JPS63282081A - Method fo main cable replacing construction of elevator - Google Patents

Method fo main cable replacing construction of elevator

Info

Publication number
JPS63282081A
JPS63282081A JP11512187A JP11512187A JPS63282081A JP S63282081 A JPS63282081 A JP S63282081A JP 11512187 A JP11512187 A JP 11512187A JP 11512187 A JP11512187 A JP 11512187A JP S63282081 A JPS63282081 A JP S63282081A
Authority
JP
Japan
Prior art keywords
main rope
rope
floor
old
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11512187A
Other languages
Japanese (ja)
Other versions
JPH0530753B2 (en
Inventor
博士 加藤
瀬野 義雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP11512187A priority Critical patent/JPS63282081A/en
Publication of JPS63282081A publication Critical patent/JPS63282081A/en
Publication of JPH0530753B2 publication Critical patent/JPH0530753B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、既設エレベータの主索を新しい主索に取替
える工法、特に1:10−ピングの場合に適用するのに
好適なエレベータの主索取替工法に関するものである。
[Detailed Description of the Invention] [Field of Industrial Application] This invention relates to a construction method for replacing the main rope of an existing elevator with a new main rope, and a method of replacing the main rope of an existing elevator with a new main rope, particularly a method of replacing the main rope of an elevator with a new main rope, which is suitable for application in the case of 1:10-ping. This is related to alternative construction methods.

〔従来の技術〕[Conventional technology]

第11図〜第13図は、例えば特開昭61−28767
8号公報に示されている従来のエレベータの主索取替工
法を示すもので、まずエレベータのかと(1)上での運
転により、かご(1)の上梁(2)の上面を、最上階(
3)の床面(3a)にほぼ一致させた位置でかごを停止
する。
11 to 13 are, for example, Japanese Patent Application Laid-Open No. 61-28767.
This shows the conventional elevator main cable replacement method shown in Publication No. 8. First, the upper surface of the upper beam (2) of the car (1) is replaced by the top floor of the car (1) by operating on the heel (1) of the elevator. (
3) The car is stopped at a position that is almost in line with the floor surface (3a).

次いで、かご(1)および釣合おもり(4)を固定して
位置ずれしないようにした後、上梁(2)を最上階(3
)の床面(3a)との間に梁(5)を設置する。
Next, after fixing the car (1) and the counterweight (4) to prevent them from shifting, the upper beam (2) is moved to the top floor (3).
) and the floor surface (3a).

そしてこの梁(5)上に、旧主業巻取機(6)と新事業
繰出し機(7) とコントローラ(8)とを有する主索
取替機(9)を設置する。
Then, on this beam (5), a main rope replacement machine (9) having an old main business winding machine (6), a new business feeding machine (7), and a controller (8) is installed.

次いで、旧主索(lO)の上梁(2)上方位置に、締結
具(11)を介して巻取りロープ(12)の先端を連結
するとともに、この連結部とかご用ロープシャックル(
13)との間の上端切断点(14)で旧主索(10)を
切断する。
Next, the tip of the take-up rope (12) is connected to the upper beam (2) of the old main rope (lO) via the fastener (11), and this connection is connected to the car rope shackle (
13), cut the old main rope (10) at the upper end cutting point (14).

次いで、上記釣合おもり(4) に梯子(15)を掛け
、おもり用ロープシャックル(16)直上の下端切断点
(17)で旧主索(10)を切断する。そして上記旧主
索巻取機(16)により、旧主索(10)を除去する。
Next, a ladder (15) is hung on the counterweight (4), and the old main rope (10) is cut at the lower end cutting point (17) just above the weight rope shackle (16). The old main rope (10) is then removed by the old main rope winder (16).

次いで、新事業繰出し機(7)から新事業(18)を繰
出し、これを第1機械室(19)内の巻上機(20)の
綱車(21)およびそらせ車(22)に巻掛けるととも
に、その先端を昇降路(23)内に懸垂する。そしてそ
の下端を、上記おもり用ロープシャックル(16)に連
結する。
Next, the new business (18) is fed out from the new business feeding machine (7) and wound around the sheave (21) and deflection wheel (22) of the hoisting machine (20) in the first machine room (19). At the same time, its tip is suspended in the hoistway (23). And its lower end is connected to the weight rope shackle (16).

以上の作業は、第12図に示すように4人の作業員(2
4)で主索1本ずつ行なう。
The above work was carried out by four workers (2
Step 4): Run each main rope one by one.

なお、各図中、(25)は釣合おもり(4)を位置固定
するためのスペーサ、(26)はかご用緩衝器、(27
)は第2機械室である。
In each figure, (25) is a spacer for fixing the position of the counterweight (4), (26) is a car shock absorber, and (27) is a spacer for fixing the position of the counterweight (4).
) is the second machine room.

(発明が解決しようとする問題点〕 上記のような従来のエレベータの主索取替工法では、旧
主索(lO)の取外しと新事業(18)の取付けとをロ
ープ本数分繰返す必要があるため、作業に多くの時間を
要するという問題がある。またすべての作業が作業員(
24)の手作業であるため、主索(10) 、 (18
)の重量が大になると人力で対応することが困難になる
という問題もある。また主索(1o) 、 (18)に
は、麻心に油が浸み込ませであるため滑り易く、また旧
主素(lO)では、素線切れを起こしている場合もあり
、この素線により手を負傷するおそれがあるとともに、
主索(10) 、 (18)を落下させてしまうおそれ
もある。また新事業(18)の摩擦により、綱車(21
)やそらせ車(22)に偏摩耗が生じたり新事業(18
)が摩耗するおそれがある等の問題がある。
(Problem to be solved by the invention) In the conventional elevator main rope replacement method as described above, it is necessary to repeat the removal of the old main rope (IO) and the installation of the new project (18) for the number of ropes. , there is a problem that the work requires a lot of time.Also, all the work is done by the worker (
24), the main ropes (10) and (18
) becomes difficult to handle manually. In addition, the main ropes (1o) and (18) are slippery because the hemp core is soaked with oil, and the old main rope (lO) may have broken wires. There is a risk of injury to your hands due to the wire, and
There is also a risk that the main ropes (10) and (18) may fall. Also, due to the friction of the new business (18), the sheave (21)
) and deflection wheels (22) or new business (18).
) may wear out.

また、多くの作業員(24)が必要となるとともに、作
業が手作業であるため制限作業時間限度前に作業を終了
させなければならず、常に最終作業の後部に手持ちの状
態が発生するという問題もある。
In addition, a large number of workers (24) are required, and since the work is done manually, the work must be completed before the work time limit, and there is always a hand-held situation after the final work. There are also problems.

この発明は、かかる問題点を解決するためになされたも
ので、主索取替作業を、能率的かつ安全に、しかも少な
い作業人員で行なうことができ、さらに制限作業時間を
有効に利用することができるエレベータの主索取替工法
を得ることを目的とする。
This invention was made to solve these problems, and allows the main rope replacement work to be carried out efficiently and safely, with fewer workers, and also to make effective use of the limited work time. The purpose of this study is to obtain a method for replacing the main cables of elevators.

(問題点を解決するための手段〕 この発明に係るエレベータの主索取替工法は、最上階又
はこれに近い階を新事業繰出し階として設定するととも
に、最下階又はこれに近い階を旧主索巻取り階として設
定し、次いでかご上での運転により、上方昇降体の上端
を新事業繰出し階の床面にほぼ一致させて停止させると
ともに、上方昇降体および下方昇降体をそれぞれ位置固
定し、次いで下方昇降体側の旧主索を、上方昇降体の上
端とほぼ同一の高さ位置に固定されたロープ固定治具に
固定するとともに、この固定部上方の中間切断点で切断
し、次いで旧主索を、上方昇降体直上の上端切断点で切
断するとともに、この切断部に新事業繰出し階に設置さ
れた新事業繰出し機から引出した新事業の先端を連結し
、次いで旧主索の上記両切断点の間の部分を、機械室に
引上げて新事業を巻上機の綱車およびそらせ車に巻掛け
、その先端を旧主索の上記ロープ固定治具上方部分に連
結し、次いで旧主索を、下方昇降体直上の下端切断点で
切断するとともに、旧主索のロープ固定治具による固定
を解除し、次いで上記旧主索巻取り階に設置された旧主
索巻取り機で旧主索を巻取って新事索の先端を下方昇降
体位置まで導き、次いで新生索の両端を上記両昇降体に
それぞれ連結するようにしたものである。
(Means for Solving the Problems) The elevator main cable replacement method according to the present invention sets the top floor or a floor near this as the floor for new business, and sets the bottom floor or a floor near this as the floor for the old main rope. It is set as a cable winding floor, and then operated on the car to stop the upper elevating body with the upper end almost in line with the floor surface of the new business delivery floor, and to fix the positions of the upper elevating body and the lower elevating body, respectively. Next, the old main rope on the lower lifting body side is fixed to a rope fixing jig fixed at a position approximately at the same height as the upper end of the upper lifting body, and is cut at an intermediate cutting point above this fixed part. The main rope is cut at the upper end cutting point directly above the upper elevating body, and the tip of the new project pulled out from the new project feeding machine installed on the new project feeding floor is connected to this cut point. The part between the two cutting points is pulled up into the machine room, the new rope is wrapped around the sheave and deflection wheel of the hoisting machine, and its tip is connected to the upper part of the rope fixing jig of the old main rope. The main rope was cut at the lower end cutting point directly above the lower lifting body, the old main rope was unfixed by the rope fixing jig, and then the old main rope winding machine installed on the old main rope winding floor was used. The old main rope is wound up and the tip of the new cable is guided to the position of the lower elevating body, and then both ends of the new cable are connected to the two elevating bodies.

〔作用〕[Effect]

この発明においては、旧主索の上端切断点と中間切断点
との間の部分を機械室に引上げることにより、機械室内
の巻上機の綱車およびそらせ車への新生索の巻掛けが、
上記作業に連続して行なわれ、また旧主索の中間切断点
と下端切断点との間の部分を旧主索巻取り機で巻取るこ
とにより、この部分への新生索の取付けが連続して行な
われる。このため、旧主索の取外し作業と新生索の取付
は作業とを別個の作業としてロープ1本毎に順次行なっ
ていた従来の方法に比較して、大幅に作業能率を向上さ
せることが可能となるとともに、少ない作業人員で作業
を行なうことが可能となる。
In this invention, by pulling up the part between the upper end cutting point and the intermediate cutting point of the old main rope into the machine room, the new rope can be wrapped around the sheave and deflection sheave of the hoisting machine in the machine room. ,
This work is carried out in succession to the above work, and by winding up the part between the middle cutting point and the lower end cutting point of the old main rope with the old main rope winding machine, the new rope can be attached to this part continuously. It is done. For this reason, work efficiency can be greatly improved compared to the conventional method in which the removal of the old main rope and the installation of the new rope were performed as separate tasks for each rope. At the same time, it becomes possible to perform the work with fewer workers.

また、主索の取替作業が、機械室部分を除いて、新事索
繰出し機と旧主索巻取り機とによる作業となり、人手を
介して主索を扱う必要がないので、特に素線切れの発生
のおそれがある旧主索の保持等が不要となり、旧主索の
手持ちによる作業員の負傷および主索の落下のおそれが
ない。
In addition, the main rope replacement work, except for the machine room, is done using the new rope payout machine and the old main rope winder, and there is no need to handle the main rope manually, so There is no need to hold the old main rope, which could cause it to break, and there is no risk of injury to workers or falling of the main rope due to holding the old main rope.

なお、上端切断点と中間切断点との間の主索の取替は、
人力による作業となるが、この部分は主索の長さも短か
く軽量であるため、手が滑って落下させるおそれはなく
安全である。
In addition, replacement of the main rope between the upper end cutting point and the middle cutting point is as follows:
Although the work is done manually, this part is safe because the main rope is short and lightweight, so there is no risk of your hands slipping and falling.

(実施例〕 第1図〜第9図はこの発明の一実施例を示すもので、図
中、第11図〜第13図と同一符号は同−又は相当部分
を示す。
(Embodiment) FIGS. 1 to 9 show an embodiment of the present invention, and in the figures, the same reference numerals as in FIGS. 11 to 13 indicate the same or corresponding parts.

第1図〜第3図に示すように、まずかと(1)側のガイ
ドレール(28)の最上11t(3)の上部に、かご吊
上げ用治具(29)を取付ける。このかと吊上げ用治具
(29)は、第4図に示すようにプレート(29a)の
板面に、ガイドレール別締結具(29b)を二列に配す
るとともに、プレート(29a)の下端両隅部に懸吊具
(29c)を取付けて構成され、両側のガイドレール別
締結具(29b)でガイドレール(28)に締結できる
ようになっている。
As shown in FIGS. 1 to 3, a car lifting jig (29) is first attached to the upper part of the uppermost portion 11t (3) of the guide rail (28) on the (1) side. The hook lifting jig (29) has guide rail separate fasteners (29b) arranged in two rows on the plate surface of the plate (29a) as shown in FIG. It is constructed by attaching hanging tools (29c) to the corners, and can be fastened to the guide rail (28) using guide rail separate fasteners (29b) on both sides.

次いで、かご(1)上で運転し、最上階(3)の床面(
3a)とかと(1)の上梁(2)の上面とがほぼ一致し
た位置で、かご(1)を停止させる。
Next, it is operated on the car (1) and the floor surface of the top floor (3) (
3a) and the top surface of the upper beam (2) of (1), the car (1) is stopped at a position where the upper surface of the upper beam (2) of (1) almost coincides with the upper surface of the upper beam (2).

次いで、釣合いおもり(4)の下部に、必要ランバイを
考慮したスペーサ(25)を挿入して釣合おもり(4)
を位置固定するとともに、釣合おもり(4)の位置修正
を行なう。なお、釣合おもり(4)の固定は、釣合おも
り(4)側の非常止めを作動させるようにしてもよい。
Next, a spacer (25) is inserted into the lower part of the counterweight (4) in consideration of the required run-by, and the counterweight (4) is removed.
At the same time, the position of the counterweight (4) is corrected. Note that the counterweight (4) may be fixed by activating an emergency stop on the counterweight (4) side.

そしてその後、釣合おもり(4)上梓上部と、最下階の
1つ上の乗場との間に導板(30)を設置する。
Then, a guide plate (30) is installed between the upper part of the counterweight (4) and the landing one level above the lowest floor.

次いで、第2図に示すように、上梁(2)と上記かご吊
上げ用治具(29)の懸吊具(29c)とを、チェンブ
ロツク(31)を有する台材はロープ(32)で連結し
、チェンブロック(31)の操作により上梁(2)の上
面と最上階の床面(3a)とを一致させる。そしてこの
位置でかと(1)を固定する。なお、かご(1)側の調
速機は動作させておく。
Next, as shown in Fig. 2, the upper beam (2) and the hanging tool (29c) of the above-mentioned car lifting jig (29) are connected to the base material having the chain block (31) with the rope (32). The upper surface of the upper beam (2) is made to coincide with the floor surface (3a) of the top floor by operating the chain block (31). Then, fix the heel (1) in this position. Note that the speed governor on the car (1) side is left in operation.

次いで、上記上梁(2)と最上階(3)の床面(3a)
との間に梁(5)を渡し、釣合おもり(4)側のガイド
レール(33)にロープ固定治具(34)を取付ける。
Next, the upper beam (2) and the floor surface (3a) of the top floor (3)
A beam (5) is passed between the rope fixing jig (34) and a rope fixing jig (34) is attached to the guide rail (33) on the counterweight (4) side.

このロープ固定治具(34)は、第5図および第6図に
示すように上記ガイドレール(33)に締結具(35)
を介して取付けられる取付金(36)と、この取付金(
36)にねじ部材(37)を介して取付けられる取付金
(38)と、この取付金(38)に締結具(39)を介
して固定されるロープ固定板(40)とを備え、上記梁
(5)とほぼ同一の高さ位置に位置設定される。そして
、このロープ固定治具(34)のロープ固定板(40)
には、締結具(41)、クリップ(42)、座金(43
)、ばね座(44)およびナツト(45)により旧主索
(lO)の各ロープがそれぞれ固定されるとともに、旧
主索(10)が、おもり用ロープシャックル(16)直
上の下端切断点(17)で切断される。なお、旧主索(
lO)のロープ固定治具(34)への固定と、下端切断
点(17)での切断とは、逆の手順で行なってもよい。
This rope fixing jig (34) has a fastener (35) attached to the guide rail (33) as shown in FIGS. 5 and 6.
The mounting bracket (36) is attached via the mounting bracket (36), and the mounting bracket (36)
36) via a screw member (37), and a rope fixing plate (40) fixed to the attachment plate (38) via a fastener (39). The position is set at almost the same height as (5). And the rope fixing plate (40) of this rope fixing jig (34)
includes a fastener (41), a clip (42), and a washer (43).
), each rope of the old main rope (lO) is fixed by the spring seat (44) and nut (45), and the old main rope (10) is fixed at the lower end cutting point ( 17). In addition, the old main rope (
10) to the rope fixing jig (34) and cutting at the lower end cutting point (17) may be performed in reverse order.

次いで、旧主索(10)を、ロープ固定治具(34)上
方の中間切断点(4B)で切断するとともに、かご用ロ
ープシャックル(13)直上の上端切断点(14)で切
断し、その後かご用ロープシャックル(13)を取外す
Next, the old main rope (10) is cut at the intermediate cutting point (4B) above the rope fixing jig (34) and at the upper end cutting point (14) directly above the car rope shackle (13), and then Remove the car rope shackle (13).

次いで、上記梁(5)上に、コントローラ(48)を有
する新事業繰出し機(47)を設置し、この新事業繰出
し機(47)から繰出された新事業(18)の先端をか
と(1)上での作業で旧主索(1o)の上端切断点(1
4)直上部に接続する。この接続方法は第8図に示すよ
うに両事業(10) 、 (18)の端部を細くしてバ
インダ(49)でリング部を形成するとともに、このリ
ング部を相互に連結し、その上からテープ(5o)を巻
くことにより行なわれる。このように両事業(10) 
、 (18)の端部を細くすることにより、後に詳述す
る作業において、連結部・を容易に綱車(21)および
そらせ車(22)の溝に通すことができ、溝から外れて
しまうことがない。またテープ(5o)の巻付けにより
、鋭部の露出がなくなるので、上記両車(21) 、 
(22)を傷付けることもない。
Next, a new business dispensing machine (47) having a controller (48) is installed on the beam (5), and the tip of the new business (18) dispensed from the new business dispensing machine (47) is connected to the handle (1). ) when working on the upper end of the old main rope (1o)
4) Connect directly above. As shown in Fig. 8, this connection method involves thinning the ends of the two parts (10) and (18) to form a ring part with a binder (49), and connecting these ring parts to each other. This is done by wrapping a tape (5o) around it. In this way, both businesses (10)
By making the end of (18) thinner, the connecting part can be easily passed through the grooves of the sheave (21) and deflection wheel (22) in the work described in detail later, and it will not come off from the groove. Never. Also, by wrapping the tape (5o), the exposure of sharp parts is eliminated, so both of the above-mentioned cars (21),
(22) will not be harmed.

このようにして両事業(10) 、 (18)を連結し
たならば、旧主索(10)の上端切断点(14)と中間
切断点(46)との間の部分を第1機械室(19)内に
引上げる。これにより、新事業(18)も第1機械室(
19)内に引上げられ、巻上機(20)の綱車(21)
およびそらせ車(22)に順次通される。そこで、旧主
索(10)と新事業(18)との連結を解除するととも
に、新事業(18)の端末におもり用ロープシャックル
(16)を取付ける。
After connecting both projects (10) and (18) in this way, the part between the upper end cutting point (14) and the middle cutting point (46) of the old main rope (10) can be connected to the first machine room ( 19) Pull up inside. As a result, the new business (18) will also be installed in the first machine room (
19) and the sheave (21) of the hoisting machine (20)
and a deflection wheel (22). Therefore, the connection between the old main rope (10) and the new business (18) is released, and a weight rope shackle (16) is attached to the terminal of the new business (18).

次いで、新事業(18)’の先端を昇降路(23)内に
懸垂させ、その先端のおもり用ロープシャックル(16
)を、旧主索(10)のロープ固定治具(34)上方部
分にUクリップボルト等により接続する。
Next, suspend the tip of the new project (18)' in the hoistway (23), and attach the weight rope shackle (16) at the tip.
) is connected to the upper part of the rope fixing jig (34) of the old main rope (10) using a U-clip bolt or the like.

次いで、ロープ固定治具(34)から新事業(18)に
接続された旧主索(10)を1本取外し、この旧主索(
lO)の下端部を、上記導板(30)上に設置した旧主
索巻取り機(51)で巻取るとともに、この巻取り速度
に合わせて新事業繰出し機(47)から新事業(18)
を繰出す。
Next, remove one old main rope (10) connected to the new business (18) from the rope fixing jig (34), and remove this old main rope (10) from the rope fixing jig (34).
The lower end of lO) is wound up by the old main rope winder (51) installed on the conductive plate (30), and the new rope (18 )
Bring out.

上記作業により、両事業(10) 、 (18)の連結
部が釣合おもり(4)位置まで導かれてきたならば、両
事業(10) 、 (18)の連結を解除し、釣合おも
り(4)におもり用ロープシャックル(16)を取付け
る。これにより、新事業(18)が釣合おもり(4)に
連結される。
By the above work, when the connecting parts of both businesses (10) and (18) have been guided to the counterweight (4) position, the connection between both businesses (10) and (18) is released, and the counterweight is removed. (4) Attach the weight rope shackle (16). As a result, the new business (18) is connected to the counterweight (4).

次いで、かご(1)の上梁(2)にかご用ロープシャッ
クル(13)の本体を仮付けし、新事業(18)を上記
ロープ固定治具(34)に固定する。そしてその後、新
事業(18)の長さを設定して切断する。
Next, the main body of the car rope shackle (13) is temporarily attached to the upper beam (2) of the car (1), and the new business (18) is fixed to the rope fixing jig (34). After that, the length of the new project (18) is set and cut.

次いで、かご(1)の上梁(2) に仮付けしておいた
かご用ロープシャックル(13)を取外して新事業(1
8)に取付け、その後このかご用ロープシャックル(1
3)を上梁(2)に取付ける、そしてその後、ロープ固
定治具(34)による新事業(18)の固定を解除する
Next, remove the car rope shackle (13) that had been temporarily attached to the upper beam (2) of the car (1), and install the new business (1).
8), then attach this basket rope shackle (1).
3) to the upper beam (2), and then release the fixation of the new project (18) by the rope fixing jig (34).

次いで、上記旧主索(lO)の中間切断点(46)での
切断以降の作業を、ロープ本数分繰返して順次行なう。
Next, the operations after cutting the old main rope (lO) at the intermediate cutting point (46) are repeated for the number of ropes in order.

次いでガイドレール(33)からロープ固定治具(34
)を取外し、かご(1)側の調速機を復帰させ、かご(
1)を釣り戻す。そして釣合おもり(4)下部のスペー
サ(25)を取外すとともに、かご(1)側のガイドレ
ール(28)からかご釣上げ治具(29)を取外す。
Next, move the rope fixing jig (34) from the guide rail (33).
), restore the speed governor on the car (1) side, and then remove the car (
1) Fish back. Then, remove the spacer (25) at the bottom of the counterweight (4), and remove the car lifting jig (29) from the guide rail (28) on the car (1) side.

次いで、新事業(18)の取付は状況を点検するととも
に、かご(1)を昇降路(23)の中間階で停止させる
。そして新事業(18)のり−プテンションを1本毎に
修正し、作業を完了させる。
Next, the installation of the new business (18) inspects the situation and stops the car (1) at the intermediate floor of the hoistway (23). Then, the new project (18): correct the glue tension one by one and complete the work.

しかして、従来は旧主索(10)の取外し作業と新事業
(18)の取付は作業とを別の作業としてロープ本数分
繰返す必要があったが、この実施例では、下方階に置か
れた旧主索巻取り機(51)で旧主索(10)を巻取れ
ば、これに接続された新事業(18)が取付けられ、主
索取替が一方向作業で完了するので、作業能率を大幅に
向上させることが可能となるとともに、作業人員も従来
4人であったものを3人にすることができる。
Conventionally, the removal of the old main rope (10) and the installation of the new main rope (18) had to be performed as separate operations and repeated for the number of ropes, but in this embodiment, Once the old main rope winder (51) is used to wind up the old main rope (10), the new line (18) connected to it can be attached, and main rope replacement can be completed in one direction, increasing work efficiency. In addition to making it possible to significantly improve the number of workers, the number of workers can be reduced from four to three.

また主索(10) 、 (t8)の取替作業が、機械室
(19) 、 (27)部分を除き、すべて新事業繰出
し機(47)と旧主索巻取り機(51)とによる作業と
なり、人手を介して主索(10) 、 (18)を扱う
必要がないため、主索(10) 、 (1B)の落下や
素線切れの発生のおそれがある旧主索(10)の手持ち
による作業員の負傷がなく、安全性を大幅に向上させる
ことができる。
In addition, the replacement work for the main ropes (10) and (t8), except for the machine room (19) and (27), was done entirely using the new project feeder (47) and the old main rope winder (51). Therefore, there is no need to manually handle the main ropes (10) and (18), so there is no need to manually handle the main ropes (10) and (18). There are no injuries to workers due to hand-holding, and safety can be greatly improved.

また、従来は作業が手作業であったため、制限作業時間
限度前に作業を終了させなければならず、常に最終作業
の後部に手持ちの状態が発生していたが、この実施例で
は、全ての作業に機械力を用いており、作業の途中で中
断することも可能であるため、制限作業時間内を一杯、
有効に使うことができ、効率的に作業を推進することが
可能となる。このため、作業を途中で中断して明日再開
するという手順も可能となる。もつとも、機械室(19
) 、 (27)部分の主索(10) 、 (18)に
ついては、上方に引上げる手作業があるが、この部分の
主索(10) 、 (18)は、長さも短かく軽量であ
るため、手が滑って落下させるおそれは全くない。
In addition, in the past, work was done manually, so the work had to be completed before the work time limit, and there was always a hand-held situation after the final work, but in this embodiment, all Mechanical power is used for the work, and it is possible to interrupt the work in the middle, so you can complete the work within the limited working time.
It can be used effectively and work can be carried out efficiently. Therefore, it becomes possible to interrupt the work midway and resume it the next day. However, the machine room (19
), (27), the main ropes (10) and (18) have to be manually pulled upwards, but the main ropes (10) and (18) in this part are short and lightweight. Therefore, there is no risk of your hand slipping and falling.

また、この実施例に係る工法は、1:10−ビングの場
合に適用すると効果的である。
Further, the construction method according to this embodiment is effective when applied in the case of 1:10-bing.

また、かご吊上げ用治具(29)を使用して上梁(2)
を最上階(3)の床面(3a)に一致させるようにして
いるので、梁(5)上に設置される新事索繰出し機(4
7)等の機器の水平出しが容易である。
Also, use the car lifting jig (29) to lift the upper beam (2).
Since it is made to match the floor surface (3a) of the top floor (3), the cable feeder (4) installed on the beam (5)
It is easy to level the equipment such as 7).

また、ロープ固定治具(34)は、主索(10) 、 
(18)の各ロープを一度に固定できるため、ロープ固
定後は、旧主索(10)の切断もまとめて行なうことが
でき、作業効率をさらに高めることができる。
In addition, the rope fixing jig (34) includes the main rope (10),
Since each rope (18) can be fixed at once, after the ropes are fixed, the old main rope (10) can also be cut at once, further increasing work efficiency.

また、主索(10) 、 (18)の取替作業が、上方
から下方へ下ろす作業で構成されているため、落下防止
にのみ留意すればよく、主索(10) 、 (18)の
先端が曲がって機器の中をかいくぐり、主索(10)。
In addition, since the replacement work for the main ropes (10) and (18) consists of lowering them from above to below, you only need to pay attention to preventing them from falling, and the tips of the main ropes (10) and (18) The main rope (10) curved and passed through the equipment.

(18)を緊張させた際に機器を損傷させるといった不
具合がでない。
(18) There is no problem such as damage to equipment when tension is applied.

また、釣合おもり(4)側の新事素(18)の端末処理
もかと(1)側の新事素(18)の端末処理も最上階(
3)で行なわれ、ロープシャックル(13) 、 (1
8)がバビッド詰めを行なうタイプの場合には、同一階
で火器を用いてバビッドの溶解が行なわれる。このため
、取扱注意作業が一箇所に集中し、管理者および火器の
二重手配が不要となるとともに、後始末も一箇所の確認
で済み、効率的である。
Also, the terminal processing of the new element (18) on the counterweight (4) side and the terminal processing of the new element (18) on the side (1) are also performed on the top floor (
3), rope shackle (13), (1
If 8) is the type that performs bavid filling, the bavid is melted using a firearm on the same floor. Therefore, the work with caution is concentrated in one place, eliminating the need for double arrangements for managers and firearms, and cleaning up can be done in one place, which is efficient.

また、新事索繰出し機(47)も旧主索巻取り機(51
)も主索をドラムに巻いた構造のものであるので、同一
機器で構成して正逆転させるようにすればよい。このた
め、各別の機器を用いるより安価である。また新事素繰
出し機(47)は、旧主索巻取り機(51)の巻取り能
力以上の主索を繰出さない構造であればよく、例えばブ
レーキ機構を有するだけの簡単なもので構成できる。こ
のため、省エネルギー化が可能となる。
In addition, the new cable unwinding machine (47) is also the old main cable winding machine (51).
) also has a structure in which the main rope is wound around a drum, so it can be configured with the same equipment to rotate forward and reverse. Therefore, it is cheaper than using separate devices. In addition, the new main rope reeling machine (47) may have a structure that does not unwind the main rope beyond the winding capacity of the old main rope reeling machine (51), and for example, it may be a simple device that only has a brake mechanism. can. Therefore, energy saving is possible.

なお上記実施例では、かご(1)側の主索取替作業階を
最上階(3)、釣合おもり(4)側の主索取替階を最下
階の1つ上の階として説明したが、停止不可能な場合(
非常停止階であったりVIPルームが位置しており、一
般作業者の立入りが禁じられている場合等)には、かご
(1)、釣合おもり(4)が可及的昇降路(23)の両
極方向に離れている方が作業性の上からは好都合である
が、多少1〜2停止分中間階寄りになフても、主索(1
0) 、 (18)の取替は容易に行なうことができる
In the above embodiment, the main rope replacement work floor on the car (1) side is the top floor (3), and the main rope replacement floor on the counterweight (4) side is one floor above the bottom floor. , if it is unstoppable (
(e.g. when the emergency stop floor is located or a VIP room is located and entry is prohibited to general workers), the car (1) and counterweight (4) can be placed in the hoistway (23). Although it is more convenient from the viewpoint of workability to move the main rope away from the poles of the main rope (1 or 2
0) and (18) can be easily replaced.

また上記実施例では、かご(1)が上方昇降体、釣合お
もり(4)が下方昇降体の場合を示したが、最上階付近
に新事索繰出し機(47)が設置され、最下階付近に旧
主索巻取り機(51)が設置されるのであれば、かご(
1)と釣合おもり(4)とが上下逆でもよい。
Furthermore, in the above embodiment, the car (1) is an upward elevating body and the counterweight (4) is a downward elevating body. If the old main rope winder (51) is installed near the floor, the cage (
1) and the counterweight (4) may be upside down.

また上記実施例では、導板(30)を最下階の1つ上の
階の床面と釣合おもり(4)の上枠との間に渡す場合を
示したが、第10図に示すように最下階の1つ上の階の
床面と釣合いおもり(4)の最上端加減おもり(4a)
との間に導板(30)を渡すようにしてもよい。
Furthermore, in the above embodiment, the conductive plate (30) is passed between the floor of the floor one floor above the lowest floor and the upper frame of the counterweight (4), but as shown in FIG. The topmost adjustment weight (4a) of the counterweight (4) is connected to the floor of the floor one level above the bottom floor.
A conductive plate (30) may be passed between the two.

〔発明の効果〕〔Effect of the invention〕

この発明は以上説明したとおり、旧主索と新事索とを連
結し、旧主索巻取り機による旧主索の巻取りと、新事索
繰出し機による新事案の繰出しとを同一作業中に行なう
ようにしているので、従来方法に比較して大幅に作業能
率を向上させることができるとともに省力化が可能とな
り、また、作業員が重い主索を手に持つことがなくなる
ので、主索の落下のおそれがないとともに作業の安全性
を確保することができる等の効果がある。
As explained above, this invention connects the old main rope and the new rope, and winds up the old main rope by the old main rope winding machine and lets out the new rope by the new rope payout machine during the same operation. This method significantly improves work efficiency and saves labor compared to conventional methods, and also eliminates the need for workers to hold the heavy main rope in their hands. This has the advantage that there is no risk of objects falling, and work safety can be ensured.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明の一実施例に係るエレベータの主索取
替工法の初期段階を示す昇降路縦断面図、第2図は第1
図のII −II線拡大断面図、第3図は第2図のII
I −III線拡線断大断面図4図はかと吊上げ用治具
の斜視図、第5図はロープ固定治具の分解斜視図、第6
図は第5図のロープ固定部の詳細を示す斜視図、第7図
はこの発明の一実施例に係るエレベータの主索取替工法
の中間段階を示す第1図相当図、第8図は第7図の■部
詳細図、第9図はこの発明の一実施例に係るエレベータ
の主索取替工法の終了に近い段階を示す第1図相当図、
第10図は釣合おもりへの導板の設置状況を示す第1図
とは異なる実施例の説明図、第11図〜第13図は従来
のエレベータの主索取替工法を作業手順に従って示す第
1図相当図である。 (1)・・・かご、 (3)−・・最上階、(4)・・
・釣合おもり(10)・・・旧主索、 (14)−・・
上端切断点、 (17)−・・下端切断点、 (1B)
−・・新事案、 (19)・・・第1機械室。 (20)・・・巻上機、(21)・・・綱車、 (22
)・・・そらせ車。 (23)・・・昇降路、 (27)・・・第2機械室、
 (29)・・・かご吊上げ用治具、 (34)−・・
ロープ固定治具。 (46)−・・中間切断点、 (47)−・・新事索繰
出し機(51)−・・旧主索巻取り機 なお各図中、同一符号は同−又は相当部分を示すものと
する。
FIG. 1 is a vertical cross-sectional view of a hoistway showing the initial stage of an elevator main cable replacement method according to an embodiment of the present invention, and FIG.
II-II line enlarged cross-sectional view of the figure, Figure 3 is II of Figure 2.
I-III enlarged line sectional view Figure 4 is a perspective view of the heel lifting jig, Figure 5 is an exploded perspective view of the rope fixing jig, Figure 6 is an exploded perspective view of the rope fixing jig.
The figure is a perspective view showing details of the rope fixing part in Fig. 5, Fig. 7 is a view corresponding to Fig. 1 showing an intermediate stage of the main rope replacement method for an elevator according to an embodiment of the present invention, and Fig. 7 is a detailed view of part ■, and FIG. 9 is a view corresponding to FIG.
Fig. 10 is an explanatory diagram of an embodiment different from Fig. 1 showing the installation situation of the guide plate on the counterweight, and Figs. 11 to 13 are diagrams showing the conventional elevator main rope replacement method according to the work procedure. This is a diagram equivalent to Figure 1. (1)...Basket, (3)-...Top floor, (4)...
・Counterweight (10)...Old main rope, (14)-...
Upper end cutting point, (17) - lower end cutting point, (1B)
-...New case, (19)...1st machine room. (20)...Hoisting machine, (21)...Sheave, (22)
)...Deflect car. (23)...Hoistway, (27)...Second machine room,
(29)... Car lifting jig, (34)...
Rope fixing jig. (46) --- Intermediate cutting point, (47) --- Shinji cable unwinding machine (51) --- Former main rope winding machine In each figure, the same reference numerals indicate the same or equivalent parts. do.

Claims (2)

【特許請求の範囲】[Claims] (1)最上階又はこれに近い階を新主索繰出し階として
設定するとともに、最下階又はこれに近い階を旧主索巻
取り階として設定し、次いでかご上での運転により、か
ご又は釣合おもりのうちの上方昇降体の上端を新主索繰
出し階の床面にほぼ一致させて停止させるとともに、か
ご又は釣合おもりのうちの下方昇降体および上記上方昇
降体をそれぞれ位置固定し、次いで下方昇降体側の旧主
索を、上方昇降体の上端とほぼ同一の高さ位置に固設さ
れたロープ固定治具に固定するとともに、この固定部上
方の中間切断点で切断し、次いで旧主索を、上方昇降体
直上の上端切断点で切断するとともに、この切断部に、
新主索繰出し階に設置された新主索繰出し機から引出し
た新主索の先端を連結し、次いで旧主索の上記両切断点
の間の部分を、機械室に引上げて新主索を巻上機の綱車
およびそらせ車に巻掛け、その先端を旧主索の上記ロー
プ固定治具上方部分に連結し、次いで旧主索を、下方昇
降体直上の下端切断点で切断するとともに、旧主索のロ
ープ固定治具による固定を解除し、次いで上記旧主索巻
取り階に設置された旧主索巻取り機で旧主索を巻取って
新主索の先端を下方昇降体位置まで導びき、次いで、新
主索の両端を上記昇降体に連結することを特徴とするエ
レベータの主索取替工法。
(1) Set the top floor or a floor close to this as the new main cable unwinding floor, and set the bottom floor or a floor close to this as the old main cable winding floor. The upper end of the upper elevating body of the counterweight is brought to a stop almost in line with the floor surface of the new main cable payout floor, and the lower elevating body of the car or counterweight and the above-mentioned upper elevating body are each fixed in position. Next, the old main rope on the lower lifting body side was fixed to a rope fixing jig fixed at a position approximately at the same height as the upper end of the upper lifting body, and was cut at an intermediate cutting point above this fixed part. Cut the old main rope at the upper end cut point directly above the upper elevating body, and at this cut point,
Connect the tips of the new main rope pulled out from the new main rope pay-out machine installed on the new main rope pay-out floor, then pull the part of the old main rope between the above two cutting points into the machine room and install the new main rope. Wrap it around the sheave and deflection wheel of the hoisting machine, connect its tip to the upper part of the rope fixing jig of the old main rope, and then cut the old main rope at the lower end cutting point directly above the lower lifting body, The fixation of the old main rope with the rope fixing jig is released, and then the old main rope is wound up with the old main rope winding machine installed on the old main rope winding floor mentioned above, and the tip of the new main rope is moved downward to the position of the elevator. A method for replacing an elevator main rope, the method comprising: guiding the new main rope up to the point where the new main rope is connected, and then connecting both ends of the new main rope to the elevating body.
(2)上方昇降体はかごであり、下方昇降体は釣合おも
りであることを特徴とする特許請求の範囲第1項記載の
エレベーターの主索取替工法。
(2) The method for replacing the main rope of an elevator according to claim 1, wherein the upper elevating body is a car and the lower elevating body is a counterweight.
JP11512187A 1987-05-12 1987-05-12 Method fo main cable replacing construction of elevator Granted JPS63282081A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11512187A JPS63282081A (en) 1987-05-12 1987-05-12 Method fo main cable replacing construction of elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11512187A JPS63282081A (en) 1987-05-12 1987-05-12 Method fo main cable replacing construction of elevator

Publications (2)

Publication Number Publication Date
JPS63282081A true JPS63282081A (en) 1988-11-18
JPH0530753B2 JPH0530753B2 (en) 1993-05-10

Family

ID=14654776

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11512187A Granted JPS63282081A (en) 1987-05-12 1987-05-12 Method fo main cable replacing construction of elevator

Country Status (1)

Country Link
JP (1) JPS63282081A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01181689A (en) * 1988-01-12 1989-07-19 Hitachi Elevator Eng & Service Co Ltd Lift rope replacing method
JPH03106780A (en) * 1989-09-19 1991-05-07 Hitachi Elevator Eng & Service Co Ltd Main rope exchange method for elevator
JP2003104651A (en) * 2001-09-28 2003-04-09 Toshiba Elevator Co Ltd Fixing method and holding device for main rope

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01181689A (en) * 1988-01-12 1989-07-19 Hitachi Elevator Eng & Service Co Ltd Lift rope replacing method
JPH03106780A (en) * 1989-09-19 1991-05-07 Hitachi Elevator Eng & Service Co Ltd Main rope exchange method for elevator
JP2003104651A (en) * 2001-09-28 2003-04-09 Toshiba Elevator Co Ltd Fixing method and holding device for main rope

Also Published As

Publication number Publication date
JPH0530753B2 (en) 1993-05-10

Similar Documents

Publication Publication Date Title
JPS63282081A (en) Method fo main cable replacing construction of elevator
JP4089986B2 (en) Hydraulic rope main rope replacement method
JP3277486B2 (en) Existing main rope winding device of the elevator
JP2839970B2 (en) Elevator main cable replacement method
JP2001302139A (en) Rope wrapping method for elevator
JP3340322B2 (en) Elevator main cable entanglement prevention device
JPH0791012B2 (en) Driving method of elevator main rope
JPH0361276A (en) Main rope replacing auxiliary device
JP2912989B2 (en) Main rope hanging method of elevator
JP3020325B2 (en) Elevator main cable replacement method
JP2815251B2 (en) Elevator main cable replacement method
JPH0818774B2 (en) How to change the elevator main rope
JPS63282079A (en) Method of main cable replacing construction of elevator
JPS63282082A (en) Method fo main cable replacing construction of elevator
JPH01181689A (en) Lift rope replacing method
JPH0530755B2 (en)
WO2024069711A1 (en) Elevator main cable replacement method and replacement assisting tool
JP2849281B2 (en) Elevator main cable replacement method
JP2603730B2 (en) How to change the elevator main rope
JP2654409B2 (en) Elevator main cable replacement method
JP2003128367A (en) Rope extension method at climbing of lifting device and its auxiliary device
JPH10203751A (en) Main rope replacing method of 2:1 roping elevator and device thereof
JPH08133634A (en) Jumping method for jump-up elevator
JPS63277187A (en) Method of renewing main rope for elevator
JP3020337B2 (en) Elevator main cable replacement method