JP3519009B2 - Elevator installation method - Google Patents

Elevator installation method

Info

Publication number
JP3519009B2
JP3519009B2 JP03005999A JP3005999A JP3519009B2 JP 3519009 B2 JP3519009 B2 JP 3519009B2 JP 03005999 A JP03005999 A JP 03005999A JP 3005999 A JP3005999 A JP 3005999A JP 3519009 B2 JP3519009 B2 JP 3519009B2
Authority
JP
Japan
Prior art keywords
elevator
guide rail
installation method
pulley
hoisting machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP03005999A
Other languages
Japanese (ja)
Other versions
JP2000226168A (en
Inventor
俊之 田所
篤史 朝枝
陽一 小平
篤 大黒屋
忍 鈴木
浩一 九十歩
伸明 八木
利夫 高崎
徹 田淵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP03005999A priority Critical patent/JP3519009B2/en
Publication of JP2000226168A publication Critical patent/JP2000226168A/en
Application granted granted Critical
Publication of JP3519009B2 publication Critical patent/JP3519009B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、かごを主ロープを
介して駆動する巻上機または上部プーリにかかる垂直荷
重を、ガイドレールまたは縦通材で支持するエレベータ
の据付方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an elevator installation method in which a vertical load applied to a hoisting machine or an upper pulley that drives a car through a main rope is supported by a guide rail or a stringer.

【0002】[0002]

【従来の技術】従来、例えば特表平10−506871
号公報に記載されているように、かごを主ロープを介し
て駆動する巻上機または主ロープが巻掛けられる上部プ
ーリにかかる垂直荷重を、ガイドレールまたは縦通材で
支持するエレベータが提案されている。このようなエレ
ベータでは、建屋に対する負担が少なくて済むため、建
屋構造の軽量化ができるという利点がある。特に最近は
昇降路頂部に機械室のないエレベータにあっては、昇降
路頂部に機械室がなくなったことから建屋に対する負担
が少なくて済む。
2. Description of the Related Art Conventionally, for example, Japanese Patent Laid-Open No. 10-506871.
As described in the publication, an elevator is proposed in which a vertical load applied to a hoisting machine that drives a car through a main rope or an upper pulley around which the main rope is wound is supported by a guide rail or a stringer. ing. Such an elevator has an advantage that the building structure can be lightened because the burden on the building can be reduced. Particularly in an elevator without a machine room at the top of the hoistway these days, the load on the building can be reduced because there is no machine room at the top of the hoistway.

【0003】また、この種の昇降路頂部に機械室がない
エレベータの据付方法としては、例えば、特許第264
8374号公報に記載されているように、最初に昇降路
上部に機器揚重用の吊り上げ具、例えば揚重用の梁等を
設置し、これを吊り点として使用して上部に設置する機
器の揚重を行いながらエレベータを据え付けるものが提
案されている。
Further, as an elevator installation method of this type having no machine room at the top of the hoistway, for example, Japanese Patent No. 264
As described in Japanese Patent No. 8374, a hoist for lifting equipment, for example, a beam for hoisting, is first installed on the upper part of a hoistway, and this is used as a hanging point to lift the equipment installed on the upper part. It is proposed to install the elevator while performing the above.

【0004】[0004]

【発明が解決しようとする課題】ところで、前述した従
来のエレベータの据付方法では、上部プーリ、ガイドレ
ール等を一括して揚重することから、かなりの重量物を
吊り上げできる大型の揚重機と揚重用の梁とを建屋に取
り付ける必要がある。そのため、建屋側にこれらの揚重
機器を設置できる充分な強度を有する必要があり、建築
コストが増大するという問題があった。
By the way, in the above-described conventional elevator installation method, the upper pulley, the guide rail, and the like are lifted together, so that a large-sized hoist and a hoist capable of hoisting a considerably heavy object are used. Heavy beams and beams need to be attached to the building. Therefore, it is necessary to have sufficient strength on the building side so that these lifting equipment can be installed, and there is a problem that the construction cost increases.

【0005】本発明はこのような従来技術における実情
に鑑みてなされたもので、その目的は、エレベータを据
え付ける建屋の建築コストを抑えることのできるエレベ
ータの据付方法を提供することにある。
[0005] The present invention has been made in view of the circumstances in the prior art, and an object thereof is to provide a mounting how the elevator which can reduce the construction costs of the building installing the elevator.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するた
め、本発明は、かごを主ロープを介して駆動する巻上機
または前記主ロープが巻掛けられる上部プーリにかかる
垂直荷重の少なくとも一方を、ガイドレールまたは縦通
材で支持するエレベータの据付方法において、昇降路最
上部に支持材を固定し、最下部ガイドレールを立設し、
この最下部ガイドレールにかご枠及びつり合いおもりを
それぞれ組み入れた後、前記支持材を吊り点として複数
のガイドレールを数珠つなぎに連結して揚重機により吊
上げ、その最上部を昇降路最上部へ、及びその最下部を
前記最下部ガイドレールへ固定し、前記支持材に、前記
上部プーリ及び巻上機の少なくとも一方を設置した後、
前記主ロープの両端を前記支持材に取付け、前記主ロー
プの中間部を前記かご枠、つり合いおもりに巻掛け、そ
して前記巻上機及び前記上部プーリの少なくとも一方に
巻掛け、前記巻上機または前記上部プーリに掛かる垂直
荷重を前記支持材によって支えた状態で前記巻上機を駆
動することにより前記かご枠を昇降させて中間部ガイド
レールの固定作業を含むエレベータ機器の据付作業を行
い、最後に前記支持材を取外す構成にした。
Means for Solving the Problems] To achieve the above object, the present onset Ming, at least one of the vertical load on the upper pulley hoist or the main rope to drive the car through the main rope is wound and in elevator installation method of supporting the guide rails or stringers, hoistway top
Fix the support material to the upper part, stand the lowermost guide rail,
Add a car frame and counterweight to this bottom guide rail.
After incorporating each, a plurality of supports are used as suspension points.
The guide rails are connected in a daisy chain and suspended by a lifting machine.
Raise the top to the top of the hoistway and the bottom
Fixed to the lowermost guide rail, the support member, the
After installing at least one of the upper pulley and hoist,
Attach both ends of the main rope to the support and
Wrap the middle part of the
On at least one of the hoisting machine and the upper pulley
Winding, the hoist driving in a state where a vertical load applied to the hoisting machine or the upper pulley was supported by the support member
By moving the car frame up and down, the middle part guide
Performs elevator equipment installation work including rail fixing work
Finally, the supporting material was removed .

【0007】[0007]

【0008】このように構成した本発明のエレベータの
据付方法は、かご枠を主ロープを介して駆動する巻上機
または上部プーリにかかる垂直荷重を、建屋に固定した
支持材により支持するので、かご枠と据付作業に必要な
機材の重量のみを昇降させるだけの荷重を建屋に負担さ
せるだけでよく、これにより、エレベータを据え付ける
建屋の建築コストを抑えることができる。
[0008] installation how the elevator of the present invention configured in this way, the vertical load on the hoist or the upper pulley to drive the car frame via the main rope, since supported by a support member fixed to the building It is only necessary to load the building with a load that raises and lowers only the weight of the car frame and the equipment necessary for the installation work, which can reduce the construction cost of the building where the elevator is installed.

【0009】[0009]

【発明の実施の形態】以下、本発明の実施の形態のエレ
ベータの据付方法を図に基づいて説明する。 図1は本
発明の第1の実施形態に係るエレベータの据付方法を説
明する図、図2は本実施形態の据付方法に用いられる据
付装置を示す図、図3は本実施形態の据付方法によるガ
イドレールの立設工程を示す図、図4は本実施形態の据
付方法による支持梁の取付工程を示す図、図5は本実施
形態の据付方法によるエレベータ機器の取付工程を示す
図である。
BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, will be described with reference to figure installation how the elevator according to the embodiment of the present invention. FIG. 1 is a diagram illustrating an elevator installation method according to a first embodiment of the present invention, FIG. 2 is a diagram showing an installation device used in the installation method of the present embodiment, and FIG. 3 is a view showing an installation method of the present embodiment. FIG. 4 is a diagram showing a standing process of the guide rail, FIG. 4 is a diagram showing a mounting process of the support beam by the installation method of the present embodiment, and FIG. 5 is a diagram showing an elevator device attachment process by the installation method of the present embodiment.

【0010】図1に示すエレベータでは、昇降路1の底
部に設置したピットベース2に、エレベータのかご枠3
を案内するガイドレール4が立設され、このガイドレー
ル4は、昇降路1の最下部に位置する最下部レール4
a、及びその上部に延設されるレール4b、4c、4d
から構成されている。ガイドレール4の最下部レール4
aはレールブラケット5a、5bにより固定され、中間
部レール4bはレールブラケット5cにより固定され、
最上部レール4dはレールブラケット5dに固定されて
いる。同様に、つり合いおもり6を案内する他のガイド
レール7もピットベース2から昇降路1頂部まで立設さ
れている。
In the elevator shown in FIG. 1, a pit base 2 installed at the bottom of a hoistway 1 has a car frame 3 for the elevator.
A guide rail 4 for guiding the vehicle is installed upright, and the guide rail 4 is the lowermost rail 4 located at the lowermost part of the hoistway 1.
a, and rails 4b, 4c, and 4d extending above it
It consists of Bottom rail 4 of guide rail 4
a is fixed by rail brackets 5a and 5b, intermediate rail 4b is fixed by rail bracket 5c,
The uppermost rail 4d is fixed to the rail bracket 5d. Similarly, another guide rail 7 for guiding the counterweight 6 is also erected from the pit base 2 to the top of the hoistway 1.

【0011】ピットベース2には、かご枠3を主ロープ
8を介して駆動する巻上機9が設置されている。主ロー
プ8の両端は、ガイドレール4、7の上部にそれぞれ取
り付けられたロープエンド10、11に固定されてお
り、この主ロープ8はつり合いおもり6のプーリ12
と、ガイドレール4、7の上部に取り付けられたプーリ
ビーム(すなわちプーリ取付台)13に支持された上部
プーリ14と、巻上機9と、かご枠3下部のかご床3a
上にあるかご下プーリ3bとに巻回されている。
A hoisting machine 9 for driving the car frame 3 via a main rope 8 is installed on the pit base 2. Both ends of the main rope 8 are fixed to rope ends 10 and 11 attached to the upper portions of the guide rails 4 and 7, respectively. The main rope 8 is a pulley 12 of a counterweight 6.
, An upper pulley 14 supported by a pulley beam (that is, a pulley mount) 13 attached to the upper portions of the guide rails 4 and 7, a hoisting machine 9, and a car floor 3a below the car frame 3.
It is wound around the upper car lower pulley 3b.

【0012】巻上機9は、制御盤15に操作ケ−ブル1
6で接続された操作スイッチ17を操作することで駆動
し、巻上機9に巻回された主ロープ8を駆動することに
よりかご枠3がガイドレール4に沿って昇降するように
なっている。昇降路1の最上階出入口側開口部には、は
ね出し足場18が設置されており、各階の出入口開口部
には、出入口品19が取り付けられる。
The hoisting machine 9 has an operation cable 1 on the control panel 15.
The car frame 3 is moved up and down along the guide rails 4 by driving the operation switch 17 connected by 6 and driving the main rope 8 wound around the hoisting machine 9. . A splash scaffold 18 is installed in the opening on the entrance / exit side of the top floor of the hoistway 1, and entrance / exit articles 19 are attached to the entrance / exit openings on each floor.

【0013】本実施形態の据付方法に用いられる据付装
置は、図2に示すように、互いに対向する昇降路1壁の
最上部にアンカ−ボルト21で固定された一対の受け材
22と、この一対の受け材22により両端が支持される
支持梁20とを備えている。この支持梁20の下には、
プーリビーム13とロープエンド10、11とがあり、
連結金具23a、吊りボルト23b、及び固定ボルト2
3cで構成された連結材23で吊持されている。プーリ
ビーム13とロープエンド10、11には、かご枠3及
びつり合いおもり6の重量が主ロープ8、上部プーリ1
4を介してかかり、この荷重を連結材23を介して支持
梁20が支持する構造となっている。また、出入口品1
9などのエレベータ機器の揚重設備は、図3に示すよう
に、最下階ホ−ル床に取付けられるウインチ30と、昇
降路1内に設けられる滑車31a、31bと、ウインチ
30に巻取られるウインチワイヤ32とからなってい
る。
As shown in FIG. 2, the installation apparatus used in the installation method of the present embodiment includes a pair of receiving members 22 fixed by anchor bolts 21 to the uppermost portions of the hoistway 1 walls facing each other, and a pair of receiving members 22. The support beam 20 has both ends supported by a pair of receiving members 22. Below this support beam 20,
There is a pulley beam 13 and rope ends 10 and 11,
Connecting fitting 23a, hanging bolt 23b, and fixing bolt 2
It is suspended by a connecting member 23 composed of 3c. For the pulley beam 13 and the rope ends 10 and 11, the weight of the car frame 3 and the counterweight 6 is the main rope 8 and the upper pulley 1
4, and the supporting beam 20 supports this load via the connecting member 23. In addition, doorway goods 1
As shown in FIG. 3, the lifting equipment for elevator equipment such as 9 has a winch 30 attached to the floor of the lowest floor, pulleys 31a and 31b provided in the hoistway 1, and a winding device for the winch 30. And a winch wire 32.

【0014】そして、本実施形態の据付方法では、まず
図3に示すように、昇降路1の最上部にて出入口開口部
にはね出し足場18を設置し、エレベータ設置の基準と
なる図示しないピアノ線を張設するとともに、エレベー
タ機器の揚重設備として、最下階ホ−ル床にウインチ3
0を取付けるとともに、昇降路1内に滑車31aを取付
け、昇降路1頂部の支持梁20に他の滑車31bを取付
けて、ウインチワイヤ32を引き回す。
In the installation method of the present embodiment, first, as shown in FIG. 3, the escape scaffold 18 is installed at the entrance opening at the top of the hoistway 1 and is not shown, which serves as a standard for elevator installation. A piano wire is stretched, and a winch 3 is installed on the bottom floor of the hall as the lifting equipment for elevator equipment.
0 is mounted, a pulley 31a is attached in the hoistway 1, another pulley 31b is attached to the support beam 20 at the top of the hoistway 1, and the winch wire 32 is drawn.

【0015】(ガイドレール4、7の立設)次いで、前
記のピアノ線により設定した基準にあわせてピットベー
ス2を設置し、このピットベース2上にかご枠3用の最
下部レール4aを取付け、この最下部レール4aをレー
ルブラケット5a、5bによって固定する。同様につり
合いおもり6側のガイドレール7の最下部も固定し、つ
り合いおもり6をウインチ30にて吊り込み、ピットベ
ース2に設置するとともに、前記の固定した最下部レー
ル4aに係合する状態でかご枠3を組み立てる。
(Standing of the guide rails 4 and 7) Next, the pit base 2 is installed according to the standard set by the piano wire, and the lowermost rail 4a for the car frame 3 is mounted on the pit base 2. The bottom rail 4a is fixed by rail brackets 5a and 5b. Similarly, the lowermost part of the guide rail 7 on the side of the counterweight 6 is also fixed, the counterweight 6 is hung by the winch 30, installed in the pit base 2 and engaged with the fixed bottom rail 4a. Assemble the car frame 3.

【0016】次いで、最上部レール4dにレール吊り金
具33を図示しないレールクリップ等で取り付け、ウイ
ンチ30にて吊り上げ、この吊り上げた最上部レール4
dの下端部に中間レール4cの上端部を連結し、その中
間部レール4cの下端部に他のレール4bの上端部を連
結するというように、レール4d、4c、4bを数珠つ
なぎに連結して吊り上げた後、この吊り上げたレール4
d、4c、4bの下端部を、すでに固定した最下部レー
ル4aの上端部に連結する。その後、ガイドレール4の
最上部レール4dをレールブラケット5dで固定し、レ
ール吊り金具33を最上部レール4dから取り外す。同
様の作業手順により、図4に示すように、つり合いおも
り6側のガイドレール7についても連結する。
Next, the rail suspension metal fitting 33 is attached to the uppermost rail 4d by a rail clip (not shown) or the like, and it is lifted by the winch 30.
The upper ends of the intermediate rails 4c are connected to the lower ends of d, the upper ends of the other rails 4b are connected to the lower ends of the intermediate rails 4c, and the rails 4d, 4c, and 4b are connected in a daisy chain. After hoisting it up, this hoisted rail 4
The lower ends of d, 4c and 4b are connected to the upper ends of the already fixed lowermost rails 4a. After that, the uppermost rail 4d of the guide rail 4 is fixed by the rail bracket 5d, and the rail suspension fitting 33 is removed from the uppermost rail 4d. By the same work procedure, as shown in FIG. 4, the guide rail 7 on the side of the counterweight 6 is also connected.

【0017】(支持梁20による垂直荷重の支持)この
ようにしてガイドレール4、7をそれぞれ立設した後、
ガイドレール4、7の上方にプーリビーム13及びロー
プエンド10、11を取り付けて、この状態で支持梁2
0とプーリビーム13及びロープエンド10、11を連
結材23につなぎ、連結材23の吊りボルト23bにて
支持高さを調整する。
(Support of Vertical Load by Support Beam 20) After the guide rails 4 and 7 are erected in this way,
The pulley beam 13 and the rope ends 10 and 11 are attached above the guide rails 4 and 7, and the support beam 2 is attached in this state.
0, the pulley beam 13, and the rope ends 10 and 11 are connected to the connecting member 23, and the supporting height is adjusted by the suspension bolt 23b of the connecting member 23.

【0018】(制御盤15の取付け及び主ロープ8の装
着)次に、図1に示すように制御盤15、操作ケ−ブル
16、操作スイッチ17をそれぞれ取り付け、制御盤1
5廻りの図示しない配線を敷設し、主ロープ8を巻上機
9、かご下プーリ3b、上部プーリ14、及びつり合い
おもり6のプーリ12に順次巻回した後、この主ロープ
8の両端をロープエンド10、11に固定する。このと
き、かご枠3、及びそのかご枠3の重量と見合うだけの
つり合いおもり6の重量は、プーリビーム13及びロー
プエンド10、11を支持する支持梁20に支持されて
おり、中間部分が未固定であるガイドレール4、7は、
かご枠3及びつり合いおもり6の重量を負担していな
い。なお、この段階では、ガイドレール4、7の中間部
分が未固定であるため、かご枠3を駆動するためのエレ
ベータの垂直荷重であるかご枠3とつり合いおもり6の
重量を、エレベータ機器の据付完了時点で最終的に支持
するガイドレール4、7が支持できない。
(Attachment of control panel 15 and attachment of main rope 8) Next, as shown in FIG. 1, the control panel 15, the operation cable 16 and the operation switch 17 are attached to the control panel 1 respectively.
After laying around five unillustrated wires and winding the main rope 8 around the hoisting machine 9, the car lower pulley 3b, the upper pulley 14, and the pulley 12 of the counterweight 6, one end of the main rope 8 is roped. Fix to the ends 10 and 11. At this time, the weight of the car frame 3 and the counterweight 6 corresponding to the weight of the car frame 3 is supported by the support beam 20 that supports the pulley beam 13 and the rope ends 10 and 11, and the intermediate portion is not fixed. The guide rails 4 and 7 are
Does not bear the weight of the car frame 3 and the counterweight 6. At this stage, since the intermediate portions of the guide rails 4 and 7 are not fixed, the weight of the counterweight, which is the vertical load of the elevator for driving the car frame 3, and the balance weight 6, which is the vertical load of the elevator car 3, is set. At the time of completion, the guide rails 4 and 7 to be finally supported cannot be supported.

【0019】(ガイドレール4、7の固定及びエレベー
タ機器の取付け)これで、かご枠3は主ロープ8を介し
て巻上機9により昇降できる状態となるので、かご枠3
に作業員が乗り込み、かご枠3を適宜昇降させながら、
図5に示すように、まだ固定されていないガイドレール
4、7の中間部分を位置決め固定するとともに、出入口
品19等のエレベータ機器を取り付けていく。昇降路1
最上部の作業の際は、はね出し足場18は取外して据付
作業を行い、最後に支持梁20を取り外すようになって
いる。
(Fixing of guide rails 4 and 7 and mounting of elevator equipment) Since the car frame 3 can now be lifted and lowered by the hoist 9 via the main rope 8, the car frame 3
A worker gets in and raises and lowers the car frame 3 appropriately,
As shown in FIG. 5, the intermediate portions of the guide rails 4 and 7 which are not yet fixed are positioned and fixed, and the elevator equipment such as the entrance / exit product 19 is attached. Hoistway 1
At the time of the work of the uppermost part, the projecting scaffold 18 is detached for installation work, and the support beam 20 is finally detached.

【0020】このように構成した第1の実施形態にあっ
ては、主ロープ8が巻掛けられる上部プーリ14にかか
る垂直荷重を、建屋に固定した支持梁20により支持す
るようにしたため、かご枠3と据付作業に必要な機材の
重量のみを昇降させるだけの荷重を建屋に負担させるだ
けで済み、この建屋の建築コストを抑えることができ
る。
In the first embodiment constructed as described above, the vertical load applied to the upper pulley 14 around which the main rope 8 is wound is supported by the support beam 20 fixed to the building. 3 and the load required to raise and lower only the weight of the equipment required for installation work need only be applied to the building, and the construction cost of this building can be suppressed.

【0021】なお、この第1の実施形態では、コンクリ
−ト構造の昇降路1の場合で説明したが、鉄筋構造の昇
降路の場合には、昇降路1を形成する建屋梁または建屋
梁に固定されたファスナプレ−ト等に受け材22を固定
するようになる。
In the first embodiment, the hoistway 1 having a concrete structure has been described. However, in the case of a hoistway having a reinforcing bar structure, a building beam or a building beam forming the hoistway 1 is used. The receiving material 22 is fixed to the fixed fastener plate or the like.

【0022】さらに、第1の実施形態では、かご床3a
上でエレベータ機器を据え付ける手順としたが、かご枠
3の上部に乗かごの天井もしくは作業床を設けた場合に
おいても同様の効果が得られる。
Further, in the first embodiment, the car floor 3a
Although the elevator equipment is installed above, the same effect can be obtained when the car ceiling or the work floor is provided above the car frame 3.

【0023】図6は本発明の第2の実施形態に係るエレ
ベータの据付方法を説明する図である。なお、図6にお
いて前述した図1〜図5に示すものと同等のものには同
一符号を付してある。
FIG. 6 is a diagram illustrating an elevator installation method according to a second embodiment of the present invention. In FIG. 6, the same components as those shown in FIGS. 1 to 5 described above are designated by the same reference numerals.

【0024】図6に示す本実施形態の据付方法では、巻
上機40がガイドレール4、7の上部に設置される場合
においても、巻上機40をガイドレール4、7に固定し
ているマシンベース(すなわち巻上機受け台)41を支
持梁20で支持するようになっている。これにより、前
述した図1〜図5に示すものと同様の効果が得られる。
According to the installation method of the present embodiment shown in FIG. 6, even when the hoisting machine 40 is installed above the guide rails 4 and 7, the hoisting machine 40 is fixed to the guide rails 4 and 7. The machine base (that is, the hoisting machine cradle) 41 is supported by the support beam 20. As a result, the same effect as that shown in FIGS. 1 to 5 can be obtained.

【0025】なお、図6ではマシンベース41を支持す
る構成としたが、巻上機40またはマシンベース41が
固定されているガイドレール4、7自体を支持梁20に
より支持した場合においても同様の効果が得られる。
Although the machine base 41 is supported in FIG. 6, the same applies when the hoisting machine 40 or the guide rails 4, 7 to which the machine base 41 is fixed are supported by the support beams 20. The effect is obtained.

【0026】図7は本発明の第3の実施形態に係るエレ
ベータの据付方法を説明する図である。なお、図7にお
いて前述した図1〜図6に示すものと同等のものには同
一符号を付してある。
FIG. 7 is a diagram for explaining an elevator installation method according to the third embodiment of the present invention. In FIG. 7, the same components as those shown in FIGS. 1 to 6 described above are designated by the same reference numerals.

【0027】図7に示す本実施形態の据付方法では、支
持梁20の代わりに昇降路1の天井に設けた吊りフック
42により、かご枠3を駆動するための垂直加重を支持
するようにした。これにより、前述した図1〜図5に示
すものと同様の効果が得られる。
In the installation method of the present embodiment shown in FIG. 7, a vertical load for driving the car frame 3 is supported by the suspension hook 42 provided on the ceiling of the hoistway 1 instead of the support beam 20. . As a result, the same effect as that shown in FIGS. 1 to 5 can be obtained.

【0028】[0028]

【発明の効果】以上説明したように、本発明のエレベー
タの据付方法は、かご枠を駆動する巻上機または上部プ
ーリにかかる垂直荷重を、建屋に固定した支持材により
支持するようにしたため、かご枠と据付作業に必要な機
材の重量のみを昇降させるだけの荷重を建屋に負担させ
るだけでよく、したがって、エレベータを据え付ける建
屋の建築コストを抑えられるという効果がある。
As described in the foregoing, installation how the elevator of the invention, the vertical load on the hoist or the upper pulley driving the cage frame, because it is supported by a supporting member fixed to the building As a result, it is only necessary to load the building with a load for raising and lowering only the weight of the car frame and the equipment necessary for the installation work, and therefore, there is an effect that the building cost of the building where the elevator is installed can be suppressed.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1の実施形態に係るエレベータの据
付方法を説明する図である。
FIG. 1 is a diagram illustrating an elevator installation method according to a first embodiment of the present invention.

【図2】本実施形態の据付方法に用いられる据付装置を
示す図である。
FIG. 2 is a diagram showing an installation device used in the installation method of the present embodiment.

【図3】本実施形態の据付方法によるガイドレールの立
設工程を示す図である。
FIG. 3 is a diagram showing a standing process of a guide rail according to the installation method of the present embodiment.

【図4】本実施形態の据付方法による支持梁の取付工程
を示す図である。
FIG. 4 is a diagram showing a mounting process of a support beam by the installation method of the present embodiment.

【図5】本実施形態の据付方法によるエレベータ機器の
取付工程を示す図である。
FIG. 5 is a diagram showing a process of mounting elevator equipment by the installation method of the present embodiment.

【図6】本発明の第2の実施形態に係るエレベータの据
付方法を説明する図である。
FIG. 6 is a diagram illustrating an elevator installation method according to a second embodiment of the present invention.

【図7】本発明の第3の実施形態に係るエレベータの据
付方法を説明する図である。
FIG. 7 is a diagram illustrating an elevator installation method according to a third embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 昇降路 3 かご枠 4 ガイドレール 7 ガイドレール 9 巻上機 10、11 ロープエンド 13 プーリビーム(プーリ取付台) 14 上部プーリ 20 支持梁 21 アンカ−ボルト 22 受け材 23 連結材 30 ウインチ 31a、31b 滑車 32 ウインチワイヤ 33 レール吊り金具 40 巻上機 41 マシンベース(巻上機受け台) 42 吊りフック 1 hoistway 3 cage frame 4 guide rails 7 Guide rail 9 hoisting machine 10, 11 rope end 13 Pulley beam (pulley mount) 14 Upper pulley 20 Support beams 21 anchor bolt 22 Receiving material 23 Connecting material 30 winches 31a, 31b pulley 32 winch wire 33 Rail hanging bracket 40 hoisting machine 41 Machine base (hoisting cradle) 42 hanging hook

───────────────────────────────────────────────────── フロントページの続き (72)発明者 大黒屋 篤 東京都千代田区神田錦町1丁目6番地 株式会社日立ビルシステム内 (72)発明者 鈴木 忍 東京都足立区中川4丁目16番29号 日立 エレベータテクノサービス株式会社内 (72)発明者 九十歩 浩一 東京都千代田区神田錦町1丁目6番地 株式会社日立ビルシステム内 (72)発明者 八木 伸明 東京都千代田区神田錦町1丁目6番地 株式会社日立ビルシステム内 (72)発明者 高崎 利夫 東京都千代田区神田錦町1丁目6番地 株式会社日立ビルシステム内 (72)発明者 田淵 徹 東京都足立区中川4丁目16番29号 日立 エレベータテクノサービス株式会社内 (56)参考文献 特開 平10−36032(JP,A) 特開 平3−88684(JP,A) 特開 昭58−82976(JP,A) 特開 昭58−47783(JP,A) 特開 平7−237847(JP,A) 特表 平10−506871(JP,A) (58)調査した分野(Int.Cl.7,DB名) B66B 7/00 - 7/12 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Atsushi Oguroya 6-6 Kandanishikicho, Chiyoda-ku, Tokyo Inside Hitachi Building System Co., Ltd. (72) Shinobu Suzuki 4-1629 Nakagawa, Adachi-ku, Tokyo Hitachi Elevator Techno Service Co., Ltd. (72) Inventor Koichi Kyuho 1-6 Kandanishikicho, Chiyoda-ku, Tokyo Hitachi Building Systems Co., Ltd. (72) Inventor Nobuaki Yagi 1-6 Kandanishiki-cho, Chiyoda-ku, Tokyo Hitachi, Ltd. Building system (72) Inventor Toshio Takasaki 1-6 Kandanishikicho, Chiyoda-ku, Tokyo Hitachi, Ltd. Building system (72) Toru Tabuchi 4-1629 Nakagawa, Adachi-ku, Tokyo Hitachi Elevator Techno Service Co., Ltd. (56) Reference JP-A-10-36032 (JP, A) JP-A-3-88684 (JP, A) JP 58-82976 (JP, A) JP 58-47783 (JP, A) JP 7-237847 (JP, A) JP 10-506871 (JP, A) (JP 58) Fields investigated (Int.Cl. 7 , DB name) B66B 7/ 00-7/12

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 かごを主ロープを介して駆動する巻上機
または前記主ロープが巻掛けられる上部プーリにかかる
垂直荷重の少なくとも一方を、ガイドレールまたは縦通
材で支持するエレベータの据付方法において、昇降路最上部に支持材を固定し、最下部ガイドレールを
立設し、この最下部ガイドレールにかご枠及びつり合い
おもりをそれぞれ組み入れた後、 前記支持材を吊り点として複数のガイドレールを数珠つ
なぎに連結して揚重機により吊上げ、その最上部を昇降
路最上部へ、及びその最下部を前記最下部ガイドレール
へ固定し、前記支持材に、前記上部プーリ及び巻上機の
少なくとも一方を設置した後、 前記主ロープの両端を前記支持材に取付け、前記主ロー
プの中間部を前記かご枠、つり合いおもりに巻掛け、そ
して前記巻上機及び前記上部プーリの少なくとも一方に
巻掛け、 前記巻上機または前記上部プーリに掛かる垂直荷重を
支持材によって支えた状態で前記巻上機を駆動するこ
とにより前記かご枠を昇降させて中間部ガイドレールの
固定作業を含むエレベータ機器の据付作業を行い、 最後に前記支持材を取外すことを特徴とする エレベータ
の据付方法。
1. A method for installing an elevator, wherein at least one of a vertical load applied to a hoisting machine that drives a car through a main rope or an upper pulley around which the main rope is wound is supported by a guide rail or a stringer. , Fix the support material to the top of the hoistway , and attach the bottom guide rail.
Stand upright, and equip this bottom guide rail with a car frame and a balance.
After incorporating the weights respectively, use a plurality of guide rails with the support material as a suspension point.
It is connected to the eel and lifted by a lifting machine, and the top of it is lifted
At the top of the road and at the bottom of the guide rail
Fixed to the support member, the upper pulley and the hoist
After installing at least one , attach both ends of the main rope to the support and
Wrap the middle part of the
On at least one of the hoisting machine and the upper pulley
Winding, the hoist or before the vertical load applied to the upper pulley
The hoist may be driven while being supported by the support material .
The car frame is moved up and down by the
An elevator installation method comprising performing an installation operation of elevator equipment including a fixing operation, and finally removing the support material .
【請求項2】 請求項1の記載において、前記建屋に固
定した前記支持材は、前記ガイドレールの上部に取り付
けられた巻上機受け台を含む前記巻上機の一部を支持し
たことを特徴とするエレベータの据付方法。
2. The support member fixed to the building according to claim 1, wherein a part of the hoisting machine including a hoisting machine cradle attached to an upper portion of the guide rail is supported. Characteristic elevator installation method.
【請求項3】 請求項1の記載において、前記建屋に固
定した前記支持材は、前記ガイドレールの上部に取り付
けられたプーリ取付台を含む上部プーリの一部を支持し
たことを特徴とするエレベータの据付方法。
3. The elevator according to claim 1, wherein the support member fixed to the building supports a part of an upper pulley including a pulley mounting base mounted on an upper portion of the guide rail. Installation method.
JP03005999A 1999-02-08 1999-02-08 Elevator installation method Expired - Lifetime JP3519009B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP03005999A JP3519009B2 (en) 1999-02-08 1999-02-08 Elevator installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP03005999A JP3519009B2 (en) 1999-02-08 1999-02-08 Elevator installation method

Publications (2)

Publication Number Publication Date
JP2000226168A JP2000226168A (en) 2000-08-15
JP3519009B2 true JP3519009B2 (en) 2004-04-12

Family

ID=12293265

Family Applications (1)

Application Number Title Priority Date Filing Date
JP03005999A Expired - Lifetime JP3519009B2 (en) 1999-02-08 1999-02-08 Elevator installation method

Country Status (1)

Country Link
JP (1) JP3519009B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002060158A (en) * 2000-08-22 2002-02-26 Mitsubishi Electric Corp Installation method for elevator
CN109592542A (en) * 2018-12-25 2019-04-09 宁波宏大电梯有限公司 A kind of carriage and the Cargo Lift with the carriage
CN111071900B (en) * 2019-12-25 2024-08-20 佛山市高明区安承升降装备研究院 Pit-free elevator

Also Published As

Publication number Publication date
JP2000226168A (en) 2000-08-15

Similar Documents

Publication Publication Date Title
US6357556B1 (en) Procedure and apparatus for the installation of an elevator
JPH11139730A (en) Elevator
JP2002003124A (en) Elevator installing device, and installing method thereof
JPH061568A (en) Erection method for elevator counter weight and counter weight
JP3519009B2 (en) Elevator installation method
JP2001114483A (en) Hoist installation method for machine room-less elevator and device for the same
JP4491110B2 (en) Elevator rope hanging method
JP2003128359A (en) Roping method for elevator
JP2000335847A (en) Elevator installation device
JP4125027B2 (en) Load receiving bracket
JP2878936B2 (en) Elevator installation method
JP2000226169A (en) Elevator erection method
JP3348018B2 (en) Elevator installation method
JP2930911B2 (en) Elevator installation method
JPH082850A (en) Work method in elevator shaft
JP3253441B2 (en) Elevator installation method
JP2877593B2 (en) Elevator installation method
JP2002332175A (en) Elevator device
JP3301923B2 (en) Elevator work scaffolding equipment
JP2002060158A (en) Installation method for elevator
JP2001072354A5 (en)
JP2003073052A (en) Rope installing method of elevator and rope guide device
JPH11209027A (en) Installation method for elevator
JP3297345B2 (en) Governor rope extension method for construction elevators
JPH11209026A (en) Installation method for elevator

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040120

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040127

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090206

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090206

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100206

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100206

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120206

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120206

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130206

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130206

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140206

Year of fee payment: 10

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term