤(16)、揚重装置(28)を接続したケーブル、(23)は
昇降路(1)に設けられた乗場である。
One end of (35) is a main rope insertion hole of the machine room (2) floor (3)
The hoisting rope of the hoisting device (28) is inserted into the hoisting device (28) by being inserted into the hoistway (25) and connected to the connecting hole (26) of the hanger (25) by a shackle (not shown). Heavy rope entrance (33)
Is inserted into the V-groove (29) and is pulled out from the lifting rope exit (34) and the upper beam (11) of the car (10) is inserted.
It is wound around a pulley (36) pivotally attached to and is suspended in the hoistway (1). (21) and (22) are cables for connecting the construction operating device (15), the construction control panel (16), and the lifting device (28), and (23) is the landing provided in the hoistway (1). is there.

【0022】上記のような構成において揚重装置(28)で
は、揚重ロープ(35)に張力Pが作用するとロープ把握機
構(30)が張力Pにより図3に示す矢印A方向に動作す
る。これにより、ロープ把握機構(30)のそれぞれのロー
ラに揚重ロープ(35)に対する押し付け力Fが作用する。
そして、ΣF>Pとなるようにロープ把握機構(30)それ
ぞれのローラが設けられているため、揚重装置(28)が付
勢されるとV溝車(29)と揚重ロープ(35)の摩擦力によっ
て揚重ロープ(35)が駆動されてかご(10)が昇降する。
In the lifting device (28) having the above structure, when the tension P acts on the lifting rope (35), the rope grasping mechanism (30) operates in the direction of arrow A shown in FIG. As a result, the pressing force F against the lifting rope (35) acts on each roller of the rope grasping mechanism (30).
Since each roller of the rope grasping mechanism (30) is provided so that ΣF> P, when the lifting device (28) is urged, the V groove wheel (29) and the lifting rope (35) are The lifting rope (35) is driven by the frictional force of and the car (10) moves up and down.

【0023】このような装置構成により、例えばエレベ
ーターの改修工事において、かご(10)を巻上機(6)によ
り主索(14)を介して移動して昇降路(1)の最上階の乗場
(23)に停止する。この状態で、かご(10)の上梁(11)の下
側に取付金具(27)をボルトにより締結し、揚重装置(28)
を固定ピン(32)を使用して取付金具(27)に装着する。ま
た、機械室(2)において、巻上機用支持梁(5)に支持体(2
4)をクリップによって架設すると共に、ケーブル(22)を
従来の移動ケーブル孔(図示しない)を利用して昇降路
(1)内に下垂して工事用運転装置(15)に接続し、また工
事用操作盤(16)、揚重装置(28)に接続する。
With such a device configuration, for example, in the repair work of an elevator, the car (10) is moved by the hoisting machine (6) through the main ropes (14) and the top floor of the hoistway (1).
Stop at (23). In this state, the mounting bracket (27) is fastened to the underside of the upper beam (11) of the car (10) with bolts, and the lifting device (28)
To the mounting bracket (27) using the fixing pin (32). In the machine room (2), the support beam (2) is attached to the hoisting machine support beam (5).
4) is erected by a clip, and the cable (22) is hoisted using a conventional moving cable hole (not shown).
(1) It hangs down and is connected to the operating device (15) for construction, and also connected to the operation panel (16) for construction and the lifting device (28).

【0024】次いで、工事用操作盤(16)を操作し揚重装
置(28)を作動させて揚重ロープ(35)一端を揚重装置(28)
の揚重ロープ入口(33)に挿入すると、揚重ロープ(35)が
揚重ロープ出口(34)から送出されるので、この揚重ロー
プ(35)の端部を滑車(36)に巻掛けてかご(10)の外側から
昇降路(1)に垂下する。そして、揚重ロープ(35)の他の
端部を機械室(2)床面(3)の主索挿通孔(4)に挿通して、
支持体(24)吊り手(25)の連結孔(26)にシャックルによっ
て連結する。
Next, the construction operation panel (16) is operated to operate the lifting device (28), and one end of the lifting rope (35) is lifted to the lifting device (28).
The lifting rope (35) will be delivered from the lifting rope outlet (34) when it is inserted into the lifting rope inlet (33), and the end of this lifting rope (35) will be wound around the pulley (36). Hang from the outside of the basket (10) into the hoistway (1). Then, insert the other end of the lifting rope (35) into the main rope insertion hole (4) of the machine room (2) floor surface (3),
The support body (24) is connected to the connection hole (26) of the suspension (25) by a shackle.

【0025】次に、図示が省略してあるがつり合おもり
(13)側の緩衝器の上に適宜な間隔片を置き、工事用操作
盤(16)を操作し揚重装置(28)を作動させてかご(10)を上
昇させると、つり合おもり(13)が下降して緩衝器の上の
間隔片に当たって停止する。この状態で揚重装置(28)に
よりさらにかご(10)を上昇させると主索(14)が緩み、主
索(14)とかご(10)及びつり合おもり(13)との連結を解除
して主索(14)を取り外す。
Next, although not shown, the counterweight
Place an appropriate spacing piece on the shock absorber on the side of (13), operate the operation control panel (16) and operate the lifting device (28) to raise the car (10), and the balance weight ( 13) descends and hits the spacer above the shock absorber to stop. When the car (10) is further raised by the lifting device (28) in this state, the main rope (14) loosens, and the main rope (14) is disconnected from the car (10) and the counterweight (13). And remove the main rope (14).

【0026】このように、かご(10)の上梁(11)の下側に
揚重装置(28)が装着され、揚重ロープ(35)は機械室(2)
床(3)の主索挿通孔(4)に挿通されて支持体(24)吊り手(2
5)の連結孔(26)にシャックルによって連結される。ま
た、揚重ロープ(35)は揚重装置(28)に長手中間部が係合
されて駆動される。そして、上記のような状況において
次に述べるようにエレベーター昇降路内工事が行われ
る。すなわち、工事の作業者がかご(10)上に乗り工事用
操作盤(16)を操作すると、工事用運転装置(15)を介して
揚重装置(28)が付勢されてかご(10)が昇降する。
As described above, the lifting device (28) is attached to the lower side of the upper beam (11) of the car (10), and the lifting rope (35) is installed in the machine room (2).
It is inserted into the main rope insertion hole (4) of the floor (3) and the support (24)
It is connected to the connection hole (26) of 5) by a shackle. Further, the lifting rope (35) is driven by engaging the lifting device (28) at the longitudinal middle portion. Then, in the above-mentioned situation, the work in the elevator hoistway is performed as described below. That is, when the construction worker rides on the car (10) and operates the construction control panel (16), the lifting device (28) is urged via the construction operation device (15), and the car (10) is urged. Moves up and down.

【0027】これによって、例えば改修工事において、
巻上機(6)、制御盤(7)を撤去した状態であっても、かご
(10)を昇降させて所要の昇降路(1)内のエレベーター用
機器に係わる作業を行うことができる。すなわち、昇降
路(1)内の乗場(23)の機器、また、乗場(23)側からかご
(10)のかごドアー装置(12)、かご(10)内の操作盤(図示
しない)、かご(10)の位置表示器(図示しない)等の各
機器の撤去、新設等の作業が行われる。
As a result, for example, in repair work,
Even when the hoisting machine (6) and control panel (7) are removed, the car
(10) can be moved up and down to perform work related to elevator equipment in the required hoistway (1). That is, the equipment of the hall (23) in the hoistway (1), and the car from the hall (23) side.
Car door device (12) of (10), operation panel in car (10) (not shown), position indicator of car (10) (not shown) .

【0028】上記のような構成において、揚重ロープ(3
5)の長さが揚重装置(28)によって制約されることがな
く、エレベーターの昇降行程が長い場合にも容易に対応
することができる。また、揚重装置(28)が1台で済み、
揚重装置(28)の仮設の手数を少なくすることができ、運
転操作が簡略化されると共に、安全のための電気回路も
単純化することができる。また、少ない手数で揚重装置
(28)を仮設することができる。したがって、エレベータ
ー昇降路内工事の段取りを容易化することができ費用を
低減することができ、またエレベーター昇降路内工事の
安全性を向上することができる。
In the above structure, the lifting rope (3
The length of 5) is not restricted by the lifting device (28), and it is possible to easily cope with a long elevator ascending and descending. Also, only one lifting device (28) is required,
The number of temporary construction of the lifting device (28) can be reduced, the driving operation can be simplified, and the electric circuit for safety can also be simplified. In addition, a lifting device with a small number of steps
(28) can be temporarily installed. Therefore, it is possible to facilitate the setup of the work in the elevator hoistway, reduce the cost, and improve the safety of the work in the elevator hoistway.

【0029】実施例2.図4は、この発明の他の実施例
を示す説明図である。図4に示したもの以外は図1〜図
3と同様のエレベーター昇降路内工事用の機器が設けら
れている。図1〜図3の符号と同符号のものは同様のも
のを示している。(28)はそれぞれかご(10)の上梁(11)の
下側に設けられた揚重装置、(35)は揚重装置(28)のそれ
ぞれに対応した揚重ロープで、互いに並列に配置されて
図示を省略しているが機械室(2)床(3)の主索挿通孔(4)
に挿通されて支持体(24)吊り手(25)の連結孔(26)にシャ
ックルによって連結されている。
Example 2. FIG. 4 is an explanatory view showing another embodiment of the present invention. Equipments for construction in the elevator hoistway similar to those shown in FIGS. 1 to 3 are provided except those shown in FIG. The same reference numerals as those in FIGS. 1 to 3 denote the same components. (28) is a lifting device provided under the upper beam (11) of the car (10), and (35) is a lifting rope corresponding to each lifting device (28), which are arranged in parallel with each other. Although not shown in the figure, the main rope insertion hole (4) in the machine room (2) floor (3)
And is connected to the connection hole (26) of the support (24) and the handle (25) by a shackle.

【0030】図4の実施例においても、揚重ロープ(35)
の長さが揚重装置(28)によって制約されることがなく、
またかご(10)の上梁(11)の下側に揚重装置(28)が配置さ
れるので少ない手数で容易に仮設することができる。し
たがって、図4の実施例においても図1〜図3の実施例
と同様の作用、効果が得られる。
Also in the embodiment of FIG. 4, the lifting rope (35)
The length of is not restricted by the lifting device (28),
Further, since the lifting device (28) is arranged below the upper beam (11) of the car (10), it can be easily temporarily installed with a small number of steps. Therefore, also in the embodiment of FIG. 4, the same operation and effect as those of the embodiment of FIGS.

【0031】また、かご(10)の自重等による負荷が1台
の揚重装置(28)の能力を超える場合に、同能力の揚重装
置(28)を複数台使用して、かご(10)がエレベーター昇降
路内工事用運転される。したがって、大能力の揚重装置
(28)を準備する必要がなく費用を節減することができ
る。
Further, when the load due to the weight of the car (10) exceeds the capacity of one lifting device (28), a plurality of lifting devices (28) having the same capacity are used to ) Is operated for construction in the elevator hoistway. Therefore, a heavy lifting device
The cost can be saved without the need to prepare (28).

【0032】実施例3.図5は、この発明の他の実施例
を示す説明図である。図5に示したもの以外のものは図
1〜図3と同様のエレベーター昇降路内工事用の機器と
なっている。図1〜図3の符号と同符号のものは同様の
ものを示している。(28)はそれぞれかご(10)の上梁(11)
の下側に設けられた揚重装置、(35)は揚重装置(28)それ
ぞれの揚重ロープで、互いに並列に配置されて図示が省
略してあるが機械室(2)床(3)の主索挿通孔(4)に挿通さ
れて支持体(24)吊り手(25)の連結孔(26)にシャックルに
よって連結されている。
Example 3. FIG. 5 is an explanatory view showing another embodiment of the present invention. Devices other than those shown in FIG. 5 are the same as those used in FIGS. 1 to 3 for construction in the elevator hoistway. The same reference numerals as those in FIGS. 1 to 3 denote the same components. (28) is the upper beam (11) of the basket (10)
Lifting device provided on the lower side of the machine, (35) is a lifting rope of each lifting device (28), which are arranged in parallel with each other and are not shown in the drawing, but the machine room (2) floor (3) It is inserted into the main rope insertion hole (4) and is connected to the support member (24) and the connection hole (26) of the hanging hand (25) by a shackle.

【0033】(37)はかご(10)の上梁(11)の下側に枢着さ
れた吊り車で、2台の揚重装置(28)の相互間に配置され
て主索(14)が巻掛けられ、かご(10)が巻上機(6)により
2:1ローピングによって吊持されている。
(37) is a suspension vehicle pivotally attached to the lower side of the upper beam (11) of the car (10), and is disposed between the two lifting devices (28) and is connected to the main rope (14). And the car (10) is suspended by the hoisting machine (6) by 2: 1 roping.

【0034】図5の実施例においても、揚重ロープ(35)
の長さが揚重装置(28)によって制約されることがなく、
またかご(10)の上梁(11)の下側に揚重装置(28)が配置さ
れるので少ない手数で容易に仮設することができる。し
たがって、詳細な説明を省略するが図5の実施例におい
ても図1〜図3の実施例と同様な作用、効果が得られ
る。
Also in the embodiment of FIG. 5, the lifting rope (35)
The length of is not restricted by the lifting device (28),
Further, since the lifting device (28) is arranged below the upper beam (11) of the car (10), it can be easily temporarily installed with a small number of steps. Therefore, although detailed description is omitted, in the embodiment of FIG. 5, the same operation and effect as those of the embodiments of FIGS. 1 to 3 can be obtained.

【0035】また、2:1ローピングによってかご(10)
が吊持された場合であって、かご(10)の自重等による負
荷が1台の揚重装置(28)の能力を超えるときに、同能力
の揚重装置(28)を複数台使用することによって、かご(1
0)がエレベーター昇降路内工事用運転される。したがっ
て、大能力の揚重装置(28)を準備する必要がなく費用を
節減することができる。
Also, a basket (10) by 2: 1 roping
If the load due to the weight of the car (10) exceeds the capacity of one lifting device (28), the multiple lifting devices (28) with the same capacity are used. By the basket (1
0) is operated for construction in the elevator hoistway. Therefore, it is not necessary to prepare a heavy lifting device (28), and the cost can be saved.

【0036】実施例4.図6は、この発明の他の実施例
を示す説明図である。図6に示したもの以外のものは図
1〜図3と同様のエレベーター昇降路内工事用の機器と
なっている。図1〜図3の符号と同符号のものは同様の
ものを示している。(38)は巻上機用支持梁(5)と平行に
配置された綱止め梁、(39)は支持体(24)と同様に構成さ
れた補助支持体で、一端が巻上機用支持梁(5)に他端は
綱止め梁(38)に載置されている。
Example 4. FIG. 6 is an explanatory view showing another embodiment of the present invention. Devices other than those shown in FIG. 6 are the same as those in FIGS. 1 to 3 for construction in the elevator hoistway. The same reference numerals as those in FIGS. 1 to 3 denote the same components. (38) is a rope stop beam arranged in parallel with the hoisting machine supporting beam (5), and (39) is an auxiliary supporting body configured in the same manner as the supporting body (24), one end of which is supporting for the hoisting machine. The other end of the beam (5) is placed on a rope (38).

【0037】図6の実施例においても、揚重ロープ(35)
の長さが揚重装置(28)によって制約されることがなく、
またかご(10)の上梁(11)の下側に揚重装置(28)が配置さ
れるので少ない手数で容易に仮設することができる。し
たがって、図6の実施例においても図1〜図3の実施例
と同様な作用、効果が得られる。
Also in the embodiment of FIG. 6, the lifting rope (35)
The length of is not restricted by the lifting device (28),
Further, since the lifting device (28) is arranged below the upper beam (11) of the car (10), it can be easily temporarily installed with a small number of steps. Therefore, also in the embodiment of FIG. 6, the same actions and effects as those of the embodiments of FIGS. 1 to 3 can be obtained.

【0038】また、かご(10)の自重が1台の揚重装置(2
8)の能力を超える場合に、同能力の揚重装置(28)を複数
台使用することによって、かご(10)がエレベーター昇降
路内工事用運転される。したがって、大能力の揚重装置
(28)を準備する必要がなく費用を節減することができ
る。
In addition, the weight of the basket (10) is one (2
When the capacity of 8) is exceeded, the car (10) is operated for construction in the elevator hoistway by using multiple lifting devices (28) of the same capacity. Therefore, a heavy lifting device
The cost can be saved without the need to prepare (28).

【0039】また、図6の実施例において、2:1ロー
ピングによってかご(10)が吊持された場合の機械室(2)
における揚重ロープ(35)が、それぞれの揚重装置(28)の
直上位置に配置された支持体(24)及び補助支持体(39)に
連結される。このため、揚重ロープ(35)及び揚重装置(2
8)に横向きの無理な荷重が作用することがなく、安全性
を向上することができる。
Further, in the embodiment of FIG. 6, the machine room (2) when the car (10) is suspended by 2: 1 roping
The hoisting rope (35) is connected to the supporting body (24) and the auxiliary supporting body (39) arranged right above the respective hoisting devices (28). Therefore, the lifting rope (35) and the lifting device (2
8) does not exert an unreasonable lateral load, thus improving safety.

【0040】実施例5.図7は、この発明の他の実施例
を示す説明図である。図7に示したもの以外のものは図
1〜図3と同様のエレベーター昇降路内工事用の機器と
なっている。図1〜図3の符号と同符号のものは同様の
ものを示している。(40)は機械室(2)の床(3)の下側に配
置された支持体で、両端が巻上機用支持梁(5)の対応位
置に設けられてアンカーボルト(41)によって床(3)の下
側に締結されている。(25)は支持体(40)の中間に設けら
れた吊り手(25)、(26)は吊り手(25)に設けられた連結孔
である。
Example 5. FIG. 7 is an explanatory view showing another embodiment of the present invention. Devices other than those shown in FIG. 7 are the same as those used in FIGS. 1 to 3 for construction in the elevator hoistway. The same reference numerals as those in FIGS. 1 to 3 denote the same components. (40) is a support placed below the floor (3) of the machine room (2), both ends of which are provided at corresponding positions of the hoisting machine support beam (5) and are anchored by anchor bolts (41) to the floor. (3) Fastened to the lower side. Reference numeral (25) is a suspender (25) provided in the middle of the support (40), and reference numeral (26) is a connecting hole provided in the suspender (25).

【0041】図7の実施例においても、揚重ロープ(35)
の長さが揚重装置(28)によって制約されることがなく、
またかご(10)の上梁(11)の下側に揚重装置(28)が配置さ
れるので少ない手数で容易に仮設することができる。し
たがって、図7の実施例においても図1〜図3の実施例
と同様な作用、効果が得られる。
Also in the embodiment of FIG. 7, the lifting rope (35)
The length of is not restricted by the lifting device (28),
Further, since the lifting device (28) is arranged below the upper beam (11) of the car (10), it can be easily temporarily installed with a small number of steps. Therefore, also in the embodiment of FIG. 7, the same actions and effects as those of the embodiments of FIGS. 1 to 3 can be obtained.

【0042】また、図7の実施例は巻上機用支持梁(5)
が撤去されるエレベーター改修工事に容易に対応するこ
とができ、図1〜図3の実施例と同様な作用を得ること
ができる。
The embodiment of FIG. 7 shows a supporting beam (5) for a hoisting machine.
It is possible to easily deal with the elevator repair work in which the above is removed, and it is possible to obtain the same operation as the embodiment of FIGS.

【0043】実施例6.図8は、この発明の他の実施例
を示す説明図である。図8に示したもの以外のものは図
1〜図3と同様のエレベーター昇降路内工事用の機器と
なっている。図1〜図3の符号と同符号のものは同様の
ものを示している。(42)はかご用レール(8)の上端部相
互に架設されて揚重装置(28)が互いに離れて装着された
支持体、(43)はかご(10)の上梁(11)に設けられて揚重装
置(28)に対向する位置に配置されて揚重ロープ(35)の端
部が連結された連結具である。
Example 6. FIG. 8 is an explanatory view showing another embodiment of the present invention. Devices other than those shown in FIG. 8 are the same as those used in FIGS. 1 to 3 for construction in the elevator hoistway. The same reference numerals as those in FIGS. 1 to 3 denote the same components. (42) is a support installed between the upper ends of the car rail (8) and the lifting devices (28) are mounted apart from each other, and (43) is provided on the upper beam (11) of the car (10). The connecting device is arranged at a position facing the lifting device (28) and the ends of the lifting rope (35) are connected.

【0044】図8の実施例においても、揚重ロープ(35)
の長さが揚重装置(28)によって制約されることがなく、
またかご用レール(8)の上端部相互に架設された支持体
(42)に揚重装置(28)が配置されるので少ない手数で容易
に仮設することができる。したがって、図8の実施例に
おいても図1〜図3の実施例と同様な作用、効果が得ら
れる。
Also in the embodiment of FIG. 8, the lifting rope (35)
The length of is not restricted by the lifting device (28),
In addition, the supports installed on the upper ends of the car rails (8).
Since the lifting device (28) is arranged on the (42), it can be easily temporarily installed with a small number of steps. Therefore, also in the embodiment of FIG. 8, the same actions and effects as those of the embodiments of FIGS. 1 to 3 can be obtained.

【0045】また、図8の実施例は巻上機用支持梁(5)
が撤去されるエレベーター改修工事であって、機械室
(2)の床の強度が不足する場合に容易に対応することが
でき、図1〜図3の実施例と同様な作用を得ることがで
きる。
Further, the embodiment of FIG. 8 shows a supporting beam (5) for a hoisting machine.
Elevator renovation work to remove
It is possible to easily cope with the case where the floor strength of (2) is insufficient, and it is possible to obtain the same operation as that of the embodiment of FIGS.

【0046】実施例7.図9は、この発明の他の実施例
を示す説明図である。図9に示したもの以外のものは図
1〜図3と同様のエレベーター昇降路内工事用の機器と
なっている。図1〜図3の符号と同符号のものは同様の
ものを示している。(28)は機械室(2)の床(3)面に設けら
れた揚重装置、(35)は床(3)の貫通孔に挿通された揚重
ロープであり、かご(10)の上梁(11)の揚重装置(28)に対
向する位置に設けられた連結具(43)に連結されている。
Example 7. FIG. 9 is an explanatory diagram showing another embodiment of the present invention. Devices other than those shown in FIG. 9 are the same as those used in FIGS. 1 to 3 for construction in the elevator hoistway. The same reference numerals as those in FIGS. 1 to 3 denote the same components. (28) is a lifting device provided on the floor (3) surface of the machine room (2), (35) is a lifting rope inserted through the through hole of the floor (3), and is on the car (10). The beam (11) is connected to a connecting tool (43) provided at a position facing the lifting device (28).

【0047】図9の実施例においても、揚重ロープ(35)
の長さが揚重装置(28)によって制約されることがなく、
また機械室(2)の床(3)面に揚重装置(28)が配置されるの
で少ない手数で容易に仮設することができる。したがっ
て、図9の実施例においても図1〜図3の実施例と同様
な作用、効果が得られる。
Also in the embodiment of FIG. 9, the lifting rope (35)
The length of is not restricted by the lifting device (28),
Further, since the lifting device (28) is arranged on the floor (3) surface of the machine room (2), temporary installation can be easily performed with a small number of steps. Therefore, also in the embodiment of FIG. 9, the same actions and effects as those of the embodiments of FIGS. 1 to 3 can be obtained.

【0048】また、図9の実施例はかご(10)で既設機器
の撤去、新設機器の装着作業を行う場合に、かご(10)上
に設置された揚重装置(28)が作業の邪魔になるときに、
この不具合を容易に解消できると共に、図1〜図3の実
施例と同様な作用を得ることができる。
Further, in the embodiment of FIG. 9, when removing existing equipment and mounting new equipment in the car (10), the lifting device (28) installed on the car (10) interferes with the work. When
This inconvenience can be easily eliminated, and the same operation as that of the embodiment shown in FIGS. 1 to 3 can be obtained.

【0049】実施例8.図10は、この発明の他の実施
例を示す説明図である。図10に示したもの以外のもの
は図1〜図3と同様のエレベーター昇降路内工事用の機
器となっている。図1〜図3の符号と同符号のものは同
様のものを示している。(28)は機械室(2)の床(3)の下側
に設けられた揚重装置、(35)は揚重装置(28)の揚重ロー
プで、かご(10)の上梁(11)の揚重装置(28)に対向する位
置に配置された連結具(43)に連結されている。
Example 8. FIG. 10 is an explanatory view showing another embodiment of the present invention. Devices other than those shown in FIG. 10 are the same as those shown in FIGS. 1 to 3 for construction in the elevator hoistway. The same reference numerals as those in FIGS. 1 to 3 denote the same components. (28) is a lifting device provided under the floor (3) of the machine room (2), (35) is a lifting rope of the lifting device (28), and the upper beam (11) of the car (10) ) Is connected to the connecting device (43) arranged at a position facing the lifting device (28).

【0050】図10の実施例においても、揚重ロープ(3
5)の長さが揚重装置(28)によって制約されることがな
く、また機械室(2)の床(3)下側のみに揚重装置(28)が配
置される。したがって、図10の実施例においても図1
〜図3の実施例と同様な作用、効果が得られる。
Also in the embodiment of FIG. 10, the lifting rope (3
The length of 5) is not restricted by the lifting device (28), and the lifting device (28) is arranged only under the floor (3) of the machine room (2). Therefore, even in the embodiment of FIG.
~ The same action and effect as the embodiment of Fig. 3 are obtained.

【0051】また、図10の実施例はかご(10)で既設機
器の撤去、新設機器の装着作業を行う場合に、かご(10)
上に設置された揚重装置(28)が作業の邪魔になるとき
に、この不具合を容易に解消できると共に、図1〜図3
の実施例と同様な作用を得ることができる。
In the embodiment of FIG. 10, the car (10) is used when removing existing equipment and installing new equipment in the car (10).
This problem can be easily resolved when the lifting device (28) installed above interferes with the work.
It is possible to obtain the same effect as that of the embodiment.

【0052】実施例9.図11は、この発明の他の実施
例を示す説明図である。図11に示したもの以外のもの
は図1〜図3と同様のエレベーター昇降路内工事用の機
器となっている。図1〜図3の符号と同符号のものは同
様のものを示している。(1)は昇降路で、実線で示す箇
所は建設済み、破線で示す箇所は未建設部分である。(4
4)は建設済み昇降路(1)の上端寄り架設されて揚重装置
(28)が装着された支持体、(35)は揚重装置(28)の揚重ロ
ープで、かご(10)の上梁(11)の揚重装置(28)に対向する
位置に配置された連結具(43)に連結されている。
Example 9. FIG. 11 is an explanatory view showing another embodiment of the present invention. Devices other than those shown in FIG. 11 are the same as those used in FIGS. 1 to 3 for construction in the elevator hoistway. The same reference numerals as those in FIGS. 1 to 3 denote the same components. (1) is the hoistway, where the solid line shows the parts already constructed and the broken line shows the parts not yet constructed. (Four
4) is a hoisting device that is erected near the upper end of the constructed hoistway (1)
The support with (28) attached, (35) is the lifting rope of the lifting device (28), and is placed at a position facing the lifting device (28) of the upper beam (11) of the car (10). Connected to the connector (43).

【0053】図11の実施例においても、揚重ロープ(3
5)の長さが揚重装置(28)によって制約されることがな
く、また建設済み昇降路(1)の上端寄り架設された支持
体(44)に揚重装置(28)が配置されるので少ない手数で容
易に仮設することができる。したがって、図11の実施
例においても図1〜図3の実施例と同様な作用、効果が
得られる。
Also in the embodiment of FIG. 11, the lifting rope (3
The length of 5) is not restricted by the lifting device (28), and the lifting device (28) is arranged on the support body (44) installed near the upper end of the constructed hoistway (1). Therefore, it can be easily installed temporarily with a small number of steps. Therefore, also in the embodiment of FIG. 11, the same operation and effect as those of the embodiments of FIGS. 1 to 3 can be obtained.

【0054】また、図11の実施例は建設途上の昇降路
(1)にエレベーターを据付ける場合に容易に対応するこ
とができ、図1〜図3の実施例と同様な作用を得ること
ができる。なお、昇降路(1)の建設進捗に伴って図11
に実線で示す建設済み箇所から、図11に破線で示す箇
所へ支持体(44)、揚重装置(28)等が移動されてエレベー
ター据付のエレベーター昇降路内工事が行われる。
The embodiment of FIG. 11 shows a hoistway under construction.
It is possible to easily cope with the case where the elevator is installed in (1), and it is possible to obtain the same operation as the embodiment of FIGS. It should be noted that as the construction of the hoistway (1) progresses, as shown in FIG.
11, the support body (44), the lifting device (28), and the like are moved from the already-constructed location indicated by the solid line to the location indicated by the broken line in FIG.

【0055】[0055]

【発明の効果】この発明は以上説明したように、昇降路
の上方に配置されて床に主索挿通孔及び巻上機用支持梁
が設けられた機械室、揚重ロープの一端側を巻上機用支
持梁を介して昇降路頂部に保持し主索挿通孔を通して昇
降路に垂下する工程と、昇降路内に昇降自在に設けられ
たかごに揚重装置を装着する工程と、揚重ロープの長手
中間部を揚重装置を介してかごに係合する工程と、揚重
装置を付勢して揚重ロープを介してかごを昇降させる工
程とが設定される。そして揚重装置の動作により揚重ロ
ープを介してかごを昇降させて昇降路のエレベーター用
機器に係わる作業が行われる。
As described above, according to the present invention, the machine room, which is disposed above the hoistway and provided with the main rope insertion hole and the hoisting machine supporting beam on the floor, winds one end side of the lifting rope. The process of holding the hoistway at the top of the hoistway through the upper machine support beam and hanging it down the hoistway through the main rope insertion hole; the step of mounting the hoisting device on the car that is vertically movable in the hoistway; A step of engaging the longitudinal middle portion of the rope with the car via the lifting device and a step of urging the lifting device to move the car up and down via the lifting rope are set. Then, the operation of the hoisting device raises and lowers the car through the hoisting rope to perform work related to the elevator equipment in the hoistway.

【0056】これにより、揚重ロープの長さが揚重装置
によって制約されることがなく、エレベーターの昇降行
程の長短に関係なく容易に対応することができる。ま
た、揚重装置が1台で済み仮設の手数を少なくすること
ができ、運転操作が簡略化されると共に、安全のための
電気回路も単純化することができる。したがって、エレ
ベーター昇降路内工事の段取りを容易化できて費用を低
減することができ、またエレベーター昇降路内工事の安
全性を向上する効果がある。
As a result, the length of the hoisting rope is not restricted by the hoisting device, and the hoisting rope can be easily accommodated regardless of the length of the elevator stroke. Further, only one lifting device is required, and the number of temporary work can be reduced, and the driving operation can be simplified and the electric circuit for safety can also be simplified. Therefore, it is possible to facilitate the setup of the work inside the elevator hoistway, reduce the cost, and improve the safety of the work inside the elevator hoistway.

【0057】また、この発明は以上説明したように、昇
降路の上方に配置されて床に主索挿通孔及び巻上機用支
持梁が設けられた機械室、複数本の揚重ロープの一端側
をそれぞれ巻上機用支持梁を介して昇降路頂部に保持し
主索挿通孔を通して昇降路に垂下する工程と、昇降路内
に昇降自在に設けられたかごに同仕様の複数台からなる
揚重装置を装着する工程と、揚重ロープそれぞれの長手
中間部を揚重装置を介してそれぞれかごに係合する工程
と、それぞれの揚重装置を付勢して揚重ロープを介して
かごを昇降させる工程とが設定される。そして同仕様の
複数台からなる揚重装置の動作により揚重ロープを介し
てかごを昇降させて昇降路のエレベーター用機器に係わ
る作業が行われる。
Further, as described above, the present invention is arranged above the hoistway and has a machine room in which a main rope insertion hole and a hoisting machine support beam are provided in the floor, and one end of a plurality of hoisting ropes. Each side is held at the top of the hoistway via the hoisting machine support beam and hung down to the hoistway through the main rope insertion hole, and a car that can be raised and lowered in the hoistway consists of multiple units with the same specifications. The steps of installing the lifting device, the steps of engaging the longitudinal intermediate portions of the lifting ropes with the respective cars via the lifting device, and the steps of biasing the respective lifting devices to the car via the lifting rope. And the process of raising and lowering. Then, the operation of the hoisting device composed of a plurality of units of the same specification elevates and lowers the car through the hoisting rope to perform work related to the elevator equipment in the hoistway.

【0058】これにより、揚重ロープの長さが揚重装置
によって制約されることがなく、エレベーターの昇降行
程の長短に関係なく容易に対応することができる。した
がって、エレベーター昇降路内工事の段取りを容易化で
きて費用を低減することができ、またエレベーター昇降
路内工事の安全性を向上する効果がある。また、かごの
自重等による負荷が1台の揚重装置の能力を超える場合
に、同仕様の揚重装置を複数台使用してかごがエレベー
ター昇降路内工事用運転される。このため、大能力の揚
重装置を準備する必要がなく費用を節減する効果があ
る。
As a result, the length of the hoisting rope is not restricted by the hoisting device, and it is possible to easily cope with the lifting stroke of the elevator regardless of its length. Therefore, it is possible to facilitate the setup of the work inside the elevator hoistway, reduce the cost, and improve the safety of the work inside the elevator hoistway. In addition, when the load due to the weight of the car exceeds the capacity of one lifting device, a plurality of lifting devices with the same specifications are used to operate the car for work in the elevator hoistway. Therefore, there is no need to prepare a large-capacity hoisting device, which has the effect of reducing costs.

【0059】また、この発明は以上説明したように、昇
降路に立設されたレールの上端部に支持体を装着する工
程と、支持体に揚重装置を装着する工程と、揚重ロープ
の長手中間部を揚重装置に係合して昇降路に垂下する工
程と、揚重ロープの下端側を、昇降路内に昇降自在に設
けられたかごに連結する工程と、揚重装置を付勢して揚
重ロープを介してかごを昇降させる工程とが設定され
る。そして、レール上端部の支持体に配置された揚重装
置の動作により揚重ロープを介してかごを昇降させて昇
降路のエレベーター用機器に係わる作業が行われる。
In addition, as described above, the present invention, the step of mounting the support on the upper end of the rail erected in the hoistway, the step of mounting the lifting device on the support, and the lifting rope The process of engaging the longitudinal middle part with the lifting device to hang it down the hoistway, the process of connecting the lower end side of the lifting rope to the car that is vertically movable in the hoistway, and attaching the lifting device And a step of moving the car up and down via a lifting rope. Then, the operation of the lifting device arranged on the support at the upper end of the rail moves the car up and down via the lifting rope to perform work related to the elevator equipment in the hoistway.

【0060】これにより、揚重ロープの長さが揚重装置
によって制約されることがなく、エレベーターの昇降行
程の長短に関係なく容易に対応することができ、また巻
上機用支持梁が撤去されるエレベーター改修工事であっ
て、機械室の床の強度が不足する場合に容易に対応する
ことができる。したがって、エレベーター昇降路内工事
の段取りを容易化できて費用を低減することができ、ま
たエレベーター昇降路内工事の安全性を向上する効果が
ある。
As a result, the length of the hoisting rope is not restricted by the hoisting device, and the hoisting machine support beam can be easily removed regardless of the length of the elevator hoisting stroke. This is an elevator renovation work to be performed, and can easily cope with the case where the floor of the machine room is insufficient in strength. Therefore, it is possible to facilitate the setup of the work inside the elevator hoistway, reduce the cost, and improve the safety of the work inside the elevator hoistway.

【0061】また、この発明は以上説明したように、昇
降路の上方に設けられた機械室に揚重装置を装着する工
程と、揚重ロープの長手中間部を揚重装置に係合して機
械室床の開口部に挿通して昇降路に垂下する工程と、揚
重ロープの下端側を昇降路内に昇降自在に設けられたか
ごに連結する工程と、揚重装置を付勢して揚重ロープを
介してかごを昇降させる工程とが設定される。そして、
機械室内に配置された揚重装置の動作により揚重ロープ
を介してかごを昇降させて昇降路のエレベーター用機器
に係わる作業が行われる。
As described above, according to the present invention, the step of mounting the lifting device in the machine room provided above the hoistway and the longitudinal middle part of the lifting rope are engaged with the lifting device. Inserting through the opening in the floor of the machine room to hang it down the hoistway, connecting the lower end of the lifting rope to a car that can be lifted up and down in the hoistway, and energizing the lifting device. The process of raising and lowering the car through the lifting rope is set. And
The operation of the lifting device arranged in the machine room raises and lowers the car through the lifting rope to perform work related to the elevator equipment in the hoistway.

【0062】これにより、揚重ロープの長さが揚重装置
によって制約されることがなく、エレベーターの昇降行
程の長短に関係なく容易に対応することができ、またか
ごの上での既設機器の撤去、新設機器の装着作業時に、
揚重装置が作業の邪魔になる場合の不具合を解消するこ
とができる。したがって、エレベーター昇降路内工事の
段取りを容易化できて費用を低減することができ、また
エレベーター昇降路内工事の安全性を向上する効果があ
る。
As a result, the length of the hoisting rope is not restricted by the hoisting device, and the hoisting stroke of the elevator can be easily dealt with regardless of the length of the elevator ascending / descending. When removing and installing new equipment,
It is possible to solve the problem when the lifting device interferes with the work. Therefore, it is possible to facilitate the setup of the work inside the elevator hoistway, reduce the cost, and improve the safety of the work inside the elevator hoistway.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の実施例1を示すエレベーター装置の
縦断面図。
FIG. 1 is a vertical cross-sectional view of an elevator device showing a first embodiment of the present invention.

【図2】図1の要部の説明図。FIG. 2 is an explanatory diagram of a main part of FIG.

【図3】図1の揚重装置の説明図。3 is an explanatory view of the lifting device of FIG. 1. FIG.

【図4】この発明の実施例2を示す説明図。FIG. 4 is an explanatory diagram showing a second embodiment of the present invention.

【図5】この発明の実施例3を示す説明図。FIG. 5 is an explanatory diagram showing Embodiment 3 of the present invention.

【図6】この発明の実施例4を示す説明図。FIG. 6 is an explanatory diagram showing Embodiment 4 of the present invention.

【図7】この発明の実施例5を示す説明図。FIG. 7 is an explanatory diagram showing Embodiment 5 of the present invention.

【図8】この発明の実施例6を示す説明図。FIG. 8 is an explanatory diagram showing Embodiment 6 of the present invention.

【図9】この発明の実施例7を示す説明図。FIG. 9 is an explanatory diagram showing Embodiment 7 of the present invention.

【図10】この発明の実施例8を示す説明図。FIG. 10 is an explanatory diagram showing Embodiment 8 of the present invention.

【図11】この発明の実施例9を示す説明図。FIG. 11 is an explanatory diagram showing Embodiment 9 of the present invention.

【図12】従来のエレベーター昇降路内工事方法を示す
エレベーター装置の縦断面図。
FIG. 12 is a vertical cross-sectional view of an elevator device showing a conventional elevator hoistway construction method.

【図13】図12の要部右側面拡大図。FIG. 13 is an enlarged view of the right side surface of the main part of FIG.

【符号の説明】[Explanation of symbols]

1 昇降路、2 機械室、3 床、4 主索挿通孔、5
巻上機用支持梁、8レール(かご用レール)、10
かご、28 揚重装置、35 揚重ロープ、42 支持
体。
1 hoistway, 2 machine room, 3 floor, 4 main rope insertion hole, 5
Hoisting machine support beams, 8 rails (car rails), 10
Basket, 28 lifting device, 35 lifting rope, 42 support.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 昇降路の上方に配置されて床に主索挿通
孔及び巻上機用支持梁が設けられた機械室、揚重ロープ
の一端側を上記巻上機用支持梁を介して上記昇降路頂部
に保持し上記主索挿通孔を通して上記昇降路に垂下する
工程と、上記昇降路内に昇降自在に設けられたかごに揚
重装置を装着する工程と、上記揚重ロープの長手中間部
を上記揚重装置を介して上記かごに係合する工程と、上
記揚重装置を付勢して上記揚重ロープを介して上記かご
を昇降させる工程とからなり、上記昇降路のエレベータ
ー用機器に係わる作業を行うエレベーター昇降路内工事
方法。
1. A machine room disposed above the hoistway and provided with a main rope insertion hole and a hoisting machine supporting beam on the floor, and one end side of a hoisting rope is provided through the hoisting machine supporting beam. A step of holding the hoistway at the top of the hoistway and hanging it down the hoistway through the main rope insertion hole; a step of mounting a hoisting device on a car that is vertically movable in the hoistway; and a longitudinal direction of the hoisting rope. An elevator of the hoistway, which comprises a step of engaging the intermediate portion with the car through the lifting device and a step of urging the lifting device to move the car up and down through the lifting rope. Elevator hoistway construction method to perform work related to equipment.
【請求項2】 昇降路の上方に配置されて床に主索挿通
孔及び巻上機用支持梁が設けられた機械室、複数本の揚
重ロープの一端側をそれぞれ上記巻上機用支持梁を介し
て上記昇降路頂部に保持し上記主索挿通孔を通して上記
昇降路に垂下する工程と、上記昇降路内に昇降自在に設
けられたかごに同仕様の複数台からなる揚重装置を装着
する工程と、上記揚重ロープそれぞれの長手中間部を上
記揚重装置を介してそれぞれ上記かごに係合する工程
と、それぞれの上記揚重装置を付勢して上記揚重ロープ
を介して上記かごを昇降させる工程とからなり、上記昇
降路のエレベーター用機器に係わる作業を行うエレベー
ター昇降路内工事方法。
2. A machine room disposed above the hoistway and provided with a main rope insertion hole and a hoisting machine supporting beam on the floor, and one end side of each of a plurality of hoisting ropes is supported by the hoisting machine. A process of holding the hoistway at the top of the hoistway via a beam and hanging it down to the hoistway through the main rope insertion hole, and a lifting device composed of a plurality of the same specifications for a car that is vertically movable in the hoistway. The step of mounting, the step of engaging the longitudinal intermediate portion of each of the lifting ropes with the car via the lifting device, and the step of biasing each lifting device via the lifting rope. An elevator hoistway construction method for performing work relating to elevator equipment in the hoistway, which comprises a step of hoisting the car.
【請求項3】 昇降路に立設されたレールの上端部に支
持体を装着する工程と、上記支持体に揚重装置を装着す
る工程と、揚重ロープの長手中間部を上記揚重装置に係
合して上記昇降路に垂下する工程と、上記揚重ロープの
下端側を上記昇降路内に昇降自在に設けられたかごに連
結する工程と、上記揚重装置を付勢して上記揚重ロープ
を介して上記かごを昇降させる工程とからなり、上記昇
降路のエレベーター用機器に係わる作業を行うエレベー
ター昇降路内工事方法。
3. A step of mounting a support on an upper end portion of a rail erected in a hoistway, a step of mounting a lifting device on the support, and a longitudinal intermediate portion of a lifting rope for the lifting device. And hanging down to the hoistway, connecting the lower end side of the lifting rope to a car provided in the hoistway so as to be lifted and lowered, and urging the lifting device to An elevator hoistway construction method for performing work related to elevator equipment in the hoistway, which comprises a step of hoisting the car through a lifting rope.
【請求項4】 昇降路の上方に設けられた機械室に揚重
装置を装着する工程と、揚重ロープの長手中間部を上記
揚重装置に係合して上記機械室床の開口部に挿通して上
記昇降路に垂下する工程と、上記揚重ロープの下端側を
上記昇降路内に昇降自在に設けられたかごに連結する工
程と、上記揚重装置を付勢して上記揚重ロープを介して
上記かごを昇降させる工程とからなり、上記昇降路のエ
レベーター用機器に係わる作業を行うエレベーター昇降
路内工事方法。
4. A step of mounting a lifting device on a machine room provided above a hoistway, and a longitudinal intermediate portion of a lifting rope is engaged with the lifting device to open the opening of the machine room floor. Inserting and hanging down to the hoistway, connecting the lower end side of the lifting rope to a car provided in the hoistway so that it can be lifted up and down, and urging the lifting device to lift the hoist. An elevator hoistway construction method for performing work related to elevator equipment in the hoistway, which comprises a step of hoisting the car through a rope.
JP13347294A 1994-06-16 1994-06-16 Work method in elevator shaft Pending JPH082850A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13347294A JPH082850A (en) 1994-06-16 1994-06-16 Work method in elevator shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13347294A JPH082850A (en) 1994-06-16 1994-06-16 Work method in elevator shaft

Publications (1)

Publication Number Publication Date
JPH082850A true JPH082850A (en) 1996-01-09

Family

ID=15105581

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13347294A Pending JPH082850A (en) 1994-06-16 1994-06-16 Work method in elevator shaft

Country Status (1)

Country Link
JP (1) JPH082850A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6446763B1 (en) * 2000-07-19 2002-09-10 Otis Elevator Company Integrated elevator installation hoist tool
JP2003073054A (en) * 2001-08-30 2003-03-12 Mitsubishi Electric Corp Car hoisting device of elevator
JP2009196808A (en) * 2008-02-25 2009-09-03 Mitsubishi Electric Corp Installing device of elevator
CN102112386A (en) * 2008-08-01 2011-06-29 奥蒂斯电梯公司 Vibration isolation assembly for an elevator system
WO2013065129A1 (en) * 2011-11-01 2013-05-10 三菱電機株式会社 Car of elevator

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6446763B1 (en) * 2000-07-19 2002-09-10 Otis Elevator Company Integrated elevator installation hoist tool
JP2003073054A (en) * 2001-08-30 2003-03-12 Mitsubishi Electric Corp Car hoisting device of elevator
JP2009196808A (en) * 2008-02-25 2009-09-03 Mitsubishi Electric Corp Installing device of elevator
CN102112386A (en) * 2008-08-01 2011-06-29 奥蒂斯电梯公司 Vibration isolation assembly for an elevator system
WO2013065129A1 (en) * 2011-11-01 2013-05-10 三菱電機株式会社 Car of elevator

Similar Documents

Publication Publication Date Title
JPH07100582B2 (en) Elevator work platform and elevator installation method
JP2007099515A (en) Method for mounting support means of lift cage to lift cage and lift shaft
JP6813123B2 (en) How to apply elevator lift extension technology
JP6969686B2 (en) How to extend the lift of a construction elevator
JPH082850A (en) Work method in elevator shaft
JP4929045B2 (en) Guide rail installation method for machine room-less elevator
JP3170559B2 (en) Elevator car fixing device
JP3807775B2 (en) How to lift the construction elevator
JPH08245116A (en) Installation engineering of elevator
JPH07237847A (en) Installation method of elevator
JP4841171B2 (en) Rise-up elevator installation method
JP2001335255A (en) Elevator installation construction method, and elevator installation unit
JP2877593B2 (en) Elevator installation method
JP3519009B2 (en) Elevator installation method
JP3301948B2 (en) Elevator installation method
JPH021066B2 (en)
JPH0388685A (en) Method for vertically providing guide rail of elevator
JP2022126286A (en) Replacement assist device of governor rope and replacement method of governor rope
JPH09235082A (en) Elevator modification method
JPH05201648A (en) Installation of elevator
JPH0859132A (en) Lifting of load
JP2000351555A (en) Method for replacing elevator main rope
JPH0747453B2 (en) Elevator installation method
JP3888513B2 (en) Main rope end adjustment method for 2-to-1 roping elevator
JP3471257B2 (en) Elevator main cable replacement method