JP7277876B2 - 建設物の施工管理装置 - Google Patents
建設物の施工管理装置 Download PDFInfo
- Publication number
- JP7277876B2 JP7277876B2 JP2019136276A JP2019136276A JP7277876B2 JP 7277876 B2 JP7277876 B2 JP 7277876B2 JP 2019136276 A JP2019136276 A JP 2019136276A JP 2019136276 A JP2019136276 A JP 2019136276A JP 7277876 B2 JP7277876 B2 JP 7277876B2
- Authority
- JP
- Japan
- Prior art keywords
- construction
- model
- building
- dimensional
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009430 construction management Methods 0.000 title claims description 43
- 238000000034 method Methods 0.000 claims description 298
- 230000008569 process Effects 0.000 claims description 281
- 238000010276 construction Methods 0.000 claims description 201
- 238000013461 design Methods 0.000 claims description 160
- 239000000463 material Substances 0.000 claims description 125
- 238000004088 simulation Methods 0.000 claims description 79
- 238000013500 data storage Methods 0.000 claims description 54
- 238000007726 management method Methods 0.000 claims description 22
- 238000009434 installation Methods 0.000 claims description 14
- 238000012937 correction Methods 0.000 claims description 13
- 238000009415 formwork Methods 0.000 claims description 9
- 238000009435 building construction Methods 0.000 claims description 8
- 238000003860 storage Methods 0.000 claims description 8
- 230000006870 function Effects 0.000 description 31
- 238000012552 review Methods 0.000 description 14
- 230000006872 improvement Effects 0.000 description 9
- 238000012545 processing Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 6
- 238000011156 evaluation Methods 0.000 description 4
- 238000004891 communication Methods 0.000 description 3
- 230000003542 behavioural effect Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 239000003086 colorant Substances 0.000 description 2
- 239000004035 construction material Substances 0.000 description 2
- 230000001186 cumulative effect Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 238000012384 transportation and delivery Methods 0.000 description 2
- 238000004590 computer program Methods 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 230000010365 information processing Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000011867 re-evaluation Methods 0.000 description 1
- 238000005215 recombination Methods 0.000 description 1
- 230000006798 recombination Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
11 3次元設計データ記憶部
12 工程データ記憶部
13 4次元シミュレート部
14 施工紐付け部
15 仮設材モデル作成部
16 4次元シミュレーション表示部
17 簡易工程調整部
18 3次元設計モデル作成部
19 工程データ作成部
30 建設物(建設物の3次元設計モデル)
31 仮設材のモデル
32 部材ステータス
33 工程項目
Claims (6)
- 三次元モデル解析プログラムを用いて建設物の施工を管理する建設物の施工管理装置であって、
3次元CADプログラムを用いて作成された建設物の3次元設計モデルの設計データを記憶する3次元設計データ記憶部と、CCPM機能を備える工程管理プログラムを用いて作成された建設物を建設する際の工程データを記憶する工程データ記憶部と、前記3次元設計データ記憶部及び前記工程データ記憶部に記憶されているデータから、建設物の施工状況を4次元シミュレートする4次元シミュレート部とを含んでおり、
該4次元シミュレート部は、前記3次元設計データ記憶部に記憶された建設物の前記3次元設計モデルの所定の部位の設計データ及び足場、型枠等の仮設材のモデルのデータと、前記工程データ記憶部に記憶された建設物の所定の部位を建設する際の工程データとを関連付けして、建設物の所定の部位の施工の開始から終了までの施工状況が画面上に明示されるように紐付けする施工紐付け部と、建設物の所定の部位を建設する際に用いられる前記足場、型枠等の仮設材のモデルを作成可能な仮設材モデル作成部と、建設物の所定の部位の施工の開始から終了までの施工状況を画面上に表示させる4次元シミュレーション表示部とを備えており、
前記仮設材モデル作成部では、前記足場、型枠等の仮設材のモデルは、前記4次元シミュレート部に取り込まれた建設物の3次元設計モデルを、画面上で2次元表示させることによって得られた2次元平面図面上において、仮設材の設置エリアを指定し、その高さを与えることで、ボリュームと設置位置が指定されただけの簡易部材として3次元モデル化されるようになっており、
前記4次元シミュレーション表示部は、時間軸の進行に伴って、建設物の所定の部位の施工状況を、作成した前記仮設材のモデルと共に画面上にシミュレート表示できるようになっており、シミュレート表示された前記仮設材のモデルを含む建設物の所定の部位の施工状況を見て、前記工程データ記憶部から取り込んだ工程データの見直しを行えるようにする建設物の施工管理装置。 - 前記4次元シミュレート部は、前記工程データ記憶部から取り込んだ工程データを修正可能な、CCPM機能を備えていないプログラムによる簡易工程調整部を備えており、該簡易工程調整部において、前記工程データ記憶部から取り込んだ工程データの見直しを行えるようなっており、前記施工紐付け部は、建設物の前記3次元設計モデルの所定の部位の設計データ及び作成した前記仮設材のモデルのデータと、前記簡易工程調整部で見直された工程データとを関連付けして、建設物の所定の部位の施工の開始から終了までの見直された施工状況が画面上に明示されるように紐付けする請求項1記載の建設物の施工管理装置。
- 前記施工紐付け部は、工程・ステータス紐付け部を備えており、該工程・ステータス紐付け部は、建設物の所定の部位を建設する際の工程データを構成する工程項目毎に、工程期間中の部材ステータスと工程期間経過後の部材ステータスとを設定して、紐付けするようになっている請求項1又は2記載の建設物の施工管理装置。
- 前記施工紐付け部は、工程・モデル紐付け部を備えており、該工程・モデル紐付け部は、建設物の前記3次元設計モデルの所定の部位の設計データ及び作成した前記仮設材のモデル毎に、一又は複数の工程項目の割り当てを実施する請求項3記載の建設物の施工管理装置。
- 3次元CADプログラムを用いて建設物の前記3次元設計モデルの設計データを作成する、3次元設計モデル作成部を備えており、該3次元設計モデル作成部は、作成した建設物の前記3次元設計モデルの設計データを前記3次元設計データ記憶部に記憶させるようになっていると共に、作成した建設物の前記3次元設計モデルを修正した、建設物の3次元修正設計モデルを作成できるようになっている請求項1~4のいずれか1項記載の建設物の施工管理装置。
- CCPM機能を備える工程管理プログラムを用いて建設物を建設する際の工程データを作成する、工程データ作成部を備えており、該工程データ作成部は、作成した工程データを前記工程データ記憶部に記憶させるようになっていると共に、前記4次元シミュレート部の前記簡易工程調整部によって見直された工程データから、CCPM機能を備える工程管理プログラムによって、建設物を建設する際の修正工程データを作成できるようになっている請求項2記載の建設物の施工管理装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019136276A JP7277876B2 (ja) | 2019-07-24 | 2019-07-24 | 建設物の施工管理装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019136276A JP7277876B2 (ja) | 2019-07-24 | 2019-07-24 | 建設物の施工管理装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2021021983A JP2021021983A (ja) | 2021-02-18 |
JP7277876B2 true JP7277876B2 (ja) | 2023-05-19 |
Family
ID=74573873
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2019136276A Active JP7277876B2 (ja) | 2019-07-24 | 2019-07-24 | 建設物の施工管理装置 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7277876B2 (ja) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2022191830A (ja) * | 2021-06-16 | 2022-12-28 | G.I.E株式会社 | 工程管理システム |
KR20230064681A (ko) * | 2021-11-03 | 2023-05-11 | 우송대학교 산학협력단 | Bim 기반 철도 인프라 사업 설계 성과품 납품관리 시스템 |
KR20230064682A (ko) * | 2021-11-03 | 2023-05-11 | 우송대학교 산학협력단 | Bim 기반 철도 인프라 사업 시공 정보 관리 시스템 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001167137A (ja) | 1999-12-06 | 2001-06-22 | Daisan Chubu:Kk | 仮設材配置図面作成装置及び記録媒体 |
JP2005050098A (ja) | 2003-07-28 | 2005-02-24 | Takenaka Komuten Co Ltd | 施工プロセス可視化方法 |
JP2010108321A (ja) | 2008-10-31 | 2010-05-13 | Hitachi-Ge Nuclear Energy Ltd | 建設状況可視化システム |
JP2011095917A (ja) | 2009-10-28 | 2011-05-12 | Being:Kk | プロジェクト進捗管理装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06332989A (ja) * | 1993-05-21 | 1994-12-02 | Toda Constr Co Ltd | 総合仮設計画図の自動作成方法 |
-
2019
- 2019-07-24 JP JP2019136276A patent/JP7277876B2/ja active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001167137A (ja) | 1999-12-06 | 2001-06-22 | Daisan Chubu:Kk | 仮設材配置図面作成装置及び記録媒体 |
JP2005050098A (ja) | 2003-07-28 | 2005-02-24 | Takenaka Komuten Co Ltd | 施工プロセス可視化方法 |
JP2010108321A (ja) | 2008-10-31 | 2010-05-13 | Hitachi-Ge Nuclear Energy Ltd | 建設状況可視化システム |
JP2011095917A (ja) | 2009-10-28 | 2011-05-12 | Being:Kk | プロジェクト進捗管理装置 |
Also Published As
Publication number | Publication date |
---|---|
JP2021021983A (ja) | 2021-02-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Logothetis et al. | Building information modelling for cultural heritage: a review | |
JP7277876B2 (ja) | 建設物の施工管理装置 | |
Elbeltagi et al. | Integrated visualized time control system for repetitive construction projects | |
Aram et al. | Requirements for BIM platforms in the concrete reinforcement supply chain | |
Zhong et al. | Geographic information system-based visual simulation methodology and its application in concrete dam construction processes | |
Kushwaha | Contribution of building information modeling (BIM) to solve problems in architecture, engineering and construction (AEC) industry and addressing barriers to implementation of BIM | |
Issa et al. | Benefits of 3D and 4D models for facility managers and AEC service providers | |
Shi et al. | 5D BIM applications in quantity surveying: dynamo and 3D printing technologies | |
Habte et al. | Application of BIM for structural engineering: a case study using Revit and customary structural analysis and design software. | |
EP1915657A2 (en) | System and process for the detailed design and production of reinforcement for buildings | |
Hadi et al. | Integrity of Revit with structural analysis softwares | |
Hosny et al. | Reducing Reinforced Concrete Materials Waste in Construction Projects Using Building Information Modeling in Egypt. | |
Ko et al. | Enhancing submittal review and construction inspection in public projects | |
Abdelmegid et al. | Establishing a link between the last planner system and simulation: A conceptual framework | |
Fischer | Benefits of 4D models for facility owners and AEC service providers | |
Naik et al. | GIS based 4D model development for planning and scheduling of a construction project | |
Tirunagari et al. | Simulation of construction sequence using BIM 4D techniques | |
KR20110109710A (ko) | 3차원 공정 모니터링 시스템 및 방법 | |
JP7487871B2 (ja) | 建設物の施工管理装置 | |
Sampaio et al. | Construction planning supported in 4D interactive virtual models | |
Piselia | 4D BIM implementation to improve EPC project performance from contractor’s perspective. A case study | |
JP5414601B2 (ja) | 施工計画作成装置およびプログラム | |
Ko et al. | Lean concurrent submittal review systems | |
Joseph et al. | Application of Building Information Modeling for an Institutional Building | |
Bovteev et al. | Applying of 4D modeling at preparation and construction stages |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20211129 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20221007 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20221018 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20221207 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20230404 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20230424 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7277876 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |