JP6867904B2 - 軌道評価システム及び軌道評価方法 - Google Patents
軌道評価システム及び軌道評価方法 Download PDFInfo
- Publication number
- JP6867904B2 JP6867904B2 JP2017135602A JP2017135602A JP6867904B2 JP 6867904 B2 JP6867904 B2 JP 6867904B2 JP 2017135602 A JP2017135602 A JP 2017135602A JP 2017135602 A JP2017135602 A JP 2017135602A JP 6867904 B2 JP6867904 B2 JP 6867904B2
- Authority
- JP
- Japan
- Prior art keywords
- displacement
- evaluation
- height
- track
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000011156 evaluation Methods 0.000 title claims description 110
- 238000006073 displacement reaction Methods 0.000 claims description 122
- 238000010276 construction Methods 0.000 claims description 50
- 238000012423 maintenance Methods 0.000 claims description 46
- 238000000034 method Methods 0.000 claims description 25
- 238000007596 consolidation process Methods 0.000 claims description 23
- 230000008859 change Effects 0.000 claims description 22
- 238000012937 correction Methods 0.000 claims description 8
- 238000004458 analytical method Methods 0.000 claims description 6
- 238000005259 measurement Methods 0.000 description 34
- 230000008569 process Effects 0.000 description 10
- 238000004364 calculation method Methods 0.000 description 5
- 238000013500 data storage Methods 0.000 description 5
- 238000012545 processing Methods 0.000 description 5
- 238000012854 evaluation process Methods 0.000 description 3
- 238000009472 formulation Methods 0.000 description 3
- 238000012886 linear function Methods 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 238000012806 monitoring device Methods 0.000 description 3
- 230000001133 acceleration Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Images
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Description
保守工事等で道床のつき固めを行った場合、理論式(1)にも示されるように、道床には初期の段階で比較的に大きな高低変位が生じ、その後、緩やかな高低変位が継続することが多い。
従来、鉄道会社においては、軌道の保守工事を行ったときに、施工直後のレールの弦高低変位を計測し、その後、一定の期間(例えば2か月)を開けて、再度、レールの弦高低変位を計測し、これらの計測値に基づいて軌道及び保守工事の評価を行っている。
しかしながら、上記従来のように、単に、軌道の保守工事の施工直後と所定期間後にレールの弦高低変位を計測しただけでは、軌道の高低変位の傾向を正確に把握することは難しい。なせなら、先に述べたように、軌道の高低変位は、保守工事の直後に比較的に大きな初期沈下が生じ、その後に緩やかな高低変位が継続するといった特徴を有する。このため、初期沈下の期間と、その後の緩やかな高低変位の期間とを切り分けることができないと、高低変位の傾向を正確に把握することができない。
本発明は、軌道又はその保守工事を正確に評価し、軌道のメンテナンスの高効率化に寄与できる軌道評価システム又は軌道評価方法を提供することを目的とする。
鉄道車両に搭載された計測装置により走行中に計測されたレールの高さ情報に基づいて複数時点における評価対象区間のレールの弦高低変位の値を含んだ軌道変位情報を生成する情報生成部と、
前記情報生成部により生成された前記軌道変位情報に下記変位理論式(A)がフィッティングするようにパラメータα、β、γ、δを求める分析部と、
前記分析部でフィッティングされた変位理論式(A)を用いて前記評価対象区間の軌道の評価値を計算する評価部と、
を備えることを特徴とする軌道評価システムである。
この構成によれば、最も弦高低変位が大きくなる代表箇所について軌道の評価を行うことができる。
この構成によれば、初期沈下後の弦高低変位の変化量により、その後の弦高低変位の傾向を予測することができる。さらに、初期沈下量のデータにより、総合的な高低変位量の推移を把握することができる。これらにより、軌道及び保守工事の正確な評価を行うことができ、効率的なメンテナンスの策定に寄与することができる。
保守工事情報を取得する情報取得部を備え、
前記評価部は、計算された評価値に基づいて、評価対象区間で施工された保守工事の評価を行うように構成してもよい。
この構成によれば、保守工事の評価により、評価対象区間の軌道に対して、施工された保守工事が効果的であったか否かを判断でき、この判断結果により、その後の効率的なメンテナンス計画の策定に寄与することができる。
鉄道車両に搭載された計測装置により走行中に計測されたレールの高さ情報を蓄積し、
蓄積された前記レールの高さ情報に基づいて複数時点における評価対象区間のレールの弦高低変位の値を含んだ軌道変位情報を生成し、
変位理論式(A)のパラメータα、β、γ、δの初期値及び前記パラメータα、β、γの制約条件を定めて、生成された前記軌道変位情報に下記変位理論式(A)がフィッティングするように一般化簡約勾配法を用いてパラメータα、β、γ、δを求め、
フィッティングされた変位理論式(A)を用いて前記評価対象区間の軌道の評価値を計算する。
続いて、軌道評価システム1において実行される評価処理について説明する。図2は、CPUにより実行される評価処理の手順を示すフローチャートである。図3は、図2のステップS14の変位理論式フィッティング処理の詳細な手順を示すフローチャートである。
評価処理が開始されると、まず、CPU10は、記憶装置15に格納された保守工事実績データから、保守工事の行われた区間を評価対象区間に設定する(ステップS11)。ここでは、複数の評価対象区間が設定されてもよい。次に、CPU10は、計測データ格納部151に格納された計測データから評価対象区間のデータを抽出する(ステップS12)。さらに、CPU10は、評価対象区間のうち代表箇所の10m弦高低変位を収集する(ステップS13)。代表箇所とは、評価対象区間のうち、最大の高低変位を有する箇所であり、CPU10が計測データに基づいて判断する。ステップS11〜S13の処理を実行するCPU10が、本発明に係る情報生成部の一例に相当する。
パラメータαは、道床の圧密性を示すパラメータであり、全体的な高低変化に対する指数関数的な変化の影響度を表わす。指数関数的な変化は施工後初期の段階で生じ、指数関数的な高低変位が支配的に表われる期間が、初期沈下(圧密過程)の期間に相当する。一般に、施工後の初期沈下が続く期間は14日程度であることが多いため、x=14のときの指数関数項の影響度合い(exp(−α・14))が、施工直後における指数関数項の影響度合いの1割(exp(0)×0.1)となるようにパラメータαの初期値α0を計算する。すなわち、exp(−α・14)=0.1となるように、初期値α0が、次式(3)のように計算される。
先ず、パラメータαについては、初期沈下(圧密過程)は日数の経過に伴って収束すると仮定されるため、α<0は考慮しないでよい。このため式(8)の条件が適用される。一方、本実施形態では、最も高頻度に計測が行われたとしても、1日に1回の計測となることを想定している。このため、1日未満で初期沈下が終了した場合には、初期沈下を評価できず、初期沈下がなかったものと見なされる。したがって、x=1における指数関数項の影響度合い(exp(α×1))が、施工直後の1割以下(exp(0)×0.1)となるαを上限とした。このため、式(9)の条件を適用できる。その結果、式(10)の制約条件が採用される。
図6は、評価値の一覧表の例を示す図である。ステップS15で計算される評価値には、図6に示されるように、初期沈下日数、初期沈下量[mm]、施工前変化量[mm/100日]、施工後変化量[mm/100日]、施工前変化量[mm/百万トン]、施工後変化量[mm/百万トン]などが含まれる。
さらに、本実施形態の軌道評価システム1及び軌道評価方法によれば、求められた変位理論式に基づいて、軌道の高低変位に関する評価値が計算されるので、この評価値を用いて軌道の効率的なメンテナンスの策定を行うことができる。
10 CPU
14 インタフェース
15 記憶装置
151 計測データ格納部
152 保守工事施工実績データ格納部
153 評価処理プログラム
101 計測デバイス
102 計測装置
181 レール
182 枕木
183 道床
Claims (5)
- 鉄道車両に搭載された計測装置により走行中に計測されたレールの高さ情報に基づいて複数時点における評価対象区間のレールの弦高低変位の値を含んだ軌道変位情報を生成する情報生成部と、
前記情報生成部により生成された前記軌道変位情報に下記変位理論式(A)がフィッティングするようにパラメータα、β、γ、δを求める分析部と、
前記分析部でフィッティングされた変位理論式(A)を用いて前記評価対象区間の軌道の評価値を計算する評価部と、
を備えることを特徴とする軌道評価システム。 - 前記情報生成部は、前記評価対象区間で計測されたレールの高さ情報から、レールの弦高低変位が最も大きい代表箇所を求め、前記評価対象区間の軌道変位情報として複数時点における前記代表箇所のレールの弦高低変位の値を計算することを特徴とする請求項1記載の軌道評価システム。
- 前記評価部が計算する評価値には、軌道の保守工事後の初期沈下量と、初期沈下後の弦高低変位の変化量とが含まれることを特徴とする請求項1又は請求項2に記載の軌道評価システム。
- 保守工事情報を取得する情報取得部を備え、
前記評価部は、計算された評価値に基づいて、評価対象区間で施工された保守工事の評価を行うことを特徴とする請求項1から請求項3のいずれか一項に記載の軌道評価システム。 - 鉄道車両に搭載された計測装置により走行中に計測されたレールの高さ情報を蓄積し、
蓄積された前記レールの高さ情報に基づいて複数時点における評価対象区間のレールの弦高低変位の値を含んだ軌道変位情報を生成し、
変位理論式(A)のパラメータα、β、γ、δの初期値及び前記パラメータα、β、γの制約条件を定めて、生成された前記軌道変位情報に下記変位理論式(A)がフィッティングするように一般化簡約勾配法を用いてパラメータα、β、γ、δを求め、
フィッティングされた変位理論式(A)を用いて前記評価対象区間の軌道の評価値を計算することを特徴とする軌道評価方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017135602A JP6867904B2 (ja) | 2017-07-11 | 2017-07-11 | 軌道評価システム及び軌道評価方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017135602A JP6867904B2 (ja) | 2017-07-11 | 2017-07-11 | 軌道評価システム及び軌道評価方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2019019454A JP2019019454A (ja) | 2019-02-07 |
JP6867904B2 true JP6867904B2 (ja) | 2021-05-12 |
Family
ID=65352782
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2017135602A Active JP6867904B2 (ja) | 2017-07-11 | 2017-07-11 | 軌道評価システム及び軌道評価方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6867904B2 (ja) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7195221B2 (ja) * | 2019-06-17 | 2022-12-23 | 公益財団法人鉄道総合技術研究所 | バラスト軌道におけるレール座屈の発生箇所の予測方法、そのプログラム及び予測システム |
AU2020482144A1 (en) * | 2020-12-15 | 2023-06-29 | Kawasaki Railcar Manufacturing Co., Ltd. | Track state monitoring device, track state monitoring system and track state monitoring method |
CN113609565B (zh) * | 2021-08-16 | 2024-04-16 | 中国铁道科学研究院集团有限公司 | 铁路桥梁轨道静态长波不平顺的验收方法及装置 |
CN114987583A (zh) * | 2022-05-18 | 2022-09-02 | 中国铁道科学研究院集团有限公司 | 一种钢轨大修预测方法、装置、电子设备和存储介质 |
CN116127631B (zh) * | 2022-12-21 | 2023-10-03 | 西南交通大学 | 一种数据物理融合下的高速铁路轨道多目标精调方法 |
CN115791456B (zh) * | 2023-02-06 | 2023-04-25 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | 一种铁路有砟轨道刚度评价方法 |
CN117875139A (zh) * | 2024-03-13 | 2024-04-12 | 中南大学 | 无砟轨道多尺度损伤演变分析方法及系统 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH630015A5 (fr) * | 1979-03-06 | 1982-05-28 | Speno International | Dispositif de mesure des deformations ondulatoires de la surface de roulement des rails d'une voie ferree. |
JPH11301478A (ja) * | 1998-04-23 | 1999-11-02 | Central Japan Railway Co | 軌道管理システム |
JP2000257005A (ja) * | 1999-03-04 | 2000-09-19 | West Japan Railway Co | 線路管理支援システム |
JP5382991B2 (ja) * | 2006-12-11 | 2014-01-08 | 三菱重工業株式会社 | 軌道系交通システムの異常診断方法及び異常診断システム |
JP2011252745A (ja) * | 2010-06-01 | 2011-12-15 | Railway Technical Research Institute | 走行路面形状測定データの処理方法 |
JP6285147B2 (ja) * | 2013-10-30 | 2018-02-28 | 東海旅客鉄道株式会社 | 著大輪重発生位置特定装置、著大輪重発生位置特定方法 |
JP6663704B2 (ja) * | 2015-12-15 | 2020-03-13 | 三菱重工エンジニアリング株式会社 | 軌道修正要領生成装置、軌道修正要領生成システム、軌道修正要領生成方法及びプログラム |
JP6659477B2 (ja) * | 2016-06-14 | 2020-03-04 | 東海旅客鉄道株式会社 | 軌道整正装置、軌道整正方法 |
JP6628712B2 (ja) * | 2016-11-10 | 2020-01-15 | 公益財団法人鉄道総合技術研究所 | 時系列データの逐次更新予測判定方法及び逐次更新予測判定システム |
-
2017
- 2017-07-11 JP JP2017135602A patent/JP6867904B2/ja active Active
Also Published As
Publication number | Publication date |
---|---|
JP2019019454A (ja) | 2019-02-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6867904B2 (ja) | 軌道評価システム及び軌道評価方法 | |
Kwon et al. | Bridge fatigue reliability assessment using probability density functions of equivalent stress range based on field monitoring data | |
JP6540883B2 (ja) | 軌道状態評価方法、装置、及びプログラム | |
US20220355839A1 (en) | Monitoring, predicting and maintaining the condition of railroad elements with digital twins | |
CN101408951B (zh) | 基于神经网络的桥式起重机当量载荷谱获取及疲劳剩余寿命估算方法 | |
Qian et al. | Railroad infrastructure 4.0: Development and application of an automatic ballast support condition assessment system | |
JP2016194442A (ja) | 鉄道橋固有振動数の変化量評価方法 | |
Rhayma et al. | A probabilistic approach for estimating the behavior of railway tracks | |
Zhou et al. | Prediction of the coexistence of rail head check initiation and wear growth | |
Nagy | Description of rail track geometry deterioration process in Hungarian rail lines No. 1 and No. 140 | |
CN110254478B (zh) | 路基变形病害识别方法及装置 | |
JP6628712B2 (ja) | 時系列データの逐次更新予測判定方法及び逐次更新予測判定システム | |
JP6894319B2 (ja) | ボルト緩み検査装置 | |
JP2006317413A (ja) | 車輌通行構造の保全システム、及び、車輌通行構造の保全方法 | |
Mandal | FEA to assess plastic deformation of railhead material damage of insulated rail joints with fibreglass and nylon endposts | |
Thompson et al. | Predictive maintenance approaches based on continuous monitoring systems at Rio Tinto | |
Mallor et al. | Propagation of uncertainty in fatigue crack growth for probabilistic life estimation | |
KR101993366B1 (ko) | 건설현장의 온실가스 발생추이 예측/경고시스템 및 그 방법 | |
Grabowski et al. | Fatigue lifetime correction of structural joints of opencast mining machinery | |
Silva et al. | Traffic monitoring using a structural health monitoring system | |
Crognale et al. | An integrated vibration-image procedure for damage identification in steel trusses | |
Ceravolo et al. | Symptom-based reliability and generalized repairing cost in monitored bridges | |
Costello et al. | Stochastic rail wear model for railroad tracks | |
Gubskyi et al. | Integrated approach to determine operational integrity of crane metal structure | |
Fletcher et al. | Rough surface rolling contact fatigue crack stress intensity factor calculation for modern rail steels |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20200511 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20210325 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20210406 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20210409 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6867904 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |