JP6559997B2 - パイプルーフ工法 - Google Patents
パイプルーフ工法 Download PDFInfo
- Publication number
- JP6559997B2 JP6559997B2 JP2015070653A JP2015070653A JP6559997B2 JP 6559997 B2 JP6559997 B2 JP 6559997B2 JP 2015070653 A JP2015070653 A JP 2015070653A JP 2015070653 A JP2015070653 A JP 2015070653A JP 6559997 B2 JP6559997 B2 JP 6559997B2
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- tubular body
- tube
- succeeding
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
2 :先行管体
2a :後端部
20 :接合面
3 :後行管体
3a :前端部
30 :接合面
4 :雌継手
4a :雌側開先面
40 :雌側挿通孔
41 :雌側取付部
42 :雌側突出部
42a :面取り
5 :雄継手
5a :雄側開先面
50 :雄側挿通孔
51 :雄側取付部
52 :雄側突出部
6 :ピン部材
6a :軸芯部
6b :拡径部
6c :貫通孔
60 :係止部材
60a :螺合孔
61 :締結部材
62 :ワッシャ
62a :当接面
62b :係止面
63 :パッキン
7 :管体
70 :連結管体
71 :第1管体
72 :第2管体
73 :第3管体
75 :ジャンクション
8 :横坑
8a :開口部
80 :地中
81 :水道管
82 :道路
83 :立坑
84 :推進機
85 :掘削機
W :管周方向
X :推進方向
Y :高さ方向
Z :幅方向
Claims (5)
- 複数の管体を横方向に推進させて埋設するためのパイプルーフ工法であって、
推進方向の前方側に埋設される先行管体と、推進方向の後方側に埋設される後行管体とを、仮連結して地中に推進させる仮連結工程と、仮連結された前記先行管体と前記後行管体とを地中に埋設された状態で本連結する本連結工程とを備え、
前記仮連結工程では、前記先行管体の一部を地中に推進させた後に、前記先行管体及び前記後行管体の管周方向で、前記先行管体及び前記後行管体の上端及び下端から離間させた位置にのみ、板厚方向に貫通させるピン部材を設けることで、前記先行管体の後端部と、前記後行管体の前端部とを、前記ピン部材で接合して仮連結するとともに、
前記本連結工程では、前記先行管体と前記後行管体とを、仮連結したまま地中に推進させた後に、前記先行管体の後端部と、前記後行管体の前端部とを、溶接で接合して本連結すること
を特徴とするパイプルーフ工法。 - 前記仮連結工程では、前記先行管体の後端部と、前記後行管体の前端部とを、互いに重なり合わせて、板厚方向に貫通させて前記ピン部材を設けることで、仮連結すること
を特徴とする請求項1に記載のパイプルーフ工法。 - 前記仮連結工程では、前記先行管体の後端部に、前記後行管体の前端部を内挿することで、前記先行管体の後端部と、前記後行管体の前端部とを、互いに重なり合わせて、前記後行管体の内側から、板厚方向に貫通させて前記ピン部材を設けることで、仮連結すること
を特徴とする請求項1又は2に記載のパイプルーフ工法。 - 前記仮連結工程では、前記先行管体の後端部と、前記後行管体の前端部とを、互いに重なり合わせて、前記先行管体又は前記後行管体の内側から、前記先行管体又は前記後行管体の内面に沿って当接面を湾曲させたワッシャを挟んで、板厚方向に貫通させて前記ピン部材を設けることで、仮連結すること
を特徴とする請求項1〜3の何れか1項に記載のパイプルーフ工法。 - 前記本連結工程では、前記先行管体の後端部の接合面と、前記後行管体の前端部の接合面とを、前記先行管体又は前記後行管体の内側から、完全溶込み溶接で接合して本連結すること
を特徴とする請求項1〜4の何れか1項に記載のパイプルーフ工法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015070653A JP6559997B2 (ja) | 2015-03-31 | 2015-03-31 | パイプルーフ工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015070653A JP6559997B2 (ja) | 2015-03-31 | 2015-03-31 | パイプルーフ工法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2016191214A JP2016191214A (ja) | 2016-11-10 |
JP6559997B2 true JP6559997B2 (ja) | 2019-08-14 |
Family
ID=57246202
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2015070653A Active JP6559997B2 (ja) | 2015-03-31 | 2015-03-31 | パイプルーフ工法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6559997B2 (ja) |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6140993A (ja) * | 1984-07-31 | 1986-02-27 | 住友金属工業株式会社 | 水平鋼管矢板の押込み工法 |
JP2004100338A (ja) * | 2002-09-11 | 2004-04-02 | Nippon Steel Corp | 円形鋼管柱とh形断面梁の高力ボルト接合構造と接合金物 |
WO2007000561A1 (en) * | 2005-06-28 | 2007-01-04 | Ho, Jadeson, Cing, Bunn | Section coupling for piling work |
JP2011208373A (ja) * | 2010-03-29 | 2011-10-20 | Nippon Steel & Sumikin Metal Products Co Ltd | 鋼管杭の機械式継手構造 |
JP5762796B2 (ja) * | 2011-03-31 | 2015-08-12 | 日鐵住金建材株式会社 | パイプルーフ工法用鋼管の連結構造及び連結工法 |
-
2015
- 2015-03-31 JP JP2015070653A patent/JP6559997B2/ja active Active
Also Published As
Publication number | Publication date |
---|---|
JP2016191214A (ja) | 2016-11-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101324173B1 (ko) | 가이드 형강을 이용한 함체 추진공법 | |
JP5986429B2 (ja) | ケーソン及びその製造方法 | |
KR20100101940A (ko) | 비개착식 터널 굴착 방법 및 이에 사용되는 터널시공구조체 | |
KR101479267B1 (ko) | 터널 벽체를 선시공한 후 터널 내부를 굴착하는 비개착 터널 시공방법 | |
KR101126009B1 (ko) | 강관 폴의 접합 구조 및 이것에 의해 접합된 강관 폴 | |
JP4584068B2 (ja) | 地下道路の分岐部または合流部のためのトンネル構造の施工法 | |
KR101925828B1 (ko) | 마찰저감 지중구조물 압입 시스템 및 그를 이용한 시공방법 | |
JP6559997B2 (ja) | パイプルーフ工法 | |
JP4556737B2 (ja) | パイプルーフ工法に使用する鋼管の継手構造及びパイプルーフ工法の施工方法 | |
KR101133734B1 (ko) | 터널 비개착 시공방법 및 그 터널구조물 | |
JP6085240B2 (ja) | 芯材、及び、上側芯材撤去方法 | |
JP6559998B2 (ja) | パイプルーフ工法 | |
JP2017089105A (ja) | パイプルーフ材の一体化構造 | |
JP4672700B2 (ja) | 地下構造物の緊結方法 | |
KR101657880B1 (ko) | 지하 구조물 축조 방법 및 이에 따른 지하 구조물 | |
JP6542825B2 (ja) | 地下構造物の施工法 | |
JP6715164B2 (ja) | パイプルーフの施工方法 | |
JP5251478B2 (ja) | 鋼製セグメント | |
JP4243989B2 (ja) | 地下構造物の外殻構造 | |
JP2019138449A (ja) | 耐震管推進敷設工法および推進力伝達装置 | |
JP5161948B2 (ja) | 推進工法 | |
KR102191503B1 (ko) | 상부 및 하부 사각관을 이용한 비개착식 터널굴착공법 | |
JP2007303166A (ja) | ケーソン工法 | |
JP2011089372A (ja) | 連続地中壁芯杭のソケット型連結部材およびその連続地中壁芯杭のソケット型連結部材を用いた連続地中壁芯杭の撤去方法 | |
JP6997671B2 (ja) | 杭、杭の接合方法および上杭の撤去方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20180320 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20181126 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20181204 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20190204 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20190709 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20190718 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6559997 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |